OPERATING DATA REPORT
DOCKET NO 50-333DATE 8 Feb 1979
CO.\lPLETED IiY li . Zit fel tTELEPlf0NE (315) 342-3840
OPERATING STATUS
Fit: Patrick Notes1. Unit Name:
780101-7801312. Reporting Period:
24363. Licensed Thermal Power (51Wt):
8834. Nameplate Rating (Gross 51We):
8215. Design Electrical Rating (Net alWe):
8306. Slaximum Dependable Capacity (Gross alwe):
8007. 31aximum Dependable Capacity (Net SIWE):8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
NONE
NONE9. Power Level To Which Restricted. If Any (Net 51We):
10. Reasons For Restrictions,if An):
This 5!onth Yr.-to-Date Cumulatise
744 744 30817!!. Hours in Reporting Period
744 744 "Rn^ '12. Number Of Hours Reactor Was Critical
0 0 013. Reactor Reserve Shutdown llours
744 744 22031.114. Ilours Generator On-Line
0 0 015. Unit Reserve Shutdown llours16. Gross Thermal Energy Generated (alWII) , 1334928 435440761334928
451280 451280 1474615017. G oss Electrical Energy Generated (alwil)
437765 437765 1426379018. Net Electrical Energy Generated (51Wil)
100% 100% 71.st19. Unit Service Factor
100% 100% 71 ta20. Unit Asailability Factor
73.5% 73.5% 65.7%21. Unit Capacity Factor (Using SIDC Nett 71.7% 71.7% 56.4%22. Unit Capacity Factor (Using DER Net)
0 0 i n a a-23. Unit Forced Outage Rate24. Shutdowns Scheduled Oser Next 6 51onthsIType.Date,and Duration of Each):
Scheduled Snubber Inspection and blaintenance Outage In Lateblarch,1979 for a Period of 7 Days.
_
25. If Shnt Down At End Of Heport Period. Estimated Date of Startup:
26. Units in Test Status lPrior to Commerciat o erationl: Forecast Achiesedr
INITIA L CRITICA LITYINITIAL ELECTRICITYCOhl\lERCI AL OPER ATION
7902130098
..
,.
AV11( AGE il \ll.Y UNII POh!.It LEVI.L..
DOCKET NO.- 5
JAFNPPUNIT
8 Feb 1979D \TE
E. ZufeltC0\fPLETED HY
(315) 342-3840TELEPil0NE
J nuary, 1979M O N Til
.
DAY AVERAGE dally POhER LEVEL DAY AVER AGE 1).\ll.Y POhER I.EVELOt h,e-Net i ggyc.3c,,
I 17 582581
2 18 583
3 19 584_
4 20 585580
5 21 585
5806 22 585
S867 23 585
g 584 g
9 25 586
E10 26 587
11 _583 g
58''12 2s 525
58''33 29 599
58214 30 652584
15
58216
SUMMARY: Unit Operated At Approximately 73'6 of Rated Themal PowerDuring this Reporting Period. On January 28, Power wasReduced to Withdraw Control Rods for Flux Shaping and PowerIncrease.
I
,
1
-:,
'S0-333 -
DOCKET NO.UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAh!E
' , , , , :6 1-e b 1979DATE ,
1: . ZufeltJanuary, 1979 COMPLETED fly
REPORT MONTil TELEPilONE (315) 342-3840-
i1
ho Cause & Corrective,[g } .y Licensee , g,E, 3 Attion to
No. Date i Eg g jy5 Event gy gOH $= 5 35g Report er mu Prevent Recurrenceou<- g
tt
-* \
NONE
.
I 2 3 4
F: Forced Reason: Method: Exhibit G - Instructions
S: Scheduled A Equipment Failure (Explain) |-Manual for Preparation ot' Data
B. Maintenance of Test 2 Manual Scram. Entry Sheets fm I icensee
C Refueling 3-Automatic Scram. Event Report (1.1.R) File (NUREG-
D Regulatory Restriction 4-Other (Explain) 0161),
E Operator Training & 1.icense Examin 1
5F AdministrativeExhibit 1 Same SourceG-Operational Er ror (Explain)
(9/77) Il Other (Explain)
- - _ . _ _ - . - _ . _ _- . . _ _ _.__.. _
*.
.
POWER AUTHORITY OF THE STATE OF NEW YORKJAMES A. FITZPATRICK NUCLEAR POWER PLANT
NARRATIVE SUMMARY OF OPERATING EXPERIENCEJANUARY, 1979
The unit was in hold at approximately 600 MW duringthis reporting period due to failure of the e"A"Condensate Booster Pump. On January 28, 1979 thepump was placed in service and power was increasingin accordance with PCIOMR.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
Maintenance Summary -
.
T f. r_ T,n n a rt- 1070
W rk Request # Cause of Results of Action taken to RepairDate System How DetectedComponent # Malfunction Malfunction Preclude Time
Recurrence (Hours)12461
1-02-79 03 RPI-26-07 OPS Loose Connector Double Ind. Tightened Conn. 1.0
12510 Full In Ind.1-10-79 03 RPI-14-39 OPS Bad Probe Buffer At All Times Replaced G-33 16.0
12511 Full In/ Full Out1-10-79 03 RPI-10-43 OPS Bad Probe Buffer At All Times Replaced Q16SG-33 16.0
142 Dirty Cam Cleaned Cam1-18-79 06 06-LR-97 OPS Follower Erratic Alarm Follower 2.0
1228712-26-78 07 "A" RBM OPS Unknown Failed St-5R N/A 100.0
.
1238912-26-78 07 APRM/RBM GPS N/A N/A Setpoint Change 24.0
12574 Rep 1r ed Flow1-9-79 07 B APRM OPS Age /Use Wrong Setting Control Board 16.0
124971-12-79 07 SRM "D" I6C Loose Conn. Errctic Ind. Tightened Conn. 4.0
12655 Dryed Out1-17-79 07 LPRM 28-45 B OPS Moisture Downscale Cleaned Conn. 40.0
125651-11-79 10 10-LS-103 OPS Bad Light Bulb No Ind. Replaced Bulb 1.0
12444Increased Air1-02-79 27 27-PCV-120 OPS Low Supp1v Air Innroner Control Supply S Oli- 80
Prop. Band
JAMES A. FITZPATRICK NUCLEAR POWER PLANT,
Maintenance Summary '
.
1T F _ Tomsom- 1_ O" O
W rk Request # Cause of Results of Action taken to RepairDate System llow DetectedComponent # Malfunction Malfunction Preclude Time
Recurrence (flours)12453
1-02-79 27 27-DWA-PA OPS Unknown Downscale ISP-31 2.0
12460 '
1-02-79 27 27-DWA-101A/B OPS Unknown Downscale ISP-31 2.0
831-29-79 27 27-0I-101A OPS Drift Downscale ISP-31 6.0
12475 Trouble Switch,
1-09-79 76 76-CPI Maint. Switch Posit. f.larm Placed in Proper 6.0
Posicion
431-17-79 MISC X-104D,100BSX-100G OPS Leakage Low Press. Repressurized 6.0
POWER AUT110RITY OF THE STATE OF NEW YORKJAMES A. FITZPATRICK NUCLEAR POWER PLANT
'
Safety Related Electrical 6 Mechanical Maintenance Summary.
.
REPAIRWORK REQUEST #DATE. SYSTEM 110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIMECOMPONENT #liOURS
1/9/79 13 #12556 Surveillance Defective Close Torque Replace Torque Switch 3013MOV-131 Switch
1/11/79 92 #12557 NA Plant Modification- NA 1
02RV-71K, L Disconnected PressureSwitch Leads at 09-45Panel. New Design ReliefValves Added During OutageDo Not llave Bellows FailurePressure Switches
1/5/79 71 #12537 NA Performed Quarterly NA 3271 BAT-3A,3B Surveillance Test ST-16F
1/17/79 71 #27 NA Performed Quarterly NA 2 1
71 BAT-3A,3B Surveillance Test ST-16FFollowing Equalize Charge
.
POWER AUTHORITY OF THE STATE OF NEW YORKJAMES A. FIT 2 PATRICK NUCLEAR POWEn PLANT
SJOHN D. LEONARD, JR. P.O. BOX 41
Resident Manager Lycoming, New York 13093
315-342 3840
February 8, 1979JAFP-79-076,
Director, Office of ManagementInformation & Program Control
United States Nuclear Regulatory CommissionWashington, D.C. 20555
Reference: Docket No. 50-333
Dear Sir:
The Operating Status Report for the month of January, 1979 isenclosed. The refueling information remains the same aspreviously submitted.
If there are any questions concerning this report, contactStanley Pobutkiewicz at 315-342-3840, Ext. 256.
Ver lygours,-
/ / /fy te i ['h A, .'s..Jo 'n D . Leonafd, Jr. [
i.~@,
JDL:EZ:kesEnc. -~
CC: USNRC, B.H. GrierUSNRC, Director, Office of Inspection
and EnforcementDistribution
.
.-.
OPERATING DATA REPORT
DOCKET NO. 50-333DATE 8 Feb 1979
CO. lPLETED IlY E. Zufelt\
TELEPHONE f315) 342-3840
OPERATING STATUS
NotesFitzPatrick1. Unit Name: 780101-7801312. Reporting Period:
24363. Licensed Thermal Power (31Wt):
8834. Nameplate Rating (Gross SIWE):
821S. Design Electrical Rating (Net SIWE):
8306. Slaximum Dependable Capacity (Gross alwe):
8007. Maximum Dependable Capacity (Net alwe):8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons:
NONE
NONE9. Power Level To Which Restricted. lf Any (Net alWe):10. Reasons For Restrictions,if Any:
This Month Yr to.Date Cumulatise
744 744 30817i1. Hours in Reporting Period
744 744 oognn ,12. Number Of liours Reactor Was Critical
0 0 013. Reactor Reserve Shutdown 11ours
744 744 22031,114. Ilours Generator On.Line
0 0 015. Unit Reserve Shutdown flours
1334928 1334928 4354907616. Gauss Thermal Energy Generated (alWil)
451280 451280 1474615017. Gross Electrical Energy Generated (alW'O
437765 437765 1426375018. Net Electrics! Energy Generated (MWil)
100% 100% 71.5%19. Unit Sersice Factor
100% 100g vi e20. Unit Asaila'ility Factora
73.5% 73.5% 65.7%21. Unit Capacity Factor (Using MDC Net) 71 7% 71.7% 56.4%22. Unit Capacity Factor (Using DER Net)
0 0 in ae23. Unit Forced Outage Rate24. Shutdowns Scheduled Oser Next 6 alonths IT)pe. Date and Duration of Each):
Scheduled Snubber Inspection and Maintenance Outage In Late .
March,1979 for a Period of 7 Days.
25. If Shut Down At End Of Iteport Period. Estimated Date of Startup:26. Units in Test Status IPrior to Conunercial Og cration): Forecast Achiesed
INITIAL CRITICA LITYINITIAL ELECTitlCi rYCost \lERCI tL OPER ATION
. .
AVERAGE DAll.Y UNIT POWER LEVEL
DOCKET NO.~
JAFNPPUNIT
8 Feb 1979DATE
"**
CONIPLETED BY
TELEPHONE (315) 342-3840
January, 1979510NTil.
DAY AVERAGE DAILY POWElt LEVEL DAY AVER AGE DAILY POhEll LEVEL(M We-Net ) of we. Net )
578 17 582
5812 Ig 583
5823 19 5_84
4 581 20 585
905 21 585
6 b '322 585
5867 23 585
8 584 24 5%
5859 25 586
58410 26 587
58311 27 582
58212 28 525
58213 9 599
58214 30 652
IS 31 721
58216
'SUhMARY :. Unit Operated At Approximately 73% of Rated Thermal PowerDuring this Reporting Period. On January 28, Power was ,
Reduced to Withdraw Control Rods for Flux Shaping and PowerIncrease. '
.
*.
i
:-
.*
50-333* DOCKET NO.
' UNITSilVTDOWNS AND POWER REDUCTIONS . ,,, !UNIT N AME6 m b 1979DATEh. Zutelt
January, 1979 COMPLETED ilYREPORT MONTil TELEPilONE (315) 342-3840
n.E Ew
,E g } $Y~ Licensee ,E r, ge, Cause & Corrective, 3 Action to
No. Date i 5? a .2 s 5 Event 3,7 gVH g: $ 35g Report * un U Prevent Recurrenceg
<. gO
t
\*
NONr ,
.
I
I
I_ _- '
I 2 3 4
F: Forced Reason: Method: Exhibit C instructions
S: Stheduled A Equipment Failure (Explain) 1 Minual for Preparation of Data
P-Maintenance of Test 2 Manual Scram. Entry Sheets foi 1.icensee
C Refueling 3 Automatic Scram. Event Itepor (1.1.lt) File (NUREG-
D Regulatory Restriction 4 Other (Explain) 0161)*
E-Operator Training & l.icense Examin i
F Administrative 5Exhibit I Same SourceG Operational Eiror (Explain)
(9/77) Il-Olher (Explain)
- .
POWER AUTHORITY OF THE STATE OF NEW YORKJAMES A. FITZPATRICK NUCLEAR POWER PLANT
NARRATIVE SUMMARY OF OPERATING EXPERIENCEJANUARY, 1979
The unit was in hold at approximately 600 MW duringthis reporting period due to failure of the e"A"Condensate Booster Pump. On January 28, 1979 thepump was placed in service and power was increasingin accordance with PCIOMR.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
Maintenance Summary
T F. F - T , n n , rv 1070 -
W rk Request # Cause of Results of Action taken to RepairDate System How DetectedComponent # Malfunction Malfunction Preclude Time
Recurrence (Hours)12661
1-02-79 03 RPI-26-07 OPS Loose Connector Double Ind. Tightened Conn. 1.0
12510 Full In Ind.1-10-79 03 PPI-14-39 OPS Bad Probe Buffer At All Times Replaced G-33 16.0
12511 Full In/ Full Out1-10-79 03 RPI-10-43 OPS Bad Probe Buffer At All Times Replaced Q16SG-33 16.0
__
142 Dirty Cam 3 Cleaned Crs1-18-79 06 06-LR-97 OPS Follower Erratic Alarm Follower 2.0
1228712-26-78 07 "A" RBM OPS Unknown Failed St-5R N/A 100.0
1238912-26-78 07 APRM/RBM OPS N/A N/A Setpoint Change 24.0
12574 Replaced Flow1-9-79 07 B APRM OPS Age /Use Wrong Setting Control Board 16.0
124971-12-79 07 SRM "D" ISC Loose Conn. Erratic Ind. Tightened Conn. 4.0
12655 Dryed Out1-17-79 07 LPRM 28-45 B OPS Moisture Downscale Cleaned Conn. 40.0
125651-11-79 10 10-LS-103 OPS Bad Light Bulb No Ind. Replaced Bulb 1.0
12444 'Increased Air1-02-79 27 27-PCV-120 OPS Low Supp1v Air Imnroner Control Supply 6 Adi. 8n
Prop. Band
.
JAMF.S A. FITZPATRICK NUCLEAR POWER PLANT
Maintenance Su= mary
I'r - '-"-~1"
r e uest # Cause of Results of Action taken to PepairDate System How DetectedComponent e Malfunction Malfunction Preclude Tice
Recurrence (Hours)12453
1-02-79 27 27-DWA-PA OPS Unknown Downscale ISP-31 2.0
124601-02-79 27 27-DWA-101A/B OPS Unknown Downscale ISP-31 2.0
831-29-79 27 27-0I-101A OPS Drift Downscale ISP-31 6.0
12475 ~- Trouble Switch1-09-79 76 76-CPI Maint. Switch Posit. Alarm Placed in Proper 6.0
Position
_.
431-17-79 MISC X-104D,100BSX-100G OPS Leakage Low Press. Repressurized 6.0
.
POWER AUTIIORITY OF TIIE STATE OF NEW YORKJAMES A. FITZPATRICK NUCLEAR POWER PLANT
s
Safety Related Electrical 6 Mechanical Maintenance Summary ,,
WORK REQUEST # REPAIRDATE. SYSTEM liOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIMECOMPONENT #
1100RS
1/9/79 13 #12556 Surveillance Defective Close Torque Replace Torque Switch 3013MOV-131 Switch
1/11/79 92 #12557 NA Plant Modification- NA 102RV-71K, L Disconnected Pressure
Switch Leads at 09-45Panel. New Design ReliefValves Added During OutageDo Not IIave Bellows FailurePressure Switches
1/5/79 71 #12537 NA Performed Quarterly NA 3271 BAT-3A,3B Surveillance Test ST-16F
1/17/79 71 #27 NA Performed Quarterly NA 271 BAT-3A,3B Surveillance Test ST-16F
Following Equalize Charge