mom-5 for tp phase-1 _ 3 works - 28 05 2014

3
MINUTES OF MEETING - NO 5 Project: TP Phase I & Phase III Venue: Park Centre, Technopark Project Office. Date : 28.05.2014 IN PRESENCE OF CLIENT M/s TECHNOPARK (TP) Mr.Madhavan Praveen Manager Projects Mr.Rahul Thambi Dy. Manager -Civil CONSULTANT M/s C R NARAYANA RAO (CRN) Mr.N.Raman Project Manager Mr.N.K.Manee Associate Vice President Mr.Purushothaman Sr.Architect Abbreviation : TPT :Techno Park Team - Client CRN : C.R.Narayana Rao – Architects& Consultants The points discussed in the meeting are as follows. SI NO. POINTS DISCUSSED ACTION BY TARGET DATE REMARKS Technopark-Phase I General : TPT informed CRN about positioning a project architect at Trivandrum for the TP project works for effective and close interaction and CRN replied that this matter will be discussed with CRN Director. 1. MLCP: Preliminary MLCP drawings (site plan, floor plans, section and area statement) prepared by CRN was presented to TPT/CRN Contractor Consultant Client - 1 -

Upload: dishku

Post on 14-Feb-2016

213 views

Category:

Documents


0 download

DESCRIPTION

minutes

TRANSCRIPT

Page 1: MOM-5 for TP Phase-1 _ 3 Works - 28 05 2014

MINUTES OF MEETING - NO 5Project: TP Phase I & Phase III Venue: Park Centre, Technopark Project Office.Date : 28.05.2014IN PRESENCE OF

CLIENT M/s TECHNOPARK (TP)Mr.Madhavan Praveen Manager ProjectsMr.Rahul Thambi Dy. Manager -CivilCONSULTANT M/s C R NARAYANA RAO (CRN)Mr.N.Raman Project ManagerMr.N.K.Manee Associate Vice PresidentMr.Purushothaman Sr.Architect

Abbreviation :

TPT :Techno Park Team - ClientCRN : C.R.Narayana Rao – Architects& Consultants

The points discussed in the meeting are as follows.

SI NO. POINTS DISCUSSED ACTION BY TARGET

DATEREMARKS

Technopark-Phase I

General :

TPT informed CRN about positioning a project architect at Trivandrum for the TP project works for effective and close interaction and CRN replied that this matter will be discussed with CRN Director.

1.

MLCP: Preliminary MLCP drawings

(site plan, floor plans, section and area statement) prepared by CRN was presented to TP team for review.

TP team confirmed that the drawings submitted would be reviewed with CEO and comments provided. ( This has since been conveyed by TP team to CRN vide mail dt.30.05.2014)

TPT/CRN

2. TPT informed CRN TP that CEO Info Contractor Consultant Client

- 1 -

Page 2: MOM-5 for TP Phase-1 _ 3 Works - 28 05 2014

Required the 3m clear height False ceiling for aesthetic look. CRN brought to the attention of TPT that most of the IT offices have false ceiling heights of around 2.7 m from FFL.If 3 M to be considered, then the HVAC load will increase considerably.But CRN architect informed that the False ceiling height 2.7m also will give the good aesthetic look.

3.

CRN also informed TPT that for IT office , 4 m height/floor would work efficiently against the suggested 4.2 m from TPT end.TPT to review with CEO and confirm the height requirement.

Info

4.

CRN further informed TPT about final requirement of the MLCP complex plus IT office in it as other services’ core can e finalized based on the requirements including sizing STP,UG sump etc. as a dedicated stand alone provisions.

TPT

Techno park – Phase III

1.

Phase III site plan drawing modified by CRN team post 14th May discussion was submitted and reviewed with TP team.

Info

2.

The minor modifications suggested by TP team to be incorporated by CRN and the revised site plan drawing to be sent (This has since been sent by CRN on 2.6.14)

CRN

3.

On the IV floor’s proposed interiors, CRN requested TP team to provide some basic requirements for the preparation of schematic level drawings.

TP team informed that the requirements would be furnished shortly after an internal review with CEO.

TPT

Minutes Prepared byCRN Site Team CC :To all participants

Contractor Consultant Client

- 2 -

Page 3: MOM-5 for TP Phase-1 _ 3 Works - 28 05 2014

CRN HO, Chennai

Contractor Consultant Client

- 3 -