Page 1: Monthly Progress Report - September 2014

DAMAC Heights at Dubai Marina

Report No.7 - September 2014

Monthly Progress Report

Submitted to

DAMAC Gulf Properties Co. LLC

P.O.BOX 2195, Dubai

United Arab Emirates

Page 2: Monthly Progress Report - September 2014

Monthly Progress Report - September 2014

30.Sep.14

© AECOM 2014

Quality Information

Document

Ref Date 16.Okt.14

Prepared by Sameh Kandil Reviewed by

Revision HistoryAuthorised

Name/Position Signature

Project Director

Fuad Hasan/Tareq Al Emam

Revision Revision Date Details

The information contained in this document produced by AECOM Middle

East Limited is solely for the use of the Client identified on the cover sheet

for the purpose for which it has been prepared and AECOM Middle East

Limited undertakes no duty to or accepts any responsibility to any third party

who may rely upon this document.

All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the

written permission of AECOM Middle East Limited.

Prepared for

Prepared by

AECOM Middle East Limited

وم ميد ايست ليمتد اي

0 16.Okt.14

Monthly Progress Report - September 2014

Damac Properties Co. LLC

P.O.Box 2195, DubaiUnited Arab Emirates

PO Box 51028, Dubai

United Arab Emirates

www.aecom.com

Page 3: Monthly Progress Report - September 2014

2

Table of Contents

Project Description 4

Tower Statistics 4

Project Stakeholders 4

Executive Summary 5

Key Accomplishments 6

Key Focus Issues 7

Area of Concerns 8

Contract Summary 10

Milestones 11

Upcoming Activities - 30 Day Look Ahead 13

Dashboard Reports 16

Schedule Progress 17

Negative Float Contour 21

Progress Photographs 23

Health, Safety and Environment 29

Engineering 31

Quality Assurance and Control 33

Commercial Status 35

Risk Management 37

Core Values into Practice 38

AECOM Core Values 39

Core Values into Practice 40

Appendices 42

Appendix 1: Schedule Update (Target Completion Programme-Rev3)

Appendix 2: Structure Delay

Appendix 3: Core Walls and Slabs Cycles

Appendix 4: MEP Progress Data Sheets

Appendix 5: Finishes Progress Data Sheets

Appendix 6: External Facade Progress Data Sheets

Appendix 7: Lifts Progress Data Sheets

Appendix 8: Garbage Chute Progress Data Sheets

Appendix 9: Long Lead Items Log

Appendix 10: Provisional Sum Nomination Log

Appendix 11: Building Permit Status

Appendix 12: Technical Review Log

Appendix 13: Outstanding RFIs

Appendix 14: Outstanding Shop Drawings

Appendix 15: Outstanding Material Submittal

Appendix 16: Outstanding Subcontractors' Prequalification

Appendix 17: Outstanding Method Statement

Appendix 18: Non-Conformance Report

Appendix 19: Actions Log

Appendix 20: AECOM's Organization Chart

Monthly Progress Report No. 7 - September 2014

Page 4: Monthly Progress Report - September 2014

3

Project

Description

Monthly Progress Report No. 7 - September 2014

Page 5: Monthly Progress Report - September 2014

4

Project Description

Tower's Statistics

141,542 m2

3,464 m2

72,899 m2

522.67 m2

335 m

6

5

79

3

1

Project Stakeholders

Monthly Progress Report No. 7 - September 2014

Designation

DAMAC Heights Tower located at plot No.A3A,392-569 at Dubai Marina and comprises of the following criteria;

Dates Projection

Project Forecast Completion 20.Dez.16

Forecast Project Duration 2012

Date of Commencement 19.Jun.11

Original Project Duration 1096

Original Completion Date 18.Jun.14

Shops

5 Bedroom 2

1

Facade Sub-Contractor

Supervision Consultant

Stakeholders Names

Ramboll Middle East Limited

ARABTEC Construction L.L.C

AECOM Middle East Limited

REMCO Co. L.L.C

Elevators Sub-Contractor

Master Developer

Local Authorities

DAMAC Gulf Properties Co. L.L.C

Toshiba Elevator Middle East L.L.C

2 Bedroom 258

3 Bedroom 86

4 Bedroom 9

Aluminum & Light Industries Co. (ALICO) Ltd

Emaar Properties PJSC

Dubai Municipality

Client

Consultant

BMU Sub-Contractor

Main Contractor

MEP Sub-Contractor

Danway L.L.C

Fit Out Sub-Contractor JC Maclean International

Dubai Civil Defense

DEWA

Dubai Civil Aviation

EtisalatTotal Tower Height

Top Roof

Mechanical Floors

Floors

30,62,85,86,8

7,88

Area/Height Calculations

Height of Tower

Floors Count

Basement&Ground Floors

Podium Floors

Typical Floors

Mechanical Floors

Apartments Built Up Area

Commercial Built Up Area

Building Built Up Area

Plot Area

Apartment Types

Number of Flats

Number of Parking Slot

Number of Shops

Rooms/Slot Count

Parking Slots 649

1 Bedroom 282

637

649

1

5

335

Page 6: Monthly Progress Report - September 2014

5

Executive

Summary

Monthly Progress Report No. 7 - September 2014

Page 7: Monthly Progress Report - September 2014

6

Executive Summary

Key Accomplishments Key Focus Issues

Construction Progress Construction Progress

• Duri g the o th of Septe er the proje t a ti ities are progressi g. The orks for the superstru ture activities are continuing although the overall delays to the project remains. The core walls cycles as well as the slab

cycles both of which are averaging (6) days.

• E a atio ork has stopped due to a seepage e e t that o urred o Septe er, that aused floodi g i the area of section DD.

• The MEP st a d d high le el ser i es, MEP risers a d pro isio for floor a d all ser i es are o goi g. The progress has improved and the delays will be mitigated by the end of October 2014.

• The fi ishes orks i ludes; lo k, plaster, pai t a d eili g are o goi g. • The Lift orks has started i the lo zo e, ed zo e a d high zo e.• Fa ade orks; Sti k urtai all at al o ies o ti ues ALICO i floors o urre tl , ho e er, the u itized curtain wall system is delayed. Also the glass panels test is still behind schedule.

• Post-Te sio i g pa kage fro le el till le el as re ie ed the rd part a d retur ed a k ith comments to ATC during the month.

• DEWA desig pa kage is o hold a aiti g the re eipt of NOC re e al fro EMAAR.• ATC as i stru ted to pro eed ith pro uri g the Bus Bars a d LV Pa els.• SH&E re ai s a fo us area of i pro e e t, ho e er, the proje t o ti ues ithout LTI.• The ke risk to the proje t re ai s the la k of re ised IFC do u e ts for all le els that is pe di g fro the desig consultant and will impact the authority packages for approval. Moreover, there is a risk of seepage from the

existing diaphragm walls. Focus also should be given to finalize all the pending nominations to avoid any potential

delays.

• There is potential delays in the structure at Level 62 (Mechanical floor) as ATC from the Engineer point of view will not be able to achieve the

planned cycle (8 days) because the width of two wing walls will increase

and thus the slip form will require reconfiguration. Also the double height

(5300 mm) will require 2 pours to reach the full height.

• The structure completion date was slipped 6 calendar days and ATC has to mitigate such delays in the forthcoming floors.

• A solution has to be proposed for the diaphragm wall in order to continue the work in Zone B.

• REMCO has to increase the allocated labors and supervisors. Also ATC has to increase its MEP supervisors in order to follow up and expedite

REMCO progress.

• REMCO has to provide the partial and full clearance to commence the plaster and ceiling work on time. Also the electrical risers work has to be

improved.

• Paint (primer & stucco) and ceiling progress to be imporved by ATC.• ALCIO has to improve the curtain wall installation.• Clearance for sequencing of work to be done to avoid NCRs and stoppage of progress.

• ATC to expidite the progress of Substation's finsihes and MEP works.Schedule Progress• ATC has to detail the external facade and lift work packages in order to enable the Engineer to monitor and control these packages.

• The Engineer is insisting on adding sufficient details for MEP works in the program in order to be able to monitor the MEP package.

• The overall delays till end of September 2014 is 182 days due to the delay in nomination of facade light package, however, the Engineer is of the view that

the facade light nomination will not affect the project completion date, as the

light fixtures will be installed before the project completion, which means there is

sufficient time for procurement and engineering.

Monthly Progress Report No. 7 - September 2014

Structure

•The Slabs were poured up to level 36 and core walls were poured up to level 38. The stairs were poured till level 28.

• The average cycles are 6 days for core walls and slabs.• The work in zone B was suspended due to the seepage event. However, secant piles breaking is going on in section BB

progressing 81% complete.

MEP

• MEP High Level works are progressing in levels B5,B4,B3,B2 and 6 till 31.

• MEP concealed works are progressing from level 6 till 24.• MEP risers- HAVC are progressing from level 6 till 22.• MEP risers- Fire Fighting are progressing from level 6 till 18.• MEP risers- Plumbing are progressing from level 6 till 31.• MEP risers- Electrical are progressing from level 6 till 19.• MEP ceiling clearance are progressing from level 6 till 9.Finishes

• Block work is progressing from level 6 till 29. • Doors sub frames and plaster works are progressing from level 6 till 22.

• Paint work is progressing from level 6 till 14 and false ceiling started in level 6.

External Facade

• ALICO started the installation of Stick frame curtain wall for balconies from level 6 till 28. Also the brackets for Unitized system

and balcony balustrade started from level 6 to 8.

Lifts

• Toshiba started the preliminary works and separator steel beams in the low, med and high zones.

Garbage Chute

• Garbage Chute mock up was done at level 6.

Page 8: Monthly Progress Report - September 2014

7

Key Accomplishments Key Focus Issues

Schedule Progress

Health, Safety and Environment

Engineering

Quality Assurance and Control• 98 NCRs were issued to date and 85 of them are closed.• 8 NCRs were issued during this month.

Commercial Status• The flooding delay events are still under review by 3rd party. No action is possible on ATC's claims until such time as the EOT

decision is reached.

• Variations submission, assessment and approval continues.• AECOM asked ATC to submit the PI insurances.• Payment Certificate (IPC) for August 2014 is under review.

• Material submittal for intercom system, MV switch gear, generator and laminated Glass for Balcony Partition were approved.

• DAMAC advised that the decision is to proceed with stone cladding and a sample sent to ATC.

• An instruction was given to ATC to proceed with procuring the Bus bars and LV Panels.

• The purchase order issued for Corridors tile.Quality Assurance and Control• ATC has to improve the quality of concrete works.• ATC has to give the structural clearance before the commencement of MEP works.

• ATC to improve quality of submittals to avoid ,multiple re-submission.

Procurement• RME has to release the Steam and Sauna package.• DAMAC has to finalize the nomination of façade light.• DAMAC to re-nominate the sanitary wares package.• ALICO to provide the factory production progress report showing the status of fabrication and the expected delivery dates.

• ALICO to expedite the delivery of Cladding Panels and Unitized Curtain Wall System.

• REMCO has to issue the purchase order of the Bus bars and LV Panels.

Procurement

• PT shop drawings for levels (64-84) are under ATC review in order to resubmit it again to the 3rd Party for approval.

• The LV shop drawings are ready for submission to DEWA, however, DEWA asked for design NOC's renewal before going

further with drawings submission for review.

• ATC continues preparing the shop drawings for false ceiling.• AECOM is preparing a proposal to have a permanent solution to the diaphragm wall.

• ATC is preparing the fabrication drawings for the secondary steel structure of level 5.

• A proposal for balcony rain water risers was submitted to Damac.• Approval has been obtained for FF and FA of level 5 from Civil defense and DM.

• AECOM is working to provide Zone B's de-strutting sequencing.

Commercial Status• Final concluded report of flooding events has to be issued by DAMAC in order to enable Arabtec to issue a revised clause 14 that will reflect the new

completion date.

• Processing of agreed variations.• Processing of contractor IPCs in line with the contractual time frame.

• ATC issued the Target Completion Programme - Rev 3 and it is under the Engineer's review. The comments will be issued to

Arabtec by 2nd week of October 2014.

Health, Safety and Environment• More work has to be done regarding the overhead protection.• House keeping needs improvement by ATC.• Excavation at sections B-B and D-D is a high risk activity.• Water Seepage at section DD and BB has to be monitored closely.• ineffective pest control in the project site offices.• Emergency escape route from level 27 to level 30 is inadequate.• More work has to be done to control the dust of Garbage Chute.

•10 site observation were closed during the month of September 2014 and 2 notices were issued.

• Number of first aid cases in September 2014 was (2) and (3) cases were recorded for near misses and (0) cases for LTI.

• 308 orientation for new hires and 195 tool box talk were done during September 2014.

Engineering• PT drawings for levels (64-84) has to be resubmitted by ATC for review.• Ramboll to provide updated drawings considering the missing electrical points for level 43 and above.

• ATC to issue fabrication drawings for secondary steel structure for P5.• AECOM to prepare a proposal to have a permanent solution to the diaphragm wall.

• AECOM to propose the sequencing of de-strutting for Zone B.• Ramboll to update the RCP plans considering the existing MEP provisions and the bulkhead dimensions for levels 6 till 38.

• Arch and MEP design drawings (IFC) for Fendi floors from Level 43 to Roof has to be finalized.

• ATC/ALICO to advice about the slab edge clashes with the façade various upper levels.

• Pool designer's full design package to be issued in order to allow DAMAC to proceed with the nomination.

• Emaar NOC has to be obtained in order to enable the submission of LV drawings to DEWA. The Renewal of design NOC can't be obtained without

Emaar NOC.

Monthly Progress Report No. 7 - September 2014

Page 9: Monthly Progress Report - September 2014

8

Area of Concerns

1

2

3

4

5

6

7

8

9

10

Area of Concern & Impact if Action not made

Lack of MEP's IFC revised drawings from Ramboll from level 43

and above:

Impact: Delay in relevant shop drawings and thus delays to obtain

DEWA approval for the shop drawings /schedule of loads and

delays in procuring LV panels and Bus bars.

Lack of proposal for a permanent solution to the diphragm wall:

Impact: Prolongation for the work suspension in Zone B.

Lack of Façade and Lifts detailed activities in the target

completion schedule:

Impact: Prevents AECOM from identifying the Façade and Lifts

critical activities for the project delivery. Also prevents AECOM

from closely monitoring the progress at site.

Lack of manpower for MEP work:

Impact: REMCO will not be able to give ATC the MEP clearance to

start the block and plaster works on time as per TCP-rev 3. 01.Okt.14

Absence of an independent inspection agency for post tension

installation:

Impact: The quality of PT works may be affected. Currently ATC is

not in compliance with the specifications and payment deductions

will be applied in response.

30.Okt.14

Delay in submitting fabrication drawings and shop drawings for

the secondry steel structure at level P5:

Impact: Installation of Unitized Curtain Wall will be delayed.

Delay in the installation of façade glass panels (Stick&Unitized):

Impact: Potential delays to the suspended ceiling installation.

01.Okt.14

8 days Core Wall cycle will not be achieved in level 62 :

Impact: Potential delays to structure completion date as the

structure is on the critical bath.

AECOM/DAMAC

15.Okt.14

Delay in finishes and electrical works inside the substation:

Impact: Potential delays for handing over the substation to DEWA

and delay for the permenent power application. 01.Okt.14 ATC

Responsible Impact

ATC/ALICO

Monthly Progress Report No. 7 - September 2014

Required Date

Arabtec

15.Okt.14 DAMAC/Ramboll

10.Okt.14

30.Okt.14 Arabtec

30.Okt.14

Lack of de-strutting sequencing in Zone B :

Impact: Potential delays to the excavation work. 10.Okt.14 AECOM

Arabtec

ATC/REMCO

Arabtec C

C

M

C

C

C

C

C

M

M

Page 10: Monthly Progress Report - September 2014

9

Area of Concerns

11

Critical Manageable

Lack of instruction to proceed with ordering the marble for Lift

Lobby:

Impact: Possibility of installation delays.15.Okt.14 DAMAC

Area of Concern & Impact if Action not made Required Date Responsible Impact

Monthly Progress Report No. 7 - September 2014

C M

M

Page 11: Monthly Progress Report - September 2014

10

Contract Summary

Approved

Claims

Approved PS

0 226,116,726

AED % AED % AED % AED %

119.845 23.6% 115.38 22.7% 75.44487 14.84% 63.693 12.5%

AC - Actual Cost; CPI - Cost Performance Index; CP - Contract Price; CV - Cost Variance; EAC - Estimate At Completion; EV - Earned Value;

NCR - Non-Conformance Report; PV - Planned Value; RFI - Request For Information; SPI - Schedule Performance Index; SV - Schedule Variance

* Note: 1) The Cost and Procurement sections will be frozen till

approving the Target Completion Programme.

2) SPI and SV improved due to the issuing of TCP-Rev 03.

479,041,833

Financial Status (AED)

Gross Certified Physical %

Complete

Approved

Variations

Total

Commitments

Residual PS Pending

Variations

79

* Note: The percentage value is the current amount divided by the Contract Price

of AED 508,301,847.

Performance Indicators Measure This Month Last Month

Monthly Progress Report No. 7 - September 2014

22.46%

Payment Status (AED m)

Variation Status

9 269

0.85

-56.5

-157

Area

Time

EV / PVSPI

SV

Float (MS01)

0.89

-44.8

-182

EV - PV (AED m)

Days Float

Remaining

EV / ACCPI

NCR Close Out 98/85 92/77

EAC Variance EAC - CP

Issued/Closed

CV EV - AC

RFI

Submittals

88%% Closed

No. of Near Misses

86%

90%

88%

Near Misses 3

Cost

Quality

Health and

Safety

Engineering

244,747,598

Effective

Contract Value

Variation Approved

35

Variation Under DAMAC

Assessment

Variation Under

ATC Assessment

Schedule Progress %

Total

No ChangeUpward Trend Downward Trend

Procurement Major Items

Variation Rejected

2

% Closed

Gross and Net certified figures exclude Advance Payments.

Estimate at

Completion

8,177,509 518,378,571

Net Certified Perviously Certified Paid to Date

37,437,524 1,899,214

Page 12: Monthly Progress Report - September 2014

11

Control Milestones

Days

Remaining

Clause 14

Program

592 18-Jun-14

226 08.Aug.13

159 06.Mär.13

90%

34%

5%

Nomination of PS Items (not yet nominated)

Days

Remaining

Clause 14

Program

-218 2-Feb-12 10

-41 3-Jun-12 80

51 21-Nov-12

35 4-Mar-13 80

44 80

-27 17-Apr-13 80

90%

34%

5%

30.Sep

Permits/NOCs Status Summary

Actual

Issue Date

23-Jan-11

14.Nov.13

25.Nov.13

10.Jul.14

171

SC Nomination for Fit

Out (Fendi Flat)

SC Nomination for

Sauna,Jacuzzi

13-Nov-14 13-Nov-14

3-Sep-14 1-Oct-14

Revised

Appoval

Required

RME/AECOM

FIC Location Approval RME/AECOM

Dubai Municipality

Fence NOC RME

SC Nomination for Fit

Out (Life Style)4-Nov-14 4-Nov-14 116 0.00

(30.00)

Milestones TCP - Rev 3 Current Forecast Current Float Variance

since Aug 14

SC Nomination for

Landscaping Works20-Nov-14 Nominated

SC Nomination for

Swimming Pool Works20-Aug-14 1-Oct-14 69 (30.00)

20

Ground water Discharge 08.Mai.14

Drainage Design NOC

and Drawings Approval

ATC

22-Jul-11

Authority NOC/PermitAnticipated

Issue DateExpiry Date

Days

RemainingResponsible

0 to 5 days

< 0 days

Upward

Trend

Downward

TrendNo Change

Note: Days remaining from 30 Sep 2014 to Planned Dates of TCP.

Milestones TCP-Rev 3 Current Forecast Current Float Variance

since Aug 14

MS03 -Producing Wild

Air (till 30th Floor)8-Mar-15 5-May-15 -50

MS02 -Completion of

Structure14-May-15 20-May-15 -4

MS01 - Project

Completion 14-May-16 20-Dec-16 -182

Monthly Progress Report No. 7 - September 2014

0.00

0.00

30.00-

3.00

50.00

SC Nomination for

Façade Lighting24-Feb-14 1-Oct-14 -178

> 5 days

0 to 5 days

< 0 days

Upward

Trend

Downward

TrendNo Change

Note:

1) Days remaining from 30 Sep 2014 to Planned Dates of TCP.

2) Variance since Aug-14: the difference between Current forecast of Sep

vs. forecast of Aug.

> 5 days

Page 13: Monthly Progress Report - September 2014

12

Permits/NOCs Status Summary

Actual

Issue Date

09.Jun.13

05.Mai.13

25-Mar-13

90%

34%

5%

Perfor a ce Measure e t – Defi itio s

30 to < 60 days

Monthly Progress Report No. 7 - September 2014

NOC/Permit Responsible

DEWA - Electrical

Electrical Load Design

NOC04.Mai.15 RME/AECOM

Revised

Appoval

Required

Anticipated

Issue Date

LV Design Drawing

Approval

Revised

Appoval

Required

RME/AECOM

Substation / Trench

Design ApprovalRME/AECOM

Planned Value (PV)

Planned value of physical works to be accomplished.

Actual Cost (AC)

Actual cost of works physically accomplished.

Earned Value (EV)

Budgeted cost of works physically accomplished.

Schedule Performance Index (SPI) = EV / PV

SPI represents the current efficiency of progress.

A SPI >1.0 denotes you are accomplishing more than planned.

A SPI <1.0 denotes you are accomplishing less than planned

Schedule Variance (SV) = EV –PVSV represents the difference between what you have

accomplished and what you planned to accomplish.

A positive (+) Schedule Variance denotes you are

ahead of schedule.

A negative (-) Schedule Variance denotes you are

behind schedule.

Note: Days remaining from 30 Sep 2014 to Anticipated Date > 60 days

< 30 days

DEWA - Water

Water Design NOC 24-Mar-15 RME/AECOM

RME/AECOMWater Supply Design

Drawing Approval

Revised

Appoval

Required

AuthorityDays

RemainingExpiry Date

Revised

Appoval

Required

Dubai Civil Defense Design Drawing Approval

Revised

Appoval

Required

RME/AECOM

Page 14: Monthly Progress Report - September 2014

13

Upcoming Activities - 30 Days Look Ahead

14

Block Work Completion-L18

Core Wall L41 - Completion

17-Oct-14

24-Oct-14

5-Oct-14

18.Okt.14

Plaster Work Completion-L25

Block Work Completion-L30

Block Work Completion-L28

Plaster Work Completion-L22

Block Work Completion-L31

Block Work Completion-L27

3-Oct-14

10-Oct-14

29-Oct-14

Plaster Work Completion-L21

Slab L42 - Completion

21.Okt.14

03.Nov.14

Core Wall L39 - Completion

Core Wall L40 - Completion13.Okt.14

Slab L41 - Completion28.Okt.14

Slab L40 - Completion

08.Okt.14

Activity Type Start Finish Activity

Monthly Progress Report No. 7 - September 2014

Slab L37 - Completion

Slab L38 - Completion

Slab L39 - Completion

12.Okt.14

08.Okt.14

16.Okt.14

Construction

27-Oct-14 Paint Work Completion-L15

13-Oct-14 Paint Work Completion-L12

17-Oct-14

Core Wall L42 - Completion

Core Wall L43 - Completion

23.Okt.14

29.Okt.14

2-Oct-14

2-Oct-14

3-Oct-14

Plaster Work Completion-L23

Monthly Progress Report No. 7 - September 2014

Block Work Completion-L29

Paint Work Completion-L6

Paint Work Completion-L7

Paint Work Completion-L8

Paint Work Completion-L9

Plaster Work Completion-L20

9-Oct-14

Paint Work Completion-L13

21-Oct-14 Paint Work Completion-L14

6-Oct-14 Paint Work Completion-L10

29-Oct-14

16-Oct-14

2-Oct-14

24-Oct-14 Plaster Work Completion-L24

31-Oct-14

2-Oct-14

9-Oct-14 Paint Work Completion-L11

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

Page 15: Monthly Progress Report - September 2014

Upcoming Activities - 30 Days Look Ahead

Quality

1-Oct-14 31-Oct-14 ATC will keep closing the outstanding NCRs.

1-Oct-14 31-Oct-14Quality Technical Meeting will be held on weekly basis to

monitor the quality.

1-Oct-14 LPO will be issued for Corridor Tiles.

Procurement 21-Oct-14 Unitized curtain wall will be delivered to site.

1-Oct-14

LPO for secondary steel strucutre will be issued.20-Oct-14

Finalize the open/overdue material submittals.

1-Oct-14 31-Oct-14

Fabrication drawings to be submitted by ATC for the

Engineer review.15-Oct-14

PT drawings for levels (64-84) will be resubmitted

again by ATC for 3rd party review.

ALICO, Toshiba and JC Maclean detailed work schedules will

be submitted to the Engineer.

Continue reviewing ATC's new shop drawings submittals.

1-Oct-14

RME has to release the Steam and Sauna Package.20-Oct-14

15-Oct-14

15-Oct-14

Ramboll to provide updated drawings considering the

missing electrical points for level 43 and above.25-Oct-14

AECOM to propose the sequencing of de-strutting for

Zone B.

DAMAC/AECOM will conclude a solution to the

diaphragm wall.

15-Oct-14

Finalize the open/overdue shop drawings submittals.31-Oct-14

MEP H/L Completion - L29

Construction

23.Okt.14

ActivityActivity Type Start Finish

MEP H/L Completion - L31

MEP H/L Completion - L32

11.Okt.14

20.Okt.14

27.Okt.14

MEP H/L Completion - L30

Schedule

15-Oct-14

Electrical design NOC will be issued.

Engineering

31-Oct-14

DAMAC will finalize the nomination of Façade Light.15-Oct-14

Re-nomination for the sanitary wares packages by

DAMAC.15-Oct-14

1-Oct-14 31-Oct-14

30-Oct-14

Continue reviewing ATC's new material submittals.

C

C

C

C

C

C

C

C

C

C

C

Page 16: Monthly Progress Report - September 2014

15

Upcoming Activities - 30 Days Look Ahead

Critical Path Activity

1-Oct-14 31-Oct-14

10-Oct-14 Payment Certificate (IPC) for August 2014 will be issued.Commercial

31-Oct-14 Finalize the list of pending variations submitted by ATC.

DAMAC will continue float tenders and receiving

quotations for the provisional sum items.

1-Oct-14

Monthly Progress Report No. 7 - September 2014

Activity Type Start Finish Activity

C

Page 17: Monthly Progress Report - September 2014

16

R

Dashboard

Report

Monthly Progress Report No. 7 - September 2014

Page 18: Monthly Progress Report - September 2014

17

Schedule ProgressControl Milestones

Clause 14

Program

Current

Forecast

18-Jun-14 20-Dec-16 -182 30.00-

8-Aug-13 20-May-15 -4 3.00

6-Mar-13 5-May-15 -50 50.00

26-Aug-13 6-Aug-15 -14 79.00

26-Nov-13 2-Jan-16 -46 10.00

11-Dec-12 9-Jul-15 -28 47.00-

5-Jan-13 29-Nov-14 -5 8.00-

18-Sep-12 30-Oct-14 -57 4.00

23-Mar-14 7-Mar-16 0 6.00-

28-Mar-13 7-Oct-15 -28 36.00-

90%

34%

5%

60- Days look Ahead Critical Activities

TCP - Rev 3

02.Okt.14 -6 6.00-

08.Okt.14 -4 3.00-

13.Okt.14 -3 3.00-

18.Okt.14 -3 3.00-

23-Oct-14 -5 5.00-

29.Okt.14 -5 4.00-

04.Nov.14 -5 6.00-

09.Nov.14 -4 5.00-

15.Nov.14 -4 6.00-

22-Feb-16

31-Aug-15

2) Variance since Aug-14: the difference between Current forecast in Sep

vs. forecast in Aug.

Activity

Slab L37 - Completion

Slab L38 - Completion

Slab L39 - Completion

Slab L42 - Completion

Slab L43 - Completion

Slab L44 - Completion

Slab L45 - Completion

Slab L41 - Completion

MilestoneTotal

Variance

8-Mar-15

14-May-15

21-Jul-15

8-Nov-15

4-Jun-15

24-Nov-14

9-Sep-14

MS01 - Project Completion

MS02-Completion of Structure

MS03 - Producing Wild Air (till

30th Floor)

MS04 - Producing Wild Air (31-

62th Floor)

MS05 - Producing Wild Air

(above 62th Floor)

MS06 - Completion of P5 Slab at

Zone B

MS07 - Completion of Block

Work till Level 36th

MS08 - Completion of Façade

Works (level 6 till level 10)

Current Float TCP - Rev 3

-5

-51

-220

-6

-58

Monthly Progress Report No. 7 - September 2014

Variance

since Aug 14

Variance

since Aug 14

No Change

08.Okt.14

Upward Trend Downward Trend

> 5 days

0 to 5 days

< 0 days

28.Okt.14

03.Nov.14

09.Nov.14

13.Nov.14

19.Nov.14

-55

-14

-37

12.Okt.14

-16

14-May-16

MS09 - Completion of Lift Works

MS10 - Commencement of

Swimming Pool Works

Note: 1) Total Variance: the difference between TCP and Current Forecast.

21.Okt.14Slab L40 - Completion

Total

Variance

-35

16.Okt.14

Current

Forecast

Page 19: Monthly Progress Report - September 2014

18

60- Days look Ahead Critical Activities

TCP - Rev 3

20-Nov-14 -5 6.00-

25.Nov.14 -5 6.00-

30.Nov.14 -6 6.00-

01.Okt.14 -7 9.00-

08.Okt.14 -5 6.00-

13.Okt.14 -5 6.00-

19.Okt.14 -4 8.00-

23.Okt.14 -6 9.00-

29.Okt.14 -5 7.00-

03.Nov.14 -5 6.00-

09.Nov.14 -4 8.00-

15.Nov.14 -4 9.00-

19.Nov.14 -5 8.00-

24.Nov.14 -5 7.00-

29.Nov.14 -5 8.00-

Block Work Completion-L18 05.Aug.14 -59 30.00-

Block Work Completion-L27 28.Sep.14 -7 7.00-

Block Work Completion-L28 07.Okt.14 -3 6.00-

Block Work Completion-L29 14.Okt.14 -3 7.00-

Block Work Completion-L30 26.Okt.14 -3 13.00-

Block Work Completion-L31 26.Okt.14 -3 7.00-

Block Work Completion-L32 30.Okt.14 -3 5.00-

Block Work Completion-L33 04.Nov.14 -5 6.00-

Block Work Completion-L34 11.Nov.14 -5 7.00-

Block Work Completion-L35 18.Nov.14 -5 8.00-

Block Work Completion-L36 24.Nov.14 -5 8.00-

Plaster Work Completion-L20 06.Sep.14 -26 6.00-

Plaster Work Completion-L21 11.Sep.14 -28 7.00-

Plaster Work Completion-L22 17.Sep.14 -29 8.00-

Plaster Work Completion-L23 22.Sep.14 -32 10.00-

Plaster Work Completion-L24 28.Sep.14 -26 4.00-

Plaster Work Completion-L25 06.Okt.14 -25 5.00-

Plaster Work Completion-L26 13.Okt.14 -19 2.00-

Plaster Work Completion-L27 21.Okt.14 -16 1.00-

Plaster Work Completion-L28 29.Okt.14 -13 1.00-

Plaster Work Completion-L29 05.Nov.14 -11 4.00-

Plaster Work Completion-L30 16.Nov.14 -6 2.00-

Core Wall L50 - Completion 04.Dez.14

Core Wall L49 - Completion

Core Wall L46 - Completion

Core Wall L47 - Completion

Activity

Core Wall L42 - Completion

Core Wall L43 - Completion

Core Wall L48 - Completion

Slab L48 - Completion

Core Wall L39 - Completion

Core Wall L40 - Completion

Core Wall L41 - Completion

29-Oct-14

17-Oct-14

10-Oct-14

5-Oct-14

3-Oct-14

29-Oct-14

11-Nov-14

16-Nov-14

22-Nov-14

9-Oct-14

16-Oct-14

24-Oct-14

29-Nov-14

2-Oct-14

Monthly Progress Report No. 7 - September 2014

2-Nov-14

13.Nov.14

Total

Variance

Current

Forecast

29.Okt.14

06.Dez.14

Core Wall L44 - Completion 03.Nov.14

Slab L46 - Completion

Slab L47 - Completion

Core Wall L45 - Completion 08.Nov.14

13.Okt.14

18.Okt.14

23.Okt.14

25.Nov.14

30.Nov.14

08.Okt.14

Variance

since Aug 14

24.Nov.14

29.Nov.14

24-Oct-14

31-Oct-14

1-Nov-14

6-Nov-14

19.Nov.14

9-Nov-14

16-Nov-14

23-Nov-14

Page 20: Monthly Progress Report - September 2014

19

60- Days look Ahead Critical Activities

TCP - Rev 3

Plaster Work Completion-L31 16.Nov.14 -14 5.00-

Paint Work Completion-L6 12.Jul.14 -82 26.00-

Paint Work Completion-L7 19.Jul.14 -75 20.00-

Paint Work Completion-L8 23.Jul.14 -71 15.00-

Paint Work Completion-L9 30.Jul.14 -65 16.00-

Paint Work Completion-L10 04.Aug.14 -63 17.00-

Paint Work Completion-L11 09.Aug.14 -61 17.00-

Paint Work Completion-L12 13.Aug.14 -61 17.00-

Paint Work Completion-L13 18.Aug.14 -60 17.00-

Paint Work Completion-L14 23.Aug.14 -59 19.00-

Paint Work Completion-L15 27.Aug.14 -61 19.00-

Paint Work Completion-L16 01.Sep.14 -62 19.00-

Paint Work Completion-L17 08.Sep.14 -61 19.00-

Paint Work Completion-L18 15.Sep.14 -60 19.00-

Paint Work Completion-L19 21.Sep.14 -61 20.00-

Paint Work Completion-L20 25.Sep.14 -63 20.00-

Paint Work Completion-L21 01.Okt.14 -66 23.00-

MEP H/L Completion - L29 07.Okt.14 -4 8.00

MEP H/L Completion - L30 11.Okt.14 -12 1.00

MEP H/L Completion - L31 14.Okt.14 -6 7.00

MEP H/L Completion - L32 20.Okt.14 -7 6.00

MEP H/L Completion - L33 28.Okt.14 -6 6.00

MEP H/L Completion - L34 04.Nov.14 -6 6.00

MEP H/L Completion - L35 11.Nov.14 -6 6.00

MEP H/L Completion - L36 17.Nov.14 -6 6.00

MEP H/L Completion - L37 23.Nov.14 -6 7.00

90%

34%

5%

21-Nov-14

27-Nov-14

6-Dec-14

30-Nov-14

2-Oct-14

3-Oct-14

2-Oct-14

23.Nov.14

29.Nov.14

10.Nov.14

17.Nov.14

6-Oct-14

27.Okt.14

03.Nov.14

11.Okt.14

23.Okt.14

20.Okt.14

Variance

since Aug 14Activity

2-Oct-14

Current

Forecast

Monthly Progress Report No. 7 - September 2014

9-Oct-14

13-Oct-14

17-Oct-14

21-Oct-14

27-Oct-14

2-Nov-14

8-Nov-14

14-Nov-14

Total

Variance

Upward Trend Downward Trend No Change

> 5 days

0 to 5 days

< 0 days

Page 21: Monthly Progress Report - September 2014

20

Physical % Complete

Nomination of PS Items

Clause 14

ProgramTCP - Rev 3 Current Float

Var. since

Aug 14

10-Aug-13 7-May-15 51 -

2-Feb-12 24-Feb-14 -178 30.00-

3-Jun-12 20-Aug-14 69 30.00-

21-Nov-12 20-Nov-14

15-Jan-13 18-Apr-13 Nominated

4-Mar-13 4-Nov-14 116 -

13-Nov-14 20 -

17-Apr-13 3-Sep-14 171 -

90%

34%

5%

Critical Path (TCP-Rev 3)

Work Packages 2013 2014 2015 2016

Planned Actual

Impact on MS02

Schedule Performance

Index (SPI)

SC Nomination for

Fit Out (Entrance)

SC Nomination for

Façade Lighting

SC Nomination for

Swimming Pool

No Change

Milestone

Nominated

Downward Trend

> 5 days

0 to 5 days

Monthly Progress Report No. 7 - September 2014

Progress % Complete

Days Remaining until

MS02

4-Nov-14

Impact on MS01

Fit Out after Wild Air

Façade Glazing

Lifts

Testing/Commissioning

* Note: Physical % Complete based on TCP - Rev 3.

Current

Forecast

< 0 days

13-Nov-14

1-Oct-14

Upward Trend

7-May-15

1-Oct-14

1-Oct-14

SC Nomination for

Landscaping Works

SC Nomination for

Roof Steel Works

Snagging

SC Nomination for

Fit Out (Life Style)

SC Nomination for

Fit Out (Fendi Flat)

SC Nomination for

Sauna,Jacuzzi

Concrete Skeleton

9.09 9.62 10.57

11.53 12.48

15.29 18.4

22.35 25.15

7.4 9.62 10.21 10.81 11.4

13.62 16.04

18.95

22.46

0

5

10

15

20

25

30

Planned % Actual %

- 182

- 4

22.5

226

0.89

Page 22: Monthly Progress Report - September 2014

21

Negative Float ContourDominant Causes for Project Delays

-10

Critical Paths AnalysisPaths Package Activities

Path 3 (Curtain Wall) Path 1 Façade LightNomination, Procurement,

Engineering, Installation.

Path 4 (MEP Long Lead Items (Mechanical))-20

Path 1 (Façade Light)

Path 2 ( Bus Bars and LV Panels)

-40

-144

-182

* Note: The shown analysis was run based on TCP-Rev 03, however, this version isn't approved so the shown analysis is only a tentative

one.

Path 3 Curtain Wall

Installation of 7 elements for

external façade (unitized system,

stick system, doors, balcony

partitions, cladding, balustrade and

louvers.

51.00-

Path 4MEP Long Lead

Items (Mechanical)

CW pumps submission/approval,

procurement/installation, producing

wild air, fit out works by JC

Maclean.

50.00-

DELAYS IDENTIFIED

THIS MONTH-182

Path 2Bus Bars and LV

Panels

Procurement/installation of Bus

Bars and LV Panels.144.00-

182.00-

Analysis run on 30-September-14

Monthly Progress Report No. 7 - September 2014

Float

Path 2 -144 days

Path 1 -182 days

Path 3 -51 days

Path 4 -50 days

Page 23: Monthly Progress Report - September 2014

22

Risk Analysis Risk Analysis on Critical Paths

Monthly Progress Report No. 7 - September 2014

Analysis run on 30-September-14

• Risk: Delay of -182 days

• Driver: Late of Nomination of Façade Light

• Mitigation:

• The Engineer is of the view that the facade light nomination will not affect the project completion date, as the light fixtures will be installed before the project completion, which means there is enough time for procurement and engineering.

• However, it is recommended that the client to expedite the nomination to avoid any risk to coordinate procurement with other parties.

• Risk: Delay of -144 days

• Driver: Procurement of Bus Bars and LV

Panels

• Mitigation:

• An instruction issued by DAMAC to ATC to proceed with procuring the Bus Bars and LV Panels. The LPO will be issued during the month of October 2014.

• On the other hand DAMAC/AECOM are working to get the NOC from Emaar in order to seek the design NOC from DEWA.

• Risk: Delay of -51 days

• Driver: Delay in Curtain Wall Installation

• Mitigation:

• The design of secondry steel structure was done by ALICO.

• ATC to submit the fabrication drawings to the engineer for approval.

• Unitized panels will be delivered to site by 21-Oct-14.

• Risk: Delay of -50 days

• Driver: Chilled Water Pumps

• Mitigation:

• On the basis that the chilled water pumps will contribute in producing wild air so that the delay in submission the material submittal affected the delivery date to site and thus affected the commencement of wild air operation. However, the pumps are approved and the purchase order will be issued during August 2014.

• The Engineer is of the view that the wild air is a vague issue so that Arabtec has been instructed many time in the weekly progress meetings to plan the wild air operation to allow the fit out work start and submit a proposal for review, however, ATC stated that the term ''wild air'' is not in the contract.

Path 1

Path 2

Path 3

Path 4

Path 1 Path2 Path3 Path 4

Paths 182 144 51 50

0

20

40

60

80

100

120

140

160

180

200

De

lay

s

Critical Paths

Page 24: Monthly Progress Report - September 2014

23

Slabs Planned Pouring Actual Pouring Progress Variance

23rd floor 02.Jul.14 4-Jul-14 100% 2.00- 24th floor 10.Jul.14 10-Jul-14 100% 1.00- 25th floor 19.Jul.14 17-Jul-14 100% 1.00 26th floor 26.Jul.14 23-Jul-14 100% 1.00- 27th floor 03.Aug.14 1-Aug-14 100% 1.00 28th floor 09.Aug.14 9-Aug-14 100% -

29th floor 16.Aug.14 14-Aug-14 100% -

30th floor 23.Aug.14 22-Aug-14 100% 1.00- 31st floor 31.Aug.14 31-Aug-14 100% - 32nd floor 06.Sep.14 7-Sep-14 100% 1.00- 33rd floor 11.Sep.14 12-Sep-14 100% - 34th floor 16.Sep.14 18-Sep-14 100% 1.00- 35th floor 21.Sep.14 24-Sep-14 100% 1.00- 36th floor 27.Sep.14 30-Sep-14 100% 3.00-

Progress Photographs

Structure Progress - Level 36

Zone B - Section DD; Seepage Area

Monthly Progress Report No. 7 - September 2014

57

.12

%

5.6

9%

17

.50

%

9.4

2%

12

.38

%

0.0

0%

0.0

0%

3.4

2%

56

.34

%

3.3

8%

16

.04

%

20

.63

%

2.1

0%

0.3

8%

%Pld %Act

DAMAC Heights

Tower

Page 25: Monthly Progress Report - September 2014

24

Core Walls Planned Pouring Actual Pouring Progress Variance

23rd floor 21.Jun.14 15-Jun-14 100% - 24th floor 30.Jun.14 19-Jun-14 100% 2.00 25th floor 06.Jul.14 26-Jun-14 100% 2.00 26th floor 13.Jul.14 3-Jul-14 100% 1.00- 27th floor 20.Jul.14 14-Jul-14 100% 1.00- 28th floor 27.Jul.14 21-Jul-14 100% 1.00-

29th floor 04.Aug.14 27-Jul-14 100% 1.00

30th floor 11.Aug.14 13-Aug-14 100% 2.00 31st floor 18.Aug.14 17-Aug-14 100% 7.00 32nd floor 23.Aug.14 24-Aug-14 100% 1.00- 33rd floor 28.Aug.14 28-Aug-14 100% 6.00 34th floor 03.Sep.14 3-Sep-14 100% 3.00- 35th floor 08.Sep.14 14-Sep-14 100% 2.00- 36th floor 16.Sep.14 17-Sep-14 100% 6.00- 37th floor 22.Sep.14 25-Sep-14 100% 3.00- 38th floor 27.Sep.14 29-Sep-14 100% 1.00-

Progress Photographs

Dry Area: False Ceiling Suspension System @ Level 6

Corridor: False Ceiling Boards @ Level 6

Monthly Progress Report No. 7 - September 2014

57

.12

%

5.6

9%

17

.50

%

9.4

2%

12

.38

%

0.0

0%

0.0

0%

3.4

2%

56

.34

%

3.3

8%

16

.04

%

20

.63

%

2.1

0%

0.3

8%

%Pld %Act

DAMAC Heights

Tower

Page 26: Monthly Progress Report - September 2014

25

HVAC HL Works Planned Finish Actual Finish Progress Variance

24th floor 30.Aug.14 91%25th floor 06.Sep.14 90%26th floor 13.Sep.14 90%27th floor 21.Sep.14 84%28th floor 28.Sep.14 69%29th floor 07.Okt.14 52%

FF HL Works Planned Finish Actual Finish Progress Variance

24th floor 30.Aug.14 99%25th floor 06.Sep.14 98%26th floor 13.Sep.14 96%27th floor 21.Sep.14 96%28th floor 28.Sep.14 88%29th floor 07.Okt.14 78%

Painting (Primer & Putty) @ Level 13

Progress Photographs

Wet Area: Wall Tiles and Water Proofing @ Level 6

Monthly Progress Report No. 7 - September 2014

57

.12

%

5.6

9%

17

.50

%

9.4

2%

12

.38

%

0.0

0%

0.0

0%

3.4

2%

56

.34

%

3.3

8%

16

.04

%

20

.63

%

2.1

0%

0.3

8%

%Pld %Act

DAMAC Heights

Tower

Page 27: Monthly Progress Report - September 2014

26

Plumbing HL Work Planned Finish Actual Finish Progress Variance

24th floor 30.Aug.14 95%25th floor 06.Sep.14 95%26th floor 13.Sep.14 95%27th floor 21.Sep.14 95%28th floor 28.Sep.14 95%29th floor 07.Okt.14 49%

Electrical HL Work Planned Finish Actual Finish Progress Variance

24th floor 30.Aug.14 94%25th floor 06.Sep.14 80%26th floor 13.Sep.14 94%27th floor 21.Sep.14 90%28th floor 28.Sep.14 90%29th floor 07.Okt.14 84%

MEP High Level Service @ Level 27

Foundation for Equipment @ Level 30

Progress Photographs Monthly Progress Report No. 7 - September 2014

57

.12

%

5.6

9%

17

.50

%

9.4

2%

12

.38

%

0.0

0%

0.0

0%

3.4

2%

56

.34

%

3.3

8%

16

.04

%

20

.63

%

2.1

0%

0.3

8%

%Pld %Act

DAMAC Heights

Tower

Page 28: Monthly Progress Report - September 2014

27

Blocks Planned Finish Actual Finish Progress Variance

17th floor 27-Jul-14 95%18th floor 5-Aug-14 50%19th floor 10-Aug-14 95%20th floor 16-Aug-14 95%21st floor 20-Aug-14 95%22nd floor 27-Aug-14 95%

23rd floor 1-Sep-14 95%

24th floor 7-Sep-14 95%25th floor 13-Sep-14 95%26th floor 20-Sep-14 95%27th floor 28-Sep-14 70%28th floor 7-Oct-14 15%29th floor 14-Oct-14 5%

Substation - Trenches and Block Wall

Stick Curtain Wall - Aluminium Cladding

Monthly Progress Report No. 7 - September 2014Progress Photographs

57

.12

%

5.6

9%

17

.50

%

9.4

2%

12

.38

%

0.0

0%

0.0

0%

3.4

2%

56

.34

%

3.3

8%

16

.04

%

20

.63

%

2.1

0%

0.3

8%

%Pld %Act

DAMAC Heights

Tower

Page 29: Monthly Progress Report - September 2014

28

Concealed MEP Planned Finish Actual Finish Progress Variance

19th floor 21-Aug-14 98%20th floor 27-Aug-14 99%21st floor 02.Sep.14 96%22nd floor 08.Sep.14 96%23rd floor 13.Sep.14 90%24th floor 18.Sep.14 59%

Plaster Planned Finish Actual Finish Progress Variance

17th floor 19-Aug-14 95%18th floor 26-Aug-14 2%19th floor 1-Sep-14 95%20th floor 6-Sep-14 70%21st floor 11-Sep-14 13%22nd floor 17-Sep-14 5%

Progress Photographs

Stick Curtain Wall - Galss Panels

Brackets Installation for Balcony Balustrade

Monthly Progress Report No. 7 - September 2014

57

.12

%

5.6

9%

17

.50

%

9.4

2%

12

.38

%

0.0

0%

0.0

0%

3.4

2%

56

.34

%

3.3

8%

16

.04

%

20

.63

%

2.1

0%

0.3

8%

%Pld %Act

DAMAC Heights

Tower

Page 30: Monthly Progress Report - September 2014

29

Health, Safety & EnvironmentHSE Statistics

Total Hours

Worked

Work Force

(Average)Fatalities Lost Time Injury

First

Aid

Cases

Near

Misses

381,010 1465 0 0 2 3

4,292,339 1402 0 4 182 15

4,673,349 0 0 4 184 18

* Note:

HSE Site Inspections

Issues Closed Open Issued Closed Open

5 - 14 10 4 2 1 2

128 - 174 172 2 22 21 1

133 - 188 182 6 24 22 2

HSE Training & Seminars

Orientation

for New Hires

308

4,440

4,748

Significant Incidents

1

2

3

4

5

6

Critical Manageable

Severe Negligible

This Month

19

No. of Training Safety Meetings

Site ObservationsNotices (Improvement &

Stop Works)

Safety

Audits

(Average)

Tool Box Talks Safety Training

Description/Comments Risk Rate

Joint

Inspections

Recordable

Injuries

0

19

Monthly Progress Report No. 7 - September 2014

Previous Months

Total Project

This Month

Previous Months

Total Project

4

66

70

Current Month

Previous Months

Total Project

195

1346

1541

5

60

65

Water seepage in section DD and a subsequent soil settlement along section BB and DD.

C

S

M

N

C

Page 31: Monthly Progress Report - September 2014

30

May Statistics

0

(0)

0

(4)

0

(19)

2

(184)

14

(188)

LTI & Lost Work Days

Monthly Progress Report No. 7 - September 2014

Fatalities

LTI

Total Hours Worked this

Month

Total Hours Worked Previous

Months

Total Hours Worked For the

Project

Notices Issued this Month

Work Force Average

Current Month

(Cumulative Contract)

Recordable Injuries

First Aid Cases

Site Observations

Eye Injuries 0 (22)

Back Injuries 0 (4)

Face Injuries 0 (9)

Trunk Front Injuries 0 (4)

Hand Injuries 1 (62)

Head Injuries 0 (4)

Arm Injuries 1 (28)

Leg Injuries 1 (35)

Ankle/Foot Injuries 0 (14)

0

0.5

1

1.5

2

2.5

3

3.5

Lost Time Injury (LTI)

Lost Work Days (LWD)

381,010

4,292,339

4,673,349

1465

2

Page 32: Monthly Progress Report - September 2014

31

EngineeringNOCs Status Summary

Actual

Issue Date

17.Sep.13

19.Jun.14 -

23.Jän.11

14.Nov.13

25.Nov.13

10.Jul.14

09.Jun.13

27.Mai.14

06.Jul.14

05.Mai.13

25-Mar-13

27-Dec-11

25-Jun-12

9-Sep-13

90%

# 34% 30 to < 60 days

5%

RME

> 60 days

< 30 days

Note: Days remaining from 30 Sep 2014 to Anticipated Date

Expiry DateDays

RemainingResponsible

Dubai Civil Aviation26.Mai.15 RME/AECOM

RME/AECOM

DEWA - Electrical

Electrical Load

Design NOC04.Mai.15 RME/AECOM

LV Design Drawing

Approval

Revised

Approval is

required

RME/AECOM

Substation / Trench

Design Approval

Revised

Approval is

required

RME/AECOM

Authority

Etisalat Design NOC

& Drawings Approval

Monthly Progress Report No. 7 - September 2014

NOC/PermitAnticipated

Issue Date

Height NOC

Warning Light NOC

GSM NOC RME/AECOM

Revised

Approval is

required

Final NOC after

final design

approval.

Water Supply Design

Drawing Approval

Revised

Approval is

required

RME/AECOM

Revised

Approval is

required

Revised

Approval is

required

16.Sep.15 RME/AECOM

Etisalat

RME

ATC

RME/AECOM

RME/AECOM

Revised

Approval is

required

Dubai Municipality

Fence NOC 22.Jul.11

Ground water

Discharge08.Mai.14

Drainage Design NOC

and Drawings

Approval

FIC Location Approval

Dubai Civil DefenseDesign Drawing

ApprovalRME/AECOM

DEWA - Water

Water Design NOC 24-Mar-15 RME/AECOM

EMAAR

Water Seepage

Remedial WorksRME

Dewatering

Conditional NOC24-Dec-12 RME

Drainage NOC 9-Dec-13

Page 33: Monthly Progress Report - September 2014

32

Critical Authorities Issues

Subject

NOCs &

Dwgs.

NOC

Engineering Submittal Status Report

1 2 3 4 5 6

17 3 12 - 1 0 1

1266 58 1055 6 73 66 8

72 37 28 1 5 1 0

209 39 128 0 17 22 3

Submitted Open Closed

367 35 332

209 39 170

72 7 65

1266 145 1121

17 1 16

1931 227 1704

Authority Action

DEWA, DM and Civil DefenceRevised approvals are required due

to the architectural changes.

Monthly Progress Report No. 7 - September 2014

EMAAR 30.Okt.14

* Note: Only 2014 submittals have been considered.

Prequalification

Approval94%

19 89%

90%

81%

90%

0

5

0

3- Revise& Resubmit 5- Under Review

4- Rejected 6- Review not required

Review Category

% RFIs Closed

Submittals Closed

Current ForecastPlanned Date

Document Submittal

Prequalification

Approval

NOC has to be given by Emaar in

order to seek the design NOC from

DEWA.

Submitted

0

Total 88%

Request for

Information

Materials

Method Statement

Number of Submittals

Submittals Open

Shop Drawings

Method Statements

Materials

Document Submittal % ClosedOverdue

1- Approved

2- Approved as Noted

Shop Drawings

* Note: Only 2014 submittals have been considered.

88%

12%

Submittals Closed

Submittals Open

1931

1704

227

90%

Page 34: Monthly Progress Report - September 2014

33

Quality Assurance & ControlNon-Conformance Reports (NCR)

Category 1: Per Work Package

Issued Closed Open IssuedClose

dOpen Issued Closed Open

8 7 1 0 0 0 8 7 1

68 57 11 3 6 2 71 63 8

3 2 1 1 1 1 4 3 1

11 11 0 4 1 3 15 12 3

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

90 77 13 8 8 6 98 85 13

Category 2: Per Root Causes

Issued Closed Open IssuedClose

dOpen Issued Closed Open

5,16,44,45,56,62,

64,73,86.9 8 1 0 1 0 9 9 0

6,8,11,12,14,15,21,22,2

3,24,26,27,29,

32,38,39,43,51,53,54,8

0,81,98.

22 22 0 1 1 0 23 23 0

9,28,99,102,104. 2 1 1 3 0 3 5 1 4

34,49,50,66. 4 4 0 0 0 0 4 4 0

1,37,40,69,82. 5 5 0 0 0 0 5 5 0

10,13,17,18,19,20,25,3

0,31,33,35,41,46,47,48,

52,55,57,58,59,60,65,6

8,70,71,72,74,75,76,77,

78,79,83,84,85,88,89,9

0,91,94,96,100,101.

40 30 10 3 5 3 43 35 8

2,3,7,42,61,63,67,87,95

.8 7 1 1 1 0 9 8 1

90 77 13 8 8 6 98 85 13

Not working as per Method Statement

Bad Workmanship

Others

Monthly Progress Report No. 7 - September 2014

Use of Unapproved Drawings/Materials

Deviation from Specifications

Not Following Manufacturer's Instructions

Deviation from the Safety Requirements

Total NCRsSeptember NCRs

Total NCRsSeptember NCRs

Total

Use of Unapproved

Drawings/Material

Total

Work AreaPrevious NCRs

Others

NCR ID

Deviation from Specifications

Not Following Manufacturer's

Instructions

Deviation from the Safety

Requirements

Not working as per Method

Statement

Bad Workmanship

Previous NCRsWork Area

Structural

External Façade

Architectural

MEP

Lifts

General

9

23

5 4

5

43

9

A

B

C

D

E

F

G

Page 35: Monthly Progress Report - September 2014

34

Key Quality Improvement Measures

Implemented in the Month

Audits

Quality Trending

Internal External

• Curre tl ATC keeps su itti g the o rete test results i ti el a er as was instructed by AECOM.

• AECOM i stru ted ATC to su it the stru tural leara e efore the commencement of MEP work.

• AECOM is going to hold Quality Technical Meetings on weekly basis to

monitor the quality.

NCR Closed %

NCRs Opened

NCRs Closed

Total NCRs Raised

NCR Opened %

Monthly Progress Report No. 7 - September 2014

8NON-CONFORMANCE

IDENTIFIED THIS

MONTH

Quality Improvement Measures

3

9

4

6

3 3

13

9

6

5

13

8

0

2

4

6

8

10

12

14

NCR Raised

87%

13%

98

85

13

Page 36: Monthly Progress Report - September 2014

35

Commercial StatusCost Summary (AED)

244,747,598 8,177,509 - 226,116,726 479,041,833 37,437,524 1,899,214

20,000,000 7,738,272 - - 27,738,272 -

297,020 389,706 686,726 515,808

1,595,000 81,655 - - 1,676,655 - -

Payment Status (AED)

AED % AED % AED % AED

119,845,391 23.58% 115,383,973 22.7% 75,444,872 14.8% 63,693,496

21,989,206 79.3% 21,989,206 79.3% 21,436,431 77.3% 21,792,331

686,726 100.0% 618,053 90.0% 418,956 61.0% 618,053

1,403,119 83.7% 1,262,807 75.3% 1,355,221 80.8% 1,320,372

516479357.2

27738271.57686726.1

Variation Status 1676655

Variation

Approved

Variation

Rejected

Variation

DAMAC

Assessment

Variation

ATC

Assessment

Variation

Approved

Variation

Rejected

Variation

DAMAC

Assessment

35 9 9 26 0 0 0

Variation Value (AED)

Variation

Approved

Variation

Rejected

Variation

DAMAC

Assessment

Variation

ATC

Assessment

Variation

Approved

Variation

Rejected

Variation

DAMAC

Assessment

8,177,509 6,801,791 1,679,024 220,190

Key Commercial Issues

1

2

36Monthly Progress Report No. 7 - September 2014

All Gross/Net Certified and Paid to Date Values excluded Advance Payments.

Item Management Strategy

Extension of Time ClaimsEOT flooding claims are under review by 3rd party, anticipated closure in

October 2014.

ATC's Pending Variations Variations submission, assessment and approval continues.

ATC IPC# 39 (Aug-14) was considered for this report.

Cumulative Current Month

Variation ATC

Assessment

ATC 0

Cumulative Current Month

Variation ATC

Assessment

ATC

ATC

RMB

IGS

GHU

* Note: The percentage value is the current amount divided by the Contract Price

12.53%

78.56%

95.29%

81.63%

Monthly Progress Report No. 7 - September 2014

Effective

Contract

Value

Approved

Variations

Approved

ClaimsApproved PS

Total

Commitments

Residual

PS

Pending

Variations

Estimate at

Completion

ATC 518,378,571

RMB 27,738,272

IGS 1,202,534

Paid to Date

%

GHU 1,676,655

Gross Certified Net Certified Previously Certified

Page 37: Monthly Progress Report - September 2014

Cash Flow (AED,000)

Notice of Delays Under Review

Ref

.Date Received

1 19-Feb-12

2 19-Feb-12

3 19-Feb-12

4 19-Feb-12

5 19-Feb-12

6 19-Feb-12

7 19-Feb-12

8 19-Feb-12

9 19-Feb-12

10 19-Feb-12

11 2-Apr-12

12 2-Apr-12

13 6-May-13

14 6-May-13

15 6-May-13

16 6-May-13

17 6-May-13

18 6-May-13

19 6-May-13

20 6-May-13

21 18-Aug-13

22 12-Feb-14

23 5-Mar-14

Ref

.

ATC Total Variations

Rejected

Item Date Received

No Claims closed to date -

Delayed nomination of Fit out for HC

Delayed nomination of Wardrobe, Vanaties

Delayed nomination of Mirrors

Delayed nomination of Landscape

ATC Total Variations

PendingDelayed nomination of Fit out for Saunna,Steam and

Delayed nomination of Fit out for Signage/Lockers

Claims Closed

Delayed nomination of Supply Porcelain/Ceramic Tiles

* Note: Only SC's nominations delays have mentioned.

Delayed nomination of Fit out for Entrance

Delayed nomination of Kitchen Cabinet

Delayed nomination of Shower Enclosure ATC Total Variations

ApprovedDelayed nomination of Timber Doors/Ironmongery

Delayed nomination of Vanity Counter

Delayed nomination of Swimming Pool

Delayed nomination of Toilet Access.

Delayed nomination of Light Fittings

Delayed nomination of Roof Features Equipment

Delayed nomination of BMU

Delayed nomination of Façade Light

Delayed nomination of Sanitary Fittings

Delayed nomination of Home Automation

Delayed nomination of Elevators

Delayed nomination of MEP

Delayed nomination of Glazing

ATC Gross % Certified

* Note: Cash flow will be produced after agreeing the target completion program.

Item ATC Paid % to Date

23.58

12.53

35

9

35

0

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

1,300

Monthly Planned

Monthly Actual

Cum. Planned

Cum. Actual

Page 38: Monthly Progress Report - September 2014

37

Risk ManagementTop 7 Risks

RS_04

Re-design of secondary

steel structure to support

the façade

Changes to the mechanical

floors arrangement and

absence of the design for

P5.

ALICO designed the secondary steel

structure. ATC to expidite submission

of fabrication drawings for approval in

order to place the material order.

ATC

Monthly Progress Report No. 7 - September 2014

Risk ID RatingRisk

Owner

DAMAC/

AECOMRS_01

RS_02

Late of issuing MEP IFC

drawings.

RME to issue the final MEP IFC

drawings. Also the renewal of DEWA

design NOC to be done. On the other

hand an instruction to proceed with

procurment was issued by DAMAC.

Risk ResponseRisk Event Cause

Flooding in Zone B

Seepage through openings

in the existing diaphragm

walls.

Seepage occurred during September

2014 and AECOM will provide a

proposal for a permanent soluation to

the diaphragm wall.

ATC/

REMCO

DAMAC/R

ME

RS_03Delays in pouring the slab

of level 62

8 days estimated cycle will

not be achieved as the

core wall will need for 2

weeks at least.

AECOM highlighted this issue to ATC in

the weekly progress meeting,

however, no mitigation provided.ATC

RS_05

Delays In MEP high level

installations, Concealed

Work and Risers Work

Delays from REMCO in

high level works

installation due to

insufficient of manpower.

REMCO to increase the allocated

manpower in order to work

concurrently in 5 levels.

RS_07 BMU Functionality

Delays in possessing

DEWA approval for LV

shop drawings and delays

in procuring LV Panels and

Bus Bars

DAMAC

ALICO

RS_06Delays in nomination of

the PS items

DAMAC's tenders

floating/awarding process

delayed.

DAMAC has to expedite the PS items'

procuring process in order to avoid

delaying the site works. Notably

façade light package.

There is no coordination

between the BMU and

Façade Designs.

Alico is doing the technical study.

Risk Rating Breakdown

0

1

2

3

4

5

Critical Severe Manageable Negligible

Critical

Severe

Manageable

Negligible

Page 39: Monthly Progress Report - September 2014

38

R

Core Values

into Practice

Monthly Progress Report No. 7 - September 2014

Page 40: Monthly Progress Report - September 2014

39

AECOM Core Values

'To enhance and sustain the world’s built, natural and social environments''

9 Core Values

We move with speed and dexterity to adapt and adjust to emerging client and project

requirements.

We recognize that our financial growth is the fairly earned result of living up to these

principles.

We earn and advance our reputation by delivering superior value on every project that we

undertake.

Our industry leadership depends on making project solutions more exciting,

sustainable and cost-effective.

Monthly Progress Report No. 7 - September 2014

We succeed by doing things the right way, with respect to ethics, laws, standards of

quality, and each other.

Our product is our people — our knowledge, skills, passion and diversity. Our success begins with valuing our people and fostering their development.

We succeed by making our clients successful. We embrace our clients’ challenges and opportunities and work for their success.

Whether in an office or on a construction site, keeping our people safe is our most

important measure of success.

Employees

Growth

Clients

Excellence

Innovation

Safety

Integrity

Agility

File :- Printed On :- 16.10.2014 at 10:38

Page 41: Monthly Progress Report - September 2014

40

Core Values into Practice

AECOM Solutions

Time Cost

1

AECOM advice to allow the

building tower to proceed

beyond Level 15 in absence

of Zone B Raft being

completed.

15 weeks + delays EOT Costs

Hig

h

AECOM reviewed the

Structure and concluded

that there was no impact

on the design to allow the

tower structure to

proceed without Zone B.

CS-Site based

Structural

B+P-Structural

Implemented

by AECOM and

closed impact

negated.

No: It is Design Related.

Design decision required

from Ramboll- however

design consultant did not

provide an adequate

response.

INT,

CLN,

EX, AG,

SA

2

Soil Improvement outside

the plot to stabilize extent

monitoring and supervision

and the need to decide

when to commence

excavation.

Continued delay

to Zone B

construction

added to the

current claim by

ATC for flood

event including

suspension of all

work.

EOT Costs+

Damages +

Insurance

claims+suspension

of work costs.

Hig

h

AECOM reviewed the

Client proposed solution

and methodology and

devised an

implementation plan in

coordination with AECOM

Geotechnical department

to minimize the risk on the

area and provided an

implementation plan with

monitoring and

contingency measures to

allow for commencement

of excavation work.

CS-Site based

Civil/ Structural

TRN-

Geotechnical

Implemented

by AECOM

ongoing

No: AECOM Scope covers

supervision services and

monitoring only.

AECOM provided advice

and recommendations to

the implementation of the

solution proposed by the

client without any liability

for the success or failure

of the solution proposed.

INT,

CLN,

EX, AG,

SA

AECOM Values Legend

Monthly Progress Report No. 7 - September 2014

Sr. Description

Impacted if not addressed

Risk AECOM Solution

AECOM

Discipline

involved

Status Included in ScopeAECOM

Values

INT: Integrity CLN: Client GR: Growth EX: Excellence INN: Innovation AG: Agility EMP: Employees SA: Safety

9 Core Values

File :- Printed On :- 16.10.2014 at 10:38

Page 42: Monthly Progress Report - September 2014

41

Core Values into Practice

AECOM Solutions

Time Cost

3

Sub Contractor for Post-

tensioned slab design

highlighting punching shear

overstress in various

columns from levels 26 and

above.

Delay to the

casting of the

slabs.

Increased cost of

adding

reinforcement

and concrete as

drop caps and

shear

reinforcement at

the identified

columns. Me

diu

m

AECOM site structural

team reviewed the

calculations and advised

that the sub contractor

was not applying the loads

correctly thereby

eliminating the added

measures.

CS-Site Structural Implemented

by AECOM and

closed negating

the impact

No: It is Design Related.

Design decision required

from Ramboll- however

design consultant did not

provide adequate

response, AECOM

provided the guidance

through on site workshop

and obtained Design

Consultant, 3rd party and

Employer consensus

resulting in the sub

contractor revising his

comments.

INT,

CLN,

EX, AG,

SA

4

AECOM Values Legend

Included in ScopeAECOM

Values

INT: Integrity CLN: Client GR: Growth EX: Excellence INN: Innovation AG: Agility EMP: Employees SA: Safety

9 Core Values

Monthly Progress Report No. 7 - September 2014

Sr. Description

Impacted if not addressed

Risk AECOM Solution

AECOM

Discipline

involved

Status

File :- Printed On :- 16.10.2014 at 10:38

Page 43: Monthly Progress Report - September 2014

42

R

Appendices

Monthly Progress Report No. 7 - September 2014

Page 44: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 1

Schedule Update

Page 45: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

TotalTotal 2012.00 24-Feb-14 14-May-16 05-Jun-11 A 20-Dec-16 -220.00 25.15% 22.46% 0.89DAMAC HEIGHTS-Target Completion Programme- Rev 3.1DAMAC HEIGHTS-Target Completion Programme- Rev 3.1 2012.00 24-Feb-14 14-May-16 05-Jun-11 A 20-Dec-16 -220.00 25.15% 22.46% 0.89GENERALGENERAL 2012.00 24-Feb-14 14-May-16 05-Jun-11 A 20-Dec-16 -220.00 100% 0% 0.00

KEY DATESKEY DATES 1700.00 15-Nov-14 14-May-16 05-Jun-11 A 20-Dec-16 -182.00 0% 0% 0.00DHKMSGN220 IFC Drawing 0.00 05-Jun-11 A 100% 100% 0.00DHKMSGN200 Commencement Date 0.00 19-Jun-11 A 100% 100% 0.00DHKMSGN210 Site Possession 0.00 19-Jun-11 A 100% 100% 0.00DHKMSGN250 DM Approval on enabling Work Completion 0.00 02-Oct-12 A 100% 100% 0.00DHKMSGN260 Approval test results on Enabling Work items 0.00 02-Oct-12 A 100% 100% 0.00DHKMSGN240 Dewatering System Handing Over 0.00 22-Oct-12 A 100% 100% 0.00DHKMSGN230 Building Permit 0.00 27-Mar-13 A 100% 100% 0.00DHKMSGN470 Design Nocs 0.00 18-Apr-13 A 100% 100% 0.00DHKMSGN410 Tower Raft Pour 0.00 17-May-13 A 100% 100% 0.00DHKMSGN420 Overall Foundation Completion 0.00 15-Nov-14 21-Dec-14 -28.00 0% 0% 0.00DHKMSGN430 Basement/Podium Completion of Structure up to GF 0.00 19-Feb-15 26-Mar-15 -28.00 0% 0% 0.00DHKMSGN400 Partial Power On (Up to Lvl.30) 0.00 19-Feb-15 19-Apr-15 -50.00 0% 0% 0.00DHKMSGN500 Wild Air On (Up to Lvl..29) 0.00 08-Mar-15 05-May-15 -50.00 0% 0% 0.00DHKMSGN450 Podium Completion of Structure up to Lv. P5 0.00 04-Jun-15 09-Jul-15 -1.00 0% 0% 0.00DHKMSGN402 Partial Power On (Lvl.31-61) 0.00 14-Jun-15 20-Jul-15 -14.00 0% 0% 0.00DHKMSGN502 Wild Air On (Lvl.31-61) 0.00 21-Jul-15 06-Aug-15 -14.00 0% 0% 0.00DHKMSGN452 Completion of Structure 0.00 12-Aug-15 17-Aug-15 7.00 0% 0% 0.00DHKMSGN440 Completion of Facade Cladding Up to Lvl.85 0.00 15-Aug-15 18-Oct-15 -10.00 0% 0% 0.00DHKMSGN462 Wild Air On (Level 62 above) 0.00 08-Nov-15 02-Jan-16 -46.00 0% 0% 0.00DHKMSGN442 Completion of Facade Cladding Up to top 0.00 12-Nov-15 13-Jan-16 -5.00 0% 0% 0.00DHKMSGN460 Permanent Power On (Overall) 0.00 08-Dec-15 25-May-16 -144.00 0% 0% 0.00DHKMSGN990 Project Completion 0.00 14-May-16 20-Dec-16 -182.00 0% 0% 0.00

EMPLOYER KEY DATESEMPLOYER KEY DATES 1756.00 07-Sep-14 19-Feb-16 15-Oct-12 A 30-Jun-16 -77.00 0% 0% 0.00ISSUANCE OF VALID NOCs (BY OTHERS)ISSUANCE OF VALID NOCs (BY OTHERS) 0.00 24-Feb-14 16-Mar-14 30-Sep-14 30-Sep-14 25.00 0% 0% 0.00AUTHORITIES APPROVALSAUTHORITIES APPROVALS 1069.00 24-Feb-14 08-Mar-16 05-May-13 A 25-May-16 -63.00 100% 0% 0.00DEWA POWER ONDEWA POWER ON 1069.00 24-Feb-14 08-Mar-16 05-May-13 A 25-May-16 -63.00 100% 0% 0.00 SUB-STATION WORKS SUB-STATION WORKS 1069.00 16-Mar-14 08-Dec-15 05-May-13 A 25-May-16 -169.00 100% 0% 0.00 LOAD SCHEDULE LOAD SCHEDULE 100.00 18-Mar-14 24-Jul-14 18-Mar-14 A 19-Jan-15 -175.00 0% 0% 0.00DHDWALS010 Prepare Shop Drawings 10.00 18-Mar-14 29-Mar-14 18-Mar-14 A 02-Oct-14 -145.00 100% 99% 0.00DHDWALS020 Prepare Load Schedules 10.00 26-Mar-14 06-Apr-14 05-Apr-14 A 13-Oct-14 -145.00 100% 99% 0.00DHDWALS090 Engineer's Review 14.00 07-Apr-14 20-Apr-14 20-May-14 A 14-Oct-14 -175.00 100% 99% 0.00DHDWALS030 Submit Load Schedules to DEWA REV 00 5.00 20-Apr-14 26-Apr-14 15-Oct-14 20-Oct-14 -145.00 100% 0% 0.00DHDWALS040 DEWA : Return Load Schedules with comments REV00 21.00 27-Apr-14 25-May-14 21-Oct-14 18-Nov-14 -122.00 100% 0% 0.00DHDWALS050 Resubmit Load Schedules REV 01 5.00 26-May-14 30-May-14 19-Nov-14 23-Nov-14 -174.00 100% 0% 0.00DHDWALS060 DEWA : Return Load Schedules with comments REV01 21.00 31-May-14 20-Jun-14 24-Nov-14 14-Dec-14 -174.00 100% 0% 0.00DHDWALS070 Resubmit Load Schedules REV 02 5.00 21-Jun-14 25-Jun-14 15-Dec-14 20-Dec-14 -143.00 100% 0% 0.00DHDWALS080 DEWA: Approve Load Schd. REV02 & Issue Const. NOC 21.00 26-Jun-14 24-Jul-14 21-Dec-14 19-Jan-15 -121.00 100% 0% 0.00

SUB-STATION WORKS SUB-STATION WORKS 667.00 16-Mar-14 02-Feb-15 05-May-13 A 20-Apr-15 -62.00 100% 0% 0.00DHDWASS110 Prepare Substation Trench Layout Shop Drg 45.00 16-Mar-14 16-Mar-14 05-May-13 A 21-Jun-13 A 100% 100% 0.00DHDWASS120 Submit SS Trench Layout Shop Drg to DEWA 4.00 16-Mar-14 16-Mar-14 22-Jun-13 A 27-Jun-13 A 100% 100% 0.00DHDWASS130 DEWA: Return Substation Layout Drg With Comments 12.00 16-Mar-14 16-Mar-14 28-Jun-13 A 09-Jul-13 A 100% 100% 0.00DHDWASS140 Incorporate DEWA Comments in Shop Drgs 12.00 16-Mar-14 16-Mar-14 10-Jul-13 A 22-Jul-13 A 100% 100% 0.00DHDWASS150 Resubmit SS Trench Layout Shop Drg to DEWA 6.00 16-Mar-14 16-Mar-14 23-Jul-13 A 30-Jul-13 A 100% 100% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Overall Foundation CompletionBasement/Podium Completion of Structure up to GF

Partial Power On (Up to Lvl.30)Wild Air On (Up to Lvl..29)

Podium Completion of Structure up to Lv. P5Partial Power On (Lvl.31-61)

Wild Air On (Lvl.31-61)Completion of Structure

Completion of Facade Cladding Up to Lvl.85

Prepare Shop DrawingsPrepare Load SchedulesEngineer's ReviewSubmit Load Schedules to DEWA REV 00

DEWA : Return Load Schedules with comments REV00Resubmit Load Schedules REV 01

DEWA : Return Load Schedules with comments REV01Resubmit Load Schedules REV 02

DEWA: Approve Load Schd. REV02 & Issue Const. NOC

DEWA: Return Substation Layout Drg With Comments

Resubmit SS Trench Layout Shop Drg to DEWA

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 1 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 46: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHDWASS160 DEWA : Approve SS Trench Layout Shop Drawings 21.00 16-Mar-14 16-Mar-14 31-Jul-13 A 27-Aug-13 A 100% 100% 0.00DHDWASS170 Complete Substations Trench Works 60.00 01-Jun-14 15-Jun-14 21-Sep-13 A 22-Jun-14 A 100% 100% 0.00DHDWASS010 Access to Substation 0.00 16-Jun-14 02-Sep-14 A 100% 100% 0.00DHDWASS020 Fix Cable Trays 6.00 05-Aug-14 11-Aug-14 22-Oct-14 29-Oct-14 -52.00 100% 0% 0.00DHDWASS030 Fix Electrical Conduits 6.00 12-Aug-14 18-Aug-14 30-Oct-14 05-Nov-14 -52.00 100% 0% 0.00DHDWASS040 Power & Lighting Wiring 6.00 19-Aug-14 25-Aug-14 06-Nov-14 12-Nov-14 -52.00 100% 0% 0.00DHDWASS050 Install & Terminate DB's 6.00 26-Aug-14 01-Sep-14 13-Nov-14 19-Nov-14 -52.00 100% 0% 0.00DHDWASS060 Install Wiring Devices 6.00 02-Sep-14 08-Sep-14 20-Nov-14 26-Nov-14 -52.00 100% 0% 0.00DHDWASS070 Install Light Fittings 6.00 02-Sep-14 08-Sep-14 20-Nov-14 26-Nov-14 -48.00 100% 0% 0.00DHDWASS080 Install Emergency Lights 6.00 02-Sep-14 08-Sep-14 20-Nov-14 26-Nov-14 -48.00 100% 0% 0.00DHDWASS090 Install Fire Alarm 5.00 03-Sep-14 08-Sep-14 22-Nov-14 26-Nov-14 -48.00 100% 0% 0.00DHDWASS100 Substation Works Completion 0.00 22-Sep-14 11-Dec-14 -52.00 100% 0% 0.00DHDWASS180 Substation Ready for Inspection 0.00 22-Sep-14 11-Dec-14 -52.00 100% 0% 0.00DHDWASS190 Consultant : Inspect Substation 3.00 23-Sep-14 25-Sep-14 13-Dec-14 15-Dec-14 -52.00 100% 0% 0.00DHDWASS200 Consultant : Submit Inspection check list to DEWA 6.00 27-Sep-14 02-Oct-14 16-Dec-14 22-Dec-14 -52.00 66.67% 0% 0.00DHDWASS210 DEWA : Inspect Substation 20.00 05-Oct-14 02-Nov-14 23-Dec-14 20-Jan-15 -44.00 0% 0% 0.00DHDWASS220 Address DEWA Comments 20.00 03-Nov-14 25-Nov-14 21-Jan-15 12-Feb-15 -53.00 0% 0% 0.00DHDWASS230 Consultant : Reinspect Substation 12.00 26-Nov-14 10-Dec-14 14-Feb-15 26-Feb-15 -53.00 0% 0% 0.00DHDWASS240 Consultant : Resubmit Inspection request to DEWA 20.00 11-Dec-14 04-Jan-15 28-Feb-15 22-Mar-15 -53.00 0% 0% 0.00DHDWASS250 DEWA : Reinspect & Approve Substation 20.00 05-Jan-15 01-Feb-15 23-Mar-15 19-Apr-15 -44.00 0% 0% 0.00DHDWASS260 Substation Ready for HT Cable / Transformer Work 0.00 02-Feb-15 20-Apr-15 -53.00 0% 0% 0.00

LV ROOM WORKS LV ROOM WORKS 603.00 21-Oct-14 08-Dec-15 01-Oct-14 25-May-16 -169.00 0% 0% 0.00DHDWALV000 Access to LV Room 0.00 21-Oct-14 01-Oct-14 131.00 0% 0% 0.00DHDWALV010 Cable Ladder & Tray Fixing 26.00 21-Oct-14 20-Nov-14 01-Oct-14 03-Nov-14 131.00 0% 0% 0.00DHDWALV020 Earthing Strips laying 20.00 05-Nov-14 27-Nov-14 18-Oct-14 10-Nov-14 139.00 0% 0% 0.00DHDWALV030 Cable lying & Terminations 26.00 22-Nov-14 22-Dec-14 04-Nov-14 04-Dec-14 139.00 0% 0% 0.00DHDWALV040 Panel Installation 45.00 03-Jan-15 23-Feb-15 08-Mar-15 28-Apr-15 61.00 0% 0% 0.00DHDWALV050 Panel Earthing termination 15.00 24-Feb-15 12-Mar-15 29-Apr-15 17-May-15 61.00 0% 0% 0.00DHDWALV060 Install MDB & Termination 30.00 19-Mar-15 22-Apr-15 22-Sep-15 29-Oct-15 -46.00 0% 0% 0.00DHDWALV170 Install Chequered Plates 12.00 23-Apr-15 04-May-15 30-Oct-15 10-Nov-15 -43.00 0% 0% 0.00DHDWALV070 Install Wiring Devices 12.00 23-Apr-15 06-May-15 31-Oct-15 12-Nov-15 -46.00 0% 0% 0.00DHDWALV080 Install Light Fittings 12.00 07-May-15 21-May-15 14-Nov-15 26-Nov-15 -46.00 0% 0% 0.00DHDWALV090 Install FM 200 System 12.00 23-May-15 04-Jun-15 28-Nov-15 12-Dec-15 -46.00 0% 0% 0.00DHDWALV100 Install Fire Alarm Devices 12.00 06-Jun-15 18-Jun-15 13-Dec-15 26-Dec-15 -46.00 0% 0% 0.00DHDWALV110 Complete All MEP Installation in Building 0.00 01-Nov-15 26-Dec-15 -46.00 0% 0% 0.00DHDWALV120 Submit Inspection request to DEWA 12.00 02-Nov-15 15-Nov-15 27-Dec-15 09-Jan-16 -46.00 0% 0% 0.00DHDWALV130 DEWA : Inspect Installation 3.00 16-Nov-15 18-Nov-15 10-Jan-16 12-Jan-16 -38.00 0% 0% 0.00DHDWALV140 Address Comments of DEWA 6.00 19-Nov-15 25-Nov-15 08-May-16 14-May-16 -144.00 0% 0% 0.00DHDWALV150 Resubmit Inspection Request to DEWA 3.00 26-Nov-15 29-Nov-15 15-May-16 17-May-16 -144.00 0% 0% 0.00DHDWALV160 DEWA : Inspect & Approve Installations 6.00 30-Nov-15 08-Dec-15 18-May-16 25-May-16 -121.00 0% 0% 0.00

PERMANENT POWER APPLICATION PERMANENT POWER APPLICATION 115.00 02-Feb-15 26-May-15 20-Apr-15 12-Aug-15 -63.00 0% 0% 0.00DHDWAPA000 Application Registration 60.00 02-Feb-15 12-Apr-15 20-Apr-15 29-Jun-15 -53.00 0% 0% 0.00DHDWAPA010 DEWA : Estimate amount for permit power 26.00 14-Apr-15 19-May-15 01-Jul-15 05-Aug-15 -45.00 0% 0% 0.00DHDWAPA020 Client : Pay Estimate amount to DEWA 0.00 26-May-15 12-Aug-15 -45.00 0% 0% 0.00

HIGH TENSION WORKS HIGH TENSION WORKS 222.00 20-Jun-15 08-Dec-15 05-Sep-15 25-May-16 -144.00 0% 0% 0.00DHDWAHT000 DEWA : HT Cable Work & Transformer Procurement & Installation130.00 20-Jun-15 23-Nov-15 05-Sep-15 07-Feb-16 -52.00 0% 0% 0.00DHDWAHT010 Permanent Power on 0.00 08-Dec-15 25-May-16 -144.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

DEWA : Approve SS Trench Layout Shop DrawingsComplete Substations Trench Works

Access to SubstationFix Cable Trays

Fix Electrical ConduitsPower & Lighting Wiring

Install & Terminate DB'sInstal l Wiring DevicesInstal l Light FittingsInstal l Emergency LightsInstal l Fire Alarm

Substation Works CompletionSubstation Ready for InspectionConsultant : Inspect Substation

Consultant : Submit Inspection check list to DEWADEWA : Inspect Substation

Address DEWA CommentsConsultant : Reinspect Substation

Consultant : Resubmit Inspection request to DEWADEWA : Reinspect & Approve SubstationSubstation Ready for HT Cable / Transformer Work

Access to LV RoomCable Ladder & Tray Fixing

Earthing Strips layingCable lying & Terminations

Panel InstallationPanel Earthing termination

Install MDB & TerminationInstall Chequered PlatesInstall Wiring Devices

Instal l Light FittingsInstall FM 200 System

Application RegistrationDEWA : Estimate amount for permit power

Client : Pay Estimate amount to DEWA

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 2 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 47: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DEWA WATER DEWA WATER 567.00 03-Mar-14 08-Mar-16 26-Jan-14 A 12-Apr-16 -20.00 0% 0% 0.00 DUBAI CIVIL DEFENCE DUBAI CIVIL DEFENCE 104.00 27-Feb-14 06-Jul-14 24-Feb-14 A 24-Feb-14 A 0% 0% 0.00 CIVIL AVIATION CIVIL AVIATION 223.00 29-Oct-14 04-Jun-15 24-Feb-14 A 24-Feb-14 A 0% 0% 0.00 ETISALAT/ DU ETISALAT/ DU 383.00 03-Mar-14 14-Jul-15 24-Feb-14 A 11-Oct-15 66.00 0% 0% 0.00 DM DRAINAGE DM DRAINAGE 567.00 24-Feb-14 08-Mar-16 24-Feb-14 A 12-Apr-16 -20.00 0% 0% 0.00

CONSTRUCTION EQUIPMENTSCONSTRUCTION EQUIPMENTS 1570.00 24-Feb-14 14-Nov-15 11-May-13 A 13-Jan-16 -60.00 0% 0% 0.00ENGINEERING & PROCUREMENTENGINEERING & PROCUREMENT 1843.00 24-Feb-14 07-Dec-15 19-Jun-11 A 02-Feb-16 128.00 0% 0% 0.00

PROVISIONAL SUMSPROVISIONAL SUMS 658.00 24-Feb-14 01-Oct-15 13-Aug-13 A 01-Oct-15 132.00 0% 0% 0.00MEP LONG LEAD ITEMSMEP LONG LEAD ITEMS 319.00 19-Mar-14 22-Jul-15 14-Jan-14 A 05-Oct-15 -29.00 0% 0% 0.00ElectricalElectrical 307.00 10-Jun-14 05-Apr-15 05-Mar-14 A 05-Oct-15 -46.00 0% 0% 0.00Bus BarBus Bar 127.00 10-Jul-14 14-Jan-15 05-Mar-14 A 17-Jun-15 -128.00 0% 0% 0.00A3260 Material Submittal 14.00 10-Jul-14 26-Jul-14 05-Mar-14 A 16-Apr-14 A 100% 100% 0.00A3270 Material Approval 14.00 27-Jul-14 13-Aug-14 06-Mar-14 A 06-May-14 A 100% 100% 0.00A3280 Issue of PO to Supplier 7.00 14-Aug-14 21-Aug-14 20-Jan-15 27-Jan-15 -128.00 100% 0% 0.00A3290 Manufacturing /Procurement and Delivery of the Material 120.00 23-Aug-14 14-Jan-15 28-Jan-15 17-Jun-15 -128.00 28.33% 0% 0.00

Wiring AccessoriesWiring Accessories 227.00 28-Oct-14 05-Apr-15 16-Apr-14 A 08-Feb-15 52.00 0% 0% 0.00A3220 Material Submittal 14.00 28-Oct-14 12-Nov-14 16-Apr-14 A 18-May-14 A 0% 100% 0.00A3230 Material Approval 14.00 13-Nov-14 29-Nov-14 17-Apr-14 A 02-Jun-14 A 0% 100% 0.00A3240 Issue of PO to Supplier 7.00 30-Nov-14 08-Dec-14 01-Oct-14 11-Oct-14 52.00 0% 0% 0.00A3250 Manufacturing /Procurement and Delivery of the Material 100.00 09-Dec-14 05-Apr-15 12-Oct-14 08-Feb-15 52.00 0% 0% 0.00

LV Panels & SwitchgearLV Panels & Switchgear 127.00 10-Jun-14 14-Dec-14 18-Mar-14 A 03-Mar-15 104.00 0% 0% 0.00A3300 Material Submittal 14.00 10-Jun-14 25-Jun-14 18-Mar-14 A 01-May-14 A 100% 100% 0.00A3310 Material Approval 14.00 26-Jun-14 12-Jul-14 19-Mar-14 A 15-May-14 A 100% 100% 0.00A3320 Issue of PO to Supplier 7.00 13-Jul-14 20-Jul-14 01-Oct-14 11-Oct-14 104.00 100% 0% 0.00A3330 Manufacturing /Procurement and Delivery of the Material 120.00 21-Jul-14 14-Dec-14 12-Oct-14 03-Mar-15 104.00 50% 0% 0.00

GeneratorGenerator 193.00 15-Jul-14 30-Mar-15 24-Aug-14 A 05-Oct-15 -46.00 0% 0% 0.00A3340 Material Submittal 14.00 15-Jul-14 02-Aug-14 24-Aug-14 A 19-Feb-15 -46.00 100% 78.57% 0.00A3350 Material Approval 14.00 03-Aug-14 18-Aug-14 25-Aug-14 A 23-Feb-15 -46.00 100% 78.57% 0.00A3360 Issue of PO to Supplier 7.00 19-Aug-14 26-Aug-14 24-Feb-15 03-Mar-15 -46.00 100% 0% 0.00A3370 Manufacturing /Procurement and Delivery of the Material 180.00 27-Aug-14 30-Mar-15 04-Mar-15 05-Oct-15 -46.00 16.67% 0% 0.00

ELVELV 227.00 19-Mar-14 28-Apr-15 16-Feb-14 A 03-Mar-15 151.00 0% 0% 0.00BMSBMS 227.00 28-Oct-14 28-Apr-15 08-Jun-14 A 03-Mar-15 151.00 0% 0% 0.00A3420 Material Submittal 14.00 28-Oct-14 12-Nov-14 08-Jun-14 A 20-Aug-14 A 0% 100% 0.00A3430 Material Approval 14.00 13-Nov-14 29-Nov-14 09-Jun-14 A 31-Aug-14 A 0% 100% 0.00A3440 Issue of PO to Supplier 7.00 30-Nov-14 08-Dec-14 01-Oct-14 11-Oct-14 151.00 0% 0% 0.00A3450 Manufacturing /Procurement and Delivery of the Material 120.00 09-Dec-14 28-Apr-15 12-Oct-14 03-Mar-15 151.00 0% 0% 0.00

FA System PanelsFA System Panels 157.00 19-Mar-14 27-Oct-14 16-Feb-14 A 27-Oct-14 20.00 0% 0% 0.00A3380 Material Submittal 14.00 19-Mar-14 03-Apr-14 16-Feb-14 A 20-May-14 A 100% 100% 0.00A3390 Material Approval 14.00 05-Apr-14 20-Apr-14 17-Feb-14 A 04-Jun-14 A 100% 100% 0.00A3400 Issue of PO to Supplier 7.00 21-Apr-14 28-Apr-14 05-Jun-14 A 23-Jun-14 A 100% 100% 0.00A3410 Manufacturing /Procurement and Delivery of the Material 150.00 29-Apr-14 27-Oct-14 24-Jun-14 A 27-Oct-14 20.00 86.67% 0% 0.00

HVACHVAC 284.00 26-Mar-14 22-Jul-15 02-Feb-14 A 19-Apr-15 96.00 0% 0% 0.00FAHUFAHU 167.00 23-Apr-14 14-Dec-14 03-Mar-14 A 15-Dec-14 5.00 0% 0% 0.00A3500 Material Submittal 14.00 23-Apr-14 08-May-14 03-Mar-14 A 20-May-14 A 100% 100% 0.00A3510 Material Approval 14.00 10-May-14 25-May-14 04-Mar-14 A 10-Jun-14 A 100% 100% 0.00A3520 Issue of PO to Supplier 7.00 26-May-14 03-Jun-14 11-Jun-14 A 22-Jun-14 A 100% 100% 0.00A3530 Manufacturing /Procurement and Delivery of the Material 160.00 04-Jun-14 14-Dec-14 23-Jun-14 A 15-Dec-14 5.00 62.5% 61.88% 0.00

FCUFCU 125.00 26-Mar-14 21-Aug-14 09-Feb-14 A 21-Aug-14 A 0% 0% 0.00A3820 Material Submittal 14.00 26-Mar-14 10-Apr-14 09-Feb-14 A 03-Jul-14 A 100% 100% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material Submittal

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 3 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 48: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

A3830 Material Approval 14.00 12-Apr-14 27-Apr-14 10-Feb-14 A 23-Jul-14 A 100% 100% 0.00A3840 Issue of PO to Supplier 7.00 28-Apr-14 05-May-14 24-Jul-14 A 31-Jul-14 A 100% 100% 0.00A3850 Manufacturing /Procurement and Delivery of the Material 90.00 06-May-14 21-Aug-14 01-Aug-14 A 21-Aug-14 A 100% 100% 0.00

Fans ( Pressurisation , Parking Extract Etc )Fans ( Pressurisation , Parking Extract Etc ) 195.00 29-May-14 19-Jan-15 10-Mar-14 A 09-Dec-14 34.00 0% 0% 0.00A3460 Material Submittal 14.00 29-May-14 14-Jun-14 10-Mar-14 A 09-Jun-14 A 100% 100% 0.00A3470 Material Approval 14.00 15-Jun-14 30-Jun-14 11-Mar-14 A 01-Jul-14 A 100% 100% 0.00A3480 Issue of PO to Supplier 7.00 01-Jul-14 08-Jul-14 02-Jul-14 A 22-Jul-14 A 100% 100% 0.00A3490 Manufacturing /Procurement and Delivery of the Material 160.00 09-Jul-14 19-Jan-15 23-Jul-14 A 09-Dec-14 34.00 43.75% 65% 0.00

Chilled Water PumpsChilled Water Pumps 195.00 29-May-14 19-Jan-15 05-Mar-14 A 18-Mar-15 -50.00 0% 0% 0.00A3540 Material Submittal 14.00 29-May-14 14-Jun-14 05-Mar-14 A 03-Jul-14 A 100% 100% 0.00A3550 Material Approval 14.00 15-Jun-14 30-Jun-14 06-Mar-14 A 19-Jul-14 A 100% 100% 0.00A3560 Issue of PO to Supplier 7.00 01-Jul-14 08-Jul-14 20-Jul-14 A 24-Aug-14 A 100% 100% 0.00A3570 Manufacturing /Procurement and Delivery of the Material 160.00 09-Jul-14 19-Jan-15 25-Aug-14 A 18-Mar-15 -50.00 43.75% 12.5% 0.00

Cooling TowerCooling Tower 257.00 03-Dec-14 22-Jul-15 25-May-14 A 19-Apr-15 96.00 0% 0% 0.00A3580 Material Submittal 14.00 03-Dec-14 18-Dec-14 25-May-14 A 12-Aug-14 A 0% 100% 0.00A3590 Material Approval 14.00 20-Dec-14 05-Jan-15 26-May-14 A 13-Aug-14 A 0% 100% 0.00A3600 Issue of PO to Supplier 7.00 06-Jan-15 13-Jan-15 01-Oct-14 11-Oct-14 96.00 0% 0% 0.00A3610 Manufacturing /Procurement and Delivery of the Material 160.00 14-Jan-15 22-Jul-15 12-Oct-14 19-Apr-15 96.00 0% 0% 0.00

ChillerChiller 215.00 22-May-14 05-Feb-15 08-Mar-14 A 15-Mar-15 4.00 0% 0% 0.00A3620 Material Submittal 14.00 22-May-14 08-Jun-14 08-Mar-14 A 09-Jun-14 A 100% 100% 0.00A3630 Material Approval 14.00 09-Jun-14 24-Jun-14 09-Mar-14 A 19-Jun-14 A 100% 100% 0.00A3640 Issue of PO to Supplier 7.00 25-Jun-14 02-Jul-14 21-Jun-14 A 22-Jun-14 A 100% 100% 0.00A3650 Manufacturing /Procurement and Delivery of the Material 180.00 03-Jul-14 05-Feb-15 24-Jun-14 A 15-Mar-15 4.00 41.67% 23.89% 0.00

Heat ExchangerHeat Exchanger 195.00 30-Apr-14 21-Dec-14 02-Feb-14 A 19-Nov-14 36.00 0% 0% 0.00A3660 Material Submittal 14.00 30-Apr-14 15-May-14 02-Feb-14 A 13-May-14 A 100% 100% 0.00A3670 Material Approval 14.00 17-May-14 02-Jun-14 03-Feb-14 A 01-Jun-14 A 100% 100% 0.00A3680 Issue of PO to Supplier 7.00 03-Jun-14 10-Jun-14 02-Jun-14 A 22-Jul-14 A 100% 100% 0.00A3690 Manufacturing /Procurement and Delivery of the Material 160.00 11-Jun-14 21-Dec-14 23-Jul-14 A 19-Nov-14 36.00 58.75% 75% 0.00

Fire FightingFire Fighting 215.00 22-May-14 03-Jun-15 01-May-14 A 15-Jun-15 45.00 0% 0% 0.00Fire PumpsFire Pumps 187.00 22-May-14 05-Feb-15 01-May-14 A 12-May-15 -43.00 0% 0% 0.00A3700 Material Submittal 14.00 22-May-14 08-Jun-14 01-May-14 A 18-May-14 A 100% 100% 0.00A3710 Material Approval 14.00 09-Jun-14 24-Jun-14 19-May-14 A 05-Jun-14 A 100% 100% 0.00A3720 Issue of PO to Supplier 7.00 25-Jun-14 02-Jul-14 01-Oct-14 11-Oct-14 -43.00 100% 0% 0.00A3730 Manufacturing /Procurement and Delivery of the Material 180.00 03-Jul-14 05-Feb-15 12-Oct-14 12-May-15 -43.00 41.67% 0% 0.00

FM200FM200 215.00 20-Sep-14 03-Jun-15 01-Oct-14 15-Jun-15 45.00 0% 0% 0.00A4020 Material Submittal 14.00 20-Sep-14 07-Oct-14 01-Oct-14 19-Oct-14 45.00 71.43% 0% 0.00A4030 Material Approval 14.00 08-Oct-14 23-Oct-14 20-Oct-14 05-Nov-14 45.00 0% 0% 0.00A4040 Issue of PO to Supplier 7.00 26-Oct-14 02-Nov-14 06-Nov-14 13-Nov-14 45.00 0% 0% 0.00A4050 Manufacturing /Procurement and Delivery of the Material 180.00 03-Nov-14 03-Jun-15 15-Nov-14 15-Jun-15 45.00 0% 0% 0.00

PlumbingPlumbing 319.00 14-Sep-14 18-Mar-15 14-Jan-14 A 03-Mar-15 96.00 0% 0% 0.00Sump PumpSump Pump 192.00 14-Sep-14 18-Mar-15 29-Jun-14 A 03-Mar-15 96.00 0% 0% 0.00A3780 Material Submittal 14.00 14-Sep-14 29-Sep-14 29-Jun-14 A 04-Aug-14 A 100% 100% 0.00A3790 Material Approval 14.00 30-Sep-14 18-Oct-14 30-Jun-14 A 14-Aug-14 A 7.14% 100% 0.00A3800 Issue of PO to Supplier 7.00 19-Oct-14 27-Oct-14 01-Oct-14 11-Oct-14 96.00 0% 0% 0.00A3810 Manufacturing /Procurement and Delivery of the Material 120.00 28-Oct-14 18-Mar-15 12-Oct-14 03-Mar-15 96.00 0% 0% 0.00

Water Heat erWater Heat er 155.00 14-Sep-14 18-Mar-15 14-Jan-14 A 31-May-14 A 0% 0% 0.00A3860 Material Submittal 14.00 14-Sep-14 29-Sep-14 14-Jan-14 A 16-Apr-14 A 100% 100% 0.00A3880 Issue of PO to Supplier 7.00 19-Oct-14 27-Oct-14 04-May-14 A 14-May-14 A 0% 100% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Material ApprovalIssue of PO to Supplier

Manufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalIssue of PO to Supplier

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 4 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 49: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

A3870 Material Approval 14.00 30-Sep-14 18-Oct-14 15-May-14 A 20-May-14 A 7.14% 100% 0.00A3890 Manufacturing /Procurement and Delivery of the Material 120.00 28-Oct-14 18-Mar-15 21-May-14 A 31-May-14 A 0% 100% 0.00

Booster PumpBooster Pump 192.00 14-Sep-14 18-Mar-15 03-Jun-14 A 03-Mar-15 96.00 0% 0% 0.00A3900 Material Submittal 14.00 14-Sep-14 29-Sep-14 03-Jun-14 A 29-Jun-14 A 100% 100% 0.00A3910 Material Approval 14.00 30-Sep-14 18-Oct-14 04-Jun-14 A 08-Jul-14 A 7.14% 100% 0.00A3920 Issue of PO to Supplier 7.00 19-Oct-14 27-Oct-14 01-Oct-14 11-Oct-14 96.00 0% 0% 0.00A3930 Manufacturing /Procurement and Delivery of the Material 120.00 28-Oct-14 18-Mar-15 12-Oct-14 03-Mar-15 96.00 0% 0% 0.00

Transfer PumpTransfer Pump 192.00 14-Sep-14 18-Mar-15 03-Jun-14 A 03-Mar-15 96.00 0% 0% 0.00A3940 Material Submittal 14.00 14-Sep-14 29-Sep-14 03-Jun-14 A 29-Jun-14 A 100% 100% 0.00A3950 Material Approval 14.00 30-Sep-14 18-Oct-14 04-Jun-14 A 08-Jul-14 A 7.14% 100% 0.00A3960 Issue of PO to Supplier 7.00 19-Oct-14 27-Oct-14 01-Oct-14 11-Oct-14 96.00 0% 0% 0.00A3970 Manufacturing /Procurement and Delivery of the Material 120.00 28-Oct-14 18-Mar-15 12-Oct-14 03-Mar-15 96.00 0% 0% 0.00

Sewage PumpSewage Pump 192.00 14-Sep-14 18-Mar-15 29-Jun-14 A 03-Mar-15 96.00 0% 0% 0.00A3980 Material Submittal 14.00 14-Sep-14 29-Sep-14 29-Jun-14 A 04-Aug-14 A 100% 100% 0.00A3990 Material Approval 14.00 30-Sep-14 18-Oct-14 30-Jun-14 A 14-Aug-14 A 7.14% 100% 0.00A4000 Issue of PO to Supplier 7.00 19-Oct-14 27-Oct-14 01-Oct-14 11-Oct-14 96.00 0% 0% 0.00A4010 Manufacturing /Procurement and Delivery of the Material 120.00 28-Oct-14 18-Mar-15 12-Oct-14 03-Mar-15 96.00 0% 0% 0.00

DOMESTIC SUBCONTRACTORSDOMESTIC SUBCONTRACTORS 1589.00 24-Feb-14 22-Mar-15 19-Jun-11 A 24-Oct-15 186.00 0% 0% 0.00Prime CostPrime Cost 363.00 01-Apr-14 28-Sep-15 24-Feb-14 A 28-Sep-15 65.00 0% 0% 0.00SUB-STRUCTURESUB-STRUCTURE 938.00 24-Feb-14 24-Feb-14 22-Jun-11 A 20-Sep-13 A 0% 0% 0.00SUPER STRUCTURESUPER STRUCTURE 1633.00 24-Feb-14 13-Jul-15 11-Apr-13 A 02-Feb-16 A 0% 0% 0.00MEPMEP 1835.00 24-Feb-14 07-Dec-15 24-Feb-14 A 24-Feb-14 A 0% 0% 0.00

CONSTRUCTIONCONSTRUCTION 1603.00 24-Feb-14 30-Apr-16 26-Jun-11 A 27-Aug-16 -88.00 25.09% 22.48% 0.90STRUCTURAL , ARCHITECTURAL , MEPSTRUCTURAL , ARCHITECTURAL , MEP 1530.00 24-Feb-14 30-Apr-16 26-Jun-11 A 31-May-16 -15.00 29.36% 28.06% 0.96FOUNDATION WORKSFOUNDATION WORKS 1363.00 24-Feb-14 11-Oct-15 26-Jun-11 A 16-Nov-15 -4.00 75.13% 71.94% 0.96BASEMENT & PODIUMBASEMENT & PODIUM 1455.00 24-Feb-14 30-Apr-16 31-May-13 A 23-May-16 -8.00 48.62% 48.59% 1.00TOWERTOWER 696.00 24-Feb-14 06-Apr-16 10-Feb-14 A 31-May-16 -45.00 24.04% 22.56% 0.94LEVELS 06 - 29LEVELS 06 - 29 577.00 24-Feb-14 14-Nov-15 10-Feb-14 A 12-Jan-16 -50.00 68.5% 64.97% 0.95LEVEL 06LEVEL 06 468.00 24-Feb-14 21-May-15 10-Feb-14 A 02-Sep-15 -72.00 76.72% 72.35% 0.94STRUCTURAL - LEVEL 6STRUCTURAL - LEVEL 6 20.00 24-Feb-14 16-Mar-14 10-Feb-14 A 09-Mar-14 A 100% 100% 1.00DHCWA07100 Core Wal - Level 06 6.00 24-Feb-14 24-Feb-14 15-Feb-14 A 20-Feb-14 A 100% 100% 1.00DHSLA06100 Construction of Horizontals - L06 4.00 10-Mar-14 11-Mar-14 10-Feb-14 A 04-Mar-14 A 100% 100% 1.00DHCWA07110 Construction of Verticals - L06 3.00 13-Mar-14 16-Mar-14 06-Mar-14 A 09-Mar-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 25-May-14 29-May-14 08-May-14 A 18-May-14 A 0% 0% 0.00DHSLA06102 Stair # 2 4.00 25-May-14 29-May-14 08-May-14 A 13-May-14 A 100% 100% 0.00DHSLA06104 Stair # 1 4.00 25-May-14 29-May-14 13-May-14 A 18-May-14 A 100% 100% 0.00

FINISHES - LEVEL 06FINISHES - LEVEL 06 246.00 12-Apr-14 21-May-15 24-Feb-14 A 14-Jul-15 -31.00 40.01% 18.14% 0.45Dry areaDry area 230.00 06-May-14 02-May-15 28-Apr-14 A 25-Jun-15 -43.00 30.8% 15.86% 0.51DHFSH06100 Block Work in Dry Area 6.00 06-May-14 12-May-14 28-Apr-14 A 19-May-14 A 100% 100% 1.00DHFSH06120 Marking,Cutting & Chasing - Dry Area 4.00 13-May-14 17-May-14 15-May-14 A 03-Jun-14 A 100% 100% 1.00DHFSH06130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 08-Jun-14 12-Jun-14 21-May-14 A 07-Jun-14 A 100% 100% 1.00DHFSH06160 Plaster in Dry Area 8.00 12-Jun-14 22-Jun-14 25-May-14 A 18-Jun-14 A 100% 100% 1.00DHFSH06190 Dry Area Floor Screed 7.00 22-Jun-14 30-Jun-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH06230 Dry Area Painting - Primer 4.00 30-Jun-14 05-Jul-14 01-Sep-14 A 01-Oct-14 -8.00 100% 80% 0.00DHFSH06260 Dry Area Painting - Stucco 6.00 05-Jul-14 12-Jul-14 06-Sep-14 A 06-Oct-14 48.00 100% 60% 0.00DHFSH06290 Dry Area False Ceiling Suspension 6.00 23-Aug-14 30-Aug-14 02-Sep-14 A 09-Oct-14 -8.00 100% 15% 0.15DHFSH06350 Dry Area False Ceiling Tiling / Boarding 5.00 17-Sep-14 23-Sep-14 14-Oct-14 19-Oct-14 37.00 100% 0% 0.00DHFSH06400 Dry Area Painting - 1st Coat 5.00 23-Sep-14 29-Sep-14 20-Oct-14 26-Oct-14 37.00 100% 0% 0.00DHFSH06450 Dry Area Flooring 5.00 12-Oct-14 18-Oct-14 02-Nov-14 06-Nov-14 32.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Material ApprovalManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Material SubmittalMaterial Approval

Issue of PO to SupplierManufacturing /Procurement and Delivery of the Material

Construction of Horizontals - L06Construction of Verticals - L06

Stair # 2Stair # 1

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - PrimerDry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area Flooring

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 5 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 50: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH06430 Installation of Timber Doors & Ironmongery 5.00 22-Mar-15 26-Mar-15 20-May-15 25-May-15 -50.00 0% 0% 0.00DHFSH06802 Installation of Wardrobe 12.00 22-Mar-15 04-Apr-15 20-May-15 02-Jun-15 -50.00 0% 0% 0.00DHFSH06500 Paint Final Coat 6.00 26-Apr-15 02-May-15 20-Jun-15 25-Jun-15 -43.00 0% 0% 0.00

Wet areaWet area 204.00 13-May-14 04-Apr-15 24-Feb-14 A 02-Jun-15 -45.00 43.27% 24.17% 0.56DHFSH06220 Wet Area Floor Screed 4.00 29-Sep-14 06-Oct-14 24-Feb-14 A 24-Feb-14 A 28.13% 100% 0.00DHFSH06110 Block Work in Wet Area 6.00 13-May-14 19-May-14 28-Apr-14 A 19-May-14 A 100% 100% 0.00DHFSH06140 Marking,Cutting & Chasing - Wet Area 4.00 20-May-14 24-May-14 15-May-14 A 03-Jun-14 A 100% 100% 1.00DHFSH06150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 08-Jun-14 12-Jun-14 21-May-14 A 07-Jun-14 A 100% 100% 1.00DHFSH06170 Plaster in Wet Area 4.00 12-Jun-14 17-Jun-14 25-May-14 A 18-Jun-14 A 100% 100% 1.00DHFSH06180 Wet Area Wall Tiling 6.00 23-Aug-14 30-Aug-14 02-Sep-14 A 02-Oct-14 -23.00 100% 60% 0.60DHFSH06300 Wet Area False Ceiling Suspension 5.00 01-Sep-14 07-Sep-14 11-Oct-14 15-Oct-14 7.00 100% 0% 0.00DHFSH06370 Wet Area False Ceiling Tiling/Boarding 6.00 17-Sep-14 24-Sep-14 14-Oct-14 20-Oct-14 15.00 100% 0% 0.00DHFSH06210 Wet Area Waterproofing 4.00 24-Sep-14 29-Sep-14 16-Sep-14 A 26-Oct-14 15.00 100% 10% 0.10DHFSH06250 Wet Area Floor Tiling 5.00 06-Oct-14 12-Oct-14 27-Oct-14 01-Nov-14 15.00 0% 0% 0.00DHFSH06460 Cabinet Carcass 5.00 18-Oct-14 22-Oct-14 02-Nov-14 06-Nov-14 15.00 0% 0% 0.00DHFSH06420 Installation of Shower Enclosure 4.00 28-Mar-15 31-Mar-15 26-May-15 30-May-15 -42.00 0% 0% 0.00DHFSH06390 Installation of Vanity Counters & Tops 5.00 28-Mar-15 01-Apr-15 26-May-15 31-May-15 -50.00 0% 0% 0.00DHFSH06800 Installation of Kitchen Cabinet 12.00 22-Mar-15 04-Apr-15 20-May-15 02-Jun-15 -50.00 0% 0% 0.00

Corridor/ Lift LobbyCorridor/ Lift Lobby 44.00 30-Jun-14 10-Mar-15 01-Sep-14 A 24-Nov-14 89.00 66.67% 0% 0.00DHFSH06240 Corridor/Lift Lobby Floor Screed 4.00 30-Jun-14 05-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH06270 Lift Lobby Painting - Primer & Stucco 6.00 05-Jul-14 12-Jul-14 01-Sep-14 A 02-Oct-14 13.00 100% 75% 0.00DHFSH06310 Lift Lobby False Ceiling Suspension 6.00 03-Sep-14 10-Sep-14 13-Oct-14 19-Oct-14 7.00 100% 0% 0.00DHFSH06360 Lift Lobby False Ceiling Tiling / Boarding 5.00 17-Sep-14 23-Sep-14 20-Oct-14 26-Oct-14 93.00 100% 0% 0.00DHFSH06410 Lift Lobby Painting - 1st Coat 6.00 23-Sep-14 30-Sep-14 27-Oct-14 02-Nov-14 93.00 100% 0% 0.00DHFSH06470 Lift Lobby Flooring 6.00 18-Oct-14 26-Oct-14 08-Nov-14 13-Nov-14 89.00 0% 0% 0.00DHFSH06490 Uti lity Rooms- Epoxy Flooring 6.00 26-Oct-14 02-Nov-14 15-Nov-14 20-Nov-14 89.00 0% 0% 0.00DHFSH06440 Installation of Steel Doors & Windows 3.00 08-Mar-15 10-Mar-15 22-Nov-14 24-Nov-14 89.00 0% 0% 0.00

StaircaseStaircase 51.00 22-Jun-14 18-Mar-15 01-Oct-14 03-Dec-14 91.00 45.08% 0% 0.00DHFSH06200 Staircase Plastering 4.00 22-Jun-14 26-Jun-14 01-Oct-14 07-Oct-14 27.00 100% 0% 0.00DHFSH06280 Staircase Painting - Primer & Stucco 6.00 12-Jul-14 19-Jul-14 08-Oct-14 14-Oct-14 119.00 100% 0% 0.00DHFSH06320 Staircase Handrail Fixing 3.00 04-Dec-14 08-Dec-14 15-Oct-14 18-Oct-14 119.00 0% 0% 0.00DHFSH06330 Staircase Painting 1st Coat 3.00 08-Dec-14 11-Dec-14 27-Oct-14 29-Oct-14 113.00 0% 0% 0.00DHFSH06340 Staircase Final Painting 5.00 11-Mar-15 16-Mar-15 25-Nov-14 30-Nov-14 91.00 0% 0% 0.00DHFSH06380 Staircase Epoxy Flooring 2.00 17-Mar-15 18-Mar-15 01-Dec-14 03-Dec-14 91.00 0% 0% 0.00

GeneralGeneral 246.00 12-Apr-14 21-May-15 03-Apr-14 A 14-Jul-15 -43.00 0% 0% 0.00DHSTR06000 Access from Structure 0.00 12-Apr-14 03-Apr-14 A 100% 100% 0.00DHFSH06510 Snagging & De-Snagging 16.00 03-May-15 21-May-15 27-Jun-15 14-Jul-15 -43.00 0% 0% 0.00

Show Flats 1 & 2Show Flats 1 & 2 116.00 12-Jul-14 29-Nov-14 01-Oct-14 18-Feb-15 93.00 0% 0% 0.00DHFSH06511 Finishes & MEP Works - Flat 1 (Workmanship) 116.00 12-Jul-14 29-Nov-14 01-Oct-14 18-Feb-15 93.00 58.62% 0% 0.00DHFSH06512 Finishes & MEP Works - Flat 2 (Workmanship) 116.00 12-Jul-14 29-Nov-14 01-Oct-14 18-Feb-15 93.00 58.62% 0% 0.00

MEP - LEVEL 06MEP - LEVEL 06 465.00 08-Mar-14 25-Apr-15 10-Feb-14 A 02-Sep-15 -106.00 70.98% 70.98% 1.00DHMEP06000 Embeded Conduits & Boxex - Concrete Works 4.00 08-Mar-14 11-Mar-14 10-Feb-14 A 04-Mar-14 A 100% 100% 0.00DHMEP06100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 15-Apr-14 05-May-14 03-Apr-14 A 29-Apr-14 A 100% 100% 1.00DHMEP06130 Cable Trays & Cable Trunking 6.00 13-May-14 19-May-14 03-Apr-14 A 29-Apr-14 A 100% 100% 0.00DHMEP06160 Pressure Testing of Pipes 12.00 23-Aug-14 04-Sep-14 28-Apr-14 A 17-May-14 A 100% 100% 0.00DHMEP06120 Embeded Condiuts,Boxes ,Sleeves and Pix Pipes in Walls 6.00 25-May-14 01-Jun-14 20-May-14 A 05-Jun-14 A 100% 100% 1.00DHMEP06110 MEP Works in Risers& Clearance 5.00 12-Jul-14 16-Jul-14 05-Apr-14 A 01-Oct-14 -33.00 100% 78% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Installation of Timber Doors & IronmongeryInstal lation of Wardrobe

Paint Final Coat

Wet Area Floor ScreedBlock Work in Wet Area

Marking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/Boarding

Wet Area WaterproofingWet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstal lation of Vanity Counters & TopsInstal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatLift Lobby Flooring

Utility Rooms- Epoxy FlooringInstallation of Steel Doors & Windows

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Finishes & MEP Works - Flat 1 (Workmanship)Finishes & MEP Works - Flat 2 (Workmanship)

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingPressure Testing of Pipes

Embeded Condiuts,Boxes ,Sleeves and Pix Pipes in WallsMEP Works in Risers& Clearance

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 6 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 51: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP06140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 10-Sep-14 17-Sep-14 01-Jun-14 A 13-Oct-14 15.00 100% 71% 0.00DHMEP06150 MEP Final Fixes 6.00 06-Apr-15 12-Apr-15 01-Jun-15 07-Jun-15 -43.00 0% 0% 0.00DHMEP06170 Sanitary ware /Toilet accessories 6.00 11-Apr-15 16-Apr-15 04-Jun-15 10-Jun-15 -43.00 0% 0% 0.00DHMEP06200 Pre-Testing & Commissioning 7.00 18-Apr-15 25-Apr-15 11-Jun-15 18-Jun-15 -43.00 0% 0% 0.00DHMEP06690 Busbar - L6 to L10 20.00 17-Feb-15 11-Mar-15 11-Aug-15 02-Sep-15 -144.00 0% 0% 0.00

LEVEL 07LEVEL 07 433.00 24-Feb-14 04-Jun-15 20-Feb-14 A 30-Jul-15 -43.00 77.04% 72.04% 0.94STRUCTURAL - LEVEL 07STRUCTURAL - LEVEL 07 21.00 24-Feb-14 24-Mar-14 20-Feb-14 A 20-Mar-14 A 100% 100% 1.00DHCWA08100 Core Wal - Level 07 9.00 24-Feb-14 05-Mar-14 20-Feb-14 A 28-Feb-14 A 100% 100% 1.00DHSLA07100 Construction of Horizontals - L07 4.00 17-Mar-14 20-Mar-14 06-Mar-14 A 16-Mar-14 A 100% 100% 1.00DHCWA08110 Construction of Verticals - L07 3.00 22-Mar-14 24-Mar-14 16-Mar-14 A 20-Mar-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 02-Jun-14 05-Jun-14 17-May-14 A 24-May-14 A 0% 0% 0.00A1330 Stair # 2 4.00 02-Jun-14 05-Jun-14 17-May-14 A 22-May-14 A 100% 100% 0.00A1320 Stair # 1 4.00 02-Jun-14 05-Jun-14 18-May-14 A 24-May-14 A 100% 100% 0.00

FINISHES - LEVEL 07FINISHES - LEVEL 07 258.00 19-Apr-14 04-Jun-15 14-Apr-14 A 30-Jul-15 -43.00 45.11% 22.06% 0.49Dry areaDry area 232.00 12-May-14 09-May-15 03-May-14 A 02-Jul-15 -33.00 45.17% 35.49% 0.79DHFSH07100 Block Work in Dry Area 6.00 12-May-14 18-May-14 03-May-14 A 24-May-14 A 100% 100% 1.00DHFSH07120 Marking,Cutting & Chasing - Dry Area 4.00 19-May-14 22-May-14 25-May-14 A 10-Jun-14 A 100% 100% 1.00DHFSH07130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 24-May-14 28-May-14 16-Jun-14 A 22-Jun-14 A 100% 100% 1.00DHFSH07160 Plaster in Dry Area 8.00 19-Jun-14 29-Jun-14 18-Jun-14 A 24-Jun-14 A 100% 100% 1.00DHFSH07190 Dry Area Floor Screed 7.00 29-Jun-14 07-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH07230 Dry Area Painting - Primer 4.00 07-Jul-14 12-Jul-14 04-Sep-14 A 01-Oct-14 -1.00 100% 80% 0.00DHFSH07260 Dry Area Painting - Stucco 6.00 12-Jul-14 19-Jul-14 09-Sep-14 A 06-Oct-14 53.00 100% 60% 0.00DHFSH07290 Dry Area False Ceiling Suspension 6.00 27-Aug-14 03-Sep-14 08-Oct-14 14-Oct-14 -8.00 100% 0% 0.00DHFSH07350 Dry Area False Ceiling Tiling / Boarding 5.00 21-Sep-14 27-Sep-14 02-Nov-14 06-Nov-14 27.00 100% 0% 0.00DHFSH07400 Dry Area Painting - 1st Coat 5.00 27-Sep-14 02-Oct-14 08-Nov-14 12-Nov-14 27.00 62.5% 0% 0.00DHFSH07450 Dry Area Flooring 5.00 18-Oct-14 23-Oct-14 22-Nov-14 26-Nov-14 20.00 0% 0% 0.00DHFSH07430 Installation of Timber Doors & Ironmongery 5.00 28-Mar-15 01-Apr-15 26-May-15 31-May-15 -50.00 0% 0% 0.00DHFSH07802 Installation of Wardrobe 12.00 05-Apr-15 18-Apr-15 03-Jun-15 16-Jun-15 -50.00 0% 0% 0.00DHFSH07500 Paint Final Coat 6.00 03-May-15 09-May-15 27-Jun-15 02-Jul-15 -33.00 0% 0% 0.00

Wet areaWet area 218.00 12-May-14 18-Apr-15 03-May-14 A 16-Jun-15 -50.00 43.27% 15.42% 0.36DHFSH07110 Block Work in Wet Area 6.00 12-May-14 18-May-14 03-May-14 A 24-May-14 A 100% 100% 0.00DHFSH07140 Marking,Cutting & Chasing - Wet Area 4.00 19-May-14 22-May-14 25-May-14 A 10-Jun-14 A 100% 100% 1.00DHFSH07150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 24-May-14 28-May-14 16-Jun-14 A 22-Jun-14 A 100% 100% 1.00DHFSH07170 Plaster in Wet Area 4.00 16-Jun-14 21-Jun-14 18-Jun-14 A 24-Jun-14 A 100% 100% 1.00DHFSH07180 Wet Area Wall Tiling 6.00 27-Aug-14 03-Sep-14 09-Sep-14 A 09-Oct-14 1.00 100% 20% 0.20DHFSH07300 Wet Area False Ceiling Suspension 5.00 03-Sep-14 09-Sep-14 15-Oct-14 20-Oct-14 3.00 100% 0% 0.00DHFSH07370 Wet Area False Ceiling Tiling/Boarding 4.00 21-Sep-14 25-Sep-14 02-Nov-14 05-Nov-14 3.00 100% 0% 0.00DHFSH07210 Wet Area Waterproofing 4.00 25-Sep-14 30-Sep-14 22-Sep-14 A 10-Nov-14 3.00 100% 10% 0.10DHFSH07220 Wet Area Floor Screed 4.00 30-Sep-14 07-Oct-14 11-Nov-14 15-Nov-14 3.00 3.13% 0% 0.00DHFSH07250 Wet Area Floor Tiling 5.00 07-Oct-14 13-Oct-14 16-Nov-14 20-Nov-14 3.00 0% 0% 0.00DHFSH06480 Cabinet Carcass 5.00 23-Oct-14 29-Oct-14 22-Nov-14 26-Nov-14 3.00 0% 0% 0.00DHFSH07420 Installation of Shower Enclosure 4.00 02-Apr-15 06-Apr-15 01-Jun-15 04-Jun-15 -41.00 0% 0% 0.00DHFSH07390 Installation of Vanity Counters & Tops 5.00 02-Apr-15 07-Apr-15 01-Jun-15 06-Jun-15 -50.00 0% 0% 0.00DHFSH07800 Installation of Kitchen Cabinet 12.00 05-Apr-15 18-Apr-15 03-Jun-15 16-Jun-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 58.00 07-Jul-14 14-Mar-15 01-Sep-14 A 11-Dec-14 123.00 66.67% 0% 0.00DHFSH07240 Corridor/Lift Lobby Floor Screed 4.00 07-Jul-14 12-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH07270 Lift Lobby Painting - Primer & Stucco 6.00 12-Jul-14 19-Jul-14 04-Sep-14 A 02-Oct-14 16.00 100% 75% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & CommissioningBusbar - L6 to L10

Construction of Horizontals - L07Construction of Verticals - L07

Stair # 2Stair # 1

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - PrimerDry Area Painting - Stucco

Dry Area False Ceiling SuspensionDry Area False Ceiling Tiling / Boarding

Dry Area Painting - 1st CoatDry Area Flooring

Instal lation of Timber Doors & IronmongeryInstallation of Wardrobe

Paint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 7 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 52: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH07310 Lift Lobby False Ceiling Suspension 6.00 09-Sep-14 16-Sep-14 21-Oct-14 28-Oct-14 3.00 100% 0% 0.00DHFSH07360 Lift Lobby False Ceiling Tiling / Boarding 5.00 21-Sep-14 27-Sep-14 02-Nov-14 06-Nov-14 112.00 100% 0% 0.00DHFSH07410 Lift Lobby Painting - 1st Coat 6.00 27-Sep-14 06-Oct-14 08-Nov-14 13-Nov-14 112.00 52.08% 0% 0.00DHFSH07440 Installation of Steel Doors & Windows 3.00 11-Mar-15 14-Mar-15 25-Nov-14 27-Nov-14 89.00 0% 0% 0.00DHFSH07470 Lift Lobby Flooring 6.00 23-Oct-14 01-Nov-14 27-Nov-14 04-Dec-14 123.00 0% 0% 0.00DHFSH07490 Uti lity Rooms- Epoxy Flooring 6.00 01-Nov-14 08-Nov-14 06-Dec-14 11-Dec-14 123.00 0% 0% 0.00

StaircaseStaircase 54.00 29-Jun-14 22-Mar-15 01-Oct-14 07-Dec-14 96.00 45.08% 0% 0.00DHFSH07200 Staircase Plastering 4.00 29-Jun-14 03-Jul-14 01-Oct-14 07-Oct-14 124.00 100% 0% 0.00DHFSH07280 Staircase Painting - Primer & Stucco 6.00 19-Jul-14 26-Jul-14 08-Oct-14 14-Oct-14 124.00 100% 0% 0.00DHFSH07320 Staircase Handrail Fixing 3.00 08-Dec-14 11-Dec-14 19-Oct-14 21-Oct-14 123.00 0% 0% 0.00DHFSH07330 Staircase Painting 1st Coat 3.00 11-Dec-14 15-Dec-14 13-Nov-14 16-Nov-14 105.00 0% 0% 0.00DHFSH07340 Staircase Final Painting 5.00 15-Mar-15 19-Mar-15 29-Nov-14 04-Dec-14 96.00 0% 0% 0.00DHFSH07380 Staircase Epoxy Flooring 2.00 21-Mar-15 22-Mar-15 06-Dec-14 07-Dec-14 96.00 0% 0% 0.00

GeneralGeneral 258.00 19-Apr-14 04-Jun-15 14-Apr-14 A 30-Jul-15 -43.00 0% 0% 0.00DHSTR07000 Access from Structure 0.00 19-Apr-14 14-Apr-14 A 100% 100% 0.00DHFSH07510 Snagging & De-Snagging 12.00 23-May-15 04-Jun-15 15-Jul-15 30-Jul-15 -43.00 0% 0% 0.00

MEP - LEVEL 07MEP - LEVEL 07 398.00 17-Mar-14 02-May-15 06-Mar-14 A 25-Jun-15 -43.00 70.98% 70.98% 1.00DHMEP07000 Embeded Conduits & Boxex - Concrete Works 4.00 17-Mar-14 20-Mar-14 06-Mar-14 A 16-Mar-14 A 100% 100% 0.00DHMEP07100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 21-Apr-14 11-May-14 14-Apr-14 A 28-May-14 A 100% 100% 1.00DHMEP07130 Cable Trays & Cable Trunking 6.00 19-May-14 25-May-14 14-Apr-14 A 28-May-14 A 100% 100% 0.00DHMEP07120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 24-May-14 31-May-14 01-Jun-14 A 12-Jun-14 A 100% 100% 1.00DHMEP07160 Pressure Testing of Pipes 12.00 01-Jun-14 14-Jun-14 07-May-14 A 10-Jul-14 A 100% 100% 0.00DHMEP07110 MEP Works in Risers& Clearance 5.00 17-Jul-14 22-Jul-14 17-Apr-14 A 02-Oct-14 -33.00 100% 78% 0.00DHMEP07140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 14-Sep-14 21-Sep-14 01-Jul-14 A 01-Nov-14 3.00 100% 71% 0.00DHMEP07150 MEP Final Fixes 6.00 11-Apr-15 16-Apr-15 07-Jun-15 13-Jun-15 -42.00 0% 0% 0.00DHMEP06180 Sanitary ware /Toilet accessories 6.00 14-Apr-15 20-Apr-15 10-Jun-15 16-Jun-15 -42.00 0% 0% 0.00DHMEP07200 Pre-Testing & Commissioning 7.00 25-Apr-15 02-May-15 18-Jun-15 25-Jun-15 -43.00 0% 0% 0.00

LEVEL 08LEVEL 08 434.00 06-Mar-14 11-Jun-15 01-Mar-14 A 06-Aug-15 -43.00 76.28% 70.79% 0.93STRUCTURAL WORKS - LEVEL 08STRUCTURAL WORKS - LEVEL 08 22.00 06-Mar-14 31-Mar-14 01-Mar-14 A 28-Mar-14 A 100% 100% 1.00DHCWA09100 Core Wal - Level 08 9.00 06-Mar-14 16-Mar-14 01-Mar-14 A 11-Mar-14 A 100% 100% 1.00DHSLA08100 Construction of Horizontals - L08 4.00 24-Mar-14 27-Mar-14 16-Mar-14 A 24-Mar-14 A 100% 100% 1.00DHCWA09110 Construction of Verticals - L08 3.00 29-Mar-14 31-Mar-14 25-Mar-14 A 28-Mar-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 08-Jun-14 11-Jun-14 22-May-14 A 31-May-14 A 0% 0% 0.00A1350 Stair # 2 4.00 08-Jun-14 11-Jun-14 22-May-14 A 28-May-14 A 100% 100% 0.00A1340 Stair # 1 4.00 08-Jun-14 11-Jun-14 25-May-14 A 31-May-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 08FINISHES WORKS - LEVEL 08 280.00 26-Apr-14 11-Jun-15 19-Apr-14 A 06-Aug-15 -43.00 41.91% 20.02% 0.48Dry areaDry area 236.00 19-May-14 17-May-15 11-May-14 A 09-Jul-15 -33.00 41.79% 35.49% 0.85DHFSH08100 Block Work in Dry Area 6.00 19-May-14 25-May-14 11-May-14 A 31-May-14 A 100% 100% 1.00DHFSH08120 Marking,Cutting & Chasing - Dry Area 4.00 26-May-14 31-May-14 28-May-14 A 12-Jun-14 A 100% 100% 1.00DHFSH08130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 01-Jun-14 04-Jun-14 29-Jun-14 A 09-Jul-14 A 100% 100% 1.00DHFSH08160 Plaster in Dry Area 8.00 24-Jun-14 03-Jul-14 06-Jul-14 A 28-Aug-14 A 100% 100% 1.00DHFSH08190 Dry Area Floor Screed 7.00 03-Jul-14 12-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH08230 Dry Area Painting - Primer 4.00 12-Jul-14 16-Jul-14 06-Sep-14 A 01-Oct-14 -5.00 100% 0% 0.00DHFSH08260 Dry Area Painting - Stucco 6.00 16-Jul-14 23-Jul-14 10-Sep-14 A 06-Oct-14 58.00 100% 0% 0.00DHFSH08290 Dry Area False Ceiling Suspension 6.00 01-Sep-14 08-Sep-14 13-Oct-14 19-Oct-14 -8.00 100% 0% 0.00DHFSH08350 Dry Area False Ceiling Tiling / Boarding 5.00 24-Sep-14 30-Sep-14 05-Nov-14 10-Nov-14 29.00 100% 0% 0.00DHFSH08400 Dry Area Painting - 1st Coat 5.00 30-Sep-14 08-Oct-14 11-Nov-14 16-Nov-14 29.00 2.5% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Construction of Horizontals - L08Construction of Verticals - L08

Stair # 2Stair # 1

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry AreaDry Area Floor Screed

Dry Area Painting - PrimerDry Area Painting - Stucco

Dry Area False Ceiling SuspensionDry Area False Ceiling Tiling / Boarding

Dry Area Painting - 1st Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 8 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 53: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH08450 Dry Area Flooring 5.00 23-Oct-14 30-Oct-14 27-Nov-14 03-Dec-14 20.00 0% 0% 0.00DHFSH08430 Installation of Timber Doors & Ironmongery 5.00 02-Apr-15 07-Apr-15 01-Jun-15 06-Jun-15 -50.00 0% 0% 0.00DHFSH08802 Installation of Wardrobe 12.00 19-Apr-15 02-May-15 17-Jun-15 30-Jun-15 -50.00 0% 0% 0.00DHFSH08500 Paint Final Coat 6.00 10-May-15 17-May-15 04-Jul-15 09-Jul-15 -33.00 0% 0% 0.00

Wet areaWet area 224.00 19-May-14 02-May-15 11-May-14 A 30-Jun-15 -50.00 39.44% 11.04% 0.28DHFSH08110 Block Work in Wet Area 6.00 19-May-14 25-May-14 11-May-14 A 31-May-14 A 100% 100% 0.00DHFSH08140 Marking,Cutting & Chasing - Wet Area 4.00 26-May-14 31-May-14 28-May-14 A 12-Jun-14 A 100% 100% 1.00DHFSH08150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 01-Jun-14 04-Jun-14 29-Jun-14 A 09-Jul-14 A 100% 100% 1.00DHFSH08170 Plaster in Wet Area 4.00 19-Jun-14 24-Jun-14 06-Jul-14 A 28-Aug-14 A 100% 100% 1.00DHFSH08180 Wet Area Wall Tiling 6.00 01-Sep-14 08-Sep-14 08-Oct-14 14-Oct-14 1.00 100% 0% 0.00DHFSH08300 Wet Area False Ceiling Suspension 5.00 07-Sep-14 13-Sep-14 19-Oct-14 23-Oct-14 5.00 100% 0% 0.00DHFSH08370 Wet Area False Ceiling Tiling/Boarding 4.00 24-Sep-14 29-Sep-14 05-Nov-14 09-Nov-14 5.00 100% 0% 0.00DHFSH08210 Wet Area Waterproofing 4.00 29-Sep-14 06-Oct-14 28-Sep-14 A 13-Nov-14 5.00 28.13% 10% 0.36DHFSH08220 Wet Area Floor Screed 4.00 06-Oct-14 11-Oct-14 15-Nov-14 18-Nov-14 5.00 0% 0% 0.00DHFSH08250 Wet Area Floor Tiling 5.00 11-Oct-14 16-Oct-14 19-Nov-14 24-Nov-14 5.00 0% 0% 0.00DHFSH06520 Cabinet Carcass 5.00 30-Oct-14 04-Nov-14 27-Nov-14 03-Dec-14 3.00 0% 0% 0.00DHFSH08420 Installation of Shower Enclosure 4.00 08-Apr-15 12-Apr-15 07-Jun-15 10-Jun-15 -40.00 0% 0% 0.00DHFSH08390 Installation of Vanity Counters & Tops 5.00 08-Apr-15 13-Apr-15 07-Jun-15 11-Jun-15 -50.00 0% 0% 0.00DHFSH08800 Installation of Kitchen Cabinet 12.00 19-Apr-15 02-May-15 17-Jun-15 30-Jun-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 85.00 12-Jul-14 17-Mar-15 01-Sep-14 A 17-Dec-14 121.00 66.67% 0% 0.00DHFSH08240 Corridor/Lift Lobby Floor Screed 4.00 12-Jul-14 16-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH08270 Lift Lobby Painting - Primer & Stucco 6.00 16-Jul-14 23-Jul-14 06-Sep-14 A 02-Oct-14 21.00 100% 0% 0.00DHFSH08310 Lift Lobby False Ceiling Suspension 6.00 13-Sep-14 20-Sep-14 26-Oct-14 01-Nov-14 5.00 100% 0% 0.00DHFSH08360 Lift Lobby False Ceiling Tiling / Boarding 5.00 24-Sep-14 30-Sep-14 05-Nov-14 10-Nov-14 112.00 100% 0% 0.00DHFSH08410 Lift Lobby Painting - 1st Coat 6.00 30-Sep-14 09-Oct-14 11-Nov-14 17-Nov-14 112.00 2.08% 0% 0.00DHFSH08440 Installation of Steel Doors & Windows 3.00 15-Mar-15 17-Mar-15 04-Dec-14 07-Dec-14 85.00 0% 0% 0.00DHFSH08470 Lift Lobby Flooring 6.00 30-Oct-14 06-Nov-14 04-Dec-14 10-Dec-14 121.00 0% 0% 0.00DHFSH08490 Uti lity Rooms- Epoxy Flooring 6.00 06-Nov-14 13-Nov-14 11-Dec-14 17-Dec-14 121.00 0% 0% 0.00

StaircaseStaircase 61.00 03-Jul-14 25-Mar-15 01-Oct-14 15-Dec-14 91.00 45.08% 0% 0.00DHFSH08200 Staircase Plastering 4.00 03-Jul-14 08-Jul-14 01-Oct-14 07-Oct-14 127.00 100% 0% 0.00DHFSH08280 Staircase Painting - Primer & Stucco 6.00 23-Jul-14 02-Aug-14 08-Oct-14 14-Oct-14 127.00 100% 0% 0.00DHFSH08320 Staircase Handrail Fixing 3.00 11-Dec-14 15-Dec-14 22-Oct-14 26-Oct-14 123.00 0% 0% 0.00DHFSH08330 Staircase Painting 1st Coat 3.00 15-Dec-14 18-Dec-14 17-Nov-14 19-Nov-14 105.00 0% 0% 0.00DHFSH08340 Staircase Final Painting 5.00 18-Mar-15 23-Mar-15 08-Dec-14 13-Dec-14 91.00 0% 0% 0.00DHFSH08380 Staircase Epoxy Flooring 2.00 24-Mar-15 25-Mar-15 14-Dec-14 15-Dec-14 91.00 0% 0% 0.00

GeneralGeneral 264.00 26-Apr-14 11-Jun-15 19-Apr-14 A 06-Aug-15 -43.00 0% 0% 0.00DHSTR08000 Access from Structure 0.00 26-Apr-14 19-Apr-14 A 100% 100% 0.00DHFSH08510 Snagging & De-Snagging 12.00 30-May-15 11-Jun-15 25-Jul-15 06-Aug-15 -43.00 0% 0% 0.00

MEP - LEVEL 08MEP - LEVEL 08 400.00 24-Mar-14 09-May-15 16-Mar-14 A 02-Jul-15 -43.00 72.62% 70.81% 0.98DHMEP08000 Embeded Conduits & Boxex - Concrete Works 4.00 24-Mar-14 27-Mar-14 16-Mar-14 A 24-Mar-14 A 100% 100% 0.00DHMEP08100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 27-Apr-14 17-May-14 19-Apr-14 A 27-May-14 A 100% 100% 1.00DHMEP08130 Cable Trays & Cable Trunking 6.00 26-May-14 02-Jun-14 19-Apr-14 A 27-May-14 A 100% 100% 0.00DHMEP08120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 01-Jun-14 07-Jun-14 07-Jun-14 A 19-Jun-14 A 100% 100% 1.00DHMEP08160 Pressure Testing of Pipes 12.00 08-Jun-14 21-Jun-14 17-May-14 A 21-Jul-14 A 100% 100% 0.00DHMEP08110 MEP Works in Risers& Clearance 5.00 23-Jul-14 30-Jul-14 19-Apr-14 A 06-Oct-14 -33.00 100% 78% 0.00DHMEP08140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 17-Sep-14 24-Sep-14 01-Jul-14 A 04-Nov-14 5.00 100% 68% 0.68DHMEP08150 MEP Final Fixes 6.00 15-Apr-15 21-Apr-15 13-Jun-15 18-Jun-15 -41.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall Ti lingWet Area False Ceiling Suspension

Wet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Instal lation of Shower EnclosureInstal lation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final Fixes

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 9 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 54: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP06190 Sanitary ware /Toilet accessories 6.00 19-Apr-15 25-Apr-15 16-Jun-15 22-Jun-15 -41.00 0% 0% 0.00DHMEP08200 Pre-Testing & Commissioning 7.00 02-May-15 09-May-15 25-Jun-15 02-Jul-15 -43.00 0% 0% 0.00

LEVEL 09LEVEL 09 431.00 17-Mar-14 18-Jun-15 12-Mar-14 A 13-Aug-15 -43.00 73.77% 69.13% 0.94STRUCTURAL WORKS -LEVEL 09STRUCTURAL WORKS -LEVEL 09 19.00 17-Mar-14 07-Apr-14 12-Mar-14 A 08-Apr-14 A 100% 100% 1.00DHCWA10100 Core Wall - Level 09 10.00 17-Mar-14 27-Mar-14 12-Mar-14 A 27-Mar-14 A 100% 100% 1.00DHSLA09100 Construction of Horizontals - L09 4.00 31-Mar-14 03-Apr-14 25-Mar-14 A 03-Apr-14 A 100% 100% 1.00DHCWA10110 Construction of Verticals - L09 3.00 05-Apr-14 07-Apr-14 03-Apr-14 A 08-Apr-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 14-Jun-14 17-Jun-14 19-Jun-14 A 23-Jun-14 A 0% 0% 0.00A1360 Stair # 1 4.00 14-Jun-14 17-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00A1370 Stair # 2 4.00 14-Jun-14 17-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 09FINISHES WORKS - LEVEL 09 283.00 01-May-14 18-Jun-15 12-May-14 A 13-Aug-15 -43.00 37.84% 19.77% 0.52Dry areaDry area 246.00 24-May-14 24-May-15 28-May-14 A 23-Jul-15 -37.00 38.95% 35.49% 0.91DHFSH09100 Block Work in Dry Area 6.00 24-May-14 31-May-14 28-May-14 A 15-Jun-14 A 100% 100% 1.00DHFSH09120 Marking,Cutting & Chasing - Dry Area 4.00 01-Jun-14 04-Jun-14 05-Jun-14 A 22-Jun-14 A 100% 100% 1.00DHFSH09130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 05-Jun-14 09-Jun-14 05-Jul-14 A 15-Jul-14 A 100% 100% 1.00DHFSH09160 Plaster in Dry Area 8.00 29-Jun-14 08-Jul-14 10-Jul-14 A 24-Aug-14 A 100% 100% 1.00DHFSH09190 Dry Area Floor Screed 7.00 08-Jul-14 16-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH09230 Dry Area Painting - Primer 4.00 16-Jul-14 21-Jul-14 09-Sep-14 A 01-Oct-14 63.00 100% 80% 0.00DHFSH09260 Dry Area Painting - Stucco 6.00 21-Jul-14 30-Jul-14 14-Sep-14 A 06-Oct-14 63.00 100% 60% 0.00DHFSH09290 Dry Area False Ceiling Suspension 6.00 06-Sep-14 13-Sep-14 18-Oct-14 23-Oct-14 -8.00 100% 0% 0.00DHFSH09350 Dry Area False Ceiling Tiling / Boarding 5.00 29-Sep-14 07-Oct-14 11-Nov-14 16-Nov-14 29.00 22.5% 0% 0.00DHFSH09400 Dry Area Painting - 1st Coat 5.00 07-Oct-14 13-Oct-14 17-Nov-14 22-Nov-14 29.00 0% 0% 0.00DHFSH09450 Dry Area Flooring 5.00 30-Oct-14 05-Nov-14 04-Dec-14 09-Dec-14 20.00 0% 0% 0.00DHFSH09430 Installation of Timber Doors & Ironmongery 5.00 08-Apr-15 13-Apr-15 07-Jun-15 11-Jun-15 -50.00 0% 0% 0.00DHFSH09802 Installation of Wardrobe 12.00 03-May-15 17-May-15 01-Jul-15 14-Jul-15 -50.00 0% 0% 0.00DHFSH09500 Paint Final Coat 6.00 18-May-15 24-May-15 15-Jul-15 23-Jul-15 -37.00 0% 0% 0.00

Wet areaWet area 232.00 24-May-14 17-May-15 28-May-14 A 14-Jul-15 -50.00 35.69% 10.5% 0.29DHFSH09110 Block Work in Wet Area 6.00 24-May-14 31-May-14 28-May-14 A 15-Jun-14 A 100% 100% 0.00DHFSH09140 Marking,Cutting & Chasing - Wet Area 4.00 01-Jun-14 04-Jun-14 05-Jun-14 A 22-Jun-14 A 100% 100% 1.00DHFSH09150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 05-Jun-14 09-Jun-14 05-Jul-14 A 15-Jul-14 A 100% 100% 1.00DHFSH09170 Plaster in Wet Area 4.00 23-Jun-14 28-Jun-14 10-Jul-14 A 24-Aug-14 A 100% 100% 1.00DHFSH09180 Wet Area Wall Tiling 6.00 06-Sep-14 13-Sep-14 13-Oct-14 19-Oct-14 1.00 100% 0% 0.00DHFSH09300 Wet Area False Ceiling Suspension 5.00 13-Sep-14 18-Sep-14 26-Oct-14 30-Oct-14 5.00 100% 0% 0.00DHFSH09370 Wet Area False Ceiling Tiling/Boarding 4.00 29-Sep-14 06-Oct-14 11-Nov-14 15-Nov-14 5.00 28.13% 0% 0.00DHFSH09210 Wet Area Waterproofing 4.00 06-Oct-14 11-Oct-14 16-Nov-14 19-Nov-14 5.00 0% 0% 0.00DHFSH09220 Wet Area Floor Screed 4.00 11-Oct-14 15-Oct-14 20-Nov-14 24-Nov-14 5.00 0% 0% 0.00DHFSH09250 Wet Area Floor Tiling 5.00 15-Oct-14 21-Oct-14 25-Nov-14 30-Nov-14 5.00 0% 0% 0.00DHFSH06530 Cabinet Carcass 5.00 05-Nov-14 10-Nov-14 04-Dec-14 09-Dec-14 3.00 0% 0% 0.00DHFSH07020 Installation of Shower Enclosure 4.00 14-Apr-15 18-Apr-15 13-Jun-15 16-Jun-15 -39.00 0% 0% 0.00DHFSH09390 Installation of Vanity Counters & Tops 5.00 14-Apr-15 19-Apr-15 13-Jun-15 17-Jun-15 -50.00 0% 0% 0.00DHFSH09800 Installation of Kitchen Cabinet 12.00 03-May-15 17-May-15 01-Jul-15 14-Jul-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 87.00 16-Jul-14 21-Mar-15 01-Sep-14 A 23-Dec-14 118.00 37.44% 0% 0.00DHFSH09240 Corridor/Lift Lobby Floor Screed 4.00 16-Jul-14 21-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH09270 Lift Lobby Painting - Primer & Stucco 6.00 21-Jul-14 30-Jul-14 09-Sep-14 A 02-Oct-14 26.00 100% 65% 0.00DHFSH09310 Lift Lobby False Ceiling Suspension 6.00 18-Sep-14 25-Sep-14 01-Nov-14 06-Nov-14 5.00 100% 0% 0.00DHFSH09360 Lift Lobby False Ceiling Tiling / Boarding 5.00 29-Sep-14 07-Oct-14 11-Nov-14 16-Nov-14 112.00 22.5% 0% 0.00DHFSH09410 Lift Lobby Painting - 1st Coat 6.00 07-Oct-14 14-Oct-14 17-Nov-14 23-Nov-14 112.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Sanitary ware /Toi let accessoriesPre-Testing & Commissioning

Core Wall - Level 09Construction of Horizontals - L09Construction of Verticals - L09

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - PrimerDry Area Painting - Stucco

Dry Area False Ceiling SuspensionDry Area False Ceiling Tiling / Boarding

Dry Area Painting - 1st CoatDry Area Flooring

Instal lation of Timber Doors & IronmongeryInstallation of Wardrobe

Paint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 10 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 55: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH09440 Installation of Steel Doors & Windows 3.00 18-Mar-15 21-Mar-15 10-Dec-14 13-Dec-14 83.00 0% 0% 0.00DHFSH09470 Lift Lobby Flooring 6.00 05-Nov-14 12-Nov-14 10-Dec-14 16-Dec-14 118.00 0% 0% 0.00DHFSH09490 Uti lity Rooms- Epoxy Flooring 6.00 12-Nov-14 19-Nov-14 17-Dec-14 23-Dec-14 118.00 0% 0% 0.00

StaircaseStaircase 66.00 08-Jul-14 29-Mar-15 01-Oct-14 21-Dec-14 91.00 45.08% 0% 0.00DHFSH09200 Staircase Plastering 4.00 08-Jul-14 13-Jul-14 01-Oct-14 07-Oct-14 130.00 100% 0% 0.00DHFSH09280 Staircase Painting - Primer & Stucco 6.00 30-Jul-14 06-Aug-14 08-Oct-14 14-Oct-14 130.00 100% 0% 0.00DHFSH09320 Staircase Handrail Fixing 3.00 15-Dec-14 18-Dec-14 27-Oct-14 29-Oct-14 125.00 0% 0% 0.00DHFSH09330 Staircase Painting 1st Coat 3.00 18-Dec-14 22-Dec-14 23-Nov-14 25-Nov-14 105.00 0% 0% 0.00DHFSH09340 Staircase Final Painting 5.00 22-Mar-15 26-Mar-15 14-Dec-14 18-Dec-14 91.00 0% 0% 0.00DHFSH09380 Staircase Epoxy Flooring 2.00 28-Mar-15 29-Mar-15 20-Dec-14 21-Dec-14 91.00 0% 0% 0.00

GeneralGeneral 270.00 01-May-14 18-Jun-15 12-May-14 A 13-Aug-15 -43.00 0% 0% 0.00DHSTR09000 Access from Structure 0.00 01-May-14 12-May-14 A 100% 100% 0.00DHFSH09510 Snagging & De-Snagging 12.00 06-Jun-15 18-Jun-15 01-Aug-15 13-Aug-15 -43.00 0% 0% 0.00

MEP - LEVEL 09MEP - LEVEL 09 402.00 31-Mar-14 17-May-15 25-Mar-14 A 09-Jul-15 -43.00 71.82% 70.75% 0.99DHMEP09000 Embeded Conduits & Boxex - Concrete Works 4.00 31-Mar-14 03-Apr-14 25-Mar-14 A 03-Apr-14 A 100% 100% 0.00DHMEP09100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 03-May-14 22-May-14 12-May-14 A 14-Jun-14 A 100% 100% 1.00DHMEP09130 Cable Trays & Cable Trunking 6.00 01-Jun-14 07-Jun-14 12-May-14 A 14-Jun-14 A 100% 100% 0.00DHMEP09160 Pressure Testing of Pipes 12.00 12-Jun-14 25-Jun-14 07-Jun-14 A 27-Jul-14 A 100% 100% 0.00DHMEP09120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 05-Jun-14 11-Jun-14 17-Jun-14 A 20-Aug-14 A 100% 100% 1.00DHMEP09110 MEP Works in Risers& Clearance 5.00 27-Jul-14 03-Aug-14 12-May-14 A 09-Oct-14 -33.00 100% 78% 0.00DHMEP09140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 22-Sep-14 29-Sep-14 29-Jul-14 A 10-Nov-14 5.00 100% 63% 0.63DHMEP09150 MEP Final Fixes 6.00 20-Apr-15 26-Apr-15 18-Jun-15 24-Jun-15 -40.00 0% 0% 0.00DHMEP06210 Sanitary ware /Toilet accessories 6.00 23-Apr-15 29-Apr-15 22-Jun-15 28-Jun-15 -40.00 0% 0% 0.00DHMEP09200 Pre-Testing & Commissioning 7.00 09-May-15 17-May-15 02-Jul-15 09-Jul-15 -43.00 0% 0% 0.00

LEVEL 10LEVEL 10 432.00 29-Mar-14 25-Jun-15 24-Feb-14 A 20-Aug-15 -43.00 72.28% 69.07% 0.96STRUCTURAL WORKS -LEVEL 10STRUCTURAL WORKS -LEVEL 10 15.00 29-Mar-14 14-Apr-14 29-Mar-14 A 15-Apr-14 A 100% 100% 1.00DHCWA11100 Core Wall - Level 10 4.00 29-Mar-14 01-Apr-14 29-Mar-14 A 06-Apr-14 A 100% 100% 1.00DHSLA10100 Construction of Horizontals - L10 4.00 07-Apr-14 10-Apr-14 05-Apr-14 A 10-Apr-14 A 100% 100% 1.00DHCWA11110 Construction of Verticals - L10 3.00 12-Apr-14 14-Apr-14 13-Apr-14 A 15-Apr-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 19-Jun-14 23-Jun-14 19-Jun-14 A 23-Jun-14 A 0% 0% 0.00A1380 Stair # 1 4.00 19-Jun-14 23-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00A1390 Stair # 2 4.00 19-Jun-14 23-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 10FINISHES WORKS - LEVEL 10 276.00 07-May-14 25-Jun-15 24-Feb-14 A 20-Aug-15 -43.00 36.53% 19.64% 0.54Dry areaDry area 252.00 01-Jun-14 31-May-15 24-Feb-14 A 30-Jul-15 -37.00 38.17% 35.49% 0.93DHFSH10190 Dry Area Floor Screed 7.00 13-Jul-14 21-Jul-14 24-Feb-14 A 24-Feb-14 A 100% 100% 0.00DHFSH10100 Block Work in Dry Area 6.00 01-Jun-14 07-Jun-14 02-Jun-14 A 17-Jun-14 A 100% 100% 1.00DHFSH10120 Marking,Cutting & Chasing - Dry Area 4.00 08-Jun-14 11-Jun-14 15-Jun-14 A 24-Jun-14 A 100% 100% 1.00DHFSH10130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 12-Jun-14 16-Jun-14 08-Jul-14 A 19-Jul-14 A 100% 100% 1.00DHFSH10160 Plaster in Dry Area 8.00 03-Jul-14 13-Jul-14 13-Jul-14 A 25-Aug-14 A 100% 100% 1.00DHFSH10230 Dry Area Painting - Primer 4.00 21-Jul-14 26-Jul-14 15-Sep-14 A 01-Oct-14 67.00 100% 80% 0.00DHFSH10260 Dry Area Painting - Stucco 6.00 26-Jul-14 04-Aug-14 20-Sep-14 A 06-Oct-14 67.00 100% 60% 0.00DHFSH10290 Dry Area False Ceiling Suspension 6.00 10-Sep-14 17-Sep-14 01-Nov-14 06-Nov-14 -15.00 100% 0% 0.00DHFSH10350 Dry Area False Ceiling Tiling / Boarding / Boarding 5.00 04-Nov-14 09-Nov-14 24-Nov-14 29-Nov-14 22.00 0% 0% 0.00DHFSH10400 Dry Area Painting - 1st Coat 6.00 10-Nov-14 16-Nov-14 30-Nov-14 07-Dec-14 22.00 0% 0% 0.00DHFSH10450 Dry Area Flooring 5.00 24-Nov-14 29-Nov-14 15-Dec-14 20-Dec-14 16.00 0% 0% 0.00DHFSH10430 Installation of Timber Doors & Ironmongery 5.00 14-Apr-15 19-Apr-15 13-Jun-15 17-Jun-15 -50.00 0% 0% 0.00DHFSH10802 Installation of Wardrobe 12.00 10-May-15 24-May-15 08-Jul-15 23-Jul-15 -50.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Installation of Steel Doors & WindowsLift Lobby Flooring

Utili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Pressure Testing of PipesEmbeded Condiuts,Boxes and Sleeves in Walls

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 10Construction of Horizontals - L10Construction of Verticals - L10

Stair # 1Stair # 2

Dry Area Floor ScreedBlock Work in Dry Area

Marking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Painting - PrimerDry Area Painting - Stucco

Dry Area False Ceiling SuspensionDry Area False Ceiling Tiling / Boarding / Boarding

Dry Area Painting - 1st CoatDry Area Flooring

Installation of Timber Doors & IronmongeryInstallation of Wardrobe

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 11 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 56: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH10500 Paint Final Coat 6.00 25-May-15 31-May-15 25-Jul-15 30-Jul-15 -37.00 0% 0% 0.00Wet areaWet area 234.00 01-Jun-14 24-May-15 02-Jun-14 A 23-Jul-15 -50.00 34.32% 10.35% 0.30DHFSH10110 Block Work in Wet Area 6.00 01-Jun-14 07-Jun-14 02-Jun-14 A 17-Jun-14 A 100% 100% 0.00DHFSH10140 Marking,Cutting & Chasing - Wet Area 4.00 08-Jun-14 11-Jun-14 15-Jun-14 A 24-Jun-14 A 100% 100% 1.00DHFSH10150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 12-Jun-14 16-Jun-14 08-Jul-14 A 19-Jul-14 A 100% 100% 1.00DHFSH10170 Plaster in Wet Area 4.00 26-Jun-14 01-Jul-14 13-Jul-14 A 25-Aug-14 A 100% 100% 1.00DHFSH10180 Wet Area Wall Tiling 6.00 10-Sep-14 17-Sep-14 18-Oct-14 23-Oct-14 1.00 100% 0% 0.00DHFSH10300 Wet Area False Ceiling Suspension 5.00 17-Sep-14 23-Sep-14 08-Nov-14 12-Nov-14 -1.00 100% 0% 0.00DHFSH10370 Wet Area False Ceiling Tiling/Boarding 4.00 04-Nov-14 08-Nov-14 24-Nov-14 27-Nov-14 -1.00 0% 0% 0.00DHFSH10210 Wet Area Waterproofing 4.00 09-Nov-14 12-Nov-14 29-Nov-14 03-Dec-14 -1.00 0% 0% 0.00DHFSH10220 Wet Area Floor Screed 4.00 13-Nov-14 17-Nov-14 04-Dec-14 08-Dec-14 -1.00 0% 0% 0.00DHFSH10250 Wet Area Floor Tiling 5.00 18-Nov-14 23-Nov-14 09-Dec-14 14-Dec-14 -1.00 0% 0% 0.00DHFSH06540 Cabinet Carcass 6.00 24-Nov-14 30-Nov-14 15-Dec-14 21-Dec-14 -1.00 0% 0% 0.00DHFSH10390 Installation of Vanity Counters & Tops 5.00 20-Apr-15 25-Apr-15 18-Jun-15 23-Jun-15 -50.00 0% 0% 0.00DHFSH10420 Installation of Shower Enclosure 4.00 26-Apr-15 29-Apr-15 24-Jun-15 28-Jun-15 -44.00 0% 0% 0.00DHFSH10800 Installation of Kitchen Cabinet 12.00 10-May-15 24-May-15 08-Jul-15 23-Jul-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 77.00 21-Jul-14 24-Mar-15 01-Sep-14 A 04-Jan-15 111.00 28.95% 0% 0.00DHFSH10240 Corridor/Lift Lobby Floor Screed 4.00 21-Jul-14 26-Jul-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH10270 Lift Lobby Painting - Primer & Stucco 6.00 26-Jul-14 04-Aug-14 15-Sep-14 A 06-Oct-14 30.00 100% 55% 0.00DHFSH10310 Lift Lobby False Ceiling Suspension 6.00 23-Sep-14 30-Sep-14 13-Nov-14 19-Nov-14 -1.00 100% 0% 0.00DHFSH10360 Lift Lobby False Ceiling Tiling / Boarding 5.00 04-Nov-14 09-Nov-14 24-Nov-14 29-Nov-14 104.00 0% 0% 0.00DHFSH10410 Lift Lobby Painting - 1st Coat 6.00 10-Nov-14 16-Nov-14 30-Nov-14 07-Dec-14 104.00 0% 0% 0.00DHFSH10440 Installation of Steel Doors & Windows 3.00 22-Mar-15 24-Mar-15 22-Dec-14 24-Dec-14 76.00 0% 0% 0.00DHFSH10470 Lift Lobby Flooring 6.00 30-Nov-14 07-Dec-14 21-Dec-14 27-Dec-14 111.00 0% 0% 0.00DHFSH10490 Uti lity Rooms- Epoxy Flooring 6.00 08-Dec-14 14-Dec-14 28-Dec-14 04-Jan-15 111.00 0% 0% 0.00

StaircaseStaircase 76.00 13-Jul-14 01-Apr-15 01-Oct-14 03-Jan-15 86.00 45.08% 0% 0.00DHFSH10200 Staircase Plastering 4.00 13-Jul-14 17-Jul-14 01-Oct-14 07-Oct-14 133.00 100% 0% 0.00DHFSH10280 Staircase Painting - Primer & Stucco 6.00 04-Aug-14 11-Aug-14 08-Oct-14 14-Oct-14 133.00 100% 0% 0.00DHFSH10320 Staircase Handrail Fixing 3.00 18-Dec-14 22-Dec-14 30-Oct-14 02-Nov-14 127.00 0% 0% 0.00DHFSH10330 Staircase Painting 1st Coat 3.00 22-Dec-14 25-Dec-14 08-Dec-14 10-Dec-14 98.00 0% 0% 0.00DHFSH10340 Staircase Final Painting 5.00 25-Mar-15 30-Mar-15 25-Dec-14 30-Dec-14 86.00 0% 0% 0.00DHFSH10380 Staircase Epoxy Flooring 2.00 31-Mar-15 01-Apr-15 31-Dec-14 03-Jan-15 86.00 0% 0% 0.00

GeneralGeneral 276.00 07-May-14 25-Jun-15 17-May-14 A 20-Aug-15 -43.00 0% 0% 0.00DHSTR10000 Access from Structure 0.00 07-May-14 17-May-14 A 100% 100% 0.00DHFSH10510 Snagging & De-Snagging 12.00 13-Jun-15 25-Jun-15 08-Aug-15 20-Aug-15 -43.00 0% 0% 0.00

MEP - LEVEL 10MEP - LEVEL 10 404.00 07-Apr-14 23-May-15 05-Apr-14 A 16-Jul-15 -44.00 69.07% 70.81% 1.03DHMEP10000 Embeded Conduits & Boxex - Concrete Works 4.00 07-Apr-14 10-Apr-14 05-Apr-14 A 10-Apr-14 A 100% 100% 0.00DHMEP10100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 08-May-14 29-May-14 19-May-14 A 19-Jun-14 A 100% 100% 1.00DHMEP10130 Cable Trays & Cable Trunking 6.00 08-Jun-14 14-Jun-14 19-May-14 A 19-Jun-14 A 100% 100% 0.00DHMEP10160 Pressure Testing of Pipes 12.00 19-Jun-14 02-Jul-14 09-Jun-14 A 30-Jul-14 A 100% 100% 0.00DHMEP10120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 12-Jun-14 18-Jun-14 24-Jun-14 A 24-Aug-14 A 100% 100% 1.00DHMEP10110 MEP Works in Risers& Clearance 5.00 04-Aug-14 09-Aug-14 17-May-14 A 11-Oct-14 -33.00 100% 78% 0.00DHMEP10140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 28-Oct-14 03-Nov-14 02-Aug-14 A 23-Nov-14 -1.00 0% 60% 0.00DHMEP10150 MEP Final Fixes 6.00 30-Apr-15 06-May-15 29-Jun-15 05-Jul-15 -44.00 0% 0% 0.00DHMEP06220 Sanitary ware /Toilet accessories 6.00 04-May-15 10-May-15 02-Jul-15 08-Jul-15 -44.00 0% 0% 0.00DHMEP10200 Pre-Testing & Commissioning 7.00 14-May-15 23-May-15 09-Jul-15 16-Jul-15 -44.00 0% 0% 0.00

LEVEL 11LEVEL 11 480.00 02-Apr-14 02-Jul-15 24-Feb-14 A 28-Sep-15 -68.00 72.14% 68.82% 0.95

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Paint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall Ti lingWet Area False Ceiling Suspension

Wet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Vanity Counters & TopsInstallation of Shower Enclosure

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Pressure Testing of PipesEmbeded Condiuts,Boxes and Sleeves in Walls

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 12 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 57: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

STRUCTURAL WORKS -LEVEL 11STRUCTURAL WORKS -LEVEL 11 16.00 02-Apr-14 20-Apr-14 07-Apr-14 A 21-Apr-14 A 100% 100% 1.00DHCWA12100 Core Wall - Level 11 4.00 02-Apr-14 06-Apr-14 07-Apr-14 A 08-Apr-14 A 100% 100% 1.00DHSLA11100 Construction of Horizontals - L11 4.00 14-Apr-14 17-Apr-14 12-Apr-14 A 17-Apr-14 A 100% 100% 1.00DHCWA12110 Construction of Verticals - L11 2.00 19-Apr-14 20-Apr-14 18-Apr-14 A 21-Apr-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 25-Jun-14 29-Jun-14 19-Jun-14 A 23-Jun-14 A 0% 0% 0.00A1400 Stair # 1 4.00 25-Jun-14 29-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00A1410 Stair # 2 4.00 25-Jun-14 29-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 11FINISHES WORKS - LEVEL 11 282.00 13-May-14 02-Jul-15 24-Feb-14 A 27-Aug-15 -43.00 35.81% 19.64% 0.55Dry areaDry area 258.00 05-Jun-14 07-Jun-15 24-Feb-14 A 06-Aug-15 -37.00 38.17% 35.49% 0.93DHFSH11190 Dry Area Floor Screed 7.00 17-Jul-14 26-Jul-14 24-Feb-14 A 24-Feb-14 A 100% 100% 0.00DHFSH11100 Block Work in Dry Area 6.00 05-Jun-14 11-Jun-14 14-Jun-14 A 23-Jun-14 A 100% 100% 1.00DHFSH11120 Marking,Cutting & Chasing - Dry Area 4.00 12-Jun-14 16-Jun-14 30-Jun-14 A 05-Jul-14 A 100% 100% 1.00DHFSH11130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 17-Jun-14 21-Jun-14 09-Jul-14 A 13-Jul-14 A 100% 100% 1.00DHFSH11160 Plaster in Dry Area 8.00 08-Jul-14 17-Jul-14 02-Aug-14 A 25-Aug-14 A 100% 100% 1.00DHFSH11230 Dry Area Painting - Primer 4.00 26-Jul-14 02-Aug-14 18-Sep-14 A 01-Oct-14 71.00 100% 80% 0.00DHFSH11260 Dry Area Painting - Stucco 6.00 02-Aug-14 09-Aug-14 23-Sep-14 A 08-Oct-14 71.00 100% 40% 0.00DHFSH11290 Dry Area False Ceiling Suspension 7.00 14-Sep-14 22-Sep-14 04-Nov-14 11-Nov-14 -15.00 100% 0% 0.00DHFSH11350 Dry Area False Ceiling Tiling / Boarding 5.00 08-Nov-14 12-Nov-14 29-Nov-14 04-Dec-14 24.00 0% 0% 0.00DHFSH11400 Dry Area Painting - 1st Coat 5.00 13-Nov-14 18-Nov-14 06-Dec-14 10-Dec-14 24.00 0% 0% 0.00DHFSH11450 Dry Area Flooring 5.00 30-Nov-14 06-Dec-14 21-Dec-14 25-Dec-14 16.00 0% 0% 0.00DHFSH11430 Installation of Timber Doors & Ironmongery 5.00 19-Apr-15 23-Apr-15 17-Jun-15 22-Jun-15 -50.00 0% 0% 0.00DHFSH11802 Installation of Wardrobe 12.00 18-May-15 31-May-15 15-Jul-15 30-Jul-15 -50.00 0% 0% 0.00DHFSH11500 Paint Final Coat 6.00 01-Jun-15 07-Jun-15 01-Aug-15 06-Aug-15 -37.00 0% 0% 0.00

Wet areaWet area 236.00 05-Jun-14 31-May-15 14-Jun-14 A 30-Jul-15 -50.00 34.32% 10.35% 0.30DHFSH11110 Block Work in Wet Area 6.00 05-Jun-14 11-Jun-14 14-Jun-14 A 23-Jun-14 A 100% 100% 0.00DHFSH11140 Marking,Cutting & Chasing - Wet Area 4.00 12-Jun-14 16-Jun-14 30-Jun-14 A 05-Jul-14 A 100% 100% 1.00DHFSH11150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 17-Jun-14 21-Jun-14 09-Jul-14 A 13-Jul-14 A 100% 100% 1.00DHFSH11170 Plaster in Wet Area 4.00 30-Jun-14 05-Jul-14 02-Aug-14 A 25-Aug-14 A 100% 100% 1.00DHFSH11180 Wet Area Wall Tiling 6.00 15-Sep-14 22-Sep-14 22-Oct-14 29-Oct-14 1.00 100% 0% 0.00DHFSH11300 Wet Area False Ceiling Suspension 5.00 22-Sep-14 28-Sep-14 12-Nov-14 17-Nov-14 1.00 100% 0% 0.00DHFSH11370 Wet Area False Ceiling Tiling/Boarding 4.00 08-Nov-14 11-Nov-14 29-Nov-14 03-Dec-14 1.00 0% 0% 0.00DHFSH11210 Wet Area Waterproofing 4.00 12-Nov-14 16-Nov-14 04-Dec-14 08-Dec-14 1.00 0% 0% 0.00DHFSH11220 Wet Area Floor Screed 4.00 17-Nov-14 20-Nov-14 09-Dec-14 13-Dec-14 1.00 0% 0% 0.00DHFSH11250 Wet Area Floor Tiling 5.00 22-Nov-14 26-Nov-14 14-Dec-14 18-Dec-14 1.00 0% 0% 0.00DHFSH06550 Cabinet Carcass 5.00 01-Dec-14 07-Dec-14 22-Dec-14 27-Dec-14 -1.00 0% 0% 0.00DHFSH11390 Installation of Vanity Counters & Tops 5.00 26-Apr-15 30-Apr-15 24-Jun-15 29-Jun-15 -50.00 0% 0% 0.00DHFSH11420 Installation of Shower Enclosure 4.00 29-Apr-15 03-May-15 28-Jun-15 01-Jul-15 -41.00 0% 0% 0.00DHFSH11800 Installation of Kitchen Cabinet 12.00 18-May-15 31-May-15 15-Jul-15 30-Jul-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 82.00 26-Jul-14 28-Mar-15 01-Sep-14 A 10-Jan-15 108.00 10.25% 0% 0.00DHFSH11240 Corridor/Lift Lobby Floor Screed 4.00 26-Jul-14 02-Aug-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH11270 Lift Lobby Painting - Primer & Stucco 6.00 02-Aug-14 09-Aug-14 18-Sep-14 A 06-Oct-14 36.00 100% 50% 0.00DHFSH11310 Lift Lobby False Ceiling Suspension 6.00 28-Sep-14 07-Oct-14 18-Nov-14 24-Nov-14 1.00 35.42% 0% 0.00DHFSH11360 Lift Lobby False Ceiling Tiling / Boarding 5.00 08-Nov-14 12-Nov-14 29-Nov-14 04-Dec-14 103.00 0% 0% 0.00DHFSH11410 Lift Lobby Painting - 1st Coat 6.00 13-Nov-14 19-Nov-14 06-Dec-14 11-Dec-14 103.00 0% 0% 0.00DHFSH11440 Installation of Steel Doors & Windows 3.00 25-Mar-15 28-Mar-15 28-Dec-14 30-Dec-14 74.00 0% 0% 0.00DHFSH11470 Lift Lobby Flooring 6.00 07-Dec-14 13-Dec-14 27-Dec-14 03-Jan-15 108.00 0% 0% 0.00DHFSH11490 Uti lity Rooms- Epoxy Flooring 6.00 14-Dec-14 20-Dec-14 04-Jan-15 10-Jan-15 108.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Core Wall - Level 11Construction of Horizontals - L11Construction of Verticals - L11

Stair # 1Stair # 2

Dry Area Floor ScreedBlock Work in Dry Area

Marking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Vanity Counters & TopsInstal lation of Shower Enclosure

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 13 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 58: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

StaircaseStaircase 81.00 17-Jul-14 05-Apr-15 01-Oct-14 08-Jan-15 85.00 45.08% 0% 0.00DHFSH11200 Staircase Plastering 4.00 17-Jul-14 22-Jul-14 01-Oct-14 07-Oct-14 136.00 100% 0% 0.00DHFSH11280 Staircase Painting - Primer & Stucco 6.00 09-Aug-14 16-Aug-14 08-Oct-14 14-Oct-14 136.00 100% 0% 0.00DHFSH11320 Staircase Handrail Fixing 3.00 22-Dec-14 25-Dec-14 03-Nov-14 05-Nov-14 128.00 0% 0% 0.00DHFSH11330 Staircase Painting 1st Coat 3.00 25-Dec-14 29-Dec-14 11-Dec-14 14-Dec-14 99.00 0% 0% 0.00DHFSH11340 Staircase Final Painting 5.00 29-Mar-15 02-Apr-15 31-Dec-14 06-Jan-15 85.00 0% 0% 0.00DHFSH11380 Staircase Epoxy Flooring 2.00 04-Apr-15 05-Apr-15 07-Jan-15 08-Jan-15 85.00 0% 0% 0.00

GeneralGeneral 282.00 13-May-14 02-Jul-15 24-May-14 A 27-Aug-15 -43.00 0% 0% 0.00DHSTR11000 Access from Structure 0.00 13-May-14 24-May-14 A 100% 100% 0.00DHFSH11510 Snagging & De-Snagging 12.00 20-Jun-15 02-Jul-15 15-Aug-15 27-Aug-15 -43.00 0% 0% 0.00

MEP - LEVEL 11MEP - LEVEL 11 480.00 15-Apr-14 30-May-15 12-Apr-14 A 28-Sep-15 -97.00 69.07% 70.11% 1.02DHMEP11000 Embeded Conduits & Boxex - Concrete Works 3.00 15-Apr-14 17-Apr-14 12-Apr-14 A 17-Apr-14 A 100% 100% 0.00DHMEP11100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 14-May-14 04-Jun-14 26-May-14 A 30-Jun-14 A 100% 100% 1.00DHMEP11130 Cable Trays & Cable Trunking 6.00 12-Jun-14 18-Jun-14 26-May-14 A 30-Jun-14 A 100% 100% 0.00DHMEP11160 Pressure Testing of Pipes 12.00 24-Jun-14 07-Jul-14 30-Jul-14 A 26-Aug-14 A 100% 100% 0.00DHMEP11120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 17-Jun-14 23-Jun-14 05-Jul-14 A 30-Aug-14 A 100% 100% 1.00DHMEP11110 MEP Works in Risers& Clearance 5.00 09-Aug-14 13-Aug-14 24-May-14 A 15-Oct-14 -33.00 100% 76% 0.00DHMEP11140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 01-Nov-14 06-Nov-14 04-Aug-14 A 27-Nov-14 1.00 0% 36% 0.00DHMEP11150 MEP Final Fixes 6.00 07-May-15 13-May-15 06-Jul-15 12-Jul-15 -44.00 0% 0% 0.00DHMEP06230 Sanitary ware /Toilet accessories 6.00 11-May-15 18-May-15 09-Jul-15 15-Jul-15 -44.00 0% 0% 0.00DHMEP11200 Pre-Testing & Commissioning 7.00 23-May-15 30-May-15 16-Jul-15 26-Jul-15 -44.00 0% 0% 0.00DHMEP11010 Busbar - L11to L15 20.00 12-Mar-15 04-Apr-15 03-Sep-15 28-Sep-15 -144.00 0% 0% 0.00

LEVEL 12LEVEL 12 457.00 07-Apr-14 09-Jul-15 24-Feb-14 A 03-Sep-15 -43.00 71.98% 68.79% 0.96STRUCTURAL WORKS -LEVEL 12STRUCTURAL WORKS -LEVEL 12 144.00 07-Apr-14 27-Apr-14 06-Apr-14 A 28-Apr-14 A 100% 100% 1.00DHCWA13120 Tower Crane Jump 1.00 13-Apr-14 13-Apr-14 06-Apr-14 A 06-Apr-14 A 100% 100% 0.00DHCWA13100 Core Wall - Level 12 6.00 07-Apr-14 13-Apr-14 10-Apr-14 A 14-Apr-14 A 100% 100% 1.00DHSLA12100 Construction of Horizontals - L12 4.00 21-Apr-14 24-Apr-14 19-Apr-14 A 24-Apr-14 A 100% 100% 1.00DHCWA13110 Construction of Verticals - L12 2.00 26-Apr-14 27-Apr-14 25-Apr-14 A 28-Apr-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 03-Jul-14 07-Jul-14 19-Jun-14 A 23-Jun-14 A 0% 0% 0.00A1420 Stair # 1 4.00 03-Jul-14 07-Jul-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00A1430 Stair # 2 3.00 05-Jul-14 07-Jul-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 12FINISHES WORKS - LEVEL 12 288.00 19-May-14 09-Jul-15 24-Feb-14 A 03-Sep-15 -43.00 35% 19.64% 0.56Dry areaDry area 264.00 11-Jun-14 14-Jun-15 24-Feb-14 A 13-Aug-15 -37.00 38.17% 35.49% 0.93DHFSH12190 Dry Area Floor Screed 7.00 22-Jul-14 02-Aug-14 24-Feb-14 A 24-Feb-14 A 100% 100% 0.00DHFSH12100 Block Work in Dry Area 6.00 11-Jun-14 17-Jun-14 09-Jun-14 A 02-Jul-14 A 100% 100% 1.00DHFSH12130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 23-Jun-14 26-Jun-14 13-Jul-14 A 17-Jul-14 A 100% 100% 1.00DHFSH12120 Marking,Cutting & Chasing - Dry Area 4.00 18-Jun-14 22-Jun-14 06-Jul-14 A 04-Aug-14 A 100% 100% 1.00DHFSH12160 Plaster in Dry Area 8.00 13-Jul-14 22-Jul-14 06-Aug-14 A 28-Aug-14 A 100% 100% 1.00DHFSH12230 Dry Area Painting - Primer 4.00 02-Aug-14 06-Aug-14 23-Sep-14 A 02-Oct-14 75.00 100% 60% 0.00DHFSH12260 Dry Area Painting - Stucco 6.00 06-Aug-14 13-Aug-14 28-Sep-14 A 09-Oct-14 75.00 100% 40% 0.00DHFSH12290 Dry Area False Ceiling Suspension 7.00 18-Sep-14 27-Sep-14 09-Nov-14 16-Nov-14 -15.00 100% 0% 0.00DHFSH12350 Dry Area False Ceiling Tiling / Boarding 5.00 11-Nov-14 16-Nov-14 04-Dec-14 09-Dec-14 25.00 0% 0% 0.00DHFSH12400 Dry Area Painting - 1st Coat 5.00 17-Nov-14 22-Nov-14 10-Dec-14 15-Dec-14 25.00 0% 0% 0.00DHFSH12450 Dry Area Flooring 5.00 07-Dec-14 11-Dec-14 27-Dec-14 31-Dec-14 16.00 0% 0% 0.00DHFSH12430 Installation of Timber Doors & Ironmongery 5.00 23-Apr-15 28-Apr-15 22-Jun-15 27-Jun-15 -50.00 0% 0% 0.00DHFSH12802 Installation of Wardrobe 12.00 23-May-15 04-Jun-15 22-Jul-15 04-Aug-15 -50.00 0% 0% 0.00DHFSH12500 Paint Final Coat 6.00 08-Jun-15 14-Jun-15 08-Aug-15 13-Aug-15 -37.00 0% 0% 0.00

Wet areaWet area 238.00 11-Jun-14 07-Jun-15 09-Jun-14 A 06-Aug-15 -50.00 33.43% 10.35% 0.31

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Pressure Testing of PipesEmbeded Condiuts,Boxes and Sleeves in Walls

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & CommissioningBusbar - L11to L15

Tower Crane JumpCore Wall - Level 12

Construction of Horizontals - L12Construction of Verticals - L12

Stair # 1Stair # 2

Dry Area Floor ScreedBlock Work in Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaMarking,Cutting & Chasing - Dry Area

Plaster in Dry AreaDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 14 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 59: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH12110 Block Work in Wet Area 6.00 11-Jun-14 17-Jun-14 09-Jun-14 A 02-Jul-14 A 100% 100% 0.00DHFSH12150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 23-Jun-14 26-Jun-14 13-Jul-14 A 17-Jul-14 A 100% 100% 1.00DHFSH12140 Marking,Cutting & Chasing - Wet Area 4.00 18-Jun-14 22-Jun-14 06-Jul-14 A 04-Aug-14 A 100% 100% 1.00DHFSH12170 Plaster in Wet Area 4.00 03-Jul-14 08-Jul-14 06-Aug-14 A 28-Aug-14 A 100% 100% 1.00DHFSH12180 Wet Area Wall Tiling 6.00 20-Sep-14 27-Sep-14 28-Oct-14 03-Nov-14 1.00 100% 0% 0.00DHFSH12300 Wet Area False Ceiling Suspension 5.00 27-Sep-14 02-Oct-14 17-Nov-14 22-Nov-14 2.00 62.5% 0% 0.00DHFSH12370 Wet Area False Ceiling Tiling/Boarding 4.00 11-Nov-14 15-Nov-14 04-Dec-14 08-Dec-14 2.00 0% 0% 0.00DHFSH12210 Wet Area Waterproofing 4.00 16-Nov-14 19-Nov-14 09-Dec-14 13-Dec-14 2.00 0% 0% 0.00DHFSH12220 Wet Area Floor Screed 4.00 20-Nov-14 24-Nov-14 14-Dec-14 17-Dec-14 2.00 0% 0% 0.00DHFSH12250 Wet Area Floor Tiling 5.00 25-Nov-14 30-Nov-14 18-Dec-14 23-Dec-14 2.00 0% 0% 0.00DHFSH06560 Cabinet Carcass 6.00 08-Dec-14 14-Dec-14 28-Dec-14 04-Jan-15 -1.00 0% 0% 0.00DHFSH12390 Installation of Vanity Counters & Tops 5.00 02-May-15 06-May-15 30-Jun-15 05-Jul-15 -50.00 0% 0% 0.00DHFSH12420 Installation of Shower Enclosure 4.00 03-May-15 06-May-15 01-Jul-15 05-Jul-15 -40.00 0% 0% 0.00DHFSH12800 Installation of Kitchen Cabinet 12.00 25-May-15 07-Jun-15 25-Jul-15 06-Aug-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 87.00 02-Aug-14 31-Mar-15 01-Sep-14 A 15-Jan-15 105.00 0% 0% 0.00DHFSH12240 Corridor/Lift Lobby Floor Screed 4.00 02-Aug-14 06-Aug-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH12270 Lift Lobby Painting - Primer & Stucco 6.00 06-Aug-14 13-Aug-14 23-Sep-14 A 07-Oct-14 40.00 100% 35% 0.00DHFSH12310 Lift Lobby False Ceiling Suspension 6.00 02-Oct-14 12-Oct-14 23-Nov-14 29-Nov-14 2.00 0% 0% 0.00DHFSH12360 Lift Lobby False Ceiling Tiling / Boarding 5.00 11-Nov-14 16-Nov-14 04-Dec-14 09-Dec-14 102.00 0% 0% 0.00DHFSH12410 Lift Lobby Painting - 1st Coat 6.00 17-Nov-14 23-Nov-14 10-Dec-14 16-Dec-14 102.00 0% 0% 0.00DHFSH12440 Installation of Steel Doors & Windows 3.00 29-Mar-15 31-Mar-15 05-Jan-15 07-Jan-15 71.00 0% 0% 0.00DHFSH12470 Lift Lobby Flooring 6.00 13-Dec-14 18-Dec-14 03-Jan-15 08-Jan-15 105.00 0% 0% 0.00DHFSH12490 Uti lity Rooms- Epoxy Flooring 6.00 20-Dec-14 25-Dec-14 10-Jan-15 15-Jan-15 105.00 0% 0% 0.00

StaircaseStaircase 87.00 22-Jul-14 08-Apr-15 01-Oct-14 15-Jan-15 83.00 45.08% 0% 0.00DHFSH12200 Staircase Plastering 4.00 22-Jul-14 27-Jul-14 01-Oct-14 07-Oct-14 139.00 100% 0% 0.00DHFSH12280 Staircase Painting - Primer & Stucco 6.00 13-Aug-14 20-Aug-14 08-Oct-14 14-Oct-14 139.00 100% 0% 0.00DHFSH12320 Staircase Handrail Fixing 3.00 25-Dec-14 29-Dec-14 06-Nov-14 09-Nov-14 129.00 0% 0% 0.00DHFSH12330 Staircase Painting 1st Coat 3.00 29-Dec-14 03-Jan-15 16-Dec-14 18-Dec-14 99.00 0% 0% 0.00DHFSH12340 Staircase Final Painting 5.00 01-Apr-15 06-Apr-15 08-Jan-15 13-Jan-15 83.00 0% 0% 0.00DHFSH12380 Staircase Epoxy Flooring 2.00 07-Apr-15 08-Apr-15 14-Jan-15 15-Jan-15 83.00 0% 0% 0.00

GeneralGeneral 288.00 19-May-14 09-Jul-15 03-Jun-14 A 03-Sep-15 -43.00 0% 0% 0.00DHSTR12000 Access from Structure 0.00 19-May-14 03-Jun-14 A 100% 100% 0.00DHFSH12510 Snagging & De-Snagging 12.00 27-Jun-15 09-Jul-15 22-Aug-15 03-Sep-15 -43.00 0% 0% 0.00

MEP - LEVEL 12MEP - LEVEL 12 427.00 22-Apr-14 03-Jun-15 19-Apr-14 A 30-Jul-15 -44.00 69.07% 69.97% 1.01DHMEP12000 Embeded Conduits & Boxex - Concrete Works 3.00 22-Apr-14 24-Apr-14 19-Apr-14 A 24-Apr-14 A 100% 100% 0.00DHMEP12100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 20-May-14 10-Jun-14 03-Jun-14 A 22-Jul-14 A 100% 100% 1.00DHMEP12130 Cable Trays & Cable Trunking 6.00 18-Jun-14 24-Jun-14 03-Jun-14 A 22-Jul-14 A 100% 100% 0.00DHMEP12120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 23-Jun-14 29-Jun-14 09-Jul-14 A 02-Sep-14 A 100% 100% 1.00DHMEP12160 Pressure Testing of Pipes 12.00 30-Jun-14 13-Jul-14 30-Jul-14 A 02-Oct-14 47.00 100% 83% 0.00DHMEP12110 MEP Works in Risers& Clearance 5.00 14-Aug-14 19-Aug-14 03-Jun-14 A 16-Oct-14 -33.00 100% 69% 0.00DHMEP12140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 04-Nov-14 10-Nov-14 10-Aug-14 A 03-Dec-14 2.00 0% 31% 0.00DHMEP12150 MEP Final Fixes 6.00 12-May-15 19-May-15 11-Jul-15 16-Jul-15 -44.00 0% 0% 0.00DHMEP06240 Sanitary ware /Toilet accessories 6.00 17-May-15 23-May-15 14-Jul-15 22-Jul-15 -44.00 0% 0% 0.00DHMEP12200 Pre-Testing & Commissioning 7.00 27-May-15 03-Jun-15 23-Jul-15 30-Jul-15 -44.00 0% 0% 0.00

LEVEL 13LEVEL 13 459.00 14-Apr-14 15-Jul-15 24-Feb-14 A 09-Sep-15 -43.00 71.49% 68.83% 0.96STRUCTURAL WORKS -LEVEL 13STRUCTURAL WORKS -LEVEL 13 17.00 14-Apr-14 03-May-14 15-Apr-14 A 05-May-14 A 100% 100% 1.00DHCWA14100 Core Wall - Level 13 4.00 14-Apr-14 17-Apr-14 15-Apr-14 A 20-Apr-14 A 100% 100% 1.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Block Work in Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Marking,Cutting & Chasing - Wet AreaPlaster in Wet Area

Wet Area Wall Ti lingWet Area False Ceiling Suspension

Wet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Vanity Counters & TopsInstallation of Shower Enclosure

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 13

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 15 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 60: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHSLA13100 Construction of Horizontals - L13 3.00 28-Apr-14 30-Apr-14 25-Apr-14 A 01-May-14 A 100% 100% 1.00DHCWA14110 Construction of Verticals - L13 2.00 01-May-14 03-May-14 02-May-14 A 05-May-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 12-Jul-14 15-Jul-14 19-Jun-14 A 14-Jul-14 A 0% 0% 0.00A1450 Stair # 2 3.00 13-Jul-14 15-Jul-14 19-Jun-14 A 23-Jun-14 A 100% 100% 0.00A1440 Stair # 1 4.00 12-Jul-14 15-Jul-14 23-Jun-14 A 14-Jul-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 13FINISHES WORKS - LEVEL 13 293.00 25-May-14 15-Jul-15 24-Feb-14 A 09-Sep-15 -43.00 32.69% 19.64% 0.60Dry areaDry area 270.00 17-Jun-14 21-Jun-15 24-Feb-14 A 20-Aug-15 -38.00 37.83% 35.49% 0.94DHMEP13190 Dry Area Floor Screed 7.00 27-Jul-14 06-Aug-14 24-Feb-14 A 24-Feb-14 A 100% 100% 0.00DHFSH13100 Block Work in Dry Area 6.00 17-Jun-14 23-Jun-14 17-Jun-14 A 09-Jul-14 A 100% 100% 1.00DHFSH13120 Marking,Cutting & Chasing - Dry Area 4.00 24-Jun-14 28-Jun-14 10-Jul-14 A 06-Aug-14 A 100% 100% 1.00DHFSH13130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 29-Jun-14 02-Jul-14 14-Jul-14 A 07-Aug-14 A 100% 100% 1.00DHFSH13160 Plaster in Dry Area 8.00 17-Jul-14 27-Jul-14 11-Aug-14 A 28-Aug-14 A 100% 100% 1.00DHFSH13230 Dry Area Painting - Primer 4.00 06-Aug-14 11-Aug-14 25-Sep-14 A 02-Oct-14 79.00 100% 50% 0.00DHFSH13260 Dry Area Painting - Stucco 6.00 11-Aug-14 18-Aug-14 29-Sep-14 A 11-Oct-14 79.00 100% 20% 0.00DHFSH13290 Dry Area False Ceiling Suspension 7.00 23-Sep-14 01-Oct-14 13-Nov-14 20-Nov-14 -15.00 87.5% 0% 0.00DHFSH13350 Dry Area False Ceiling Tiling / Boarding 5.00 15-Nov-14 19-Nov-14 09-Dec-14 14-Dec-14 26.00 0% 0% 0.00DHFSH13400 Dry Area Painting - 1st Coat 5.00 20-Nov-14 25-Nov-14 15-Dec-14 20-Dec-14 26.00 0% 0% 0.00DHFSH13450 Dry Area Flooring 5.00 13-Dec-14 17-Dec-14 03-Jan-15 07-Jan-15 16.00 0% 0% 0.00DHFSH13430 Installation of Timber Doors & Ironmongery 6.00 29-Apr-15 05-May-15 28-Jun-15 04-Jul-15 -50.00 0% 0% 0.00DHFSH13802 Installation of Wardrobe 12.00 27-May-15 09-Jun-15 27-Jul-15 09-Aug-15 -50.00 0% 0% 0.00DHFSH13500 Paint Final Coat 6.00 15-Jun-15 21-Jun-15 15-Aug-15 20-Aug-15 -38.00 0% 0% 0.00

Wet areaWet area 240.00 17-Jun-14 14-Jun-15 17-Jun-14 A 13-Aug-15 -50.00 28.8% 10.35% 0.36DHFSH13110 Block Work in Wet Area 6.00 17-Jun-14 23-Jun-14 17-Jun-14 A 09-Jul-14 A 100% 100% 0.00DHFSH13140 Marking,Cutting & Chasing - Wet Area 4.00 24-Jun-14 28-Jun-14 10-Jul-14 A 06-Aug-14 A 100% 100% 1.00DHFSH13150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 29-Jun-14 02-Jul-14 14-Jul-14 A 07-Aug-14 A 100% 100% 1.00DHMEP13170 Plaster in Wet Area 4.00 07-Jul-14 12-Jul-14 11-Aug-14 A 28-Aug-14 A 100% 100% 1.00DHMEP13180 Wet Area Wall Tiling 6.00 24-Sep-14 01-Oct-14 02-Nov-14 08-Nov-14 1.00 85.42% 0% 0.00DHFSH13300 Wet Area False Ceiling Suspension 5.00 01-Oct-14 09-Oct-14 22-Nov-14 26-Nov-14 4.00 0% 0% 0.00DHFSH13370 Wet Area False Ceiling Tiling/Boarding 4.00 15-Nov-14 18-Nov-14 09-Dec-14 13-Dec-14 4.00 0% 0% 0.00DHFSH13210 Wet Area Waterproofing 4.00 19-Nov-14 23-Nov-14 14-Dec-14 17-Dec-14 4.00 0% 0% 0.00DHFSH13220 Wet Area Floor Screed 4.00 24-Nov-14 27-Nov-14 18-Dec-14 22-Dec-14 4.00 0% 0% 0.00DHFSH13250 Wet Area Floor Tiling 5.00 29-Nov-14 04-Dec-14 23-Dec-14 28-Dec-14 4.00 0% 0% 0.00DHFSH06570 Cabinet Carcass 5.00 15-Dec-14 20-Dec-14 05-Jan-15 10-Jan-15 -1.00 0% 0% 0.00DHFSH13420 Installation of Shower Enclosure 4.00 06-May-15 10-May-15 05-Jul-15 08-Jul-15 -39.00 0% 0% 0.00DHFSH13390 Installation of Vanity Counters & Tops 5.00 06-May-15 11-May-15 05-Jul-15 09-Jul-15 -50.00 0% 0% 0.00DHFSH13800 Installation of Kitchen Cabinet 12.00 01-Jun-15 14-Jun-15 01-Aug-15 13-Aug-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 92.00 06-Aug-14 04-Apr-15 01-Sep-14 A 21-Jan-15 102.00 0% 0% 0.00DHFSH13240 Corridor/Lift Lobby Floor Screed 4.00 06-Aug-14 11-Aug-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH13270 Lift Lobby Painting - Primer & Stucco 6.00 11-Aug-14 18-Aug-14 25-Sep-14 A 07-Oct-14 46.00 100% 35% 0.00DHFSH13310 Lift Lobby False Ceiling Suspension 6.00 09-Oct-14 16-Oct-14 27-Nov-14 04-Dec-14 4.00 0% 0% 0.00DHFSH13360 Lift Lobby False Ceiling Tiling / Boarding 5.00 15-Nov-14 19-Nov-14 09-Dec-14 14-Dec-14 101.00 0% 0% 0.00DHFSH13410 Lift Lobby Painting - 1st Coat 6.00 20-Nov-14 26-Nov-14 15-Dec-14 21-Dec-14 101.00 0% 0% 0.00DHFSH13440 Installation of Steel Doors & Windows 3.00 01-Apr-15 04-Apr-15 11-Jan-15 13-Jan-15 69.00 0% 0% 0.00DHFSH13470 Lift Lobby Flooring 6.00 18-Dec-14 24-Dec-14 08-Jan-15 14-Jan-15 102.00 0% 0% 0.00DHFSH13490 Uti lity Rooms- Epoxy Flooring 6.00 25-Dec-14 31-Dec-14 15-Jan-15 21-Jan-15 102.00 0% 0% 0.00

StaircaseStaircase 92.00 27-Jul-14 12-Apr-15 01-Oct-14 21-Jan-15 83.00 45.08% 0% 0.00DHFSH13200 Staircase Plastering 4.00 27-Jul-14 03-Aug-14 01-Oct-14 07-Oct-14 142.00 100% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Construction of Horizontals - L13Construction of Verticals - L13

Stair # 2Stair # 1

Dry Area Floor ScreedBlock Work in Dry Area

Marking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceil ing SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase Plastering

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 16 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 61: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH13280 Staircase Painting - Primer & Stucco 6.00 18-Aug-14 25-Aug-14 08-Oct-14 14-Oct-14 142.00 100% 0% 0.00DHFSH13320 Staircase Handrail Fixing 3.00 29-Dec-14 03-Jan-15 10-Nov-14 12-Nov-14 131.00 0% 0% 0.00DHFSH13330 Staircase Painting 1st Coat 3.00 03-Jan-15 06-Jan-15 21-Dec-14 23-Dec-14 100.00 0% 0% 0.00DHFSH13340 Staircase Final Painting 5.00 05-Apr-15 09-Apr-15 14-Jan-15 19-Jan-15 83.00 0% 0% 0.00DHFSH13380 Staircase Epoxy Flooring 2.00 11-Apr-15 12-Apr-15 20-Jan-15 21-Jan-15 83.00 0% 0% 0.00

GeneralGeneral 293.00 25-May-14 15-Jul-15 07-Jun-14 A 09-Sep-15 -43.00 0% 0% 0.00DHSTR13000 Access from Structure 0.00 25-May-14 07-Jun-14 A 100% 100% 0.00DHFSH13510 Snagging & De-Snagging 12.00 02-Jul-15 15-Jul-15 27-Aug-15 09-Sep-15 -43.00 0% 0% 0.00

MEP - LEVEL 13MEP - LEVEL 13 428.00 28-Apr-14 08-Jun-15 25-Apr-14 A 04-Aug-15 -44.00 69.07% 69.97% 1.01DHMEP13000 Embeded Conduits & Boxex - Concrete Works 3.00 28-Apr-14 30-Apr-14 25-Apr-14 A 01-May-14 A 100% 100% 0.00DHMEP13100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 26-May-14 16-Jun-14 07-Jun-14 A 06-Aug-14 A 100% 100% 1.00DHMEP13130 Cable Trays & Cable Trunking 6.00 24-Jun-14 30-Jun-14 07-Jun-14 A 06-Aug-14 A 100% 100% 0.00DHMEP13120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 29-Jun-14 05-Jul-14 13-Jul-14 A 08-Sep-14 A 100% 100% 1.00DHMEP13160 Pressure Testing of Pipes 12.00 06-Jul-14 19-Jul-14 30-Jul-14 A 08-Oct-14 50.00 100% 63% 0.00DHMEP13110 MEP Works in Risers& Clearance 5.00 20-Aug-14 25-Aug-14 15-Jun-14 A 18-Oct-14 -33.00 100% 69% 0.00DHMEP13140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 08-Nov-14 13-Nov-14 13-Aug-14 A 08-Dec-14 4.00 0% 31% 0.00DHMEP13150 MEP Final Fixes 6.00 18-May-15 24-May-15 15-Jul-15 23-Jul-15 -44.00 0% 0% 0.00DHMEP06250 Sanitary ware /Toilet accessories 6.00 21-May-15 27-May-15 21-Jul-15 27-Jul-15 -44.00 0% 0% 0.00DHMEP13200 Pre-Testing & Commissioning 7.00 01-Jun-15 08-Jun-15 28-Jul-15 04-Aug-15 -44.00 0% 0% 0.00

LEVEL 14LEVEL 14 462.00 19-Apr-14 25-Jul-15 24-Feb-14 A 16-Sep-15 -43.00 69.77% 68.86% 0.99STRUCTURAL WORKS - LEVEL 14STRUCTURAL WORKS - LEVEL 14 18.00 19-Apr-14 08-May-14 21-Apr-14 A 11-May-14 A 100% 100% 1.00DHCWA15100 Core Wall - Level 14 4.00 19-Apr-14 22-Apr-14 21-Apr-14 A 27-Apr-14 A 100% 100% 1.00DHSLA14100 Construction of Horizontals - L14 3.00 04-May-14 06-May-14 03-May-14 A 08-May-14 A 100% 100% 1.00DHCWA15110 Construction of Verticals - L14 2.00 07-May-14 08-May-14 09-May-14 A 11-May-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 20-Jul-14 23-Jul-14 16-Jul-14 A 20-Jul-14 A 0% 0% 0.00A1460 Stair # 1 4.00 20-Jul-14 23-Jul-14 16-Jul-14 A 20-Jul-14 A 100% 100% 0.00A1470 Stair # 2 3.00 21-Jul-14 23-Jul-14 17-Jul-14 A 20-Jul-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 14FINISHES WORKS - LEVEL 14 299.00 02-Jun-14 25-Jul-15 24-Feb-14 A 16-Sep-15 -43.00 25.16% 19.64% 0.78Dry areaDry area 276.00 24-Jun-14 28-Jun-15 24-Feb-14 A 27-Aug-15 -38.00 35.99% 35.49% 0.99DHMEP14190 Dry Area Floor Screed 7.00 03-Aug-14 11-Aug-14 24-Feb-14 A 24-Feb-14 A 100% 100% 0.00DHFSH14100 Block Work in Dry Area 6.00 24-Jun-14 30-Jun-14 24-Jun-14 A 20-Jul-14 A 100% 100% 1.00DHFSH14120 Marking,Cutting & Chasing - Dry Area 4.00 01-Jul-14 05-Jul-14 13-Jul-14 A 10-Aug-14 A 100% 100% 1.00DHFSH14130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 06-Jul-14 09-Jul-14 10-Aug-14 A 12-Aug-14 A 100% 100% 1.00DHFSH14160 Plaster in Dry Area 8.00 22-Jul-14 03-Aug-14 17-Aug-14 A 08-Sep-14 A 100% 100% 1.00DHFSH14230 Dry Area Painting - Primer 4.00 11-Aug-14 16-Aug-14 25-Sep-14 A 02-Oct-14 83.00 100% 50% 0.00DHFSH14260 Dry Area Painting - Stucco 6.00 16-Aug-14 23-Aug-14 06-Oct-14 12-Oct-14 83.00 100% 0% 0.00DHFSH14290 Dry Area False Ceiling Suspension 6.00 29-Sep-14 08-Oct-14 19-Nov-14 25-Nov-14 -15.00 18.75% 0% 0.00DHFSH14350 Dry Area False Ceiling Tiling / Boarding 5.00 18-Nov-14 23-Nov-14 14-Dec-14 18-Dec-14 27.00 0% 0% 0.00DHFSH14400 Dry Area Painting - 1st Coat 5.00 24-Nov-14 29-Nov-14 20-Dec-14 24-Dec-14 27.00 0% 0% 0.00DHFSH14450 Dry Area Flooring 5.00 18-Dec-14 23-Dec-14 08-Jan-15 13-Jan-15 16.00 0% 0% 0.00DHFSH14430 Installation of Timber Doors & Ironmongery 5.00 06-May-15 11-May-15 05-Jul-15 09-Jul-15 -50.00 0% 0% 0.00DHFSH14802 Installation of Wardrobe 12.00 03-Jun-15 16-Jun-15 03-Aug-15 16-Aug-15 -50.00 0% 0% 0.00DHFSH14500 Paint Final Coat 6.00 22-Jun-15 28-Jun-15 22-Aug-15 27-Aug-15 -38.00 0% 0% 0.00

Wet areaWet area 242.00 24-Jun-14 21-Jun-15 24-Jun-14 A 20-Aug-15 -50.00 14.4% 10.35% 0.72DHFSH14110 Block Work in Wet Area 6.00 24-Jun-14 30-Jun-14 24-Jun-14 A 20-Jul-14 A 100% 100% 0.00DHFSH14140 Marking,Cutting & Chasing - Wet Area 4.00 01-Jul-14 05-Jul-14 13-Jul-14 A 10-Aug-14 A 100% 100% 1.00DHFSH14150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 06-Jul-14 09-Jul-14 10-Aug-14 A 12-Aug-14 A 100% 100% 1.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Staircase Painting - Primer & StuccoStaircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 14Construction of Horizontals - L14Construction of Verticals - L14

Stair # 1Stair # 2

Dry Area Floor ScreedBlock Work in Dry Area

Marking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 17 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 62: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP14170 Plaster in Wet Area 4.00 13-Jul-14 16-Jul-14 17-Aug-14 A 08-Sep-14 A 100% 100% 1.00DHMEP14180 Wet Area Wall Tiling 6.00 29-Sep-14 08-Oct-14 06-Nov-14 12-Nov-14 1.00 18.75% 0% 0.00DHFSH14300 Wet Area False Ceiling Suspension 5.00 08-Oct-14 14-Oct-14 26-Nov-14 01-Dec-14 5.00 0% 0% 0.00DHFSH14370 Wet Area False Ceiling Tiling/Boarding 4.00 18-Nov-14 22-Nov-14 14-Dec-14 17-Dec-14 5.00 0% 0% 0.00DHFSH14210 Wet Area Waterproofing 4.00 23-Nov-14 26-Nov-14 18-Dec-14 22-Dec-14 5.00 0% 0% 0.00DHFSH14220 Wet Area Floor Screed 4.00 27-Nov-14 01-Dec-14 23-Dec-14 27-Dec-14 5.00 0% 0% 0.00DHFSH14250 Wet Area Floor Tiling 5.00 03-Dec-14 08-Dec-14 28-Dec-14 03-Jan-15 5.00 0% 0% 0.00DHFSH06580 Cabinet Carcass 5.00 21-Dec-14 25-Dec-14 11-Jan-15 15-Jan-15 -1.00 0% 0% 0.00DHFSH14420 Installation of Shower Enclosure 4.00 11-May-15 14-May-15 09-Jul-15 13-Jul-15 -37.00 0% 0% 0.00DHFSH14390 Installation of Vanity Counters & Tops 5.00 12-May-15 18-May-15 11-Jul-15 15-Jul-15 -50.00 0% 0% 0.00DHFSH14800 Installation of Kitchen Cabinet 12.00 08-Jun-15 21-Jun-15 08-Aug-15 20-Aug-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 97.00 11-Aug-14 07-Apr-15 01-Sep-14 A 27-Jan-15 99.00 0% 0% 0.00DHFSH14240 Corridor/Lift Lobby Floor Screed 4.00 11-Aug-14 16-Aug-14 01-Sep-14 A 01-Sep-14 A 100% 100% 0.00DHFSH14270 Lift Lobby Painting - Primer & Stucco 6.00 16-Aug-14 23-Aug-14 25-Sep-14 A 08-Oct-14 50.00 100% 15% 0.00DHFSH14310 Lift Lobby False Ceiling Suspension 6.00 14-Oct-14 21-Oct-14 03-Dec-14 09-Dec-14 5.00 0% 0% 0.00DHFSH14360 Lift Lobby False Ceiling Tiling / Boarding 5.00 18-Nov-14 23-Nov-14 14-Dec-14 18-Dec-14 100.00 0% 0% 0.00DHFSH14410 Lift Lobby Painting - 1st Coat 6.00 24-Nov-14 30-Nov-14 20-Dec-14 25-Dec-14 100.00 0% 0% 0.00DHFSH14440 Installation of Steel Doors & Windows 3.00 05-Apr-15 07-Apr-15 17-Jan-15 19-Jan-15 67.00 0% 0% 0.00DHFSH14470 Lift Lobby Flooring 6.00 24-Dec-14 30-Dec-14 14-Jan-15 20-Jan-15 99.00 0% 0% 0.00DHFSH14490 Uti lity Rooms- Epoxy Flooring 6.00 31-Dec-14 07-Jan-15 21-Jan-15 27-Jan-15 99.00 0% 0% 0.00

StaircaseStaircase 97.00 03-Aug-14 15-Apr-15 01-Oct-14 27-Jan-15 84.00 45.08% 0% 0.00DHFSH14200 Staircase Plastering 4.00 03-Aug-14 07-Aug-14 01-Oct-14 07-Oct-14 92.00 100% 0% 0.00DHFSH14280 Staircase Painting - Primer & Stucco 6.00 23-Aug-14 30-Aug-14 09-Oct-14 15-Oct-14 144.00 100% 0% 0.00DHFSH14320 Staircase Handrail Fixing 3.00 03-Jan-15 06-Jan-15 13-Nov-14 16-Nov-14 134.00 0% 0% 0.00DHFSH14330 Staircase Painting 1st Coat 3.00 06-Jan-15 10-Jan-15 25-Dec-14 28-Dec-14 102.00 0% 0% 0.00DHFSH14340 Staircase Final Painting 5.00 08-Apr-15 13-Apr-15 20-Jan-15 25-Jan-15 84.00 0% 0% 0.00DHFSH14380 Staircase Epoxy Flooring 2.00 14-Apr-15 15-Apr-15 26-Jan-15 27-Jan-15 84.00 0% 0% 0.00

GeneralGeneral 299.00 02-Jun-14 25-Jul-15 12-Jun-14 A 16-Sep-15 -43.00 0% 0% 0.00DHSTR14000 Access from Structure 0.00 02-Jun-14 12-Jun-14 A 100% 100% 0.00DHFSH14510 Snagging & De-Snagging 12.00 09-Jul-15 25-Jul-15 03-Sep-15 16-Sep-15 -43.00 0% 0% 0.00

MEP - LEVEL 14MEP - LEVEL 14 431.00 04-May-14 15-Jun-15 03-May-14 A 11-Aug-15 -44.00 69.07% 69.97% 1.01DHMEP14000 Embeded Conduits & Boxex - Concrete Works 3.00 04-May-14 06-May-14 03-May-14 A 08-May-14 A 100% 100% 0.00DHMEP14100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 02-Jun-14 22-Jun-14 12-Jun-14 A 05-Aug-14 A 100% 100% 1.00DHMEP14130 Cable Trays & Cable Trunking 6.00 01-Jul-14 07-Jul-14 12-Jun-14 A 05-Aug-14 A 100% 100% 0.00DHMEP14160 Pressure Testing of Pipes 12.00 13-Jul-14 26-Jul-14 30-Jul-14 A 12-Aug-14 A 100% 100% 0.00DHMEP14120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 06-Jul-14 12-Jul-14 22-Jul-14 A 08-Sep-14 A 100% 100% 1.00DHMEP14110 MEP Works in Risers& Clearance 5.00 26-Aug-14 31-Aug-14 14-Jul-14 A 23-Oct-14 -33.00 100% 69% 0.00DHMEP14140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 11-Nov-14 17-Nov-14 16-Aug-14 A 13-Dec-14 5.00 0% 31% 0.00DHMEP14150 MEP Final Fixes 6.00 23-May-15 28-May-15 22-Jul-15 28-Jul-15 -42.00 0% 0% 0.00DHMEP06260 Sanitary ware /Toilet accessories 6.00 26-May-15 01-Jun-15 26-Jul-15 01-Aug-15 -42.00 0% 0% 0.00DHMEP14200 Pre-Testing & Commissioning 7.00 08-Jun-15 15-Jun-15 04-Aug-15 11-Aug-15 -44.00 0% 0% 0.00

LEVEL 15LEVEL 15 465.00 23-Apr-14 01-Aug-15 28-Apr-14 A 26-Sep-15 -43.00 69.31% 68.9% 0.99STRUCTURAL WORKS -LEVEL 15STRUCTURAL WORKS -LEVEL 15 19.00 23-Apr-14 14-May-14 28-Apr-14 A 18-May-14 A 100% 100% 1.00DHCWA16100 Core Wall - Level 15 9.00 23-Apr-14 03-May-14 28-Apr-14 A 05-May-14 A 100% 100% 1.00DHSLA15100 Construction of Horizontals - L15 3.00 10-May-14 12-May-14 10-May-14 A 15-May-14 A 100% 100% 1.00DHCWA16110 Construction of Verticals - L15 2.00 13-May-14 14-May-14 17-May-14 A 18-May-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 27-Jul-14 02-Aug-14 22-Jul-14 A 26-Jul-14 A 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Plaster in Wet AreaWet Area Wall Ti ling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Pressure Testing of PipesEmbeded Condiuts,Boxes and Sleeves in Walls

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 15Construction of Horizontals - L15Construction of Verticals - L15

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 18 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 63: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

A1480 Stair # 1 4.00 27-Jul-14 02-Aug-14 22-Jul-14 A 26-Jul-14 A 100% 100% 0.00A1490 Stair # 2 3.00 30-Jul-14 02-Aug-14 22-Jul-14 A 26-Jul-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 15FINISHES WORKS - LEVEL 15 305.00 08-Jun-14 01-Aug-15 19-Jun-14 A 26-Sep-15 -43.00 23.05% 19.64% 0.85Dry areaDry area 282.00 29-Jun-14 05-Jul-15 02-Jul-14 A 03-Sep-15 -38.00 35.49% 35.49% 1.00DHFSH15100 Block Work in Dry Area 6.00 29-Jun-14 05-Jul-14 02-Jul-14 A 20-Jul-14 A 100% 100% 1.00DHFSH15120 Marking,Cutting & Chasing - Dry Area 4.00 06-Jul-14 09-Jul-14 09-Aug-14 A 12-Aug-14 A 100% 100% 1.00DHFSH15130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 10-Jul-14 14-Jul-14 11-Aug-14 A 17-Aug-14 A 100% 100% 1.00DHFSH15160 Plaster in Dry Area 8.00 27-Jul-14 07-Aug-14 17-Aug-14 A 13-Sep-14 A 100% 100% 1.00DHMEP15190 Dry Area Floor Screed 7.00 07-Aug-14 16-Aug-14 01-Oct-14 11-Oct-14 42.00 100% 0% 0.00DHFSH15230 Dry Area Painting - Primer 4.00 16-Aug-14 20-Aug-14 12-Oct-14 15-Oct-14 79.00 100% 0% 0.00DHFSH15260 Dry Area Painting - Stucco 6.00 20-Aug-14 27-Aug-14 16-Oct-14 22-Oct-14 79.00 100% 0% 0.00DHFSH15290 Dry Area False Ceiling Suspension 6.00 06-Oct-14 13-Oct-14 24-Nov-14 30-Nov-14 -15.00 0% 0% 0.00DHFSH15350 Dry Area False Ceiling Tiling / Boarding 5.00 22-Nov-14 26-Nov-14 18-Dec-14 23-Dec-14 28.00 0% 0% 0.00DHFSH15400 Dry Area Painting - 1st Coat 5.00 27-Nov-14 03-Dec-14 24-Dec-14 29-Dec-14 28.00 0% 0% 0.00DHFSH15450 Dry Area Flooring 5.00 24-Dec-14 29-Dec-14 14-Jan-15 19-Jan-15 16.00 0% 0% 0.00DHFSH15430 Installation of Timber Doors & Ironmongery 5.00 12-May-15 18-May-15 11-Jul-15 15-Jul-15 -50.00 0% 0% 0.00DHFSH15802 Installation of Wardrobe 12.00 08-Jun-15 21-Jun-15 08-Aug-15 20-Aug-15 -50.00 0% 0% 0.00DHFSH15500 Paint Final Coat 6.00 29-Jun-15 05-Jul-15 29-Aug-15 03-Sep-15 -38.00 0% 0% 0.00

Wet areaWet area 244.00 29-Jun-14 28-Jun-15 02-Jul-14 A 27-Aug-15 -50.00 10.35% 10.35% 1.00DHFSH15110 Block Work in Wet Area 6.00 29-Jun-14 05-Jul-14 02-Jul-14 A 20-Jul-14 A 100% 100% 0.00DHFSH15140 Marking,Cutting & Chasing - Wet Area 4.00 06-Jul-14 09-Jul-14 09-Aug-14 A 12-Aug-14 A 100% 100% 1.00DHFSH15150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 10-Jul-14 14-Jul-14 11-Aug-14 A 17-Aug-14 A 100% 100% 1.00DHMEP15170 Plaster in Wet Area 4.00 17-Jul-14 21-Jul-14 17-Aug-14 A 13-Sep-14 A 100% 100% 1.00DHMEP15180 Wet Area Wall Tiling 6.00 06-Oct-14 13-Oct-14 11-Nov-14 17-Nov-14 1.00 0% 0% 0.00DHFSH15300 Wet Area False Ceiling Suspension 5.00 13-Oct-14 19-Oct-14 01-Dec-14 07-Dec-14 5.00 0% 0% 0.00DHFSH15370 Wet Area False Ceiling Tiling/Boarding 4.00 22-Nov-14 25-Nov-14 18-Dec-14 22-Dec-14 6.00 0% 0% 0.00DHFSH15210 Wet Area Waterproofing 4.00 26-Nov-14 30-Nov-14 23-Dec-14 27-Dec-14 6.00 0% 0% 0.00DHFSH15220 Wet Area Floor Screed 4.00 01-Dec-14 06-Dec-14 28-Dec-14 31-Dec-14 6.00 0% 0% 0.00DHFSH15250 Wet Area Floor Tiling 5.00 07-Dec-14 11-Dec-14 03-Jan-15 07-Jan-15 6.00 0% 0% 0.00DHFSH06590 Cabinet Carcass 5.00 27-Dec-14 31-Dec-14 17-Jan-15 21-Jan-15 -1.00 0% 0% 0.00DHFSH15420 Installation of Shower Enclosure 4.00 18-May-15 21-May-15 15-Jul-15 21-Jul-15 -36.00 0% 0% 0.00DHFSH15390 Installation of Vanity Counters & Tops 5.00 20-May-15 25-May-15 20-Jul-15 25-Jul-15 -50.00 0% 0% 0.00DHFSH15800 Installation of Kitchen Cabinet 12.00 15-Jun-15 28-Jun-15 15-Aug-15 27-Aug-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 95.00 16-Aug-14 11-Apr-15 12-Oct-14 02-Feb-15 96.00 0% 0% 0.00DHFSH15240 Corridor/Lift Lobby Floor Screed 4.00 16-Aug-14 20-Aug-14 12-Oct-14 15-Oct-14 42.00 100% 0% 0.00DHFSH15270 Lift Lobby Painting - Primer & Stucco 6.00 20-Aug-14 27-Aug-14 16-Oct-14 22-Oct-14 42.00 100% 0% 0.00DHFSH15310 Lift Lobby False Ceiling Suspension 6.00 19-Oct-14 27-Oct-14 08-Dec-14 14-Dec-14 5.00 0% 0% 0.00DHFSH15360 Lift Lobby False Ceiling Tiling / Boarding 5.00 22-Nov-14 26-Nov-14 18-Dec-14 23-Dec-14 99.00 0% 0% 0.00DHFSH15410 Lift Lobby Painting - 1st Coat 6.00 27-Nov-14 04-Dec-14 24-Dec-14 30-Dec-14 99.00 0% 0% 0.00DHFSH15440 Installation of Steel Doors & Windows 3.00 08-Apr-15 11-Apr-15 22-Jan-15 25-Jan-15 65.00 0% 0% 0.00DHFSH15470 Lift Lobby Flooring 6.00 30-Dec-14 06-Jan-15 20-Jan-15 26-Jan-15 96.00 0% 0% 0.00DHFSH15490 Uti lity Rooms- Epoxy Flooring 6.00 07-Jan-15 13-Jan-15 27-Jan-15 02-Feb-15 96.00 0% 0% 0.00

StaircaseStaircase 102.00 07-Aug-14 19-Apr-15 01-Oct-14 02-Feb-15 84.00 45.08% 0% 0.00DHFSH15200 Staircase Plastering 4.00 07-Aug-14 12-Aug-14 01-Oct-14 07-Oct-14 148.00 100% 0% 0.00DHFSH15280 Staircase Painting - Primer & Stucco 6.00 27-Aug-14 03-Sep-14 23-Oct-14 30-Oct-14 135.00 100% 0% 0.00DHFSH15320 Staircase Handrail Fixing 3.00 06-Jan-15 10-Jan-15 17-Nov-14 19-Nov-14 136.00 0% 0% 0.00DHFSH15330 Staircase Painting 1st Coat 3.00 10-Jan-15 13-Jan-15 30-Dec-14 03-Jan-15 103.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceil ing SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Instal lation of Shower EnclosureInstallation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 19 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 64: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH15340 Staircase Final Painting 5.00 12-Apr-15 16-Apr-15 26-Jan-15 31-Jan-15 84.00 0% 0% 0.00DHFSH15380 Staircase Epoxy Flooring 2.00 18-Apr-15 19-Apr-15 01-Feb-15 02-Feb-15 84.00 0% 0% 0.00

GeneralGeneral 305.00 08-Jun-14 01-Aug-15 19-Jun-14 A 26-Sep-15 -43.00 0% 0% 0.00DHSTR15000 Access from Structure 0.00 08-Jun-14 19-Jun-14 A 100% 100% 0.00DHFSH15510 Snagging & De-Snagging 12.00 16-Jul-15 01-Aug-15 10-Sep-15 26-Sep-15 -43.00 0% 0% 0.00

MEP - LEVEL 15MEP - LEVEL 15 434.00 10-May-14 22-Jun-15 10-May-14 A 18-Aug-15 -44.00 69.07% 69.97% 1.01DHMEP15000 Embeded Conduits & Boxex - Concrete Works 3.00 10-May-14 12-May-14 10-May-14 A 15-May-14 A 100% 100% 0.00DHMEP15100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 08-Jun-14 28-Jun-14 19-Jun-14 A 04-Aug-14 A 100% 100% 1.00DHMEP15130 Cable Trays & Cable Trunking 6.00 06-Jul-14 12-Jul-14 19-Jun-14 A 04-Aug-14 A 100% 100% 0.00DHMEP15160 Pressure Testing of Pipes 12.00 17-Jul-14 02-Aug-14 15-Jul-14 A 19-Aug-14 A 100% 100% 0.00DHMEP15120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 10-Jul-14 16-Jul-14 04-Aug-14 A 10-Sep-14 A 100% 100% 1.00DHMEP15110 MEP Works in Risers& Clearance 5.00 01-Sep-14 06-Sep-14 14-Jul-14 A 30-Oct-14 -33.00 100% 69% 0.00DHMEP15140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 15-Nov-14 20-Nov-14 18-Aug-14 A 17-Dec-14 5.00 0% 31% 0.00DHMEP15150 MEP Final Fixes 6.00 27-May-15 02-Jun-15 27-Jul-15 02-Aug-15 -40.00 0% 0% 0.00DHMEP06270 Sanitary ware /Toilet accessories 6.00 31-May-15 06-Jun-15 30-Jul-15 05-Aug-15 -40.00 0% 0% 0.00DHMEP15200 Pre-Testing & Commissioning 7.00 15-Jun-15 22-Jun-15 11-Aug-15 18-Aug-15 -44.00 0% 0% 0.00

LEVEL 16LEVEL 16 496.00 04-May-14 08-Aug-15 05-May-14 A 22-Oct-15 -59.00 69.38% 68.9% 0.99STRUCTURAL WORKS -LEVEL 16STRUCTURAL WORKS -LEVEL 16 121.00 04-May-14 20-May-14 05-May-14 A 23-May-14 A 100% 100% 1.00DHCWA17120 Tower Crane Jump 1.00 08-May-14 08-May-14 05-May-14 A 05-May-14 A 100% 100% 0.00DHCWA17100 Core Wall - Level 16 5.00 04-May-14 08-May-14 06-May-14 A 08-May-14 A 100% 100% 1.00DHSLA16100 Construction of Horizontals- L16 3.00 15-May-14 18-May-14 16-May-14 A 20-May-14 A 100% 100% 1.00DHCWA17110 Construction of Verticals - L16 2.00 19-May-14 20-May-14 21-May-14 A 23-May-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 04-Aug-14 07-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0% 0.00A1500 Stair # 1 4.00 04-Aug-14 07-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00A1510 Stair # 2 3.00 05-Aug-14 07-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 16FINISHES WORKS - LEVEL 16 311.00 14-Jun-14 08-Aug-15 26-Jun-14 A 03-Oct-15 -43.00 23.05% 19.64% 0.85Dry areaDry area 288.00 05-Jul-14 12-Jul-15 07-Jul-14 A 10-Sep-15 -38.00 35.49% 35.49% 1.00DHFSH16100 Block Work in Dry Area 6.00 05-Jul-14 10-Jul-14 07-Jul-14 A 28-Jul-14 A 100% 100% 1.00DHFSH16120 Marking,Cutting & Chasing - Dry Area 4.00 12-Jul-14 15-Jul-14 12-Aug-14 A 14-Aug-14 A 100% 100% 1.00DHFSH16130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 16-Jul-14 20-Jul-14 18-Aug-14 A 26-Aug-14 A 100% 100% 1.00DHFSH16160 Plaster in Dry Area 8.00 03-Aug-14 12-Aug-14 20-Aug-14 A 18-Sep-14 A 100% 100% 1.00DHMEP16190 Dry Area Floor Screed 7.00 12-Aug-14 20-Aug-14 01-Oct-14 11-Oct-14 45.00 100% 0% 0.00DHFSH16230 Dry Area Painting - Primer 4.00 20-Aug-14 25-Aug-14 12-Oct-14 15-Oct-14 84.00 100% 0% 0.00DHFSH16260 Dry Area Painting - Stucco 6.00 25-Aug-14 01-Sep-14 16-Oct-14 22-Oct-14 84.00 100% 0% 0.00DHFSH16290 Dry Area False Ceiling Suspension 6.00 11-Oct-14 18-Oct-14 29-Nov-14 06-Dec-14 -15.00 0% 0% 0.00DHFSH16350 Dry Area False Ceiling Tiling / Boarding 5.00 25-Nov-14 30-Nov-14 23-Dec-14 28-Dec-14 29.00 0% 0% 0.00DHFSH16400 Dry Area Painting - 1st Coat 5.00 01-Dec-14 07-Dec-14 29-Dec-14 04-Jan-15 29.00 0% 0% 0.00DHFSH16450 Dry Area Flooring 5.00 30-Dec-14 05-Jan-15 20-Jan-15 25-Jan-15 16.00 0% 0% 0.00DHFSH16430 Installation of Timber Doors & Ironmongery 5.00 18-May-15 23-May-15 15-Jul-15 22-Jul-15 -50.00 0% 0% 0.00DHFSH16802 Installation of Wardrobe 12.00 15-Jun-15 28-Jun-15 15-Aug-15 27-Aug-15 -50.00 0% 0% 0.00DHFSH16500 Paint Final Coat 6.00 06-Jul-15 12-Jul-15 05-Sep-15 10-Sep-15 -38.00 0% 0% 0.00

Wet areaWet area 246.00 05-Jul-14 05-Jul-15 07-Jul-14 A 03-Sep-15 -50.00 10.35% 10.35% 1.00DHFSH16110 Block Work in Wet Area 6.00 05-Jul-14 10-Jul-14 07-Jul-14 A 28-Jul-14 A 100% 100% 0.00DHFSH16140 Marking,Cutting & Chasing - Wet Area 4.00 12-Jul-14 15-Jul-14 12-Aug-14 A 14-Aug-14 A 100% 100% 1.00DHFSH16150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 16-Jul-14 20-Jul-14 18-Aug-14 A 26-Aug-14 A 100% 100% 1.00DHMEP16170 Plaster in Wet Area 4.00 23-Jul-14 27-Jul-14 20-Aug-14 A 18-Sep-14 A 100% 100% 1.00DHMEP16180 Wet Area Wall Tiling 6.00 11-Oct-14 18-Oct-14 16-Nov-14 22-Nov-14 1.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Pressure Testing of PipesEmbeded Condiuts,Boxes and Sleeves in Walls

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Tower Crane JumpCore Wall - Level 16

Construction of Horizontals- L16Construction of Verticals - L16

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall Ti ling

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 20 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 65: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH16300 Wet Area False Ceiling Suspension 5.00 18-Oct-14 23-Oct-14 07-Dec-14 11-Dec-14 4.00 0% 0% 0.00DHFSH16370 Wet Area False Ceiling Tiling/Boarding 4.00 25-Nov-14 29-Nov-14 23-Dec-14 27-Dec-14 6.00 0% 0% 0.00DHFSH16210 Wet Area Waterproofing 4.00 30-Nov-14 04-Dec-14 28-Dec-14 31-Dec-14 6.00 0% 0% 0.00DHFSH16220 Wet Area Floor Screed 4.00 06-Dec-14 09-Dec-14 03-Jan-15 06-Jan-15 6.00 0% 0% 0.00DHFSH16250 Wet Area Floor Tiling 6.00 10-Dec-14 16-Dec-14 07-Jan-15 13-Jan-15 6.00 0% 0% 0.00DHFSH06600 Cabinet Carcass 5.00 03-Jan-15 07-Jan-15 22-Jan-15 27-Jan-15 -1.00 0% 0% 0.00DHFSH16420 Installation of Shower Enclosure 4.00 23-May-15 26-May-15 22-Jul-15 26-Jul-15 -37.00 0% 0% 0.00DHFSH16390 Installation of Vanity Counters & Tops 5.00 25-May-15 30-May-15 25-Jul-15 29-Jul-15 -50.00 0% 0% 0.00DHFSH16800 Installation of Kitchen Cabinet 12.00 22-Jun-15 05-Jul-15 22-Aug-15 03-Sep-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 100.00 20-Aug-14 14-Apr-15 12-Oct-14 08-Feb-15 93.00 0% 0% 0.00DHFSH16240 Corridor/Lift Lobby Floor Screed 4.00 20-Aug-14 25-Aug-14 12-Oct-14 15-Oct-14 45.00 100% 0% 0.00DHFSH16270 Lift Lobby Painting - Primer & Stucco 6.00 25-Aug-14 01-Sep-14 16-Oct-14 22-Oct-14 45.00 100% 0% 0.00DHFSH16310 Lift Lobby False Ceiling Suspension 6.00 23-Oct-14 01-Nov-14 13-Dec-14 18-Dec-14 4.00 0% 0% 0.00DHFSH16360 Lift Lobby False Ceiling Tiling / Boarding 5.00 25-Nov-14 30-Nov-14 23-Dec-14 28-Dec-14 98.00 0% 0% 0.00DHFSH16410 Lift Lobby Painting - 1st Coat 6.00 01-Dec-14 08-Dec-14 29-Dec-14 05-Jan-15 98.00 0% 0% 0.00DHFSH16440 Installation of Steel Doors & Windows 3.00 12-Apr-15 14-Apr-15 28-Jan-15 31-Jan-15 63.00 0% 0% 0.00DHFSH16470 Lift Lobby Flooring 6.00 06-Jan-15 12-Jan-15 26-Jan-15 01-Feb-15 93.00 0% 0% 0.00DHFSH16490 Uti lity Rooms- Epoxy Flooring 6.00 13-Jan-15 19-Jan-15 02-Feb-15 08-Feb-15 93.00 0% 0% 0.00

StaircaseStaircase 107.00 12-Aug-14 22-Apr-15 01-Oct-14 08-Feb-15 83.00 45.08% 0% 0.00DHFSH16200 Staircase Plastering 4.00 12-Aug-14 17-Aug-14 01-Oct-14 07-Oct-14 151.00 100% 0% 0.00DHFSH16280 Staircase Painting - Primer & Stucco 6.00 01-Sep-14 08-Sep-14 23-Oct-14 30-Oct-14 138.00 100% 0% 0.00DHFSH16320 Staircase Handrail Fixing 3.00 10-Jan-15 13-Jan-15 20-Nov-14 23-Nov-14 137.00 0% 0% 0.00DHFSH16330 Staircase Painting 1st Coat 3.00 13-Jan-15 17-Jan-15 05-Jan-15 07-Jan-15 103.00 0% 0% 0.00DHFSH16340 Staircase Final Painting 5.00 15-Apr-15 20-Apr-15 01-Feb-15 05-Feb-15 83.00 0% 0% 0.00DHFSH16380 Staircase Epoxy Flooring 2.00 21-Apr-15 22-Apr-15 07-Feb-15 08-Feb-15 83.00 0% 0% 0.00

GeneralGeneral 311.00 14-Jun-14 08-Aug-15 26-Jun-14 A 03-Oct-15 -43.00 0% 0% 0.00DHSTR16000 Access from Structure 0.00 14-Jun-14 26-Jun-14 A 100% 100% 0.00DHFSH16510 Snagging & De-Snagging 12.00 26-Jul-15 08-Aug-15 17-Sep-15 03-Oct-15 -43.00 0% 0% 0.00

MEP - LEVEL 16MEP - LEVEL 16 496.00 15-May-14 29-Jun-15 16-May-14 A 22-Oct-15 -91.00 69.07% 69.82% 1.01DHMEP16000 Embeded Conduits & Boxex - Concrete Works 3.00 15-May-14 18-May-14 16-May-14 A 20-May-14 A 100% 100% 0.00DHMEP16100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 14-Jun-14 03-Jul-14 26-Jun-14 A 12-Aug-14 A 100% 100% 1.00DHMEP16130 Cable Trays & Cable Trunking 6.00 12-Jul-14 17-Jul-14 26-Jun-14 A 12-Aug-14 A 100% 100% 0.00DHMEP16160 Pressure Testing of Pipes 12.00 23-Jul-14 07-Aug-14 02-Aug-14 A 20-Aug-14 A 100% 100% 0.00DHMEP16120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 16-Jul-14 22-Jul-14 04-Aug-14 A 15-Sep-14 A 100% 100% 1.00DHMEP16110 MEP Works in Risers& Clearance 5.00 07-Sep-14 11-Sep-14 24-Jul-14 A 05-Nov-14 -33.00 100% 69% 0.00DHMEP16140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 18-Nov-14 24-Nov-14 20-Aug-14 A 22-Dec-14 4.00 0% 26% 0.00DHMEP16150 MEP Final Fixes 6.00 01-Jun-15 07-Jun-15 01-Aug-15 06-Aug-15 -40.00 0% 0% 0.00DHMEP06280 Sanitary ware /Toilet accessories 6.00 04-Jun-15 10-Jun-15 04-Aug-15 10-Aug-15 -38.00 0% 0% 0.00DHMEP16200 Pre-Testing & Commissioning 7.00 22-Jun-15 29-Jun-15 18-Aug-15 25-Aug-15 -44.00 0% 0% 0.00DHMEP16010 Busbar - L16 to L20 20.00 05-Apr-15 27-Apr-15 29-Sep-15 22-Oct-15 -144.00 0% 0% 0.00

LEVEL 17LEVEL 17 483.00 10-May-14 15-Aug-15 10-May-14 A 10-Oct-15 -43.00 69.41% 68.99% 0.99STRUCTURAL WORKS - LEVEL 17STRUCTURAL WORKS - LEVEL 17 15.00 10-May-14 26-May-14 10-May-14 A 30-May-14 A 100% 100% 1.00DHCWA18100 Core Wall - Level 17 5.00 10-May-14 14-May-14 10-May-14 A 14-May-14 A 100% 100% 1.00DHSLA17100 Construction of Horizontals - L17 3.00 21-May-14 24-May-14 21-May-14 A 27-May-14 A 100% 100% 1.00DHCWA18110 Construction of Verticals - L17 2.00 25-May-14 26-May-14 28-May-14 A 30-May-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 10-Aug-14 13-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0% 0.00A1520 Stair # 1 4.00 10-Aug-14 13-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstal lation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Pressure Testing of PipesEmbeded Condiuts,Boxes and Sleeves in Walls

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toi let accessories

Pre-Testing & CommissioningBusbar - L16 to L20

Core Wall - Level 17Construction of Horizontals - L17Construction of Verticals - L17

Stair # 1

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 21 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 66: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

A1530 Stair # 2 3.00 11-Aug-14 13-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00FINISHES WORKS - LEVEL 17FINISHES WORKS - LEVEL 17 317.00 30-Jun-14 15-Aug-15 01-Jul-14 A 10-Oct-15 -43.00 23.05% 19.64% 0.85Dry areaDry area 294.00 21-Jul-14 21-Jul-15 10-Jul-14 A 17-Sep-15 -38.00 35.49% 35.49% 1.00DHFSH17100 Block Work in Dry Area 6.00 21-Jul-14 27-Jul-14 10-Jul-14 A 12-Aug-14 A 100% 100% 1.00DHFSH17120 Marking,Cutting & Chasing - Dry Area 4.00 30-Jul-14 03-Aug-14 14-Aug-14 A 17-Aug-14 A 100% 100% 1.00DHFSH17130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 04-Aug-14 07-Aug-14 28-Aug-14 A 02-Sep-14 A 100% 100% 1.00DHFSH17160 Plaster in Dry Area 8.00 11-Aug-14 19-Aug-14 30-Aug-14 A 22-Sep-14 A 100% 100% 1.00DHMEP17190 Dry Area Floor Screed 7.00 20-Aug-14 27-Aug-14 01-Oct-14 11-Oct-14 48.00 100% 0% 0.00DHFSH17230 Dry Area Painting - Primer 4.00 28-Aug-14 01-Sep-14 12-Oct-14 15-Oct-14 89.00 100% 0% 0.00DHFSH17260 Dry Area Painting - Stucco 6.00 02-Sep-14 08-Sep-14 16-Oct-14 22-Oct-14 89.00 100% 0% 0.00DHFSH17290 Dry Area False Ceiling Suspension 6.00 15-Oct-14 22-Oct-14 04-Dec-14 10-Dec-14 -15.00 0% 0% 0.00DHFSH17350 Dry Area False Ceiling Tiling / Boarding 5.00 29-Nov-14 04-Dec-14 28-Dec-14 03-Jan-15 30.00 0% 0% 0.00DHFSH17400 Dry Area Painting - 1st Coat 5.00 06-Dec-14 10-Dec-14 04-Jan-15 08-Jan-15 30.00 0% 0% 0.00DHFSH17450 Dry Area Flooring 5.00 06-Jan-15 11-Jan-15 26-Jan-15 31-Jan-15 16.00 0% 0% 0.00DHFSH17430 Installation of Timber Doors & Ironmongery 5.00 23-May-15 27-May-15 22-Jul-15 27-Jul-15 -50.00 0% 0% 0.00DHFSH17802 Installation of Wardrobe 12.00 22-Jun-15 05-Jul-15 22-Aug-15 03-Sep-15 -50.00 0% 0% 0.00DHFSH17500 Paint Final Coat 6.00 13-Jul-15 21-Jul-15 12-Sep-15 17-Sep-15 -38.00 0% 0% 0.00

Wet areaWet area 248.00 21-Jul-14 12-Jul-15 10-Jul-14 A 10-Sep-15 -50.00 10.35% 10.35% 1.00DHFSH17110 Block Work in Wet Area 6.00 21-Jul-14 27-Jul-14 10-Jul-14 A 12-Aug-14 A 100% 100% 0.00DHFSH17140 Marking,Cutting & Chasing - Wet Area 4.00 30-Jul-14 03-Aug-14 14-Aug-14 A 17-Aug-14 A 100% 100% 1.00DHFSH17150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 04-Aug-14 07-Aug-14 28-Aug-14 A 02-Sep-14 A 100% 100% 1.00DHMEP17170 Plaster in Wet Area 4.00 11-Aug-14 14-Aug-14 30-Aug-14 A 22-Sep-14 A 100% 100% 1.00DHMEP17180 Wet Area Wall Tiling 6.00 15-Oct-14 22-Oct-14 20-Nov-14 26-Nov-14 1.00 0% 0% 0.00DHFSH17300 Wet Area False Ceiling Suspension 5.00 22-Oct-14 29-Oct-14 11-Dec-14 16-Dec-14 3.00 0% 0% 0.00DHFSH17370 Wet Area False Ceiling Tiling/Boarding 4.00 29-Nov-14 03-Dec-14 28-Dec-14 31-Dec-14 8.00 0% 0% 0.00DHFSH17210 Wet Area Waterproofing 4.00 04-Dec-14 08-Dec-14 03-Jan-15 06-Jan-15 8.00 0% 0% 0.00DHFSH17220 Wet Area Floor Screed 4.00 09-Dec-14 13-Dec-14 07-Jan-15 11-Jan-15 8.00 0% 0% 0.00DHFSH17250 Wet Area Floor Tiling 5.00 14-Dec-14 18-Dec-14 12-Jan-15 17-Jan-15 8.00 0% 0% 0.00DHFSH06610 Cabinet Carcass 5.00 08-Jan-15 13-Jan-15 28-Jan-15 02-Feb-15 -1.00 0% 0% 0.00DHFSH17420 Installation of Shower Enclosure 4.00 27-May-15 31-May-15 27-Jul-15 30-Jul-15 -38.00 0% 0% 0.00DHFSH17390 Installation of Vanity Counters & Tops 5.00 30-May-15 03-Jun-15 29-Jul-15 03-Aug-15 -50.00 0% 0% 0.00DHFSH17800 Installation of Kitchen Cabinet 12.00 29-Jun-15 12-Jul-15 29-Aug-15 10-Sep-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 105.00 28-Aug-14 18-Apr-15 12-Oct-14 14-Feb-15 90.00 0% 0% 0.00DHFSH17240 Corridor/Lift Lobby Floor Screed 4.00 28-Aug-14 01-Sep-14 12-Oct-14 15-Oct-14 48.00 100% 0% 0.00DHFSH17270 Lift Lobby Painting - Primer & Stucco 6.00 02-Sep-14 08-Sep-14 16-Oct-14 22-Oct-14 48.00 100% 0% 0.00DHFSH17310 Lift Lobby False Ceiling Suspension 6.00 29-Oct-14 05-Nov-14 17-Dec-14 23-Dec-14 3.00 0% 0% 0.00DHFSH17360 Lift Lobby False Ceiling Tiling / Boarding 5.00 29-Nov-14 04-Dec-14 28-Dec-14 03-Jan-15 97.00 0% 0% 0.00DHFSH17410 Lift Lobby Painting - 1st Coat 6.00 06-Dec-14 11-Dec-14 04-Jan-15 10-Jan-15 97.00 0% 0% 0.00DHFSH17440 Installation of Steel Doors & Windows 3.00 15-Apr-15 18-Apr-15 03-Feb-15 05-Feb-15 61.00 0% 0% 0.00DHFSH17470 Lift Lobby Flooring 6.00 12-Jan-15 18-Jan-15 01-Feb-15 07-Feb-15 90.00 0% 0% 0.00DHFSH17490 Uti lity Rooms- Epoxy Flooring 6.00 19-Jan-15 25-Jan-15 08-Feb-15 14-Feb-15 90.00 0% 0% 0.00

StaircaseStaircase 112.00 20-Aug-14 26-Apr-15 01-Oct-14 14-Feb-15 82.00 45.08% 0% 0.00DHFSH17200 Staircase Plastering 4.00 20-Aug-14 24-Aug-14 01-Oct-14 07-Oct-14 154.00 100% 0% 0.00DHFSH17280 Staircase Painting - Primer & Stucco 6.00 09-Sep-14 15-Sep-14 23-Oct-14 30-Oct-14 141.00 100% 0% 0.00DHFSH17320 Staircase Handrail Fixing 3.00 13-Jan-15 17-Jan-15 24-Nov-14 26-Nov-14 138.00 0% 0% 0.00DHFSH17330 Staircase Painting 1st Coat 3.00 17-Jan-15 20-Jan-15 10-Jan-15 12-Jan-15 103.00 0% 0% 0.00DHFSH17340 Staircase Final Painting 5.00 19-Apr-15 23-Apr-15 07-Feb-15 11-Feb-15 82.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Ti ling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstal lation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final Painting

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 22 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 67: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH17380 Staircase Epoxy Flooring 2.00 25-Apr-15 26-Apr-15 12-Feb-15 14-Feb-15 82.00 0% 0% 0.00GeneralGeneral 317.00 30-Jun-14 15-Aug-15 01-Jul-14 A 10-Oct-15 -43.00 0% 0% 0.00DHSTR17000 Access from Structure 0.00 30-Jun-14 01-Jul-14 A 100% 100% 0.00DHFSH17510 Snagging & De-Snagging 12.00 02-Aug-15 15-Aug-15 27-Sep-15 10-Oct-15 -43.00 0% 0% 0.00

MEP - LEVEL 17MEP - LEVEL 17 452.00 21-May-14 06-Jul-15 21-May-14 A 01-Sep-15 -44.00 69.07% 69.97% 1.01DHMEP17000 Embeded Conduits & Boxex - Concrete Works 3.00 21-May-14 24-May-14 21-May-14 A 27-May-14 A 100% 100% 0.00DHMEP17100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 30-Jun-14 20-Jul-14 01-Jul-14 A 26-Aug-14 A 100% 100% 1.00DHMEP17130 Cable Trays & Cable Trunking 6.00 30-Jul-14 05-Aug-14 01-Jul-14 A 26-Aug-14 A 100% 100% 0.00DHMEP17160 Pressure Testing of Pipes 12.00 11-Aug-14 24-Aug-14 03-Aug-14 A 27-Aug-14 A 100% 100% 0.00DHMEP17120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 04-Aug-14 10-Aug-14 10-Aug-14 A 18-Sep-14 A 100% 100% 1.00DHMEP17110 MEP Works in Risers& Clearance 5.00 13-Sep-14 17-Sep-14 26-Jul-14 A 11-Nov-14 -33.00 100% 69% 0.00DHMEP17140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 22-Nov-14 27-Nov-14 27-Aug-14 A 27-Dec-14 3.00 0% 31% 0.00DHMEP17150 MEP Final Fixes 6.00 06-Jun-15 11-Jun-15 05-Aug-15 11-Aug-15 -40.00 0% 0% 0.00DHMEP06290 Sanitary ware /Toilet accessories 6.00 09-Jun-15 15-Jun-15 09-Aug-15 15-Aug-15 -36.00 0% 0% 0.00DHMEP17200 Pre-Testing & Commissioning 7.00 29-Jun-15 06-Jul-15 25-Aug-15 01-Sep-15 -44.00 0% 0% 0.00

LEVEL 18LEVEL 18 486.00 15-May-14 22-Aug-15 15-May-14 A 18-Oct-15 -43.00 69.44% 65.98% 0.95STRUCTURAL WORKS -LEVEL 18STRUCTURAL WORKS -LEVEL 18 16.00 15-May-14 03-Jun-14 15-May-14 A 05-Jun-14 A 100% 100% 1.00DHCWA19100 Core Wall - Level 18 5.00 15-May-14 20-May-14 15-May-14 A 19-May-14 A 100% 100% 1.00DHSLA18100 Construction of Horizontals - L18 3.00 29-May-14 01-Jun-14 28-May-14 A 03-Jun-14 A 100% 100% 1.00DHCWA19110 Construction of Verticals - L18 2.00 02-Jun-14 03-Jun-14 04-Jun-14 A 05-Jun-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 17-Aug-14 20-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0% 0.00A1540 Stair # 1 4.00 17-Aug-14 20-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00A1550 Stair # 2 3.00 18-Aug-14 20-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 18FINISHES WORKS - LEVEL 18 323.00 03-Jul-14 22-Aug-15 06-Jul-14 A 18-Oct-15 -43.00 23.05% 6.45% 0.28Dry areaDry area 298.00 30-Jul-14 28-Jul-15 15-Jul-14 A 27-Sep-15 -38.00 35.49% 13.7% 0.39DHFSH18120 Marking,Cutting & Chasing - Dry Area 4.00 06-Aug-14 10-Aug-14 17-Aug-14 A 19-Aug-14 A 100% 100% 1.00DHFSH18100 Block Work in Dry Area 6.00 30-Jul-14 05-Aug-14 15-Jul-14 A 01-Oct-14 1.00 100% 50% 0.50DHFSH18130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 11-Aug-14 14-Aug-14 09-Sep-14 A 02-Oct-14 41.00 100% 20% 0.20DHFSH18160 Plaster in Dry Area 8.00 18-Aug-14 26-Aug-14 06-Oct-14 A 14-Oct-14 41.00 100% 2% 0.02DHMEP18190 Dry Area Floor Screed 7.00 27-Aug-14 03-Sep-14 15-Oct-14 22-Oct-14 41.00 100% 0% 0.00DHFSH18230 Dry Area Painting - Primer 4.00 04-Sep-14 08-Sep-14 23-Oct-14 28-Oct-14 84.00 100% 0% 0.00DHFSH18260 Dry Area Painting - Stucco 6.00 09-Sep-14 15-Sep-14 29-Oct-14 04-Nov-14 84.00 100% 0% 0.00DHFSH18290 Dry Area False Ceiling Suspension 6.00 20-Oct-14 28-Oct-14 09-Dec-14 15-Dec-14 -15.00 0% 0% 0.00DHFSH18350 Dry Area False Ceiling Tiling / Boarding 5.00 03-Dec-14 08-Dec-14 03-Jan-15 07-Jan-15 31.00 0% 0% 0.00DHFSH18400 Dry Area Painting - 1st Coat 5.00 09-Dec-14 14-Dec-14 08-Jan-15 13-Jan-15 31.00 0% 0% 0.00DHFSH18450 Dry Area Flooring 5.00 12-Jan-15 17-Jan-15 01-Feb-15 05-Feb-15 16.00 0% 0% 0.00DHFSH18430 Installation of Timber Doors & Ironmongery 5.00 27-May-15 01-Jun-15 27-Jul-15 01-Aug-15 -50.00 0% 0% 0.00DHFSH18802 Installation of Wardrobe 12.00 29-Jun-15 12-Jul-15 29-Aug-15 10-Sep-15 -50.00 0% 0% 0.00DHFSH18500 Paint Final Coat 6.00 22-Jul-15 28-Jul-15 19-Sep-15 27-Sep-15 -38.00 0% 0% 0.00

Wet areaWet area 292.00 30-Jul-14 21-Jul-15 15-Jul-14 A 17-Sep-15 -50.00 10.35% 1.59% 0.15DHFSH18140 Marking,Cutting & Chasing - Wet Area 4.00 06-Aug-14 10-Aug-14 17-Aug-14 A 19-Aug-14 A 100% 100% 1.00DHFSH18110 Block Work in Wet Area 6.00 30-Jul-14 05-Aug-14 15-Jul-14 A 01-Oct-14 38.00 100% 50% 0.00DHFSH18150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 11-Aug-14 14-Aug-14 09-Sep-14 A 02-Oct-14 38.00 100% 20% 0.20DHMEP18170 Plaster in Wet Area 4.00 18-Aug-14 21-Aug-14 06-Oct-14 A 09-Oct-14 38.00 100% 2% 0.02DHMEP18180 Wet Area Wall Tiling 7.00 19-Oct-14 28-Oct-14 24-Nov-14 01-Dec-14 1.00 0% 0% 0.00DHFSH18300 Wet Area False Ceiling Suspension 5.00 28-Oct-14 03-Nov-14 16-Dec-14 21-Dec-14 2.00 0% 0% 0.00DHFSH18370 Wet Area False Ceiling Tiling/Boarding 4.00 03-Dec-14 07-Dec-14 03-Jan-15 06-Jan-15 9.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Staircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable TrunkingPressure Testing of Pipes

Embeded Condiuts,Boxes and Sleeves in WallsMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 18Construction of Horizontals - L18Construction of Verticals - L18

Stair # 1Stair # 2

Marking,Cutting & Chasing - Dry AreaBlock Work in Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Marking,Cutting & Chasing - Wet AreaBlock Work in Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Ti ling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/Boarding

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 23 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 68: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH18210 Wet Area Waterproofing 4.00 08-Dec-14 11-Dec-14 07-Jan-15 11-Jan-15 9.00 0% 0% 0.00DHFSH18220 Wet Area Floor Screed 4.00 13-Dec-14 16-Dec-14 12-Jan-15 15-Jan-15 9.00 0% 0% 0.00DHFSH18250 Wet Area Floor Tiling 5.00 17-Dec-14 22-Dec-14 17-Jan-15 21-Jan-15 9.00 0% 0% 0.00DHFSH06620 Cabinet Carcass 5.00 14-Jan-15 19-Jan-15 03-Feb-15 08-Feb-15 -1.00 0% 0% 0.00DHFSH18420 Installation of Shower Enclosure 4.00 01-Jun-15 04-Jun-15 01-Aug-15 04-Aug-15 -39.00 0% 0% 0.00DHFSH18390 Installation of Vanity Counters & Tops 5.00 03-Jun-15 08-Jun-15 03-Aug-15 08-Aug-15 -50.00 0% 0% 0.00DHFSH18800 Installation of Kitchen Cabinet 12.00 06-Jul-15 21-Jul-15 05-Sep-15 17-Sep-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 100.00 04-Sep-14 21-Apr-15 23-Oct-14 19-Feb-15 87.00 0% 0% 0.00DHFSH18240 Corridor/Lift Lobby Floor Screed 4.00 04-Sep-14 08-Sep-14 23-Oct-14 28-Oct-14 41.00 100% 0% 0.00DHFSH18270 Lift Lobby Painting - Primer & Stucco 6.00 09-Sep-14 15-Sep-14 29-Oct-14 04-Nov-14 41.00 100% 0% 0.00DHFSH18310 Lift Lobby False Ceiling Suspension 6.00 03-Nov-14 10-Nov-14 22-Dec-14 28-Dec-14 2.00 0% 0% 0.00DHFSH18360 Lift Lobby False Ceiling Tiling / Boarding 5.00 03-Dec-14 08-Dec-14 03-Jan-15 07-Jan-15 96.00 0% 0% 0.00DHFSH18410 Lift Lobby Painting - 1st Coat 6.00 09-Dec-14 15-Dec-14 08-Jan-15 14-Jan-15 96.00 0% 0% 0.00DHFSH18440 Installation of Steel Doors & Windows 3.00 19-Apr-15 21-Apr-15 09-Feb-15 11-Feb-15 59.00 0% 0% 0.00DHFSH18470 Lift Lobby Flooring 6.00 18-Jan-15 24-Jan-15 07-Feb-15 12-Feb-15 87.00 0% 0% 0.00DHFSH18490 Uti lity Rooms- Epoxy Flooring 6.00 25-Jan-15 31-Jan-15 14-Feb-15 19-Feb-15 87.00 0% 0% 0.00

StaircaseStaircase 107.00 27-Aug-14 29-Apr-15 15-Oct-14 19-Feb-15 81.00 45.08% 0% 0.00DHFSH18200 Staircase Plastering 5.00 27-Aug-14 01-Sep-14 15-Oct-14 20-Oct-14 146.00 100% 0% 0.00DHFSH18280 Staircase Painting - Primer & Stucco 6.00 16-Sep-14 22-Sep-14 05-Nov-14 11-Nov-14 134.00 100% 0% 0.00DHFSH18320 Staircase Handrail Fixing 3.00 17-Jan-15 20-Jan-15 27-Nov-14 30-Nov-14 139.00 0% 0% 0.00DHFSH18330 Staircase Painting 1st Coat 3.00 20-Jan-15 24-Jan-15 14-Jan-15 17-Jan-15 103.00 0% 0% 0.00DHFSH18340 Staircase Final Painting 5.00 22-Apr-15 27-Apr-15 12-Feb-15 17-Feb-15 81.00 0% 0% 0.00DHFSH18380 Staircase Epoxy Flooring 2.00 28-Apr-15 29-Apr-15 18-Feb-15 19-Feb-15 81.00 0% 0% 0.00

GeneralGeneral 323.00 03-Jul-14 22-Aug-15 06-Jul-14 A 18-Oct-15 -43.00 0% 0% 0.00DHSTR18000 Access from Structure 0.00 03-Jul-14 06-Jul-14 A 100% 100% 0.00DHFSH18510 Snagging & De-Snagging 12.00 09-Aug-15 22-Aug-15 04-Oct-15 18-Oct-15 -43.00 0% 0% 0.00

MEP - LEVEL 18MEP - LEVEL 18 455.00 29-May-14 13-Jul-15 28-May-14 A 08-Sep-15 -44.00 69.07% 69.97% 1.01DHMEP18000 Embeded Conduits & Boxex - Concrete Works 3.00 29-May-14 01-Jun-14 28-May-14 A 03-Jun-14 A 100% 100% 0.00DHMEP18100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 06-Jul-14 26-Jul-14 06-Jul-14 A 27-Aug-14 A 100% 100% 1.00DHMEP18130 Cable Trays & Cable Trunking 6.00 06-Aug-14 12-Aug-14 06-Jul-14 A 27-Aug-14 A 100% 100% 0.00DHMEP18120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 11-Aug-14 17-Aug-14 24-Aug-14 A 18-Sep-14 A 100% 100% 1.00DHMEP18160 Pressure Testing of Pipes 12.00 18-Aug-14 31-Aug-14 16-Aug-14 A 23-Sep-14 A 100% 100% 0.00DHMEP18110 MEP Works in Risers& Clearance 5.00 18-Sep-14 23-Sep-14 04-Aug-14 A 17-Nov-14 -33.00 100% 60% 0.00DHMEP18140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 25-Nov-14 01-Dec-14 02-Sep-14 A 31-Dec-14 2.00 0% 31% 0.00DHMEP18150 MEP Final Fixes 6.00 13-Jun-15 18-Jun-15 12-Aug-15 18-Aug-15 -36.00 0% 0% 0.00DHMEP06300 Sanitary ware /Toilet accessories 6.00 16-Jun-15 22-Jun-15 16-Aug-15 22-Aug-15 -36.00 0% 0% 0.00DHMEP18200 Pre-Testing & Commissioning 7.00 06-Jul-15 13-Jul-15 01-Sep-15 08-Sep-15 -44.00 0% 0% 0.00

LEVEL 19LEVEL 19 489.00 21-May-14 29-Aug-15 20-May-14 A 25-Oct-15 -43.00 69.61% 69.2% 0.99STRUCTURAL WORKS -LEVEL 19STRUCTURAL WORKS -LEVEL 19 106.00 21-May-14 09-Jun-14 20-May-14 A 12-Jun-14 A 100% 100% 1.00DHCWA20120 Tower Crane Jump 1.00 26-May-14 26-May-14 20-May-14 A 20-May-14 A 100% 100% 0.00DHCWA20100 Core Wall - Level 19 5.00 21-May-14 26-May-14 20-May-14 A 26-May-14 A 100% 100% 1.00DHSLA191000 Construction of Horizontals - L19 3.00 04-Jun-14 07-Jun-14 04-Jun-14 A 09-Jun-14 A 100% 100% 1.00DHCWA20110 Construction of Verticals - L19 2.00 08-Jun-14 09-Jun-14 10-Jun-14 A 12-Jun-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 24-Aug-14 27-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0% 0.00A1560 Stair # 1 4.00 24-Aug-14 27-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00A1570 Stair # 2 3.00 25-Aug-14 27-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 19FINISHES WORKS - LEVEL 19 329.00 07-Jul-14 29-Aug-15 09-Jul-14 A 25-Oct-15 -43.00 23.05% 19.64% 0.85Dry areaDry area 301.00 04-Aug-14 04-Aug-15 20-Jul-14 A 04-Oct-15 -38.00 35.49% 35.49% 1.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Wet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstal lation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Tower Crane JumpCore Wall - Level 19

Construction of Horizontals - L19Construction of Verticals - L19

Stair # 1Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 24 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 69: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH19100 Block Work in Dry Area 6.00 04-Aug-14 10-Aug-14 20-Jul-14 A 24-Aug-14 A 100% 100% 1.00DHFSH19120 Marking,Cutting & Chasing - Dry Area 4.00 11-Aug-14 14-Aug-14 19-Aug-14 A 24-Aug-14 A 100% 100% 1.00DHFSH19130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 16-Aug-14 19-Aug-14 09-Sep-14 A 14-Sep-14 A 100% 100% 1.00DHFSH19160 Plaster in Dry Area 9.00 23-Aug-14 01-Sep-14 14-Sep-14 A 24-Sep-14 A 100% 100% 1.00DHMEP19190 Dry Area Floor Screed 7.00 02-Sep-14 09-Sep-14 09-Oct-14 16-Oct-14 49.00 100% 0% 0.00DHFSH19230 Dry Area Painting - Primer 4.00 10-Sep-14 14-Sep-14 18-Oct-14 21-Oct-14 94.00 100% 0% 0.00DHFSH19260 Dry Area Painting - Stucco 6.00 15-Sep-14 21-Sep-14 22-Oct-14 29-Oct-14 94.00 100% 0% 0.00DHFSH19290 Dry Area False Ceiling Suspension 6.00 26-Oct-14 02-Nov-14 14-Dec-14 20-Dec-14 -15.00 0% 0% 0.00DHFSH19350 Dry Area False Ceiling Tiling / Boarding 5.00 07-Dec-14 11-Dec-14 07-Jan-15 12-Jan-15 32.00 0% 0% 0.00DHFSH19400 Dry Area Painting - 1st Coat 5.00 13-Dec-14 17-Dec-14 13-Jan-15 18-Jan-15 32.00 0% 0% 0.00DHFSH19450 Dry Area Flooring 5.00 18-Jan-15 22-Jan-15 07-Feb-15 11-Feb-15 16.00 0% 0% 0.00DHFSH19430 Installation of Timber Doors & Ironmongery 4.00 02-Jun-15 06-Jun-15 02-Aug-15 05-Aug-15 -50.00 0% 0% 0.00DHFSH19802 Installation of Wardrobe 12.00 06-Jul-15 21-Jul-15 05-Sep-15 17-Sep-15 -50.00 0% 0% 0.00DHFSH19500 Paint Final Coat 6.00 29-Jul-15 04-Aug-15 28-Sep-15 04-Oct-15 -38.00 0% 0% 0.00

Wet areaWet area 295.00 04-Aug-14 28-Jul-15 20-Jul-14 A 27-Sep-15 -50.00 10.35% 10.35% 1.00DHFSH19110 Block Work in Wet Area 6.00 04-Aug-14 10-Aug-14 20-Jul-14 A 24-Aug-14 A 100% 100% 0.00DHFSH19140 Marking,Cutting & Chasing - Wet Area 4.00 11-Aug-14 14-Aug-14 19-Aug-14 A 24-Aug-14 A 100% 100% 1.00DHFSH19150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 16-Aug-14 19-Aug-14 09-Sep-14 A 14-Sep-14 A 100% 100% 1.00DHMEP19170 Plaster in Wet Area 4.00 23-Aug-14 26-Aug-14 14-Sep-14 A 24-Sep-14 A 100% 100% 1.00DHMEP19180 Wet Area Wall Tiling 7.00 23-Oct-14 02-Nov-14 29-Nov-14 07-Dec-14 1.00 0% 0% 0.00DHFSH19300 Wet Area False Ceiling Suspension 5.00 02-Nov-14 08-Nov-14 21-Dec-14 25-Dec-14 1.00 0% 0% 0.00DHFSH19370 Wet Area False Ceiling Tiling/Boarding 4.00 07-Dec-14 10-Dec-14 07-Jan-15 11-Jan-15 10.00 0% 0% 0.00DHFSH19210 Wet Area Waterproofing 4.00 11-Dec-14 15-Dec-14 12-Jan-15 15-Jan-15 10.00 0% 0% 0.00DHFSH19220 Wet Area Floor Screed 4.00 16-Dec-14 20-Dec-14 17-Jan-15 20-Jan-15 10.00 0% 0% 0.00DHFHS19250 Wet Area Floor Tiling 5.00 21-Dec-14 25-Dec-14 21-Jan-15 26-Jan-15 10.00 0% 0% 0.00DHFSH06630 Cabinet Carcass 5.00 20-Jan-15 25-Jan-15 09-Feb-15 14-Feb-15 -1.00 0% 0% 0.00DHFSH19420 Installation of Shower Enclosure 4.00 06-Jun-15 09-Jun-15 05-Aug-15 09-Aug-15 -40.00 0% 0% 0.00DHFSH19390 Installation of Vanity Counters & Tops 5.00 08-Jun-15 13-Jun-15 08-Aug-15 12-Aug-15 -50.00 0% 0% 0.00DHFSH19800 Installation of Kitchen Cabinet 12.00 13-Jul-15 28-Jul-15 12-Sep-15 27-Sep-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 110.00 10-Sep-14 25-Apr-15 18-Oct-14 25-Feb-15 84.00 0% 0% 0.00DHFSH19240 Corridor/Lift Lobby Floor Screed 4.00 10-Sep-14 14-Sep-14 18-Oct-14 21-Oct-14 49.00 100% 0% 0.00DHFSH19270 Lift Lobby Painting - Primer & Stucco 6.00 15-Sep-14 21-Sep-14 22-Oct-14 29-Oct-14 49.00 100% 0% 0.00DHFSH19310 Lift Lobby False Ceiling Suspension 6.00 08-Nov-14 15-Nov-14 27-Dec-14 03-Jan-15 1.00 0% 0% 0.00DHFSH19360 Lift Lobby False Ceiling Tiling / Boarding 5.00 07-Dec-14 11-Dec-14 07-Jan-15 12-Jan-15 95.00 0% 0% 0.00DHFSH19410 Lift Lobby Painting - 1st Coat 6.00 13-Dec-14 18-Dec-14 13-Jan-15 19-Jan-15 95.00 0% 0% 0.00DHFSH19440 Installation of Steel Doors & Windows 3.00 22-Apr-15 25-Apr-15 15-Feb-15 17-Feb-15 57.00 0% 0% 0.00DHFSH19470 Lift Lobby Flooring 6.00 24-Jan-15 29-Jan-15 12-Feb-15 18-Feb-15 84.00 0% 0% 0.00DHFSH19490 Uti lity Rooms- Epoxy Flooring 6.00 31-Jan-15 05-Feb-15 19-Feb-15 25-Feb-15 84.00 0% 0% 0.00

StaircaseStaircase 117.00 02-Sep-14 03-May-15 09-Oct-14 25-Feb-15 81.00 45.08% 0% 0.00DHFSH19200 Staircase Plastering 4.00 02-Sep-14 06-Sep-14 09-Oct-14 13-Oct-14 155.00 100% 0% 0.00DHFSH19280 Staircase Painting - Primer & Stucco 6.00 22-Sep-14 28-Sep-14 30-Oct-14 05-Nov-14 142.00 100% 0% 0.00DHFSH19320 Staircase Handrail Fixing 3.00 20-Jan-15 24-Jan-15 01-Dec-14 04-Dec-14 140.00 0% 0% 0.00DHFSH19330 Staircase Painting 1st Coat 3.00 24-Jan-15 27-Jan-15 19-Jan-15 21-Jan-15 103.00 0% 0% 0.00DHFSH19340 Staircase Final Painting 5.00 26-Apr-15 30-Apr-15 18-Feb-15 23-Feb-15 81.00 0% 0% 0.00DHFSH19380 Staircase Epoxy Flooring 2.00 02-May-15 03-May-15 24-Feb-15 25-Feb-15 81.00 0% 0% 0.00

GeneralGeneral 329.00 07-Jul-14 29-Aug-15 09-Jul-14 A 25-Oct-15 -43.00 0% 0% 0.00DHSTR19000 Access from Structure 0.00 07-Jul-14 09-Jul-14 A 100% 100% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceiling Suspension

Wet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstal lation of Shower EnclosureInstallation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from Structure

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 25 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 70: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH19510 Snagging & De-Snagging 12.00 16-Aug-15 29-Aug-15 11-Oct-15 25-Oct-15 -43.00 0% 0% 0.00MEP - LEVEL 19MEP - LEVEL 19 455.00 04-Jun-14 16-Jul-15 04-Jun-14 A 12-Sep-15 -44.00 69.41% 70.32% 1.01DHMEP19000 Embeded Conduits & Boxex - Concrete Works 3.00 04-Jun-14 07-Jun-14 04-Jun-14 A 09-Jun-14 A 100% 100% 0.00DHMEP19100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 12-Jul-14 03-Aug-14 09-Jul-14 A 30-Aug-14 A 100% 100% 1.00DHMEP19130 Cable Trays & Cable Trunking 6.00 11-Aug-14 17-Aug-14 09-Jul-14 A 30-Aug-14 A 100% 100% 0.00DHMEP19120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 16-Aug-14 21-Aug-14 25-Aug-14 A 20-Sep-14 A 100% 100% 1.00DHMEP19160 Pressure Testing of Pipes 12.00 23-Aug-14 04-Sep-14 17-Aug-14 A 12-Oct-14 68.00 100% 86% 0.00DHMEP19110 MEP Works in Risers& Clearance 6.00 24-Sep-14 30-Sep-14 16-Aug-14 A 23-Nov-14 -33.00 100% 21% 0.00DHMEP19140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 29-Nov-14 06-Dec-14 04-Sep-14 A 06-Jan-15 1.00 0% 31% 0.00DHMEP19150 MEP Final Fixes 6.00 10-Jun-15 16-Jun-15 10-Aug-15 16-Aug-15 -40.00 0% 0% 0.00DHMEP06310 Sanitary ware /Toilet accessories 6.00 17-Jun-15 23-Jun-15 17-Aug-15 23-Aug-15 -34.00 0% 0% 0.00DHMEP19200 Pre-Testing & Commissioning 7.00 09-Jul-15 16-Jul-15 05-Sep-15 12-Sep-15 -44.00 0% 0% 0.00

LEVEL 20LEVEL 20 504.00 28-May-14 05-Sep-15 27-May-14 A 01-Nov-15 -43.00 69.7% 68.58% 0.98STRUCTURAL WORKS - LEVEL 20STRUCTURAL WORKS - LEVEL 20 16.00 28-May-14 15-Jun-14 27-May-14 A 18-Jun-14 A 100% 100% 1.00DHCWA21100 Core Wall - Level 20 4.00 28-May-14 01-Jun-14 27-May-14 A 31-May-14 A 100% 100% 1.00DHSLA20100 Construction of Horizontals - L20 3.00 10-Jun-14 12-Jun-14 11-Jun-14 A 14-Jun-14 A 100% 100% 1.00DHCWA21110 Construction of Verticals - L20 2.00 14-Jun-14 15-Jun-14 15-Jun-14 A 18-Jun-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 01-Sep-14 04-Sep-14 02-Aug-14 A 06-Aug-14 A 0% 0% 0.00A1580 Stair # 1 4.00 01-Sep-14 04-Sep-14 02-Aug-14 A 06-Aug-14 A 100% 100% 0.00A1590 Stair # 2 3.00 02-Sep-14 04-Sep-14 02-Aug-14 A 06-Aug-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 20FINISHES WORKS - LEVEL 20 335.00 13-Jul-14 05-Sep-15 14-Jul-14 A 01-Nov-15 -43.00 23.05% 17.59% 0.76Dry areaDry area 307.00 10-Aug-14 11-Aug-15 29-Jul-14 A 11-Oct-15 -38.00 35.49% 33.03% 0.93DHFSH20100 Block Work in Dry Area 6.00 10-Aug-14 16-Aug-14 29-Jul-14 A 25-Aug-14 A 100% 100% 1.00DHFSH20120 Marking,Cutting & Chasing - Dry Area 4.00 17-Aug-14 20-Aug-14 21-Aug-14 A 27-Aug-14 A 100% 100% 1.00DHFSH20130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 21-Aug-14 25-Aug-14 11-Sep-14 A 18-Sep-14 A 100% 100% 1.00DHFSH20160 Plaster in Dry Area 8.00 28-Aug-14 06-Sep-14 14-Sep-14 A 11-Oct-14 50.00 100% 70% 0.70DHMEP20190 Dry Area Floor Screed 7.00 07-Sep-14 14-Sep-14 12-Oct-14 19-Oct-14 50.00 100% 0% 0.00DHFSH20230 Dry Area Painting - Primer 4.00 15-Sep-14 18-Sep-14 20-Oct-14 23-Oct-14 97.00 100% 0% 0.00DHFSH20260 Dry Area Painting - Stucco 6.00 20-Sep-14 25-Sep-14 26-Oct-14 01-Nov-14 97.00 100% 0% 0.00DHFSH20290 Dry Area False Ceiling Suspension 6.00 30-Oct-14 06-Nov-14 18-Dec-14 24-Dec-14 -15.00 0% 0% 0.00DHFSH20350 Dry Area False Ceiling Tiling / Boarding 5.00 10-Dec-14 15-Dec-14 12-Jan-15 17-Jan-15 33.00 0% 0% 0.00DHFSH20400 Dry Area Painting - 1st Coat 5.00 16-Dec-14 21-Dec-14 18-Jan-15 22-Jan-15 33.00 0% 0% 0.00DHFSH20450 Dry Area Flooring 5.00 24-Jan-15 28-Jan-15 12-Feb-15 17-Feb-15 16.00 0% 0% 0.00DHFSH20430 Installation of Timber Doors & Ironmongery 4.00 07-Jun-15 10-Jun-15 06-Aug-15 10-Aug-15 -50.00 0% 0% 0.00DHFSH20802 Installation of Wardrobe 12.00 11-Jul-15 26-Jul-15 09-Sep-15 22-Sep-15 -50.00 0% 0% 0.00DHFSH20500 Paint Final Coat 6.00 05-Aug-15 11-Aug-15 05-Oct-15 11-Oct-15 -38.00 0% 0% 0.00

Wet areaWet area 301.00 10-Aug-14 04-Aug-15 29-Jul-14 A 04-Oct-15 -50.00 10.35% 8.17% 0.79DHFSH20110 Block Work in Wet Area 6.00 10-Aug-14 16-Aug-14 29-Jul-14 A 25-Aug-14 A 100% 100% 0.00DHFSH20140 Marking,Cutting & Chasing - Wet Area 4.00 17-Aug-14 20-Aug-14 21-Aug-14 A 27-Aug-14 A 100% 100% 1.00DHFSH20150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 21-Aug-14 25-Aug-14 11-Sep-14 A 18-Sep-14 A 100% 100% 1.00DHMEP20170 Plaster in Wet Area 4.00 28-Aug-14 01-Sep-14 14-Sep-14 A 09-Oct-14 47.00 100% 70% 0.70DHMEP20180 Wet Area Wall Tiling 6.00 30-Oct-14 06-Nov-14 06-Dec-14 11-Dec-14 1.00 0% 0% 0.00DHFSH20300 Wet Area False Ceiling Suspension 5.00 06-Nov-14 12-Nov-14 25-Dec-14 30-Dec-14 0.00 0% 0% 0.00DHFSH20370 Wet Area False Ceiling Tiling/Boarding 4.00 10-Dec-14 14-Dec-14 12-Jan-15 15-Jan-15 11.00 0% 0% 0.00DHFSH20210 Wet Area Waterproofing 4.00 15-Dec-14 18-Dec-14 17-Jan-15 20-Jan-15 11.00 0% 0% 0.00DHFSH20220 Wet Area Floor Screed 4.00 20-Dec-14 23-Dec-14 21-Jan-15 25-Jan-15 11.00 0% 0% 0.00DHFSH20250 Wet Area Floor Tiling 5.00 24-Dec-14 29-Dec-14 26-Jan-15 31-Jan-15 11.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Snagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 20Construction of Horizontals - L20Construction of Verticals - L20

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall Ti lingWet Area False Ceiling Suspension

Wet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor Tiling

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 26 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 71: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH06640 Cabinet Carcass 5.00 26-Jan-15 31-Jan-15 15-Feb-15 19-Feb-15 -1.00 0% 0% 0.00DHFSH20420 Installation of Shower Enclosure 4.00 10-Jun-15 14-Jun-15 10-Aug-15 13-Aug-15 -40.00 0% 0% 0.00DHFSH20390 Installation of Vanity Counters & Tops 5.00 13-Jun-15 17-Jun-15 12-Aug-15 17-Aug-15 -50.00 0% 0% 0.00DHFSH20800 Installation of Kitchen Cabinet 12.00 22-Jul-15 04-Aug-15 19-Sep-15 04-Oct-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 113.00 15-Sep-14 28-Apr-15 20-Oct-14 03-Mar-15 81.00 0% 0% 0.00DHFSH20240 Corridor/Lift Lobby Floor Screed 4.00 15-Sep-14 18-Sep-14 20-Oct-14 23-Oct-14 50.00 100% 0% 0.00DHFSH20270 Lift Lobby Painting - Primer & Stucco 6.00 20-Sep-14 25-Sep-14 26-Oct-14 01-Nov-14 50.00 100% 0% 0.00DHFSH20310 Lift Lobby False Ceiling Suspension 6.00 12-Nov-14 19-Nov-14 31-Dec-14 07-Jan-15 0.00 0% 0% 0.00DHFSH20360 Lift Lobby False Ceiling Tiling / Boarding 5.00 10-Dec-14 15-Dec-14 12-Jan-15 17-Jan-15 94.00 0% 0% 0.00DHFSH20410 Lift Lobby Painting - 1st Coat 6.00 16-Dec-14 22-Dec-14 18-Jan-15 24-Jan-15 94.00 0% 0% 0.00DHFSH20440 Installation of Steel Doors & Windows 3.00 26-Apr-15 28-Apr-15 21-Feb-15 23-Feb-15 55.00 0% 0% 0.00DHFSH20470 Lift Lobby Flooring 6.00 29-Jan-15 04-Feb-15 18-Feb-15 24-Feb-15 81.00 0% 0% 0.00DHFSH20490 Uti lity Rooms- Epoxy Flooring 6.00 05-Feb-15 11-Feb-15 25-Feb-15 03-Mar-15 81.00 0% 0% 0.00

StaircaseStaircase 120.00 07-Sep-14 06-May-15 12-Oct-14 03-Mar-15 80.00 45.08% 0% 0.00DHFSH20200 Staircase Plastering 4.00 07-Sep-14 10-Sep-14 12-Oct-14 15-Oct-14 156.00 100% 0% 0.00DHFSH20280 Staircase Painting - Primer & Stucco 6.00 27-Sep-14 02-Oct-14 02-Nov-14 08-Nov-14 143.00 66.67% 0% 0.00DHFSH20320 Staircase Handrail Fixing 3.00 24-Jan-15 27-Jan-15 06-Dec-14 08-Dec-14 140.00 0% 0% 0.00DHFSH20330 Staircase Painting 1st Coat 3.00 27-Jan-15 31-Jan-15 24-Jan-15 26-Jan-15 102.00 0% 0% 0.00DHFSH20340 Staircase Final Painting 5.00 29-Apr-15 04-May-15 24-Feb-15 01-Mar-15 80.00 0% 0% 0.00DHFSH20380 Staircase Epoxy Flooring 2.00 05-May-15 06-May-15 02-Mar-15 03-Mar-15 80.00 0% 0% 0.00

GeneralGeneral 335.00 13-Jul-14 05-Sep-15 14-Jul-14 A 01-Nov-15 -43.00 0% 0% 0.00DHSTR20000 Access from Structure 0.00 13-Jul-14 14-Jul-14 A 100% 100% 0.00DHFSH20510 Snagging & De-Snagging 12.00 23-Aug-15 05-Sep-15 19-Oct-15 01-Nov-15 -43.00 0% 0% 0.00

MEP - LEVEL 20MEP - LEVEL 20 467.00 10-Jun-14 22-Jul-15 11-Jun-14 A 15-Sep-15 -44.00 69.55% 69.9% 1.01DHMEP20000 Embeded Conduits & Boxex - Concrete Works 3.00 10-Jun-14 12-Jun-14 11-Jun-14 A 14-Jun-14 A 100% 100% 0.00DHMEP20100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 15-Jul-14 06-Aug-14 14-Jul-14 A 03-Sep-14 A 100% 100% 1.00DHMEP20130 Cable Trays & Cable Trunking 6.00 17-Aug-14 23-Aug-14 14-Jul-14 A 03-Sep-14 A 100% 100% 0.00DHMEP20120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 21-Aug-14 27-Aug-14 25-Aug-14 A 22-Sep-14 A 100% 100% 1.00DHMEP20160 Pressure Testing of Pipes 12.00 28-Aug-14 10-Sep-14 24-Aug-14 A 13-Oct-14 70.00 100% 53% 0.00DHMEP20110 MEP Works in Risers& Clearance 6.00 01-Oct-14 09-Oct-14 17-Aug-14 A 29-Nov-14 -33.00 0% 21% 0.00DHMEP20140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 03-Dec-14 09-Dec-14 07-Sep-14 A 11-Jan-15 0.00 0% 12% 0.00DHMEP20150 MEP Final Fixes 6.00 15-Jun-15 21-Jun-15 15-Aug-15 20-Aug-15 -40.00 0% 0% 0.00DHMEP06320 Sanitary ware /Toilet accessories 6.00 18-Jun-15 24-Jun-15 18-Aug-15 24-Aug-15 -32.00 0% 0% 0.00DHMEP20200 Pre-Testing & Commissioning 7.00 13-Jul-15 22-Jul-15 08-Sep-15 15-Sep-15 -44.00 0% 0% 0.00

LEVEL 21LEVEL 21 515.00 02-Jun-14 12-Sep-15 01-Jun-14 A 14-Nov-15 -48.00 69.72% 67.71% 0.97STRUCTURAL WORKS - LEVEL 21STRUCTURAL WORKS - LEVEL 21 17.00 02-Jun-14 21-Jun-14 01-Jun-14 A 24-Jun-14 A 100% 100% 1.00DHCWA22100 Core Wall - Level 21 4.00 02-Jun-14 05-Jun-14 01-Jun-14 A 06-Jun-14 A 100% 100% 1.00DHSLA21100 Construction of Horizontals - L21 3.00 16-Jun-14 18-Jun-14 18-Jun-14 A 21-Jun-14 A 100% 100% 1.00DHCWA22110 Construction of Verticals - L21 2.00 19-Jun-14 21-Jun-14 22-Jun-14 A 24-Jun-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 07-Sep-14 10-Sep-14 07-Aug-14 A 12-Aug-14 A 0% 0% 0.00A1600 Stair # 1 4.00 07-Sep-14 10-Sep-14 07-Aug-14 A 12-Aug-14 A 100% 100% 0.00A1610 Stair # 2 3.00 08-Sep-14 10-Sep-14 07-Aug-14 A 12-Aug-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 21FINISHES WORKS - LEVEL 21 341.00 20-Jul-14 12-Sep-15 22-Jul-14 A 08-Nov-15 -43.00 23.05% 13.69% 0.59Dry areaDry area 313.00 14-Aug-14 18-Aug-15 10-Aug-14 A 19-Oct-15 -38.00 35.49% 28.35% 0.80DHFSH21120 Marking,Cutting & Chasing - Dry Area 4.00 21-Aug-14 25-Aug-14 12-Aug-14 A 24-Aug-14 A 100% 100% 1.00DHFSH21100 Block Work in Dry Area 6.00 14-Aug-14 20-Aug-14 10-Aug-14 A 25-Aug-14 A 100% 100% 1.00DHFSH21130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 26-Aug-14 30-Aug-14 15-Sep-14 A 21-Sep-14 A 100% 100% 1.00DHFSH21160 Plaster in Dry Area 8.00 03-Sep-14 11-Sep-14 22-Sep-14 A 16-Oct-14 48.00 100% 13% 0.13

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Cabinet CarcassInstallation of Shower EnclosureInstal lation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 21Construction of Horizontals - L21Construction of Verticals - L21

Stair # 1Stair # 2

Marking,Cutting & Chasing - Dry AreaBlock Work in Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 27 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 72: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP21190 Dry Area Floor Screed 7.00 13-Sep-14 20-Sep-14 18-Oct-14 26-Oct-14 48.00 100% 0% 0.00DHFSH21230 Dry Area Painting - Primer 4.00 21-Sep-14 24-Sep-14 27-Oct-14 30-Oct-14 97.00 100% 0% 0.00DHFSH21260 Dry Area Painting - Stucco 6.00 25-Sep-14 01-Oct-14 01-Nov-14 06-Nov-14 97.00 83.33% 0% 0.00DHFSH21290 Dry Area False Ceiling Suspension 6.00 04-Nov-14 11-Nov-14 23-Dec-14 29-Dec-14 -15.00 0% 0% 0.00DHFSH21350 Dry Area False Ceiling Tiling / Boarding 5.00 14-Dec-14 18-Dec-14 17-Jan-15 21-Jan-15 34.00 0% 0% 0.00DHFSH21400 Dry Area Painting - 1st Coat 5.00 20-Dec-14 24-Dec-14 22-Jan-15 27-Jan-15 34.00 0% 0% 0.00DHFSH21450 Dry Area Flooring 5.00 29-Jan-15 03-Feb-15 18-Feb-15 23-Feb-15 16.00 0% 0% 0.00DHFSH21430 Installation of Timber Doors & Ironmongery 4.00 11-Jun-15 15-Jun-15 11-Aug-15 15-Aug-15 -50.00 0% 0% 0.00DHFSH21802 Installation of Wardrobe 12.00 15-Jul-15 30-Jul-15 14-Sep-15 29-Sep-15 -50.00 0% 0% 0.00DHFSH21500 Paint Final Coat 6.00 12-Aug-15 18-Aug-15 12-Oct-15 19-Oct-15 -38.00 0% 0% 0.00

Wet areaWet area 307.00 14-Aug-14 11-Aug-15 10-Aug-14 A 11-Oct-15 -50.00 10.35% 4.02% 0.39DHFSH21140 Marking,Cutting & Chasing - Wet Area 5.00 21-Aug-14 26-Aug-14 12-Aug-14 A 24-Aug-14 A 100% 100% 1.00DHFSH21110 Block Work in Wet Area 6.00 14-Aug-14 20-Aug-14 10-Aug-14 A 25-Aug-14 A 100% 100% 0.00DHFSH21150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 27-Aug-14 31-Aug-14 15-Sep-14 A 21-Sep-14 A 100% 100% 1.00DHMEP21170 Plaster in Wet Area 4.00 03-Sep-14 07-Sep-14 22-Sep-14 A 12-Oct-14 49.00 100% 13% 0.13DHMEP21180 Wet Area Wall Tiling 6.00 04-Nov-14 11-Nov-14 10-Dec-14 16-Dec-14 1.00 0% 0% 0.00DHFSH21300 Wet Area False Ceiling Suspension 5.00 11-Nov-14 17-Nov-14 30-Dec-14 05-Jan-15 -1.00 0% 0% 0.00DHFSH21370 Wet Area False Ceiling Tiling/Boarding 4.00 14-Dec-14 17-Dec-14 17-Jan-15 20-Jan-15 12.00 0% 0% 0.00DHFSH21210 Wet Area Waterproofing 4.00 18-Dec-14 22-Dec-14 21-Jan-15 25-Jan-15 12.00 0% 0% 0.00DHFSH21220 Wet Area Floor Screed 4.00 23-Dec-14 27-Dec-14 26-Jan-15 29-Jan-15 12.00 0% 0% 0.00DHFSH21250 Wet Area Floor Tiling 5.00 28-Dec-14 03-Jan-15 31-Jan-15 04-Feb-15 12.00 0% 0% 0.00DHFSH06650 Cabinet Carcass 5.00 01-Feb-15 05-Feb-15 21-Feb-15 25-Feb-15 -1.00 0% 0% 0.00DHFSH21420 Installation of Shower Enclosure 4.00 15-Jun-15 18-Jun-15 15-Aug-15 18-Aug-15 -40.00 0% 0% 0.00DHFSH21390 Installation of Vanity Counters & Tops 5.00 17-Jun-15 22-Jun-15 17-Aug-15 22-Aug-15 -50.00 0% 0% 0.00DHFSH21800 Installation of Kitchen Cabinet 12.00 29-Jul-15 11-Aug-15 28-Sep-15 11-Oct-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 113.00 21-Sep-14 02-May-15 27-Oct-14 09-Mar-15 78.00 0% 0% 0.00DHFSH21240 Corridor/Lift Lobby Floor Screed 4.00 21-Sep-14 24-Sep-14 27-Oct-14 30-Oct-14 48.00 100% 0% 0.00DHFSH21270 Lift Lobby Painting - Primer & Stucco 6.00 25-Sep-14 01-Oct-14 01-Nov-14 06-Nov-14 48.00 83.33% 0% 0.00DHFSH21310 Lift Lobby False Ceiling Suspension 6.00 17-Nov-14 24-Nov-14 06-Jan-15 12-Jan-15 -1.00 0% 0% 0.00DHFSH21360 Lift Lobby False Ceiling Tiling / Boarding 5.00 14-Dec-14 18-Dec-14 17-Jan-15 21-Jan-15 93.00 0% 0% 0.00DHFSH21410 Lift Lobby Painting - 1st Coat 6.00 20-Dec-14 25-Dec-14 22-Jan-15 28-Jan-15 93.00 0% 0% 0.00DHFSH21440 Installation of Steel Doors & Windows 3.00 29-Apr-15 02-May-15 26-Feb-15 01-Mar-15 53.00 0% 0% 0.00DHFSH21470 Lift Lobby Flooring 6.00 04-Feb-15 10-Feb-15 24-Feb-15 02-Mar-15 78.00 0% 0% 0.00DHFSH21490 Uti lity Rooms- Epoxy Flooring 6.00 11-Feb-15 17-Feb-15 03-Mar-15 09-Mar-15 78.00 0% 0% 0.00

StaircaseStaircase 120.00 13-Sep-14 10-May-15 18-Oct-14 09-Mar-15 79.00 45.08% 0% 0.00DHFSH21200 Staircase Plastering 4.00 13-Sep-14 16-Sep-14 18-Oct-14 21-Oct-14 154.00 100% 0% 0.00DHFSH21280 Staircase Painting - Primer & Stucco 6.00 02-Oct-14 11-Oct-14 08-Nov-14 13-Nov-14 141.00 0% 0% 0.00DHFSH21320 Staircase Handrail Fixing 3.00 27-Jan-15 31-Jan-15 09-Dec-14 11-Dec-14 140.00 0% 0% 0.00DHFSH21330 Staircase Painting 1st Coat 3.00 31-Jan-15 03-Feb-15 28-Jan-15 31-Jan-15 101.00 0% 0% 0.00DHFSH21340 Staircase Final Painting 5.00 03-May-15 07-May-15 02-Mar-15 07-Mar-15 79.00 0% 0% 0.00DHFSH21380 Staircase Epoxy Flooring 2.00 09-May-15 10-May-15 08-Mar-15 09-Mar-15 79.00 0% 0% 0.00

GeneralGeneral 341.00 20-Jul-14 12-Sep-15 22-Jul-14 A 08-Nov-15 -43.00 0% 0% 0.00DHSTR21000 Access from Structure 0.00 20-Jul-14 22-Jul-14 A 100% 100% 0.00DHFSH21510 Snagging & De-Snagging 12.00 30-Aug-15 12-Sep-15 26-Oct-15 08-Nov-15 -43.00 0% 0% 0.00

MEP - LEVEL 21MEP - LEVEL 21 515.00 16-Jun-14 29-Jul-15 18-Jun-14 A 14-Nov-15 -86.00 69.55% 69.9% 1.01DHMEP21000 Embeded Conduits & Boxex - Concrete Works 3.00 16-Jun-14 18-Jun-14 18-Jun-14 A 21-Jun-14 A 100% 100% 0.00DHMEP21100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 20-Jul-14 11-Aug-14 22-Jul-14 A 07-Sep-14 A 100% 100% 1.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Til ing / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Marking,Cutting & Chasing - Wet AreaBlock Work in Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Ti ling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Instal lation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 28 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 73: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP21130 Cable Trays & Cable Trunking 6.00 21-Aug-14 27-Aug-14 22-Jul-14 A 07-Sep-14 A 100% 100% 0.00DHMEP21120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 27-Aug-14 02-Sep-14 25-Aug-14 A 22-Sep-14 A 100% 100% 1.00DHMEP21160 Pressure Testing of Pipes 12.00 03-Sep-14 16-Sep-14 27-Aug-14 A 13-Oct-14 73.00 100% 86% 0.00DHMEP21110 MEP Works in Risers& Clearance 6.00 11-Oct-14 16-Oct-14 18-Aug-14 A 06-Dec-14 -33.00 0% 21% 0.00DHMEP21140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 07-Dec-14 13-Dec-14 09-Sep-14 A 15-Jan-15 -1.00 0% 12% 0.00DHMEP21150 MEP Final Fixes 6.00 20-Jun-15 25-Jun-15 19-Aug-15 25-Aug-15 -40.00 0% 0% 0.00DHMEP06330 Sanitary ware /Toilet accessories 6.00 23-Jun-15 29-Jun-15 23-Aug-15 29-Aug-15 -30.00 0% 0% 0.00DHMEP21200 Pre-Testing & Commissioning 7.00 22-Jul-15 29-Jul-15 15-Sep-15 22-Sep-15 -44.00 0% 0% 0.00DHMEP21010 Busbar - L21to L25 19.00 28-Apr-15 20-May-15 24-Oct-15 14-Nov-15 -144.00 0% 0% 0.00

LEVEL 22LEVEL 22 513.00 12-Jun-14 19-Sep-15 07-Jun-14 A 15-Nov-15 -43.00 69.75% 67.61% 0.97STRUCTURAL WORKS - LEVEL 22STRUCTURAL WORKS - LEVEL 22 13.00 12-Jun-14 26-Jun-14 07-Jun-14 A 30-Jun-14 A 100% 100% 1.00DHCWA23100 Core Wall - Level 22 4.00 12-Jun-14 16-Jun-14 07-Jun-14 A 10-Jun-14 A 100% 100% 1.00DHSLA22100 Construction of Horizontals - L22 3.00 22-Jun-14 24-Jun-14 24-Jun-14 A 27-Jun-14 A 100% 100% 1.00DHCWA23110 Construction of Verticals - L22 2.00 25-Jun-14 26-Jun-14 28-Jun-14 A 30-Jun-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 13-Sep-14 16-Sep-14 13-Aug-14 A 26-Aug-14 A 0% 0% 0.00A1620 Stair # 1 4.00 13-Sep-14 16-Sep-14 13-Aug-14 A 18-Aug-14 A 100% 100% 0.00A1630 Stair # 2 3.00 14-Sep-14 16-Sep-14 23-Aug-14 A 26-Aug-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 22FINISHES WORKS - LEVEL 22 347.00 27-Jul-14 19-Sep-15 27-Jul-14 A 15-Nov-15 -43.00 23.05% 13.15% 0.57Dry areaDry area 319.00 21-Aug-14 25-Aug-15 12-Aug-14 A 26-Oct-15 -38.00 35.49% 27.7% 0.78DHFSH22100 Block Work in Dry Area 6.00 21-Aug-14 27-Aug-14 12-Aug-14 A 25-Aug-14 A 100% 100% 1.00DHFSH22120 Marking,Cutting & Chasing - Dry Area 4.00 28-Aug-14 01-Sep-14 01-Sep-14 A 07-Sep-14 A 100% 100% 1.00DHFSH22130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 02-Sep-14 06-Sep-14 21-Sep-14 A 26-Sep-14 A 100% 100% 1.00DHFSH22160 Plaster in Dry Area 8.00 09-Sep-14 17-Sep-14 28-Sep-14 A 16-Oct-14 51.00 100% 5% 0.05DHMEP22190 Dry Area Floor Screed 7.00 18-Sep-14 25-Sep-14 18-Oct-14 26-Oct-14 51.00 100% 0% 0.00DHFSH22230 Dry Area Painting - Primer 4.00 27-Sep-14 30-Sep-14 27-Oct-14 30-Oct-14 102.00 100% 0% 0.00DHFSH22260 Dry Area Painting - Stucco 6.00 01-Oct-14 09-Oct-14 01-Nov-14 06-Nov-14 102.00 0% 0% 0.00DHFSH22290 Dry Area False Ceiling Suspension 6.00 09-Nov-14 16-Nov-14 28-Dec-14 04-Jan-15 -15.00 0% 0% 0.00DHFSH22350 Dry Area False Ceiling Tiling / Boarding 5.00 17-Dec-14 22-Dec-14 21-Jan-15 26-Jan-15 35.00 0% 0% 0.00DHFSH22400 Dry Area Painting - 1st Coat 5.00 23-Dec-14 28-Dec-14 27-Jan-15 01-Feb-15 35.00 0% 0% 0.00DHFSH22450 Dry Area Flooring 5.00 04-Feb-15 09-Feb-15 24-Feb-15 01-Mar-15 16.00 0% 0% 0.00DHFSH22430 Installation of Timber Doors & Ironmongery 4.00 16-Jun-15 20-Jun-15 16-Aug-15 19-Aug-15 -50.00 0% 0% 0.00DHFSH22802 Installation of Wardrobe 12.00 22-Jul-15 04-Aug-15 19-Sep-15 04-Oct-15 -50.00 0% 0% 0.00DHFSH22500 Paint Final Coat 6.00 19-Aug-15 25-Aug-15 20-Oct-15 26-Oct-15 -38.00 0% 0% 0.00

Wet areaWet area 313.00 21-Aug-14 18-Aug-15 12-Aug-14 A 19-Oct-15 -50.00 10.35% 3.44% 0.33DHFSH22110 Block Work in Wet Area 6.00 21-Aug-14 27-Aug-14 12-Aug-14 A 25-Aug-14 A 100% 100% 0.00DHFSH22140 Marking,Cutting & Chasing - Wet Area 4.00 28-Aug-14 01-Sep-14 01-Sep-14 A 07-Sep-14 A 100% 100% 1.00DHFSH22150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 02-Sep-14 06-Sep-14 21-Sep-14 A 26-Sep-14 A 100% 100% 1.00DHMEP22170 Plaster in Wet Area 4.00 09-Sep-14 13-Sep-14 28-Sep-14 A 12-Oct-14 53.00 100% 5% 0.05DHMEP22180 Wet Area Wall Tiling 6.00 09-Nov-14 16-Nov-14 15-Dec-14 21-Dec-14 1.00 0% 0% 0.00DHFSH22300 Wet Area False Ceiling Suspension 5.00 16-Nov-14 22-Nov-14 05-Jan-15 10-Jan-15 -2.00 0% 0% 0.00DHFSH22370 Wet Area False Ceiling Tiling/Boarding 4.00 17-Dec-14 21-Dec-14 21-Jan-15 25-Jan-15 13.00 0% 0% 0.00DHFSH22210 Wet Area Waterproofing 4.00 22-Dec-14 25-Dec-14 26-Jan-15 29-Jan-15 13.00 0% 0% 0.00DHFSH22220 Wet Area Floor Screed 4.00 27-Dec-14 30-Dec-14 31-Jan-15 03-Feb-15 13.00 0% 0% 0.00DHFSH22250 Wet Area Floor Tiling 5.00 31-Dec-14 06-Jan-15 04-Feb-15 09-Feb-15 13.00 0% 0% 0.00DHFSH06660 Cabinet Carcass 5.00 07-Feb-15 11-Feb-15 26-Feb-15 03-Mar-15 -1.00 0% 0% 0.00DHFSH22420 Installation of Shower Enclosure 4.00 20-Jun-15 23-Jun-15 19-Aug-15 23-Aug-15 -40.00 0% 0% 0.00DHFSH22390 Installation of Vanity Counters & Tops 5.00 22-Jun-15 27-Jun-15 22-Aug-15 26-Aug-15 -50.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toi let accessories

Pre-Testing & CommissioningBusbar - L21to L25

Core Wall - Level 22Construction of Horizontals - L22Construction of Verticals - L22

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall Ti lingWet Area False Ceiling Suspension

Wet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 29 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 74: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH22800 Installation of Kitchen Cabinet 12.00 05-Aug-15 18-Aug-15 05-Oct-15 19-Oct-15 -50.00 0% 0% 0.00Lift Lobby / CorridorLift Lobby / Corridor 118.00 27-Sep-14 05-May-15 27-Oct-14 15-Mar-15 75.00 0% 0% 0.00DHFSH22240 Corridor/Lift Lobby Floor Screed 4.00 27-Sep-14 30-Sep-14 27-Oct-14 30-Oct-14 51.00 100% 0% 0.00DHFSH22270 Lift Lobby Painting - Primer & Stucco 6.00 01-Oct-14 09-Oct-14 01-Nov-14 06-Nov-14 51.00 0% 0% 0.00DHFSH22310 Lift Lobby False Ceiling Suspension 6.00 22-Nov-14 29-Nov-14 11-Jan-15 17-Jan-15 -2.00 0% 0% 0.00DHFSH22360 Lift Lobby False Ceiling Tiling / Boarding 5.00 17-Dec-14 22-Dec-14 21-Jan-15 26-Jan-15 92.00 0% 0% 0.00DHFSH22410 Lift Lobby Painting - 1st Coat 6.00 23-Dec-14 29-Dec-14 27-Jan-15 02-Feb-15 92.00 0% 0% 0.00DHFSH22440 Installation of Steel Doors & Windows 3.00 03-May-15 05-May-15 04-Mar-15 07-Mar-15 51.00 0% 0% 0.00DHFSH22470 Lift Lobby Flooring 6.00 10-Feb-15 16-Feb-15 02-Mar-15 08-Mar-15 75.00 0% 0% 0.00DHFSH22490 Uti lity Rooms- Epoxy Flooring 6.00 17-Feb-15 23-Feb-15 09-Mar-15 15-Mar-15 75.00 0% 0% 0.00

StaircaseStaircase 125.00 18-Sep-14 13-May-15 18-Oct-14 15-Mar-15 78.00 45.08% 0% 0.00DHFSH22200 Staircase Plastering 4.00 18-Sep-14 22-Sep-14 18-Oct-14 21-Oct-14 157.00 100% 0% 0.00DHFSH22280 Staircase Painting - Primer & Stucco 6.00 11-Oct-14 16-Oct-14 08-Nov-14 13-Nov-14 144.00 0% 0% 0.00DHFSH22320 Staircase Handrail Fixing 3.00 31-Jan-15 03-Feb-15 13-Dec-14 15-Dec-14 140.00 0% 0% 0.00DHFSH22330 Staircase Painting 1st Coat 3.00 03-Feb-15 07-Feb-15 02-Feb-15 04-Feb-15 100.00 0% 0% 0.00DHFSH22340 Staircase Final Painting 5.00 06-May-15 11-May-15 08-Mar-15 12-Mar-15 78.00 0% 0% 0.00DHFSH22380 Staircase Epoxy Flooring 2.00 12-May-15 13-May-15 14-Mar-15 15-Mar-15 78.00 0% 0% 0.00

GeneralGeneral 347.00 27-Jul-14 19-Sep-15 27-Jul-14 A 15-Nov-15 -43.00 0% 0% 0.00DHSTR22000 Access from Structure 0.00 27-Jul-14 27-Jul-14 A 100% 100% 0.00DHFSH22510 Snagging & De-Snagging 12.00 06-Sep-15 19-Sep-15 02-Nov-15 15-Nov-15 -43.00 0% 0% 0.00

MEP - LEVEL 22MEP - LEVEL 22 476.00 22-Jun-14 05-Aug-15 24-Jun-14 A 01-Oct-15 -44.00 69.55% 69.9% 1.01DHMEP22000 Embeded Conduits & Boxex - Concrete Works 3.00 22-Jun-14 24-Jun-14 24-Jun-14 A 27-Jun-14 A 100% 100% 0.00DHMEP22100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 27-Jul-14 18-Aug-14 27-Jul-14 A 09-Sep-14 A 100% 100% 1.00DHMEP22130 Cable Trays & Cable Trunking 6.00 28-Aug-14 03-Sep-14 27-Jul-14 A 09-Sep-14 A 100% 100% 0.00DHMEP22120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 02-Sep-14 08-Sep-14 08-Sep-14 A 17-Sep-14 A 100% 100% 1.00DHMEP22160 Pressure Testing of Pipes 12.00 09-Sep-14 22-Sep-14 20-Aug-14 A 14-Oct-14 75.00 100% 53% 0.00DHMEP22110 MEP Works in Risers& Clearance 6.00 18-Oct-14 23-Oct-14 19-Aug-14 A 11-Dec-14 -33.00 0% 16% 0.00DHMEP22140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 10-Dec-14 16-Dec-14 11-Sep-14 A 20-Jan-15 -2.00 0% 12% 0.00DHMEP22150 MEP Final Fixes 6.00 24-Jun-15 30-Jun-15 24-Aug-15 30-Aug-15 -40.00 0% 0% 0.00DHMEP06340 Sanitary ware /Toilet accessories 6.00 28-Jun-15 04-Jul-15 27-Aug-15 02-Sep-15 -28.00 0% 0% 0.00DHMEP22200 Pre-Testing & Commissioning 7.00 29-Jul-15 05-Aug-15 22-Sep-15 01-Oct-15 -44.00 0% 0% 0.00

LEVEL 23LEVEL 23 516.00 17-Jun-14 28-Sep-15 12-Jun-14 A 22-Nov-15 -43.00 69.77% 67.34% 0.97STRUCTURAL WORKS - LEVEL 23STRUCTURAL WORKS - LEVEL 23 84.00 17-Jun-14 06-Jul-14 12-Jun-14 A 08-Jul-14 A 100% 100% 1.00DHCWA24100 Core Wall - Level 23 4.00 17-Jun-14 21-Jun-14 12-Jun-14 A 15-Jun-14 A 100% 100% 1.00DHCWA24120 Tower Crane Jump 1.00 21-Jun-14 21-Jun-14 17-Jun-14 A 17-Jun-14 A 100% 100% 0.00DHSLA23100 Construction of Horizontals- L23 5.00 28-Jun-14 02-Jul-14 27-Jun-14 A 04-Jul-14 A 100% 100% 1.00DHCWA24110 Construction of Verticals - L23 3.00 03-Jul-14 06-Jul-14 04-Jul-14 A 08-Jul-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 17-Sep-14 21-Sep-14 18-Aug-14 A 23-Aug-14 A 0% 0% 0.00A1640 Stair # 1 4.00 17-Sep-14 21-Sep-14 18-Aug-14 A 23-Aug-14 A 100% 100% 0.00A1650 Stair # 2 3.00 18-Sep-14 21-Sep-14 18-Aug-14 A 23-Aug-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 23FINISHES WORKS - LEVEL 23 353.00 04-Aug-14 28-Sep-15 04-Aug-14 A 22-Nov-15 -43.00 23.05% 11.84% 0.51Dry areaDry area 325.00 26-Aug-14 01-Sep-15 25-Aug-14 A 02-Nov-15 -38.00 35.49% 26.13% 0.74DHFSH23120 Marking,Cutting & Chasing - Dry Area 4.00 02-Sep-14 06-Sep-14 07-Sep-14 A 10-Sep-14 A 100% 100% 1.00DHFSH23100 Block Work in Dry Area 6.00 26-Aug-14 01-Sep-14 25-Aug-14 A 15-Sep-14 A 100% 100% 1.00DHFSH23130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 07-Sep-14 10-Sep-14 30-Sep-14 A 11-Oct-14 51.00 100% 50% 0.50DHFSH23160 Plaster in Dry Area 8.00 14-Sep-14 22-Sep-14 12-Oct-14 20-Oct-14 51.00 100% 0% 0.00DHMEP23190 Dry Area Floor Screed 7.00 23-Sep-14 30-Sep-14 21-Oct-14 29-Oct-14 51.00 100% 0% 0.00DHFSH23230 Dry Area Painting - Primer 4.00 01-Oct-14 07-Oct-14 30-Oct-14 03-Nov-14 104.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 23Tower Crane Jump

Construction of Horizontals- L23Construction of Verticals - L23

Stair # 1Stair # 2

Marking,Cutting & Chasing - Dry AreaBlock Work in Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 30 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 75: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH23260 Dry Area Painting - Stucco 6.00 08-Oct-14 14-Oct-14 04-Nov-14 10-Nov-14 104.00 0% 0% 0.00DHFSH23290 Dry Area False Ceiling Suspension 6.00 13-Nov-14 20-Nov-14 12-Jan-15 19-Jan-15 -23.00 0% 0% 0.00DHFSH23350 Dry Area False Ceiling Tiling / Boarding 5.00 21-Dec-14 25-Dec-14 04-Feb-15 10-Feb-15 28.00 0% 0% 0.00DHFSH23400 Dry Area Painting - 1st Coat 5.00 27-Dec-14 31-Dec-14 10-Feb-15 16-Feb-15 28.00 0% 0% 0.00DHFSH23450 Dry Area Flooring 5.00 10-Feb-15 15-Feb-15 02-Mar-15 07-Mar-15 16.00 0% 0% 0.00DHFSH23430 Installation of Timber Doors & Ironmongery 4.00 21-Jun-15 24-Jun-15 20-Aug-15 24-Aug-15 -50.00 0% 0% 0.00DHFSH23802 Installation of Wardrobe 12.00 29-Jul-15 11-Aug-15 28-Sep-15 11-Oct-15 -50.00 0% 0% 0.00DHFSH23500 Paint Final Coat 6.00 26-Aug-15 01-Sep-15 27-Oct-15 02-Nov-15 -38.00 0% 0% 0.00

Wet areaWet area 319.00 26-Aug-14 25-Aug-15 25-Aug-14 A 26-Oct-15 -50.00 10.35% 2.05% 0.20DHFSH23140 Marking,Cutting & Chasing - Wet Area 4.00 02-Sep-14 06-Sep-14 07-Sep-14 A 10-Sep-14 A 100% 100% 1.00DHFSH23110 Block Work in Wet Area 6.00 26-Aug-14 01-Sep-14 25-Aug-14 A 15-Sep-14 A 100% 100% 0.00DHFSH23150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 07-Sep-14 10-Sep-14 30-Sep-14 A 11-Oct-14 54.00 100% 50% 0.50DHMEP23170 Plaster in Wet Area 4.00 14-Sep-14 17-Sep-14 12-Oct-14 15-Oct-14 54.00 100% 0% 0.00DHMEP23180 Wet Area Wall Tiling 6.00 13-Nov-14 20-Nov-14 20-Dec-14 25-Dec-14 1.00 0% 0% 0.00DHFSH23300 Wet Area False Ceiling Suspension 5.00 20-Nov-14 26-Nov-14 19-Jan-15 25-Jan-15 -11.00 0% 0% 0.00DHFSH23370 Wet Area False Ceiling Tiling/Boarding 4.00 21-Dec-14 24-Dec-14 04-Feb-15 09-Feb-15 6.00 0% 0% 0.00DHFSH23210 Wet Area Waterproofing 4.00 25-Dec-14 29-Dec-14 09-Feb-15 14-Feb-15 6.00 0% 0% 0.00DHFSH23220 Wet Area Floor Screed 4.00 30-Dec-14 04-Jan-15 14-Feb-15 18-Feb-15 6.00 0% 0% 0.00DHFSH23250 Wet Area Floor Tiling 5.00 05-Jan-15 10-Jan-15 18-Feb-15 24-Feb-15 6.00 0% 0% 0.00DHFSH06670 Cabinet Carcass 5.00 12-Feb-15 17-Feb-15 04-Mar-15 09-Mar-15 -1.00 0% 0% 0.00DHFSH23420 Installation of Shower Enclosure 4.00 24-Jun-15 28-Jun-15 24-Aug-15 27-Aug-15 -41.00 0% 0% 0.00DHFSH23390 Installation of Vanity Counters & Tops 5.00 27-Jun-15 01-Jul-15 26-Aug-15 31-Aug-15 -50.00 0% 0% 0.00DHFSH23800 Installation of Kitchen Cabinet 12.00 12-Aug-15 25-Aug-15 12-Oct-15 26-Oct-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 120.00 01-Oct-14 09-May-15 30-Oct-14 21-Mar-15 72.00 0% 0% 0.00DHFSH23240 Corridor/Lift Lobby Floor Screed 4.00 01-Oct-14 07-Oct-14 30-Oct-14 03-Nov-14 51.00 0% 0% 0.00DHFSH23270 Lift Lobby Painting - Primer & Stucco 6.00 08-Oct-14 14-Oct-14 04-Nov-14 10-Nov-14 51.00 0% 0% 0.00DHFSH23310 Lift Lobby False Ceiling Suspension 6.00 26-Nov-14 04-Dec-14 25-Jan-15 01-Feb-15 -11.00 0% 0% 0.00DHFSH23360 Lift Lobby False Ceiling Tiling / Boarding 5.00 21-Dec-14 25-Dec-14 04-Feb-15 10-Feb-15 83.00 0% 0% 0.00DHFSH23410 Lift Lobby Painting - 1st Coat 6.00 27-Dec-14 03-Jan-15 10-Feb-15 17-Feb-15 83.00 0% 0% 0.00DHFSH23440 Installation of Steel Doors & Windows 3.00 06-May-15 09-May-15 10-Mar-15 12-Mar-15 49.00 0% 0% 0.00DHFSH23470 Lift Lobby Flooring 6.00 16-Feb-15 22-Feb-15 08-Mar-15 14-Mar-15 72.00 0% 0% 0.00DHFSH23490 Uti lity Rooms- Epoxy Flooring 6.00 23-Feb-15 01-Mar-15 15-Mar-15 21-Mar-15 72.00 0% 0% 0.00

StaircaseStaircase 127.00 23-Sep-14 18-May-15 21-Oct-14 21-Mar-15 77.00 45.08% 0% 0.00DHFSH23200 Staircase Plastering 4.00 23-Sep-14 27-Sep-14 21-Oct-14 26-Oct-14 157.00 100% 0% 0.00DHFSH23280 Staircase Painting - Primer & Stucco 6.00 15-Oct-14 21-Oct-14 11-Nov-14 17-Nov-14 144.00 0% 0% 0.00DHFSH23320 Staircase Handrail Fixing 3.00 03-Feb-15 07-Feb-15 16-Dec-14 18-Dec-14 140.00 0% 0% 0.00DHFSH23330 Staircase Painting 1st Coat 3.00 07-Feb-15 10-Feb-15 16-Feb-15 19-Feb-15 91.00 0% 0% 0.00DHFSH23340 Staircase Final Painting 5.00 10-May-15 14-May-15 14-Mar-15 18-Mar-15 77.00 0% 0% 0.00DHFSH23380 Staircase Epoxy Flooring 2.00 17-May-15 18-May-15 19-Mar-15 21-Mar-15 77.00 0% 0% 0.00

GeneralGeneral 353.00 04-Aug-14 28-Sep-15 04-Aug-14 A 22-Nov-15 -43.00 0% 0% 0.00DHSTR23000 Access from Structure 0.00 04-Aug-14 04-Aug-14 A 100% 100% 0.00DHFSH23510 Snagging & De-Snagging 12.00 13-Sep-15 28-Sep-15 09-Nov-15 22-Nov-15 -43.00 0% 0% 0.00

MEP - LEVEL 23MEP - LEVEL 23 479.00 30-Jun-14 12-Aug-15 27-Jun-14 A 08-Oct-15 -44.00 69.55% 69.9% 1.01DHMEP23000 Embeded Conduits & Boxex - Concrete Works 3.00 30-Jun-14 02-Jul-14 27-Jun-14 A 04-Jul-14 A 100% 100% 0.00DHMEP23100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 04-Aug-14 24-Aug-14 04-Aug-14 A 13-Sep-14 A 100% 100% 1.00DHMEP23130 Cable Trays & Cable Trunking 6.00 02-Sep-14 08-Sep-14 04-Aug-14 A 13-Sep-14 A 100% 100% 0.00DHMEP23120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 07-Sep-14 13-Sep-14 11-Sep-14 A 29-Sep-14 A 100% 100% 1.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Til ing / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Marking,Cutting & Chasing - Wet AreaBlock Work in Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Ti ling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstal lation of Shower EnclosureInstallation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in Walls

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 31 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 76: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP23160 Pressure Testing of Pipes 12.00 14-Sep-14 27-Sep-14 30-Aug-14 A 14-Oct-14 78.00 100% 66% 0.00DHMEP23110 MEP Works in Risers& Clearance 6.00 26-Oct-14 01-Nov-14 20-Aug-14 A 17-Dec-14 -33.00 0% 12% 0.00DHMEP23140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 14-Dec-14 20-Dec-14 14-Sep-14 A 04-Feb-15 -11.00 0% 12% 0.00DHMEP23150 MEP Final Fixes 6.00 29-Jun-15 05-Jul-15 29-Aug-15 03-Sep-15 -41.00 0% 0% 0.00DHMEP06350 Sanitary ware /Toilet accessories 6.00 02-Jul-15 08-Jul-15 01-Sep-15 07-Sep-15 -26.00 0% 0% 0.00DHMEP23200 Pre-Testing & Commissioning 7.00 05-Aug-15 12-Aug-15 01-Oct-15 08-Oct-15 -44.00 0% 0% 0.00

LEVEL 24LEVEL 24 519.00 22-Jun-14 05-Oct-15 17-Jun-14 A 29-Nov-15 -43.00 69.45% 61.38% 0.88STRUCTURAL WORKS - LEVEL 24STRUCTURAL WORKS - LEVEL 24 20.00 22-Jun-14 14-Jul-14 17-Jun-14 A 14-Jul-14 A 100% 100% 1.00DHCWA25100 Core Wall - Level 24 8.00 22-Jun-14 30-Jun-14 17-Jun-14 A 19-Jun-14 A 100% 100% 1.00DHSLA24100 Construction of Horizontals - L24 4.00 07-Jul-14 10-Jul-14 04-Jul-14 A 10-Jul-14 A 100% 100% 1.00DHCWA25110 Construction of Verticals - L24 3.00 12-Jul-14 14-Jul-14 10-Jul-14 A 14-Jul-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 22-Sep-14 25-Sep-14 24-Aug-14 A 30-Aug-14 A 0% 0% 0.00A1660 Stair # 1 4.00 22-Sep-14 25-Sep-14 24-Aug-14 A 30-Aug-14 A 100% 100% 0.00A1670 Stair # 2 3.00 23-Sep-14 25-Sep-14 24-Aug-14 A 30-Aug-14 A 100% 100% 0.00

FINISHES WORKS - LEVEL 24FINISHES WORKS - LEVEL 24 359.00 10-Aug-14 05-Oct-15 10-Aug-14 A 29-Nov-15 -43.00 21.35% 10.88% 0.51Dry areaDry area 331.00 01-Sep-14 08-Sep-15 28-Aug-14 A 09-Nov-15 -38.00 35.49% 24.98% 0.70DHFSH24120 Marking,Cutting & Chasing - Dry Area 4.00 08-Sep-14 11-Sep-14 11-Sep-14 A 15-Sep-14 A 100% 100% 1.00DHFSH24100 Block Work in Dry Area 6.00 01-Sep-14 07-Sep-14 28-Aug-14 A 21-Sep-14 A 100% 100% 1.00DHFSH24130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 13-Sep-14 16-Sep-14 09-Oct-14 13-Oct-14 52.00 100% 0% 0.00DHFSH24160 Plaster in Dry Area 8.00 20-Sep-14 28-Sep-14 14-Oct-14 22-Oct-14 52.00 100% 0% 0.00DHMEP24190 Dry Area Floor Screed 7.00 29-Sep-14 08-Oct-14 23-Oct-14 01-Nov-14 52.00 28.57% 0% 0.00DHFSH24230 Dry Area Painting - Primer 4.00 09-Oct-14 13-Oct-14 02-Nov-14 05-Nov-14 107.00 0% 0% 0.00DHFSH24260 Dry Area Painting - Stucco 6.00 14-Oct-14 20-Oct-14 06-Nov-14 12-Nov-14 107.00 0% 0% 0.00DHFSH24290 Dry Area False Ceiling Suspension 6.00 18-Nov-14 25-Nov-14 17-Jan-15 24-Jan-15 -23.00 0% 0% 0.00DHFSH24350 Dry Area False Ceiling Tiling / Boarding 5.00 24-Dec-14 29-Dec-14 09-Feb-15 15-Feb-15 29.00 0% 0% 0.00DHFSH24400 Dry Area Painting - 1st Coat 5.00 30-Dec-14 05-Jan-15 15-Feb-15 21-Feb-15 29.00 0% 0% 0.00DHFSH24450 Dry Area Flooring 5.00 16-Feb-15 21-Feb-15 08-Mar-15 12-Mar-15 16.00 0% 0% 0.00DHFSH24430 Installation of Timber Doors & Ironmongery 4.00 25-Jun-15 29-Jun-15 25-Aug-15 29-Aug-15 -50.00 0% 0% 0.00DHFSH24802 Installation of Wardrobe 12.00 05-Aug-15 18-Aug-15 05-Oct-15 19-Oct-15 -50.00 0% 0% 0.00DHFSH24500 Paint Final Coat 6.00 02-Sep-15 08-Sep-15 03-Nov-15 09-Nov-15 -38.00 0% 0% 0.00

Wet areaWet area 325.00 01-Sep-14 01-Sep-15 28-Aug-14 A 02-Nov-15 -50.00 10.35% 1.03% 0.10DHFSH24140 Marking,Cutting & Chasing - Wet Area 4.00 08-Sep-14 11-Sep-14 11-Sep-14 A 15-Sep-14 A 100% 100% 1.00DHFSH24110 Block Work in Wet Area 6.00 01-Sep-14 07-Sep-14 28-Aug-14 A 21-Sep-14 A 100% 100% 0.00DHFSH24150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 13-Sep-14 16-Sep-14 09-Oct-14 13-Oct-14 56.00 100% 0% 0.00DHMEP24170 Plaster in Wet Area 4.00 20-Sep-14 23-Sep-14 14-Oct-14 18-Oct-14 56.00 100% 0% 0.00DHMEP24180 Wet Area Wall Tiling 6.00 18-Nov-14 25-Nov-14 24-Dec-14 30-Dec-14 1.00 0% 0% 0.00DHFSH24300 Wet Area False Ceiling Suspension 5.00 25-Nov-14 01-Dec-14 24-Jan-15 29-Jan-15 -12.00 0% 0% 0.00DHFSH24370 Wet Area False Ceiling Tiling/Boarding 4.00 24-Dec-14 28-Dec-14 09-Feb-15 14-Feb-15 7.00 0% 0% 0.00DHFSH24210 Wet Area Waterproofing 4.00 29-Dec-14 03-Jan-15 14-Feb-15 18-Feb-15 7.00 0% 0% 0.00DHFSH24220 Wet Area Floor Screed 4.00 04-Jan-15 07-Jan-15 18-Feb-15 23-Feb-15 7.00 0% 0% 0.00DHFSH24250 Wet Area Floor Tiling 5.00 08-Jan-15 13-Jan-15 23-Feb-15 01-Mar-15 7.00 0% 0% 0.00DHFSH06680 Cabinet Carcass 5.00 18-Feb-15 23-Feb-15 10-Mar-15 15-Mar-15 -1.00 0% 0% 0.00DHFSH24420 Installation of Shower Enclosure 4.00 29-Jun-15 02-Jul-15 29-Aug-15 01-Sep-15 -42.00 0% 0% 0.00DHFSH24390 Installation of Vanity Counters & Tops 5.00 01-Jul-15 06-Jul-15 31-Aug-15 05-Sep-15 -50.00 0% 0% 0.00DHFSH24800 Installation of Kitchen Cabinet 12.00 19-Aug-15 01-Sep-15 20-Oct-15 02-Nov-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 123.00 09-Oct-14 12-May-15 02-Nov-14 26-Mar-15 69.00 0% 0% 0.00DHFSH24240 Corridor/Lift Lobby Floor Screed 4.00 09-Oct-14 13-Oct-14 02-Nov-14 05-Nov-14 52.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toi let accessories

Pre-Testing & Commissioning

Core Wall - Level 24Construction of Horizontals - L24Construction of Verticals - L24

Stair # 1Stair # 2

Marking,Cutting & Chasing - Dry AreaBlock Work in Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Marking,Cutting & Chasing - Wet AreaBlock Work in Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceiling Suspension

Wet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor Screed

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 32 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 77: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH24270 Lift Lobby Painting - Primer & Stucco 6.00 14-Oct-14 20-Oct-14 06-Nov-14 12-Nov-14 52.00 0% 0% 0.00DHFSH24310 Lift Lobby False Ceiling Suspension 6.00 01-Dec-14 09-Dec-14 29-Jan-15 05-Feb-15 -12.00 0% 0% 0.00DHFSH24360 Lift Lobby False Ceiling Tiling / Boarding 5.00 24-Dec-14 29-Dec-14 09-Feb-15 15-Feb-15 82.00 0% 0% 0.00DHFSH24410 Lift Lobby Painting - 1st Coat 6.00 30-Dec-14 06-Jan-15 15-Feb-15 22-Feb-15 82.00 0% 0% 0.00DHFSH24440 Installation of Steel Doors & Windows 3.00 10-May-15 12-May-15 16-Mar-15 18-Mar-15 47.00 0% 0% 0.00DHFSH24470 Lift Lobby Flooring 6.00 22-Feb-15 28-Feb-15 14-Mar-15 19-Mar-15 69.00 0% 0% 0.00DHFSH24490 Uti lity Rooms- Epoxy Flooring 6.00 01-Mar-15 07-Mar-15 21-Mar-15 26-Mar-15 69.00 0% 0% 0.00

StaircaseStaircase 130.00 29-Sep-14 21-May-15 23-Oct-14 26-Mar-15 76.00 22.54% 0% 0.00DHFSH24200 Staircase Plastering 4.00 29-Sep-14 02-Oct-14 23-Oct-14 28-Oct-14 158.00 50% 0% 0.00DHFSH24280 Staircase Painting - Primer & Stucco 6.00 21-Oct-14 28-Oct-14 13-Nov-14 19-Nov-14 145.00 0% 0% 0.00DHFSH24320 Staircase Handrail Fixing 3.00 07-Feb-15 10-Feb-15 20-Dec-14 22-Dec-14 140.00 0% 0% 0.00DHFSH24330 Staircase Painting 1st Coat 3.00 10-Feb-15 14-Feb-15 21-Feb-15 24-Feb-15 90.00 0% 0% 0.00DHFSH24340 Staircase Final Painting 5.00 13-May-15 19-May-15 19-Mar-15 24-Mar-15 76.00 0% 0% 0.00DHFSH24380 Staircase Epoxy Flooring 2.00 20-May-15 21-May-15 25-Mar-15 26-Mar-15 76.00 0% 0% 0.00

GeneralGeneral 359.00 10-Aug-14 05-Oct-15 10-Aug-14 A 29-Nov-15 -43.00 0% 0% 0.00DHSTR24000 Access from Structure 0.00 10-Aug-14 10-Aug-14 A 100% 100% 0.00DHFSH24510 Snagging & De-Snagging 12.00 20-Sep-15 05-Oct-15 16-Nov-15 29-Nov-15 -43.00 0% 0% 0.00

MEP - LEVEL 24MEP - LEVEL 24 482.00 08-Jul-14 19-Aug-15 04-Jul-14 A 17-Oct-15 -44.00 69.55% 55.73% 0.80DHMEP24000 Embeded Conduits & Boxex - Concrete Works 3.00 08-Jul-14 10-Jul-14 04-Jul-14 A 10-Jul-14 A 100% 100% 0.00DHMEP24100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 10-Aug-14 30-Aug-14 10-Aug-14 A 14-Sep-14 A 100% 100% 1.00DHMEP24130 Cable Trays & Cable Trunking 6.00 08-Sep-14 14-Sep-14 10-Aug-14 A 14-Sep-14 A 100% 100% 0.00DHMEP24120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 13-Sep-14 18-Sep-14 16-Sep-14 A 12-Oct-14 53.00 100% 59% 0.59DHMEP24160 Pressure Testing of Pipes 12.00 20-Sep-14 02-Oct-14 30-Aug-14 A 18-Oct-14 78.00 83.33% 66% 0.00DHMEP24110 MEP Works in Risers& Clearance 6.00 02-Nov-14 08-Nov-14 24-Aug-14 A 23-Dec-14 -33.00 0% 12% 0.00DHMEP24140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 17-Dec-14 23-Dec-14 16-Sep-14 A 09-Feb-15 -12.00 0% 12% 0.00DHMEP24150 MEP Final Fixes 6.00 04-Jul-15 09-Jul-15 02-Sep-15 08-Sep-15 -42.00 0% 0% 0.00DHMEP06360 Sanitary ware /Toilet accessories 6.00 07-Jul-15 13-Jul-15 06-Sep-15 12-Sep-15 -24.00 0% 0% 0.00DHMEP24200 Pre-Testing & Commissioning 7.00 12-Aug-15 19-Aug-15 08-Oct-15 17-Oct-15 -44.00 0% 0% 0.00

LEVEL 25LEVEL 25 534.00 01-Jul-14 12-Oct-15 21-Jun-14 A 07-Dec-15 -43.00 68.79% 52.75% 0.77STRUCTURAL WORKS - LEVEL 25STRUCTURAL WORKS - LEVEL 25 18.00 01-Jul-14 21-Jul-14 21-Jun-14 A 19-Jul-14 A 100% 100% 1.00DHCWA26100 Core Wall - Level 25 5.00 01-Jul-14 06-Jul-14 21-Jun-14 A 26-Jun-14 A 100% 100% 1.00DHSLA25100 Construction of Horizontals - L25 4.00 15-Jul-14 19-Jul-14 10-Jul-14 A 17-Jul-14 A 100% 100% 1.00DHCWA26110 Construction of Verticals - L25 2.00 20-Jul-14 21-Jul-14 17-Jul-14 A 19-Jul-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 28-Sep-14 01-Oct-14 01-Sep-14 A 04-Sep-14 A 0% 0% 0.00A1680 Stair # 1 4.00 28-Sep-14 01-Oct-14 01-Sep-14 A 04-Sep-14 A 75% 100% 0.00A1690 Stair # 2 3.00 29-Sep-14 01-Oct-14 01-Sep-14 A 04-Sep-14 A 66.67% 100% 0.00

FINISHES WORKS - LEVEL 25FINISHES WORKS - LEVEL 25 365.00 17-Aug-14 12-Oct-15 13-Aug-14 A 07-Dec-15 -43.00 18.36% 9.92% 0.54Dry areaDry area 337.00 07-Sep-14 15-Sep-15 30-Aug-14 A 16-Nov-15 -38.00 32.42% 23.82% 0.73DHFSH25100 Block Work in Dry Area 6.00 07-Sep-14 13-Sep-14 30-Aug-14 A 27-Sep-14 A 100% 100% 1.00DHFSH25120 Marking,Cutting & Chasing - Dry Area 4.00 14-Sep-14 17-Sep-14 09-Oct-14 13-Oct-14 50.00 100% 0% 0.00DHFSH25130 Sub frame Fixing/Plaster Preparation - Dry Area 5.00 18-Sep-14 23-Sep-14 14-Oct-14 19-Oct-14 51.00 100% 0% 0.00DHFSH25160 Plaster in Dry Area 8.00 25-Sep-14 06-Oct-14 21-Oct-14 30-Oct-14 50.00 62.5% 0% 0.00DHMEP25190 Dry Area Floor Screed 7.00 07-Oct-14 14-Oct-14 01-Nov-14 08-Nov-14 50.00 0% 0% 0.00DHFSH25230 Dry Area Painting - Primer 4.00 15-Oct-14 19-Oct-14 09-Nov-14 12-Nov-14 106.00 0% 0% 0.00DHFSH25260 Dry Area Painting - Stucco 6.00 20-Oct-14 27-Oct-14 13-Nov-14 19-Nov-14 106.00 0% 0% 0.00DHFSH25290 Dry Area False Ceiling Suspension 6.00 23-Nov-14 30-Nov-14 21-Jan-15 28-Jan-15 -23.00 0% 0% 0.00DHFSH25350 Dry Area False Ceiling Tiling / Boarding 5.00 31-Dec-14 06-Jan-15 16-Feb-15 22-Feb-15 28.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Lift Lobby Painting - Primer & StuccoLift Lobby False Ceiling Suspension

Lift Lobby False Ceiling Tiling / BoardingLift Lobby Painting - 1st Coat

Instal lation of Steel Doors & WindowsLift Lobby Flooring

Uti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 25Construction of Horizontals - L25Construction of Verticals - L25

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / Boarding

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 33 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 78: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH25400 Dry Area Painting - 1st Coat 5.00 07-Jan-15 12-Jan-15 22-Feb-15 28-Feb-15 28.00 0% 0% 0.00DHFSH25450 Dry Area Flooring 5.00 22-Feb-15 26-Feb-15 14-Mar-15 18-Mar-15 16.00 0% 0% 0.00DHFSH25430 Installation of Timber Doors & Ironmongery 4.00 30-Jun-15 04-Jul-15 30-Aug-15 02-Sep-15 -50.00 0% 0% 0.00DHFSH25802 Installation of Wardrobe 12.00 12-Aug-15 25-Aug-15 12-Oct-15 26-Oct-15 -50.00 0% 0% 0.00DHFSH25500 Paint Final Coat 6.00 09-Sep-15 15-Sep-15 10-Nov-15 16-Nov-15 -38.00 0% 0% 0.00

Wet areaWet area 331.00 07-Sep-14 08-Sep-15 30-Aug-14 A 09-Nov-15 -50.00 10.35% 0% 0.00DHFSH25110 Block Work in Wet Area 6.00 07-Sep-14 13-Sep-14 30-Aug-14 A 27-Sep-14 A 100% 100% 0.00DHFSH25140 Marking,Cutting & Chasing - Wet Area 4.00 14-Sep-14 17-Sep-14 09-Oct-14 13-Oct-14 50.00 100% 0% 0.00DHFSH25150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 18-Sep-14 22-Sep-14 14-Oct-14 18-Oct-14 56.00 100% 0% 0.00DHMEP25170 Plaster in Wet Area 4.00 25-Sep-14 29-Sep-14 21-Oct-14 26-Oct-14 54.00 100% 0% 0.00DHMEP25180 Wet Area Wall Tiling 6.00 23-Nov-14 30-Nov-14 29-Dec-14 05-Jan-15 1.00 0% 0% 0.00DHFSH25300 Wet Area False Ceiling Suspension 5.00 30-Nov-14 07-Dec-14 28-Jan-15 03-Feb-15 -12.00 0% 0% 0.00DHFSH25370 Wet Area False Ceiling Tiling/Boarding 4.00 31-Dec-14 05-Jan-15 16-Feb-15 21-Feb-15 6.00 0% 0% 0.00DHFSH25210 Wet Area Waterproofing 4.00 06-Jan-15 10-Jan-15 21-Feb-15 25-Feb-15 6.00 0% 0% 0.00DHFSH25220 Wet Area Floor Screed 4.00 11-Jan-15 14-Jan-15 25-Feb-15 02-Mar-15 6.00 0% 0% 0.00DHFSH25250 Wet Area Floor Tiling 5.00 15-Jan-15 20-Jan-15 02-Mar-15 08-Mar-15 6.00 0% 0% 0.00DHFSH06690 Cabinet Carcass 5.00 24-Feb-15 01-Mar-15 16-Mar-15 21-Mar-15 -1.00 0% 0% 0.00DHFSH25420 Installation of Shower Enclosure 4.00 04-Jul-15 07-Jul-15 02-Sep-15 06-Sep-15 -43.00 0% 0% 0.00DHFSH25390 Installation of Vanity Counters & Tops 5.00 06-Jul-15 11-Jul-15 05-Sep-15 09-Sep-15 -50.00 0% 0% 0.00DHFSH25800 Installation of Kitchen Cabinet 12.00 26-Aug-15 08-Sep-15 27-Oct-15 09-Nov-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 122.00 15-Oct-14 17-May-15 09-Nov-14 01-Apr-15 66.00 0% 0% 0.00DHFSH25240 Corridor/Lift Lobby Floor Screed 4.00 15-Oct-14 19-Oct-14 09-Nov-14 12-Nov-14 50.00 0% 0% 0.00DHFSH25270 Lift Lobby Painting - Primer & Stucco 6.00 20-Oct-14 27-Oct-14 13-Nov-14 19-Nov-14 50.00 0% 0% 0.00DHFSH25310 Lift Lobby False Ceiling Suspension 6.00 07-Dec-14 14-Dec-14 03-Feb-15 10-Feb-15 -12.00 0% 0% 0.00DHFSH25360 Lift Lobby False Ceiling Tiling / Boarding 5.00 31-Dec-14 06-Jan-15 16-Feb-15 22-Feb-15 79.00 0% 0% 0.00DHFSH25410 Lift Lobby Painting - 1st Coat 6.00 07-Jan-15 13-Jan-15 22-Feb-15 01-Mar-15 79.00 0% 0% 0.00DHFSH25440 Installation of Steel Doors & Windows 3.00 13-May-15 17-May-15 22-Mar-15 24-Mar-15 45.00 0% 0% 0.00DHFSH25470 Lift Lobby Flooring 6.00 28-Feb-15 05-Mar-15 19-Mar-15 25-Mar-15 66.00 0% 0% 0.00DHFSH25490 Uti lity Rooms- Epoxy Flooring 6.00 07-Mar-15 12-Mar-15 26-Mar-15 01-Apr-15 66.00 0% 0% 0.00

StaircaseStaircase 129.00 07-Oct-14 25-May-15 01-Nov-14 01-Apr-15 75.00 0% 0% 0.00DHFSH25200 Staircase Plastering 4.00 07-Oct-14 11-Oct-14 01-Nov-14 04-Nov-14 155.00 0% 0% 0.00DHFSH25280 Staircase Painting - Primer & Stucco 6.00 28-Oct-14 03-Nov-14 20-Nov-14 26-Nov-14 142.00 0% 0% 0.00DHFSH25320 Staircase Handrail Fixing 3.00 10-Feb-15 14-Feb-15 23-Dec-14 25-Dec-14 140.00 0% 0% 0.00DHFSH25330 Staircase Painting 1st Coat 3.00 14-Feb-15 17-Feb-15 28-Feb-15 03-Mar-15 87.00 0% 0% 0.00DHFSH25340 Staircase Final Painting 5.00 18-May-15 23-May-15 25-Mar-15 30-Mar-15 75.00 0% 0% 0.00DHFSH25380 Staircase Epoxy Flooring 2.00 24-May-15 25-May-15 31-Mar-15 01-Apr-15 75.00 0% 0% 0.00

GeneralGeneral 365.00 17-Aug-14 12-Oct-15 13-Aug-14 A 07-Dec-15 -43.00 0% 0% 0.00DHSTR25000 Access from Structure 0.00 17-Aug-14 13-Aug-14 A 100% 100% 0.00DHFSH25510 Snagging & De-Snagging 12.00 29-Sep-15 12-Oct-15 23-Nov-15 07-Dec-15 -43.00 0% 0% 0.00

MEP - LEVEL 25MEP - LEVEL 25 494.00 16-Jul-14 23-Aug-15 10-Jul-14 A 20-Oct-15 -44.00 69.55% 35.09% 0.50DHMEP25000 Embeded Conduits & Boxex - Concrete Works 3.00 16-Jul-14 19-Jul-14 10-Jul-14 A 17-Jul-14 A 100% 100% 0.00DHMEP25100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 17-Aug-14 06-Sep-14 13-Aug-14 A 18-Sep-14 A 100% 100% 1.00DHMEP25130 Cable Trays & Cable Trunking 6.00 14-Sep-14 20-Sep-14 13-Aug-14 A 18-Sep-14 A 100% 100% 0.00DHMEP25120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 18-Sep-14 24-Sep-14 14-Oct-14 20-Oct-14 50.00 100% 0% 0.00DHMEP25160 Pressure Testing of Pipes 12.00 25-Sep-14 11-Oct-14 09-Sep-14 A 30-Oct-14 74.00 41.67% 33% 0.00DHMEP25110 MEP Works in Risers& Clearance 6.00 09-Nov-14 15-Nov-14 30-Aug-14 A 29-Dec-14 -33.00 0% 12% 0.00DHMEP25140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 24-Dec-14 30-Dec-14 17-Sep-14 A 16-Feb-15 -12.00 0% 4% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Dry Area Painting - 1st CoatDry Area Flooring

Installation of Timber Doors & IronmongeryInstal lation of Wardrobe

Paint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Instal lation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etcCable Trays & Cable Trunking

Embeded Condiuts,Boxes and Sleeves in WallsPressure Testing of Pipes

MEP Works in Risers& ClearancePlenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 34 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 79: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP25150 MEP Final Fixes 6.00 08-Jul-15 14-Jul-15 07-Sep-15 13-Sep-15 -43.00 0% 0% 0.00DHMEP06370 Sanitary ware /Toilet accessories 6.00 12-Jul-15 20-Jul-15 10-Sep-15 16-Sep-15 -25.00 0% 0% 0.00DHMEP25200 Pre-Testing & Commissioning 7.00 16-Aug-15 23-Aug-15 12-Oct-15 20-Oct-15 -44.00 0% 0% 0.00

LEVEL 26LEVEL 26 540.00 07-Jul-14 20-Oct-15 27-Jun-14 A 14-Dec-15 -43.00 65.18% 52.74% 0.81STRUCTURAL WORKS - LEVEL 26STRUCTURAL WORKS - LEVEL 26 19.00 07-Jul-14 30-Jul-14 27-Jun-14 A 26-Jul-14 A 100% 100% 1.00DHCWA27100 Core Wall - Level 26 6.00 07-Jul-14 13-Jul-14 27-Jun-14 A 03-Jul-14 A 100% 100% 1.00DHSLA26100 Construction of Horizontals - L26 4.00 22-Jul-14 26-Jul-14 17-Jul-14 A 23-Jul-14 A 100% 100% 1.00DHCWA27110 Construction of Verticals - L26 2.00 27-Jul-14 30-Jul-14 22-Jul-14 A 26-Jul-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 06-Oct-14 09-Oct-14 05-Sep-14 A 08-Sep-14 A 0% 0% 0.00A1700 Stair # 1 4.00 06-Oct-14 09-Oct-14 05-Sep-14 A 08-Sep-14 A 0% 100% 0.00A1710 Stair # 2 3.00 07-Oct-14 09-Oct-14 05-Sep-14 A 08-Sep-14 A 0% 100% 0.00

FINISHES WORKS - LEVEL 26FINISHES WORKS - LEVEL 26 371.00 24-Aug-14 20-Oct-15 19-Aug-14 A 14-Dec-15 -43.00 12.81% 9.92% 0.77Dry areaDry area 343.00 14-Sep-14 22-Sep-15 08-Sep-14 A 23-Nov-15 -38.00 27.29% 23.82% 0.87DHFSH26100 Block Work in Dry Area 6.00 14-Sep-14 20-Sep-14 08-Sep-14 A 29-Sep-14 A 100% 100% 1.00DHFSH26120 Marking,Cutting & Chasing - Dry Area 4.00 21-Sep-14 24-Sep-14 09-Oct-14 13-Oct-14 53.00 100% 0% 0.00DHFSH26130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 25-Sep-14 29-Sep-14 14-Oct-14 18-Oct-14 55.00 100% 0% 0.00DHFSH26160 Plaster in Dry Area 8.00 02-Oct-14 13-Oct-14 21-Oct-14 30-Oct-14 53.00 0% 0% 0.00DHMEP26190 Dry Area Floor Screed 7.00 14-Oct-14 21-Oct-14 01-Nov-14 08-Nov-14 53.00 0% 0% 0.00DHFSH26230 Dry Area Painting - Primer 4.00 22-Oct-14 27-Oct-14 09-Nov-14 12-Nov-14 109.00 0% 0% 0.00DHFSH26260 Dry Area Painting - Stucco 6.00 28-Oct-14 03-Nov-14 13-Nov-14 19-Nov-14 109.00 0% 0% 0.00DHFSH26290 Dry Area False Ceiling Suspension 6.00 27-Nov-14 06-Dec-14 26-Jan-15 02-Feb-15 -23.00 0% 0% 0.00DHFSH26350 Dry Area False Ceiling Tiling / Boarding 5.00 05-Jan-15 10-Jan-15 19-Feb-15 25-Feb-15 28.00 0% 0% 0.00DHFSH26400 Dry Area Painting - 1st Coat 5.00 11-Jan-15 15-Jan-15 25-Feb-15 03-Mar-15 28.00 0% 0% 0.00DHFSH26450 Dry Area Flooring 5.00 28-Feb-15 04-Mar-15 19-Mar-15 24-Mar-15 16.00 0% 0% 0.00DHFSH26430 Installation of Timber Doors & Ironmongery 4.00 05-Jul-15 08-Jul-15 03-Sep-15 07-Sep-15 -50.00 0% 0% 0.00DHFSH26802 Installation of Wardrobe 12.00 19-Aug-15 01-Sep-15 20-Oct-15 02-Nov-15 -50.00 0% 0% 0.00DHFSH26500 Paint Final Coat 6.00 16-Sep-15 22-Sep-15 17-Nov-15 23-Nov-15 -38.00 0% 0% 0.00

Wet areaWet area 337.00 14-Sep-14 15-Sep-15 08-Sep-14 A 16-Nov-15 -50.00 3.08% 0% 0.00DHFSH26110 Block Work in Wet Area 6.00 14-Sep-14 20-Sep-14 08-Sep-14 A 29-Sep-14 A 100% 100% 0.00DHFSH26140 Marking,Cutting & Chasing - Wet Area 4.00 21-Sep-14 24-Sep-14 09-Oct-14 13-Oct-14 53.00 100% 0% 0.00DHFSH26150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 25-Sep-14 29-Sep-14 14-Oct-14 18-Oct-14 60.00 100% 0% 0.00DHMEP26170 Plaster in Wet Area 4.00 02-Oct-14 08-Oct-14 21-Oct-14 26-Oct-14 58.00 0% 0% 0.00DHMEP26180 Wet Area Wall Tiling 6.00 27-Nov-14 06-Dec-14 04-Jan-15 10-Jan-15 1.00 0% 0% 0.00DHFSH26300 Wet Area False Ceiling Suspension 5.00 06-Dec-14 11-Dec-14 02-Feb-15 08-Feb-15 -13.00 0% 0% 0.00DHFSH26370 Wet Area False Ceiling Tiling/Boarding 4.00 05-Jan-15 08-Jan-15 19-Feb-15 24-Feb-15 8.00 0% 0% 0.00DHFSH26210 Wet Area Waterproofing 4.00 10-Jan-15 13-Jan-15 24-Feb-15 01-Mar-15 8.00 0% 0% 0.00DHFSH26220 Wet Area Floor Screed 4.00 14-Jan-15 18-Jan-15 01-Mar-15 05-Mar-15 8.00 0% 0% 0.00DHFSH26250 Wet Area Floor Tiling 5.00 19-Jan-15 24-Jan-15 05-Mar-15 11-Mar-15 8.00 0% 0% 0.00DHFSH06700 Cabinet Carcass 5.00 02-Mar-15 07-Mar-15 22-Mar-15 26-Mar-15 -1.00 0% 0% 0.00DHFSH26420 Installation of Shower Enclosure 4.00 08-Jul-15 12-Jul-15 07-Sep-15 10-Sep-15 -44.00 0% 0% 0.00DHFSH26390 Installation of Vanity Counters & Tops 5.00 11-Jul-15 15-Jul-15 09-Sep-15 14-Sep-15 -50.00 0% 0% 0.00DHFSH26800 Installation of Kitchen Cabinet 12.00 02-Sep-15 15-Sep-15 03-Nov-15 16-Nov-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 127.00 22-Oct-14 20-May-15 09-Nov-14 07-Apr-15 63.00 0% 0% 0.00DHFSH26240 Corridor/Lift Lobby Floor Screed 4.00 22-Oct-14 27-Oct-14 09-Nov-14 12-Nov-14 53.00 0% 0% 0.00DHFSH26270 Lift Lobby Painting - Primer & Stucco 6.00 28-Oct-14 03-Nov-14 13-Nov-14 19-Nov-14 53.00 0% 0% 0.00DHFSH26310 Lift Lobby False Ceiling Suspension 6.00 11-Dec-14 18-Dec-14 08-Feb-15 15-Feb-15 -13.00 0% 0% 0.00DHFSH26360 Lift Lobby False Ceiling Tiling / Boarding 5.00 05-Jan-15 10-Jan-15 19-Feb-15 25-Feb-15 79.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - Level 26Construction of Horizontals - L26Construction of Verticals - L26

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Ti ling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

Instal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 35 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 80: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH26410 Lift Lobby Painting - 1st Coat 6.00 11-Jan-15 17-Jan-15 25-Feb-15 04-Mar-15 79.00 0% 0% 0.00DHFSH26440 Installation of Steel Doors & Windows 3.00 18-May-15 20-May-15 28-Mar-15 30-Mar-15 43.00 0% 0% 0.00DHFSH26470 Lift Lobby Flooring 6.00 05-Mar-15 11-Mar-15 25-Mar-15 31-Mar-15 63.00 0% 0% 0.00DHFSH26490 Uti lity Rooms- Epoxy Flooring 6.00 12-Mar-15 18-Mar-15 01-Apr-15 07-Apr-15 63.00 0% 0% 0.00

StaircaseStaircase 134.00 14-Oct-14 28-May-15 01-Nov-14 07-Apr-15 74.00 0% 0% 0.00DHFSH26200 Staircase Plastering 4.00 14-Oct-14 18-Oct-14 01-Nov-14 04-Nov-14 158.00 0% 0% 0.00DHFSH26280 Staircase Painting - Primer & Stucco 6.00 04-Nov-14 10-Nov-14 20-Nov-14 26-Nov-14 145.00 0% 0% 0.00DHFSH26320 Staircase Handrail Fixing 3.00 14-Feb-15 17-Feb-15 27-Dec-14 29-Dec-14 140.00 0% 0% 0.00DHFSH26330 Staircase Painting 1st Coat 3.00 17-Feb-15 21-Feb-15 03-Mar-15 07-Mar-15 87.00 0% 0% 0.00DHFSH26340 Staircase Final Painting 5.00 21-May-15 26-May-15 31-Mar-15 05-Apr-15 74.00 0% 0% 0.00DHFSH26380 Staircase Epoxy Flooring 2.00 27-May-15 28-May-15 06-Apr-15 07-Apr-15 74.00 0% 0% 0.00

GeneralGeneral 371.00 24-Aug-14 20-Oct-15 19-Aug-14 A 14-Dec-15 -43.00 0% 0% 0.00DHSTR26000 Access from Structure 0.00 24-Aug-14 19-Aug-14 A 100% 100% 0.00DHFSH26510 Snagging & De-Snagging 12.00 06-Oct-15 20-Oct-15 30-Nov-15 14-Dec-15 -43.00 0% 0% 0.00

MEP - LEVEL 26MEP - LEVEL 26 535.00 23-Jul-14 26-Aug-15 17-Jul-14 A 08-Dec-15 -82.00 63.79% 35% 0.55DHMEP26000 Embeded Conduits & Boxex - Concrete Works 3.00 23-Jul-14 26-Jul-14 17-Jul-14 A 23-Jul-14 A 100% 100% 0.00DHMEP26100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 24-Aug-14 13-Sep-14 19-Aug-14 A 21-Sep-14 A 100% 100% 1.00DHMEP26130 Cable Trays & Cable Trunking 6.00 21-Sep-14 27-Sep-14 19-Aug-14 A 21-Sep-14 A 100% 100% 0.00DHMEP26120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 25-Sep-14 01-Oct-14 14-Oct-14 20-Oct-14 53.00 83.33% 0% 0.00DHMEP26160 Pressure Testing of Pipes 8.00 02-Oct-14 18-Oct-14 16-Sep-14 A 30-Oct-14 77.00 0% 33% 0.00DHMEP26110 MEP Works in Risers& Clearance 6.00 16-Nov-14 22-Nov-14 08-Sep-14 A 05-Jan-15 -33.00 0% 12% 0.00DHMEP26140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 28-Dec-14 04-Jan-15 20-Sep-14 A 19-Feb-15 -12.00 0% 1% 0.00DHMEP26150 MEP Final Fixes 6.00 13-Jul-15 21-Jul-15 12-Sep-15 17-Sep-15 -44.00 0% 0% 0.00DHMEP06380 Sanitary ware /Toilet accessories 6.00 16-Jul-15 25-Jul-15 15-Sep-15 21-Sep-15 -26.00 0% 0% 0.00DHMEP26200 Pre-Testing & Commissioning 7.00 19-Aug-15 26-Aug-15 17-Oct-15 24-Oct-15 -44.00 0% 0% 0.00DHMEP26010 Busbar - L26 to L30 20.00 21-May-15 13-Jun-15 15-Nov-15 08-Dec-15 -144.00 0% 0% 0.00

LEVEL 27LEVEL 27 543.00 14-Jul-14 27-Oct-15 04-Jul-14 A 21-Dec-15 -43.00 52.87% 52.22% 0.99STRUCTURAL WORKS - LEVEL 27STRUCTURAL WORKS - LEVEL 27 61.00 14-Jul-14 05-Aug-14 04-Jul-14 A 05-Aug-14 A 100% 100% 1.00DHCWA28100 Core Wall - L27 6.00 14-Jul-14 20-Jul-14 04-Jul-14 A 14-Jul-14 A 100% 100% 1.00DHCWA28120 Tower Crane Jump 1.00 20-Jul-14 20-Jul-14 15-Jul-14 A 17-Jul-14 A 100% 100% 0.00DHSLA27100 Construction of Horizontals - L27 3.00 31-Jul-14 03-Aug-14 27-Jul-14 A 31-Jul-14 A 100% 100% 1.00DHCWA28110 Construction of Verticals - L27 2.00 04-Aug-14 05-Aug-14 04-Aug-14 A 05-Aug-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 11-Oct-14 14-Oct-14 09-Sep-14 A 14-Sep-14 A 0% 0% 0.00A1720 Stair # 1 4.00 11-Oct-14 14-Oct-14 09-Sep-14 A 14-Sep-14 A 0% 100% 0.00A1730 Stair # 2 3.00 11-Oct-14 13-Oct-14 09-Sep-14 A 14-Sep-14 A 0% 100% 0.00

FINISHES WORKS - LEVEL 27FINISHES WORKS - LEVEL 27 377.00 01-Sep-14 27-Oct-15 04-Sep-14 A 21-Dec-15 -43.00 10.4% 6.94% 0.67Dry areaDry area 346.00 22-Sep-14 01-Oct-15 25-Sep-14 A 30-Nov-15 -38.00 24.4% 16.67% 0.68DHFSH27100 Block Work in Dry Area 6.00 22-Sep-14 28-Sep-14 25-Sep-14 A 12-Oct-14 3.00 100% 70% 0.70DHFSH27120 Marking,Cutting & Chasing - Dry Area 4.00 29-Sep-14 02-Oct-14 13-Oct-14 16-Oct-14 53.00 50% 0% 0.00DHFSH27130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 06-Oct-14 09-Oct-14 18-Oct-14 21-Oct-14 55.00 0% 0% 0.00DHFSH27160 Plaster in Dry Area 8.00 13-Oct-14 21-Oct-14 26-Oct-14 03-Nov-14 53.00 0% 0% 0.00DHMEP27190 Dry Area Floor Screed 7.00 22-Oct-14 30-Oct-14 04-Nov-14 11-Nov-14 53.00 0% 0% 0.00DHFSH27230 Dry Area Painting - Primer 4.00 01-Nov-14 04-Nov-14 12-Nov-14 16-Nov-14 109.00 0% 0% 0.00DHFSH27260 Dry Area Painting - Stucco 6.00 05-Nov-14 11-Nov-14 17-Nov-14 23-Nov-14 109.00 0% 0% 0.00DHFSH27290 Dry Area False Ceiling Suspension 6.00 03-Dec-14 10-Dec-14 31-Jan-15 07-Feb-15 -23.00 0% 0% 0.00DHFSH27350 Dry Area False Ceiling Tiling / Boarding 5.00 08-Jan-15 13-Jan-15 23-Feb-15 01-Mar-15 28.00 0% 0% 0.00DHFSH27400 Dry Area Painting - 1st Coat 5.00 14-Jan-15 19-Jan-15 01-Mar-15 07-Mar-15 28.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & CommissioningBusbar - L26 to L30

Core Wall - L27Tower Crane Jump

Construction of Horizontals - L27Construction of Verticals - L27

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Til ing / BoardingDry Area Painting - 1st Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 36 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 81: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH27450 Dry Area Flooring 5.00 05-Mar-15 10-Mar-15 25-Mar-15 30-Mar-15 16.00 0% 0% 0.00DHFSH27430 Installation of Timber Doors & Ironmongery 4.00 09-Jul-15 13-Jul-15 08-Sep-15 12-Sep-15 -50.00 0% 0% 0.00DHFSH27802 Installation of Wardrobe 12.00 26-Aug-15 08-Sep-15 27-Oct-15 09-Nov-15 -50.00 0% 0% 0.00DHFSH27500 Paint Final Coat 6.00 26-Sep-15 01-Oct-15 24-Nov-15 30-Nov-15 -38.00 0% 0% 0.00

Wet areaWet area 340.00 22-Sep-14 22-Sep-15 25-Sep-14 A 23-Nov-15 -50.00 0.52% 0% 0.00DHFSH27110 Block Work in Wet Area 6.00 22-Sep-14 28-Sep-14 25-Sep-14 A 12-Oct-14 53.00 100% 70% 0.00DHFSH27140 Marking,Cutting & Chasing - Wet Area 4.00 29-Sep-14 02-Oct-14 13-Oct-14 16-Oct-14 53.00 50% 0% 0.00DHFSH27150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 06-Oct-14 09-Oct-14 18-Oct-14 21-Oct-14 61.00 0% 0% 0.00DHMEP27170 Plaster in Wet Area 4.00 13-Oct-14 16-Oct-14 26-Oct-14 29-Oct-14 59.00 0% 0% 0.00DHMEP27180 Wet Area Wall Tiling 6.00 03-Dec-14 10-Dec-14 08-Jan-15 14-Jan-15 1.00 0% 0% 0.00DHFSH27300 Wet Area False Ceiling Suspension 5.00 10-Dec-14 16-Dec-14 07-Feb-15 12-Feb-15 -14.00 0% 0% 0.00DHFSH27370 Wet Area False Ceiling Tiling/Boarding 4.00 08-Jan-15 12-Jan-15 23-Feb-15 28-Feb-15 10.00 0% 0% 0.00DHFSH27210 Wet Area Waterproofing 4.00 13-Jan-15 17-Jan-15 28-Feb-15 04-Mar-15 10.00 0% 0% 0.00DHFSH27220 Wet Area Floor Screed 4.00 18-Jan-15 21-Jan-15 04-Mar-15 09-Mar-15 10.00 0% 0% 0.00DHFSH27250 Wet Area Floor Tiling 5.00 22-Jan-15 27-Jan-15 09-Mar-15 15-Mar-15 10.00 0% 0% 0.00DHFSH06710 Cabinet Carcass 5.00 08-Mar-15 12-Mar-15 28-Mar-15 01-Apr-15 -1.00 0% 0% 0.00DHFSH27420 Installation of Shower Enclosure 4.00 13-Jul-15 16-Jul-15 12-Sep-15 15-Sep-15 -45.00 0% 0% 0.00DHFSH27390 Installation of Vanity Counters & Tops 5.00 15-Jul-15 22-Jul-15 14-Sep-15 19-Sep-15 -50.00 0% 0% 0.00DHFSH27800 Installation of Kitchen Cabinet 12.00 09-Sep-15 22-Sep-15 10-Nov-15 23-Nov-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 129.00 01-Nov-14 24-May-15 12-Nov-14 13-Apr-15 60.00 0% 0% 0.00DHFSH27240 Corridor/Lift Lobby Floor Screed 4.00 01-Nov-14 04-Nov-14 12-Nov-14 16-Nov-14 53.00 0% 0% 0.00DHFSH27270 Lift Lobby Painting - Primer & Stucco 6.00 05-Nov-14 11-Nov-14 17-Nov-14 23-Nov-14 53.00 0% 0% 0.00DHFSH27310 Lift Lobby False Ceiling Suspension 6.00 16-Dec-14 23-Dec-14 12-Feb-15 19-Feb-15 -14.00 0% 0% 0.00DHFSH27360 Lift Lobby False Ceiling Tiling / Boarding 5.00 08-Jan-15 13-Jan-15 23-Feb-15 01-Mar-15 79.00 0% 0% 0.00DHFSH27410 Lift Lobby Painting - 1st Coat 6.00 14-Jan-15 20-Jan-15 01-Mar-15 08-Mar-15 79.00 0% 0% 0.00DHFSH27440 Installation of Steel Doors & Windows 3.00 21-May-15 24-May-15 02-Apr-15 05-Apr-15 41.00 0% 0% 0.00DHFSH27470 Lift Lobby Flooring 6.00 11-Mar-15 17-Mar-15 31-Mar-15 06-Apr-15 60.00 0% 0% 0.00DHFSH27490 Uti lity Rooms- Epoxy Flooring 6.00 18-Mar-15 24-Mar-15 07-Apr-15 13-Apr-15 60.00 0% 0% 0.00

StaircaseStaircase 136.00 22-Oct-14 01-Jun-15 04-Nov-14 13-Apr-15 73.00 0% 0% 0.00DHFSH27200 Staircase Plastering 4.00 22-Oct-14 27-Oct-14 04-Nov-14 08-Nov-14 158.00 0% 0% 0.00DHFSH27280 Staircase Painting - Primer & Stucco 6.00 12-Nov-14 18-Nov-14 24-Nov-14 30-Nov-14 145.00 0% 0% 0.00DHFSH27320 Staircase Handrail Fixing 3.00 17-Feb-15 21-Feb-15 30-Dec-14 03-Jan-15 140.00 0% 0% 0.00DHFSH27330 Staircase Painting 1st Coat 3.00 21-Feb-15 24-Feb-15 07-Mar-15 10-Mar-15 87.00 0% 0% 0.00DHFSH27340 Staircase Final Painting 5.00 25-May-15 30-May-15 06-Apr-15 11-Apr-15 73.00 0% 0% 0.00DHFSH27380 Staircase Epoxy Flooring 2.00 31-May-15 01-Jun-15 12-Apr-15 13-Apr-15 73.00 0% 0% 0.00

GeneralGeneral 377.00 01-Sep-14 27-Oct-15 04-Sep-14 A 21-Dec-15 -43.00 0% 0% 0.00DHSTR27000 Access from Structure 0.00 01-Sep-14 04-Sep-14 A 100% 100% 0.00DHFSH27510 Snagging & De-Snagging 12.00 14-Oct-15 27-Oct-15 08-Dec-15 21-Dec-15 -43.00 0% 0% 0.00

MEP - LEVEL 27MEP - LEVEL 27 497.00 31-Jul-14 30-Aug-15 27-Jul-14 A 27-Oct-15 -44.00 34.97% 35.32% 1.01DHMEP27000 Embeded Conduits & Boxex - Concrete Works 3.00 31-Jul-14 03-Aug-14 27-Jul-14 A 31-Jul-14 A 100% 100% 0.00DHMEP27100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 01-Sep-14 21-Sep-14 04-Sep-14 A 23-Sep-14 A 100% 100% 1.00DHMEP27130 Cable Trays & Cable Trunking 6.00 29-Sep-14 07-Oct-14 04-Sep-14 A 19-Oct-14 62.00 33.33% 0% 0.00DHMEP27120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 06-Oct-14 12-Oct-14 18-Oct-14 23-Oct-14 53.00 0% 0% 0.00DHMEP27160 Pressure Testing of Pipes 12.00 13-Oct-14 27-Oct-14 26-Sep-14 A 03-Nov-14 77.00 0% 33% 0.00DHMEP27110 MEP Works in Risers& Clearance 6.00 23-Nov-14 29-Nov-14 15-Sep-14 A 11-Jan-15 -33.00 0% 12% 0.00DHMEP27140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 31-Dec-14 07-Jan-15 22-Sep-14 A 23-Feb-15 -12.00 0% 12% 0.00DHMEP27150 MEP Final Fixes 6.00 20-Jul-15 26-Jul-15 16-Sep-15 22-Sep-15 -45.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceiling Ti ling/BoardingWet Area Waterproofing

Wet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from Structure

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final Fixes

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 37 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 82: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP06390 Sanitary ware /Toilet accessories 6.00 23-Jul-15 29-Jul-15 20-Sep-15 28-Sep-15 -27.00 0% 0% 0.00DHMEP27200 Pre-Testing & Commissioning 7.00 23-Aug-15 30-Aug-15 20-Oct-15 27-Oct-15 -44.00 0% 0% 0.00

LEVEL 28LEVEL 28 546.00 21-Jul-14 03-Nov-15 15-Jul-14 A 28-Dec-15 -43.00 51.27% 51% 0.99STRUCTURAL WORKS - LEVEL 28STRUCTURAL WORKS - LEVEL 28 18.00 21-Jul-14 12-Aug-14 15-Jul-14 A 11-Aug-14 A 100% 100% 1.00DHCWA29100 Core Wall - L28 6.00 21-Jul-14 27-Jul-14 15-Jul-14 A 21-Jul-14 A 100% 100% 1.00DHSLA28100 Construction of Horizontals - L28 3.00 06-Aug-14 09-Aug-14 06-Aug-14 A 09-Aug-14 A 100% 100% 1.00DHCWA29110 Construction of Verticals - L28 3.00 10-Aug-14 12-Aug-14 10-Aug-14 A 11-Aug-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 15-Oct-14 19-Oct-14 18-Oct-14 21-Oct-14 50.00 0% 0% 0.00A1740 Stair # 1 4.00 15-Oct-14 19-Oct-14 18-Oct-14 21-Oct-14 13.00 0% 0% 0.00A1750 Stair # 2 3.00 15-Oct-14 18-Oct-14 19-Oct-14 21-Oct-14 50.00 0% 0% 0.00

FINISHES WORKS - LEVEL 28FINISHES WORKS - LEVEL 28 383.00 07-Sep-14 03-Nov-15 08-Sep-14 A 28-Dec-15 -43.00 3.31% 1.49% 0.45Dry areaDry area 347.00 29-Sep-14 08-Oct-15 25-Sep-14 A 08-Dec-15 -38.00 7.94% 3.57% 0.45DHFSH28100 Block Work in Dry Area 6.00 29-Sep-14 07-Oct-14 25-Sep-14 A 18-Oct-14 3.00 33.33% 15% 0.45DHFSH28120 Marking,Cutting & Chasing - Dry Area 4.00 08-Oct-14 12-Oct-14 19-Oct-14 22-Oct-14 51.00 0% 0% 0.00DHFSH28130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 13-Oct-14 16-Oct-14 23-Oct-14 28-Oct-14 53.00 0% 0% 0.00DHFSH28160 Plaster in Dry Area 8.00 20-Oct-14 29-Oct-14 01-Nov-14 09-Nov-14 51.00 0% 0% 0.00DHMEP28190 Dry Area Floor Screed 7.00 30-Oct-14 06-Nov-14 10-Nov-14 17-Nov-14 51.00 0% 0% 0.00DHFSH28230 Dry Area Painting - Primer 4.00 08-Nov-14 11-Nov-14 18-Nov-14 22-Nov-14 107.00 0% 0% 0.00DHFSH28260 Dry Area Painting - Stucco 6.00 12-Nov-14 18-Nov-14 23-Nov-14 29-Nov-14 107.00 0% 0% 0.00DHFSH28290 Dry Area False Ceiling Suspension 6.00 08-Dec-14 15-Dec-14 04-Feb-15 11-Feb-15 -23.00 0% 0% 0.00DHFSH28350 Dry Area False Ceiling Tiling / Boarding 5.00 12-Jan-15 17-Jan-15 28-Feb-15 05-Mar-15 27.00 0% 0% 0.00DHFSH28400 Dry Area Painting - 1st Coat 5.00 18-Jan-15 22-Jan-15 05-Mar-15 11-Mar-15 27.00 0% 0% 0.00DHFSH28450 Dry Area Flooring 5.00 11-Mar-15 16-Mar-15 31-Mar-15 05-Apr-15 16.00 0% 0% 0.00DHFSH28430 Installation of Timber Doors & Ironmongery 4.00 14-Jul-15 20-Jul-15 13-Sep-15 16-Sep-15 -50.00 0% 0% 0.00DHFSH28802 Installation of Wardrobe 12.00 02-Sep-15 15-Sep-15 03-Nov-15 16-Nov-15 -50.00 0% 0% 0.00DHFSH28500 Paint Final Coat 6.00 03-Oct-15 08-Oct-15 01-Dec-15 08-Dec-15 -38.00 0% 0% 0.00

Wet areaWet area 341.00 29-Sep-14 01-Oct-15 25-Sep-14 A 30-Nov-15 -50.00 0% 0% 0.00DHFSH28110 Block Work in Wet Area 6.00 29-Sep-14 07-Oct-14 25-Sep-14 A 18-Oct-14 51.00 33.33% 15% 0.00DHFSH28140 Marking,Cutting & Chasing - Wet Area 4.00 08-Oct-14 12-Oct-14 19-Oct-14 22-Oct-14 51.00 0% 0% 0.00DHFSH28150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 13-Oct-14 16-Oct-14 23-Oct-14 28-Oct-14 60.00 0% 0% 0.00DHMEP28170 Plaster in Wet Area 4.00 20-Oct-14 23-Oct-14 01-Nov-14 04-Nov-14 58.00 0% 0% 0.00DHMEP28180 Wet Area Wall Tiling 6.00 08-Dec-14 15-Dec-14 13-Jan-15 19-Jan-15 1.00 0% 0% 0.00DHFSH28300 Wet Area False Ceiling Suspension 5.00 15-Dec-14 21-Dec-14 11-Feb-15 17-Feb-15 -15.00 0% 0% 0.00DHFSH28370 Wet Area False Ceiling Tiling/Boarding 4.00 12-Jan-15 15-Jan-15 28-Feb-15 04-Mar-15 11.00 0% 0% 0.00DHFSH28210 Wet Area Waterproofing 4.00 17-Jan-15 20-Jan-15 04-Mar-15 09-Mar-15 11.00 0% 0% 0.00DHFSH28220 Wet Area Floor Screed 4.00 21-Jan-15 25-Jan-15 09-Mar-15 14-Mar-15 11.00 0% 0% 0.00DHFSH28250 Wet Area Floor Tiling 5.00 26-Jan-15 31-Jan-15 14-Mar-15 19-Mar-15 11.00 0% 0% 0.00DHFSH06720 Cabinet Carcass 4.00 14-Mar-15 17-Mar-15 02-Apr-15 06-Apr-15 -1.00 0% 0% 0.00DHFSH28420 Installation of Shower Enclosure 4.00 20-Jul-15 23-Jul-15 16-Sep-15 20-Sep-15 -46.00 0% 0% 0.00DHFSH28390 Installation of Vanity Counters & Tops 5.00 22-Jul-15 27-Jul-15 19-Sep-15 26-Sep-15 -50.00 0% 0% 0.00DHFSH28800 Installation of Kitchen Cabinet 12.00 16-Sep-15 01-Oct-15 17-Nov-15 30-Nov-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 129.00 08-Nov-14 27-May-15 18-Nov-14 19-Apr-15 57.00 0% 0% 0.00DHFSH28240 Corridor/Lift Lobby Floor Screed 4.00 08-Nov-14 11-Nov-14 18-Nov-14 22-Nov-14 51.00 0% 0% 0.00DHFSH28270 Lift Lobby Painting - Primer & Stucco 6.00 12-Nov-14 18-Nov-14 23-Nov-14 29-Nov-14 51.00 0% 0% 0.00DHFSH28310 Lift Lobby False Ceiling Suspension 6.00 21-Dec-14 28-Dec-14 17-Feb-15 24-Feb-15 -15.00 0% 0% 0.00DHFSH28360 Lift Lobby False Ceiling Tiling / Boarding 5.00 12-Jan-15 17-Jan-15 28-Feb-15 05-Mar-15 78.00 0% 0% 0.00DHFSH28410 Lift Lobby Painting - 1st Coat 6.00 18-Jan-15 24-Jan-15 05-Mar-15 12-Mar-15 78.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Sanitary ware /Toi let accessoriesPre-Testing & Commissioning

Core Wall - L28Construction of Horizontals - L28Construction of Verticals - L28

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Instal lation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Ti ling

Wet Area False Ceiling SuspensionWet Area False Ceiling Tiling/Boarding

Wet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Shower Enclosure

Instal lation of Vanity Counters & TopsInstallation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 38 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 83: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH28440 Installation of Steel Doors & Windows 3.00 25-May-15 27-May-15 07-Apr-15 09-Apr-15 40.00 0% 0% 0.00DHFSH28470 Lift Lobby Flooring 6.00 17-Mar-15 23-Mar-15 06-Apr-15 12-Apr-15 57.00 0% 0% 0.00DHFSH28490 Uti lity Rooms- Epoxy Flooring 6.00 24-Mar-15 30-Mar-15 13-Apr-15 19-Apr-15 57.00 0% 0% 0.00

StaircaseStaircase 135.00 30-Oct-14 04-Jun-15 10-Nov-14 18-Apr-15 71.00 0% 0% 0.00DHFSH28200 Staircase Plastering 4.00 30-Oct-14 03-Nov-14 10-Nov-14 13-Nov-14 156.00 0% 0% 0.00DHFSH28280 Staircase Painting - Primer & Stucco 6.00 19-Nov-14 25-Nov-14 30-Nov-14 07-Dec-14 143.00 0% 0% 0.00DHFSH28320 Staircase Handrail Fixing 3.00 21-Feb-15 24-Feb-15 04-Jan-15 06-Jan-15 140.00 0% 0% 0.00DHFSH28330 Staircase Painting 1st Coat 3.00 24-Feb-15 28-Feb-15 10-Mar-15 14-Mar-15 87.00 0% 0% 0.00DHFSH28340 Staircase Final Painting 5.00 28-May-15 02-Jun-15 11-Apr-15 15-Apr-15 71.00 0% 0% 0.00DHFSH28380 Staircase Epoxy Flooring 2.00 03-Jun-15 04-Jun-15 16-Apr-15 18-Apr-15 71.00 0% 0% 0.00

GeneralGeneral 383.00 07-Sep-14 03-Nov-15 08-Sep-14 A 28-Dec-15 -43.00 0% 0% 0.00DHSTR28000 Access from Structure 0.00 07-Sep-14 08-Sep-14 A 100% 100% 0.00DHFSH28510 Snagging & De-Snagging 12.00 21-Oct-15 03-Nov-15 15-Dec-15 28-Dec-15 -43.00 0% 0% 0.00

MEP - LEVEL 28MEP - LEVEL 28 497.00 06-Aug-14 02-Sep-15 06-Aug-14 A 31-Oct-15 -44.00 34.97% 35.32% 1.01DHMEP28000 Embeded Conduits & Boxex - Concrete Works 3.00 06-Aug-14 09-Aug-14 06-Aug-14 A 09-Aug-14 A 100% 100% 0.00DHMEP28100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 08-Sep-14 28-Sep-14 08-Sep-14 A 29-Sep-14 A 100% 100% 1.00DHMEP28130 Cable Trays & Cable Trunking 6.00 08-Oct-14 14-Oct-14 08-Sep-14 A 26-Oct-14 61.00 0% 0% 0.00DHMEP28120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 13-Oct-14 19-Oct-14 23-Oct-14 30-Oct-14 51.00 0% 0% 0.00DHMEP28160 Pressure Testing of Pipes 12.00 20-Oct-14 03-Nov-14 29-Sep-14 A 09-Nov-14 75.00 0% 33% 0.00DHMEP28110 MEP Works in Risers& Clearance 6.00 30-Nov-14 07-Dec-14 21-Sep-14 A 17-Jan-15 -33.00 0% 12% 0.00DHMEP28140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 05-Jan-15 11-Jan-15 24-Sep-14 A 28-Feb-15 -13.00 0% 12% 0.00DHMEP28150 MEP Final Fixes 6.00 25-Jul-15 30-Jul-15 21-Sep-15 29-Sep-15 -46.00 0% 0% 0.00DHMEP06400 Sanitary ware /Toilet accessories 6.00 28-Jul-15 03-Aug-15 27-Sep-15 03-Oct-15 -28.00 0% 0% 0.00DHMEP28200 Pre-Testing & Commissioning 7.00 26-Aug-15 02-Sep-15 24-Oct-15 31-Oct-15 -44.00 0% 0% 0.00

LEVEL 29LEVEL 29 565.00 30-Jul-14 14-Nov-15 22-Jul-14 A 12-Jan-16 -50.00 48.72% 47.32% 0.97STRUCTURAL WORKS - LEVEL 29STRUCTURAL WORKS - LEVEL 29 18.00 30-Jul-14 19-Aug-14 22-Jul-14 A 16-Aug-14 A 100% 100% 1.00DHCWA30100 Core Wall - L29 5.00 30-Jul-14 04-Aug-14 22-Jul-14 A 27-Jul-14 A 100% 100% 1.00DHSLA29100 Construction of Horizontals - L29 3.00 13-Aug-14 16-Aug-14 12-Aug-14 A 14-Aug-14 A 100% 100% 1.00DHCWA30110 Construction of Verticals - L29 3.00 17-Aug-14 19-Aug-14 15-Aug-14 A 16-Aug-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 19-Oct-14 23-Oct-14 22-Oct-14 27-Oct-14 50.00 0% 0% 0.00A1760 Stair # 1 4.00 20-Oct-14 23-Oct-14 22-Oct-14 27-Oct-14 13.00 0% 0% 0.00A1770 Stair # 2 4.00 19-Oct-14 22-Oct-14 22-Oct-14 27-Oct-14 50.00 0% 0% 0.00

FINISHES WORKS - LEVEL 29FINISHES WORKS - LEVEL 29 396.00 13-Sep-14 14-Nov-15 14-Sep-14 A 12-Jan-16 -50.00 0% 0.55% 0.00Dry areaDry area 378.00 13-Sep-14 31-Oct-15 25-Sep-14 A 29-Dec-15 -50.00 0% 1.19% 0.00DHFSH29102 Block Work for Mechanical Portion 8.00 13-Sep-14 21-Sep-14 25-Sep-14 A 12-Oct-14 36.00 100% 5% 0.00DHFSH29100 Block Work in Dry Area 6.00 08-Oct-14 14-Oct-14 25-Sep-14 A 22-Oct-14 3.00 0% 5% 0.00DHFSH29120 Marking,Cutting & Chasing - Dry Area 4.00 15-Oct-14 19-Oct-14 23-Oct-14 28-Oct-14 50.00 0% 0% 0.00DHFSH29130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 20-Oct-14 23-Oct-14 29-Oct-14 02-Nov-14 52.00 0% 0% 0.00DHFSH29600 Service Area Civil Works 20.00 22-Sep-14 16-Oct-14 13-Oct-14 05-Nov-14 36.00 40% 0% 0.00DHFSH29160 Plaster in Dry Area 8.00 28-Oct-14 05-Nov-14 05-Nov-14 13-Nov-14 50.00 0% 0% 0.00DHMEP29190 Dry Area Floor Screed 7.00 06-Nov-14 13-Nov-14 15-Nov-14 22-Nov-14 50.00 0% 0% 0.00DHFSH29230 Dry Area Painting - Primer 4.00 15-Nov-14 18-Nov-14 23-Nov-14 26-Nov-14 106.00 0% 0% 0.00DHFSH29260 Dry Area Painting - Stucco 6.00 19-Nov-14 25-Nov-14 27-Nov-14 04-Dec-14 106.00 0% 0% 0.00DHFSH29290 Dry Area False Ceiling Suspension 6.00 13-Dec-14 20-Dec-14 09-Feb-15 16-Feb-15 -23.00 0% 0% 0.00DHFSH29350 Dry Area False Ceiling Tiling / Boarding 5.00 19-Jan-15 24-Jan-15 07-Mar-15 12-Mar-15 24.00 0% 0% 0.00DHFSH29400 Dry Area Painting - 1st Coat 5.00 25-Jan-15 29-Jan-15 12-Mar-15 18-Mar-15 24.00 0% 0% 0.00DHFSH29450 Dry Area Flooring 5.00 16-Mar-15 21-Mar-15 05-Apr-15 09-Apr-15 16.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Installation of Steel Doors & WindowsLift Lobby Flooring

Utili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from Structure

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L29Construction of Horizontals - L29Construction of Verticals - L29

Stair # 1Stair # 2

Block Work for Mechanical PortionBlock Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry AreaService Area Civil Works

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area Flooring

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 39 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 84: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH29430 Installation of Timber Doors & Ironmongery 5.00 21-Jul-15 26-Jul-15 17-Sep-15 22-Sep-15 -50.00 0% 0% 0.00DHFSH29802 Installation of Wardrobe 12.00 09-Sep-15 22-Sep-15 10-Nov-15 23-Nov-15 -50.00 0% 0% 0.00DHFSH29500 Paint Final Coat 6.00 25-Oct-15 31-Oct-15 23-Dec-15 29-Dec-15 -50.00 0% 0% 0.00

Wet areaWet area 343.00 08-Oct-14 08-Oct-15 25-Sep-14 A 08-Dec-15 -50.00 0% 0% 0.00DHFSH29110 Block Work in Wet Area 6.00 08-Oct-14 14-Oct-14 25-Sep-14 A 22-Oct-14 50.00 0% 5% 0.00DHFSH29140 Marking,Cutting & Chasing - Wet Area 4.00 15-Oct-14 19-Oct-14 23-Oct-14 28-Oct-14 50.00 0% 0% 0.00DHFSH29150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 20-Oct-14 23-Oct-14 29-Oct-14 02-Nov-14 60.00 0% 0% 0.00DHMEP29170 Plaster in Wet Area 4.00 28-Oct-14 01-Nov-14 05-Nov-14 09-Nov-14 58.00 0% 0% 0.00DHMEP29180 Wet Area Wall Tiling 6.00 13-Dec-14 20-Dec-14 18-Jan-15 24-Jan-15 1.00 0% 0% 0.00DHFSH29300 Wet Area False Ceiling Suspension 5.00 20-Dec-14 25-Dec-14 16-Feb-15 22-Feb-15 -16.00 0% 0% 0.00DHFSH29370 Wet Area False Ceiling Tiling/Boarding 4.00 19-Jan-15 22-Jan-15 07-Mar-15 11-Mar-15 24.00 0% 0% 0.00DHFSH29210 Wet Area Waterproofing 4.00 24-Jan-15 27-Jan-15 11-Mar-15 16-Mar-15 24.00 0% 0% 0.00DHFSH29220 Wet Area Floor Screed 4.00 28-Jan-15 01-Feb-15 16-Mar-15 21-Mar-15 24.00 0% 0% 0.00DHFSH29250 Wet Area Floor Tiling 5.00 02-Feb-15 07-Feb-15 21-Mar-15 26-Mar-15 24.00 0% 0% 0.00DHFSH29420 Installation of Shower Enclosure 4.00 26-Jul-15 29-Jul-15 22-Sep-15 28-Sep-15 -48.00 0% 0% 0.00DHFSH29390 Installation of Vanity Counters & Tops 5.00 27-Jul-15 01-Aug-15 26-Sep-15 30-Sep-15 -50.00 0% 0% 0.00DHFSH29800 Installation of Kitchen Cabinets 12.00 26-Sep-15 08-Oct-15 24-Nov-15 08-Dec-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 129.00 15-Nov-14 31-May-15 23-Nov-14 23-Apr-15 132.00 0% 0% 0.00DHFSH29240 Corridor/Lift Lobby Floor Screed 4.00 15-Nov-14 18-Nov-14 23-Nov-14 26-Nov-14 50.00 0% 0% 0.00DHFSH29270 Lift Lobby Painting - Primer & Stucco 6.00 19-Nov-14 25-Nov-14 27-Nov-14 04-Dec-14 50.00 0% 0% 0.00DHFSH29310 Lift Lobby False Ceiling Suspension 6.00 25-Dec-14 03-Jan-15 22-Feb-15 01-Mar-15 -16.00 0% 0% 0.00DHFSH29360 Lift Lobby False Ceiling Tiling / Boarding 5.00 19-Jan-15 24-Jan-15 07-Mar-15 12-Mar-15 79.00 0% 0% 0.00DHFSH29410 Lift Lobby Painting - 1st Coat 6.00 25-Jan-15 31-Jan-15 12-Mar-15 19-Mar-15 79.00 0% 0% 0.00DHFSH29440 Installation of Steel Doors & Windows 3.00 28-May-15 31-May-15 11-Apr-15 13-Apr-15 40.00 0% 0% 0.00DHFSH29470 Lift Lobby Flooring 6.00 22-Mar-15 28-Mar-15 11-Apr-15 16-Apr-15 128.00 0% 0% 0.00DHFSH29490 Uti lity Rooms- Epoxy Flooring 6.00 29-Mar-15 04-Apr-15 18-Apr-15 23-Apr-15 132.00 0% 0% 0.00

StaircaseStaircase 134.00 06-Nov-14 08-Jun-15 15-Nov-14 21-Apr-15 70.00 0% 0% 0.00DHFSH29200 Staircase Plastering 4.00 06-Nov-14 10-Nov-14 15-Nov-14 18-Nov-14 155.00 0% 0% 0.00DHFSH29280 Staircase Painting - Primer & Stucco 6.00 26-Nov-14 03-Dec-14 06-Dec-14 11-Dec-14 142.00 0% 0% 0.00DHFSH29320 Staircase Handrail Fixing 3.00 24-Feb-15 28-Feb-15 07-Jan-15 10-Jan-15 140.00 0% 0% 0.00DHFSH29330 Staircase Painting 1st Coat 3.00 28-Feb-15 03-Mar-15 18-Mar-15 22-Mar-15 83.00 0% 0% 0.00DHFSH29340 Staircase Final Painting 5.00 01-Jun-15 06-Jun-15 14-Apr-15 19-Apr-15 67.00 0% 0% 0.00DHFSH29380 Staircase Epoxy Flooring 2.00 07-Jun-15 08-Jun-15 20-Apr-15 21-Apr-15 70.00 0% 0% 0.00

GeneralGeneral 396.00 13-Sep-14 14-Nov-15 14-Sep-14 A 12-Jan-16 -50.00 0% 0% 0.00DHSTR29000 Access from Structure 0.00 13-Sep-14 14-Sep-14 A 100% 100% 0.00DHFSH29510 Snagging & De-Snagging 12.00 01-Nov-15 14-Nov-15 30-Dec-15 12-Jan-16 -50.00 0% 0% 0.00

MEP - LEVEL 29MEP - LEVEL 29 515.00 11-Aug-14 13-Sep-15 12-Aug-14 A 14-Nov-15 -50.00 25.83% 22.23% 0.86DHMEP29000 Embeded Conduits & Boxex - Concrete Works 6.00 11-Aug-14 17-Aug-14 12-Aug-14 A 14-Aug-14 A 100% 100% 0.00DHMEP29100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 15-Sep-14 07-Oct-14 14-Sep-14 A 11-Oct-14 -5.00 77.78% 66% 0.85DHMEP29130 Cable Trays & Cable Trunking 6.00 15-Oct-14 21-Oct-14 14-Sep-14 A 30-Oct-14 61.00 0% 0% 0.00DHMEP29120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 20-Oct-14 27-Oct-14 29-Oct-14 04-Nov-14 50.00 0% 0% 0.00DHMEP29610 Piping Works 21.00 18-Oct-14 11-Nov-14 06-Nov-14 30-Nov-14 36.00 0% 0% 0.00DHMEP29160 Pressure Testing of Pipes 12.00 26-Nov-14 10-Dec-14 16-Dec-14 29-Dec-14 39.00 0% 0% 0.00DHMEP29600 Flushing the Loop upto L 30 45.00 18-Oct-14 10-Dec-14 06-Nov-14 29-Dec-14 37.00 0% 0% 0.00DHMEP29620 Ducting ,Cabling,Wiring& Connections 30.00 12-Nov-14 17-Dec-14 01-Dec-14 06-Jan-15 37.00 0% 0% 0.00DHMEP29110 MEP Works in Risers& Clearance 6.00 08-Dec-14 14-Dec-14 23-Sep-14 A 22-Jan-15 -33.00 0% 11% 0.00DHMEP29140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 12-Jan-15 18-Jan-15 29-Sep-14 A 07-Mar-15 -13.00 0% 11% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Installation of Timber Doors & IronmongeryInstallation of Wardrobe

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Installation of Shower EnclosureInstallation of Vanity Counters & Tops

Installation of Kitchen Cabinets

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from Structure

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Piping WorksPressure Testing of PipesFlushing the Loop upto L 30

Ducting ,Cabling,Wiring& ConnectionsMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 40 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 85: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP29150 MEP Final Fixes 6.00 02-Aug-15 08-Aug-15 01-Oct-15 07-Oct-15 -50.00 0% 0% 0.00DHMEP06410 Sanitary ware /Toilet accessories 6.00 05-Aug-15 11-Aug-15 05-Oct-15 11-Oct-15 -32.00 0% 0% 0.00DHMEP29200 Pre-Testing & Commissioning 7.00 06-Sep-15 13-Sep-15 07-Nov-15 14-Nov-15 -50.00 0% 0% 0.00

LEVELS 30 (MECHANICAL FLOOR)LEVELS 30 (MECHANICAL FLOOR) 565.00 05-Aug-14 21-Nov-15 28-Jul-14 A 19-Jan-16 -50.00 51.15% 41.8% 0.82LEVEL 30 (MECHANICAL FLOOR)LEVEL 30 (MECHANICAL FLOOR) 565.00 05-Aug-14 21-Nov-15 28-Jul-14 A 19-Jan-16 -50.00 51.15% 41.8% 0.82STRUCTURAL WORKS - LEVEL 30STRUCTURAL WORKS - LEVEL 30 45.00 05-Aug-14 26-Aug-14 28-Jul-14 A 28-Aug-14 A 100% 100% 1.00DHCWA31100 Core Wall - L30 6.00 05-Aug-14 11-Aug-14 28-Jul-14 A 13-Aug-14 A 100% 100% 1.00DHCWA31120 Tower Crane Jump 1.00 05-Aug-14 05-Aug-14 20-Aug-14 A 20-Aug-14 A 100% 100% 0.00DHSLA30100 Construction of Horizontals - L30 (Mech Floor) 3.00 20-Aug-14 23-Aug-14 17-Aug-14 A 22-Aug-14 A 100% 100% 1.00DHCWA31110 Construction of Verticals - L30 (Mech Floor) 3.00 24-Aug-14 26-Aug-14 23-Aug-14 A 28-Aug-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 26-Oct-14 29-Oct-14 29-Oct-14 02-Nov-14 49.00 0% 0% 0.00A1780 Stair # 1 4.00 26-Oct-14 29-Oct-14 29-Oct-14 02-Nov-14 12.00 0% 0% 0.00A1790 Stair # 2 4.00 26-Oct-14 29-Oct-14 29-Oct-14 02-Nov-14 49.00 0% 0% 0.00

FINISHES WORKS - LEVEL 30FINISHES WORKS - LEVEL 30 396.00 17-Sep-14 21-Nov-15 01-Oct-14 19-Jan-16 -50.00 0% 0% 0.00Dry areaDry area 353.00 22-Sep-14 10-Oct-15 13-Oct-14 09-Dec-15 -27.00 0% 0% 0.00DHFSH30600 Service Area Civil Works 20.00 22-Sep-14 16-Oct-14 13-Oct-14 05-Nov-14 43.00 40% 0% 0.00DHFSH30100 Block Work in Dry Area 6.00 19-Oct-14 26-Oct-14 02-Nov-14 08-Nov-14 -5.00 0% 0% 0.00DHFSH30120 Marking,Cutting & Chasing - Dry Area 4.00 27-Oct-14 30-Oct-14 09-Nov-14 12-Nov-14 43.00 0% 0% 0.00DHFSH30130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 01-Nov-14 04-Nov-14 13-Nov-14 17-Nov-14 45.00 0% 0% 0.00DHFSH30160 Plaster in Dry Area 8.00 08-Nov-14 16-Nov-14 20-Nov-14 29-Nov-14 43.00 0% 0% 0.00DHMEP30190 Dry Area Floor Screed 7.00 17-Nov-14 24-Nov-14 30-Nov-14 08-Dec-14 43.00 0% 0% 0.00DHFSH30230 Dry Area Painting - Primer 4.00 25-Nov-14 29-Nov-14 09-Dec-14 13-Dec-14 96.00 0% 0% 0.00DHFSH30260 Dry Area Painting - Stucco 6.00 30-Nov-14 07-Dec-14 14-Dec-14 20-Dec-14 96.00 0% 0% 0.00DHFSH30290 Dry Area False Ceiling Suspension 6.00 17-Dec-14 24-Dec-14 14-Feb-15 21-Feb-15 -23.00 0% 0% 0.00DHFSH30610 GRP Lining For the Water Tank 20.00 19-Feb-15 14-Mar-15 19-Apr-15 11-May-15 103.00 0% 0% 0.00DHFSH30350 Dry Area False Ceiling Tiling / Boarding 5.00 24-Feb-15 01-Mar-15 28-May-15 02-Jun-15 -43.00 0% 0% 0.00DHFSH30400 Dry Area Painting - 1st Coat 5.00 02-Mar-15 07-Mar-15 03-Jun-15 08-Jun-15 -43.00 0% 0% 0.00DHFSH30450 Dry Area Polyurethene Abrasion resistant Flooring 5.00 22-Mar-15 26-Mar-15 09-Jun-15 14-Jun-15 -34.00 0% 0% 0.00DHFSH30620 Ladder for Tank 7.00 28-Mar-15 04-Apr-15 15-Jun-15 22-Jun-15 113.00 0% 0% 0.00DHFSH30430 Installation of Timber Doors & Ironmongery 5.00 25-Jul-15 29-Jul-15 21-Sep-15 28-Sep-15 -12.00 0% 0% 0.00DHFSH30500 Paint Final Coat 6.00 04-Oct-15 10-Oct-15 03-Dec-15 09-Dec-15 -50.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 167.00 25-Nov-14 03-Jun-15 09-Dec-14 23-Jun-15 83.00 0% 0% 0.00DHFSH30240 Corridor/Lift Lobby Floor Screed 4.00 25-Nov-14 29-Nov-14 09-Dec-14 13-Dec-14 43.00 0% 0% 0.00DHFSH30270 Lift Lobby Painting - Primer & Stucco 6.00 30-Nov-14 07-Dec-14 14-Dec-14 20-Dec-14 43.00 0% 0% 0.00DHFSH30310 Lift Lobby False Ceiling Suspension 6.00 03-Jan-15 10-Jan-15 01-Mar-15 08-Mar-15 -16.00 0% 0% 0.00DHFSH30360 Lift Lobby False Ceiling Tiling / Boarding 5.00 24-Feb-15 01-Mar-15 28-May-15 02-Jun-15 15.00 0% 0% 0.00DHFSH30410 Lift Lobby Painting - 1st Coat 6.00 02-Mar-15 08-Mar-15 03-Jun-15 09-Jun-15 15.00 0% 0% 0.00DHFSH30440 Installation of Steel Doors & Windows 3.00 01-Jun-15 03-Jun-15 09-Jun-15 11-Jun-15 -7.00 0% 0% 0.00DHFSH30470 Lift Lobby Flooring 6.00 29-Mar-15 04-Apr-15 10-Jun-15 16-Jun-15 83.00 0% 0% 0.00DHFSH30490 Uti lity Rooms- Epoxy Flooring 6.00 05-Apr-15 11-Apr-15 17-Jun-15 23-Jun-15 83.00 0% 0% 0.00

StaircaseStaircase 171.00 17-Nov-14 14-Jun-15 30-Nov-14 20-Jun-15 22.00 0% 0% 0.00DHFSH30200 Staircase Plastering 4.00 17-Nov-14 20-Nov-14 30-Nov-14 04-Dec-14 145.00 0% 0% 0.00DHFSH30280 Staircase Painting - Primer & Stucco 6.00 08-Dec-14 14-Dec-14 21-Dec-14 27-Dec-14 132.00 0% 0% 0.00DHFSH30320 Staircase Handrail Fixing 3.00 28-Feb-15 03-Mar-15 11-Jan-15 13-Jan-15 140.00 0% 0% 0.00DHFSH30330 Staircase Painting 1st Coat 3.00 03-Mar-15 07-Mar-15 22-Mar-15 25-Mar-15 83.00 0% 0% 0.00DHFSH30340 Staircase Final Painting 5.00 07-Jun-15 11-Jun-15 13-Jun-15 17-Jun-15 22.00 0% 0% 0.00DHFSH30380 Staircase Epoxy Flooring 2.00 13-Jun-15 14-Jun-15 18-Jun-15 20-Jun-15 22.00 0% 0% 0.00

GeneralGeneral 396.00 17-Sep-14 21-Nov-15 01-Oct-14 19-Jan-16 -50.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

MEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L30Tower Crane JumpConstruction of Horizontals - L30 (Mech Floor)Construction of Verticals - L30 (Mech Floor)

Stair # 1Stair # 2

Service Area Civil WorksBlock Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

GRP Lining For the Water TankDry Area False Ceiling Tiling / Boarding

Dry Area Painting - 1st CoatDry Area Polyurethene Abrasion resistant Flooring

Ladder for TankInstallation of Timber Doors & Ironmongery

Paint Final Coat

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & WindowsLift Lobby Flooring

Uti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 41 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 86: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHSTR30000 Access from Structure 0.00 17-Sep-14 01-Oct-14 -5.00 100% 0% 0.00DHFSH30510 Snagging & De-Snagging 12.00 08-Nov-15 21-Nov-15 06-Jan-16 19-Jan-16 -50.00 0% 0% 0.00

MEP - LEVEL 30MEP - LEVEL 30 515.00 18-Aug-14 20-Sep-15 17-Aug-14 A 21-Nov-15 -41.00 20.3% 0% 0.00DHMEP30000 Embeded Conduits & Boxex - Concrete Works 6.00 18-Aug-14 24-Aug-14 17-Aug-14 A 22-Aug-14 A 100% 100% 0.00DHMEP30100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 18-Sep-14 11-Oct-14 01-Oct-14 23-Oct-14 -5.00 61.11% 0% 0.00DHMEP30130 Cable Trays & Cable Trunking 6.00 27-Oct-14 02-Nov-14 09-Nov-14 15-Nov-14 52.00 0% 0% 0.00DHMEP30120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 01-Nov-14 06-Nov-14 13-Nov-14 19-Nov-14 43.00 0% 0% 0.00DHMEP30610 Install FAHU's 20.00 21-Dec-14 13-Jan-15 22-Dec-14 14-Jan-15 5.00 0% 0% 0.00DHMEP30110 MEP Works in Risers& Clearance 6.00 15-Dec-14 21-Dec-14 24-Jan-15 29-Jan-15 -33.00 0% 0% 0.00DHMEP30630 Flushing 1st Loop - Upto L30 25.00 14-Jan-15 11-Feb-15 15-Jan-15 12-Feb-15 5.00 0% 0% 0.00DHMEP30620 Ducting ,Cabling,Wiring& Connections 30.00 14-Jan-15 17-Feb-15 15-Jan-15 18-Feb-15 40.00 0% 0% 0.00DHMEP30160 Pressure Testing of Pipes 12.00 05-Feb-15 18-Feb-15 05-Apr-15 18-Apr-15 -14.00 0% 0% 0.00DHMEP30600 Installation of Water Tanks ,Pumps,,Extract Fans,Pressurization Fans45.00 28-Dec-14 18-Feb-15 25-Feb-15 18-Apr-15 -50.00 0% 0% 0.00DHMEP30140 Chiller Installation & Wiring,Cable Pulling,Plenum Boxes &fire Sprinklers30.00 20-Jan-15 23-Feb-15 22-Apr-15 27-May-15 -43.00 0% 0% 0.00DHMEP30150 MEP Final Fixes 6.00 05-Aug-15 11-Aug-15 05-Oct-15 11-Oct-15 -17.00 0% 0% 0.00DHMEP06420 Sanitary ware /Toilet accessories 6.00 09-Aug-15 15-Aug-15 08-Oct-15 15-Oct-15 -17.00 0% 0% 0.00DHMEP30200 Pre-Testing & Commissioning 7.00 13-Sep-15 20-Sep-15 14-Nov-15 21-Nov-15 -41.00 0% 0% 0.00

LEVELS 31 - 61LEVELS 31 - 61 599.00 12-Aug-14 26-Jan-16 14-Aug-14 A 07-Mar-16 -32.00 8.37% 7.52% 0.90LEVEL 31LEVEL 31 534.00 12-Aug-14 07-Sep-15 14-Aug-14 A 22-Dec-15 -45.00 42.62% 38.85% 0.91STRUCTURAL WORKS - LEVEL 31STRUCTURAL WORKS - LEVEL 31 19.00 12-Aug-14 02-Sep-14 14-Aug-14 A 02-Sep-14 A 100% 100% 1.00DHCWA32100 Core Wall - L31 6.00 12-Aug-14 18-Aug-14 14-Aug-14 A 17-Aug-14 A 100% 100% 1.00DHSLA31100 Construction of Horizontals - L31 4.00 27-Aug-14 31-Aug-14 29-Aug-14 A 31-Aug-14 A 100% 100% 1.00DHCWA32110 Construction of Verticals - L31 2.00 01-Sep-14 02-Sep-14 31-Aug-14 A 02-Sep-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 30-Oct-14 03-Nov-14 04-Nov-14 08-Nov-14 47.00 0% 0% 0.00A1800 Stair # 1 4.00 30-Oct-14 03-Nov-14 04-Nov-14 08-Nov-14 11.00 0% 0% 0.00A1810 Stair # 2 3.00 01-Nov-14 03-Nov-14 05-Nov-14 08-Nov-14 47.00 0% 0% 0.00

FINISHES WORKS - LEVEL 31FINISHES WORKS - LEVEL 31 299.00 22-Sep-14 07-Sep-15 21-Sep-14 A 27-Sep-15 28.00 0% 0% 0.00Dry areaDry area 263.00 19-Oct-14 24-Aug-15 02-Nov-14 10-Sep-15 28.00 0% 0% 0.00DHFSH31100 Block Work in Dry Area 6.00 19-Oct-14 26-Oct-14 02-Nov-14 08-Nov-14 -5.00 0% 0% 0.00DHFSH31120 Marking,Cutting & Chasing - Dry Area 4.00 27-Oct-14 30-Oct-14 09-Nov-14 12-Nov-14 46.00 0% 0% 0.00DHFSH31130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 01-Nov-14 04-Nov-14 13-Nov-14 17-Nov-14 48.00 0% 0% 0.00DHFSH31160 Plaster in Dry Area 8.00 08-Nov-14 16-Nov-14 20-Nov-14 29-Nov-14 46.00 0% 0% 0.00DHMEP31190 Dry Area Floor Screed 7.00 17-Nov-14 24-Nov-14 30-Nov-14 08-Dec-14 46.00 0% 0% 0.00DHFSH31230 Dry Area Painting - Primer 4.00 25-Nov-14 29-Nov-14 09-Dec-14 13-Dec-14 104.00 0% 0% 0.00DHFSH31260 Dry Area Painting - Stucco 6.00 30-Nov-14 07-Dec-14 14-Dec-14 20-Dec-14 104.00 0% 0% 0.00DHFSH31290 Dry Area False Ceiling Suspension 6.00 22-Dec-14 29-Dec-14 18-Feb-15 25-Feb-15 -23.00 0% 0% 0.00DHFSH31350 Dry Area False Ceiling Tiling / Boarding 5.00 05-Mar-15 10-Mar-15 07-Jun-15 11-Jun-15 -43.00 0% 0% 0.00DHFSH31400 Dry Area Painting - 1st Coat 5.00 11-Mar-15 16-Mar-15 13-Jun-15 17-Jun-15 -43.00 0% 0% 0.00DHFSH31450 Dry Area Flooring 5.00 26-Mar-15 31-Mar-15 18-Jun-15 23-Jun-15 -38.00 0% 0% 0.00DHFSH31430 Installation of Timber Doors & Ironmongery 5.00 21-Jul-15 26-Jul-15 06-Aug-15 12-Aug-15 -14.00 0% 0% 0.00DHFSH31802 Installation of Wardrobe 12.00 22-Jul-15 04-Aug-15 08-Aug-15 22-Aug-15 -14.00 0% 0% 0.00DHFSH31500 Paint Final Coat 6.00 18-Aug-15 24-Aug-15 03-Sep-15 10-Sep-15 28.00 0% 0% 0.00

Wet areaWet area 245.00 19-Oct-14 03-Aug-15 02-Nov-14 20-Aug-15 -5.00 0% 0% 0.00DHFSH31110 Block Work in Wet Area 6.00 19-Oct-14 26-Oct-14 02-Nov-14 08-Nov-14 46.00 0% 0% 0.00DHFSH31140 Marking,Cutting & Chasing - Wet Area 4.00 27-Oct-14 30-Oct-14 09-Nov-14 12-Nov-14 46.00 0% 0% 0.00DHFSH31150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 01-Nov-14 04-Nov-14 13-Nov-14 17-Nov-14 51.00 0% 0% 0.00DHMEP31170 Plaster in Wet Area 4.00 08-Nov-14 11-Nov-14 20-Nov-14 24-Nov-14 49.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Access from Structure

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Instal l FAHU'sMEP Works in Risers& Clearance

Flushing 1st Loop - Upto L30Ducting ,Cabling,Wiring& Connections

Pressure Testing of PipesInstallation of Water Tanks ,Pumps,,Extract Fans,Pressurization Fans

Chiller Installation & Wiring,Cable Pulling,Plenum Boxes &fire SprinklersMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L31Construction of Horizontals - L31Construction of Verticals - L31

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st CoatDry Area Flooring

Installation of Timber Doors & IronmongeryInstallation of Wardrobe

Paint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet Area

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 42 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 87: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP31180 Wet Area Wall Tiling 6.00 17-Dec-14 24-Dec-14 22-Jan-15 28-Jan-15 1.00 0% 0% 0.00DHFSH31300 Wet Area False Ceiling Suspension 5.00 29-Dec-14 05-Jan-15 25-Feb-15 03-Mar-15 -15.00 0% 0% 0.00DHFSH31370 Wet Area False Ceiling Tiling/Boarding 4.00 28-Feb-15 03-Mar-15 15-Mar-15 19-Mar-15 2.00 0% 0% 0.00DHFSH31210 Wet Area Waterproofing 4.00 04-Mar-15 08-Mar-15 19-Mar-15 24-Mar-15 2.00 0% 0% 0.00DHFSH31220 Wet Area Floor Screed 4.00 09-Mar-15 12-Mar-15 24-Mar-15 29-Mar-15 2.00 0% 0% 0.00DHFSH31250 Wet Area Floor Tiling 5.00 14-Mar-15 18-Mar-15 29-Mar-15 04-Apr-15 2.00 0% 0% 0.00DHFSH06730 Cabinet Carcass 4.00 19-Mar-15 23-Mar-15 07-Apr-15 11-Apr-15 -1.00 0% 0% 0.00DHFSH31420 Installation of Shower Enclosure 4.00 26-Jul-15 29-Jul-15 11-Aug-15 16-Aug-15 -4.00 0% 0% 0.00DHFSH31390 Installation of Vanity Counters & Tops 5.00 27-Jul-15 01-Aug-15 12-Aug-15 18-Aug-15 -3.00 0% 0% 0.00DHFSH31800 Installation of Kitchen Cabinet 12.00 21-Jul-15 03-Aug-15 06-Aug-15 20-Aug-15 -14.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 179.00 25-Nov-14 07-Jun-15 09-Dec-14 07-Jul-15 75.00 0% 0% 0.00DHFSH31240 Corridor/Lift Lobby Floor Screed 4.00 25-Nov-14 29-Nov-14 09-Dec-14 13-Dec-14 46.00 0% 0% 0.00DHFSH31270 Lift Lobby Painting - Primer & Stucco 6.00 30-Nov-14 07-Dec-14 14-Dec-14 20-Dec-14 46.00 0% 0% 0.00DHFSH31310 Lift Lobby False Ceiling Suspension 6.00 06-Jan-15 13-Jan-15 04-Mar-15 11-Mar-15 -16.00 0% 0% 0.00DHFSH31360 Lift Lobby False Ceiling Tiling / Boarding 5.00 28-Feb-15 04-Mar-15 15-Mar-15 21-Mar-15 81.00 0% 0% 0.00DHFSH31410 Lift Lobby Painting - 1st Coat 6.00 05-Mar-15 11-Mar-15 07-Jun-15 13-Jun-15 15.00 0% 0% 0.00DHFSH31440 Installation of Steel Doors & Windows 3.00 04-Jun-15 07-Jun-15 18-Jun-15 21-Jun-15 -12.00 0% 0% 0.00DHFSH31470 Lift Lobby Flooring 6.00 01-Apr-15 07-Apr-15 24-Jun-15 30-Jun-15 75.00 0% 0% 0.00DHFSH31490 Uti lity Rooms- Epoxy Flooring 6.00 08-Apr-15 14-Apr-15 01-Jul-15 07-Jul-15 75.00 0% 0% 0.00

StaircaseStaircase 179.00 17-Nov-14 16-Jun-15 30-Nov-14 29-Jun-15 16.00 0% 0% 0.00DHFSH31200 Staircase Plastering 4.00 17-Nov-14 20-Nov-14 30-Nov-14 04-Dec-14 148.00 0% 0% 0.00DHFSH31280 Staircase Painting - Primer & Stucco 6.00 08-Dec-14 14-Dec-14 21-Dec-14 27-Dec-14 135.00 0% 0% 0.00DHFSH31320 Staircase Handrail Fixing 3.00 03-Mar-15 07-Mar-15 14-Jan-15 17-Jan-15 140.00 0% 0% 0.00DHFSH31330 Staircase Painting 1st Coat 3.00 17-Mar-15 19-Mar-15 18-Jun-15 21-Jun-15 11.00 0% 0% 0.00DHFSH31340 Staircase Final Painting 5.00 08-Jun-15 13-Jun-15 22-Jun-15 27-Jun-15 16.00 0% 0% 0.00DHFSH31380 Staircase Epoxy Flooring 2.00 15-Jun-15 16-Jun-15 28-Jun-15 29-Jun-15 16.00 0% 0% 0.00

GeneralGeneral 299.00 22-Sep-14 07-Sep-15 21-Sep-14 A 27-Sep-15 28.00 0% 0% 0.00DHSTR31000 Access from Structure 0.00 22-Sep-14 21-Sep-14 A 100% 100% 0.00DHFSH31510 Snagging & De-Snagging 12.00 25-Aug-15 07-Sep-15 10-Sep-15 27-Sep-15 28.00 0% 0% 0.00

MEP - LEVEL 31MEP - LEVEL 31 534.00 28-Aug-14 17-Aug-15 29-Aug-14 A 22-Dec-15 -63.00 15.54% 6.3% 0.41DHMEP31000 Embeded Conduits & Boxex - Concrete Works 3.00 28-Aug-14 31-Aug-14 29-Aug-14 A 31-Aug-14 A 100% 100% 0.00DHMEP31100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 22-Sep-14 14-Oct-14 22-Sep-14 A 20-Oct-14 -5.00 44.44% 18% 0.41DHMEP31130 Cable Trays & Cable Trunking 6.00 27-Oct-14 02-Nov-14 09-Nov-14 15-Nov-14 56.00 0% 0% 0.00DHMEP31120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 01-Nov-14 06-Nov-14 13-Nov-14 19-Nov-14 46.00 0% 0% 0.00DHMEP31160 Pressure Testing of Pipes 12.00 08-Nov-14 20-Nov-14 20-Nov-14 04-Dec-14 73.00 0% 0% 0.00DHMEP31110 MEP Works in Risers& Clearance 5.00 22-Dec-14 27-Dec-14 28-Sep-14 A 04-Feb-15 -33.00 0% 11% 0.00DHMEP31140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 21-Feb-15 26-Feb-15 08-Mar-15 15-Mar-15 -7.00 0% 0% 0.00DHMEP31150 MEP Final Fixes 6.00 30-Jul-15 05-Aug-15 16-Aug-15 23-Aug-15 25.00 0% 0% 0.00DHMEP06430 Sanitary ware /Toilet accessories 6.00 03-Aug-15 09-Aug-15 19-Aug-15 26-Aug-15 28.00 0% 0% 0.00DHMEP31200 Pre-Testing & Commissioning 7.00 10-Aug-15 17-Aug-15 26-Aug-15 03-Sep-15 28.00 0% 0% 0.00DHMEP31010 Busbar - L31to L35 12.00 14-Jun-15 27-Jun-15 09-Dec-15 22-Dec-15 -144.00 0% 0% 0.00

LEVEL 32LEVEL 32 495.00 19-Aug-14 13-Sep-15 19-Aug-14 A 09-Nov-15 -6.00 38.69% 36.32% 0.94STRUCTURAL WORKS - LEVEL 32STRUCTURAL WORKS - LEVEL 32 18.00 19-Aug-14 08-Sep-14 19-Aug-14 A 09-Sep-14 A 100% 100% 1.00DHCWA33100 Core Wall - L32 4.00 19-Aug-14 23-Aug-14 19-Aug-14 A 24-Aug-14 A 100% 100% 1.00DHSLA32100 Construction of Horizontals - L32 4.00 02-Sep-14 06-Sep-14 02-Sep-14 A 07-Sep-14 A 100% 100% 1.00DHCWA33110 Construction of Verticals - L32 2.00 07-Sep-14 08-Sep-14 08-Sep-14 A 09-Sep-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 05-Nov-14 09-Nov-14 10-Nov-14 13-Nov-14 45.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Wet Area Wall TilingWet Area False Ceiling Suspension

Wet Area False Ceiling Ti ling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Shower EnclosureInstal lation of Vanity Counters & TopsInstal lation of Kitchen Cabinet

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtili ty Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L32Construction of Horizontals - L32Construction of Verticals - L32

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 43 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 88: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

A1820 Stair # 1 4.00 05-Nov-14 09-Nov-14 10-Nov-14 13-Nov-14 10.00 0% 0% 0.00A1830 Stair # 2 3.00 06-Nov-14 09-Nov-14 11-Nov-14 13-Nov-14 45.00 0% 0% 0.00

FINISHES WORKS - LEVEL 32FINISHES WORKS - LEVEL 32 336.00 28-Sep-14 13-Sep-15 01-Oct-14 09-Nov-15 -6.00 0% 0% 0.00Dry areaDry area 296.00 23-Oct-14 30-Aug-15 06-Nov-14 26-Oct-15 -6.00 0% 0% 0.00DHFSH32100 Block Work in Dry Area 6.00 23-Oct-14 30-Oct-14 06-Nov-14 12-Nov-14 -5.00 0% 0% 0.00DHFSH32120 Marking,Cutting & Chasing - Dry Area 4.00 01-Nov-14 04-Nov-14 13-Nov-14 17-Nov-14 45.00 0% 0% 0.00DHFSH32130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 05-Nov-14 09-Nov-14 18-Nov-14 22-Nov-14 47.00 0% 0% 0.00DHFSH32160 Plaster in Dry Area 8.00 12-Nov-14 20-Nov-14 25-Nov-14 04-Dec-14 45.00 0% 0% 0.00DHMEP32190 Dry Area Floor Screed 7.00 22-Nov-14 29-Nov-14 06-Dec-14 13-Dec-14 45.00 0% 0% 0.00DHFSH32230 Dry Area Painting - Primer 4.00 30-Nov-14 04-Dec-14 14-Dec-14 17-Dec-14 105.00 0% 0% 0.00DHFSH32260 Dry Area Painting - Stucco 6.00 06-Dec-14 11-Dec-14 18-Dec-14 24-Dec-14 105.00 0% 0% 0.00DHFSH32290 Dry Area False Ceiling Suspension 6.00 27-Dec-14 04-Jan-15 23-Feb-15 02-Mar-15 -23.00 0% 0% 0.00DHFSH32350 Dry Area False Ceiling Tiling / Boarding 5.00 03-Mar-15 08-Mar-15 18-Mar-15 24-Mar-15 30.00 0% 0% 0.00DHFSH32400 Dry Area Painting - 1st Coat 5.00 17-Mar-15 22-Mar-15 18-Jun-15 23-Jun-15 -43.00 0% 0% 0.00DHFSH32450 Dry Area Flooring 5.00 31-Mar-15 05-Apr-15 24-Jun-15 29-Jun-15 -39.00 0% 0% 0.00DHFSH32430 Installation of Timber Doors & Ironmongery 5.00 27-Jul-15 01-Aug-15 12-Aug-15 18-Aug-15 -14.00 0% 0% 0.00DHFSH32802 Installation of Wardrobe 12.00 27-Jul-15 09-Aug-15 12-Aug-15 26-Aug-15 -14.00 0% 0% 0.00DHFSH32500 Paint Final Coat 6.00 24-Aug-15 30-Aug-15 20-Oct-15 26-Oct-15 -6.00 0% 0% 0.00

Wet areaWet area 274.00 23-Oct-14 06-Aug-15 06-Nov-14 29-Sep-15 -35.00 0% 0% 0.00DHFSH32110 Block Work in Wet Area 6.00 23-Oct-14 30-Oct-14 06-Nov-14 12-Nov-14 45.00 0% 0% 0.00DHFSH32140 Marking,Cutting & Chasing - Wet Area 4.00 01-Nov-14 04-Nov-14 13-Nov-14 17-Nov-14 45.00 0% 0% 0.00DHFSH32150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 05-Nov-14 09-Nov-14 18-Nov-14 22-Nov-14 51.00 0% 0% 0.00DHMEP32170 Plaster in Wet Area 4.00 12-Nov-14 16-Nov-14 25-Nov-14 29-Nov-14 49.00 0% 0% 0.00DHMEP32180 Wet Area Wall Tiling 6.00 22-Dec-14 29-Dec-14 27-Jan-15 02-Feb-15 1.00 0% 0% 0.00DHFSH32300 Wet Area False Ceiling Suspension 5.00 04-Jan-15 10-Jan-15 02-Mar-15 08-Mar-15 -16.00 0% 0% 0.00DHFSH32370 Wet Area False Ceiling Tiling/Boarding 4.00 03-Mar-15 07-Mar-15 18-Mar-15 23-Mar-15 3.00 0% 0% 0.00DHFSH32210 Wet Area Waterproofing 4.00 08-Mar-15 11-Mar-15 23-Mar-15 28-Mar-15 3.00 0% 0% 0.00DHFSH32220 Wet Area Floor Screed 4.00 12-Mar-15 16-Mar-15 28-Mar-15 01-Apr-15 3.00 0% 0% 0.00DHFSH32250 Wet Area Floor Tiling 5.00 17-Mar-15 22-Mar-15 01-Apr-15 07-Apr-15 3.00 0% 0% 0.00DHFSH06740 Cabinet Carcass 4.00 24-Mar-15 28-Mar-15 12-Apr-15 15-Apr-15 -1.00 0% 0% 0.00DHFSH32390 Installation of Vanity Counters & Tops 5.00 02-Aug-15 06-Aug-15 18-Aug-15 24-Aug-15 -5.00 0% 0% 0.00DHFSH32800 Installation of Kitchen Cabinet 12.00 25-Jul-15 06-Aug-15 10-Aug-15 24-Aug-15 -14.00 0% 0% 0.00DHFSH32420 Installation of Shower Enclosure 4.00 01-Aug-15 04-Aug-15 26-Sep-15 29-Sep-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 180.00 30-Nov-14 10-Jun-15 14-Dec-14 13-Jul-15 72.00 0% 0% 0.00DHFSH32240 Corridor/Lift Lobby Floor Screed 4.00 30-Nov-14 04-Dec-14 14-Dec-14 17-Dec-14 45.00 0% 0% 0.00DHFSH32270 Lift Lobby Painting - Primer & Stucco 6.00 06-Dec-14 11-Dec-14 18-Dec-14 24-Dec-14 45.00 0% 0% 0.00DHFSH32310 Lift Lobby False Ceiling Suspension 6.00 10-Jan-15 17-Jan-15 08-Mar-15 15-Mar-15 -16.00 0% 0% 0.00DHFSH32360 Lift Lobby False Ceiling Tiling / Boarding 5.00 03-Mar-15 08-Mar-15 18-Mar-15 24-Mar-15 81.00 0% 0% 0.00DHFSH32410 Lift Lobby Painting - 1st Coat 6.00 09-Mar-15 15-Mar-15 10-Jun-15 16-Jun-15 15.00 0% 0% 0.00DHFSH32440 Installation of Steel Doors & Windows 3.00 08-Jun-15 10-Jun-15 24-Jun-15 27-Jun-15 -14.00 0% 0% 0.00DHFSH32470 Lift Lobby Flooring 6.00 06-Apr-15 12-Apr-15 30-Jun-15 06-Jul-15 72.00 0% 0% 0.00DHFSH32490 Uti lity Rooms- Epoxy Flooring 6.00 13-Apr-15 19-Apr-15 07-Jul-15 13-Jul-15 72.00 0% 0% 0.00

StaircaseStaircase 180.00 22-Nov-14 18-Jun-15 06-Dec-14 05-Jul-15 16.00 0% 0% 0.00DHFSH32200 Staircase Plastering 4.00 22-Nov-14 25-Nov-14 06-Dec-14 09-Dec-14 147.00 0% 0% 0.00DHFSH32280 Staircase Painting - Primer & Stucco 6.00 13-Dec-14 18-Dec-14 25-Dec-14 31-Dec-14 134.00 0% 0% 0.00DHFSH32320 Staircase Handrail Fixing 3.00 07-Mar-15 10-Mar-15 18-Jan-15 20-Jan-15 140.00 0% 0% 0.00DHFSH32330 Staircase Painting 1st Coat 3.00 23-Mar-15 25-Mar-15 24-Jun-15 27-Jun-15 9.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Vanity Counters & TopsInstallation of Kitchen Cabinet

Installation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 44 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 89: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH32340 Staircase Final Painting 5.00 11-Jun-15 16-Jun-15 28-Jun-15 02-Jul-15 16.00 0% 0% 0.00DHFSH32380 Staircase Epoxy Flooring 2.00 17-Jun-15 18-Jun-15 04-Jul-15 05-Jul-15 16.00 0% 0% 0.00

GeneralGeneral 336.00 28-Sep-14 13-Sep-15 01-Oct-14 09-Nov-15 -6.00 0% 0% 0.00DHSTR32000 Access from Structure 0.00 28-Sep-14 01-Oct-14 -3.00 100% 0% 0.00DHFSH32510 Snagging & De-Snagging 12.00 31-Aug-15 13-Sep-15 27-Oct-15 09-Nov-15 -6.00 0% 0% 0.00

MEP - LEVEL 32MEP - LEVEL 32 477.00 03-Sep-14 23-Aug-15 02-Sep-14 A 19-Oct-15 -6.00 5.83% 0% 0.00DHMEP32000 Embeded Conduits & Boxex - Concrete Works 3.00 03-Sep-14 06-Sep-14 02-Sep-14 A 07-Sep-14 A 100% 100% 0.00DHMEP32100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 28-Sep-14 20-Oct-14 06-Oct-14 27-Oct-14 -5.00 16.67% 0% 0.00DHMEP32130 Cable Trays & Cable Trunking 6.00 01-Nov-14 06-Nov-14 13-Nov-14 19-Nov-14 56.00 0% 0% 0.00DHMEP32120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 05-Nov-14 11-Nov-14 18-Nov-14 24-Nov-14 45.00 0% 0% 0.00DHMEP32160 Pressure Testing of Pipes 12.00 12-Nov-14 25-Nov-14 25-Nov-14 09-Dec-14 72.00 0% 0% 0.00DHMEP32110 MEP Works in Risers& Clearance 5.00 28-Dec-14 03-Jan-15 05-Feb-15 10-Feb-15 -33.00 0% 0% 0.00DHMEP32140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 24-Feb-15 02-Mar-15 11-Mar-15 18-Mar-15 -7.00 0% 0% 0.00DHMEP32150 MEP Final Fixes 6.00 05-Aug-15 11-Aug-15 30-Sep-15 06-Oct-15 -9.00 0% 0% 0.00DHMEP06440 Sanitary ware /Toilet accessories 6.00 09-Aug-15 15-Aug-15 04-Oct-15 10-Oct-15 -6.00 0% 0% 0.00DHMEP32200 Pre-Testing & Commissioning 7.00 16-Aug-15 23-Aug-15 11-Oct-15 19-Oct-15 -6.00 0% 0% 0.00

LEVEL 33LEVEL 33 495.00 24-Aug-14 19-Sep-15 24-Aug-14 A 12-Nov-15 -6.00 36.35% 36.35% 1.00STRUCTURAL WORKS - LEVEL 33STRUCTURAL WORKS - LEVEL 33 19.00 24-Aug-14 14-Sep-14 24-Aug-14 A 14-Sep-14 A 100% 100% 1.00DHCWA34100 Core Wall - L33 5.00 24-Aug-14 28-Aug-14 24-Aug-14 A 28-Aug-14 A 100% 100% 1.00DHSLA33100 Construction of Horizontals - L33 4.00 08-Sep-14 11-Sep-14 10-Sep-14 A 12-Sep-14 A 100% 100% 1.00DHCWA34110 Construction of Verticals - L33 2.00 13-Sep-14 14-Sep-14 13-Sep-14 A 14-Sep-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 10-Nov-14 13-Nov-14 15-Nov-14 18-Nov-14 44.00 0% 0% 0.00A1840 Stair # 1 4.00 10-Nov-14 13-Nov-14 15-Nov-14 18-Nov-14 10.00 0% 0% 0.00A1850 Stair # 2 3.00 11-Nov-14 13-Nov-14 16-Nov-14 18-Nov-14 44.00 0% 0% 0.00

FINISHES WORKS - LEVEL 33FINISHES WORKS - LEVEL 33 334.00 06-Oct-14 19-Sep-15 09-Oct-14 12-Nov-15 -6.00 0% 0% 0.00Dry areaDry area 295.00 29-Oct-14 05-Sep-15 11-Nov-14 29-Oct-15 -6.00 0% 0% 0.00DHFSH33100 Block Work in Dry Area 6.00 29-Oct-14 04-Nov-14 11-Nov-14 17-Nov-14 -5.00 0% 0% 0.00DHFSH33120 Marking,Cutting & Chasing - Dry Area 4.00 05-Nov-14 09-Nov-14 18-Nov-14 22-Nov-14 44.00 0% 0% 0.00DHFSH33130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 10-Nov-14 13-Nov-14 23-Nov-14 26-Nov-14 46.00 0% 0% 0.00DHFSH33160 Plaster in Dry Area 8.00 17-Nov-14 25-Nov-14 30-Nov-14 09-Dec-14 44.00 0% 0% 0.00DHMEP33190 Dry Area Floor Screed 7.00 26-Nov-14 04-Dec-14 10-Dec-14 17-Dec-14 44.00 0% 0% 0.00DHFSH33230 Dry Area Painting - Primer 4.00 06-Dec-14 09-Dec-14 18-Dec-14 22-Dec-14 109.00 0% 0% 0.00DHFSH33260 Dry Area Painting - Stucco 6.00 10-Dec-14 16-Dec-14 23-Dec-14 29-Dec-14 109.00 0% 0% 0.00DHFSH33290 Dry Area False Ceiling Suspension 6.00 31-Dec-14 08-Jan-15 28-Feb-15 07-Mar-15 -23.00 0% 0% 0.00DHFSH33350 Dry Area False Ceiling Tiling / Boarding 5.00 21-Mar-15 25-Mar-15 22-Jun-15 27-Jun-15 -43.00 0% 0% 0.00DHFSH33400 Dry Area Painting - 1st Coat 5.00 26-Mar-15 31-Mar-15 28-Jun-15 02-Jul-15 -43.00 0% 0% 0.00DHFSH33450 Dry Area Flooring 5.00 05-Apr-15 09-Apr-15 04-Jul-15 08-Jul-15 -43.00 0% 0% 0.00DHFSH33430 Installation of Timber Doors & Ironmongery 5.00 02-Aug-15 06-Aug-15 18-Aug-15 24-Aug-15 -14.00 0% 0% 0.00DHFSH33802 Installation of Wardrobe 12.00 01-Aug-15 13-Aug-15 17-Aug-15 31-Aug-15 -14.00 0% 0% 0.00DHFSH33500 Paint Final Coat 6.00 30-Aug-15 05-Sep-15 24-Oct-15 29-Oct-15 -6.00 0% 0% 0.00

Wet areaWet area 273.00 29-Oct-14 12-Aug-15 11-Nov-14 03-Oct-15 -35.00 0% 0% 0.00DHFSH33110 Block Work in Wet Area 6.00 29-Oct-14 04-Nov-14 11-Nov-14 17-Nov-14 44.00 0% 0% 0.00DHFSH33140 Marking,Cutting & Chasing - Wet Area 4.00 05-Nov-14 09-Nov-14 18-Nov-14 22-Nov-14 44.00 0% 0% 0.00DHFSH33150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 10-Nov-14 13-Nov-14 23-Nov-14 26-Nov-14 51.00 0% 0% 0.00DHMEP33170 Plaster in Wet Area 4.00 17-Nov-14 20-Nov-14 30-Nov-14 04-Dec-14 49.00 0% 0% 0.00DHMEP33180 Wet Area Wall Tiling 6.00 27-Dec-14 04-Jan-15 01-Feb-15 07-Feb-15 1.00 0% 0% 0.00DHFSH33300 Wet Area False Ceiling Suspension 5.00 08-Jan-15 14-Jan-15 07-Mar-15 12-Mar-15 -17.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L33Construction of Horizontals - L33Construction of Verticals - L33

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Til ing / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Ti ling

Wet Area False Ceiling Suspension

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 45 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 90: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH33370 Wet Area False Ceiling Tiling/Boarding 4.00 07-Mar-15 10-Mar-15 23-Mar-15 28-Mar-15 3.00 0% 0% 0.00DHFSH33210 Wet Area Waterproofing 4.00 11-Mar-15 15-Mar-15 28-Mar-15 01-Apr-15 3.00 0% 0% 0.00DHFSH33220 Wet Area Floor Screed 4.00 16-Mar-15 19-Mar-15 01-Apr-15 06-Apr-15 3.00 0% 0% 0.00DHFSH33250 Wet Area Floor Tiling 5.00 21-Mar-15 25-Mar-15 06-Apr-15 12-Apr-15 3.00 0% 0% 0.00DHFSH06750 Cabinet Carcass 4.00 29-Mar-15 01-Apr-15 16-Apr-15 20-Apr-15 -1.00 0% 0% 0.00DHFSH33800 Installation of Kitchen Cabinet 12.00 28-Jul-15 10-Aug-15 13-Aug-15 27-Aug-15 -14.00 0% 0% 0.00DHFSH33390 Installation of Vanity Counters & Tops 5.00 08-Aug-15 12-Aug-15 24-Aug-15 30-Aug-15 -7.00 0% 0% 0.00DHFSH33420 Installation of Shower Enclosure 4.00 06-Aug-15 10-Aug-15 29-Sep-15 03-Oct-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 184.00 06-Dec-14 14-Jun-15 18-Dec-14 25-Jul-15 66.00 0% 0% 0.00DHFSH33240 Corridor/Lift Lobby Floor Screed 4.00 06-Dec-14 09-Dec-14 18-Dec-14 22-Dec-14 44.00 0% 0% 0.00DHFSH33270 Lift Lobby Painting - Primer & Stucco 6.00 10-Dec-14 16-Dec-14 23-Dec-14 29-Dec-14 44.00 0% 0% 0.00DHFSH33310 Lift Lobby False Ceiling Suspension 6.00 14-Jan-15 21-Jan-15 12-Mar-15 19-Mar-15 -17.00 0% 0% 0.00DHFSH33360 Lift Lobby False Ceiling Tiling / Boarding 5.00 07-Mar-15 11-Mar-15 23-Mar-15 29-Mar-15 80.00 0% 0% 0.00DHFSH33410 Lift Lobby Painting - 1st Coat 6.00 12-Mar-15 18-Mar-15 14-Jun-15 20-Jun-15 15.00 0% 0% 0.00DHFSH33440 Installation of Steel Doors & Windows 3.00 11-Jun-15 14-Jun-15 04-Jul-15 06-Jul-15 -19.00 0% 0% 0.00DHFSH33470 Lift Lobby Flooring 6.00 11-Apr-15 16-Apr-15 09-Jul-15 15-Jul-15 66.00 0% 0% 0.00DHFSH33490 Uti lity Rooms- Epoxy Flooring 6.00 18-Apr-15 23-Apr-15 16-Jul-15 25-Jul-15 66.00 0% 0% 0.00

StaircaseStaircase 184.00 26-Nov-14 22-Jun-15 10-Dec-14 14-Jul-15 13.00 0% 0% 0.00DHFSH33200 Staircase Plastering 4.00 26-Nov-14 30-Nov-14 10-Dec-14 14-Dec-14 146.00 0% 0% 0.00DHFSH33280 Staircase Painting - Primer & Stucco 6.00 17-Dec-14 23-Dec-14 30-Dec-14 06-Jan-15 133.00 0% 0% 0.00DHFSH33320 Staircase Handrail Fixing 3.00 10-Mar-15 14-Mar-15 21-Jan-15 24-Jan-15 140.00 0% 0% 0.00DHFSH33330 Staircase Painting 1st Coat 3.00 01-Apr-15 04-Apr-15 04-Jul-15 06-Jul-15 4.00 0% 0% 0.00DHFSH33340 Staircase Final Painting 5.00 15-Jun-15 20-Jun-15 07-Jul-15 12-Jul-15 13.00 0% 0% 0.00DHFSH33380 Staircase Epoxy Flooring 2.00 21-Jun-15 22-Jun-15 13-Jul-15 14-Jul-15 13.00 0% 0% 0.00

GeneralGeneral 334.00 06-Oct-14 19-Sep-15 09-Oct-14 12-Nov-15 -6.00 0% 0% 0.00DHSTR33000 Access from Structure 0.00 06-Oct-14 09-Oct-14 -2.00 0% 0% 0.00DHFSH33510 Snagging & De-Snagging 12.00 06-Sep-15 19-Sep-15 31-Oct-15 12-Nov-15 -6.00 0% 0% 0.00

MEP - LEVEL 33MEP - LEVEL 33 477.00 09-Sep-14 29-Aug-15 10-Sep-14 A 22-Oct-15 -6.00 0% 0% 0.00DHMEP33000 Embeded Conduits & Boxex - Concrete Works 3.00 09-Sep-14 11-Sep-14 10-Sep-14 A 12-Sep-14 A 100% 100% 0.00DHMEP33100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 07-Oct-14 28-Oct-14 13-Oct-14 03-Nov-14 -5.00 0% 0% 0.00DHMEP33130 Cable Trays & Cable Trunking 6.00 05-Nov-14 11-Nov-14 18-Nov-14 24-Nov-14 56.00 0% 0% 0.00DHMEP33120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 10-Nov-14 16-Nov-14 23-Nov-14 29-Nov-14 44.00 0% 0% 0.00DHMEP33160 Pressure Testing of Pipes 12.00 17-Nov-14 30-Nov-14 30-Nov-14 14-Dec-14 71.00 0% 0% 0.00DHMEP33110 MEP Works in Risers& Clearance 5.00 04-Jan-15 08-Jan-15 11-Feb-15 16-Feb-15 -33.00 0% 0% 0.00DHMEP33140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 28-Feb-15 05-Mar-15 16-Mar-15 23-Mar-15 -8.00 0% 0% 0.00DHMEP33150 MEP Final Fixes 6.00 11-Aug-15 17-Aug-15 04-Oct-15 10-Oct-15 -9.00 0% 0% 0.00DHMEP06450 Sanitary ware /Toilet accessories 6.00 15-Aug-15 20-Aug-15 07-Oct-15 14-Oct-15 -6.00 0% 0% 0.00DHMEP33200 Pre-Testing & Commissioning 7.00 22-Aug-15 29-Aug-15 15-Oct-15 22-Oct-15 -6.00 0% 0% 0.00

LEVEL 34LEVEL 34 495.00 30-Aug-14 22-Sep-15 30-Aug-14 A 16-Nov-15 -6.00 36.39% 36.39% 1.00STRUCTURAL WORKS - LEVEL 34STRUCTURAL WORKS - LEVEL 34 25.00 30-Aug-14 18-Sep-14 30-Aug-14 A 21-Sep-14 A 100% 100% 1.00DHCWA35100 Core Wall - L34 5.00 30-Aug-14 03-Sep-14 30-Aug-14 A 03-Sep-14 A 100% 100% 1.00DHCWA35120 Tower Crane Jump 1.00 30-Aug-14 30-Aug-14 06-Sep-14 A 07-Sep-14 A 100% 100% 0.00DHSLA34100 Construction of Horizontals - L34 4.00 13-Sep-14 16-Sep-14 15-Sep-14 A 18-Sep-14 A 100% 100% 1.00DHCWA35110 Construction of Verticals - L34 2.00 17-Sep-14 18-Sep-14 20-Sep-14 A 21-Sep-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 16-Nov-14 19-Nov-14 20-Nov-14 24-Nov-14 42.00 0% 0% 0.00A1860 Stair # 1 4.00 16-Nov-14 19-Nov-14 20-Nov-14 24-Nov-14 9.00 0% 0% 0.00A1870 Stair # 2 3.00 17-Nov-14 19-Nov-14 22-Nov-14 24-Nov-14 42.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Wet Area False Ceiling Ti ling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Instal lation of Kitchen CabinetInstal lation of Vanity Counters & Tops

Installation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L34Tower Crane Jump

Construction of Horizontals - L34Construction of Verticals - L34

Stair # 1Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 46 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 91: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

FINISHES WORKS - LEVEL 34FINISHES WORKS - LEVEL 34 334.00 09-Oct-14 22-Sep-15 13-Oct-14 16-Nov-15 -6.00 0% 0% 0.00Dry areaDry area 293.00 05-Nov-14 08-Sep-15 17-Nov-14 02-Nov-15 -6.00 0% 0% 0.00DHFSH34100 Block Work in Dry Area 6.00 05-Nov-14 11-Nov-14 17-Nov-14 23-Nov-14 -5.00 0% 0% 0.00DHFSH34120 Marking,Cutting & Chasing - Dry Area 4.00 12-Nov-14 16-Nov-14 24-Nov-14 27-Nov-14 42.00 0% 0% 0.00DHFSH34130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 17-Nov-14 20-Nov-14 29-Nov-14 03-Dec-14 44.00 0% 0% 0.00DHFSH34160 Plaster in Dry Area 8.00 24-Nov-14 03-Dec-14 07-Dec-14 15-Dec-14 42.00 0% 0% 0.00DHMEP34190 Dry Area Floor Screed 7.00 04-Dec-14 11-Dec-14 16-Dec-14 23-Dec-14 42.00 0% 0% 0.00DHFSH34230 Dry Area Painting - Primer 4.00 13-Dec-14 16-Dec-14 24-Dec-14 28-Dec-14 108.00 0% 0% 0.00DHFSH34260 Dry Area Painting - Stucco 6.00 17-Dec-14 23-Dec-14 29-Dec-14 05-Jan-15 108.00 0% 0% 0.00DHFSH34290 Dry Area False Ceiling Suspension 6.00 06-Jan-15 13-Jan-15 04-Mar-15 11-Mar-15 -23.00 0% 0% 0.00DHFSH34350 Dry Area False Ceiling Tiling / Boarding 5.00 10-Mar-15 15-Mar-15 28-Mar-15 02-Apr-15 34.00 0% 0% 0.00DHFSH34400 Dry Area Painting - 1st Coat 5.00 26-Mar-15 31-Mar-15 28-Jun-15 02-Jul-15 -39.00 0% 0% 0.00DHFSH34450 Dry Area Flooring 5.00 09-Apr-15 14-Apr-15 08-Jul-15 13-Jul-15 -43.00 0% 0% 0.00DHFSH34430 Installation of Timber Doors & Ironmongery 5.00 05-Aug-15 10-Aug-15 22-Aug-15 27-Aug-15 -14.00 0% 0% 0.00DHFSH34802 Installation of Wardrobe 12.00 05-Aug-15 18-Aug-15 22-Aug-15 05-Sep-15 -14.00 0% 0% 0.00DHFSH34500 Paint Final Coat 6.00 02-Sep-15 08-Sep-15 27-Oct-15 02-Nov-15 -6.00 0% 0% 0.00

Wet areaWet area 271.00 05-Nov-14 16-Aug-15 17-Nov-14 06-Oct-15 -35.00 0% 0% 0.00DHFSH34110 Block Work in Wet Area 6.00 05-Nov-14 11-Nov-14 17-Nov-14 23-Nov-14 42.00 0% 0% 0.00DHFSH34140 Marking,Cutting & Chasing - Wet Area 4.00 12-Nov-14 16-Nov-14 24-Nov-14 27-Nov-14 42.00 0% 0% 0.00DHFSH34150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 17-Nov-14 20-Nov-14 29-Nov-14 03-Dec-14 50.00 0% 0% 0.00DHMEP34170 Plaster in Wet Area 4.00 24-Nov-14 27-Nov-14 07-Dec-14 10-Dec-14 48.00 0% 0% 0.00DHMEP34180 Wet Area Wall Tiling 6.00 31-Dec-14 08-Jan-15 05-Feb-15 11-Feb-15 1.00 0% 0% 0.00DHFSH34300 Wet Area False Ceiling Suspension 5.00 13-Jan-15 19-Jan-15 11-Mar-15 17-Mar-15 -18.00 0% 0% 0.00DHFSH34370 Wet Area False Ceiling Tiling/Boarding 4.00 10-Mar-15 14-Mar-15 28-Mar-15 01-Apr-15 3.00 0% 0% 0.00DHFSH34210 Wet Area Waterproofing 4.00 15-Mar-15 18-Mar-15 01-Apr-15 06-Apr-15 3.00 0% 0% 0.00DHFSH34220 Wet Area Floor Screed 4.00 19-Mar-15 23-Mar-15 06-Apr-15 11-Apr-15 3.00 0% 0% 0.00DHFSH34250 Wet Area Floor Tiling 5.00 24-Mar-15 29-Mar-15 11-Apr-15 16-Apr-15 3.00 0% 0% 0.00DHFSH06760 Cabinet Carcass 4.00 02-Apr-15 06-Apr-15 21-Apr-15 25-Apr-15 -1.00 0% 0% 0.00DHFSH34800 Installation of Kitchen Cabinet 12.00 01-Aug-15 13-Aug-15 17-Aug-15 31-Aug-15 -14.00 0% 0% 0.00DHFSH34390 Installation of Vanity Counters & Tops 5.00 11-Aug-15 16-Aug-15 27-Aug-15 02-Sep-15 -7.00 0% 0% 0.00DHFSH34420 Installation of Shower Enclosure 4.00 10-Aug-15 13-Aug-15 03-Oct-15 06-Oct-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 183.00 13-Dec-14 17-Jun-15 24-Dec-14 29-Jul-15 64.00 0% 0% 0.00DHFSH34240 Corridor/Lift Lobby Floor Screed 4.00 13-Dec-14 16-Dec-14 24-Dec-14 28-Dec-14 42.00 0% 0% 0.00DHFSH34270 Lift Lobby Painting - Primer & Stucco 6.00 17-Dec-14 23-Dec-14 29-Dec-14 05-Jan-15 42.00 0% 0% 0.00DHFSH34310 Lift Lobby False Ceiling Suspension 6.00 19-Jan-15 26-Jan-15 17-Mar-15 24-Mar-15 -18.00 0% 0% 0.00DHFSH34360 Lift Lobby False Ceiling Tiling / Boarding 5.00 10-Mar-15 15-Mar-15 28-Mar-15 02-Apr-15 79.00 0% 0% 0.00DHFSH34410 Lift Lobby Painting - 1st Coat 6.00 16-Mar-15 22-Mar-15 17-Jun-15 23-Jun-15 15.00 0% 0% 0.00DHFSH34440 Installation of Steel Doors & Windows 3.00 15-Jun-15 17-Jun-15 07-Jul-15 09-Jul-15 -19.00 0% 0% 0.00DHFSH34470 Lift Lobby Flooring 6.00 15-Apr-15 21-Apr-15 14-Jul-15 22-Jul-15 64.00 0% 0% 0.00DHFSH34490 Uti lity Rooms- Epoxy Flooring 6.00 22-Apr-15 28-Apr-15 23-Jul-15 29-Jul-15 64.00 0% 0% 0.00

StaircaseStaircase 182.00 04-Dec-14 25-Jun-15 16-Dec-14 20-Jul-15 13.00 0% 0% 0.00DHFSH34200 Staircase Plastering 4.00 04-Dec-14 08-Dec-14 16-Dec-14 20-Dec-14 144.00 0% 0% 0.00DHFSH34280 Staircase Painting - Primer & Stucco 6.00 24-Dec-14 30-Dec-14 06-Jan-15 12-Jan-15 131.00 0% 0% 0.00DHFSH34320 Staircase Handrail Fixing 3.00 14-Mar-15 17-Mar-15 25-Jan-15 27-Jan-15 140.00 0% 0% 0.00DHFSH34330 Staircase Painting 1st Coat 3.00 05-Apr-15 07-Apr-15 07-Jul-15 09-Jul-15 4.00 0% 0% 0.00DHFSH34340 Staircase Final Painting 5.00 18-Jun-15 23-Jun-15 11-Jul-15 15-Jul-15 13.00 0% 0% 0.00DHFSH34380 Staircase Epoxy Flooring 2.00 24-Jun-15 25-Jun-15 16-Jul-15 20-Jul-15 13.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet Area

Sub frame Fixing/Plaster Preparation - Wet AreaPlaster in Wet Area

Wet Area Wall TilingWet Area False Ceil ing Suspension

Wet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Kitchen CabinetInstallation of Vanity Counters & Tops

Instal lation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 47 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 92: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

GeneralGeneral 334.00 09-Oct-14 22-Sep-15 13-Oct-14 16-Nov-15 -6.00 0% 0% 0.00DHSTR34000 Access from Structure 0.00 09-Oct-14 13-Oct-14 1.00 0% 0% 0.00DHFSH34510 Snagging & De-Snagging 12.00 09-Sep-15 22-Sep-15 03-Nov-15 16-Nov-15 -6.00 0% 0% 0.00

MEP - LEVEL 34MEP - LEVEL 34 477.00 14-Sep-14 01-Sep-15 15-Sep-14 A 26-Oct-15 -6.00 0% 0% 0.00DHMEP34000 Embeded Conduits & Boxex - Concrete Works 3.00 14-Sep-14 16-Sep-14 15-Sep-14 A 18-Sep-14 A 100% 100% 0.00DHMEP34100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 14-Oct-14 04-Nov-14 20-Oct-14 10-Nov-14 -5.00 0% 0% 0.00DHMEP34130 Cable Trays & Cable Trunking 6.00 12-Nov-14 18-Nov-14 24-Nov-14 30-Nov-14 55.00 0% 0% 0.00DHMEP34120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 17-Nov-14 23-Nov-14 29-Nov-14 06-Dec-14 42.00 0% 0% 0.00DHMEP34160 Pressure Testing of Pipes 12.00 24-Nov-14 08-Dec-14 07-Dec-14 20-Dec-14 69.00 0% 0% 0.00DHMEP34110 MEP Works in Risers& Clearance 5.00 10-Jan-15 14-Jan-15 17-Feb-15 22-Feb-15 -33.00 0% 0% 0.00DHMEP34140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 03-Mar-15 09-Mar-15 21-Mar-15 28-Mar-15 -9.00 0% 0% 0.00DHMEP34150 MEP Final Fixes 6.00 15-Aug-15 20-Aug-15 07-Oct-15 14-Oct-15 -9.00 0% 0% 0.00DHMEP06460 Sanitary ware /Toilet accessories 6.00 18-Aug-15 24-Aug-15 11-Oct-15 18-Oct-15 -6.00 0% 0% 0.00DHMEP34200 Pre-Testing & Commissioning 7.00 25-Aug-15 01-Sep-15 19-Oct-15 26-Oct-15 -6.00 0% 0% 0.00

LEVEL 35LEVEL 35 368.00 04-Sep-14 28-Sep-15 04-Sep-14 A 19-Nov-15 -6.00 36.42% 36.42% 1.00STRUCTURAL WORKS - LEVEL 35STRUCTURAL WORKS - LEVEL 35 21.00 04-Sep-14 23-Sep-14 04-Sep-14 A 27-Sep-14 A 100% 100% 1.00DHCWA36100 Core Wall - L35 4.00 04-Sep-14 08-Sep-14 04-Sep-14 A 14-Sep-14 A 100% 100% 1.00DHSLA35100 Construction of Horizontals - L35 4.00 17-Sep-14 21-Sep-14 22-Sep-14 A 24-Sep-14 A 100% 100% 1.00DHCWA36110 Construction of Verticals - L35 2.00 22-Sep-14 23-Sep-14 25-Sep-14 A 27-Sep-14 A 100% 100% 1.00

STAIRCASESSTAIRCASES 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 41.00 0% 0% 0.00A1880 Stair # 1 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 8.00 0% 0% 0.00A1890 Stair # 2 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 41.00 0% 0% 0.00

FINISHES WORKS - LEVEL 35FINISHES WORKS - LEVEL 35 333.00 14-Oct-14 28-Sep-15 18-Oct-14 19-Nov-15 -6.00 0% 0% 0.00Dry areaDry area 292.00 12-Nov-14 12-Sep-15 22-Nov-14 05-Nov-15 -6.00 0% 0% 0.00DHFSH35100 Block Work in Dry Area 6.00 12-Nov-14 18-Nov-14 22-Nov-14 27-Nov-14 -5.00 0% 0% 0.00DHFSH35120 Marking,Cutting & Chasing - Dry Area 4.00 19-Nov-14 23-Nov-14 29-Nov-14 03-Dec-14 41.00 0% 0% 0.00DHFSH35130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 24-Nov-14 27-Nov-14 04-Dec-14 08-Dec-14 43.00 0% 0% 0.00DHFSH35160 Plaster in Dry Area 8.00 01-Dec-14 10-Dec-14 11-Dec-14 20-Dec-14 41.00 0% 0% 0.00DHMEP35190 Dry Area Floor Screed 7.00 11-Dec-14 18-Dec-14 21-Dec-14 28-Dec-14 41.00 0% 0% 0.00DHFSH35230 Dry Area Painting - Primer 4.00 20-Dec-14 23-Dec-14 29-Dec-14 03-Jan-15 108.00 0% 0% 0.00DHFSH35260 Dry Area Painting - Stucco 6.00 24-Dec-14 30-Dec-14 04-Jan-15 10-Jan-15 108.00 0% 0% 0.00DHFSH35290 Dry Area False Ceiling Suspension 6.00 11-Jan-15 18-Jan-15 09-Mar-15 16-Mar-15 -23.00 0% 0% 0.00DHFSH35350 Dry Area False Ceiling Tiling / Boarding 5.00 14-Mar-15 18-Mar-15 01-Apr-15 07-Apr-15 34.00 0% 0% 0.00DHFSH35400 Dry Area Painting - 1st Coat 5.00 30-Mar-15 04-Apr-15 01-Jul-15 06-Jul-15 -38.00 0% 0% 0.00DHFSH35450 Dry Area Flooring 5.00 14-Apr-15 19-Apr-15 13-Jul-15 20-Jul-15 -43.00 0% 0% 0.00DHFSH35430 Installation of Timber Doors & Ironmongery 5.00 09-Aug-15 13-Aug-15 25-Aug-15 31-Aug-15 -14.00 0% 0% 0.00DHFSH35802 Installation of Wardrobe 12.00 10-Aug-15 23-Aug-15 26-Aug-15 09-Sep-15 -14.00 0% 0% 0.00DHFSH35500 Paint Final Coat 6.00 06-Sep-15 12-Sep-15 31-Oct-15 05-Nov-15 -6.00 0% 0% 0.00

Wet areaWet area 270.00 12-Nov-14 19-Aug-15 22-Nov-14 10-Oct-15 -35.00 0% 0% 0.00DHFSH35110 Block Work in Wet Area 6.00 12-Nov-14 18-Nov-14 22-Nov-14 27-Nov-14 41.00 0% 0% 0.00DHFSH35140 Marking,Cutting & Chasing - Wet Area 4.00 19-Nov-14 23-Nov-14 29-Nov-14 03-Dec-14 41.00 0% 0% 0.00DHFSH35150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 24-Nov-14 27-Nov-14 04-Dec-14 08-Dec-14 50.00 0% 0% 0.00DHMEP35170 Plaster in Wet Area 4.00 01-Dec-14 06-Dec-14 11-Dec-14 15-Dec-14 48.00 0% 0% 0.00DHMEP35180 Wet Area Wall Tiling 6.00 06-Jan-15 13-Jan-15 10-Feb-15 16-Feb-15 1.00 0% 0% 0.00DHFSH35300 Wet Area False Ceiling Suspension 5.00 18-Jan-15 24-Jan-15 16-Mar-15 22-Mar-15 -19.00 0% 0% 0.00DHFSH35370 Wet Area False Ceiling Tiling/Boarding 4.00 14-Mar-15 17-Mar-15 01-Apr-15 06-Apr-15 3.00 0% 0% 0.00DHFSH35210 Wet Area Waterproofing 4.00 18-Mar-15 22-Mar-15 06-Apr-15 11-Apr-15 3.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toi let accessories

Pre-Testing & Commissioning

Core Wall - L35Construction of Horizontals - L35Construction of Verticals - L35

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor Screed

Dry Area Painting - PrimerDry Area Painting - Stucco

Dry Area False Ceiling SuspensionDry Area False Ceiling Til ing / Boarding

Dry Area Painting - 1st CoatDry Area Flooring

Installation of Timber Doors & IronmongeryInstallation of Wardrobe

Paint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/BoardingWet Area Waterproofing

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 48 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 93: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH35220 Wet Area Floor Screed 4.00 23-Mar-15 26-Mar-15 11-Apr-15 15-Apr-15 3.00 0% 0% 0.00DHFSH35250 Wet Area Floor Tiling 5.00 28-Mar-15 01-Apr-15 15-Apr-15 21-Apr-15 3.00 0% 0% 0.00DHFSH06770 Cabinet Carcass 4.00 07-Apr-15 11-Apr-15 26-Apr-15 29-Apr-15 -1.00 0% 0% 0.00DHFSH35800 Installation of Kitchen Cabinet 12.00 04-Aug-15 17-Aug-15 20-Aug-15 03-Sep-15 -14.00 0% 0% 0.00DHFSH35390 Installation of Vanity Counters & Tops 5.00 15-Aug-15 19-Aug-15 31-Aug-15 06-Sep-15 -7.00 0% 0% 0.00DHFSH35420 Installation of Shower Enclosure 4.00 13-Aug-15 17-Aug-15 06-Oct-15 10-Oct-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 183.00 20-Dec-14 21-Jun-15 29-Dec-14 03-Aug-15 62.00 0% 0% 0.00DHFSH35240 Corridor/Lift Lobby Floor Screed 4.00 20-Dec-14 23-Dec-14 29-Dec-14 03-Jan-15 41.00 0% 0% 0.00DHFSH35270 Lift Lobby Painting - Primer & Stucco 6.00 24-Dec-14 30-Dec-14 04-Jan-15 10-Jan-15 41.00 0% 0% 0.00DHFSH35310 Lift Lobby False Ceiling Suspension 6.00 24-Jan-15 31-Jan-15 22-Mar-15 29-Mar-15 -19.00 0% 0% 0.00DHFSH35360 Lift Lobby False Ceiling Tiling / Boarding 5.00 14-Mar-15 18-Mar-15 01-Apr-15 07-Apr-15 78.00 0% 0% 0.00DHFSH35410 Lift Lobby Painting - 1st Coat 6.00 19-Mar-15 25-Mar-15 21-Jun-15 27-Jun-15 15.00 0% 0% 0.00DHFSH35440 Installation of Steel Doors & Windows 3.00 18-Jun-15 21-Jun-15 11-Jul-15 13-Jul-15 -19.00 0% 0% 0.00DHFSH35470 Lift Lobby Flooring 6.00 20-Apr-15 26-Apr-15 21-Jul-15 27-Jul-15 62.00 0% 0% 0.00DHFSH35490 Uti lity Rooms- Epoxy Flooring 6.00 27-Apr-15 03-May-15 28-Jul-15 03-Aug-15 62.00 0% 0% 0.00

StaircaseStaircase 181.00 11-Dec-14 29-Jun-15 21-Dec-14 23-Jul-15 13.00 0% 0% 0.00DHFSH35200 Staircase Plastering 4.00 11-Dec-14 15-Dec-14 21-Dec-14 24-Dec-14 143.00 0% 0% 0.00DHFSH35280 Staircase Painting - Primer & Stucco 6.00 31-Dec-14 07-Jan-15 11-Jan-15 17-Jan-15 130.00 0% 0% 0.00DHFSH35320 Staircase Handrail Fixing 3.00 17-Mar-15 21-Mar-15 28-Jan-15 31-Jan-15 140.00 0% 0% 0.00DHFSH35330 Staircase Painting 1st Coat 3.00 08-Apr-15 11-Apr-15 11-Jul-15 13-Jul-15 4.00 0% 0% 0.00DHFSH35340 Staircase Final Painting 5.00 22-Jun-15 27-Jun-15 14-Jul-15 21-Jul-15 13.00 0% 0% 0.00DHFSH35380 Staircase Epoxy Flooring 2.00 28-Jun-15 29-Jun-15 22-Jul-15 23-Jul-15 13.00 0% 0% 0.00

GeneralGeneral 333.00 14-Oct-14 28-Sep-15 18-Oct-14 19-Nov-15 -6.00 0% 0% 0.00DHSTR35000 Access from Structure 0.00 14-Oct-14 18-Oct-14 3.00 0% 0% 0.00DHFSH35510 Snagging & De-Snagging 12.00 13-Sep-15 28-Sep-15 07-Nov-15 19-Nov-15 -6.00 0% 0% 0.00

MEP - LEVEL 35MEP - LEVEL 35 333.00 18-Sep-14 05-Sep-15 23-Sep-14 A 29-Oct-15 -6.00 0% 0% 0.00DHMEP35000 Embeded Conduits & Boxex - Concrete Works 3.00 18-Sep-14 21-Sep-14 23-Sep-14 A 24-Sep-14 A 100% 100% 0.00DHMEP35100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 21-Oct-14 11-Nov-14 28-Oct-14 17-Nov-14 -5.00 0% 0% 0.00DHMEP35130 Cable Trays & Cable Trunking 6.00 19-Nov-14 25-Nov-14 29-Nov-14 06-Dec-14 55.00 0% 0% 0.00DHMEP35120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 24-Nov-14 30-Nov-14 04-Dec-14 10-Dec-14 41.00 0% 0% 0.00DHMEP35160 Pressure Testing of Pipes 12.00 01-Dec-14 15-Dec-14 11-Dec-14 24-Dec-14 68.00 0% 0% 0.00DHMEP35110 MEP Works in Risers& Clearance 5.00 15-Jan-15 20-Jan-15 23-Feb-15 28-Feb-15 -33.00 0% 0% 0.00DHMEP35140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 07-Mar-15 12-Mar-15 25-Mar-15 01-Apr-15 -10.00 0% 0% 0.00DHMEP35150 MEP Final Fixes 6.00 18-Aug-15 24-Aug-15 11-Oct-15 18-Oct-15 -9.00 0% 0% 0.00DHMEP06470 Sanitary ware /Toilet accessories 6.00 22-Aug-15 27-Aug-15 15-Oct-15 21-Oct-15 -6.00 0% 0% 0.00DHMEP35200 Pre-Testing & Commissioning 7.00 29-Aug-15 05-Sep-15 22-Oct-15 29-Oct-15 -6.00 0% 0% 0.00

LEVEL 36LEVEL 36 401.00 09-Sep-14 05-Oct-15 15-Sep-14 A 03-Jan-16 -40.00 36.45% 31.42% 0.86STRUCTURAL WORKS - LEVEL 36STRUCTURAL WORKS - LEVEL 36 21.00 09-Sep-14 29-Sep-14 15-Sep-14 A 01-Oct-14 -1.00 100% 86.19% 0.86DHCWA37100 Core Wall - L36 7.00 09-Sep-14 16-Sep-14 15-Sep-14 A 17-Sep-14 A 100% 100% 1.00DHSLA36100 Construction of Horizontals - L36 4.00 23-Sep-14 27-Sep-14 28-Sep-14 A 30-Sep-14 A 100% 100% 1.00DHCWA37110 Construction of Verticals - L36 2.00 28-Sep-14 29-Sep-14 30-Sep-14 A 01-Oct-14 -1.00 100% 50% 0.50

STAIRCASESSTAIRCASES 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 41.00 0% 0% 0.00A1900 Stair # 1 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 8.00 0% 0% 0.00A1910 Stair # 2 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 41.00 0% 0% 0.00

FINISHES WORKS - LEVEL 36FINISHES WORKS - LEVEL 36 335.00 19-Oct-14 05-Oct-15 22-Oct-14 26-Nov-15 -9.00 0% 0% 0.00Dry areaDry area 294.00 18-Nov-14 19-Sep-15 26-Nov-14 12-Nov-15 -9.00 0% 0% 0.00DHFSH36100 Block Work in Dry Area 6.00 18-Nov-14 24-Nov-14 26-Nov-14 03-Dec-14 -5.00 0% 0% 0.00DHFSH36120 Marking,Cutting & Chasing - Dry Area 4.00 25-Nov-14 29-Nov-14 04-Dec-14 08-Dec-14 40.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Wet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Kitchen CabinetInstal lation of Vanity Counters & Tops

Installation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L36Construction of Horizontals - L36Construction of Verticals - L36

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry Area

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 49 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 94: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH36130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 30-Nov-14 04-Dec-14 09-Dec-14 13-Dec-14 42.00 0% 0% 0.00DHFSH36160 Plaster in Dry Area 8.00 08-Dec-14 16-Dec-14 16-Dec-14 24-Dec-14 40.00 0% 0% 0.00DHMEP36190 Dry Area Floor Screed 7.00 17-Dec-14 24-Dec-14 25-Dec-14 03-Jan-15 40.00 0% 0% 0.00DHFSH36230 Dry Area Painting - Primer 4.00 25-Dec-14 29-Dec-14 04-Jan-15 07-Jan-15 108.00 0% 0% 0.00DHFSH36260 Dry Area Painting - Stucco 6.00 30-Dec-14 06-Jan-15 08-Jan-15 14-Jan-15 108.00 0% 0% 0.00DHFSH36290 Dry Area False Ceiling Suspension 6.00 15-Jan-15 22-Jan-15 14-Mar-15 21-Mar-15 -23.00 0% 0% 0.00DHFSH36350 Dry Area False Ceiling Tiling / Boarding 5.00 17-Mar-15 22-Mar-15 06-Apr-15 12-Apr-15 34.00 0% 0% 0.00DHFSH36400 Dry Area Painting - 1st Coat 5.00 02-Apr-15 07-Apr-15 05-Jul-15 09-Jul-15 -37.00 0% 0% 0.00DHFSH36450 Dry Area Flooring 5.00 19-Apr-15 23-Apr-15 20-Jul-15 25-Jul-15 -43.00 0% 0% 0.00DHFSH36430 Installation of Timber Doors & Ironmongery 5.00 12-Aug-15 17-Aug-15 29-Aug-15 03-Sep-15 -14.00 0% 0% 0.00DHFSH36802 Installation of Wardrobe 12.00 15-Aug-15 27-Aug-15 31-Aug-15 14-Sep-15 -14.00 0% 0% 0.00DHFSH36500 Paint Final Coat 6.00 13-Sep-15 19-Sep-15 07-Nov-15 12-Nov-15 -9.00 0% 0% 0.00

Wet areaWet area 269.00 18-Nov-14 23-Aug-15 26-Nov-14 14-Oct-15 -35.00 0% 0% 0.00DHFSH36110 Block Work in Wet Area 6.00 18-Nov-14 24-Nov-14 26-Nov-14 03-Dec-14 40.00 0% 0% 0.00DHFSH36140 Marking,Cutting & Chasing - Wet Area 4.00 25-Nov-14 29-Nov-14 04-Dec-14 08-Dec-14 40.00 0% 0% 0.00DHFSH36150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 30-Nov-14 04-Dec-14 09-Dec-14 13-Dec-14 50.00 0% 0% 0.00DHMEP36170 Plaster in Wet Area 4.00 08-Dec-14 11-Dec-14 16-Dec-14 20-Dec-14 48.00 0% 0% 0.00DHMEP36180 Wet Area Wall Tiling 6.00 11-Jan-15 18-Jan-15 15-Feb-15 21-Feb-15 1.00 0% 0% 0.00DHFSH36300 Wet Area False Ceiling Suspension 5.00 22-Jan-15 28-Jan-15 21-Mar-15 26-Mar-15 -20.00 0% 0% 0.00DHFSH36370 Wet Area False Ceiling Tiling/Boarding 4.00 17-Mar-15 21-Mar-15 06-Apr-15 11-Apr-15 3.00 0% 0% 0.00DHFSH36210 Wet Area Waterproofing 4.00 22-Mar-15 25-Mar-15 11-Apr-15 15-Apr-15 3.00 0% 0% 0.00DHFSH36220 Wet Area Floor Screed 4.00 26-Mar-15 30-Mar-15 15-Apr-15 20-Apr-15 3.00 0% 0% 0.00DHFSH36250 Wet Area Floor Tiling 5.00 31-Mar-15 05-Apr-15 20-Apr-15 26-Apr-15 3.00 0% 0% 0.00DHFSH06780 Cabinet Carcass 4.00 12-Apr-15 15-Apr-15 30-Apr-15 04-May-15 -1.00 0% 0% 0.00DHFSH36800 Installation of Kitchen Cabinet 12.00 08-Aug-15 20-Aug-15 24-Aug-15 07-Sep-15 -14.00 0% 0% 0.00DHFSH36390 Installation of Vanity Counters & Tops 5.00 18-Aug-15 23-Aug-15 03-Sep-15 09-Sep-15 -7.00 0% 0% 0.00DHFSH36420 Installation of Shower Enclosure 4.00 17-Aug-15 20-Aug-15 10-Oct-15 14-Oct-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 183.00 25-Dec-14 24-Jun-15 04-Jan-15 08-Aug-15 60.00 0% 0% 0.00DHFSH36240 Corridor/Lift Lobby Floor Screed 4.00 25-Dec-14 29-Dec-14 04-Jan-15 07-Jan-15 40.00 0% 0% 0.00DHFSH36270 Lift Lobby Painting - Primer & Stucco 6.00 30-Dec-14 06-Jan-15 08-Jan-15 14-Jan-15 40.00 0% 0% 0.00DHFSH36310 Lift Lobby False Ceiling Suspension 6.00 28-Jan-15 04-Feb-15 26-Mar-15 02-Apr-15 -20.00 0% 0% 0.00DHFSH36360 Lift Lobby False Ceiling Tiling / Boarding 5.00 17-Mar-15 22-Mar-15 06-Apr-15 12-Apr-15 77.00 0% 0% 0.00DHFSH36410 Lift Lobby Painting - 1st Coat 6.00 23-Mar-15 29-Mar-15 24-Jun-15 30-Jun-15 15.00 0% 0% 0.00DHFSH36440 Installation of Steel Doors & Windows 3.00 22-Jun-15 24-Jun-15 14-Jul-15 16-Jul-15 -19.00 0% 0% 0.00DHFSH36470 Lift Lobby Flooring 6.00 25-Apr-15 30-Apr-15 26-Jul-15 01-Aug-15 60.00 0% 0% 0.00DHFSH36490 Uti lity Rooms- Epoxy Flooring 6.00 02-May-15 07-May-15 02-Aug-15 08-Aug-15 60.00 0% 0% 0.00

StaircaseStaircase 180.00 17-Dec-14 02-Jul-15 25-Dec-14 27-Jul-15 13.00 0% 0% 0.00DHFSH36200 Staircase Plastering 4.00 17-Dec-14 21-Dec-14 25-Dec-14 29-Dec-14 142.00 0% 0% 0.00DHFSH36280 Staircase Painting - Primer & Stucco 6.00 07-Jan-15 13-Jan-15 15-Jan-15 21-Jan-15 129.00 0% 0% 0.00DHFSH36320 Staircase Handrail Fixing 3.00 21-Mar-15 24-Mar-15 01-Feb-15 03-Feb-15 140.00 0% 0% 0.00DHFSH36330 Staircase Painting 1st Coat 3.00 12-Apr-15 14-Apr-15 14-Jul-15 16-Jul-15 4.00 0% 0% 0.00DHFSH36340 Staircase Final Painting 5.00 25-Jun-15 30-Jun-15 20-Jul-15 25-Jul-15 13.00 0% 0% 0.00DHFSH36380 Staircase Epoxy Flooring 2.00 01-Jul-15 02-Jul-15 26-Jul-15 27-Jul-15 13.00 0% 0% 0.00

GeneralGeneral 335.00 19-Oct-14 05-Oct-15 22-Oct-14 26-Nov-15 -9.00 0% 0% 0.00DHSTR36000 Access from Structure 0.00 19-Oct-14 22-Oct-14 4.00 0% 0% 0.00DHFSH36510 Snagging & De-Snagging 12.00 20-Sep-15 05-Oct-15 14-Nov-15 26-Nov-15 -9.00 0% 0% 0.00

MEP - LEVEL 36MEP - LEVEL 36 379.00 24-Sep-14 12-Sep-15 28-Sep-14 A 03-Jan-16 -58.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Sub frame Fixing/Plaster Preparation - Dry AreaPlaster in Dry Area

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceil ing SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstal lation of Kitchen CabinetInstallation of Vanity Counters & Tops

Installation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 50 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 95: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP36000 Embeded Conduits & Boxex - Concrete Works 3.00 24-Sep-14 27-Sep-14 28-Sep-14 A 30-Sep-14 A 100% 100% 0.00DHMEP36100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 28-Oct-14 17-Nov-14 03-Nov-14 23-Nov-14 -5.00 0% 0% 0.00DHMEP36130 Cable Trays & Cable Trunking 6.00 25-Nov-14 01-Dec-14 04-Dec-14 10-Dec-14 55.00 0% 0% 0.00DHMEP36120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 30-Nov-14 07-Dec-14 09-Dec-14 15-Dec-14 40.00 0% 0% 0.00DHMEP36160 Pressure Testing of Pipes 12.00 08-Dec-14 21-Dec-14 16-Dec-14 29-Dec-14 67.00 0% 0% 0.00DHMEP36110 MEP Works in Risers& Clearance 5.00 21-Jan-15 26-Jan-15 01-Mar-15 05-Mar-15 -33.00 0% 0% 0.00DHMEP36140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 10-Mar-15 16-Mar-15 30-Mar-15 06-Apr-15 -11.00 0% 0% 0.00DHMEP36150 MEP Final Fixes 6.00 25-Aug-15 31-Aug-15 19-Oct-15 25-Oct-15 -9.00 0% 0% 0.00DHMEP06550 Sanitary ware /Toilet accessories 6.00 29-Aug-15 03-Sep-15 22-Oct-15 28-Oct-15 -9.00 0% 0% 0.00DHMEP36200 Pre-Testing & Commissioning 7.00 05-Sep-15 12-Sep-15 29-Oct-15 05-Nov-15 -9.00 0% 0% 0.00DHMEP36010 Busbar - L36 to L40 10.00 28-Jun-15 08-Jul-15 23-Dec-15 03-Jan-16 -144.00 0% 0% 0.00

LEVEL 37LEVEL 37 361.00 17-Sep-14 08-Oct-15 18-Sep-14 A 30-Nov-15 -9.00 17.63% 8.87% 0.50STRUCTURAL WORKS - LEVEL 37STRUCTURAL WORKS - LEVEL 37 14.00 17-Sep-14 07-Oct-14 18-Sep-14 A 11-Oct-14 -2.00 48.36% 24.34% 0.50DHCWA38100 Core Wall - L37 5.00 17-Sep-14 22-Sep-14 18-Sep-14 A 25-Sep-14 A 100% 100% 1.00DHCWA38120 Tower Crane Jump 1.00 17-Sep-14 17-Sep-14 01-Oct-14 01-Oct-14 -4.00 100% 0% 0.00DHSLA37100 Construction of Horizontals - L37 4.00 29-Sep-14 02-Oct-14 02-Oct-14 08-Oct-14 -2.00 50% 0% 0.00DHCWA38110 Construction of Verticals - L37 2.00 06-Oct-14 07-Oct-14 09-Oct-14 11-Oct-14 -2.00 0% 0% 0.00

STAIRCASESSTAIRCASES 4.00 01-Dec-14 06-Dec-14 07-Dec-14 10-Dec-14 41.00 0% 0% 0.00A1920 Stair # 1 4.00 01-Dec-14 06-Dec-14 07-Dec-14 10-Dec-14 8.00 0% 0% 0.00A1930 Stair # 2 4.00 01-Dec-14 06-Dec-14 07-Dec-14 10-Dec-14 41.00 0% 0% 0.00

FINISHES WORKS - LEVEL 37FINISHES WORKS - LEVEL 37 333.00 26-Oct-14 08-Oct-15 29-Oct-14 30-Nov-15 -9.00 0% 0% 0.00Dry areaDry area 293.00 24-Nov-14 22-Sep-15 01-Dec-14 16-Nov-15 -9.00 0% 0% 0.00DHFSH37100 Block Work in Dry Area 6.00 24-Nov-14 30-Nov-14 01-Dec-14 08-Dec-14 -5.00 0% 0% 0.00DHFSH37120 Marking,Cutting & Chasing - Dry Area 4.00 01-Dec-14 06-Dec-14 09-Dec-14 13-Dec-14 39.00 0% 0% 0.00DHFSH37130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 07-Dec-14 10-Dec-14 14-Dec-14 17-Dec-14 41.00 0% 0% 0.00DHFSH37160 Plaster in Dry Area 8.00 14-Dec-14 22-Dec-14 21-Dec-14 29-Dec-14 39.00 0% 0% 0.00DHMEP37190 Dry Area Floor Screed 7.00 23-Dec-14 30-Dec-14 30-Dec-14 07-Jan-15 39.00 0% 0% 0.00DHFSH37230 Dry Area Painting - Primer 4.00 31-Dec-14 05-Jan-15 08-Jan-15 12-Jan-15 108.00 0% 0% 0.00DHFSH37260 Dry Area Painting - Stucco 6.00 06-Jan-15 12-Jan-15 13-Jan-15 19-Jan-15 108.00 0% 0% 0.00DHFSH37290 Dry Area False Ceiling Suspension 6.00 20-Jan-15 27-Jan-15 18-Mar-15 25-Mar-15 -23.00 0% 0% 0.00DHFSH37350 Dry Area False Ceiling Tiling / Boarding 5.00 21-Mar-15 25-Mar-15 11-Apr-15 16-Apr-15 34.00 0% 0% 0.00DHFSH37400 Dry Area Painting - 1st Coat 5.00 06-Apr-15 11-Apr-15 08-Jul-15 13-Jul-15 -36.00 0% 0% 0.00DHFSH37450 Dry Area Flooring 5.00 23-Apr-15 28-Apr-15 25-Jul-15 29-Jul-15 -43.00 0% 0% 0.00DHFSH37430 Installation of Timber Doors & Ironmongery 5.00 18-Aug-15 23-Aug-15 03-Sep-15 09-Sep-15 -14.00 0% 0% 0.00DHFSH37802 Installation of Wardrobe 12.00 22-Aug-15 03-Sep-15 07-Sep-15 21-Sep-15 -14.00 0% 0% 0.00DHFSH37500 Paint Final Coat 6.00 16-Sep-15 22-Sep-15 10-Nov-15 16-Nov-15 -9.00 0% 0% 0.00

Wet areaWet area 268.00 24-Nov-14 29-Aug-15 01-Dec-14 18-Oct-15 -35.00 0% 0% 0.00DHFSH37110 Block Work in Wet Area 6.00 24-Nov-14 30-Nov-14 01-Dec-14 08-Dec-14 39.00 0% 0% 0.00DHFSH37140 Marking,Cutting & Chasing - Wet Area 4.00 01-Dec-14 06-Dec-14 09-Dec-14 13-Dec-14 39.00 0% 0% 0.00DHFSH37150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 07-Dec-14 10-Dec-14 14-Dec-14 17-Dec-14 50.00 0% 0% 0.00DHMEP37170 Plaster in Wet Area 4.00 14-Dec-14 17-Dec-14 21-Dec-14 24-Dec-14 48.00 0% 0% 0.00DHMEP37180 Wet Area Wall Tiling 6.00 15-Jan-15 22-Jan-15 19-Feb-15 25-Feb-15 1.00 0% 0% 0.00DHFSH37300 Wet Area False Ceiling Suspension 5.00 27-Jan-15 02-Feb-15 25-Mar-15 31-Mar-15 -21.00 0% 0% 0.00DHFSH37370 Wet Area False Ceiling Tiling/Boarding 4.00 21-Mar-15 24-Mar-15 11-Apr-15 15-Apr-15 3.00 0% 0% 0.00DHMEP37210 Wet Area Waterproofing 4.00 25-Mar-15 29-Mar-15 15-Apr-15 20-Apr-15 3.00 0% 0% 0.00DHFSH37220 Wet Area Floor Screed 4.00 30-Mar-15 02-Apr-15 20-Apr-15 25-Apr-15 3.00 0% 0% 0.00DHFSH37250 Wet Area Floor Tiling 5.00 04-Apr-15 08-Apr-15 25-Apr-15 30-Apr-15 3.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toi let accessories

Pre-Testing & Commissioning

Core Wall - L37Tower Crane Jump

Construction of Horizontals - L37Construction of Verticals - L37

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 51 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 96: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHFSH06790 Cabinet Carcass 4.00 16-Apr-15 20-Apr-15 05-May-15 09-May-15 -1.00 0% 0% 0.00DHFSH37800 Installation of Kitchen Cabinet 12.00 15-Aug-15 27-Aug-15 31-Aug-15 14-Sep-15 -14.00 0% 0% 0.00DHFSH37390 Installation of Vanity Counters & Tops 5.00 24-Aug-15 29-Aug-15 09-Sep-15 15-Sep-15 -9.00 0% 0% 0.00DHFSH37420 Installation of Shower Enclosure 4.00 23-Aug-15 26-Aug-15 14-Oct-15 18-Oct-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 181.00 31-Dec-14 28-Jun-15 08-Jan-15 10-Aug-15 60.00 0% 0% 0.00DHFSH37240 Corridor/Lift Lobby Floor Screed 4.00 31-Dec-14 05-Jan-15 08-Jan-15 12-Jan-15 39.00 0% 0% 0.00DHFSH37270 Lift Lobby Painting - Primer & Stucco 6.00 06-Jan-15 12-Jan-15 13-Jan-15 19-Jan-15 39.00 0% 0% 0.00DHFSH37310 Lift Lobby False Ceiling Suspension 6.00 02-Feb-15 09-Feb-15 31-Mar-15 07-Apr-15 -21.00 0% 0% 0.00DHFSH37360 Lift Lobby False Ceiling Tiling / Boarding 5.00 21-Mar-15 25-Mar-15 11-Apr-15 16-Apr-15 76.00 0% 0% 0.00DHFSH37410 Lift Lobby Painting - 1st Coat 6.00 26-Mar-15 01-Apr-15 28-Jun-15 04-Jul-15 15.00 0% 0% 0.00DHFSH37440 Installation of Steel Doors & Windows 3.00 25-Jun-15 28-Jun-15 20-Jul-15 22-Jul-15 -19.00 0% 0% 0.00DHFSH37470 Lift Lobby Flooring 6.00 29-Apr-15 05-May-15 30-Jul-15 05-Aug-15 61.00 0% 0% 0.00DHFSH37490 Uti lity Rooms- Epoxy Flooring 6.00 04-May-15 10-May-15 04-Aug-15 10-Aug-15 60.00 0% 0% 0.00

StaircaseStaircase 180.00 23-Dec-14 06-Jul-15 30-Dec-14 01-Aug-15 14.00 0% 0% 0.00DHFSH37200 Staircase Plastering 4.00 23-Dec-14 27-Dec-14 30-Dec-14 04-Jan-15 141.00 0% 0% 0.00DHFSH37280 Staircase Painting - Primer & Stucco 6.00 13-Jan-15 19-Jan-15 20-Jan-15 26-Jan-15 128.00 0% 0% 0.00DHFSH37320 Staircase Handrail Fixing 3.00 24-Mar-15 28-Mar-15 04-Feb-15 07-Feb-15 140.00 0% 0% 0.00DHFSH37330 Staircase Painting 1st Coat 3.00 15-Apr-15 18-Apr-15 20-Jul-15 22-Jul-15 4.00 0% 0% 0.00DHFSH37340 Staircase Final Painting 5.00 29-Jun-15 04-Jul-15 23-Jul-15 28-Jul-15 15.00 0% 0% 0.00DHFSH37380 Staircase Epoxy Flooring 2.00 05-Jul-15 06-Jul-15 30-Jul-15 01-Aug-15 14.00 0% 0% 0.00

GeneralGeneral 333.00 26-Oct-14 08-Oct-15 29-Oct-14 30-Nov-15 -9.00 0% 0% 0.00DHSTR37000 Access from Structure 0.00 26-Oct-14 29-Oct-14 4.00 0% 0% 0.00DHFSH37510 Snagging & De-Snagging 12.00 26-Sep-15 08-Oct-15 17-Nov-15 30-Nov-15 -9.00 0% 0% 0.00

MEP - LEVEL 37MEP - LEVEL 37 334.00 30-Sep-14 15-Sep-15 06-Oct-14 09-Nov-15 -9.00 0% 0% 0.00DHMEP37000 Embeded Conduits & Boxex - Concrete Works 3.00 30-Sep-14 02-Oct-14 06-Oct-14 08-Oct-14 20.00 33.33% 0% 0.00DHMEP37100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 03-Nov-14 23-Nov-14 09-Nov-14 29-Nov-14 -5.00 0% 0% 0.00DHMEP37130 Cable Trays & Cable Trunking 6.00 01-Dec-14 08-Dec-14 09-Dec-14 15-Dec-14 55.00 0% 0% 0.00DHMEP37120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 07-Dec-14 13-Dec-14 14-Dec-14 20-Dec-14 39.00 0% 0% 0.00DHMEP37160 Pressure Testing of Pipes 12.00 14-Dec-14 27-Dec-14 21-Dec-14 04-Jan-15 66.00 0% 0% 0.00DHMEP37110 MEP Works in Risers& Clearance 5.00 27-Jan-15 01-Feb-15 07-Mar-15 11-Mar-15 -33.00 0% 0% 0.00DHMEP37140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 14-Mar-15 19-Mar-15 04-Apr-15 11-Apr-15 -12.00 0% 0% 0.00DHMEP37150 MEP Final Fixes 6.00 29-Aug-15 03-Sep-15 22-Oct-15 28-Oct-15 -9.00 0% 0% 0.00DHMEP06580 Sanitary ware /Toilet accessories 6.00 01-Sep-15 07-Sep-15 26-Oct-15 01-Nov-15 -9.00 0% 0% 0.00DHMEP37200 Pre-Testing & Commissioning 7.00 08-Sep-15 15-Sep-15 02-Nov-15 09-Nov-15 -9.00 0% 0% 0.00

LEVEL 38LEVEL 38 362.00 23-Sep-14 12-Oct-15 27-Sep-14 A 05-Dec-15 -9.00 8.88% 8.88% 1.00STRUCTURAL WORKS - LEVEL 38STRUCTURAL WORKS - LEVEL 38 15.00 23-Sep-14 11-Oct-14 27-Sep-14 A 14-Oct-14 -2.00 24.38% 24.38% 1.00DHCWA39100 Core Wall - L38 4.00 23-Sep-14 27-Sep-14 27-Sep-14 A 29-Sep-14 A 100% 100% 1.00DHSLA38100 Construction of Horizontals - L38 3.00 06-Oct-14 08-Oct-14 09-Oct-14 12-Oct-14 -2.00 0% 0% 0.00DHCWA39110 Construction of Verticals - L38 2.00 09-Oct-14 11-Oct-14 13-Oct-14 14-Oct-14 -2.00 0% 0% 0.00

STAIRCASESSTAIRCASES 4.00 07-Dec-14 10-Dec-14 11-Dec-14 15-Dec-14 41.00 0% 0% 0.00A1940 Stair # 1 4.00 07-Dec-14 10-Dec-14 11-Dec-14 15-Dec-14 8.00 0% 0% 0.00A1950 Stair # 2 4.00 07-Dec-14 10-Dec-14 11-Dec-14 15-Dec-14 41.00 0% 0% 0.00

FINISHES WORKS - LEVEL 38FINISHES WORKS - LEVEL 38 331.00 30-Oct-14 12-Oct-15 04-Nov-14 05-Dec-15 -9.00 0% 0% 0.00Dry areaDry area 290.00 01-Dec-14 28-Sep-15 09-Dec-14 19-Nov-15 -9.00 0% 0% 0.00DHFSH38100 Block Work in Dry Area 6.00 01-Dec-14 08-Dec-14 09-Dec-14 15-Dec-14 -5.00 0% 0% 0.00DHFSH38120 Marking,Cutting & Chasing - Dry Area 4.00 09-Dec-14 13-Dec-14 16-Dec-14 20-Dec-14 36.00 0% 0% 0.00DHFSH38130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 14-Dec-14 17-Dec-14 21-Dec-14 24-Dec-14 38.00 0% 0% 0.00DHFSH38160 Plaster in Dry Area 8.00 21-Dec-14 29-Dec-14 28-Dec-14 06-Jan-15 36.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Cabinet CarcassInstallation of Kitchen CabinetInstallation of Vanity Counters & Tops

Installation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUti lity Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L38Construction of Horizontals - L38Construction of Verticals - L38

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry Area

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 52 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 97: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP38190 Dry Area Floor Screed 7.00 30-Dec-14 07-Jan-15 07-Jan-15 14-Jan-15 36.00 0% 0% 0.00DHFSH38230 Dry Area Painting - Primer 4.00 08-Jan-15 12-Jan-15 15-Jan-15 19-Jan-15 147.00 0% 0% 0.00DHFSH38260 Dry Area Painting - Stucco 6.00 13-Jan-15 19-Jan-15 20-Jan-15 26-Jan-15 147.00 0% 0% 0.00DHFSH38290 Dry Area False Ceiling Suspension 6.00 25-Jan-15 01-Feb-15 23-Mar-15 30-Mar-15 -23.00 0% 0% 0.00DHFSH38350 Dry Area False Ceiling Tiling / Boarding 5.00 24-Mar-15 29-Mar-15 15-Apr-15 21-Apr-15 34.00 0% 0% 0.00DHFSH38400 Dry Area Painting - 1st Coat 5.00 09-Apr-15 14-Apr-15 12-Jul-15 16-Jul-15 -35.00 0% 0% 0.00DHFSH38450 Dry Area Flooring 5.00 28-Apr-15 03-May-15 29-Jul-15 03-Aug-15 -43.00 0% 0% 0.00DHFSH38430 Installation of Timber Doors & Ironmongery 5.00 22-Aug-15 26-Aug-15 07-Sep-15 13-Sep-15 -14.00 0% 0% 0.00DHFSH38802 Installation of Wardrobe 12.00 29-Aug-15 10-Sep-15 14-Sep-15 30-Sep-15 -14.00 0% 0% 0.00DHFSH38500 Paint Final Coat 6.00 20-Sep-15 28-Sep-15 14-Nov-15 19-Nov-15 -9.00 0% 0% 0.00

Wet areaWet area 265.00 01-Dec-14 03-Sep-15 09-Dec-14 21-Oct-15 -35.00 0% 0% 0.00DHFSH38110 Block Work in Wet Area 6.00 01-Dec-14 08-Dec-14 09-Dec-14 15-Dec-14 36.00 0% 0% 0.00DHFSH38140 Marking,Cutting & Chasing - Wet Area 4.00 09-Dec-14 13-Dec-14 16-Dec-14 20-Dec-14 36.00 0% 0% 0.00DHFSH38150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 14-Dec-14 17-Dec-14 21-Dec-14 24-Dec-14 48.00 0% 0% 0.00DHMEP38170 Plaster in Wet Area 4.00 21-Dec-14 24-Dec-14 28-Dec-14 31-Dec-14 46.00 0% 0% 0.00DHMEP38180 Wet Area Wall Tiling 6.00 20-Jan-15 27-Jan-15 24-Feb-15 02-Mar-15 1.00 0% 0% 0.00DHFSH38300 Wet Area False Ceiling Suspension 5.00 01-Feb-15 07-Feb-15 30-Mar-15 05-Apr-15 -22.00 0% 0% 0.00DHFSH38370 Wet Area False Ceiling Tiling/Boarding 4.00 24-Mar-15 28-Mar-15 15-Apr-15 20-Apr-15 3.00 0% 0% 0.00DHMEP38210 Wet Area Waterproofing 4.00 29-Mar-15 01-Apr-15 20-Apr-15 25-Apr-15 3.00 0% 0% 0.00DHFSH38220 Wet Area Floor Screed 4.00 02-Apr-15 06-Apr-15 25-Apr-15 29-Apr-15 3.00 0% 0% 0.00DHFSH38250 Wet Area Floor Tiling 5.00 07-Apr-15 12-Apr-15 29-Apr-15 05-May-15 3.00 0% 0% 0.00DHFSH06810 Cabinet Carcass 4.00 21-Apr-15 25-Apr-15 10-May-15 13-May-15 -1.00 0% 0% 0.00DHFSH38390 Installation of Vanity Counters & Tops 5.00 27-Aug-15 01-Sep-15 13-Sep-15 19-Sep-15 -9.00 0% 0% 0.00DHFSH38800 Installation of Kitchen Cabinet 12.00 22-Aug-15 03-Sep-15 07-Sep-15 21-Sep-15 -14.00 0% 0% 0.00DHFSH38420 Installation of Shower Enclosure 4.00 26-Aug-15 30-Aug-15 18-Oct-15 21-Oct-15 -38.00 0% 0% 0.00

Lift Lobby / CorridorLift Lobby / Corridor 181.00 08-Jan-15 01-Jul-15 15-Jan-15 17-Aug-15 56.00 0% 0% 0.00DHFSH38240 Corridor/Lift Lobby Floor Screed 4.00 08-Jan-15 12-Jan-15 15-Jan-15 19-Jan-15 36.00 0% 0% 0.00DHFSH38270 Lift Lobby Painting - Primer & Stucco 6.00 13-Jan-15 19-Jan-15 20-Jan-15 26-Jan-15 36.00 0% 0% 0.00DHFSH38310 Lift Lobby False Ceiling Suspension 6.00 07-Feb-15 14-Feb-15 05-Apr-15 12-Apr-15 -22.00 0% 0% 0.00DHFSH38360 Lift Lobby False Ceiling Tiling / Boarding 5.00 24-Mar-15 29-Mar-15 15-Apr-15 21-Apr-15 75.00 0% 0% 0.00DHFSH38410 Lift Lobby Painting - 1st Coat 6.00 30-Mar-15 05-Apr-15 01-Jul-15 07-Jul-15 15.00 0% 0% 0.00DHFSH38440 Installation of Steel Doors & Windows 3.00 29-Jun-15 01-Jul-15 23-Jul-15 26-Jul-15 -19.00 0% 0% 0.00DHFSH38470 Lift Lobby Flooring 6.00 04-May-15 10-May-15 04-Aug-15 10-Aug-15 56.00 0% 0% 0.00DHFSH38490 Uti lity Rooms- Epoxy Flooring 6.00 11-May-15 18-May-15 11-Aug-15 17-Aug-15 56.00 0% 0% 0.00

StaircaseStaircase 178.00 30-Dec-14 09-Jul-15 07-Jan-15 05-Aug-15 13.00 0% 0% 0.00DHFSH38200 Staircase Plastering 4.00 30-Dec-14 04-Jan-15 07-Jan-15 11-Jan-15 138.00 0% 0% 0.00DHFSH38280 Staircase Painting - Primer & Stucco 6.00 20-Jan-15 26-Jan-15 27-Jan-15 02-Feb-15 125.00 0% 0% 0.00DHFSH38320 Staircase Handrail Fixing 3.00 28-Mar-15 31-Mar-15 08-Feb-15 10-Feb-15 140.00 0% 0% 0.00DHFSH38330 Staircase Painting 1st Coat 3.00 19-Apr-15 21-Apr-15 23-Jul-15 26-Jul-15 4.00 0% 0% 0.00DHFSH38340 Staircase Final Painting 5.00 02-Jul-15 07-Jul-15 27-Jul-15 01-Aug-15 15.00 0% 0% 0.00DHFSH38380 Staircase Epoxy Flooring 2.00 08-Jul-15 09-Jul-15 04-Aug-15 05-Aug-15 13.00 0% 0% 0.00

GeneralGeneral 331.00 30-Oct-14 12-Oct-15 04-Nov-14 05-Dec-15 -9.00 0% 0% 0.00DHSTR38000 Access from Structure 0.00 30-Oct-14 04-Nov-14 4.00 0% 0% 0.00DHFSH38510 Snagging & De-Snagging 12.00 29-Sep-15 12-Oct-15 21-Nov-15 05-Dec-15 -9.00 0% 0% 0.00

MEP - LEVEL 38MEP - LEVEL 38 333.00 07-Oct-14 19-Sep-15 11-Oct-14 12-Nov-15 -9.00 0% 0% 0.00DHMEP38000 Embeded Conduits & Boxex - Concrete Works 3.00 07-Oct-14 09-Oct-14 11-Oct-14 13-Oct-14 21.00 0% 0% 0.00DHMEP38100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 09-Nov-14 29-Nov-14 15-Nov-14 06-Dec-14 -5.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Dry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstallation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceil ing SuspensionWet Area False Ceiling Tiling/BoardingWet Area WaterproofingWet Area Floor ScreedWet Area Floor Tiling

Cabinet CarcassInstallation of Vanity Counters & TopsInstallation of Kitchen Cabinet

Installation of Shower Enclosure

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstallation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st CoatStaircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 53 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 98: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHMEP38130 Cable Trays & Cable Trunking 6.00 09-Dec-14 15-Dec-14 16-Dec-14 22-Dec-14 53.00 0% 0% 0.00DHMEP38120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 14-Dec-14 20-Dec-14 21-Dec-14 27-Dec-14 36.00 0% 0% 0.00DHMEP38160 Pressure Testing of Pipes 12.00 21-Dec-14 04-Jan-15 28-Dec-14 11-Jan-15 63.00 0% 0% 0.00DHMEP38110 MEP Works in Risers& Clearance 5.00 02-Feb-15 07-Feb-15 12-Mar-15 17-Mar-15 -33.00 0% 0% 0.00DHMEP38140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 17-Mar-15 23-Mar-15 08-Apr-15 15-Apr-15 -13.00 0% 0% 0.00DHMEP38150 MEP Final Fixes 6.00 01-Sep-15 07-Sep-15 26-Oct-15 01-Nov-15 -9.00 0% 0% 0.00DHMEP06560 Sanitary ware /Toilet accessories 6.00 05-Sep-15 10-Sep-15 29-Oct-15 04-Nov-15 -9.00 0% 0% 0.00DHMEP38200 Pre-Testing & Commissioning 7.00 12-Sep-15 19-Sep-15 05-Nov-15 12-Nov-15 -9.00 0% 0% 0.00

LEVEL 39LEVEL 39 361.00 28-Sep-14 17-Oct-15 30-Sep-14 A 08-Dec-15 -9.00 6.65% 0% 0.00STRUCTURAL WORKS - LEVEL 39STRUCTURAL WORKS - LEVEL 39 15.00 28-Sep-14 15-Oct-14 30-Sep-14 A 19-Oct-14 -2.00 18.25% 0% 0.00DHCWA40100 Core Wall - L39 4.00 28-Sep-14 01-Oct-14 30-Sep-14 A 08-Oct-14 -4.00 75% 0% 0.00DHSLA39100 Construction of Horizontals - L39 4.00 09-Oct-14 13-Oct-14 13-Oct-14 16-Oct-14 -2.00 0% 0% 0.00DHCWA40110 Construction of Verticals - L39 2.00 14-Oct-14 15-Oct-14 18-Oct-14 19-Oct-14 -2.00 0% 0% 0.00

STAIRCASESSTAIRCASES 4.00 11-Dec-14 15-Dec-14 16-Dec-14 20-Dec-14 41.00 0% 0% 0.00A1960 Stair # 1 4.00 11-Dec-14 15-Dec-14 16-Dec-14 20-Dec-14 8.00 0% 0% 0.00A1970 Stair # 2 4.00 11-Dec-14 15-Dec-14 16-Dec-14 20-Dec-14 41.00 0% 0% 0.00

FINISHES WORKS - LEVEL 39FINISHES WORKS - LEVEL 39 329.00 05-Nov-14 17-Oct-15 10-Nov-14 08-Dec-15 -9.00 0% 0% 0.00Dry areaDry area 289.00 07-Dec-14 01-Oct-15 14-Dec-14 23-Nov-15 -9.00 0% 0% 0.00DHFSH39100 Block Work in Dry Area 6.00 07-Dec-14 13-Dec-14 14-Dec-14 20-Dec-14 -5.00 0% 0% 0.00DHFSH39120 Marking,Cutting & Chasing - Dry Area 4.00 14-Dec-14 17-Dec-14 21-Dec-14 24-Dec-14 35.00 0% 0% 0.00DHFSH39130 Sub frame Fixing/Plaster Preparation - Dry Area 4.00 18-Dec-14 22-Dec-14 25-Dec-14 29-Dec-14 37.00 0% 0% 0.00DHFSH39160 Plaster in Dry Area 8.00 25-Dec-14 04-Jan-15 03-Jan-15 11-Jan-15 35.00 0% 0% 0.00DHFSH39190 Dry Area Floor Screed 7.00 05-Jan-15 12-Jan-15 12-Jan-15 19-Jan-15 35.00 0% 0% 0.00DHFSH39230 Dry Area Painting - Primer 4.00 13-Jan-15 17-Jan-15 20-Jan-15 24-Jan-15 106.00 0% 0% 0.00DHFSH39260 Dry Area Painting - Stucco 6.00 18-Jan-15 24-Jan-15 25-Jan-15 31-Jan-15 106.00 0% 0% 0.00DHFSH39290 Dry Area False Ceiling Suspension 6.00 29-Jan-15 05-Feb-15 28-Mar-15 04-Apr-15 -23.00 0% 0% 0.00DHFSH39350 Dry Area False Ceiling Tiling / Boarding 5.00 28-Mar-15 01-Apr-15 20-Apr-15 26-Apr-15 34.00 0% 0% 0.00DHFSH39400 Dry Area Painting - 1st Coat 5.00 13-Apr-15 18-Apr-15 15-Jul-15 22-Jul-15 -34.00 0% 0% 0.00DHFSH39450 Dry Area Flooring 5.00 03-May-15 07-May-15 03-Aug-15 08-Aug-15 -43.00 0% 0% 0.00DHFSH39430 Installation of Timber Doors & Ironmongery 5.00 25-Aug-15 30-Aug-15 10-Sep-15 16-Sep-15 -14.00 0% 0% 0.00DHFSH39802 Installation of Wardrobe 12.00 02-Sep-15 15-Sep-15 19-Sep-15 05-Oct-15 -14.00 0% 0% 0.00DHFSH39500 Paint Final Coat 6.00 26-Sep-15 01-Oct-15 17-Nov-15 23-Nov-15 -9.00 0% 0% 0.00

Wet areaWet area 264.00 07-Dec-14 07-Sep-15 14-Dec-14 25-Oct-15 -35.00 0% 0% 0.00DHFSH39110 Block Work in Wet Area 6.00 07-Dec-14 13-Dec-14 14-Dec-14 20-Dec-14 35.00 0% 0% 0.00DHFSH39140 Marking,Cutting & Chasing - Wet Area 4.00 14-Dec-14 17-Dec-14 21-Dec-14 24-Dec-14 35.00 0% 0% 0.00DHFSH39150 Sub frame Fixing/Plaster Preparation - Wet Area 4.00 18-Dec-14 22-Dec-14 25-Dec-14 29-Dec-14 48.00 0% 0% 0.00DHFSH39170 Plaster in Wet Area 4.00 25-Dec-14 29-Dec-14 03-Jan-15 06-Jan-15 46.00 0% 0% 0.00DHFSH39180 Wet Area Wall Tiling 6.00 25-Jan-15 01-Feb-15 01-Mar-15 07-Mar-15 1.00 0% 0% 0.00DHFSH39300 Wet Area False Ceiling Suspension 5.00 05-Feb-15 11-Feb-15 04-Apr-15 09-Apr-15 -23.00 0% 0% 0.00DHFSH39370 Wet Area False Ceiling Tiling/Boarding 4.00 28-Mar-15 31-Mar-15 20-Apr-15 25-Apr-15 3.00 0% 0% 0.00DHFSH39210 Wet Area Waterproofing 4.00 01-Apr-15 05-Apr-15 25-Apr-15 29-Apr-15 3.00 0% 0% 0.00DHFSH39220 Wet Area Floor Screed 4.00 06-Apr-15 09-Apr-15 29-Apr-15 04-May-15 3.00 0% 0% 0.00DHFSH39250 Wet Area Floor Tiling 5.00 11-Apr-15 15-Apr-15 04-May-15 10-May-15 3.00 0% 0% 0.00DHFSH06820 Cabinet Carcass 4.00 26-Apr-15 29-Apr-15 14-May-15 19-May-15 -1.00 0% 0% 0.00DHFSH39390 Installation of Vanity Counters & Tops 5.00 31-Aug-15 05-Sep-15 16-Sep-15 22-Sep-15 -9.00 0% 0% 0.00DHFSH39800 Installation of Kitchen Cabinet 12.00 25-Aug-15 07-Sep-15 10-Sep-15 27-Sep-15 -14.00 0% 0% 0.00DHFSH39420 Installation of Shower Enclosure 4.00 30-Aug-15 02-Sep-15 21-Oct-15 25-Oct-15 -38.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

Core Wall - L39Construction of Horizontals - L39Construction of Verticals - L39

Stair # 1Stair # 2

Block Work in Dry AreaMarking,Cutting & Chasing - Dry AreaSub frame Fixing/Plaster Preparation - Dry Area

Plaster in Dry AreaDry Area Floor ScreedDry Area Painting - Primer

Dry Area Painting - StuccoDry Area False Ceiling Suspension

Dry Area False Ceiling Tiling / BoardingDry Area Painting - 1st Coat

Dry Area FlooringInstal lation of Timber Doors & Ironmongery

Installation of WardrobePaint Final Coat

Block Work in Wet AreaMarking,Cutting & Chasing - Wet AreaSub frame Fixing/Plaster Preparation - Wet Area

Plaster in Wet AreaWet Area Wall Tiling

Wet Area False Ceiling SuspensionWet Area False Ceil ing Tiling/BoardingWet Area WaterproofingWet Area Floor Screed

Wet Area Floor TilingCabinet Carcass

Installation of Vanity Counters & TopsInstal lation of Kitchen Cabinet

Instal lation of Shower Enclosure

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 54 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 99: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

Lift Lobby / CorridorLift Lobby / Corridor 181.00 13-Jan-15 05-Jul-15 20-Jan-15 22-Aug-15 54.00 0% 0% 0.00DHFSH39240 Corridor/Lift Lobby Floor Screed 4.00 13-Jan-15 17-Jan-15 20-Jan-15 24-Jan-15 35.00 0% 0% 0.00DHFSH39270 Lift Lobby Painting - Primer & Stucco 6.00 18-Jan-15 24-Jan-15 25-Jan-15 31-Jan-15 35.00 0% 0% 0.00DHFSH39310 Lift Lobby False Ceiling Suspension 6.00 11-Feb-15 18-Feb-15 09-Apr-15 16-Apr-15 -23.00 0% 0% 0.00DHFSH39360 Lift Lobby False Ceiling Tiling / Boarding 5.00 28-Mar-15 01-Apr-15 20-Apr-15 26-Apr-15 74.00 0% 0% 0.00DHFSH39410 Lift Lobby Painting - 1st Coat 6.00 02-Apr-15 08-Apr-15 05-Jul-15 11-Jul-15 15.00 0% 0% 0.00DHFSH39440 Installation of Steel Doors & Windows 3.00 02-Jul-15 05-Jul-15 27-Jul-15 29-Jul-15 -19.00 0% 0% 0.00DHFSH39470 Lift Lobby Flooring 6.00 09-May-15 14-May-15 09-Aug-15 15-Aug-15 54.00 0% 0% 0.00DHFSH39490 Uti lity Rooms- Epoxy Flooring 6.00 17-May-15 23-May-15 16-Aug-15 22-Aug-15 54.00 0% 0% 0.00

StaircaseStaircase 178.00 05-Jan-15 13-Jul-15 12-Jan-15 10-Aug-15 12.00 0% 0% 0.00DHFSH39200 Staircase Plastering 4.00 05-Jan-15 08-Jan-15 12-Jan-15 15-Jan-15 137.00 0% 0% 0.00DHFSH39280 Staircase Painting - Primer & Stucco 6.00 25-Jan-15 31-Jan-15 01-Feb-15 07-Feb-15 124.00 0% 0% 0.00DHFSH39320 Staircase Handrail Fixing 3.00 31-Mar-15 04-Apr-15 11-Feb-15 14-Feb-15 140.00 0% 0% 0.00DHFSH39330 Staircase Painting 1st Coat 3.00 22-Apr-15 25-Apr-15 27-Jul-15 29-Jul-15 4.00 0% 0% 0.00DHFSH39340 Staircase Final Painting 5.00 06-Jul-15 11-Jul-15 30-Jul-15 04-Aug-15 15.00 0% 0% 0.00DHFSH39380 Staircase Epoxy Flooring 2.00 12-Jul-15 13-Jul-15 09-Aug-15 10-Aug-15 12.00 0% 0% 0.00

GeneralGeneral 329.00 05-Nov-14 17-Oct-15 10-Nov-14 08-Dec-15 -9.00 0% 0% 0.00DHSTR39000 Access from Structure 0.00 05-Nov-14 10-Nov-14 4.00 0% 0% 0.00DHFSH39510 Snagging & De-Snagging 12.00 03-Oct-15 17-Oct-15 24-Nov-15 08-Dec-15 -9.00 0% 0% 0.00

MEP - LEVEL 39MEP - LEVEL 39 333.00 11-Oct-14 22-Sep-15 14-Oct-14 16-Nov-15 -9.00 0% 0% 0.00DHMEP39000 Embeded Conduits & Boxex - Concrete Works 3.00 11-Oct-14 13-Oct-14 14-Oct-14 16-Oct-14 23.00 0% 0% 0.00DHMEP39100 H/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc18.00 15-Nov-14 06-Dec-14 20-Nov-14 11-Dec-14 -5.00 0% 0% 0.00DHMEP39130 Cable Trays & Cable Trunking 6.00 14-Dec-14 20-Dec-14 21-Dec-14 27-Dec-14 53.00 0% 0% 0.00DHMEP39120 Embeded Condiuts,Boxes and Sleeves in Walls 6.00 18-Dec-14 24-Dec-14 25-Dec-14 31-Dec-14 35.00 0% 0% 0.00DHMEP39160 Pressure Testing of Pipes 12.00 25-Dec-14 08-Jan-15 03-Jan-15 15-Jan-15 62.00 0% 0% 0.00DHMEP39110 MEP Works in Risers& Clearance 5.00 08-Feb-15 12-Feb-15 18-Mar-15 23-Mar-15 -33.00 0% 0% 0.00DHMEP39140 Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixes6.00 21-Mar-15 26-Mar-15 13-Apr-15 20-Apr-15 -14.00 0% 0% 0.00DHMEP39150 MEP Final Fixes 6.00 05-Sep-15 10-Sep-15 29-Oct-15 04-Nov-15 -9.00 0% 0% 0.00DHMEP06570 Sanitary ware /Toilet accessories 6.00 08-Sep-15 14-Sep-15 02-Nov-15 08-Nov-15 -9.00 0% 0% 0.00DHMEP39200 Pre-Testing & Commissioning 7.00 15-Sep-15 22-Sep-15 09-Nov-15 16-Nov-15 -9.00 0% 0% 0.00

LEVEL 40LEVEL 40 358.00 02-Oct-14 20-Oct-15 09-Oct-14 12-Dec-15 -9.00 0% 0% 0.00LEVEL 41LEVEL 41 383.00 09-Oct-14 24-Oct-15 14-Oct-14 14-Jan-16 -35.00 0% 0% 0.00LEVEL 42LEVEL 42 356.00 14-Oct-14 27-Oct-15 19-Oct-14 19-Dec-15 -9.00 0% 0% 0.00LEVEL 43LEVEL 43 354.00 20-Oct-14 31-Oct-15 26-Oct-14 22-Dec-15 -9.00 0% 0% 0.00LEVEL 44LEVEL 44 353.00 26-Oct-14 04-Nov-15 30-Oct-14 26-Dec-15 -9.00 0% 0% 0.00LEVEL 45LEVEL 45 355.00 30-Oct-14 11-Nov-15 04-Nov-14 02-Jan-16 -9.00 0% 0% 0.00LEVEL 46LEVEL 46 372.00 04-Nov-14 16-Nov-15 09-Nov-14 26-Jan-16 -27.00 0% 0% 0.00LEVEL 47LEVEL 47 352.00 10-Nov-14 21-Nov-15 15-Nov-14 09-Jan-16 -9.00 0% 0% 0.00LEVEL 48LEVEL 48 350.00 16-Nov-14 25-Nov-15 20-Nov-14 12-Jan-16 -9.00 0% 0% 0.00LEVEL 49LEVEL 49 349.00 20-Nov-14 30-Nov-15 25-Nov-14 16-Jan-16 -9.00 0% 0% 0.00LEVEL 50LEVEL 50 348.00 25-Nov-14 06-Dec-15 30-Nov-14 19-Jan-16 -9.00 0% 0% 0.00LEVEL 51LEVEL 51 360.00 30-Nov-14 10-Dec-15 06-Dec-14 07-Feb-16 -22.00 0% 0% 0.00LEVEL 52LEVEL 52 346.00 06-Dec-14 15-Dec-15 10-Dec-14 26-Jan-16 -9.00 0% 0% 0.00LEVEL 53LEVEL 53 345.00 10-Dec-14 20-Dec-15 15-Dec-14 30-Jan-16 -9.00 0% 0% 0.00LEVEL 54LEVEL 54 344.00 15-Dec-14 24-Dec-15 20-Dec-14 02-Feb-16 -9.00 0% 0% 0.00LEVEL 55LEVEL 55 343.00 20-Dec-14 29-Dec-15 24-Dec-14 06-Feb-16 -9.00 0% 0% 0.00LEVEL 56LEVEL 56 350.00 24-Dec-14 03-Jan-16 29-Dec-14 18-Feb-16 -17.00 0% 0% 0.00LEVEL 57LEVEL 57 329.00 29-Dec-14 07-Jan-16 04-Jan-15 30-Jan-16 -19.00 0% 0% 0.00LEVEL 58LEVEL 58 332.00 03-Jan-15 14-Jan-16 07-Jan-15 06-Feb-16 -19.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Corridor/Lift Lobby Floor ScreedLift Lobby Painting - Primer & Stucco

Lift Lobby False Ceiling SuspensionLift Lobby False Ceiling Tiling / Boarding

Lift Lobby Painting - 1st CoatInstal lation of Steel Doors & Windows

Lift Lobby FlooringUtility Rooms- Epoxy Flooring

Staircase PlasteringStaircase Painting - Primer & Stucco

Staircase Handrail FixingStaircase Painting 1st Coat

Staircase Final PaintingStaircase Epoxy Flooring

Access from StructureSnagging & De-Snagging

Embeded Conduits & Boxex - Concrete WorksH/L Chilled Water Piping,Drainage,Water ,Fire fighting Piping ,Ducting, Cabling , Wiring etc

Cable Trays & Cable TrunkingEmbeded Condiuts,Boxes and Sleeves in Walls

Pressure Testing of PipesMEP Works in Risers& Clearance

Plenum Boxes,Water heaters, FCUs &fire Sprinkler drops and 2nd fixesMEP Final FixesSanitary ware /Toilet accessories

Pre-Testing & Commissioning

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 55 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 100: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

LEVEL 59LEVEL 59 333.00 06-Jan-15 19-Jan-16 11-Jan-15 10-Feb-16 -19.00 0% 0% 0.00LEVEL 60LEVEL 60 332.00 11-Jan-15 23-Jan-16 15-Jan-15 14-Feb-16 -19.00 0% 0% 0.00LEVEL 61LEVEL 61 348.00 14-Jan-15 26-Jan-16 19-Jan-15 07-Mar-16 -35.00 0% 0% 0.00

LEVELS 62 (MECHANICAL FLOOR)LEVELS 62 (MECHANICAL FLOOR) 350.00 18-Jan-15 28-Jan-16 22-Jan-15 13-Mar-16 -38.00 0% 0% 0.00LEVELS 63-85LEVELS 63-85 395.00 25-Jan-15 19-Mar-16 29-Jan-15 12-May-16 -39.00 0% 0% 0.00LEVEL 85(MECHANICAL FLOOR)LEVEL 85(MECHANICAL FLOOR) 315.00 30-Apr-15 21-Mar-16 05-May-15 15-May-16 -44.00 0% 0% 0.00LEVEL 86 TO ROOFLEVEL 86 TO ROOF 324.00 06-May-15 06-Apr-16 11-May-15 31-May-16 -46.00 0% 0% 0.00ROOFING & WATERPROOFING SYSTEMROOFING & WATERPROOFING SYSTEM 20.00 17-May-15 08-Jun-15 21-May-15 13-Jun-15 49.00 0% 0% 0.00SPECIALIST WORKSSPECIALIST WORKS 120.00 11-Oct-15 23-Mar-16 10-Dec-15 27-Apr-16 -17.00 0% 0% 0.00

FACADE WORKSFACADE WORKS 582.00 19-Jul-14 19-Jan-16 15-Jul-14 A 27-Aug-16 -178.00 11.43% 1.94% 0.17STONE CLADDING -PODIUMSTONE CLADDING -PODIUM 135.00 09-May-15 19-Oct-15 13-May-15 24-Oct-15 82.00 0% 0% 0.00FACADE CLADDINGFACADE CLADDING 359.00 23-Jul-14 12-Nov-15 15-Jul-14 A 13-Jan-16 -51.00 12.38% 2.1% 0.17DHFCDGNT00 Curtain Wall Glazing - Level L6-10 39.00 23-Jul-14 09-Sep-14 15-Jul-14 A 30-Oct-14 -57.00 100% 20% 0.20DHFCDGNT01 Curtain Wall Glazing - Level 11-16 45.00 11-Aug-14 02-Oct-14 13-Aug-14 A 23-Nov-14 -57.00 95.83% 15% 0.16DHFCDGNT02 Curtain Wall Glazing - Level 17-22 45.00 04-Sep-14 30-Oct-14 09-Sep-14 A 18-Dec-14 -57.00 49.17% 5% 0.10DHFCDGNT03 Curtain Wall Glazing - Level 23-29 45.00 29-Sep-14 24-Nov-14 22-Sep-14 A 13-Jan-15 -57.00 2.5% 2% 0.80DHFCDGNT04 Aluminum Louvers - Level 30 12.00 15-Nov-14 29-Nov-14 05-Jan-15 18-Jan-15 -41.00 0% 0% 0.00DHFCDGNT05 Curtain Wall Glazing - Level 30 18.00 12-Nov-14 04-Dec-14 14-Jan-15 04-Feb-15 -51.00 0% 0% 0.00DHFCDGNT06 Curtain Wall Glazing - Level 31-36 45.00 05-Nov-14 29-Dec-14 07-Jan-15 01-Mar-15 -51.00 0% 0% 0.00DHFCDGNT07 Curtain Wall Glazing - Level 37-42 45.00 30-Nov-14 24-Jan-15 01-Feb-15 25-Mar-15 -51.00 0% 0% 0.00DHFCDGNT08 Curtain Wall Glazing - Level 43-48 45.00 25-Dec-14 17-Feb-15 25-Feb-15 19-Apr-15 -51.00 0% 0% 0.00DHFCDGNT09 Curtain Wall Glazing - Level 49-54 45.00 20-Jan-15 14-Mar-15 22-Mar-15 13-May-15 -51.00 0% 0% 0.00DHFCDGNT11 Curtain Wall Glazing - Level 55-56 14.00 04-Mar-15 21-Mar-15 04-May-15 21-May-15 -51.00 0% 0% 0.00DHFCDGNT12 Curtain Wall Glazing - Level 57-61 45.00 18-Feb-15 12-Apr-15 20-Apr-15 13-Jun-15 -51.00 0% 0% 0.00DHFCDGNT10 Aluminum Louvers - Level 62 12.00 02-Apr-15 16-Apr-15 03-Jun-15 17-Jun-15 -51.00 0% 0% 0.00DHFCDGNT13 Curtain Wall Glazing - Level 62 18.00 04-Apr-15 25-Apr-15 04-Jun-15 25-Jun-15 -51.00 0% 0% 0.00DHFCDGNT14 Curtain Wall Glazing - Level 63-68 45.00 26-Mar-15 18-May-15 26-May-15 20-Jul-15 -51.00 0% 0% 0.00DHFCDGNT15 Curtain Wall Glazing - Level 69-74 45.00 21-Apr-15 13-Jun-15 21-Jun-15 15-Aug-15 -51.00 0% 0% 0.00DHFCDGNT17 Curtain Wall Glazing - Level 75-80 45.00 28-May-15 21-Jul-15 29-Jul-15 20-Sep-15 -51.00 0% 0% 0.00DHFCDGNT18 Curtain Wall Glazing - Level 81-84 30.00 01-Jul-15 06-Aug-15 01-Sep-15 08-Oct-15 -51.00 0% 0% 0.00DHFCDGNT16 Aluminum Louvers & Cladding - Level 85 18.00 26-Jul-15 15-Aug-15 26-Sep-15 18-Oct-15 -51.00 0% 0% 0.00DHFCDGNT19 Facade Cladding - Level 86 Above - APEX 60.00 01-Sep-15 12-Nov-15 03-Nov-15 13-Jan-16 -51.00 0% 0% 0.00

FACADE LIGHTINGFACADE LIGHTING 381.00 20-Oct-14 19-Jan-16 31-May-15 27-Aug-16 -182.00 0% 0% 0.00FACADE CLEANING SYSTEMFACADE CLEANING SYSTEM 389.00 19-Jul-14 29-Oct-15 01-Oct-14 11-Jan-16 -58.00 0% 0% 0.00

CONVEYING SYSTEMCONVEYING SYSTEM 437.00 24-Aug-14 22-Feb-16 24-Aug-14 A 07-Mar-16 0.00 9.42% 20.63% 2.19LIFTLIFT 437.00 24-Aug-14 22-Feb-16 24-Aug-14 A 07-Mar-16 0.00 9.42% 20.63% 2.19LIFTS - (L1-L6)LIFTS - (L1-L6) 437.00 24-Aug-14 22-Feb-16 24-Aug-14 A 07-Mar-16 0.00 25% 25% 1.00DHLFTGNL00 Template & Plumbing 20.00 24-Aug-14 15-Sep-14 24-Aug-14 A 28-Sep-14 A 100% 100% 1.00DHLFTGNL05 Control Panel Installation & Wiring 25.00 17-Sep-14 18-Oct-14 01-Oct-14 02-Nov-14 0.00 48% 0% 0.00DHLFTGNL01 Bracket Fixing 60.00 01-Oct-14 14-Dec-14 18-Oct-14 28-Dec-14 0.00 0% 0% 0.00DHLFTGNL02 Rail Fixing 80.00 28-Oct-14 31-Jan-15 11-Nov-14 14-Feb-15 0.00 0% 0% 0.00DHLFTGNL04 Machine Room Equipment Installation 12.00 12-Feb-15 25-Feb-15 17-Feb-15 02-Mar-15 9.00 0% 0% 0.00DHLFTGNL03 Entrance & Door Fixing 90.00 20-Nov-14 07-Mar-15 06-Dec-14 21-Mar-15 0.00 0% 0% 0.00DHLFTGNL06 Counter Weight Frame Installation 7.00 04-Mar-15 11-Mar-15 18-Mar-15 25-Mar-15 0.00 0% 0% 0.00DHLFTGNL07 Cabin Assembly 10.00 05-Mar-15 16-Mar-15 19-Mar-15 30-Mar-15 0.00 0% 0% 0.00DHLFTGNL08 Pit Equipment Installation 4.00 17-Mar-15 21-Mar-15 31-Mar-15 04-Apr-15 0.00 0% 0% 0.00DHLFTGNL09 Roping 6.00 22-Mar-15 28-Mar-15 05-Apr-15 11-Apr-15 0.00 0% 0% 0.00DHLFTGNL10 Hoist way & Cabin Wiring 6.00 29-Mar-15 04-Apr-15 12-Apr-15 18-Apr-15 0.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Curtain Wall Glazing - Level L6-10Curtain Wall Glazing - Level 11-16

Curtain Wall Glazing - Level 17-22Curtain Wall Glazing - Level 23-29Aluminum Louvers - Level 30

Curtain Wall Glazing - Level 30Curtain Wall Glazing - Level 31-36

Curtain Wall Glazing - Level 37-42Curtain Wall Glazing - Level 43-48

Curtain Wall Glazing - Level 49-54Curtain Wall Glazing - Level 55-56

Curtain Wall Glazing - Level 57-61Aluminum Louvers - Level 62

Curtain Wall Glazing - Level 62Curtain Wall Glazing - Level 63-68

Curtain Wall Glazing - Level 69-74Curtain Wall Glazing - Level 75-80

Curtain Wall Glazing - Level 81-84Aluminum Louvers & Cladding - Level 85

Template & PlumbingControl Panel Installation & Wiring

Bracket FixingRail Fixing

Machine Room Equipment InstallationEntrance & Door FixingCounter Weight Frame InstallationCabin AssemblyPit Equipment Installation

RopingHoist way & Cabin Wiring

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 56 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 101: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHLFTGNL11 Lift Car Works 6.00 05-Apr-15 11-Apr-15 19-Apr-15 25-Apr-15 0.00 0% 0% 0.00DHLFTGNL12 Testing 14.00 16-Apr-15 02-May-15 30-Apr-15 17-May-15 0.00 0% 0% 0.00DHLFTGNL22 Final finishes & Testing & Commissioing 247.00 03-May-15 22-Feb-16 18-May-15 07-Mar-16 0.00 0% 0% 0.00

LIFTS - (M7-M9)LIFTS - (M7-M9) 428.00 24-Aug-14 22-Feb-16 24-Aug-14 A 25-Feb-16 -3.00 12.69% 25% 1.97DHLFTGNM00 Template & Plumbing 65.00 24-Aug-14 10-Nov-14 24-Aug-14 A 28-Sep-14 A 50.77% 100% 1.97DHLFTGNM05 Control Panel Installation & Wiring 18.00 11-Nov-14 01-Dec-14 01-Oct-14 23-Oct-14 32.00 0% 0% 0.00DHLFTGNM01 Bracket Fixing 60.00 20-Nov-14 31-Jan-15 13-Oct-14 23-Dec-14 32.00 0% 0% 0.00DHLFTGNM02 Rail Fixing 70.00 08-Dec-14 28-Feb-15 30-Oct-14 21-Jan-15 32.00 0% 0% 0.00DHLFTGNM03 Entrance & Door Fixing 75.00 31-Dec-14 29-Mar-15 23-Nov-14 19-Feb-15 32.00 0% 0% 0.00DHLFTGNM04 Machine Room Equipment Installation- L68 12.00 05-Mar-15 18-Mar-15 10-Mar-15 23-Mar-15 -3.00 0% 0% 0.00DHLFTGNM06 Counter Weight Frame Installation 30.00 30-Mar-15 03-May-15 02-Apr-15 06-May-15 -3.00 0% 0% 0.00DHLFTGNM07 Cabin Assembly 7.00 02-May-15 09-May-15 05-May-15 12-May-15 -3.00 0% 0% 0.00DHLFTGNM08 Pit Equipment Installation 7.00 10-May-15 18-May-15 13-May-15 21-May-15 -3.00 0% 0% 0.00DHLFTGNM09 Roping 7.00 19-May-15 26-May-15 23-May-15 30-May-15 -3.00 0% 0% 0.00DHLFTGNM10 Hoist way & Cabin Wiring 7.00 27-May-15 03-Jun-15 31-May-15 07-Jun-15 -3.00 0% 0% 0.00DHLFTGNM11 Lift Car Finishes 8.00 04-Jun-15 13-Jun-15 08-Jun-15 16-Jun-15 -3.00 0% 0% 0.00DHLFTGNM12 Testing & ready for CTU 14.00 14-Jun-15 29-Jun-15 17-Jun-15 02-Jul-15 -3.00 0% 0% 0.00DHLFTGNM22 Final finishes & Testing & Commissioing 198.00 30-Jun-15 22-Feb-16 04-Jul-15 25-Feb-16 -3.00 0% 0% 0.00

LIFTS - (H10-H11)LIFTS - (H10-H11) 424.00 12-Oct-14 22-Feb-16 24-Aug-14 A 21-Feb-16 1.00 0% 25% 0.00DHLFTGNH00 Template & Plumbing 30.00 12-Oct-14 16-Nov-14 24-Aug-14 A 28-Sep-14 A 0% 100% 0.00DHLFTGNH05 Control Panel Installation & Wiring 24.00 17-Nov-14 15-Dec-14 01-Oct-14 01-Nov-14 37.00 0% 0% 0.00DHLFTGNH01 Bracket Fixing 85.00 31-Dec-14 09-Apr-15 17-Nov-14 25-Feb-15 37.00 0% 0% 0.00DHLFTGNH02 Rail Fixing 95.00 18-Jan-15 07-May-15 04-Dec-14 25-Mar-15 37.00 0% 0% 0.00DHLFTGNH03 Entrance & Door Fixing 85.00 16-Feb-15 26-May-15 04-Jan-15 12-Apr-15 37.00 0% 0% 0.00DHLFTGNH04 Machine Room Equipment Installation 12.00 25-May-15 07-Jun-15 24-May-15 06-Jun-15 1.00 0% 0% 0.00DHLFTGNH06 Counter Weight Frame Installation 12.00 08-Jun-15 21-Jun-15 07-Jun-15 20-Jun-15 1.00 0% 0% 0.00DHLFTGNH07 Cabin Assembly 8.00 20-Jun-15 28-Jun-15 18-Jun-15 27-Jun-15 1.00 0% 0% 0.00DHLFTGNH08 Pit Equipment Installation 6.00 29-Jun-15 05-Jul-15 28-Jun-15 04-Jul-15 1.00 0% 0% 0.00DHLFTGNH09 Roping 9.00 30-Jun-15 09-Jul-15 29-Jun-15 08-Jul-15 1.00 0% 0% 0.00DHLFTGNH10 Hoist way & Cabin Wiring 7.00 08-Jul-15 15-Jul-15 07-Jul-15 14-Jul-15 1.00 0% 0% 0.00DHLFTGNH11 Lift Car Finishes 7.00 16-Jul-15 26-Jul-15 15-Jul-15 25-Jul-15 1.00 0% 0% 0.00DHLFTGNH12 Testing & ready for CTU 14.00 27-Jul-15 11-Aug-15 26-Jul-15 10-Aug-15 1.00 0% 0% 0.00DHLFTGNH32 Final finishes & Testing & Commissioing 163.00 12-Aug-15 22-Feb-16 11-Aug-15 21-Feb-16 1.00 0% 0% 0.00

LIFTS - (H12)LIFTS - (H12) 413.00 18-Oct-14 22-Feb-16 24-Aug-14 A 21-Feb-16 1.00 0% 7.5% 0.00DHLFTGNH13 Template & Plumbing 30.00 18-Oct-14 22-Nov-14 24-Aug-14 A 10-Nov-14 10.00 0% 30% 0.00DHLFTGNH18 Control Panel Installation & Wiring 24.00 23-Nov-14 21-Dec-14 11-Nov-14 09-Dec-14 10.00 0% 0% 0.00DHLFTGNH14 Bracket Fixing 90.00 25-Nov-14 11-Mar-15 13-Nov-14 28-Feb-15 10.00 0% 0% 0.00DHLFTGNH15 Rail Fixing 90.00 22-Dec-14 06-Apr-15 10-Dec-14 25-Mar-15 10.00 0% 0% 0.00DHLFTGNH16 Entrance & Door Fixing 100.00 27-Jan-15 24-May-15 15-Jan-15 11-May-15 10.00 0% 0% 0.00DHLFTGNH17 Machine Room Equipment Installation 12.00 21-May-15 03-Jun-15 20-May-15 02-Jun-15 1.00 0% 0% 0.00DHLFTGNH19 Counter Weight Frame Installation 12.00 04-Jun-15 17-Jun-15 03-Jun-15 16-Jun-15 1.00 0% 0% 0.00DHLFTGNH20 Cabin Assembly 12.00 10-Jun-15 23-Jun-15 09-Jun-15 22-Jun-15 1.00 0% 0% 0.00DHLFTGNH21 Pit Equipment Installation 7.00 24-Jun-15 01-Jul-15 23-Jun-15 30-Jun-15 1.00 0% 0% 0.00DHLFTGNH22 Roping 11.00 25-Jun-15 07-Jul-15 24-Jun-15 06-Jul-15 1.00 0% 0% 0.00DHLFTGNH23 Hoist way & Cabin Wiring 10.00 02-Jul-15 13-Jul-15 01-Jul-15 12-Jul-15 1.00 0% 0% 0.00DHLFTGNH24 Lift Car Finishes 6.00 14-Jul-15 22-Jul-15 13-Jul-15 21-Jul-15 1.00 0% 0% 0.00DHLFTGNH25 Testing & ready for CTU 14.00 23-Jul-15 08-Aug-15 22-Jul-15 06-Aug-15 1.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Lift Car WorksTesting

Template & PlumbingControl Panel Installation & Wiring

Bracket FixingRail Fixing

Entrance & Door FixingMachine Room Equipment Installation- L68

Counter Weight Frame InstallationCabin Assembly

Pit Equipment InstallationRoping

Hoist way & Cabin WiringLift Car Finishes

Testing & ready for CTU

Template & PlumbingControl Panel Installation & Wiring

Bracket FixingRail Fixing

Entrance & Door FixingMachine Room Equipment Installation

Counter Weight Frame InstallationCabin Assembly

Pit Equipment InstallationRoping

Hoist way & Cabin WiringLift Car Finishes

Testing & ready for CTU

Template & PlumbingControl Panel Installation & Wiring

Bracket FixingRail Fixing

Entrance & Door FixingMachine Room Equipment Installation

Counter Weight Frame InstallationCabin Assembly

Pit Equipment InstallationRoping

Hoist way & Cabin WiringLift Car Finishes

Testing & ready for CTU

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 57 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 102: Monthly Progress Report - September 2014

Activity ID Activity Name OriginalDuration

Planned Start Planned Finish Actual/ForecastStart

Actual/ForecastFinish

TotalFloat

Planned %Complete

Actual %Complete

SPI

DHLFTGNH35 Final finishes & Testing & Commissioing 66.00 08-Dec-15 22-Feb-16 07-Dec-15 21-Feb-16 1.00 0% 0% 0.00GARBAGE CHUTEGARBAGE CHUTE 330.00 30-Aug-14 04-Oct-15 02-Sep-14 A 02-Nov-15 -23.00 3.42% 0.38% 0.11LEVEL GF-28LEVEL GF-28 110.00 30-Aug-14 11-Jan-15 02-Sep-14 A 17-Jan-15 4.00 16.05% 2% 0.12DHGRBGNG00 Frame Fixing GF-L28 80.00 30-Aug-14 06-Dec-14 02-Sep-14 A 05-Jan-15 -8.00 33.91% 2% 0.06DHGRBGNG01 Installation of Water Supply & FF Risers GF-L28 80.00 10-Sep-14 17-Dec-14 02-Sep-14 A 05-Jan-15 0.00 21.41% 2% 0.09DHGRBGNG02 Electrical Conduiting & Wiring GF-L28 80.00 22-Sep-14 29-Dec-14 02-Sep-14 A 05-Jan-15 4.00 8.91% 2% 0.22DHGRBGNG03 Chute Installation GF-L28 80.00 06-Oct-14 11-Jan-15 02-Sep-14 A 17-Jan-15 4.00 0% 2% 0.00

LEVEL 29-56LEVEL 29-56 102.00 06-Dec-14 14-Apr-15 06-Jan-15 04-May-15 -8.00 0% 0% 0.00DHGRBGN290 Frame Fixing L29-L56 80.00 06-Dec-14 10-Mar-15 06-Jan-15 08-Apr-15 -8.00 0% 0% 0.00DHGRBGN291 Installation of Water Supply & FF Risers L29-L56 80.00 17-Dec-14 22-Mar-15 15-Jan-15 18-Apr-15 -8.00 0% 0% 0.00DHGRBGN292 Electrical Conduiting & Wiring L29-L56 80.00 29-Dec-14 02-Apr-15 25-Jan-15 27-Apr-15 -8.00 0% 0% 0.00DHGRBGN293 Chute Installation L29-L56 80.00 11-Jan-15 14-Apr-15 01-Feb-15 04-May-15 -8.00 0% 0% 0.00

LEVEL 57-80LEVEL 57-80 92.00 10-Mar-15 06-Jul-15 09-Apr-15 28-Jul-15 -8.00 0% 0% 0.00DHGRBGN570 Frame Fixing L57-L80 70.00 10-Mar-15 01-Jun-15 09-Apr-15 30-Jun-15 2.00 0% 0% 0.00DHGRBGN571 Installation of Water Supply & FF Risers L57-L80 70.00 22-Mar-15 13-Jun-15 19-Apr-15 09-Jul-15 -2.00 0% 0% 0.00DHGRBGN572 Electrical Conduiting & Wiring L57-L80 70.00 02-Apr-15 24-Jun-15 28-Apr-15 21-Jul-15 -6.00 0% 0% 0.00DHGRBGN573 Chute Installation L57-L80 70.00 14-Apr-15 06-Jul-15 05-May-15 28-Jul-15 -8.00 0% 0% 0.00

LEVEL 81 to RoofLEVEL 81 to Roof 62.00 07-May-15 01-Aug-15 08-Jun-15 20-Aug-15 -8.00 0% 0% 0.00DHGRBGN810 Frame Fixing L81- Roof 20.00 07-May-15 01-Jun-15 08-Jun-15 30-Jun-15 22.00 0% 0% 0.00DHGRBGN811 Installation of Water Supply & FF Risers L81- Roof 20.00 20-May-15 13-Jun-15 17-Jun-15 09-Jul-15 18.00 0% 0% 0.00DHGRBGN812 Electrical Conduiting & Wiring L81- Roof 20.00 01-Jun-15 24-Jun-15 27-Jun-15 21-Jul-15 14.00 0% 0% 0.00DHGRBGN813 Chute Installation L81- Roof 20.00 06-Jul-15 01-Aug-15 29-Jul-15 20-Aug-15 -8.00 0% 0% 0.00

LEVEL GF-Roof (ALL LEVELS)LEVEL GF-Roof (ALL LEVELS) 330.00 03-Sep-14 04-Oct-15 01-Oct-14 02-Nov-15 -23.00 1.54% 0% 0.00DHGRBGN000 MEP Termination to Chute 158.00 18-Feb-15 25-Aug-15 11-Mar-15 14-Sep-15 -8.00 0% 0% 0.00DHGRBGN001 Civil Finishes 312.00 03-Sep-14 10-Sep-15 01-Oct-14 11-Oct-15 -23.00 7.69% 0% 0.00DHGRBGN002 Door Installation & Final Electrical Connections 250.00 25-Nov-14 17-Sep-15 24-Dec-14 19-Oct-15 -23.00 0% 0% 0.00DHGRBGN003 Ventilation Fans 12.00 05-Sep-15 17-Sep-15 05-Oct-15 19-Oct-15 -23.00 0% 0% 0.00DHGRBGN004 Panel Installation 12.00 19-Sep-15 04-Oct-15 20-Oct-15 02-Nov-15 -23.00 0% 0% 0.00

FINISHES AFTER DISMANTLING UTILITIESFINISHES AFTER DISMANTLING UTILITIES 318.00 17-May-15 13-Apr-16 21-May-15 04-Jun-16 -42.00 0% 0% 0.00CLOSEOUT ( SNAGGING , COMMISSIONING & AS BUILTS)CLOSEOUT ( SNAGGING , COMMISSIONING & AS BUILTS) 427.00 22-Jul-15 14-May-16 28-Jul-15 20-Dec-16 -182.00 0% 0% 0.00DHCHNGN210 Preparing & Submitting As built Drawings 150.00 22-Jul-15 17-Jan-16 28-Jul-15 23-Jan-16 33.00 0% 0% 0.00DHCHNGN220 Preparing and Submitting Final O&M manuals 55.00 22-Nov-15 25-Jan-16 28-Nov-15 31-Jan-16 33.00 0% 0% 0.00DHCHNGN230 Preparing and Submitting close out Documents 25.00 01-Mar-16 29-Mar-16 30-Jun-16 31-Jul-16 -65.00 0% 0% 0.00DHCHNGN200 Overall Testing & Commissioning Works 120.00 17-Dec-15 05-May-16 20-Jul-16 11-Dec-16 -182.00 0% 0% 0.00DHCHNGN300 Overall Snagging & Handing Over 90.00 30-Jan-16 14-May-16 01-Sep-16 20-Dec-16 -182.00 0% 0% 0.00DHCHNGN500 Overall Completion 0.00 14-May-16 20-Dec-16 -182.00 0% 0% 0.00

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2014 2015

Frame Fixing GF-L28Instal lation of Water Supply & FF Risers GF-L28Electrical Conduiting & Wiring GF-L28

Chute Installation GF-L28

Frame Fixing L29-L56Installation of Water Supply & FF Risers L29-L56

Electrical Conduiting & Wiring L29-L56Chute Installation L29-L56

Frame Fixing L57-L80Installation of Water Supply & FF Risers L57-L80

Electrical Conduiting & Wiring L57-L80Chute Installation L57-L80

Frame Fixing L81- RoofInstallation of Water Supply & FF Risers L81- Roof

Electrical Conduiting & Wiring L81- RoofChute Installation L81- Roof

MEP Termination to ChuteCivil Finishes

Door Installation & Final Electrical ConnectionsVentilation Fans

Panel Installation

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 58 of 58Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Project Progress Update as of 30-Sep-2014Taregt Completion Programme - Rev 03

 

Date Revision Chec... Appr...20-Aug-14 Target Completion Programme - Rev 03 (Baseline)30-Sep-14 Schedule Update - September-14 (Update) SK

Page 103: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 2

Structure Delay

Page 104: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

TotalTotal 1288.00 24-Feb-14 12-Aug-15 26-Jun-11 A 17-Aug-15 57.12% 56.34% 7.00DAMAC HEIGHTS-Target Completion Programme- Rev 3.1DAMAC HEIGHTS-Target Completion Programme- Rev 3.1 1288.00 24-Feb-14 12-Aug-15 26-Jun-11 A 17-Aug-15 57.12% 56.34% 7.00CONSTRUCTIONCONSTRUCTION 1288.00 24-Feb-14 12-Aug-15 26-Jun-11 A 17-Aug-15 57.12% 56.34% 7.00STRUCTURAL , ARCHITECTURAL , MEPSTRUCTURAL , ARCHITECTURAL , MEP 1288.00 24-Feb-14 12-Aug-15 26-Jun-11 A 17-Aug-15 57.12% 56.34% 7.00FOUNDATION WORKSFOUNDATION WORKS 1099.00 24-Feb-14 29-Nov-14 26-Jun-11 A 05-Jan-15 87.26% 83.62% -28.00BASEMENT B05 (-16.00 FFL)BASEMENT B05 (-16.00 FFL) 1099.00 24-Feb-14 29-Nov-14 26-Jun-11 A 05-Jan-15 87.26% 83.62% -28.00STRUCTURAL B05STRUCTURAL B05 1099.00 24-Feb-14 29-Nov-14 26-Jun-11 A 05-Jan-15 87.26% 83.62% -28.00ZONE A ( Area1,2 & 3)ZONE A ( Area1,2 & 3) 88.00 24-Feb-14 24-Feb-14 26-Jun-11 A 06-Jun-13 A 100% 100%ZONE B (Area 4)ZONE B (Area 4) 371.00 24-Feb-14 29-Nov-14 19-Oct-13 A 05-Jan-15 59.91% 48.45% -28.00Soil Work - Section BBSoil Work - Section BB 289.00 24-Feb-14 10-Aug-14 19-Oct-13 A 16-Oct-14 100% 98.75% 21.00DHFNAB6200Install 1st level of Struts @+2.46 DMD (B1 Level ) 14.00 24-Feb-14 24-Feb-14 19-Oct-13 A 07-Nov-13 A 100% 100%DHFNAB6210Excavation Works up to -4.0 DMD 8.00 24-Feb-14 24-Feb-14 19-Oct-13 A 12-Dec-13 A 100% 100%DHFNAB6230Destress Anchores at level -4.7 DMD 2.00 05-Jul-14 06-Jul-14 30-Jan-14 A 01-Feb-14 A 100% 100%DHFNAB6220Install 3rd level of Struts @-3.94 (B3 Level)-Sec B-B 27.00 24-Feb-14 24-Feb-14 12-Feb-14 A 12-Feb-14 A 100% 100%DHFNAB6260Destress Anchores at level B4-6.99 DMD 2.00 07-Jul-14 08-Jul-14 01-Aug-14 A 01-Aug-14 A 100% 100%DHFNAB6240Excavation works up to level B5-Sec B-B 25.00 09-Jul-14 09-Aug-14 12-Jul-14 A 15-Oct-14 100% 58% -18.00DHFNAB6250Demolition of Internal Diaphragm Wall up to B4 3.00 07-Aug-14 10-Aug-14 16-Aug-14 A 16-Oct-14 100% 94% 21.00

Soil Work - Section DDSoil Work - Section DD 290.00 10-Jul-14 23-Sep-14 12-Nov-13 A 01-Nov-14 100% 0% 12.00DHFNAB6520Excavation upto -3.79 DMD-B3 Lvl -Sec D-D 6.00 26-Jul-14 03-Aug-14 26-Jul-14 A 03-Aug-14 A 100% 100%DHFNAB6500Install 2nd level of Struts @-0.59 DMD (B2 Level)- Sec D-D14.00 10-Jul-14 24-Jul-14 12-Nov-13 A 14-Aug-14 A 100% 100%DHFNAB6530Strut Instal lation at -3.79 DMD-B3 Lvl -Sec D-D 14.00 04-Aug-14 19-Aug-14 04-Aug-14 A 19-Aug-14 A 100% 100%DHFNAB6540Excavation upto -6.99 DMD-B4 Lvl -Sec D-D 6.00 20-Aug-14 26-Aug-14 20-Aug-14 A 26-Aug-14 A 100% 100%DHFNAB6510Install 4th level of Struts @-6.99 (B4 Level)-Sec D-D 18.00 27-Aug-14 16-Sep-14 01-Oct-14 23-Oct-14 100% 0% -28.00DHFNAB6270Final Excavation Works up to B5 - Sec D-D 5.00 17-Sep-14 22-Sep-14 26-Oct-14 30-Oct-14 100% 0% -28.00DHFNAB6280Demolition of Remaining Internal Diaphragm Wall 3.00 21-Sep-14 23-Sep-14 29-Oct-14 01-Nov-14 100% 0% 12.00

Piles and RAFTPiles and RAFT 57.00 21-Sep-14 29-Nov-14 29-Oct-14 05-Jan-15 12.16% 0% -28.00DHFNAB6290Pile Integrity Test By Zetas 4.00 21-Sep-14 24-Sep-14 29-Oct-14 02-Nov-14 100% 0% -28.00DHFNAB6300Pile Head Trimming 6.00 25-Sep-14 01-Oct-14 03-Nov-14 09-Nov-14 83.33% 0% -28.00DHFNAB6310Dressing /Surface Preparation 4.00 02-Oct-14 08-Oct-14 10-Nov-14 13-Nov-14 0% 0% -28.00DHFNAB6320Anti termite/ Bl inding & Pile Profiling 4.00 09-Oct-14 13-Oct-14 15-Nov-14 18-Nov-14 0% 0% -28.00DHFNAB6350Waterproofing Works and Protection Screed 3.00 14-Oct-14 16-Oct-14 19-Nov-14 22-Nov-14 0% 0% -21.00DHFNAB6330Pile Head treatment 4.00 14-Oct-14 18-Oct-14 19-Nov-14 23-Nov-14 0% 0% -28.00DHFNAB6340Therma-cool Insulation Boards 4.00 14-Oct-14 18-Oct-14 19-Nov-14 23-Nov-14 0% 0% -28.00DHFNAB6360Vertical Protection Boards 6.00 19-Oct-14 26-Oct-14 24-Nov-14 30-Nov-14 0% 0% -28.00DHFNAB6390Reinforcement Works of Tower crane Foundation inside Raft5.00 30-Oct-14 04-Nov-14 06-Dec-14 10-Dec-14 0% 0% -20.00DHFNAB6370Rebar for Raft 15.00 27-Oct-14 12-Nov-14 01-Dec-14 18-Dec-14 0% 0% -28.00DHFNAB6380MEP Works (Raft) 15.00 28-Oct-14 13-Nov-14 03-Dec-14 20-Dec-14 0% 0% -28.00DHFNAB6400Concrete Pour 1.00 15-Nov-14 15-Nov-14 21-Dec-14 21-Dec-14 0% 0% -28.00DHCLBB3100Columns & Walls 6.00 16-Nov-14 22-Nov-14 22-Dec-14 28-Dec-14 0% 0% -27.00DHRWBB3100Retaining Wall 12.00 16-Nov-14 29-Nov-14 22-Dec-14 05-Jan-15 0% 0% -28.00

STAIRCASES BASEMENT B05STAIRCASES BASEMENT B05 99.00 24-Feb-14 16-Mar-14 05-Dec-13 A 22-Dec-13 A 0% 0%DHSLAP5130 Stair # 3 8.00 24-Feb-14 24-Feb-14 05-Dec-13 A 10-Dec-13 A 100% 100%DHSLAP5135 Stair # 1 4.00 16-Mar-14 16-Mar-14 08-Dec-13 A 13-Dec-13 A 100% 100%DHSLAP5125 Stair # 2 5.00 16-Mar-14 16-Mar-14 17-Dec-13 A 22-Dec-13 A 100% 100%

BASEMENT & PODIUMBASEMENT & PODIUM 1169.00 24-Feb-14 04-Jun-15 31-May-13 A 09-Jul-15 81.24% 81.24% -28.00BASEMENT B04 (-12.80 FFL)BASEMENT B04 (-12.80 FFL) 1034.00 24-Feb-14 27-Dec-14 31-May-13 A 01-Feb-15 77.49% 77.49% -28.00STRUCTURAL B04STRUCTURAL B04 1034.00 24-Feb-14 27-Dec-14 31-May-13 A 01-Feb-15 77.49% 77.49% -28.00BASEMENT B04 (ZONE A)BASEMENT B04 (ZONE A) 36.00 24-Feb-14 24-Feb-14 31-May-13 A 11-Aug-13 A 100% 100%

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Install 1st level of Struts @+2.46 DMD (B1 Level )Excavation Works up to -4.0 DMD

Destress Anchores at level -4.7 DMDInstall 3rd level of Struts @-3.94 (B3 Level)-Sec B-B

Destress Anchores at level B4-6.99 DMDExcavation works up to level B5-Sec B-BDemolition of Internal Diaphragm Wall up to B4

Excavation upto -3.79 DMD-B3 Lvl -Sec D-DInstal l 2nd level of Struts @-0.59 DMD (B2 Level)- Sec D-DStrut Installation at -3.79 DMD-B3 Lvl -Sec D-DExcavation upto -6.99 DMD-B4 Lvl -Sec D-D

Install 4th level of Struts @-6.99 (B4 Level)-Sec D-DFinal Excavation Works up to B5 - Sec D-DDemolition of Remaining Internal Diaphragm Wall

Pile Integrity Test By ZetasPile Head TrimmingDressing /Surface PreparationAnti termite/ Blinding & Pile ProfilingWaterproofing Works and Protection ScreedPile Head treatmentTherma-cool Insulation BoardsVertical Protection BoardsReinforcement Works of Tower crane Foundation inside RaftRebar for RaftMEP Works (Raft)Concrete PourColumns & WallsRetaining Wall

Stair # 1Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 1 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 105: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

BASEMENT B04 (ZONE B)BASEMENT B04 (ZONE B) 28.00 24-Nov-14 27-Dec-14 30-Dec-14 01-Feb-15 0% 0% -28.00DHCLBB3110Removal Of Struts-B4 6.00 26-Nov-14 03-Dec-14 03-Jan-15 08-Jan-15 0% 0% -28.00DHSLBB3100Construct Slab - Level B04 14.00 24-Nov-14 10-Dec-14 30-Dec-14 15-Jan-15 0% 0% -28.00DHCLBB2100Columns & Walls 6.00 11-Dec-14 17-Dec-14 17-Jan-15 22-Jan-15 0% 0% -28.00DHRWBB2100Retaining Wall 14.00 11-Dec-14 27-Dec-14 17-Jan-15 01-Feb-15 0% 0% -28.00

STAIRCASES BASEMENT B04STAIRCASES BASEMENT B04 100.00 24-Feb-14 25-Mar-14 13-Dec-13 A 03-Feb-14 A 0% 0%DHSLAP5205 Stair # 1 4.00 25-Mar-14 25-Mar-14 13-Dec-13 A 18-Dec-13 A 100% 100%DHSLAP5270 Stair # 3 8.00 24-Feb-14 24-Feb-14 13-Dec-13 A 18-Dec-13 A 100% 100%DHSLAP5215 Stair # 2 5.00 25-Mar-14 25-Mar-14 29-Jan-14 A 03-Feb-14 A 100% 100%

BASEMENT B03 (-9.60 FFL)BASEMENT B03 (-9.60 FFL) 1046.00 24-Feb-14 15-Jan-15 19-Jun-13 A 19-Feb-15 77.49% 77.49% -28.00STRUCTURAL B03STRUCTURAL B03 1046.00 24-Feb-14 15-Jan-15 19-Jun-13 A 19-Feb-15 77.49% 77.49% -28.00BASEMENT B03 (ZONE A)BASEMENT B03 (ZONE A) 51.00 24-Feb-14 24-Feb-14 19-Jun-13 A 10-Sep-13 A 100% 100%BASEMENT B03 (ZONE B)BASEMENT B03 (ZONE B) 24.00 18-Dec-14 15-Jan-15 24-Jan-15 19-Feb-15 0% 0% -28.00DHSLBB2110Removal Of Struts-B3 6.00 21-Dec-14 27-Dec-14 26-Jan-15 01-Feb-15 0% 0% -28.00DHSLBB2100Slab - Level B03 14.00 18-Dec-14 04-Jan-15 24-Jan-15 08-Feb-15 0% 0% -28.00DHCLBB1100Columns & Walls 7.00 05-Jan-15 12-Jan-15 09-Feb-15 16-Feb-15 0% 0% -26.00DHRWBB1100Retaining Wall 10.00 05-Jan-15 15-Jan-15 09-Feb-15 19-Feb-15 0% 0% -28.00

STAIRCASES BASEMENT B03STAIRCASES BASEMENT B03 8.00 01-Apr-14 01-Apr-14 19-Dec-13 A 23-Feb-14 A 0% 0%DHSLAP5145 Stair # 3 8.00 01-Apr-14 01-Apr-14 19-Dec-13 A 24-Dec-13 A 100% 100%DHSLAP5150 Stair # 1 4.00 01-Apr-14 01-Apr-14 02-Feb-14 A 07-Feb-14 A 100% 100%DHSLAP5140 Stair # 2 5.00 01-Apr-14 01-Apr-14 18-Feb-14 A 23-Feb-14 A 100% 100%

BASEMENT B02 (-6.40 FFL)BASEMENT B02 (-6.40 FFL) 1060.00 24-Feb-14 07-Feb-15 30-Jun-13 A 14-Mar-15 77.49% 77.49% -23.00STRUCTURAL B02STRUCTURAL B02 1060.00 24-Feb-14 07-Feb-15 30-Jun-13 A 14-Mar-15 77.49% 77.49% -23.00BASEMENT B02 (ZONE A)BASEMENT B02 (ZONE A) 67.00 24-Feb-14 24-Feb-14 30-Jun-13 A 24-Sep-13 A 100% 100%BASEMENT B02 (ZONE B)BASEMENT B02 (ZONE B) 25.00 10-Jan-15 07-Feb-15 14-Feb-15 14-Mar-15 0% 0% -23.00DHCLBGF110Removal Of Struts-B2 6.00 10-Jan-15 15-Jan-15 14-Feb-15 19-Feb-15 0% 0% -25.00DHSLBB1100Slab - Level B02 10.00 15-Jan-15 26-Jan-15 19-Feb-15 02-Mar-15 0% 0% -28.00DHCLBGF100Columns & Walls 6.00 28-Jan-15 03-Feb-15 04-Mar-15 10-Mar-15 0% 0% -28.00DHRWBGF100Retaining Wall 10.00 27-Jan-15 07-Feb-15 03-Mar-15 14-Mar-15 0% 0% -23.00

STAIRCASES BASEMENT B02STAIRCASES BASEMENT B02 10.00 08-Apr-14 08-Apr-14 24-Dec-13 A 23-Feb-14 A 0% 0%DHSLAP5156 Stair # 3 8.00 08-Apr-14 08-Apr-14 24-Dec-13 A 29-Dec-13 A 100% 100%DHSLAP5155 Stair # 2 5.00 08-Apr-14 08-Apr-14 12-Feb-14 A 17-Feb-14 A 100% 100%DHSLAP5157 Stair # 1 4.00 08-Apr-14 08-Apr-14 18-Feb-14 A 23-Feb-14 A 100% 100%

BASEMENT B01 (-3.20 FFL)BASEMENT B01 (-3.20 FFL) 1069.00 24-Feb-14 03-Mar-15 16-Jul-13 A 07-Apr-15 78.22% 78.22% -28.00STRUCTURAL B01STRUCTURAL B01 1069.00 24-Feb-14 03-Mar-15 16-Jul-13 A 07-Apr-15 78.22% 78.22% -28.00BASEMENT B01 (ZONE A)BASEMENT B01 (ZONE A) 619.00 24-Feb-14 24-Feb-14 16-Jul-13 A 22-Oct-13 A 100% 100%BASEMENT B01 (ZONE B)BASEMENT B01 (ZONE B) 27.00 01-Feb-15 03-Mar-15 08-Mar-15 07-Apr-15 0% 0% -28.00DHCLBP1110Removal Of Struts-B1 6.00 01-Feb-15 07-Feb-15 08-Mar-15 14-Mar-15 0% 0% -23.00DHSLBGF100Slab - Level B01 14.00 04-Feb-15 19-Feb-15 11-Mar-15 26-Mar-15 0% 0% -28.00DHCLBP1100Columns & Walls 10.00 21-Feb-15 03-Mar-15 28-Mar-15 07-Apr-15 0% 0% -28.00

STAIRCASES BASEMENT B01STAIRCASES BASEMENT B01 12.00 12-Apr-14 15-Apr-14 01-Jan-14 A 15-Apr-14 A 0% 0%DHSLAP5165 Stair # 3 8.00 15-Apr-14 15-Apr-14 01-Jan-14 A 06-Jan-14 A 100% 100%DHSLAP5160 Stair # 2 5.00 15-Apr-14 15-Apr-14 14-Feb-14 A 19-Feb-14 A 100% 100%DHSLAP5167 Stair # 1 4.00 12-Apr-14 15-Apr-14 12-Apr-14 A 15-Apr-14 A 100% 100%

GROUND FLOOR (000 FFL)GROUND FLOOR (000 FFL) 1067.00 24-Feb-14 23-Mar-15 22-Aug-13 A 27-Apr-15 78.69% 78.69% -28.00STRUCTURAL GFSTRUCTURAL GF 1067.00 24-Feb-14 23-Mar-15 22-Aug-13 A 27-Apr-15 78.69% 78.69% -28.00GROUND FLOOR (ZONE A)GROUND FLOOR (ZONE A) 634.00 24-Feb-14 24-Feb-14 22-Aug-13 A 04-Nov-13 A 100% 100%GROUND FLOOR (ZONE B)GROUND FLOOR (ZONE B) 17.00 04-Mar-15 23-Mar-15 08-Apr-15 27-Apr-15 0% 0% -28.00DHSLBP1100Slab - Level GF 12.00 04-Mar-15 17-Mar-15 08-Apr-15 21-Apr-15 0% 0% -28.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Removal Of Struts-B4Construct Slab - Level B04Columns & WallsRetaining Wall

Stair # 1

Stair # 2

Removal Of Struts-B3Slab - Level B03Columns & WallsRetaining Wall

Stair # 3Stair # 1Stair # 2

Removal Of Struts-B2Slab - Level B02Columns & WallsRetaining Wall

Stair # 3Stair # 2Stair # 1

Removal Of Struts-B1Slab - Level B01

Columns & Walls

Stair # 3Stair # 2Stair # 1

Slab - Level GF

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 2 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 106: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHCLBP2100Columns & Walls 5.00 18-Mar-15 23-Mar-15 22-Apr-15 27-Apr-15 0% 0% -28.00STAIRCASES GROUND FLOORSTAIRCASES GROUND FLOOR 14.00 19-Apr-14 22-Apr-14 08-Jan-14 A 22-Apr-14 A 0% 0%DHSLAP5175 Stair # 3 8.00 22-Apr-14 22-Apr-14 08-Jan-14 A 13-Jan-14 A 100% 100%DHSLAP5170 Stair # 2 5.00 22-Apr-14 22-Apr-14 14-Feb-14 A 19-Feb-14 A 100% 100%DHSLAP5180 Stair # 1 4.00 19-Apr-14 22-Apr-14 19-Apr-14 A 22-Apr-14 A 100% 100%

LEVEL P1 (+3.10 FFL)LEVEL P1 (+3.10 FFL) 1057.00 24-Feb-14 06-Apr-15 22-Aug-13 A 11-May-15 84.72% 84.72% -28.00STRUCTURAL P1STRUCTURAL P1 1057.00 24-Feb-14 06-Apr-15 22-Aug-13 A 11-May-15 84.72% 84.72% -28.00LEVEL P1 (ZONE A)LEVEL P1 (ZONE A) 664.00 24-Feb-14 24-Feb-14 22-Aug-13 A 24-Nov-13 A 100% 100%LEVEL P1 (ZONE B)LEVEL P1 (ZONE B) 12.00 24-Mar-15 06-Apr-15 28-Apr-15 11-May-15 0% 0% -28.00DHSLBP2100Slab - Level P1 7.00 24-Mar-15 31-Mar-15 28-Apr-15 05-May-15 0% 0% -28.00DHCLBP3100Columns & Walls 5.00 01-Apr-15 06-Apr-15 06-May-15 11-May-15 0% 0% -28.00

STAIRCASES LEVEL P1STAIRCASES LEVEL P1 15.00 24-Apr-14 29-Apr-14 31-Jan-14 A 29-Apr-14 A 0% 0%DHSLAP5190 Stair # 3 6.00 24-Apr-14 24-Apr-14 31-Jan-14 A 05-Feb-14 A 100% 100%DHSLAP5195 Stair # 1 4.00 26-Apr-14 29-Apr-14 26-Apr-14 A 29-Apr-14 A 100% 100%DHSLAP5185 Stair # 2 5.00 24-Apr-14 29-Apr-14 24-Apr-14 A 29-Apr-14 A 100% 100%

LEVEL P2 (+6.20 FFL)LEVEL P2 (+6.20 FFL) 470.00 24-Feb-14 20-Apr-15 20-Oct-13 A 26-May-15 84.73% 84.73% -28.00STRUCTURAL P2STRUCTURAL P2 470.00 24-Feb-14 20-Apr-15 20-Oct-13 A 26-May-15 84.73% 84.73% -28.00LEVEL P2 (ZONE A)LEVEL P2 (ZONE A) 72.00 24-Feb-14 24-Feb-14 20-Oct-13 A 13-Dec-13 A 100% 100%LEVEL P2 (ZONE B)LEVEL P2 (ZONE B) 12.00 07-Apr-15 20-Apr-15 12-May-15 26-May-15 0% 0% -28.00DHSLBP3100Slab - Level P2 7.00 07-Apr-15 14-Apr-15 12-May-15 20-May-15 0% 0% -28.00DHCLBP4100Columns & Walls 5.00 15-Apr-15 20-Apr-15 21-May-15 26-May-15 0% 0% -28.00

STAIRCASES LEVEL P2STAIRCASES LEVEL P2 16.00 30-Apr-14 05-May-14 12-Feb-14 A 05-May-14 A 0% 0%DHSLAP5210 Stair # 3 6.00 30-Apr-14 30-Apr-14 12-Feb-14 A 17-Feb-14 A 100% 100%DHSLAP5220 Stair # 1 4.00 01-May-14 05-May-14 01-May-14 A 05-May-14 A 100% 100%DHSLAP5200 Stair # 2 5.00 30-Apr-14 05-May-14 30-Apr-14 A 05-May-14 A 100% 100%

LEVEL P3 (+9.30 FFL)LEVEL P3 (+9.30 FFL) 472.00 24-Feb-14 04-May-15 04-Nov-13 A 09-Jun-15 84.81% 84.81% -28.00STRUCTURAL P3STRUCTURAL P3 472.00 24-Feb-14 04-May-15 04-Nov-13 A 09-Jun-15 84.81% 84.81% -28.00LEVEL P3 (ZONE A)LEVEL P3 (ZONE A) 32.00 24-Feb-14 24-Feb-14 04-Nov-13 A 31-Dec-13 A 100% 100%LEVEL P3 (ZONE B)LEVEL P3 (ZONE B) 12.00 21-Apr-15 04-May-15 27-May-15 09-Jun-15 0% 0% -28.00DHSLBP4100Slab - Level P3 7.00 21-Apr-15 28-Apr-15 27-May-15 03-Jun-15 0% 0% -28.00DHCLBP5100Columns & Walls 5.00 29-Apr-15 04-May-15 04-Jun-15 09-Jun-15 0% 0% -28.00

STAIRCASES LEVEL P3STAIRCASES LEVEL P3 6.00 06-May-14 12-May-14 06-May-14 A 12-May-14 A 0% 0%DHSLAP5250 Stair # 1 4.00 07-May-14 11-May-14 07-May-14 A 11-May-14 A 100% 100%DHSLAP5230 Stair # 2 5.00 06-May-14 11-May-14 06-May-14 A 11-May-14 A 100% 100%DHSLAP5240 Stair # 3 6.00 06-May-14 12-May-14 06-May-14 A 12-May-14 A 100% 100%

LEVEL P4 (+12.4 FFL)LEVEL P4 (+12.4 FFL) 471.00 24-Feb-14 19-May-15 05-Dec-13 A 23-Jun-15 84.73% 84.73% -28.00STRUCTURAL P4STRUCTURAL P4 471.00 24-Feb-14 19-May-15 05-Dec-13 A 23-Jun-15 84.73% 84.73% -28.00LEVEL P4 (ZONE A)LEVEL P4 (ZONE A) 34.00 24-Feb-14 24-Feb-14 05-Dec-13 A 21-Jan-14 A 100% 100%LEVEL P4 (ZONE B)LEVEL P4 (ZONE B) 12.00 05-May-15 19-May-15 10-Jun-15 23-Jun-15 0% 0% -28.00DHSLBP5100Slab - Level P4 7.00 05-May-15 12-May-15 10-Jun-15 17-Jun-15 0% 0% -28.00DHCLBP5110Columns & Walls 5.00 13-May-15 19-May-15 18-Jun-15 23-Jun-15 0% 0% -28.00

STAIRCASES LEVEL P4STAIRCASES LEVEL P4 7.00 12-May-14 19-May-14 12-May-14 A 19-May-14 A 0% 0%DHSLAP5267 Stair # 1 4.00 13-May-14 17-May-14 13-May-14 A 17-May-14 A 100% 100%DHSLAP5260 Stair # 2 5.00 12-May-14 17-May-14 12-May-14 A 17-May-14 A 100% 100%DHSLAP5265 Stair # 3 6.00 13-May-14 19-May-14 13-May-14 A 19-May-14 A 100% 100%

LEVEL P5 (+15.79 FFL)LEVEL P5 (+15.79 FFL) 458.00 24-Feb-14 04-Jun-15 08-Jan-14 A 09-Jul-15 92.33% 92.33% -28.00STRUCTURAL P5STRUCTURAL P5 458.00 24-Feb-14 04-Jun-15 08-Jan-14 A 09-Jul-15 92.33% 92.33% -28.00LEVEL P5 (ZONE A)LEVEL P5 (ZONE A) 35.00 24-Feb-14 25-Mar-14 08-Jan-14 A 24-Feb-14 A 100% 100%LEVEL P5 (ZONE B)LEVEL P5 (ZONE B) 14.00 20-May-15 04-Jun-15 24-Jun-15 09-Jul-15 0% 0% -28.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Columns & Walls

Stair # 3Stair # 2Stair # 1

Slab - Level P1Columns & Walls

Stair # 3Stair # 1Stair # 2

Slab - Level P2Columns & Walls

Stair # 3Stair # 1Stair # 2

Slab - Level P3Columns & Walls

Stair # 1Stair # 2Stair # 3

Slab - Level P4Columns & Walls

Stair # 1Stair # 2Stair # 3

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 3 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 107: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHSLBP5130Slab - Level P5 14.00 20-May-15 04-Jun-15 24-Jun-15 09-Jul-15 0% 0% -28.00STAIRCASES LEVEL P5STAIRCASES LEVEL P5 6.00 18-May-14 24-May-14 18-May-14 A 24-May-14 A 0% 0%DHSLAP5290 Stair # 2 5.00 18-May-14 22-May-14 18-May-14 A 22-May-14 A 100% 100%DHSLAP5299 Stair # 1 4.00 20-May-14 24-May-14 20-May-14 A 24-May-14 A 100% 100%

TOWERTOWER 454.00 24-Feb-14 12-Aug-15 10-Feb-14 A 17-Aug-15 45.41% 44.61% 7.00LEVELS 06 - 29LEVELS 06 - 29 207.00 24-Feb-14 23-Oct-14 10-Feb-14 A 27-Oct-14 100% 100% 50.00LEVEL 06LEVEL 06 83.00 24-Feb-14 29-May-14 10-Feb-14 A 18-May-14 A 100% 100%STRUCTURAL - LEVEL 6STRUCTURAL - LEVEL 6 20.00 24-Feb-14 16-Mar-14 10-Feb-14 A 09-Mar-14 A 100% 100%DHCWA07100Core Wal - Level 06 6.00 24-Feb-14 24-Feb-14 15-Feb-14 A 20-Feb-14 A 100% 100%DHSLA06100Construction of Horizontals - L06 4.00 10-Mar-14 11-Mar-14 10-Feb-14 A 04-Mar-14 A 100% 100%DHCWA07110Construction of Verticals - L06 3.00 13-Mar-14 16-Mar-14 06-Mar-14 A 09-Mar-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 25-May-14 29-May-14 08-May-14 A 18-May-14 A 0% 0%DHSLA06102Stair # 2 4.00 25-May-14 29-May-14 08-May-14 A 13-May-14 A 100% 100%DHSLA06104Stair # 1 4.00 25-May-14 29-May-14 13-May-14 A 18-May-14 A 100% 100%

LEVEL 07LEVEL 07 83.00 24-Feb-14 05-Jun-14 20-Feb-14 A 24-May-14 A 100% 100%STRUCTURAL - LEVEL 07STRUCTURAL - LEVEL 07 21.00 24-Feb-14 24-Mar-14 20-Feb-14 A 20-Mar-14 A 100% 100%DHCWA08100Core Wal - Level 07 9.00 24-Feb-14 05-Mar-14 20-Feb-14 A 28-Feb-14 A 100% 100%DHSLA07100Construction of Horizontals - L07 4.00 17-Mar-14 20-Mar-14 06-Mar-14 A 16-Mar-14 A 100% 100%DHCWA08110Construction of Verticals - L07 3.00 22-Mar-14 24-Mar-14 16-Mar-14 A 20-Mar-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 02-Jun-14 05-Jun-14 17-May-14 A 24-May-14 A 0% 0%A1330 Stair # 2 4.00 02-Jun-14 05-Jun-14 17-May-14 A 22-May-14 A 100% 100%A1320 Stair # 1 4.00 02-Jun-14 05-Jun-14 18-May-14 A 24-May-14 A 100% 100%

LEVEL 08LEVEL 08 83.00 06-Mar-14 11-Jun-14 01-Mar-14 A 31-May-14 A 100% 100%STRUCTURAL WORKS - LEVEL 08STRUCTURAL WORKS - LEVEL 08 22.00 06-Mar-14 31-Mar-14 01-Mar-14 A 28-Mar-14 A 100% 100%DHCWA09100Core Wal - Level 08 9.00 06-Mar-14 16-Mar-14 01-Mar-14 A 11-Mar-14 A 100% 100%DHSLA08100Construction of Horizontals - L08 4.00 24-Mar-14 27-Mar-14 16-Mar-14 A 24-Mar-14 A 100% 100%DHCWA09110Construction of Verticals - L08 3.00 29-Mar-14 31-Mar-14 25-Mar-14 A 28-Mar-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 08-Jun-14 11-Jun-14 22-May-14 A 31-May-14 A 0% 0%A1350 Stair # 2 4.00 08-Jun-14 11-Jun-14 22-May-14 A 28-May-14 A 100% 100%A1340 Stair # 1 4.00 08-Jun-14 11-Jun-14 25-May-14 A 31-May-14 A 100% 100%

LEVEL 09LEVEL 09 79.00 17-Mar-14 17-Jun-14 12-Mar-14 A 23-Jun-14 A 100% 100%STRUCTURAL WORKS -LEVEL 09STRUCTURAL WORKS -LEVEL 09 19.00 17-Mar-14 07-Apr-14 12-Mar-14 A 08-Apr-14 A 100% 100%DHCWA10100Core Wall - Level 09 10.00 17-Mar-14 27-Mar-14 12-Mar-14 A 27-Mar-14 A 100% 100%DHSLA09100Construction of Horizontals - L09 4.00 31-Mar-14 03-Apr-14 25-Mar-14 A 03-Apr-14 A 100% 100%DHCWA10110Construction of Verticals - L09 3.00 05-Apr-14 07-Apr-14 03-Apr-14 A 08-Apr-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 14-Jun-14 17-Jun-14 19-Jun-14 A 23-Jun-14 A 0% 0%A1360 Stair # 1 4.00 14-Jun-14 17-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100%A1370 Stair # 2 4.00 14-Jun-14 17-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100%

LEVEL 10LEVEL 10 74.00 29-Mar-14 23-Jun-14 29-Mar-14 A 23-Jun-14 A 100% 100%STRUCTURAL WORKS -LEVEL 10STRUCTURAL WORKS -LEVEL 10 15.00 29-Mar-14 14-Apr-14 29-Mar-14 A 15-Apr-14 A 100% 100%DHCWA11100Core Wall - Level 10 4.00 29-Mar-14 01-Apr-14 29-Mar-14 A 06-Apr-14 A 100% 100%DHSLA10100Construction of Horizontals - L10 4.00 07-Apr-14 10-Apr-14 05-Apr-14 A 10-Apr-14 A 100% 100%DHCWA11110Construction of Verticals - L10 3.00 12-Apr-14 14-Apr-14 13-Apr-14 A 15-Apr-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 19-Jun-14 23-Jun-14 19-Jun-14 A 23-Jun-14 A 0% 0%A1380 Stair # 1 4.00 19-Jun-14 23-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100%A1390 Stair # 2 4.00 19-Jun-14 23-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100%

LEVEL 11LEVEL 11 75.00 02-Apr-14 29-Jun-14 07-Apr-14 A 23-Jun-14 A 100% 100%STRUCTURAL WORKS -LEVEL 11STRUCTURAL WORKS -LEVEL 11 16.00 02-Apr-14 20-Apr-14 07-Apr-14 A 21-Apr-14 A 100% 100%DHCWA12100Core Wall - Level 11 4.00 02-Apr-14 06-Apr-14 07-Apr-14 A 08-Apr-14 A 100% 100%

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Slab - Level P5

Stair # 2Stair # 1

Core Wal - Level 06Construction of Horizontals - L06Construction of Verticals - L06

Stair # 2Stair # 1

Core Wal - Level 07Construction of Horizontals - L07Construction of Verticals - L07

Stair # 2Stair # 1

Core Wal - Level 08Construction of Horizontals - L08Construction of Verticals - L08

Stair # 2Stair # 1

Core Wall - Level 09Construction of Horizontals - L09Construction of Verticals - L09

Stair # 1Stair # 2

Core Wall - Level 10Construction of Horizontals - L10Construction of Verticals - L10

Stair # 1Stair # 2

Core Wall - Level 11

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 4 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 108: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHSLA11100Construction of Horizontals - L11 4.00 14-Apr-14 17-Apr-14 12-Apr-14 A 17-Apr-14 A 100% 100%DHCWA12110Construction of Verticals - L11 2.00 19-Apr-14 20-Apr-14 18-Apr-14 A 21-Apr-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 25-Jun-14 29-Jun-14 19-Jun-14 A 23-Jun-14 A 0% 0%A1400 Stair # 1 4.00 25-Jun-14 29-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100%A1410 Stair # 2 4.00 25-Jun-14 29-Jun-14 19-Jun-14 A 23-Jun-14 A 100% 100%

LEVEL 12LEVEL 12 144.00 07-Apr-14 07-Jul-14 06-Apr-14 A 23-Jun-14 A 100% 100%STRUCTURAL WORKS -LEVEL 12STRUCTURAL WORKS -LEVEL 12 144.00 07-Apr-14 27-Apr-14 06-Apr-14 A 28-Apr-14 A 100% 100%DHCWA13120Tower Crane Jump 1.00 13-Apr-14 13-Apr-14 06-Apr-14 A 06-Apr-14 A 100% 100%DHCWA13100Core Wall - Level 12 6.00 07-Apr-14 13-Apr-14 10-Apr-14 A 14-Apr-14 A 100% 100%DHSLA12100Construction of Horizontals - L12 4.00 21-Apr-14 24-Apr-14 19-Apr-14 A 24-Apr-14 A 100% 100%DHCWA13110Construction of Verticals - L12 2.00 26-Apr-14 27-Apr-14 25-Apr-14 A 28-Apr-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 03-Jul-14 07-Jul-14 19-Jun-14 A 23-Jun-14 A 0% 0%A1420 Stair # 1 4.00 03-Jul-14 07-Jul-14 19-Jun-14 A 23-Jun-14 A 100% 100%A1430 Stair # 2 3.00 05-Jul-14 07-Jul-14 19-Jun-14 A 23-Jun-14 A 100% 100%

LEVEL 13LEVEL 13 79.00 14-Apr-14 15-Jul-14 15-Apr-14 A 14-Jul-14 A 100% 100%STRUCTURAL WORKS -LEVEL 13STRUCTURAL WORKS -LEVEL 13 17.00 14-Apr-14 03-May-14 15-Apr-14 A 05-May-14 A 100% 100%DHCWA14100Core Wall - Level 13 4.00 14-Apr-14 17-Apr-14 15-Apr-14 A 20-Apr-14 A 100% 100%DHSLA13100Construction of Horizontals - L13 3.00 28-Apr-14 30-Apr-14 25-Apr-14 A 01-May-14 A 100% 100%DHCWA14110Construction of Verticals - L13 2.00 01-May-14 03-May-14 02-May-14 A 05-May-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 12-Jul-14 15-Jul-14 19-Jun-14 A 14-Jul-14 A 0% 0%A1450 Stair # 2 3.00 13-Jul-14 15-Jul-14 19-Jun-14 A 23-Jun-14 A 100% 100%A1440 Stair # 1 4.00 12-Jul-14 15-Jul-14 23-Jun-14 A 14-Jul-14 A 100% 100%

LEVEL 14LEVEL 14 82.00 19-Apr-14 23-Jul-14 21-Apr-14 A 20-Jul-14 A 100% 100%STRUCTURAL WORKS - LEVEL 14STRUCTURAL WORKS - LEVEL 14 18.00 19-Apr-14 08-May-14 21-Apr-14 A 11-May-14 A 100% 100%DHCWA15100Core Wall - Level 14 4.00 19-Apr-14 22-Apr-14 21-Apr-14 A 27-Apr-14 A 100% 100%DHSLA14100Construction of Horizontals - L14 3.00 04-May-14 06-May-14 03-May-14 A 08-May-14 A 100% 100%DHCWA15110Construction of Verticals - L14 2.00 07-May-14 08-May-14 09-May-14 A 11-May-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 20-Jul-14 23-Jul-14 16-Jul-14 A 20-Jul-14 A 0% 0%A1460 Stair # 1 4.00 20-Jul-14 23-Jul-14 16-Jul-14 A 20-Jul-14 A 100% 100%A1470 Stair # 2 3.00 21-Jul-14 23-Jul-14 17-Jul-14 A 20-Jul-14 A 100% 100%

LEVEL 15LEVEL 15 84.00 23-Apr-14 02-Aug-14 28-Apr-14 A 26-Jul-14 A 100% 100%STRUCTURAL WORKS -LEVEL 15STRUCTURAL WORKS -LEVEL 15 19.00 23-Apr-14 14-May-14 28-Apr-14 A 18-May-14 A 100% 100%DHCWA16100Core Wall - Level 15 9.00 23-Apr-14 03-May-14 28-Apr-14 A 05-May-14 A 100% 100%DHSLA15100Construction of Horizontals - L15 3.00 10-May-14 12-May-14 10-May-14 A 15-May-14 A 100% 100%DHCWA16110Construction of Verticals - L15 2.00 13-May-14 14-May-14 17-May-14 A 18-May-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 27-Jul-14 02-Aug-14 22-Jul-14 A 26-Jul-14 A 0% 0%A1480 Stair # 1 4.00 27-Jul-14 02-Aug-14 22-Jul-14 A 26-Jul-14 A 100% 100%A1490 Stair # 2 3.00 30-Jul-14 02-Aug-14 22-Jul-14 A 26-Jul-14 A 100% 100%

LEVEL 16LEVEL 16 121.00 04-May-14 07-Aug-14 05-May-14 A 31-Jul-14 A 100% 100%STRUCTURAL WORKS -LEVEL 16STRUCTURAL WORKS -LEVEL 16 121.00 04-May-14 20-May-14 05-May-14 A 23-May-14 A 100% 100%DHCWA17120Tower Crane Jump 1.00 08-May-14 08-May-14 05-May-14 A 05-May-14 A 100% 100%DHCWA17100Core Wall - Level 16 5.00 04-May-14 08-May-14 06-May-14 A 08-May-14 A 100% 100%DHSLA16100Construction of Horizontals- L16 3.00 15-May-14 18-May-14 16-May-14 A 20-May-14 A 100% 100%DHCWA17110Construction of Verticals - L16 2.00 19-May-14 20-May-14 21-May-14 A 23-May-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 04-Aug-14 07-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0%A1500 Stair # 1 4.00 04-Aug-14 07-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%A1510 Stair # 2 3.00 05-Aug-14 07-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%

LEVEL 17LEVEL 17 80.00 10-May-14 13-Aug-14 10-May-14 A 31-Jul-14 A 100% 100%STRUCTURAL WORKS - LEVEL 17STRUCTURAL WORKS - LEVEL 17 15.00 10-May-14 26-May-14 10-May-14 A 30-May-14 A 100% 100%

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Construction of Horizontals - L11Construction of Verticals - L11

Stair # 1Stair # 2

Tower Crane JumpCore Wall - Level 12Construction of Horizontals - L12Construction of Verticals - L12

Stair # 1Stair # 2

Core Wall - Level 13Construction of Horizontals - L13Construction of Verticals - L13

Stair # 2Stair # 1

Core Wall - Level 14Construction of Horizontals - L14Construction of Verticals - L14

Stair # 1Stair # 2

Core Wall - Level 15Construction of Horizontals - L15Construction of Verticals - L15

Stair # 1Stair # 2

Tower Crane JumpCore Wall - Level 16

Construction of Horizontals- L16Construction of Verticals - L16

Stair # 1Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 5 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 109: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHCWA18100Core Wall - Level 17 5.00 10-May-14 14-May-14 10-May-14 A 14-May-14 A 100% 100%DHSLA17100Construction of Horizontals - L17 3.00 21-May-14 24-May-14 21-May-14 A 27-May-14 A 100% 100%DHCWA18110Construction of Verticals - L17 2.00 25-May-14 26-May-14 28-May-14 A 30-May-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 10-Aug-14 13-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0%A1520 Stair # 1 4.00 10-Aug-14 13-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%A1530 Stair # 2 3.00 11-Aug-14 13-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%

LEVEL 18LEVEL 18 81.00 15-May-14 20-Aug-14 15-May-14 A 31-Jul-14 A 100% 100%STRUCTURAL WORKS -LEVEL 18STRUCTURAL WORKS -LEVEL 18 16.00 15-May-14 03-Jun-14 15-May-14 A 05-Jun-14 A 100% 100%DHCWA19100Core Wall - Level 18 5.00 15-May-14 20-May-14 15-May-14 A 19-May-14 A 100% 100%DHSLA18100Construction of Horizontals - L18 3.00 29-May-14 01-Jun-14 28-May-14 A 03-Jun-14 A 100% 100%DHCWA19110Construction of Verticals - L18 2.00 02-Jun-14 03-Jun-14 04-Jun-14 A 05-Jun-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 17-Aug-14 20-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0%A1540 Stair # 1 4.00 17-Aug-14 20-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%A1550 Stair # 2 3.00 18-Aug-14 20-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%

LEVEL 19LEVEL 19 106.00 21-May-14 27-Aug-14 20-May-14 A 31-Jul-14 A 100% 100%STRUCTURAL WORKS -LEVEL 19STRUCTURAL WORKS -LEVEL 19 106.00 21-May-14 09-Jun-14 20-May-14 A 12-Jun-14 A 100% 100%DHCWA20120Tower Crane Jump 1.00 26-May-14 26-May-14 20-May-14 A 20-May-14 A 100% 100%DHCWA20100Core Wall - Level 19 5.00 21-May-14 26-May-14 20-May-14 A 26-May-14 A 100% 100%DHSLA191000Construction of Horizontals - L19 3.00 04-Jun-14 07-Jun-14 04-Jun-14 A 09-Jun-14 A 100% 100%DHCWA20110Construction of Verticals - L19 2.00 08-Jun-14 09-Jun-14 10-Jun-14 A 12-Jun-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 24-Aug-14 27-Aug-14 30-Jul-14 A 31-Jul-14 A 0% 0%A1560 Stair # 1 4.00 24-Aug-14 27-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%A1570 Stair # 2 3.00 25-Aug-14 27-Aug-14 30-Jul-14 A 31-Jul-14 A 100% 100%

LEVEL 20LEVEL 20 84.00 28-May-14 04-Sep-14 27-May-14 A 06-Aug-14 A 100% 100%STRUCTURAL WORKS - LEVEL 20STRUCTURAL WORKS - LEVEL 20 16.00 28-May-14 15-Jun-14 27-May-14 A 18-Jun-14 A 100% 100%DHCWA21100Core Wall - Level 20 4.00 28-May-14 01-Jun-14 27-May-14 A 31-May-14 A 100% 100%DHSLA20100Construction of Horizontals - L20 3.00 10-Jun-14 12-Jun-14 11-Jun-14 A 14-Jun-14 A 100% 100%DHCWA21110Construction of Verticals - L20 2.00 14-Jun-14 15-Jun-14 15-Jun-14 A 18-Jun-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 01-Sep-14 04-Sep-14 02-Aug-14 A 06-Aug-14 A 0% 0%A1580 Stair # 1 4.00 01-Sep-14 04-Sep-14 02-Aug-14 A 06-Aug-14 A 100% 100%A1590 Stair # 2 3.00 02-Sep-14 04-Sep-14 02-Aug-14 A 06-Aug-14 A 100% 100%

LEVEL 21LEVEL 21 85.00 02-Jun-14 10-Sep-14 01-Jun-14 A 12-Aug-14 A 100% 100%STRUCTURAL WORKS - LEVEL 21STRUCTURAL WORKS - LEVEL 21 17.00 02-Jun-14 21-Jun-14 01-Jun-14 A 24-Jun-14 A 100% 100%DHCWA22100Core Wall - Level 21 4.00 02-Jun-14 05-Jun-14 01-Jun-14 A 06-Jun-14 A 100% 100%DHSLA21100Construction of Horizontals - L21 3.00 16-Jun-14 18-Jun-14 18-Jun-14 A 21-Jun-14 A 100% 100%DHCWA22110Construction of Verticals - L21 2.00 19-Jun-14 21-Jun-14 22-Jun-14 A 24-Jun-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 07-Sep-14 10-Sep-14 07-Aug-14 A 12-Aug-14 A 0% 0%A1600 Stair # 1 4.00 07-Sep-14 10-Sep-14 07-Aug-14 A 12-Aug-14 A 100% 100%A1610 Stair # 2 3.00 08-Sep-14 10-Sep-14 07-Aug-14 A 12-Aug-14 A 100% 100%

LEVEL 22LEVEL 22 81.00 12-Jun-14 16-Sep-14 07-Jun-14 A 26-Aug-14 A 100% 100%STRUCTURAL WORKS - LEVEL 22STRUCTURAL WORKS - LEVEL 22 13.00 12-Jun-14 26-Jun-14 07-Jun-14 A 30-Jun-14 A 100% 100%DHCWA23100Core Wall - Level 22 4.00 12-Jun-14 16-Jun-14 07-Jun-14 A 10-Jun-14 A 100% 100%DHSLA22100Construction of Horizontals - L22 3.00 22-Jun-14 24-Jun-14 24-Jun-14 A 27-Jun-14 A 100% 100%DHCWA23110Construction of Verticals - L22 2.00 25-Jun-14 26-Jun-14 28-Jun-14 A 30-Jun-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 13-Sep-14 16-Sep-14 13-Aug-14 A 26-Aug-14 A 0% 0%A1620 Stair # 1 4.00 13-Sep-14 16-Sep-14 13-Aug-14 A 18-Aug-14 A 100% 100%A1630 Stair # 2 3.00 14-Sep-14 16-Sep-14 23-Aug-14 A 26-Aug-14 A 100% 100%

LEVEL 23LEVEL 23 84.00 17-Jun-14 21-Sep-14 12-Jun-14 A 23-Aug-14 A 100% 100%STRUCTURAL WORKS - LEVEL 23STRUCTURAL WORKS - LEVEL 23 84.00 17-Jun-14 06-Jul-14 12-Jun-14 A 08-Jul-14 A 100% 100%

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Core Wall - Level 17Construction of Horizontals - L17Construction of Verticals - L17

Stair # 1Stair # 2

Core Wall - Level 18Construction of Horizontals - L18Construction of Verticals - L18

Stair # 1Stair # 2

Tower Crane JumpCore Wall - Level 19

Construction of Horizontals - L19Construction of Verticals - L19

Stair # 1Stair # 2

Core Wall - Level 20Construction of Horizontals - L20Construction of Verticals - L20

Stair # 1Stair # 2

Core Wall - Level 21Construction of Horizontals - L21Construction of Verticals - L21

Stair # 1Stair # 2

Core Wall - Level 22Construction of Horizontals - L22Construction of Verticals - L22

Stair # 1Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 6 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 110: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHCWA24100Core Wall - Level 23 4.00 17-Jun-14 21-Jun-14 12-Jun-14 A 15-Jun-14 A 100% 100%DHCWA24120Tower Crane Jump 1.00 21-Jun-14 21-Jun-14 17-Jun-14 A 17-Jun-14 A 100% 100%DHSLA23100Construction of Horizontals- L23 5.00 28-Jun-14 02-Jul-14 27-Jun-14 A 04-Jul-14 A 100% 100%DHCWA24110Construction of Verticals - L23 3.00 03-Jul-14 06-Jul-14 04-Jul-14 A 08-Jul-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 17-Sep-14 21-Sep-14 18-Aug-14 A 23-Aug-14 A 0% 0%A1640 Stair # 1 4.00 17-Sep-14 21-Sep-14 18-Aug-14 A 23-Aug-14 A 100% 100%A1650 Stair # 2 3.00 18-Sep-14 21-Sep-14 18-Aug-14 A 23-Aug-14 A 100% 100%

LEVEL 24LEVEL 24 81.00 22-Jun-14 25-Sep-14 17-Jun-14 A 30-Aug-14 A 100% 100%STRUCTURAL WORKS - LEVEL 24STRUCTURAL WORKS - LEVEL 24 20.00 22-Jun-14 14-Jul-14 17-Jun-14 A 14-Jul-14 A 100% 100%DHCWA25100Core Wall - Level 24 8.00 22-Jun-14 30-Jun-14 17-Jun-14 A 19-Jun-14 A 100% 100%DHSLA24100Construction of Horizontals - L24 4.00 07-Jul-14 10-Jul-14 04-Jul-14 A 10-Jul-14 A 100% 100%DHCWA25110Construction of Verticals - L24 3.00 12-Jul-14 14-Jul-14 10-Jul-14 A 14-Jul-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 22-Sep-14 25-Sep-14 24-Aug-14 A 30-Aug-14 A 0% 0%A1660 Stair # 1 4.00 22-Sep-14 25-Sep-14 24-Aug-14 A 30-Aug-14 A 100% 100%A1670 Stair # 2 3.00 23-Sep-14 25-Sep-14 24-Aug-14 A 30-Aug-14 A 100% 100%

LEVEL 25LEVEL 25 78.00 01-Jul-14 01-Oct-14 21-Jun-14 A 04-Sep-14 A 100% 100%STRUCTURAL WORKS - LEVEL 25STRUCTURAL WORKS - LEVEL 25 18.00 01-Jul-14 21-Jul-14 21-Jun-14 A 19-Jul-14 A 100% 100%DHCWA26100Core Wall - Level 25 5.00 01-Jul-14 06-Jul-14 21-Jun-14 A 26-Jun-14 A 100% 100%DHSLA25100Construction of Horizontals - L25 4.00 15-Jul-14 19-Jul-14 10-Jul-14 A 17-Jul-14 A 100% 100%DHCWA26110Construction of Verticals - L25 2.00 20-Jul-14 21-Jul-14 17-Jul-14 A 19-Jul-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 28-Sep-14 01-Oct-14 01-Sep-14 A 04-Sep-14 A 0% 0%A1680 Stair # 1 4.00 28-Sep-14 01-Oct-14 01-Sep-14 A 04-Sep-14 A 75% 100%A1690 Stair # 2 3.00 29-Sep-14 01-Oct-14 01-Sep-14 A 04-Sep-14 A 66.67% 100%

LEVEL 26LEVEL 26 78.00 07-Jul-14 09-Oct-14 27-Jun-14 A 08-Sep-14 A 100% 100%STRUCTURAL WORKS - LEVEL 26STRUCTURAL WORKS - LEVEL 26 19.00 07-Jul-14 30-Jul-14 27-Jun-14 A 26-Jul-14 A 100% 100%DHCWA27100Core Wall - Level 26 6.00 07-Jul-14 13-Jul-14 27-Jun-14 A 03-Jul-14 A 100% 100%DHSLA26100Construction of Horizontals - L26 4.00 22-Jul-14 26-Jul-14 17-Jul-14 A 23-Jul-14 A 100% 100%DHCWA27110Construction of Verticals - L26 2.00 27-Jul-14 30-Jul-14 22-Jul-14 A 26-Jul-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 06-Oct-14 09-Oct-14 05-Sep-14 A 08-Sep-14 A 0% 0%A1700 Stair # 1 4.00 06-Oct-14 09-Oct-14 05-Sep-14 A 08-Sep-14 A 0% 100%A1710 Stair # 2 3.00 07-Oct-14 09-Oct-14 05-Sep-14 A 08-Sep-14 A 0% 100%

LEVEL 27LEVEL 27 76.00 14-Jul-14 14-Oct-14 04-Jul-14 A 14-Sep-14 A 100% 100%STRUCTURAL WORKS - LEVEL 27STRUCTURAL WORKS - LEVEL 27 61.00 14-Jul-14 05-Aug-14 04-Jul-14 A 05-Aug-14 A 100% 100%DHCWA28100Core Wall - L27 6.00 14-Jul-14 20-Jul-14 04-Jul-14 A 14-Jul-14 A 100% 100%DHCWA28120Tower Crane Jump 1.00 20-Jul-14 20-Jul-14 15-Jul-14 A 17-Jul-14 A 100% 100%DHSLA27100Construction of Horizontals - L27 3.00 31-Jul-14 03-Aug-14 27-Jul-14 A 31-Jul-14 A 100% 100%DHCWA28110Construction of Verticals - L27 2.00 04-Aug-14 05-Aug-14 04-Aug-14 A 05-Aug-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 11-Oct-14 14-Oct-14 09-Sep-14 A 14-Sep-14 A 0% 0%A1720 Stair # 1 4.00 11-Oct-14 14-Oct-14 09-Sep-14 A 14-Sep-14 A 0% 100%A1730 Stair # 2 3.00 11-Oct-14 13-Oct-14 09-Sep-14 A 14-Sep-14 A 0% 100%

LEVEL 28LEVEL 28 76.00 21-Jul-14 19-Oct-14 15-Jul-14 A 21-Oct-14 100% 100% 50.00STRUCTURAL WORKS - LEVEL 28STRUCTURAL WORKS - LEVEL 28 18.00 21-Jul-14 12-Aug-14 15-Jul-14 A 11-Aug-14 A 100% 100%DHCWA29100Core Wall - L28 6.00 21-Jul-14 27-Jul-14 15-Jul-14 A 21-Jul-14 A 100% 100%DHSLA28100Construction of Horizontals - L28 3.00 06-Aug-14 09-Aug-14 06-Aug-14 A 09-Aug-14 A 100% 100%DHCWA29110Construction of Verticals - L28 3.00 10-Aug-14 12-Aug-14 10-Aug-14 A 11-Aug-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 15-Oct-14 19-Oct-14 18-Oct-14 21-Oct-14 0% 0% 50.00A1740 Stair # 1 4.00 15-Oct-14 19-Oct-14 18-Oct-14 21-Oct-14 0% 0% 13.00A1750 Stair # 2 3.00 15-Oct-14 18-Oct-14 19-Oct-14 21-Oct-14 0% 0% 50.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Core Wall - Level 23Tower Crane Jump

Construction of Horizontals- L23Construction of Verticals - L23

Stair # 1Stair # 2

Core Wall - Level 24Construction of Horizontals - L24Construction of Verticals - L24

Stair # 1Stair # 2

Core Wall - Level 25Construction of Horizontals - L25Construction of Verticals - L25

Stair # 1Stair # 2

Core Wall - Level 26Construction of Horizontals - L26Construction of Verticals - L26

Stair # 1Stair # 2

Core Wall - L27Tower Crane Jump

Construction of Horizontals - L27Construction of Verticals - L27

Stair # 1Stair # 2

Core Wall - L28Construction of Horizontals - L28Construction of Verticals - L28

Stair # 1Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 7 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 111: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

LEVEL 29LEVEL 29 74.00 30-Jul-14 23-Oct-14 22-Jul-14 A 27-Oct-14 100% 100% 50.00STRUCTURAL WORKS - LEVEL 29STRUCTURAL WORKS - LEVEL 29 18.00 30-Jul-14 19-Aug-14 22-Jul-14 A 16-Aug-14 A 100% 100%DHCWA30100Core Wall - L29 5.00 30-Jul-14 04-Aug-14 22-Jul-14 A 27-Jul-14 A 100% 100%DHSLA29100Construction of Horizontals - L29 3.00 13-Aug-14 16-Aug-14 12-Aug-14 A 14-Aug-14 A 100% 100%DHCWA30110Construction of Verticals - L29 3.00 17-Aug-14 19-Aug-14 15-Aug-14 A 16-Aug-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 19-Oct-14 23-Oct-14 22-Oct-14 27-Oct-14 0% 0% 50.00A1760 Stair # 1 4.00 20-Oct-14 23-Oct-14 22-Oct-14 27-Oct-14 0% 0% 13.00A1770 Stair # 2 4.00 19-Oct-14 22-Oct-14 22-Oct-14 27-Oct-14 0% 0% 50.00

LEVELS 30 (MECHANICAL FLOOR)LEVELS 30 (MECHANICAL FLOOR) 74.00 05-Aug-14 29-Oct-14 28-Jul-14 A 02-Nov-14 100% 100% 49.00LEVEL 30 (MECHANICAL FLOOR)LEVEL 30 (MECHANICAL FLOOR) 74.00 05-Aug-14 29-Oct-14 28-Jul-14 A 02-Nov-14 100% 100% 49.00STRUCTURAL WORKS - LEVEL 30STRUCTURAL WORKS - LEVEL 30 45.00 05-Aug-14 26-Aug-14 28-Jul-14 A 28-Aug-14 A 100% 100%DHCWA31100Core Wall - L30 6.00 05-Aug-14 11-Aug-14 28-Jul-14 A 13-Aug-14 A 100% 100%DHCWA31120Tower Crane Jump 1.00 05-Aug-14 05-Aug-14 20-Aug-14 A 20-Aug-14 A 100% 100%DHSLA30100Construction of Horizontals - L30 (Mech Floor) 3.00 20-Aug-14 23-Aug-14 17-Aug-14 A 22-Aug-14 A 100% 100%DHCWA31110Construction of Verticals - L30 (Mech Floor) 3.00 24-Aug-14 26-Aug-14 23-Aug-14 A 28-Aug-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 26-Oct-14 29-Oct-14 29-Oct-14 02-Nov-14 0% 0% 49.00A1780 Stair # 1 4.00 26-Oct-14 29-Oct-14 29-Oct-14 02-Nov-14 0% 0% 12.00A1790 Stair # 2 4.00 26-Oct-14 29-Oct-14 29-Oct-14 02-Nov-14 0% 0% 49.00

LEVELS 31 - 61LEVELS 31 - 61 197.00 12-Aug-14 30-Mar-15 14-Aug-14 A 04-Apr-15 22.1% 20.3% 35.00LEVEL 31LEVEL 31 73.00 12-Aug-14 03-Nov-14 14-Aug-14 A 08-Nov-14 100% 100% 47.00STRUCTURAL WORKS - LEVEL 31STRUCTURAL WORKS - LEVEL 31 19.00 12-Aug-14 02-Sep-14 14-Aug-14 A 02-Sep-14 A 100% 100%DHCWA32100Core Wall - L31 6.00 12-Aug-14 18-Aug-14 14-Aug-14 A 17-Aug-14 A 100% 100%DHSLA31100Construction of Horizontals - L31 4.00 27-Aug-14 31-Aug-14 29-Aug-14 A 31-Aug-14 A 100% 100%DHCWA32110Construction of Verticals - L31 2.00 01-Sep-14 02-Sep-14 31-Aug-14 A 02-Sep-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 30-Oct-14 03-Nov-14 04-Nov-14 08-Nov-14 0% 0% 47.00A1800 Stair # 1 4.00 30-Oct-14 03-Nov-14 04-Nov-14 08-Nov-14 0% 0% 11.00A1810 Stair # 2 3.00 01-Nov-14 03-Nov-14 05-Nov-14 08-Nov-14 0% 0% 47.00

LEVEL 32LEVEL 32 72.00 19-Aug-14 09-Nov-14 19-Aug-14 A 13-Nov-14 100% 100% 45.00STRUCTURAL WORKS - LEVEL 32STRUCTURAL WORKS - LEVEL 32 18.00 19-Aug-14 08-Sep-14 19-Aug-14 A 09-Sep-14 A 100% 100%DHCWA33100Core Wall - L32 4.00 19-Aug-14 23-Aug-14 19-Aug-14 A 24-Aug-14 A 100% 100%DHSLA32100Construction of Horizontals - L32 4.00 02-Sep-14 06-Sep-14 02-Sep-14 A 07-Sep-14 A 100% 100%DHCWA33110Construction of Verticals - L32 2.00 07-Sep-14 08-Sep-14 08-Sep-14 A 09-Sep-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 05-Nov-14 09-Nov-14 10-Nov-14 13-Nov-14 0% 0% 45.00A1820 Stair # 1 4.00 05-Nov-14 09-Nov-14 10-Nov-14 13-Nov-14 0% 0% 10.00A1830 Stair # 2 3.00 06-Nov-14 09-Nov-14 11-Nov-14 13-Nov-14 0% 0% 45.00

LEVEL 33LEVEL 33 72.00 24-Aug-14 13-Nov-14 24-Aug-14 A 18-Nov-14 100% 100% 44.00STRUCTURAL WORKS - LEVEL 33STRUCTURAL WORKS - LEVEL 33 19.00 24-Aug-14 14-Sep-14 24-Aug-14 A 14-Sep-14 A 100% 100%DHCWA34100Core Wall - L33 5.00 24-Aug-14 28-Aug-14 24-Aug-14 A 28-Aug-14 A 100% 100%DHSLA33100Construction of Horizontals - L33 4.00 08-Sep-14 11-Sep-14 10-Sep-14 A 12-Sep-14 A 100% 100%DHCWA34110Construction of Verticals - L33 2.00 13-Sep-14 14-Sep-14 13-Sep-14 A 14-Sep-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 10-Nov-14 13-Nov-14 15-Nov-14 18-Nov-14 0% 0% 44.00A1840 Stair # 1 4.00 10-Nov-14 13-Nov-14 15-Nov-14 18-Nov-14 0% 0% 10.00A1850 Stair # 2 3.00 11-Nov-14 13-Nov-14 16-Nov-14 18-Nov-14 0% 0% 44.00

LEVEL 34LEVEL 34 72.00 30-Aug-14 19-Nov-14 30-Aug-14 A 24-Nov-14 100% 100% 42.00STRUCTURAL WORKS - LEVEL 34STRUCTURAL WORKS - LEVEL 34 25.00 30-Aug-14 18-Sep-14 30-Aug-14 A 21-Sep-14 A 100% 100%DHCWA35100Core Wall - L34 5.00 30-Aug-14 03-Sep-14 30-Aug-14 A 03-Sep-14 A 100% 100%DHCWA35120Tower Crane Jump 1.00 30-Aug-14 30-Aug-14 06-Sep-14 A 07-Sep-14 A 100% 100%DHSLA34100Construction of Horizontals - L34 4.00 13-Sep-14 16-Sep-14 15-Sep-14 A 18-Sep-14 A 100% 100%DHCWA35110Construction of Verticals - L34 2.00 17-Sep-14 18-Sep-14 20-Sep-14 A 21-Sep-14 A 100% 100%

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Core Wall - L29Construction of Horizontals - L29Construction of Verticals - L29

Stair # 1Stair # 2

Core Wall - L30Tower Crane JumpConstruction of Horizontals - L30 (Mech Floor)Construction of Verticals - L30 (Mech Floor)

Stair # 1Stair # 2

Core Wall - L31Construction of Horizontals - L31Construction of Verticals - L31

Stair # 1Stair # 2

Core Wall - L32Construction of Horizontals - L32Construction of Verticals - L32

Stair # 1Stair # 2

Core Wall - L33Construction of Horizontals - L33Construction of Verticals - L33

Stair # 1Stair # 2

Core Wall - L34Tower Crane Jump

Construction of Horizontals - L34Construction of Verticals - L34

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 8 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 112: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

STAIRCASESSTAIRCASES 4.00 16-Nov-14 19-Nov-14 20-Nov-14 24-Nov-14 0% 0% 42.00A1860 Stair # 1 4.00 16-Nov-14 19-Nov-14 20-Nov-14 24-Nov-14 0% 0% 9.00A1870 Stair # 2 3.00 17-Nov-14 19-Nov-14 22-Nov-14 24-Nov-14 0% 0% 42.00

LEVEL 35LEVEL 35 72.00 04-Sep-14 25-Nov-14 04-Sep-14 A 30-Nov-14 100% 100% 41.00STRUCTURAL WORKS - LEVEL 35STRUCTURAL WORKS - LEVEL 35 21.00 04-Sep-14 23-Sep-14 04-Sep-14 A 27-Sep-14 A 100% 100%DHCWA36100Core Wall - L35 4.00 04-Sep-14 08-Sep-14 04-Sep-14 A 14-Sep-14 A 100% 100%DHSLA35100Construction of Horizontals - L35 4.00 17-Sep-14 21-Sep-14 22-Sep-14 A 24-Sep-14 A 100% 100%DHCWA36110Construction of Verticals - L35 2.00 22-Sep-14 23-Sep-14 25-Sep-14 A 27-Sep-14 A 100% 100%

STAIRCASESSTAIRCASES 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 0% 0% 41.00A1880 Stair # 1 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 0% 0% 8.00A1890 Stair # 2 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 0% 0% 41.00

LEVEL 36LEVEL 36 72.00 09-Sep-14 30-Nov-14 15-Sep-14 A 06-Dec-14 100% 86.19% 41.00STRUCTURAL WORKS - LEVEL 36STRUCTURAL WORKS - LEVEL 36 21.00 09-Sep-14 29-Sep-14 15-Sep-14 A 01-Oct-14 100% 86.19% -1.00DHCWA37100Core Wall - L36 7.00 09-Sep-14 16-Sep-14 15-Sep-14 A 17-Sep-14 A 100% 100%DHSLA36100Construction of Horizontals - L36 4.00 23-Sep-14 27-Sep-14 28-Sep-14 A 30-Sep-14 A 100% 100%DHCWA37110Construction of Verticals - L36 2.00 28-Sep-14 29-Sep-14 30-Sep-14 A 01-Oct-14 100% 50% -1.00

STAIRCASESSTAIRCASES 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 0% 0% 41.00A1900 Stair # 1 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 0% 0% 8.00A1910 Stair # 2 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 0% 0% 41.00

LEVEL 37LEVEL 37 64.00 17-Sep-14 06-Dec-14 18-Sep-14 A 10-Dec-14 48.36% 24.34% 41.00STRUCTURAL WORKS - LEVEL 37STRUCTURAL WORKS - LEVEL 37 14.00 17-Sep-14 07-Oct-14 18-Sep-14 A 11-Oct-14 48.36% 24.34% -2.00DHCWA38100Core Wall - L37 5.00 17-Sep-14 22-Sep-14 18-Sep-14 A 25-Sep-14 A 100% 100%DHCWA38120Tower Crane Jump 1.00 17-Sep-14 17-Sep-14 01-Oct-14 01-Oct-14 100% 0% -4.00DHSLA37100Construction of Horizontals - L37 4.00 29-Sep-14 02-Oct-14 02-Oct-14 08-Oct-14 50% 0% -2.00DHCWA38110Construction of Verticals - L37 2.00 06-Oct-14 07-Oct-14 09-Oct-14 11-Oct-14 0% 0% -2.00

STAIRCASESSTAIRCASES 4.00 01-Dec-14 06-Dec-14 07-Dec-14 10-Dec-14 0% 0% 41.00A1920 Stair # 1 4.00 01-Dec-14 06-Dec-14 07-Dec-14 10-Dec-14 0% 0% 8.00A1930 Stair # 2 4.00 01-Dec-14 06-Dec-14 07-Dec-14 10-Dec-14 0% 0% 41.00

LEVEL 38LEVEL 38 66.00 23-Sep-14 10-Dec-14 27-Sep-14 A 15-Dec-14 24.38% 24.38% 41.00STRUCTURAL WORKS - LEVEL 38STRUCTURAL WORKS - LEVEL 38 15.00 23-Sep-14 11-Oct-14 27-Sep-14 A 14-Oct-14 24.38% 24.38% -2.00DHCWA39100Core Wall - L38 4.00 23-Sep-14 27-Sep-14 27-Sep-14 A 29-Sep-14 A 100% 100%DHSLA38100Construction of Horizontals - L38 3.00 06-Oct-14 08-Oct-14 09-Oct-14 12-Oct-14 0% 0% -2.00DHCWA39110Construction of Verticals - L38 2.00 09-Oct-14 11-Oct-14 13-Oct-14 14-Oct-14 0% 0% -2.00

STAIRCASESSTAIRCASES 4.00 07-Dec-14 10-Dec-14 11-Dec-14 15-Dec-14 0% 0% 41.00A1940 Stair # 1 4.00 07-Dec-14 10-Dec-14 11-Dec-14 15-Dec-14 0% 0% 8.00A1950 Stair # 2 4.00 07-Dec-14 10-Dec-14 11-Dec-14 15-Dec-14 0% 0% 41.00

LEVEL 39LEVEL 39 66.00 28-Sep-14 15-Dec-14 30-Sep-14 A 20-Dec-14 18.25% 0% 41.00STRUCTURAL WORKS - LEVEL 39STRUCTURAL WORKS - LEVEL 39 15.00 28-Sep-14 15-Oct-14 30-Sep-14 A 19-Oct-14 18.25% 0% -2.00DHCWA40100Core Wall - L39 4.00 28-Sep-14 01-Oct-14 30-Sep-14 A 08-Oct-14 75% 0% -4.00DHSLA39100Construction of Horizontals - L39 4.00 09-Oct-14 13-Oct-14 13-Oct-14 16-Oct-14 0% 0% -2.00DHCWA40110Construction of Verticals - L39 2.00 14-Oct-14 15-Oct-14 18-Oct-14 19-Oct-14 0% 0% -2.00

STAIRCASESSTAIRCASES 4.00 11-Dec-14 15-Dec-14 16-Dec-14 20-Dec-14 0% 0% 41.00A1960 Stair # 1 4.00 11-Dec-14 15-Dec-14 16-Dec-14 20-Dec-14 0% 0% 8.00A1970 Stair # 2 4.00 11-Dec-14 15-Dec-14 16-Dec-14 20-Dec-14 0% 0% 41.00

LEVEL 40LEVEL 40 64.00 02-Oct-14 20-Dec-14 09-Oct-14 24-Dec-14 0% 0% 40.00STRUCTURAL WORKS - LEVEL 40STRUCTURAL WORKS - LEVEL 40 13.00 02-Oct-14 20-Oct-14 09-Oct-14 23-Oct-14 0% 0% -2.00DHCWA41100Core Wall - L40 4.00 02-Oct-14 08-Oct-14 09-Oct-14 13-Oct-14 0% 0% -4.00DHSLA40100Construction of Horizontals - L40 4.00 14-Oct-14 18-Oct-14 18-Oct-14 21-Oct-14 0% 0% -2.00DHCWA41110Construction of Verticals - L40 2.00 19-Oct-14 20-Oct-14 22-Oct-14 23-Oct-14 0% 0% -2.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Stair # 1Stair # 2

Core Wall - L35Construction of Horizontals - L35Construction of Verticals - L35

Stair # 1Stair # 2

Core Wall - L36Construction of Horizontals - L36Construction of Verticals - L36

Stair # 1Stair # 2

Core Wall - L37Tower Crane JumpConstruction of Horizontals - L37Construction of Verticals - L37

Stair # 1Stair # 2

Core Wall - L38Construction of Horizontals - L38Construction of Verticals - L38

Stair # 1Stair # 2

Core Wall - L39Construction of Horizontals - L39Construction of Verticals - L39

Stair # 1Stair # 2

Core Wall - L40Construction of Horizontals - L40Construction of Verticals - L40

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 9 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 113: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

STAIRCASESSTAIRCASES 4.00 16-Dec-14 20-Dec-14 21-Dec-14 24-Dec-14 0% 0% 40.00A1990 Stair # 2 3.00 16-Dec-14 18-Dec-14 21-Dec-14 23-Dec-14 0% 0% 41.00A1980 Stair # 1 4.00 16-Dec-14 20-Dec-14 21-Dec-14 24-Dec-14 0% 0% 8.00

LEVEL 41LEVEL 41 64.00 09-Oct-14 24-Dec-14 14-Oct-14 29-Dec-14 0% 0% 40.00STRUCTURAL WORKS - LEVEL 41STRUCTURAL WORKS - LEVEL 41 14.00 09-Oct-14 27-Oct-14 14-Oct-14 30-Oct-14 0% 0% -2.00DHCWA42120Tower Crane Jump 1.00 09-Oct-14 09-Oct-14 14-Oct-14 14-Oct-14 0% 0% -1.00DHCWA42100Core Wall - L41 4.00 09-Oct-14 13-Oct-14 14-Oct-14 18-Oct-14 0% 0% -4.00DHSLA41100Construction of Horizontals - L41 4.00 20-Oct-14 23-Oct-14 23-Oct-14 28-Oct-14 0% 0% -2.00DHCWA42110Construction of Verticals - L41 2.00 26-Oct-14 27-Oct-14 29-Oct-14 30-Oct-14 0% 0% -2.00

STAIRCASESSTAIRCASES 5.00 20-Dec-14 24-Dec-14 24-Dec-14 29-Dec-14 0% 0% 40.00A2010 Stair # 2 4.00 20-Dec-14 23-Dec-14 24-Dec-14 28-Dec-14 0% 0% 41.00A2000 Stair # 1 4.00 21-Dec-14 24-Dec-14 25-Dec-14 29-Dec-14 0% 0% 8.00

LEVEL 42LEVEL 42 64.00 14-Oct-14 29-Dec-14 19-Oct-14 04-Jan-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 42STRUCTURAL WORKS - LEVEL 42 15.00 14-Oct-14 01-Nov-14 19-Oct-14 05-Nov-14 0% 0% -4.00DHCWA43100Core Wall - L42 5.00 14-Oct-14 19-Oct-14 19-Oct-14 23-Oct-14 0% 0% -4.00DHSLA42100Construction of Horizontals - L42 4.00 26-Oct-14 29-Oct-14 30-Oct-14 03-Nov-14 0% 0% -4.00DHCWA43110Construction of Verticals - L42 2.00 30-Oct-14 01-Nov-14 04-Nov-14 05-Nov-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 24-Dec-14 29-Dec-14 29-Dec-14 04-Jan-15 0% 0% 40.00A2030 Stair # 2 4.00 24-Dec-14 28-Dec-14 29-Dec-14 03-Jan-15 0% 0% 41.00A2020 Stair # 1 4.00 25-Dec-14 29-Dec-14 30-Dec-14 04-Jan-15 0% 0% 8.00

LEVEL 43LEVEL 43 63.00 20-Oct-14 04-Jan-15 26-Oct-14 08-Jan-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 43STRUCTURAL WORKS - LEVEL 43 15.00 20-Oct-14 06-Nov-14 26-Oct-14 11-Nov-14 0% 0% -4.00DHCWA44100Core Wall - L43 4.00 20-Oct-14 23-Oct-14 26-Oct-14 29-Oct-14 0% 0% -4.00DHSLA43100Construction of Horizontals - L43 4.00 01-Nov-14 04-Nov-14 05-Nov-14 09-Nov-14 0% 0% -4.00DHCWA44110Construction of Verticals - L43 2.00 05-Nov-14 06-Nov-14 10-Nov-14 11-Nov-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 29-Dec-14 04-Jan-15 04-Jan-15 08-Jan-15 0% 0% 40.00A2050 Stair # 2 4.00 29-Dec-14 03-Jan-15 04-Jan-15 07-Jan-15 0% 0% 41.00A2040 Stair # 1 4.00 30-Dec-14 04-Jan-15 05-Jan-15 08-Jan-15 0% 0% 8.00

LEVEL 44LEVEL 44 63.00 26-Oct-14 08-Jan-15 30-Oct-14 13-Jan-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 44STRUCTURAL WORKS - LEVEL 44 15.00 26-Oct-14 11-Nov-14 30-Oct-14 16-Nov-14 0% 0% -4.00DHCWA45100Core Wall - L44 4.00 26-Oct-14 29-Oct-14 30-Oct-14 03-Nov-14 0% 0% -4.00DHSLA44100Construction of Horizontals - L44 4.00 05-Nov-14 09-Nov-14 10-Nov-14 13-Nov-14 0% 0% -4.00DHCWA45110Construction of Verticals - L44 2.00 10-Nov-14 11-Nov-14 15-Nov-14 16-Nov-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 04-Jan-15 08-Jan-15 08-Jan-15 13-Jan-15 0% 0% 40.00A2070 Stair # 2 4.00 04-Jan-15 07-Jan-15 08-Jan-15 12-Jan-15 0% 0% 41.00A2060 Stair # 1 4.00 05-Jan-15 08-Jan-15 10-Jan-15 13-Jan-15 0% 0% 8.00

LEVEL 45LEVEL 45 63.00 30-Oct-14 13-Jan-15 04-Nov-14 18-Jan-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 45STRUCTURAL WORKS - LEVEL 45 16.00 30-Oct-14 17-Nov-14 04-Nov-14 22-Nov-14 0% 0% -4.00DHCWA46120Tower Crane Jump 1.00 30-Oct-14 30-Oct-14 04-Nov-14 04-Nov-14 0% 0% -1.00DHCWA46100Core Wall - L45 4.00 30-Oct-14 03-Nov-14 04-Nov-14 08-Nov-14 0% 0% -4.00DHSLA45100Construction of Horizontals - L45 4.00 11-Nov-14 15-Nov-14 16-Nov-14 19-Nov-14 0% 0% -4.00DHCWA46110Construction of Verticals - L45 2.00 16-Nov-14 17-Nov-14 20-Nov-14 22-Nov-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 08-Jan-15 13-Jan-15 13-Jan-15 18-Jan-15 0% 0% 40.00A2090 Stair # 2 4.00 08-Jan-15 12-Jan-15 13-Jan-15 17-Jan-15 0% 0% 41.00A2080 Stair # 1 4.00 10-Jan-15 13-Jan-15 14-Jan-15 18-Jan-15 0% 0% 8.00

LEVEL 46LEVEL 46 63.00 04-Nov-14 18-Jan-15 09-Nov-14 22-Jan-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 46STRUCTURAL WORKS - LEVEL 46 17.00 04-Nov-14 23-Nov-14 09-Nov-14 27-Nov-14 0% 0% -4.00DHCWA47100Core Wall - L46 5.00 04-Nov-14 09-Nov-14 09-Nov-14 13-Nov-14 0% 0% -4.00DHSLA46100Construction of Horizontals - L46 4.00 17-Nov-14 20-Nov-14 22-Nov-14 25-Nov-14 0% 0% -4.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L41Construction of Horizontals - L41Construction of Verticals - L41

Stair # 2Stair # 1

Core Wall - L42Construction of Horizontals - L42Construction of Verticals - L42

Stair # 2Stair # 1

Core Wall - L43Construction of Horizontals - L43Construction of Verticals - L43

Stair # 2Stair # 1

Core Wall - L44Construction of Horizontals - L44Construction of Verticals - L44

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L45Construction of Horizontals - L45Construction of Verticals - L45

Stair # 2Stair # 1

Core Wall - L46Construction of Horizontals - L46

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 10 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 114: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHCWA47110Construction of Verticals - L46 2.00 22-Nov-14 23-Nov-14 26-Nov-14 27-Nov-14 0% 0% -4.00STAIRCASESSTAIRCASES 5.00 13-Jan-15 18-Jan-15 18-Jan-15 22-Jan-15 0% 0% 40.00A2110 Stair # 2 4.00 13-Jan-15 17-Jan-15 18-Jan-15 21-Jan-15 0% 0% 41.00A2100 Stair # 1 4.00 14-Jan-15 18-Jan-15 19-Jan-15 22-Jan-15 0% 0% 8.00

LEVEL 47LEVEL 47 62.00 10-Nov-14 22-Jan-15 15-Nov-14 27-Jan-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 47STRUCTURAL WORKS - LEVEL 47 16.00 10-Nov-14 27-Nov-14 15-Nov-14 03-Dec-14 0% 0% -4.00DHCWA48100Core Wall - L47 5.00 10-Nov-14 15-Nov-14 15-Nov-14 19-Nov-14 0% 0% -4.00DHSLA47100Construction of Horizontals - L47 4.00 22-Nov-14 25-Nov-14 26-Nov-14 30-Nov-14 0% 0% -4.00DHCWA48110Construction of Verticals - L47 2.00 26-Nov-14 27-Nov-14 01-Dec-14 03-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 18-Jan-15 22-Jan-15 22-Jan-15 27-Jan-15 0% 0% 40.00A2130 Stair # 2 4.00 18-Jan-15 21-Jan-15 22-Jan-15 26-Jan-15 0% 0% 41.00A2120 Stair # 1 4.00 19-Jan-15 22-Jan-15 24-Jan-15 27-Jan-15 0% 0% 8.00

LEVEL 48LEVEL 48 61.00 16-Nov-14 27-Jan-15 20-Nov-14 01-Feb-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 48STRUCTURAL WORKS - LEVEL 48 15.00 16-Nov-14 03-Dec-14 20-Nov-14 08-Dec-14 0% 0% -4.00DHCWA49120Tower Crane Jump 1.00 16-Nov-14 16-Nov-14 20-Nov-14 20-Nov-14 0% 0% -1.00DHCWA49100Core Wall - L48 4.00 16-Nov-14 19-Nov-14 20-Nov-14 24-Nov-14 0% 0% -4.00DHSLA48100Construction of Horizontals - L48 4.00 26-Nov-14 30-Nov-14 01-Dec-14 06-Dec-14 0% 0% -4.00DHCWA49110Construction of Verticals - L48 2.00 01-Dec-14 03-Dec-14 07-Dec-14 08-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 22-Jan-15 27-Jan-15 27-Jan-15 01-Feb-15 0% 0% 40.00A2150 Stair # 2 4.00 22-Jan-15 26-Jan-15 27-Jan-15 31-Jan-15 0% 0% 41.00A2140 Stair # 1 4.00 24-Jan-15 27-Jan-15 28-Jan-15 01-Feb-15 0% 0% 8.00

LEVEL 49LEVEL 49 61.00 20-Nov-14 01-Feb-15 25-Nov-14 05-Feb-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 49STRUCTURAL WORKS - LEVEL 49 14.00 20-Nov-14 07-Dec-14 25-Nov-14 11-Dec-14 0% 0% -4.00DHCWA50100Core Wall - L49 4.00 20-Nov-14 24-Nov-14 25-Nov-14 29-Nov-14 0% 0% -4.00DHSLA49100Construction of Horizontals - L49 4.00 30-Nov-14 04-Dec-14 06-Dec-14 09-Dec-14 0% 0% -4.00DHCWA50110Construction of Verticals - L49 2.00 06-Dec-14 07-Dec-14 10-Dec-14 11-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 27-Jan-15 01-Feb-15 01-Feb-15 05-Feb-15 0% 0% 40.00A2170 Stair # 2 4.00 27-Jan-15 31-Jan-15 01-Feb-15 04-Feb-15 0% 0% 41.00A2160 Stair # 1 4.00 28-Jan-15 01-Feb-15 02-Feb-15 05-Feb-15 0% 0% 8.00

LEVEL 50LEVEL 50 61.00 25-Nov-14 05-Feb-15 30-Nov-14 10-Feb-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 50STRUCTURAL WORKS - LEVEL 50 14.00 25-Nov-14 11-Dec-14 30-Nov-14 16-Dec-14 0% 0% -4.00DHCWA51100Core Wall - L50 4.00 25-Nov-14 29-Nov-14 30-Nov-14 04-Dec-14 0% 0% -4.00DHSLA50100Construction of Horizontals - L50 4.00 06-Dec-14 09-Dec-14 10-Dec-14 14-Dec-14 0% 0% -4.00DHCWA51110Construction of Verticals - L50 2.00 10-Dec-14 11-Dec-14 15-Dec-14 16-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 01-Feb-15 05-Feb-15 05-Feb-15 10-Feb-15 0% 0% 40.00A2190 Stair # 2 4.00 01-Feb-15 04-Feb-15 05-Feb-15 09-Feb-15 0% 0% 41.00A2180 Stair # 1 4.00 02-Feb-15 05-Feb-15 07-Feb-15 10-Feb-15 0% 0% 8.00

LEVEL 51LEVEL 51 61.00 30-Nov-14 10-Feb-15 06-Dec-14 15-Feb-15 0% 0% 40.00STRUCTURAL WORKS - LEVEL 51STRUCTURAL WORKS - LEVEL 51 14.00 30-Nov-14 16-Dec-14 06-Dec-14 21-Dec-14 0% 0% -4.00DHCWA52100Core Wall - L51 4.00 30-Nov-14 04-Dec-14 06-Dec-14 09-Dec-14 0% 0% -4.00DHSLA51100Construction of Horizontals - L51 4.00 10-Dec-14 14-Dec-14 15-Dec-14 18-Dec-14 0% 0% -4.00DHCWA52110Construction of Verticals - L51 2.00 15-Dec-14 16-Dec-14 20-Dec-14 21-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 05-Feb-15 10-Feb-15 10-Feb-15 15-Feb-15 0% 0% 40.00A2210 Stair # 2 4.00 05-Feb-15 09-Feb-15 10-Feb-15 14-Feb-15 0% 0% 41.00A2200 Stair # 1 4.00 07-Feb-15 10-Feb-15 11-Feb-15 15-Feb-15 0% 0% 8.00

LEVEL 52LEVEL 52 62.00 06-Dec-14 16-Feb-15 10-Dec-14 21-Feb-15 0% 0% 39.00STRUCTURAL WORKS - LEVEL 52STRUCTURAL WORKS - LEVEL 52 14.00 06-Dec-14 21-Dec-14 10-Dec-14 25-Dec-14 0% 0% -4.00DHCWA53120Tower Crane Jump 1.00 06-Dec-14 06-Dec-14 10-Dec-14 10-Dec-14 0% 0% -1.00DHCWA53100Core Wall - L52 4.00 06-Dec-14 09-Dec-14 10-Dec-14 14-Dec-14 0% 0% -4.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Construction of Verticals - L46

Stair # 2Stair # 1

Core Wall - L47Construction of Horizontals - L47Construction of Verticals - L47

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L48

Construction of Horizontals - L48Construction of Verticals - L48

Stair # 2Stair # 1

Core Wall - L49Construction of Horizontals - L49Construction of Verticals - L49

Stair # 2Stair # 1

Core Wall - L50Construction of Horizontals - L50Construction of Verticals - L50

Stair # 2Stair # 1

Core Wall - L51Construction of Horizontals - L51Construction of Verticals - L51

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L52

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 11 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 115: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHSLA52100Construction of Horizontals - L52 4.00 15-Dec-14 18-Dec-14 20-Dec-14 23-Dec-14 0% 0% -4.00DHCWA53110Construction of Verticals - L52 2.00 20-Dec-14 21-Dec-14 24-Dec-14 25-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 4.00 12-Feb-15 16-Feb-15 17-Feb-15 21-Feb-15 0% 0% 39.00A2220 Stair # 1 4.00 12-Feb-15 16-Feb-15 17-Feb-15 21-Feb-15 0% 0% 7.00A2230 Stair # 2 4.00 12-Feb-15 16-Feb-15 17-Feb-15 21-Feb-15 0% 0% 39.00

LEVEL 53LEVEL 53 62.00 10-Dec-14 21-Feb-15 15-Dec-14 25-Feb-15 0% 0% 39.00STRUCTURAL WORKS - LEVEL 53STRUCTURAL WORKS - LEVEL 53 14.00 10-Dec-14 25-Dec-14 15-Dec-14 30-Dec-14 0% 0% -4.00DHCWA54100Core Wall - L53 4.00 10-Dec-14 14-Dec-14 15-Dec-14 18-Dec-14 0% 0% -4.00DHSLA53100Construction of Horizontals - L53 4.00 20-Dec-14 23-Dec-14 24-Dec-14 28-Dec-14 0% 0% -4.00DHCWA54110Construction of Verticals - L53 2.00 24-Dec-14 25-Dec-14 29-Dec-14 30-Dec-14 0% 0% -4.00

STAIRCASESSTAIRCASES 4.00 17-Feb-15 21-Feb-15 22-Feb-15 25-Feb-15 0% 0% 39.00A2240 Stair # 1 4.00 17-Feb-15 21-Feb-15 22-Feb-15 25-Feb-15 0% 0% 7.00A2250 Stair # 2 4.00 17-Feb-15 21-Feb-15 22-Feb-15 25-Feb-15 0% 0% 39.00

LEVEL 54LEVEL 54 62.00 15-Dec-14 25-Feb-15 20-Dec-14 02-Mar-15 0% 0% 39.00STRUCTURAL WORKS - LEVEL 54STRUCTURAL WORKS - LEVEL 54 13.00 15-Dec-14 29-Dec-14 20-Dec-14 04-Jan-15 0% 0% -4.00DHCWA55100Core Wall - L54 4.00 15-Dec-14 18-Dec-14 20-Dec-14 23-Dec-14 0% 0% -4.00DHSLA54100Construction of Horizontals - L54 4.00 23-Dec-14 27-Dec-14 28-Dec-14 31-Dec-14 0% 0% -4.00DHCWA55110Construction of Verticals - L54 2.00 28-Dec-14 29-Dec-14 03-Jan-15 04-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 4.00 22-Feb-15 25-Feb-15 26-Feb-15 02-Mar-15 0% 0% 39.00A2260 Stair # 1 4.00 22-Feb-15 25-Feb-15 26-Feb-15 02-Mar-15 0% 0% 7.00A2270 Stair # 2 4.00 22-Feb-15 25-Feb-15 26-Feb-15 02-Mar-15 0% 0% 39.00

LEVEL 55LEVEL 55 62.00 20-Dec-14 02-Mar-15 24-Dec-14 07-Mar-15 0% 0% 39.00STRUCTURAL WORKS - LEVEL 55STRUCTURAL WORKS - LEVEL 55 13.00 20-Dec-14 04-Jan-15 24-Dec-14 08-Jan-15 0% 0% -4.00DHCWA56100Core Wall - L55 4.00 20-Dec-14 23-Dec-14 24-Dec-14 28-Dec-14 0% 0% -4.00DHSLA55100Construction of Horizontals - L55 3.00 29-Dec-14 31-Dec-14 04-Jan-15 06-Jan-15 0% 0% -4.00DHCWA56110Construction of Verticals - L55 2.00 03-Jan-15 04-Jan-15 07-Jan-15 08-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 4.00 26-Feb-15 02-Mar-15 03-Mar-15 07-Mar-15 0% 0% 39.00A2280 Stair # 1 4.00 26-Feb-15 02-Mar-15 03-Mar-15 07-Mar-15 0% 0% 7.00A2290 Stair # 2 4.00 26-Feb-15 02-Mar-15 03-Mar-15 07-Mar-15 0% 0% 39.00

LEVEL 56LEVEL 56 62.00 24-Dec-14 07-Mar-15 29-Dec-14 11-Mar-15 0% 0% 38.00STRUCTURAL WORKS - LEVEL 56STRUCTURAL WORKS - LEVEL 56 13.00 24-Dec-14 08-Jan-15 29-Dec-14 13-Jan-15 0% 0% -4.00DHCWA57120Tower Crane Jump 1.00 24-Dec-14 24-Dec-14 29-Dec-14 29-Dec-14 0% 0% -1.00DHCWA57100Core Wall - L56 4.00 24-Dec-14 28-Dec-14 29-Dec-14 03-Jan-15 0% 0% -4.00DHSLA56100Construction of Horizontals - L56 3.00 04-Jan-15 06-Jan-15 08-Jan-15 11-Jan-15 0% 0% -4.00DHCWA57110Construction of Verticals - L56 2.00 07-Jan-15 08-Jan-15 12-Jan-15 13-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 4.00 03-Mar-15 07-Mar-15 08-Mar-15 11-Mar-15 0% 0% 38.00A2310 Stair # 2 3.00 03-Mar-15 05-Mar-15 08-Mar-15 10-Mar-15 0% 0% 39.00A2300 Stair # 1 4.00 03-Mar-15 07-Mar-15 08-Mar-15 11-Mar-15 0% 0% 7.00

LEVEL 57LEVEL 57 62.00 29-Dec-14 11-Mar-15 04-Jan-15 16-Mar-15 0% 0% 38.00STRUCTURAL WORKS - LEVEL 57STRUCTURAL WORKS - LEVEL 57 12.00 29-Dec-14 12-Jan-15 04-Jan-15 17-Jan-15 0% 0% -4.00DHCWA58100Core Wall - L57 3.00 29-Dec-14 31-Dec-14 04-Jan-15 06-Jan-15 0% 0% -4.00DHSLA57100Construction of Horizontals - L57 4.00 06-Jan-15 10-Jan-15 11-Jan-15 14-Jan-15 0% 0% -4.00DHCWA58110Construction of Verticals - L57 2.00 11-Jan-15 12-Jan-15 15-Jan-15 17-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 07-Mar-15 11-Mar-15 11-Mar-15 16-Mar-15 0% 0% 38.00A2330 Stair # 2 4.00 07-Mar-15 10-Mar-15 11-Mar-15 15-Mar-15 0% 0% 39.00A2320 Stair # 1 4.00 08-Mar-15 11-Mar-15 12-Mar-15 16-Mar-15 0% 0% 7.00

LEVEL 58LEVEL 58 63.00 03-Jan-15 16-Mar-15 07-Jan-15 21-Mar-15 0% 0% 38.00STRUCTURAL WORKS - LEVEL 58STRUCTURAL WORKS - LEVEL 58 13.00 03-Jan-15 17-Jan-15 07-Jan-15 21-Jan-15 0% 0% -4.00DHCWA59100Core Wall - L58 3.00 03-Jan-15 05-Jan-15 07-Jan-15 10-Jan-15 0% 0% -4.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Construction of Horizontals - L52Construction of Verticals - L52

Stair # 1Stair # 2

Core Wall - L53Construction of Horizontals - L53Construction of Verticals - L53

Stair # 1Stair # 2

Core Wall - L54Construction of Horizontals - L54Construction of Verticals - L54

Stair # 1Stair # 2

Core Wall - L55Construction of Horizontals - L55Construction of Verticals - L55

Stair # 1Stair # 2

Tower Crane JumpCore Wall - L56Construction of Horizontals - L56Construction of Verticals - L56

Stair # 2Stair # 1

Core Wall - L57Construction of Horizontals - L57Construction of Verticals - L57

Stair # 2Stair # 1

Core Wall - L58

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 12 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 116: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHSLA58100Construction of Horizontals - L58 4.00 11-Jan-15 14-Jan-15 15-Jan-15 19-Jan-15 0% 0% -4.00DHCWA59110Construction of Verticals - L58 2.00 15-Jan-15 17-Jan-15 20-Jan-15 21-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 11-Mar-15 16-Mar-15 16-Mar-15 21-Mar-15 0% 0% 38.00A2350 Stair # 2 4.00 11-Mar-15 15-Mar-15 16-Mar-15 19-Mar-15 0% 0% 39.00A2340 Stair # 1 4.00 12-Mar-15 16-Mar-15 17-Mar-15 21-Mar-15 0% 0% 7.00

LEVEL 59LEVEL 59 64.00 06-Jan-15 21-Mar-15 11-Jan-15 25-Mar-15 0% 0% 37.00STRUCTURAL WORKS - LEVEL 59STRUCTURAL WORKS - LEVEL 59 13.00 06-Jan-15 20-Jan-15 11-Jan-15 25-Jan-15 0% 0% -4.00DHCWA60100Core Wall - L59 4.00 06-Jan-15 10-Jan-15 11-Jan-15 14-Jan-15 0% 0% -4.00DHSLA59100Construction of Horizontals - L59 3.00 15-Jan-15 18-Jan-15 20-Jan-15 22-Jan-15 0% 0% -4.00DHCWA60110Construction of Verticals - L59 2.00 19-Jan-15 20-Jan-15 24-Jan-15 25-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 5.00 16-Mar-15 21-Mar-15 21-Mar-15 25-Mar-15 0% 0% 37.00A2370 Stair # 2 3.00 16-Mar-15 18-Mar-15 21-Mar-15 23-Mar-15 0% 0% 39.00A2360 Stair # 1 4.00 17-Mar-15 21-Mar-15 22-Mar-15 25-Mar-15 0% 0% 7.00

LEVEL 60LEVEL 60 64.00 11-Jan-15 25-Mar-15 15-Jan-15 30-Mar-15 0% 0% 36.00STRUCTURAL WORKS - LEVEL 60STRUCTURAL WORKS - LEVEL 60 13.00 11-Jan-15 25-Jan-15 15-Jan-15 29-Jan-15 0% 0% -4.00DHCWA61120Tower Crane Jump 1.00 11-Jan-15 11-Jan-15 15-Jan-15 15-Jan-15 0% 0% -2.00DHCWA61100Core Wall - L 60 3.00 11-Jan-15 13-Jan-15 15-Jan-15 18-Jan-15 0% 0% -4.00DHSLA60100Construction of Horizontal - L60 3.00 20-Jan-15 22-Jan-15 25-Jan-15 27-Jan-15 0% 0% -4.00DHCWA61110Construction of Verticals - L60 2.00 24-Jan-15 25-Jan-15 28-Jan-15 29-Jan-15 0% 0% -4.00

STAIRCASESSTAIRCASES 6.00 19-Mar-15 25-Mar-15 24-Mar-15 30-Mar-15 0% 0% 36.00A2390 Stair # 2 3.00 19-Mar-15 22-Mar-15 24-Mar-15 26-Mar-15 0% 0% 39.00A2380 Stair # 1 4.00 22-Mar-15 25-Mar-15 26-Mar-15 30-Mar-15 0% 0% 7.00

LEVEL 61LEVEL 61 65.00 14-Jan-15 30-Mar-15 19-Jan-15 04-Apr-15 0% 0% 35.00STRUCTURAL WORKS - LEVEL 61STRUCTURAL WORKS - LEVEL 61 13.00 14-Jan-15 28-Jan-15 19-Jan-15 02-Feb-15 0% 0% -4.00DHCWA62100Core Wall - L61 3.00 14-Jan-15 17-Jan-15 19-Jan-15 21-Jan-15 0% 0% -4.00DHSLA61100Construction of Horizontal - L61 3.00 24-Jan-15 26-Jan-15 28-Jan-15 31-Jan-15 0% 0% -4.00DHCWA62110Construction of Verticals - L61 2.00 27-Jan-15 28-Jan-15 01-Feb-15 02-Feb-15 0% 0% -4.00

STAIRCASESSTAIRCASES 7.00 23-Mar-15 30-Mar-15 28-Mar-15 04-Apr-15 0% 0% 35.00A2410 Stair # 2 3.00 23-Mar-15 25-Mar-15 28-Mar-15 30-Mar-15 0% 0% 39.00A2400 Stair # 1 4.00 26-Mar-15 30-Mar-15 31-Mar-15 04-Apr-15 0% 0% 7.00

LEVELS 62 (MECHANICAL FLOOR)LEVELS 62 (MECHANICAL FLOOR) 66.00 18-Jan-15 04-Apr-15 22-Jan-15 08-Apr-15 0% 0% 34.00LEVEL 62LEVEL 62 66.00 18-Jan-15 04-Apr-15 22-Jan-15 08-Apr-15 0% 0% 34.00STRUCTURAL WORKS - LEVEL 62STRUCTURAL WORKS - LEVEL 62 18.00 18-Jan-15 07-Feb-15 22-Jan-15 11-Feb-15 0% 0% -4.00DHCWA63100Core Wall - L62 6.00 18-Jan-15 24-Jan-15 22-Jan-15 28-Jan-15 0% 0% -4.00DHSLA62100Construction of Horizontal - L62 ( Mech . Floor ) 5.00 29-Jan-15 03-Feb-15 03-Feb-15 08-Feb-15 0% 0% -4.00DHCWA63110Construction of Verticals - L62 ( Mech . Floor ) 3.00 04-Feb-15 07-Feb-15 09-Feb-15 11-Feb-15 0% 0% -4.00

STAIRCASESSTAIRCASES 7.00 28-Mar-15 04-Apr-15 01-Apr-15 08-Apr-15 0% 0% 34.00A2430 Stair # 2 3.00 28-Mar-15 30-Mar-15 01-Apr-15 04-Apr-15 0% 0% 38.00A2420 Stair # 1 4.00 31-Mar-15 04-Apr-15 05-Apr-15 08-Apr-15 0% 0% 7.00

LEVELS 63-85LEVELS 63-85 148.00 25-Jan-15 16-Jul-15 29-Jan-15 23-Jul-15 0% 0% 12.00LEVEL 63LEVEL 63 64.00 25-Jan-15 08-Apr-15 29-Jan-15 13-Apr-15 0% 0% 33.00STRUCTURAL WORKS - LEVEL 63STRUCTURAL WORKS - LEVEL 63 18.00 25-Jan-15 14-Feb-15 29-Jan-15 18-Feb-15 0% 0% -3.00DHCWA64100Core Wall - L63 3.00 25-Jan-15 27-Jan-15 29-Jan-15 01-Feb-15 0% 0% -4.00DHSLA63100Construction of Horizontal - L63 4.00 08-Feb-15 11-Feb-15 12-Feb-15 16-Feb-15 0% 0% -4.00DHCWA64110Construction of Verticals - L63 2.00 12-Feb-15 14-Feb-15 17-Feb-15 18-Feb-15 0% 0% -3.00

STAIRCASESSTAIRCASES 8.00 31-Mar-15 08-Apr-15 05-Apr-15 13-Apr-15 0% 0% 33.00A2450 Stair # 2 3.00 31-Mar-15 02-Apr-15 05-Apr-15 07-Apr-15 0% 0% 38.00A2440 Stair # 1 4.00 05-Apr-15 08-Apr-15 09-Apr-15 13-Apr-15 0% 0% 7.00

LEVEL 64LEVEL 64 65.00 28-Jan-15 13-Apr-15 02-Feb-15 18-Apr-15 0% 0% 32.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Construction of Horizontals - L58Construction of Verticals - L58

Stair # 2Stair # 1

Core Wall - L59Construction of Horizontals - L59Construction of Verticals - L59

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L 60Construction of Horizontal - L60Construction of Verticals - L60

Stair # 2Stair # 1

Core Wall - L61Construction of Horizontal - L61Construction of Verticals - L61

Stair # 2Stair # 1

Core Wall - L62Construction of Horizontal - L62 ( Mech . Floor )Construction of Verticals - L62 ( Mech . Floor )

Stair # 2Stair # 1

Core Wall - L63Construction of Horizontal - L63Construction of Verticals - L63

Stair # 2Stair # 1

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 13 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 117: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

STRUCTURAL WORKS - LEVEL 64STRUCTURAL WORKS - LEVEL 64 18.00 28-Jan-15 17-Feb-15 02-Feb-15 22-Feb-15 0% 0% -3.00DHCWA65120Tower Crane Jump 1.00 28-Jan-15 28-Jan-15 02-Feb-15 02-Feb-15 0% 0% 0.00DHCWA65100Core Wall - L64 5.00 28-Jan-15 02-Feb-15 02-Feb-15 07-Feb-15 0% 0% -4.00DHSLA64100Construction of Horizontal - L64 3.00 12-Feb-15 15-Feb-15 17-Feb-15 19-Feb-15 0% 0% -3.00DHCWA65110Construction of Verticals - L64 2.00 16-Feb-15 17-Feb-15 21-Feb-15 22-Feb-15 0% 0% -3.00

STAIRCASESSTAIRCASES 9.00 04-Apr-15 13-Apr-15 08-Apr-15 18-Apr-15 0% 0% 32.00A2470 Stair # 2 3.00 04-Apr-15 06-Apr-15 08-Apr-15 11-Apr-15 0% 0% 38.00A2460 Stair # 1 4.00 09-Apr-15 13-Apr-15 14-Apr-15 18-Apr-15 0% 0% 7.00

LEVEL 65LEVEL 65 64.00 03-Feb-15 18-Apr-15 08-Feb-15 22-Apr-15 0% 0% 31.00STRUCTURAL WORKS - LEVEL 65STRUCTURAL WORKS - LEVEL 65 17.00 03-Feb-15 22-Feb-15 08-Feb-15 26-Feb-15 0% 0% -3.00DHCWA66100Core Wall - L65 5.00 03-Feb-15 08-Feb-15 08-Feb-15 12-Feb-15 0% 0% -4.00DHSLA65100Construction of Horizontals - L65 3.00 17-Feb-15 19-Feb-15 22-Feb-15 24-Feb-15 0% 0% -3.00DHCWA66110Construction of Verticals - L65 2.00 21-Feb-15 22-Feb-15 25-Feb-15 26-Feb-15 0% 0% -3.00

STAIRCASESSTAIRCASES 10.00 07-Apr-15 18-Apr-15 12-Apr-15 22-Apr-15 0% 0% 31.00A2490 Stair # 2 3.00 07-Apr-15 09-Apr-15 12-Apr-15 14-Apr-15 0% 0% 38.00A2480 Stair # 1 4.00 14-Apr-15 18-Apr-15 19-Apr-15 22-Apr-15 0% 0% 7.00

LEVEL 66LEVEL 66 63.00 09-Feb-15 22-Apr-15 14-Feb-15 27-Apr-15 0% 0% 30.00STRUCTURAL WORKS - LEVEL 66STRUCTURAL WORKS - LEVEL 66 16.00 09-Feb-15 26-Feb-15 14-Feb-15 03-Mar-15 0% 0% -3.00DHCWA67100Core Wall - L66 5.00 09-Feb-15 14-Feb-15 14-Feb-15 18-Feb-15 0% 0% -4.00DHSLA66100Construction of Horizontals - L66 3.00 22-Feb-15 24-Feb-15 26-Feb-15 01-Mar-15 0% 0% -3.00DHCWA67110Construction of Verticals - L66 2.00 25-Feb-15 26-Feb-15 02-Mar-15 03-Mar-15 0% 0% -3.00

STAIRCASESSTAIRCASES 11.00 11-Apr-15 22-Apr-15 15-Apr-15 27-Apr-15 0% 0% 30.00A2510 Stair # 2 3.00 11-Apr-15 13-Apr-15 15-Apr-15 18-Apr-15 0% 0% 38.00A2500 Stair # 1 4.00 19-Apr-15 22-Apr-15 23-Apr-15 27-Apr-15 0% 0% 7.00

LEVEL 67LEVEL 67 62.00 15-Feb-15 27-Apr-15 19-Feb-15 02-May-15 0% 0% 29.00STRUCTURAL WORKS - LEVEL 67STRUCTURAL WORKS - LEVEL 67 14.00 15-Feb-15 02-Mar-15 19-Feb-15 07-Mar-15 0% 0% -3.00DHCWA68120Tower Crane Jump 1.00 15-Feb-15 15-Feb-15 19-Feb-15 19-Feb-15 0% 0% -1.00DHCWA68100Core Wall - L67 4.00 15-Feb-15 18-Feb-15 19-Feb-15 23-Feb-15 0% 0% -4.00DHSLA67100Construction of Horizontals - L67 3.00 25-Feb-15 28-Feb-15 02-Mar-15 04-Mar-15 0% 0% -3.00DHCWA68110Construction of Verticals - L67 2.00 01-Mar-15 02-Mar-15 05-Mar-15 07-Mar-15 0% 0% -3.00

STAIRCASESSTAIRCASES 12.00 14-Apr-15 27-Apr-15 19-Apr-15 02-May-15 0% 0% 29.00A2530 Stair # 2 3.00 14-Apr-15 16-Apr-15 19-Apr-15 21-Apr-15 0% 0% 38.00A2520 Stair # 1 4.00 23-Apr-15 27-Apr-15 28-Apr-15 02-May-15 0% 0% 7.00

LEVEL 68LEVEL 68 62.00 19-Feb-15 02-May-15 24-Feb-15 06-May-15 0% 0% 28.00STRUCTURAL WORKS - LEVEL 68STRUCTURAL WORKS - LEVEL 68 14.00 19-Feb-15 07-Mar-15 24-Feb-15 11-Mar-15 0% 0% -2.00DHCWA69100Core Wall - L68 4.00 19-Feb-15 23-Feb-15 24-Feb-15 28-Feb-15 0% 0% -4.00DHSLA68100Construction of Horizontals - L68 3.00 02-Mar-15 04-Mar-15 07-Mar-15 09-Mar-15 0% 0% -3.00DHCWA69110Construction of Verticals - L68 2.00 05-Mar-15 07-Mar-15 10-Mar-15 11-Mar-15 0% 0% -2.00

STAIRCASESSTAIRCASES 13.00 18-Apr-15 02-May-15 22-Apr-15 06-May-15 0% 0% 28.00A2550 Stair # 2 3.00 18-Apr-15 20-Apr-15 22-Apr-15 25-Apr-15 0% 0% 38.00A2540 Stair # 1 4.00 28-Apr-15 02-May-15 03-May-15 06-May-15 0% 0% 7.00

LEVEL 69LEVEL 69 62.00 24-Feb-15 06-May-15 01-Mar-15 11-May-15 0% 0% 27.00STRUCTURAL WORKS - LEVEL 69STRUCTURAL WORKS - LEVEL 69 14.00 24-Feb-15 11-Mar-15 01-Mar-15 16-Mar-15 0% 0% -2.00DHCWA70100Core Wall - L69 4.00 24-Feb-15 28-Feb-15 01-Mar-15 04-Mar-15 0% 0% -4.00DHSLA69100Construction of Horizontals - L69 3.00 07-Mar-15 09-Mar-15 11-Mar-15 14-Mar-15 0% 0% -2.00DHCWA70110Construction of Verticals - L69 2.00 10-Mar-15 11-Mar-15 15-Mar-15 16-Mar-15 0% 0% -2.00

STAIRCASESSTAIRCASES 13.00 22-Apr-15 06-May-15 27-Apr-15 11-May-15 0% 0% 27.00A2570 Stair # 2 3.00 22-Apr-15 25-Apr-15 27-Apr-15 29-Apr-15 0% 0% 37.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Tower Crane JumpCore Wall - L64

Construction of Horizontal - L64Construction of Verticals - L64

Stair # 2Stair # 1

Core Wall - L65Construction of Horizontals - L65Construction of Verticals - L65

Stair # 2Stair # 1

Core Wall - L66Construction of Horizontals - L66Construction of Verticals - L66

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L67Construction of Horizontals - L67Construction of Verticals - L67

Stair # 2Stair # 1

Core Wall - L68Construction of Horizontals - L68Construction of Verticals - L68

Stair # 2Stair # 1

Core Wall - L69Construction of Horizontals - L69Construction of Verticals - L69

Stair # 2

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 14 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 118: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

A2560 Stair # 1 4.00 03-May-15 06-May-15 07-May-15 11-May-15 0% 0% 7.00LEVEL 70LEVEL 70 62.00 01-Mar-15 11-May-15 05-Mar-15 17-May-15 0% 0% 26.00STRUCTURAL WORKS - LEVEL 70STRUCTURAL WORKS - LEVEL 70 13.00 01-Mar-15 15-Mar-15 05-Mar-15 19-Mar-15 0% 0% -2.00DHCWA71120Tower Crane Jump 1.00 01-Mar-15 01-Mar-15 05-Mar-15 05-Mar-15 0% 0% 0.00DHCWA71100Core Wall - L70 5.00 01-Mar-15 05-Mar-15 05-Mar-15 10-Mar-15 0% 0% -4.00DHSLA70100Construction of Horizontals - L70 3.00 10-Mar-15 12-Mar-15 15-Mar-15 17-Mar-15 0% 0% -2.00DHCWA71110Construction of Verticals - L70 2.00 14-Mar-15 15-Mar-15 18-Mar-15 19-Mar-15 0% 0% -2.00

STAIRCASESSTAIRCASES 14.00 26-Apr-15 11-May-15 30-Apr-15 17-May-15 0% 0% 26.00A2590 Stair # 2 3.00 26-Apr-15 28-Apr-15 30-Apr-15 03-May-15 0% 0% 37.00A2580 Stair # 1 4.00 07-May-15 11-May-15 12-May-15 17-May-15 0% 0% 7.00

LEVEL 71LEVEL 71 61.00 07-Mar-15 17-May-15 11-Mar-15 21-May-15 0% 0% 25.00STRUCTURAL WORKS - LEVEL 71STRUCTURAL WORKS - LEVEL 71 11.00 07-Mar-15 18-Mar-15 11-Mar-15 23-Mar-15 0% 0% -2.00DHCWA72100Core Wall - L71 4.00 07-Mar-15 10-Mar-15 11-Mar-15 15-Mar-15 0% 0% -4.00DHSLA71100Construction of Horizontals - L71 3.00 14-Mar-15 16-Mar-15 18-Mar-15 21-Mar-15 0% 0% -2.00DHCWA72110Construction of Verticals - L71 2.00 17-Mar-15 18-Mar-15 22-Mar-15 23-Mar-15 0% 0% -2.00

STAIRCASESSTAIRCASES 15.00 29-Apr-15 17-May-15 04-May-15 21-May-15 0% 0% 25.00A2610 Stair # 2 3.00 29-Apr-15 02-May-15 04-May-15 06-May-15 0% 0% 37.00A2600 Stair # 1 4.00 12-May-15 17-May-15 18-May-15 21-May-15 0% 0% 7.00

LEVEL 72LEVEL 72 61.00 11-Mar-15 21-May-15 16-Mar-15 26-May-15 0% 0% 24.00STRUCTURAL WORKS - LEVEL 72STRUCTURAL WORKS - LEVEL 72 11.00 11-Mar-15 23-Mar-15 16-Mar-15 28-Mar-15 0% 0% -3.00DHCWA73100Core Wall - L72 4.00 11-Mar-15 15-Mar-15 16-Mar-15 19-Mar-15 0% 0% -4.00DHSLA72100Construction of Horizontals - L72 3.00 18-Mar-15 21-Mar-15 23-Mar-15 25-Mar-15 0% 0% -3.00DHCWA73110Construction of Verticals - L72 2.00 22-Mar-15 23-Mar-15 26-Mar-15 28-Mar-15 0% 0% -3.00

STAIRCASESSTAIRCASES 16.00 03-May-15 21-May-15 07-May-15 26-May-15 0% 0% 24.00A2630 Stair # 2 3.00 03-May-15 05-May-15 07-May-15 10-May-15 0% 0% 37.00A2620 Stair # 1 4.00 18-May-15 21-May-15 23-May-15 26-May-15 0% 0% 7.00

LEVEL 73LEVEL 73 61.00 16-Mar-15 26-May-15 21-Mar-15 31-May-15 0% 0% 23.00STRUCTURAL WORKS - LEVEL 73STRUCTURAL WORKS - LEVEL 73 11.00 16-Mar-15 28-Mar-15 21-Mar-15 01-Apr-15 0% 0% -4.00DHCWA74100Core Wall - L73 4.00 16-Mar-15 19-Mar-15 21-Mar-15 24-Mar-15 0% 0% -4.00DHSLA73100Construction of Horizontals - L73 3.00 23-Mar-15 25-Mar-15 28-Mar-15 30-Mar-15 0% 0% -4.00DHCWA74110Construction of Verticals - L73 2.00 26-Mar-15 28-Mar-15 31-Mar-15 01-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 17.00 06-May-15 26-May-15 11-May-15 31-May-15 0% 0% 23.00A2650 Stair # 2 3.00 06-May-15 09-May-15 11-May-15 13-May-15 0% 0% 37.00A2640 Stair # 1 4.00 23-May-15 26-May-15 27-May-15 31-May-15 0% 0% 7.00

LEVEL 74LEVEL 74 61.00 21-Mar-15 31-May-15 25-Mar-15 04-Jun-15 0% 0% 22.00STRUCTURAL WORKS - LEVEL 74STRUCTURAL WORKS - LEVEL 74 10.00 21-Mar-15 31-Mar-15 25-Mar-15 05-Apr-15 0% 0% -4.00DHCWA75120Tower Crane Jump 1.00 21-Mar-15 21-Mar-15 25-Mar-15 25-Mar-15 0% 0% -1.00DHCWA75100Core Wall - L74 4.00 21-Mar-15 24-Mar-15 25-Mar-15 29-Mar-15 0% 0% -4.00DHSLA74100Construction of Horizontals - L74 3.00 26-Mar-15 29-Mar-15 31-Mar-15 02-Apr-15 0% 0% -4.00DHCWA75110Construction of Verticals - L74 2.00 30-Mar-15 31-Mar-15 04-Apr-15 05-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 18.00 10-May-15 31-May-15 14-May-15 04-Jun-15 0% 0% 22.00A2670 Stair # 2 3.00 10-May-15 12-May-15 14-May-15 18-May-15 0% 0% 37.00A2660 Stair # 1 4.00 27-May-15 31-May-15 01-Jun-15 04-Jun-15 0% 0% 7.00

LEVEL 75LEVEL 75 61.00 25-Mar-15 04-Jun-15 30-Mar-15 09-Jun-15 0% 0% 21.00STRUCTURAL WORKS - LEVEL 75STRUCTURAL WORKS - LEVEL 75 9.00 25-Mar-15 04-Apr-15 30-Mar-15 08-Apr-15 0% 0% -4.00DHCWA76100Core Wall - L75 3.00 25-Mar-15 28-Mar-15 30-Mar-15 01-Apr-15 0% 0% -4.00DHSLA75100Construction of Horizontals - L75 3.00 30-Mar-15 01-Apr-15 04-Apr-15 06-Apr-15 0% 0% -4.00DHCWA76110Construction of Verticals - L75 2.00 02-Apr-15 04-Apr-15 07-Apr-15 08-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 19.00 13-May-15 04-Jun-15 19-May-15 09-Jun-15 0% 0% 21.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Stair # 1

Tower Crane JumpCore Wall - L70Construction of Horizontals - L70Construction of Verticals - L70

Stair # 2Stair # 1

Core Wall - L71Construction of Horizontals - L71Construction of Verticals - L71

Stair # 2Stair # 1

Core Wall - L72Construction of Horizontals - L72Construction of Verticals - L72

Stair # 2Stair # 1

Core Wall - L73Construction of Horizontals - L73Construction of Verticals - L73

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L74Construction of Horizontals - L74Construction of Verticals - L74

Stair # 2Stair # 1

Core Wall - L75Construction of Horizontals - L75Construction of Verticals - L75

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 15 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 119: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

A2690 Stair # 2 3.00 13-May-15 17-May-15 19-May-15 21-May-15 0% 0% 37.00A2680 Stair # 1 4.00 01-Jun-15 04-Jun-15 06-Jun-15 09-Jun-15 0% 0% 7.00

LEVEL 76LEVEL 76 62.00 29-Mar-15 09-Jun-15 02-Apr-15 14-Jun-15 0% 0% 20.00STRUCTURAL WORKS - LEVEL 76STRUCTURAL WORKS - LEVEL 76 9.00 29-Mar-15 07-Apr-15 02-Apr-15 12-Apr-15 0% 0% -4.00DHCWA77100Core Wall - L76 3.00 29-Mar-15 31-Mar-15 02-Apr-15 05-Apr-15 0% 0% -4.00DHSLA76100Construction of Horizontals - L76 3.00 02-Apr-15 05-Apr-15 07-Apr-15 09-Apr-15 0% 0% -4.00DHCWA77110Construction of Verticals - L76 2.00 06-Apr-15 07-Apr-15 11-Apr-15 12-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 20.00 18-May-15 09-Jun-15 23-May-15 14-Jun-15 0% 0% 20.00A2710 Stair # 2 3.00 18-May-15 20-May-15 23-May-15 25-May-15 0% 0% 37.00A2700 Stair # 1 4.00 06-Jun-15 09-Jun-15 10-Jun-15 14-Jun-15 0% 0% 7.00

LEVEL 77LEVEL 77 63.00 01-Apr-15 14-Jun-15 06-Apr-15 18-Jun-15 0% 0% 19.00STRUCTURAL WORKS - LEVEL 77STRUCTURAL WORKS - LEVEL 77 9.00 01-Apr-15 11-Apr-15 06-Apr-15 15-Apr-15 0% 0% -4.00DHCWA78100Core Wall - L77 3.00 01-Apr-15 04-Apr-15 06-Apr-15 08-Apr-15 0% 0% -4.00DHSLA77100Construction of Horizontals - L77 3.00 06-Apr-15 08-Apr-15 11-Apr-15 13-Apr-15 0% 0% -4.00DHCWA78110Construction of Verticals - L77 2.00 09-Apr-15 11-Apr-15 14-Apr-15 15-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 21.00 21-May-15 14-Jun-15 26-May-15 18-Jun-15 0% 0% 19.00A2730 Stair # 2 3.00 21-May-15 24-May-15 26-May-15 28-May-15 0% 0% 37.00A2720 Stair # 1 4.00 10-Jun-15 14-Jun-15 15-Jun-15 18-Jun-15 0% 0% 7.00

LEVEL 78LEVEL 78 64.00 05-Apr-15 18-Jun-15 09-Apr-15 23-Jun-15 0% 0% 18.00STRUCTURAL WORKS - LEVEL 78STRUCTURAL WORKS - LEVEL 78 9.00 05-Apr-15 14-Apr-15 09-Apr-15 19-Apr-15 0% 0% -4.00DHCWA79140Tower Crane Jump 1.00 05-Apr-15 05-Apr-15 09-Apr-15 09-Apr-15 0% 0% -2.00DHCWA79100Core Wall - L78 3.00 05-Apr-15 07-Apr-15 09-Apr-15 12-Apr-15 0% 0% -4.00DHSLA78100Construction of Horizontals - L78 3.00 09-Apr-15 12-Apr-15 14-Apr-15 16-Apr-15 0% 0% -4.00DHCWA79110Construction of Verticals - L78 2.00 13-Apr-15 14-Apr-15 18-Apr-15 19-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 22.00 25-May-15 18-Jun-15 30-May-15 23-Jun-15 0% 0% 18.00A2750 Stair # 2 3.00 25-May-15 27-May-15 30-May-15 01-Jun-15 0% 0% 37.00A2740 Stair # 1 4.00 15-Jun-15 18-Jun-15 20-Jun-15 23-Jun-15 0% 0% 7.00

LEVEL 79LEVEL 79 65.00 08-Apr-15 23-Jun-15 13-Apr-15 28-Jun-15 0% 0% 17.00STRUCTURAL WORKS - LEVEL 79STRUCTURAL WORKS - LEVEL 79 9.00 08-Apr-15 18-Apr-15 13-Apr-15 22-Apr-15 0% 0% -4.00DHCWA80100Core Wall - L79 3.00 08-Apr-15 11-Apr-15 13-Apr-15 15-Apr-15 0% 0% -4.00DHSLA79100Construction of Horizontals - L79 3.00 13-Apr-15 15-Apr-15 18-Apr-15 20-Apr-15 0% 0% -4.00DHCWA80110Construction of Verticals - L79 2.00 16-Apr-15 18-Apr-15 21-Apr-15 22-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 23.00 28-May-15 23-Jun-15 02-Jun-15 28-Jun-15 0% 0% 17.00A2770 Stair # 2 3.00 28-May-15 31-May-15 02-Jun-15 04-Jun-15 0% 0% 37.00A2760 Stair # 1 4.00 20-Jun-15 23-Jun-15 24-Jun-15 28-Jun-15 0% 0% 7.00

LEVEL 80LEVEL 80 66.00 12-Apr-15 28-Jun-15 16-Apr-15 02-Jul-15 0% 0% 16.00STRUCTURAL WORKS - LEVEL 80STRUCTURAL WORKS - LEVEL 80 10.00 12-Apr-15 22-Apr-15 16-Apr-15 27-Apr-15 0% 0% -4.00DHCWA81100Core Wall - Level 80 3.00 12-Apr-15 14-Apr-15 16-Apr-15 19-Apr-15 0% 0% -4.00DHSLA80100Construction of Horizontals - L80 3.00 18-Apr-15 20-Apr-15 22-Apr-15 25-Apr-15 0% 0% -4.00DHCWA81110Construction of Verticals - L80 2.00 21-Apr-15 22-Apr-15 26-Apr-15 27-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 24.00 01-Jun-15 28-Jun-15 06-Jun-15 02-Jul-15 0% 0% 16.00A2790 Stair # 2 3.00 01-Jun-15 03-Jun-15 06-Jun-15 08-Jun-15 0% 0% 37.00A2780 Stair # 1 4.00 24-Jun-15 28-Jun-15 29-Jun-15 02-Jul-15 0% 0% 7.00

LEVEL 81LEVEL 81 67.00 15-Apr-15 02-Jul-15 20-Apr-15 07-Jul-15 0% 0% 15.00STRUCTURAL WORKS - LEVEL 81STRUCTURAL WORKS - LEVEL 81 10.00 15-Apr-15 26-Apr-15 20-Apr-15 30-Apr-15 0% 0% -4.00DHCWA78120Core Wall - L81 3.00 15-Apr-15 18-Apr-15 20-Apr-15 22-Apr-15 0% 0% -4.00DHSLA811000Construction of Horizontals - L81 3.00 21-Apr-15 23-Apr-15 26-Apr-15 28-Apr-15 0% 0% -4.00DHCWA78130Construction of Verticals - L81 2.00 25-Apr-15 26-Apr-15 29-Apr-15 30-Apr-15 0% 0% -4.00

STAIRCASESSTAIRCASES 25.00 04-Jun-15 02-Jul-15 09-Jun-15 07-Jul-15 0% 0% 15.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Stair # 2Stair # 1

Core Wall - L76Construction of Horizontals - L76Construction of Verticals - L76

Stair # 2Stair # 1

Core Wall - L77Construction of Horizontals - L77Construction of Verticals - L77

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L78Construction of Horizontals - L78Construction of Verticals - L78

Stair # 2Stair # 1

Core Wall - L79Construction of Horizontals - L79Construction of Verticals - L79

Stair # 2Stair # 1

Core Wall - Level 80Construction of Horizontals - L80Construction of Verticals - L80

Stair # 2Stair # 1

Core Wall - L81Construction of Horizontals - L81Construction of Verticals - L81

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 16 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 120: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

A2900 Stair # 2 3.00 04-Jun-15 07-Jun-15 09-Jun-15 11-Jun-15 0% 0% 37.00A2890 Stair # 1 4.00 29-Jun-15 02-Jul-15 04-Jul-15 07-Jul-15 0% 0% 7.00

LEVEL 82LEVEL 82 68.00 19-Apr-15 07-Jul-15 23-Apr-15 12-Jul-15 0% 0% 14.00STRUCTURAL WORKS - LEVEL 82STRUCTURAL WORKS - LEVEL 82 10.00 19-Apr-15 29-Apr-15 23-Apr-15 04-May-15 0% 0% -4.00DHCWA79150Tower Crane Jump 1.00 19-Apr-15 19-Apr-15 23-Apr-15 23-Apr-15 0% 0% -2.00DHCWA79120Core Wall - L82 3.00 19-Apr-15 21-Apr-15 23-Apr-15 26-Apr-15 0% 0% -4.00DHSLA821000Construction of Horizontals - L82 3.00 25-Apr-15 27-Apr-15 29-Apr-15 02-May-15 0% 0% -4.00DHCWA79130Construction of Verticals - L82 2.00 28-Apr-15 29-Apr-15 03-May-15 04-May-15 0% 0% -4.00

STAIRCASESSTAIRCASES 26.00 08-Jun-15 07-Jul-15 13-Jun-15 12-Jul-15 0% 0% 14.00A2920 Stair # 2 3.00 08-Jun-15 10-Jun-15 13-Jun-15 15-Jun-15 0% 0% 37.00A2910 Stair # 1 4.00 04-Jul-15 07-Jul-15 08-Jul-15 12-Jul-15 0% 0% 7.00

LEVEL 83LEVEL 83 69.00 22-Apr-15 12-Jul-15 27-Apr-15 16-Jul-15 0% 0% 13.00STRUCTURAL WORKS - LEVEL 83STRUCTURAL WORKS - LEVEL 83 10.00 22-Apr-15 03-May-15 27-Apr-15 07-May-15 0% 0% -4.00DHCWA80120Core Wall - L83 3.00 22-Apr-15 25-Apr-15 27-Apr-15 29-Apr-15 0% 0% -4.00DHSLA831000Construction of Horizontals - L83 2.00 29-Apr-15 30-Apr-15 04-May-15 05-May-15 0% 0% -4.00DHCWA80130Construction of Verticals - L83 2.00 02-May-15 03-May-15 06-May-15 07-May-15 0% 0% -4.00

STAIRCASESSTAIRCASES 27.00 11-Jun-15 12-Jul-15 16-Jun-15 16-Jul-15 0% 0% 13.00A2940 Stair # 2 3.00 11-Jun-15 14-Jun-15 16-Jun-15 18-Jun-15 0% 0% 37.00A2930 Stair # 1 4.00 08-Jul-15 12-Jul-15 13-Jul-15 16-Jul-15 0% 0% 7.00

LEVEL 84LEVEL 84 70.00 26-Apr-15 16-Jul-15 30-Apr-15 23-Jul-15 0% 0% 12.00STRUCTURAL WORKS - LEVEL 84STRUCTURAL WORKS - LEVEL 84 10.00 26-Apr-15 06-May-15 30-Apr-15 11-May-15 0% 0% -4.00DHCWA81150Core Wall - Level 84 4.00 26-Apr-15 29-Apr-15 30-Apr-15 04-May-15 0% 0% -4.00DHSLA841000Construction of Horizontals - L84 2.00 03-May-15 04-May-15 07-May-15 09-May-15 0% 0% -4.00DHCWA81160Construction of Verticals - L84 2.00 05-May-15 06-May-15 10-May-15 11-May-15 0% 0% -4.00

STAIRCASESSTAIRCASES 28.00 15-Jun-15 16-Jul-15 20-Jun-15 23-Jul-15 0% 0% 12.00A2960 Stair # 2 3.00 15-Jun-15 17-Jun-15 20-Jun-15 22-Jun-15 0% 0% 37.00A2950 Stair # 1 4.00 13-Jul-15 16-Jul-15 20-Jul-15 23-Jul-15 0% 0% 7.00

LEVEL 85(MECHANICAL FLOOR)LEVEL 85(MECHANICAL FLOOR) 70.00 30-Apr-15 23-Jul-15 05-May-15 28-Jul-15 0% 0% 12.00LEVEL 85LEVEL 85 70.00 30-Apr-15 23-Jul-15 05-May-15 28-Jul-15 0% 0% 12.00STRUCTURAL WORKS - LEVEL 85STRUCTURAL WORKS - LEVEL 85 8.00 30-Apr-15 09-May-15 05-May-15 13-May-15 0% 0% -4.00DHCWA81170Tower Crane Jump 1.00 30-Apr-15 30-Apr-15 05-May-15 05-May-15 0% 0% 0.00DHCWA81120Core Wall - Level 85 4.00 30-Apr-15 04-May-15 05-May-15 09-May-15 0% 0% -4.00DHSLA851000Construction of Horizontals - L85(Mech Floor) 4.00 04-May-15 07-May-15 09-May-15 12-May-15 0% 0% -4.00DHCWA81130Construction of Verticals - L85 (Mech Floor) 1.00 09-May-15 09-May-15 13-May-15 13-May-15 0% 0% -4.00

STAIRCASESSTAIRCASES 29.00 18-Jun-15 23-Jul-15 23-Jun-15 28-Jul-15 0% 0% 12.00A2810 Stair # 2 4.00 18-Jun-15 22-Jun-15 23-Jun-15 27-Jun-15 0% 0% 37.00A2800 Stair # 1 4.00 20-Jul-15 23-Jul-15 25-Jul-15 28-Jul-15 0% 0% 7.00

LEVEL 86 TO ROOFLEVEL 86 TO ROOF 82.00 06-May-15 12-Aug-15 11-May-15 17-Aug-15 0% 0% 7.00LEVEL 86LEVEL 86 66.00 10-May-15 28-Jul-15 14-May-15 02-Aug-15 0% 0% 12.00STRUCTURAL WORKS - LEVEL 86STRUCTURAL WORKS - LEVEL 86 3.00 10-May-15 12-May-15 14-May-15 18-May-15 0% 0% -4.00DHSLA861000Construction of Horizontals - L86 2.00 10-May-15 11-May-15 14-May-15 17-May-15 0% 0% -4.00DHCWA81140Construction of Verticals - L86 1.00 12-May-15 12-May-15 18-May-15 18-May-15 0% 0% -4.00

STAIRCASESSTAIRCASES 29.00 23-Jun-15 28-Jul-15 28-Jun-15 02-Aug-15 0% 0% 12.00A2830 Stair # 2 4.00 23-Jun-15 27-Jun-15 28-Jun-15 01-Jul-15 0% 0% 37.00A2820 Stair # 1 4.00 25-Jul-15 28-Jul-15 29-Jul-15 02-Aug-15 0% 0% 7.00

ROOF & TOP OF ROOFROOF & TOP OF ROOF 82.00 06-May-15 12-Aug-15 11-May-15 17-Aug-15 0% 0% 7.00STRUCTURAL WORKS - LEVEL 87 & AboveSTRUCTURAL WORKS - LEVEL 87 & Above 8.00 06-May-15 14-May-15 11-May-15 20-May-15 0% 0% -4.00DHCWA82100Core Wall - Level RF,URF 4.00 06-May-15 10-May-15 11-May-15 14-May-15 0% 0% -4.00DHSLA871000Construction of Roof Deck Slab L87 1.00 13-May-15 13-May-15 19-May-15 19-May-15 0% 0% -4.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Stair # 2Stair # 1

Tower Crane JumpCore Wall - L82Construction of Horizontals - L82Construction of Verticals - L82

Stair # 2Stair # 1

Core Wall - L83Construction of Horizontals - L83Construction of Verticals - L83

Stair # 2Stair # 1

Core Wall - Level 84Construction of Horizontals - L84Construction of Verticals - L84

Stair # 2Stair # 1

Tower Crane JumpCore Wall - Level 85Construction of Horizontals - L85(Mech Floor)Construction of Verticals - L85 (Mech Floor)

Stair # 2Stair # 1

Construction of Horizontals - L86Construction of Verticals - L86

Stair # 2Stair # 1

Core Wall - Level RF,URFConstruction of Roof Deck Slab L87

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 17 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 121: Monthly Progress Report - September 2014

Activity ID Activity Name CurrentDuration

Planned Start Planned Finish Actual/Forecast Start Actual/Forecast Finish Planned %Complete

Actual %Complete

TotalFloat

DHSLA881000Construction of Top of Roof Slab-L88 2.00 13-May-15 14-May-15 19-May-15 20-May-15 0% 0% -4.00STAIRCASESSTAIRCASES 38.00 28-Jun-15 12-Aug-15 02-Jul-15 17-Aug-15 0% 0% 7.00A2850 Stair # 2 4.00 28-Jun-15 01-Jul-15 02-Jul-15 06-Jul-15 0% 0% 37.00A2840 Stair # 1 4.00 09-Aug-15 12-Aug-15 13-Aug-15 17-Aug-15 0% 0% 7.00

M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F2014 2015 2016 2017

Construction of Top of Roof Slab-L88

Stair # 2Stair # 1

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Data Date : 30-Sep-14Page : 18 of 18Printed On : 16-Oct-14

BaselineActual WorkRemaining Work

Critical Remaining WorkBaseline MilestoneCurernt Milestone

Damac Heights Tower at Dubai MarinaProject Progress Update as of 30-Sep-2014

Delay in the Structure[

Date Revision Checked Approved20-Aug... Target Completion Programme - Rev 03 (Basel...30-Sep... Schedule Update - September-14 (Update) SK

Page 122: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 3

Core Walls and SlabsCycles

Page 123: Monthly Progress Report - September 2014

Gain/Loss (Days) Gain/Loss (Days) Gain/Loss (Days)

Total Last Period Current Week

Core Wal - L06 6 15-Feb-14 20-Feb-14 0 - 20-Feb-14 - -Core Wal - L07 9 20-Feb-14 5-Mar-14 0 13.00 28-Feb-14 8.00 5.00 5.00Core Wal - L08 9 6-Mar-14 16-Mar-14 0 11.00 11-Mar-14 11.00 - -

WeeklyMovement

Planned Actual / Forecast Progress Analysis

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Core Walls Cycles

Core Wall Levels Original Duration Planned StartDate

Planned FinishDate

TotalFloat Critical Planned

Cycle Actual Finish Date Actual Cycle Forecast Finish Date

Core Wal - L08 9 6-Mar-14 16-Mar-14 0 11.00 11-Mar-14 11.00 - -Core Wall - L09 10 17-Mar-14 27-Mar-14 0 11.00 23-Mar-14 12.00 (1.00) (1.00)Core Wall - L10 4 29-Mar-14 1-Apr-14 0 5.00 31-Mar-14 8.00 (3.00) (3.00)Core Wall - L11 4 2-Apr-14 6-Apr-14 0 5.00 8-Apr-14 8.00 (3.00) (3.00)Core Wall - L12 6 7-Apr-14 13-Apr-14 0 7.00 14-Apr-14 6.00 1.00 1.00Core Wall - L13 4 14-Apr-14 17-Apr-14 0 4.00 20-Apr-14 6.00 (2.00) (2.00)Core Wall - L14 4 19-Apr-14 22-Apr-14 0 5.00 27-Apr-14 7.00 (2.00) (2.00)Core Wall - L15 9 23-Apr-14 3-May-14 0 11.00 5-May-14 8.00 3.00 3.00Core Wall - L16 5 4-May-14 8-May-14 0 5.00 8-May-14 3.00 2.00 2.00Core Wall - L17 5 10-May-14 14-May-14 0 6.00 14-May-14 6.00 - -Core Wall - L18 5 15-May-14 20-May-14 0 6.00 19-May-14 5.00 1.00 1.00Core Wall - L19 5 21-May-14 26-May-14 0 6.00 26-May-14 7.00 (1.00) (1.00)Core Wall - L20 4 28-May-14 1-Jun-14 0 6.00 31-May-14 5.00 1.00 1.00Core Wall - L21 4 2-Jun-14 5-Jun-14 0 4.00 6-Jun-14 6.00 (2.00) (2.00)Core Wall - L21 4 2-Jun-14 5-Jun-14 0 4.00 6-Jun-14 6.00 (2.00) (2.00)Core Wall - L 22 4 12-Jun-14 16-Jun-14 0 11.00 10-Jun-14 4.00 7.00 7.00Core Wall - L23 4 17-Jun-14 21-Jun-14 0 5.00 15-Jun-14 5.00 - -Core Wall - L24 8 22-Jun-14 30-Jun-14 0 9.00 19-Jun-14 4.00 5.00 5.00Core Wall - L25 5 1-Jul-14 6-Jul-14 0 6.00 26-Jun-14 7.00 (1.00) (1.00)Core Wall - L26 6 7-Jul-14 13-Jul-14 0 7.00 3-Jul-14 7.00 - -Core Wall - L27 6 14-Jul-14 20-Jul-14 0 7.00 14-Jul-14 11.00 (4.00) (4.00)Core Wall - L28 6 21-Jul-14 27-Jul-14 0 7.00 21-Jul-14 7.00 - -Core Wall - L29 5 30-Jul-14 4-Aug-14 0 8.00 27-Jul-14 6.00 2.00 2.00Core Wall - L30 6 5-Aug-14 11-Aug-14 0 7.00 13-Aug-14 17.00 (10.00) (10.00)Core Wall - L31 6 12-Aug-14 18-Aug-14 0 7.00 17-Aug-14 4.00 3.00 3.00Core Wall - L32 4 19-Aug-14 23-Aug-14 0 5.00 24-Aug-14 7.00 (2.00) (2.00)Core Wall - L33 5 24-Aug-14 28-Aug-14 0 5.00 28-Aug-14 4.00 1.00 1.00Core Wall - L34 5 30-Aug-14 3-Sep-14 0 6.00 3-Sep-14 6.00 - -Core Wall - L34 5 30-Aug-14 3-Sep-14 0 6.00 3-Sep-14 6.00 - -Core Wall - L35 4 4-Sep-14 8-Sep-14 0 5.00 14-Sep-14 11.00 (6.00) (6.00)Core Wall - L36 7 9-Sep-14 16-Sep-14 0 8.00 17-Sep-14 3.00 5.00 5.00Core Wall - L37 5 17-Sep-14 22-Sep-14 0 6.00 25-Sep-14 8.00 (2.00) (2.00)Core Wall - L38 4 23-Sep-14 27-Sep-14 0 5.00 29-Sep-14 4.00 1.00 1.00Core Wall - L39 4 28-Sep-14 1-Oct-14 0 4.00 3-Oct-14Core Wall - L40 4 2-Oct-14 8-Oct-14 0 7.00 10-Oct-14Core Wall - L41 4 9-Oct-14 13-Oct-14 0 5.00 15-Oct-14Core Wall - L42 5 14-Oct-14 19-Oct-14 0 6.00 21-Oct-14Core Wall - L43 4 20-Oct-14 23-Oct-14 0 4.00 25-Oct-14Core Wall - L44 4 26-Oct-14 29-Oct-14 0 6.00 31-Oct-14Core Wall - L45 4 30-Oct-14 3-Nov-14 0 5.00 5-Nov-14Core Wall - L46 5 4-Nov-14 9-Nov-14 0 6.00 11-Nov-14Core Wall - L47 5 10-Nov-14 15-Nov-14 0 6.00 17-Nov-14Core Wall - L47 5 10-Nov-14 15-Nov-14 0 6.00 17-Nov-14Core Wall - L48 4 16-Nov-14 19-Nov-14 0 4.00 21-Nov-14Core Wall - L49 4 20-Nov-14 24-Nov-14 0 5.00 26-Nov-14

Page 124: Monthly Progress Report - September 2014

Gain/Loss (Days) Gain/Loss (Days) Gain/Loss (Days)

Total Last Period Current WeekWeekly

Movement

Planned Actual / Forecast Progress Analysis

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Core Walls Cycles

Core Wall Levels Original Duration Planned StartDate

Planned FinishDate

TotalFloat Critical Planned

Cycle Actual Finish Date Actual Cycle Forecast Finish Date

Core Wall - L50 4 25-Nov-14 29-Nov-14 0 5.00 1-Dec-14Core Wall - L51 4 30-Nov-14 4-Dec-14 0 5.00 6-Dec-14Core Wall - L52 4 6-Dec-14 9-Dec-14 0 5.00 11-Dec-14Core Wall - L52 4 6-Dec-14 9-Dec-14 0 5.00 11-Dec-14Core Wall - L53 4 10-Dec-14 14-Dec-14 0 5.00 16-Dec-14Core Wall - L54 4 15-Dec-14 18-Dec-14 0 4.00 20-Dec-14Core Wall - L55 4 20-Dec-14 23-Dec-14 0 5.00 25-Dec-14Core Wall - L56 4 24-Dec-14 28-Dec-14 0 5.00 30-Dec-14Core Wall - L57 3 29-Dec-14 31-Dec-14 0 3.00 2-Jan-15Core Wall - L58 3 3-Jan-15 5-Jan-15 0 5.00 7-Jan-15Core Wall - L59 4 6-Jan-15 10-Jan-15 0 5.00 12-Jan-15Core Wall - L 60 3 11-Jan-15 13-Jan-15 0 3.00 15-Jan-15Core Wall - L61 3 14-Jan-15 17-Jan-15 0 4.00 19-Jan-15Core Wall - L62 6 18-Jan-15 24-Jan-15 0 7.00 26-Jan-15Core Wall - L63 3 25-Jan-15 27-Jan-15 0 3.00 29-Jan-15Core Wall - L64 5 28-Jan-15 2-Feb-15 0 6.00 4-Feb-15Core Wall - L65 5 3-Feb-15 8-Feb-15 0 6.00 10-Feb-15Core Wall - L65 5 3-Feb-15 8-Feb-15 0 6.00 10-Feb-15Core Wall - L66 5 9-Feb-15 14-Feb-15 0 6.00 16-Feb-15Core Wall - L67 4 15-Feb-15 18-Feb-15 0 4.00 20-Feb-15Core Wall - L68 4 19-Feb-15 23-Feb-15 0 5.00 25-Feb-15Core Wall - L69 4 24-Feb-15 28-Feb-15 0 5.00 2-Mar-15Core Wall - L70 5 1-Mar-15 5-Mar-15 0 5.00 7-Mar-15Core Wall - L71 4 7-Mar-15 10-Mar-15 0 5.00 12-Mar-15Core Wall - L72 4 11-Mar-15 15-Mar-15 0 5.00 17-Mar-15Core Wall - L73 4 16-Mar-15 19-Mar-15 0 4.00 21-Mar-15Core Wall - L74 4 21-Mar-15 24-Mar-15 0 5.00 26-Mar-15Core Wall - L75 3 25-Mar-15 28-Mar-15 0 4.00 30-Mar-15Core Wall - L76 3 29-Mar-15 31-Mar-15 0 3.00 2-Apr-15Core Wall - L77 3 1-Apr-15 4-Apr-15 0 4.00 6-Apr-15Core Wall - L78 3 5-Apr-15 7-Apr-15 0 3.00 9-Apr-15Core Wall - L78 3 5-Apr-15 7-Apr-15 0 3.00 9-Apr-15Core Wall - L79 3 8-Apr-15 11-Apr-15 0 4.00 13-Apr-15Core Wall - Level 80 3 12-Apr-15 14-Apr-15 0 3.00 16-Apr-15Core Wall - L81 3 15-Apr-15 18-Apr-15 0 4.00 20-Apr-15Core Wall - L82 3 19-Apr-15 21-Apr-15 0 3.00 23-Apr-15Core Wall - L83 3 22-Apr-15 25-Apr-15 0 4.00 27-Apr-15Core Wall - Level 84 4 26-Apr-15 29-Apr-15 0 4.00 1-May-15Core Wall - Level 85 4 30-Apr-15 4-May-15 0 5.00 6-May-15Core Wall - Level RF,URF 4 6-May-15 10-May-15 0 6.00 12-May-15Grand Total 10-May-15 12-May-15 (2.00) (1.00) (1.00)

Notes Legend**This Analysis was run using the Target Completion Programme (TCP) - Rev 03. Behind the Planned Cycle

Achieved the Planned CycleAhead of the Planned CycleAhead of the Planned Cycle

Page 125: Monthly Progress Report - September 2014

Gain/Loss (Days) Gain/Loss (Days) Gain/Loss (Days)

Total Last Period Current Week

Construction of Horizontals - L06 4 10-Mar-14 11-Mar-14 0 - 4-Mar-14 7.00 7.00Construction of Horizontals - L07 4 17-Mar-14 20-Mar-14 0 9.00 16-Mar-14 12.00 (3.00) (3.00)Construction of Horizontals - L08 4 24-Mar-14 27-Mar-14 0 7.00 25-Mar-14 9.00 (2.00) (2.00)

Planned Actual / Forecast Progress Analysis

WeeklyMovement

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Slabs Cycles

Slab Levels Original Duration Planned StartDate

Planned FinishDate

TotalFloat Critical Planned

Cycle Actual Finish Date Actual Cycle Forecast Finish Date

Construction of Horizontals - L08 4 24-Mar-14 27-Mar-14 0 7.00 25-Mar-14 9.00 (2.00) (2.00)Construction of Horizontals - L09 4 31-Mar-14 3-Apr-14 0 7.00 3-Apr-14 9.00 (2.00) (2.00)Construction of Horizontals - L10 4 7-Apr-14 10-Apr-14 0 7.00 10-Apr-14 7.00 - -Construction of Horizontals - L11 4 14-Apr-14 17-Apr-14 0 7.00 17-Apr-14 7.00 - -Construction of Horizontals - L12 4 21-Apr-14 24-Apr-14 0 7.00 24-Apr-14 7.00 - -Construction of Horizontals - L13 3 28-Apr-14 30-Apr-14 0 6.00 30-Apr-14 6.00 - -Construction of Horizontals - L14 3 4-May-14 6-May-14 0 6.00 8-May-14 8.00 (2.00) (2.00)Construction of Horizontals - L15 3 10-May-14 12-May-14 0 6.00 15-May-14 7.00 (1.00) (1.00)Construction of Horizontals- L16 3 15-May-14 18-May-14 0 6.00 20-May-14 5.00 1.00 1.00Construction of Horizontals - L17 3 21-May-14 24-May-14 0 6.00 27-May-14 7.00 (1.00) (1.00)Construction of Horizontals - L18 3 29-May-14 1-Jun-14 0 8.00 3-Jun-14 7.00 1.00 1.00Construction of Horizontals - L19 3 4-Jun-14 7-Jun-14 0 6.00 9-Jun-14 6.00 - -Construction of Horizontals - L20 3 10-Jun-14 12-Jun-14 0 5.00 14-Jun-14 5.00 - -Construction of Horizontals - L21 3 16-Jun-14 18-Jun-14 0 6.00 21-Jun-14 7.00 (1.00) (1.00)Construction of Horizontals - L21 3 16-Jun-14 18-Jun-14 0 6.00 21-Jun-14 7.00 (1.00) (1.00)Construction of Horizontals - L22 3 22-Jun-14 24-Jun-14 0 6.00 27-Jun-14 6.00 - -Construction of Horizontals- L23 5 28-Jun-14 2-Jul-14 0 8.00 4-Jul-14 7.00 1.00 1.00Construction of Horizontals - L24 4 7-Jul-14 10-Jul-14 0 8.00 10-Jul-14 6.00 2.00 2.00Construction of Horizontals - L25 4 15-Jul-14 19-Jul-14 0 9.00 17-Jul-14 7.00 2.00 2.00Construction of Horizontals - L26 4 22-Jul-14 26-Jul-14 0 7.00 23-Jul-14 6.00 1.00 1.00Construction of Horizontals - L27 3 31-Jul-14 3-Aug-14 0 8.00 1-Aug-14 9.00 (1.00) (1.00)Construction of Horizontals - L28 3 6-Aug-14 9-Aug-14 0 6.00 9-Aug-14 8.00 (2.00) (2.00)Construction of Horizontals - L29 3 13-Aug-14 16-Aug-14 0 7.00 14-Aug-14 5.00 2.00 2.00Construction of Horizontals - L30 (M) 3 20-Aug-14 23-Aug-14 0 7.00 22-Aug-14 8.00 (1.00) (1.00)Construction of Horizontals - L31 4 27-Aug-14 31-Aug-14 0 8.00 31-Aug-14 9.00 (1.00) (1.00)Construction of Horizontals - L32 4 2-Sep-14 6-Sep-14 0 6.00 7-Sep-14 7.00 (1.00) (1.00)Construction of Horizontals - L33 4 8-Sep-14 11-Sep-14 0 5.00 12-Sep-14 5.00 - -Construction of Horizontals - L34 4 13-Sep-14 16-Sep-14 0 5.00 18-Sep-14 6.00 (1.00) (1.00)Construction of Horizontals - L34 4 13-Sep-14 16-Sep-14 0 5.00 18-Sep-14 6.00 (1.00) (1.00)Construction of Horizontals - L35 4 17-Sep-14 21-Sep-14 0 5.00 24-Sep-14 6.00 (1.00) (1.00)Construction of Horizontals - L36 4 23-Sep-14 27-Sep-14 0 6.00 30-Sep-14 6.00 - -Construction of Horizontals - L37 4 29-Sep-14 2-Oct-14 1 5.00 5-Oct-14Construction of Horizontals - L38 3 6-Oct-14 8-Oct-14 1 6.00 11-Oct-14Construction of Horizontals - L39 4 9-Oct-14 13-Oct-14 1 5.00 16-Oct-14Construction of Horizontals - L40 4 14-Oct-14 18-Oct-14 1 5.00 21-Oct-14Construction of Horizontals - L41 4 20-Oct-14 23-Oct-14 1 5.00 26-Oct-14Construction of Horizontals - L42 4 26-Oct-14 29-Oct-14 0 6.00 1-Nov-14Construction of Horizontals - L43 4 1-Nov-14 4-Nov-14 0 6.00 7-Nov-14Construction of Horizontals - L44 4 5-Nov-14 9-Nov-14 0 5.00 12-Nov-14Construction of Horizontals - L45 4 11-Nov-14 15-Nov-14 0 6.00 18-Nov-14Construction of Horizontals - L46 4 17-Nov-14 20-Nov-14 0 5.00 23-Nov-14Construction of Horizontals - L47 4 22-Nov-14 25-Nov-14 0 5.00 28-Nov-14Construction of Horizontals - L47 4 22-Nov-14 25-Nov-14 0 5.00 28-Nov-14Construction of Horizontals - L48 4 26-Nov-14 30-Nov-14 0 5.00 3-Dec-14Construction of Horizontals - L49 4 30-Nov-14 4-Dec-14 0 4.00 7-Dec-14

Page 126: Monthly Progress Report - September 2014

Gain/Loss (Days) Gain/Loss (Days) Gain/Loss (Days)

Total Last Period Current WeekPlanned Actual / Forecast Progress Analysis

WeeklyMovement

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Slabs Cycles

Slab Levels Original Duration Planned StartDate

Planned FinishDate

TotalFloat Critical Planned

Cycle Actual Finish Date Actual Cycle Forecast Finish Date

Construction of Horizontals - L50 4 6-Dec-14 9-Dec-14 0 5.00 12-Dec-14Construction of Horizontals - L51 4 10-Dec-14 14-Dec-14 0 5.00 17-Dec-14Construction of Horizontals - L52 4 15-Dec-14 18-Dec-14 0 4.00 21-Dec-14Construction of Horizontals - L52 4 15-Dec-14 18-Dec-14 0 4.00 21-Dec-14Construction of Horizontals - L53 4 20-Dec-14 23-Dec-14 0 5.00 26-Dec-14Construction of Horizontals - L54 4 23-Dec-14 27-Dec-14 0 4.00 30-Dec-14Construction of Horizontals - L55 3 29-Dec-14 31-Dec-14 0 4.00 3-Jan-15Construction of Horizontals - L56 3 4-Jan-15 6-Jan-15 0 6.00 9-Jan-15Construction of Horizontals - L57 4 6-Jan-15 10-Jan-15 0 4.00 13-Jan-15Construction of Horizontals - L58 4 11-Jan-15 14-Jan-15 0 4.00 17-Jan-15Construction of Horizontals - L59 3 15-Jan-15 18-Jan-15 0 4.00 21-Jan-15Construction of Horizontal - L60 3 20-Jan-15 22-Jan-15 0 4.00 25-Jan-15Construction of Horizontal - L61 3 24-Jan-15 26-Jan-15 0 4.00 29-Jan-15Construction of Horizontal - L62 ( M ) 5 29-Jan-15 3-Feb-15 0 8.00 6-Feb-15Construction of Horizontal - L63 4 8-Feb-15 11-Feb-15 0 8.00 14-Feb-15Construction of Horizontal - L64 3 12-Feb-15 15-Feb-15 1 4.00 18-Feb-15Construction of Horizontals - L65 3 17-Feb-15 19-Feb-15 1 4.00 22-Feb-15Construction of Horizontals - L65 3 17-Feb-15 19-Feb-15 1 4.00 22-Feb-15Construction of Horizontals - L66 3 22-Feb-15 24-Feb-15 1 5.00 27-Feb-15Construction of Horizontals - L67 3 25-Feb-15 28-Feb-15 1 4.00 3-Mar-15Construction of Horizontals - L68 3 2-Mar-15 4-Mar-15 1 4.00 7-Mar-15Construction of Horizontals - L69 3 7-Mar-15 9-Mar-15 2 5.00 12-Mar-15Construction of Horizontals - L70 3 10-Mar-15 12-Mar-15 2 3.00 15-Mar-15Construction of Horizontals - L71 3 14-Mar-15 16-Mar-15 2 4.00 19-Mar-15Construction of Horizontals - L72 3 18-Mar-15 21-Mar-15 1 5.00 24-Mar-15Construction of Horizontals - L73 3 23-Mar-15 25-Mar-15 0 4.00 28-Mar-15Construction of Horizontals - L74 3 26-Mar-15 29-Mar-15 0 4.00 1-Apr-15Construction of Horizontals - L75 3 30-Mar-15 1-Apr-15 0 3.00 4-Apr-15Construction of Horizontals - L76 3 2-Apr-15 5-Apr-15 0 4.00 8-Apr-15Construction of Horizontals - L77 3 6-Apr-15 8-Apr-15 0 3.00 11-Apr-15Construction of Horizontals - L78 3 9-Apr-15 12-Apr-15 0 4.00 15-Apr-15Construction of Horizontals - L78 3 9-Apr-15 12-Apr-15 0 4.00 15-Apr-15Construction of Horizontals - L79 3 13-Apr-15 15-Apr-15 0 3.00 18-Apr-15Construction of Horizontals - L80 3 18-Apr-15 20-Apr-15 0 5.00 23-Apr-15Construction of Horizontals - L81 3 21-Apr-15 23-Apr-15 0 3.00 26-Apr-15Construction of Horizontals - L82 3 25-Apr-15 27-Apr-15 0 4.00 30-Apr-15Construction of Horizontals - L83 2 29-Apr-15 30-Apr-15 0 3.00 3-May-15Construction of Horizontals - L84 2 3-May-15 4-May-15 0 4.00 7-May-15Construction of Horizontals - L85 (M) 4 4-May-15 7-May-15 0 3.00 10-May-15Construction of Horizontals - L86 2 10-May-15 11-May-15 0 4.00 14-May-15Construction of Roof Deck Slab L87 1 13-May-15 13-May-15 0 2.00 16-May-15Construction of Top of Roof Slab-L88 2 13-May-15 14-May-15 0 1.00 17-May-15Grand Total 14-May-15 17-May-15 (3.00) (2.00) (1.00)

Notes Legend**This Analysis was run using the Target Completion Programme (TCP) - Rev 03. Behind the Planned Cycle**This Analysis was run using the Target Completion Programme (TCP) - Rev 03. Behind the Planned Cycle** According to TCP-Rev 03, The Target Completion Date for Tower Structure is 14-May-15. Achieved the Planned Cycle

Ahead of the Planned Cycle

Page 127: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 4

MEP Progress

Page 128: Monthly Progress Report - September 2014

FloorPipes

SupportFixing

Inst. of CWHorizontal

Pipes

CWPipeTest

CW PipeFinal

Insulation

DuctsSupportFixing

DuctFabric.

Instal. ofDucts &

Insulation

Volume, Fire,Smoke, NRDampers

Fixing

Inst. ofCW

RiserPipes

CWRiserTest

Inst. ofDuctsRisers

DuctsRisersTest

Inst. ofFanCoil

Units

FCUConnection(Duct/Pipe)

FCUDrainPipe

Inst. ofValves &Acces.

Inst. ofFlexibleDucts

AccessPanels

Inst. ofPlenumBoxes

Inst. ofGrilles&Diffusers

KitchenExhaust

Fan Fixing

ThermostatFixing

HVAC Work Progress

ShaftWorks(10%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

CW Pipes Ducts FinalFix

(10%)

Works with FCGrids

Final FixWorks Prior to False Ceiling

ClearenceWorkswithFC

Grids(10%)

WorksPrior to

FCClearence

(20%)

HL Works Prior to BlocksHL Works

Prior toBlocks(50%)

Chilled Water Pipes

Shaft Works

Ducts

B5 80% 80% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 30% 26% 0% 0% 0%

B4 80% 80% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 30% 26% 0% 0% 0%

B3 80% 80% 0% 0% 50% 50% 50% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 59% 26% 0% 0% 0%

B2 80% 80% 0% 0% 60% 50% 50% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 59% 26% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 26% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 26% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 26% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 26% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 26% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 60% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 19% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 100% 100% 100% 100% 100% 100% 100% 100% 70% 0% 100% 0% 100% 100% 100% 95% 95% 0% 95% 0% 0% 0% 100% 70% 100% 76% 0%

7th 100% 100% 100% 100% 100% 100% 100% 100% 70% 0% 100% 0% 100% 100% 98% 95% 95% 0% 95% 0% 0% 0% 100% 70% 99% 76% 0%

8th 100% 100% 97% 97% 100% 100% 100% 100% 70% 0% 100% 0% 100% 95% 95% 95% 0% 0% 95% 0% 0% 0% 100% 70% 99% 38% 0%

9th 100% 100% 97% 97% 98% 98% 98% 98% 70% 0% 100% 0% 100% 95% 95% 95% 0% 0% 0% 0% 0% 0% 99% 70% 99% 0% 0%

10th 100% 100% 97% 80% 98% 98% 98% 98% 70% 0% 100% 0% 100% 80% 95% 95% 0% 0% 0% 0% 0% 0% 99% 70% 97% 0% 0%

11th 95% 95% 95% 0% 98% 98% 98% 98% 60% 0% 100% 0% 100% 0% 20% 95% 0% 0% 0% 0% 0% 0% 96% 67% 82% 0% 0%

12th 95% 95% 60% 0% 98% 98% 98% 98% 60% 0% 100% 0% 95% 0% 0% 45% 0% 0% 0% 0% 0% 0% 96% 67% 71% 0% 0%

13th 95% 95% 0% 0% 98% 98% 98% 98% 60% 0% 100% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 67% 67% 0% 0%

14th 95% 95% 95% 0% 98% 98% 98% 98% 60% 0% 100% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 67% 67% 0% 0%

15th 95% 95% 95% 0% 98% 98% 98% 98% 60% 0% 100% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 67% 67% 0% 0%

16th 95% 95% 95% 0% 98% 98% 98% 98% 60% 0% 100% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 67% 67% 0% 0%

17th 95% 95% 95% 0% 98% 98% 98% 98% 60% 0% 100% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 67% 67% 0% 0%

18th 95% 95% 95% 0% 98% 98% 98% 98% 0% 0% 98% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 47% 70% 0% 0%

19th 95% 95% 60% 0% 98% 98% 98% 98% 0% 0% 70% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 34% 70% 0% 0%

20th 95% 95% 0% 0% 98% 98% 98% 98% 0% 0% 70% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 34% 67% 0% 0%

21st 95% 95% 60% 0% 98% 98% 98% 98% 0% 0% 70% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 34% 67% 0% 0%

22nd 95% 95% 0% 0% 98% 98% 98% 98% 0% 0% 30% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 14% 67% 0% 0%

23rd 95% 95% 0% 0% 98% 98% 98% 98% 0% 0% 0% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 67% 0% 0%

24th 95% 95% 60% 0% 95% 95% 90% 80% 0% 0% 0% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 91% 0% 67% 0% 0%

25th 95% 95% 0% 0% 95% 95% 90% 85% 0% 0% 0% 0% 30% 0% 0% 0% 0% 0% 0% 0% 0% 0% 90% 0% 21% 0% 0%

26th 95% 95% 0% 0% 90% 95% 90% 60% 0% 0% 0% 0% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 90% 0% 7% 0% 0%

27th 95% 95% 0% 0% 90% 90% 80% 40% 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 84% 0% 70% 0% 0%

28th 70% 70% 0% 0% 90% 90% 70% 20% 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 69% 0% 70% 0% 0%

29th 70% 70% 0% 0% 50% 70% 40% 10% 0% 0% 0% 0% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 52% 0% 63% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 129: Monthly Progress Report - September 2014

FloorPipes

SupportFixing

Inst. of CWHorizontal

Pipes

CWPipeTest

CW PipeFinal

Insulation

DuctsSupportFixing

DuctFabric.

Instal. ofDucts &

Insulation

Volume, Fire,Smoke, NRDampers

Fixing

Inst. ofCW

RiserPipes

CWRiserTest

Inst. ofDuctsRisers

DuctsRisersTest

Inst. ofFanCoil

Units

FCUConnection(Duct/Pipe)

FCUDrainPipe

Inst. ofValves &Acces.

Inst. ofFlexibleDucts

AccessPanels

Inst. ofPlenumBoxes

Inst. ofGrilles&Diffusers

KitchenExhaust

Fan Fixing

ThermostatFixing

HVAC Work Progress

ShaftWorks(10%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

CW Pipes Ducts FinalFix

(10%)

Works with FCGrids

Final FixWorks Prior to False Ceiling

ClearenceWorkswithFC

Grids(10%)

WorksPrior to

FCClearence

(20%)

HL Works Prior to BlocksHL Works

Prior toBlocks(50%)

Chilled Water Pipes

Shaft Works

Ducts

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 130: Monthly Progress Report - September 2014

FloorPipes

SupportFixing

Inst. of CWHorizontal

Pipes

CWPipeTest

CW PipeFinal

Insulation

DuctsSupportFixing

DuctFabric.

Instal. ofDucts &

Insulation

Volume, Fire,Smoke, NRDampers

Fixing

Inst. ofCW

RiserPipes

CWRiserTest

Inst. ofDuctsRisers

DuctsRisersTest

Inst. ofFanCoil

Units

FCUConnection(Duct/Pipe)

FCUDrainPipe

Inst. ofValves &Acces.

Inst. ofFlexibleDucts

AccessPanels

Inst. ofPlenumBoxes

Inst. ofGrilles&Diffusers

KitchenExhaust

Fan Fixing

ThermostatFixing

HVAC Work Progress

ShaftWorks(10%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

CW Pipes Ducts FinalFix

(10%)

Works with FCGrids

Final FixWorks Prior to False Ceiling

ClearenceWorkswithFC

Grids(10%)

WorksPrior to

FCClearence

(20%)

HL Works Prior to BlocksHL Works

Prior toBlocks(50%)

Chilled Water Pipes

Shaft Works

Ducts

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 131: Monthly Progress Report - September 2014

Works Prior to FalseCeiling Clearence

FloorPipes

SupportFixing

Inst. of FireFighting Pipes

Fire Pipe Testand Flushing

Inst. ofRiserPipes

RiserTest

Installation of ZoneControl Valves

Installation ofSprinkler

Dropper Pipes

Installation ofIdentification

Labels

Installation ofLanding

Valve

Installation ofSprinkler Heads

Installation ofSprinkler

Cover

Installation ofFire Hose Reel

and Cabinet

Installation ofFire

Extinguishers

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

HL WorksPrior toBlocks(65%)

Works Priorto FC

Clearence(5%)

Works withFC Grids(10%)

Final Fix(10%)

ShaftWorks(10%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Fire Fighting Work Progress

HL Works Prior to Blocks Final FixWorks with FC GridsShaft Work

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 80% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 78% 0% 0% 0% 0%

B3 80% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 78% 0% 0% 0% 0%

B2 80% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 78% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 100% 100% 100% 100% 100% 0% 0% 100% 0% 0% 0% 0% 0% 100% 100% 0% 5% 0%

7th 100% 100% 100% 100% 100% 0% 0% 100% 0% 0% 0% 0% 0% 100% 100% 0% 5% 0%7th 100% 100% 100% 100% 100% 0% 0% 100% 0% 0% 0% 0% 0% 100% 100% 0% 5% 0%

8th 100% 100% 100% 100% 100% 0% 0% 100% 0% 0% 0% 0% 0% 100% 100% 0% 5% 0%

9th 100% 100% 100% 100% 100% 0% 0% 100% 0% 0% 0% 0% 0% 100% 100% 0% 5% 0%

10th 100% 100% 100% 100% 100% 0% 0% 100% 0% 0% 0% 0% 0% 100% 100% 0% 5% 0%

11th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

12th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

13th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

14th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

15th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

16th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

17th 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 0% 0%

18th 100% 100% 100% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 100% 95% 0% 0% 0%

19th 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0%19th 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0%

20th 100% 100% 60% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 99% 0% 0% 0% 0%

21st 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0%

22nd 100% 100% 60% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 99% 0% 0% 0% 0%

23rd 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0%

24th 100% 100% 40% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 99% 0% 0% 0% 0%

25th 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 98% 0% 0% 0% 0%

26th 98% 98% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 0% 0% 0% 0%

27th 98% 98% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 0% 0% 0% 0%

28th 90% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 88% 0% 0% 0% 0%

29th 80% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 78% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 132: Monthly Progress Report - September 2014

Works Prior to FalseCeiling Clearence

FloorPipes

SupportFixing

Inst. of FireFighting Pipes

Fire Pipe Testand Flushing

Inst. ofRiserPipes

RiserTest

Installation of ZoneControl Valves

Installation ofSprinkler

Dropper Pipes

Installation ofIdentification

Labels

Installation ofLanding

Valve

Installation ofSprinkler Heads

Installation ofSprinkler

Cover

Installation ofFire Hose Reel

and Cabinet

Installation ofFire

Extinguishers

HL WorksPrior toBlocks(65%)

Works Priorto FC

Clearence(5%)

Works withFC Grids(10%)

Final Fix(10%)

ShaftWorks(10%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Fire Fighting Work Progress

HL Works Prior to Blocks Final FixWorks with FC GridsShaft Work

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 133: Monthly Progress Report - September 2014

Works Prior to FalseCeiling Clearence

FloorPipes

SupportFixing

Inst. of FireFighting Pipes

Fire Pipe Testand Flushing

Inst. ofRiserPipes

RiserTest

Installation of ZoneControl Valves

Installation ofSprinkler

Dropper Pipes

Installation ofIdentification

Labels

Installation ofLanding

Valve

Installation ofSprinkler Heads

Installation ofSprinkler

Cover

Installation ofFire Hose Reel

and Cabinet

Installation ofFire

Extinguishers

HL WorksPrior toBlocks(65%)

Works Priorto FC

Clearence(5%)

Works withFC Grids(10%)

Final Fix(10%)

ShaftWorks(10%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Fire Fighting Work Progress

HL Works Prior to Blocks Final FixWorks with FC GridsShaft Work

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 134: Monthly Progress Report - September 2014

Floor

DrainagePipes

SupportFixing

Inst. ofDrainagePipes &Fittings

DrainagePipesTest

WaterPipes

SupportFixing

Inst. ofWater

Pipes &Fittings

Inst. OfDrainage

PipesRiser

DrainageRiserTest

Inst. OfWaterPipesRiser

WS RiserTest

Cutting &Chasing in

BlockWalls

FixingDrainagePipes in

Block Walls

DrainagePipesTest

FixingWater

Pipes inBlock

WaterPipesTest

Inst. &Connection

to WaterHeater

Inst. ofIdentification

Labels

Inst. ofSanitary

ware

Inst. ofWaterMeter

Inst. ofFloorDrain

Covers

Plumbing Work Progress

HL Works Prior to BlocksFinal Fix

HL WorksPrior toBlocks(60%)

Works Priorto FC

Clearence(5%)

Final Fix(15%)

Shaft Works

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

ConcealedMEP

Services(10%)

Drainage Water SupplyConcealed MEP Services

Works Prior toFalse Ceiling

Clearence ShaftWorks(10%)

Drainage Water Supply

Fixing FittingsHorizontal

Test Fixing FittingsHorizontal Riser Test Riser Walls Block Walls Test Block

WallsTest Heater Labels ware Meter Covers

B5 40% 40% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 22% 0% 0% 0% 0%

B4 40% 40% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 22% 0% 0% 0% 0%

B3 45% 45% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 24% 0% 0% 0% 0%

B2 40% 40% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 22% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 98% 98% 98% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 100% 98% 100% 0% 0% 0% 99% 95% 100% 98% 0%

7th 98% 98% 98% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 100% 98% 100% 0% 0% 0% 99% 95% 100% 98% 0%

8th 95% 95% 95% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 100% 98% 100% 0% 0% 0% 97% 95% 100% 98% 0%

9th 95% 95% 95% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 100% 90% 100% 0% 0% 0% 97% 95% 100% 91% 0%

10th 95% 95% 95% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 100% 80% 100% 0% 0% 0% 97% 95% 100% 81% 0%

11th 95% 95% 95% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 100% 90% 0% 0% 0% 0% 97% 95% 100% 86% 0%

12th 95% 95% 90% 100% 100% 98% 95% 90% 90% 100% 100% 100% 100% 100% 80% 0% 0% 0% 0% 97% 94% 100% 76% 0%

13th 95% 95% 90% 100% 100% 98% 98% 90% 90% 100% 100% 100% 100% 60% 80% 0% 0% 0% 0% 97% 95% 99% 76% 0%

14th 95% 95% 90% 100% 100% 95% 95% 90% 90% 100% 100% 100% 98% 0% 80% 0% 0% 0% 0% 97% 93% 97% 76% 0%

15th 98% 98% 98% 100% 100% 95% 95% 90% 0% 100% 100% 100% 98% 0% 80% 0% 0% 0% 0% 99% 86% 97% 76% 0%

16th 98% 98% 98% 100% 100% 95% 95% 90% 0% 100% 100% 100% 98% 0% 60% 0% 0% 0% 0% 99% 86% 97% 57% 0%

17th 98% 98% 98% 95% 98% 95% 95% 90% 0% 100% 100% 100% 98% 0% 80% 0% 0% 0% 0% 98% 86% 97% 76% 0%17th 98% 98% 98% 95% 98% 95% 95% 90% 0% 100% 100% 100% 98% 0% 80% 0% 0% 0% 0% 98% 86% 97% 76% 0%

18th 98% 98% 98% 95% 95% 95% 95% 90% 0% 100% 100% 100% 98% 0% 80% 0% 0% 0% 0% 97% 86% 97% 76% 0%

19th 98% 98% 98% 95% 95% 95% 95% 0% 0% 100% 100% 100% 98% 0% 80% 0% 0% 0% 0% 97% 57% 97% 76% 0%

20th 98% 98% 98% 98% 98% 95% 95% 0% 0% 100% 100% 100% 98% 60% 0% 0% 0% 0% 0% 98% 57% 98% 0% 0%

21st 98% 98% 98% 98% 98% 95% 95% 0% 0% 100% 100% 100% 98% 0% 0% 0% 0% 0% 0% 98% 57% 97% 0% 0%

22nd 98% 98% 98% 90% 90% 95% 95% 0% 0% 100% 98% 98% 98% 0% 0% 0% 0% 0% 0% 95% 57% 96% 0% 0%

23rd 98% 98% 98% 90% 90% 95% 95% 0% 0% 95% 95% 95% 95% 0% 0% 0% 0% 0% 0% 95% 57% 93% 0% 0%

24th 98% 98% 98% 90% 90% 95% 95% 0% 0% 40% 30% 30% 30% 0% 0% 0% 0% 0% 0% 95% 57% 30% 0% 0%

25th 98% 98% 98% 90% 90% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 57% 0% 0% 0%

26th 98% 98% 98% 90% 90% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 57% 0% 0% 0%

27th 98% 98% 98% 90% 90% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 57% 0% 0% 0%

28th 98% 98% 98% 90% 90% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 57% 0% 0% 0%

29th 90% 90% 0% 0% 0% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 43% 0% 0% 0%29th 90% 90% 0% 0% 0% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 43% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 135: Monthly Progress Report - September 2014

Floor

DrainagePipes

SupportFixing

Inst. ofDrainagePipes &Fittings

DrainagePipesTest

WaterPipes

SupportFixing

Inst. ofWater

Pipes &Fittings

Inst. OfDrainage

PipesRiser

DrainageRiserTest

Inst. OfWaterPipesRiser

WS RiserTest

Cutting &Chasing in

BlockWalls

FixingDrainagePipes in

Block Walls

DrainagePipesTest

FixingWater

Pipes inBlock

WaterPipesTest

Inst. &Connection

to WaterHeater

Inst. ofIdentification

Labels

Inst. ofSanitary

ware

Inst. ofWaterMeter

Inst. ofFloorDrain

Covers

Plumbing Work Progress

HL Works Prior to BlocksFinal Fix

HL WorksPrior toBlocks(60%)

Works Priorto FC

Clearence(5%)

Final Fix(15%)

Shaft Works

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

ConcealedMEP

Services(10%)

Drainage Water SupplyConcealed MEP Services

Works Prior toFalse Ceiling

Clearence ShaftWorks(10%)

Drainage Water Supply

Fixing FittingsHorizontal

Test Fixing FittingsHorizontal Riser Test Riser Walls Block Walls Test Block

WallsTest Heater Labels ware Meter Covers

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 50% 40% 0% 0% 0% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 22% 43% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 136: Monthly Progress Report - September 2014

Floor

DrainagePipes

SupportFixing

Inst. ofDrainagePipes &Fittings

DrainagePipesTest

WaterPipes

SupportFixing

Inst. ofWater

Pipes &Fittings

Inst. OfDrainage

PipesRiser

DrainageRiserTest

Inst. OfWaterPipesRiser

WS RiserTest

Cutting &Chasing in

BlockWalls

FixingDrainagePipes in

Block Walls

DrainagePipesTest

FixingWater

Pipes inBlock

WaterPipesTest

Inst. &Connection

to WaterHeater

Inst. ofIdentification

Labels

Inst. ofSanitary

ware

Inst. ofWaterMeter

Inst. ofFloorDrain

Covers

Plumbing Work Progress

HL Works Prior to BlocksFinal Fix

HL WorksPrior toBlocks(60%)

Works Priorto FC

Clearence(5%)

Final Fix(15%)

Shaft Works

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

ConcealedMEP

Services(10%)

Drainage Water SupplyConcealed MEP Services

Works Prior toFalse Ceiling

Clearence ShaftWorks(10%)

Drainage Water Supply

Fixing FittingsHorizontal

Test Fixing FittingsHorizontal Riser Test Riser Walls Block Walls Test Block

WallsTest Heater Labels ware Meter Covers

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 2:35 PM

Page 137: Monthly Progress Report - September 2014

Electrical Work Progress

BusB,Light,Pow.

FireAlarm

VoiceandData

Emerg.Light

LowCurrent

HV

Marki

ng&

Back

Box

Inst.o

fCon

duits

forLig

hting

&Po

wer

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forFir

eAlar

m

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forVo

ice/D

ata

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forEm

erg.

Light

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forLo

wCu

rrent

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Inst.O

fBus

BarR

isers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fHV

Cable

Light and Power Fire Alarm Voice and Data Emergency LightLow Current

(CCTV,Intercom,BMS,Access Control)

HL Works Prior to Blocks (Inside and Below Concrete Slab) Shaft Works

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Floor

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forLig

hting

&Po

wer

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forFir

eAlar

m

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forVo

ice/D

ata

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forEm

erg.

Light

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forLo

wCu

rrent

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Inst.O

fBus

BarR

isers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fHV

Cable

Rise

rs

B5 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

B4 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

B3 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

B2 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

B1 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

G 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

P1 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

P2 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

P3 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%P3 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

P4 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 100% 100% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

P5 95% 95% 0% 0% 95% 95% 0% 0% 95% 95% 0% 0% 95% 95% 0% 0% 95% 95% 40% 40% 0% 0% 0% 0% 0% 0%

6th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 80% 10% 0% 80% 80% 0% 20%

7th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 80% 10% 0% 80% 80% 0% 20%

8th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 80% 10% 0% 80% 80% 0% 20%

9th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 80% 10% 0% 80% 80% 0% 20%

10th 100% 100% 95% 95% 100% 100% 95% 95% 80% 80% 90% 90% 100% 100% 95% 95% 100% 100% 95% 80% 10% 0% 80% 80% 0% 20%

11th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 80% 80% 0% 20%

12th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

13th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

14th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 95% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

15th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 95% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

16th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 95% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

17th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 70% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

18th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 70% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

19th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 70% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 20%

20th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 90% 70% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0%

21st 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 70% 100% 100% 95% 95% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0%

22nd 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 70% 100% 100% 95% 95% 100% 100% 95% 80% 0% 0% 0% 0% 0% 0%

23rd 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 95% 0% 100% 100% 90% 90% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

24th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 0% 0% 100% 100% 90% 90% 100% 100% 40% 0% 0% 0% 0% 0% 0% 0%

25th 80% 80% 65% 65% 100% 100% 80% 80% 100% 100% 0% 0% 100% 100% 90% 90% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

26th 100% 100% 95% 95% 100% 100% 95% 95% 100% 100% 0% 0% 100% 100% 90% 90% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 1 of 6 Printed On: 9/30/2014 at 2:35 PM

Page 138: Monthly Progress Report - September 2014

Electrical Work Progress

BusB,Light,Pow.

FireAlarm

VoiceandData

Emerg.Light

LowCurrent

HV

Marki

ng&

Back

Box

Inst.o

fCon

duits

forLig

hting

&Po

wer

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forFir

eAlar

m

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forVo

ice/D

ata

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forEm

erg.

Light

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forLo

wCu

rrent

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Inst.O

fBus

BarR

isers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fHV

Cable

Light and Power Fire Alarm Voice and Data Emergency LightLow Current

(CCTV,Intercom,BMS,Access Control)

HL Works Prior to Blocks (Inside and Below Concrete Slab) Shaft Works

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Floor

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forLig

hting

&Po

wer

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forFir

eAlar

m

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forVo

ice/D

ata

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forEm

erg.

Light

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forLo

wCu

rrent

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Inst.O

fBus

BarR

isers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fHV

Cable

Rise

rs

27th 100% 100% 80% 80% 100% 100% 95% 95% 100% 100% 0% 0% 100% 100% 90% 90% 100% 100% 40% 0% 0% 0% 0% 0% 0% 0%

28th 100% 100% 80% 80% 100% 100% 95% 95% 100% 100% 0% 0% 100% 100% 90% 90% 100% 100% 40% 0% 0% 0% 0% 0% 0% 0%

29th 80% 80% 80% 80% 100% 100% 80% 80% 100% 100% 95% 50% 100% 100% 80% 80% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

30th 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 0% 0% 100% 100% 0% 0% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

31st 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 0% 0% 100% 100% 0% 0% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 80% 80% 0% 0% 80% 80% 0% 0% 100% 100% 0% 0% 100% 100% 0% 0% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

34th 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

35th 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

36th 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 2 of 6 Printed On: 9/30/2014 at 2:35 PM

Page 139: Monthly Progress Report - September 2014

Electrical Work Progress

BusB,Light,Pow.

FireAlarm

VoiceandData

Emerg.Light

LowCurrent

HV

Marki

ng&

Back

Box

Inst.o

fCon

duits

forLig

hting

&Po

wer

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forFir

eAlar

m

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forVo

ice/D

ata

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forEm

erg.

Light

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Inst.o

fCon

duits

forLo

wCu

rrent

Inst.o

fCab

leTr

ay/

Pullin

gWirir

ng/C

ables

Inst.O

fBus

BarR

isers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fHV

Cable

Light and Power Fire Alarm Voice and Data Emergency LightLow Current

(CCTV,Intercom,BMS,Access Control)

HL Works Prior to Blocks (Inside and Below Concrete Slab) Shaft Works

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Floor

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forLig

hting

&Po

wer

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forFir

eAlar

m

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forVo

ice/D

ata

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forEm

erg.

Light

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Marki

ng&

Back

Box

Fixing

Inst.o

fCon

duits

forLo

wCu

rrent

Inst.o

fCab

leTr

ay/

Trun

king

Pullin

gWirir

ng/C

ables

Inst.O

fBus

BarR

isers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fCab

leRi

sers

Inst.O

fHV

Cable

Rise

rs

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 3 of 6 Printed On: 9/30/2014 at 2:35 PM

Page 140: Monthly Progress Report - September 2014

Emerg.Light

GIBo

xand

Cond

uits

Light-

Pullin

gW

irirng

/Cab

les

Powe

r-Pu

lling

Wirir

ng/C

ables

Fire-

Pullin

gW

irirng

/Cab

les

Voice

/Data

-Pull

ingW

irirng

/Cab

les

Low

Cure

nt-P

ulling

Wirir

ng/C

ables

FireA

larm

Devic

esab

oveC

eiling

Powe

rPoin

ts

Low

Curre

ntDe

vices

abov

eCeil

ing

Test

ofCa

blesa

nd

Test

ofCa

blesa

nd

instal

lation

,Dre

ssing

andT

ermi

natio

n

Inst.o

fSMD

Bs

Cable

sTer

mina

tion

Inst.o

fTap

offun

it

Inst.o

fLigh

tsFix

tures

Inst.o

fPow

e&Da

ta

Instal

lation

of

Instal

lation

ofMa

nual

PullS

tation

Voice

Evac

uatio

n

Instal

lation

ofEm

erge

ncy&

Exit

Inst.o

fCCT

V

Inst.o

fInter

com

Inst.o

fBMS

Devic

es

Light and Power Fire AlarmConcealed

MEPServices

(10%)

WorksPrior to FCClearence

(10%)

Workswith FCGrids

Final Fix(25%)

Low Current(CCTV,Intercom,

BMS)

Final FixWorks

with FCGrids

ShaftWorks(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

HL WorksPrior toBlocks(50%)

Electrical Work Progress

Concealed MEP Services (InsideBlocks)

Works Prior to FalseCeiling Clearence

Floor

B5

B4

B3

B2

B1

G

P1

P2

P3

GIBo

xand

Cond

uits

Light-

Pullin

gW

irirng

/Cab

les

Powe

r-Pu

lling

Wirir

ng/C

ables

Fire-

Pullin

gW

irirng

/Cab

les

Voice

/Data

-Pull

ingW

irirng

/Cab

les

Low

Cure

nt-P

ulling

Wirir

ng/C

ables

FireA

larm

Devic

esab

oveC

eiling

Powe

rPoin

ts

Low

Curre

ntDe

vices

abov

eCeil

ing

Test

ofCa

blesa

ndW

ires

Test

ofCa

blesa

ndW

ires

DBins

tallat

ion,D

ress

ingan

dTer

mina

tion

Inst.o

fSMD

Bs

Cable

sTer

mina

tion

Inst.o

fTap

offun

it

Inst.o

fLigh

tsFix

tures

Inst.o

fPow

e&Da

taSo

ckets

Instal

lation

ofDe

tector

s

Instal

lation

ofMa

nual

PullS

tation

Voice

Evac

uatio

n

Instal

lation

ofEm

erge

ncy&

Exit

Lights

Inst.o

fCCT

V

Inst.o

fInter

com

Inst.o

fBMS

Devic

es

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

(10%) (10%)Grids(5%)(50%)

P3

P4

P5

6th

7th

8th

9th

10th

11th

12th

13th

14th

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 49% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 54% 0% 0% 0% 0% 0%

100% 100% 100% 100% 95% 50% 95% 95% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 97% 23% 99% 95% 0% 0%

100% 100% 100% 100% 95% 50% 95% 95% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 97% 23% 99% 95% 0% 0%

100% 100% 100% 100% 95% 100% 95% 95% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 97% 23% 100% 95% 0% 0%

100% 100% 100% 100% 95% 100% 95% 95% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 97% 23% 100% 95% 0% 0%

100% 100% 100% 100% 95% 100% 95% 95% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 23% 100% 95% 0% 0%

100% 100% 100% 100% 95% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 18% 100% 0% 0% 0%

100% 100% 100% 100% 95% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 2% 100% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 2% 99% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 2% 99% 0% 0% 0%

15th

16th

17th

18th

19th

20th

21st

22nd

23rd

24th

25th

26th

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 2% 99% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 96% 2% 99% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 2% 99% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 2% 99% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 2% 99% 0% 0% 0%

100% 100% 100% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 99% 0% 0% 0%

100% 80% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 96% 0% 0% 0%

100% 80% 80% 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 97% 0% 96% 0% 0% 0%

90% 90% 90% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 94% 0% 87% 0% 0% 0%

90% 90% 90% 90% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 94% 0% 87% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 80% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 94% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 4 of 6 Printed On: 9/30/2014 at 2:35 PM

Page 141: Monthly Progress Report - September 2014

Emerg.Light

GIBo

xand

Cond

uits

Light-

Pullin

gW

irirng

/Cab

les

Powe

r-Pu

lling

Wirir

ng/C

ables

Fire-

Pullin

gW

irirng

/Cab

les

Voice

/Data

-Pull

ingW

irirng

/Cab

les

Low

Cure

nt-P

ulling

Wirir

ng/C

ables

FireA

larm

Devic

esab

oveC

eiling

Powe

rPoin

ts

Low

Curre

ntDe

vices

abov

eCeil

ing

Test

ofCa

blesa

nd

Test

ofCa

blesa

nd

instal

lation

,Dre

ssing

andT

ermi

natio

n

Inst.o

fSMD

Bs

Cable

sTer

mina

tion

Inst.o

fTap

offun

it

Inst.o

fLigh

tsFix

tures

Inst.o

fPow

e&Da

ta

Instal

lation

of

Instal

lation

ofMa

nual

PullS

tation

Voice

Evac

uatio

n

Instal

lation

ofEm

erge

ncy&

Exit

Inst.o

fCCT

V

Inst.o

fInter

com

Inst.o

fBMS

Devic

es

Light and Power Fire AlarmConcealed

MEPServices

(10%)

WorksPrior to FCClearence

(10%)

Workswith FCGrids

Final Fix(25%)

Low Current(CCTV,Intercom,

BMS)

Final FixWorks

with FCGrids

ShaftWorks(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

HL WorksPrior toBlocks(50%)

Electrical Work Progress

Concealed MEP Services (InsideBlocks)

Works Prior to FalseCeiling Clearence

Floor

27th

28th

29th

30th

31st

32nd

33rd

34th

GIBo

xand

Cond

uits

Light-

Pullin

gW

irirng

/Cab

les

Powe

r-Pu

lling

Wirir

ng/C

ables

Fire-

Pullin

gW

irirng

/Cab

les

Voice

/Data

-Pull

ingW

irirng

/Cab

les

Low

Cure

nt-P

ulling

Wirir

ng/C

ables

FireA

larm

Devic

esab

oveC

eiling

Powe

rPoin

ts

Low

Curre

ntDe

vices

abov

eCeil

ing

Test

ofCa

blesa

ndW

ires

Test

ofCa

blesa

ndW

ires

DBins

tallat

ion,D

ress

ingan

dTer

mina

tion

Inst.o

fSMD

Bs

Cable

sTer

mina

tion

Inst.o

fTap

offun

it

Inst.o

fLigh

tsFix

tures

Inst.o

fPow

e&Da

taSo

ckets

Instal

lation

ofDe

tector

s

Instal

lation

ofMa

nual

PullS

tation

Voice

Evac

uatio

n

Instal

lation

ofEm

erge

ncy&

Exit

Lights

Inst.o

fCCT

V

Inst.o

fInter

com

Inst.o

fBMS

Devic

es

(10%) (10%)Grids(5%)(50%)

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 90% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 90% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 84% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 50% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 50% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 50% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 0%

35th

36th

37th

38th

39th

40th

41st

42nd

43rd

44th

45th

46th

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th

48th

49th

50th

51st

52nd

53rd

54th

55th

56th

57th

58th

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 5 of 6 Printed On: 9/30/2014 at 2:35 PM

Page 142: Monthly Progress Report - September 2014

Emerg.Light

GIBo

xand

Cond

uits

Light-

Pullin

gW

irirng

/Cab

les

Powe

r-Pu

lling

Wirir

ng/C

ables

Fire-

Pullin

gW

irirng

/Cab

les

Voice

/Data

-Pull

ingW

irirng

/Cab

les

Low

Cure

nt-P

ulling

Wirir

ng/C

ables

FireA

larm

Devic

esab

oveC

eiling

Powe

rPoin

ts

Low

Curre

ntDe

vices

abov

eCeil

ing

Test

ofCa

blesa

nd

Test

ofCa

blesa

nd

instal

lation

,Dre

ssing

andT

ermi

natio

n

Inst.o

fSMD

Bs

Cable

sTer

mina

tion

Inst.o

fTap

offun

it

Inst.o

fLigh

tsFix

tures

Inst.o

fPow

e&Da

ta

Instal

lation

of

Instal

lation

ofMa

nual

PullS

tation

Voice

Evac

uatio

n

Instal

lation

ofEm

erge

ncy&

Exit

Inst.o

fCCT

V

Inst.o

fInter

com

Inst.o

fBMS

Devic

es

Light and Power Fire AlarmConcealed

MEPServices

(10%)

WorksPrior to FCClearence

(10%)

Workswith FCGrids

Final Fix(25%)

Low Current(CCTV,Intercom,

BMS)

Final FixWorks

with FCGrids

ShaftWorks(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

HL WorksPrior toBlocks(50%)

Electrical Work Progress

Concealed MEP Services (InsideBlocks)

Works Prior to FalseCeiling Clearence

Floor

59th

60th

61st

62nd

63rd

64th

65th

66th

GIBo

xand

Cond

uits

Light-

Pullin

gW

irirng

/Cab

les

Powe

r-Pu

lling

Wirir

ng/C

ables

Fire-

Pullin

gW

irirng

/Cab

les

Voice

/Data

-Pull

ingW

irirng

/Cab

les

Low

Cure

nt-P

ulling

Wirir

ng/C

ables

FireA

larm

Devic

esab

oveC

eiling

Powe

rPoin

ts

Low

Curre

ntDe

vices

abov

eCeil

ing

Test

ofCa

blesa

ndW

ires

Test

ofCa

blesa

ndW

ires

DBins

tallat

ion,D

ress

ingan

dTer

mina

tion

Inst.o

fSMD

Bs

Cable

sTer

mina

tion

Inst.o

fTap

offun

it

Inst.o

fLigh

tsFix

tures

Inst.o

fPow

e&Da

taSo

ckets

Instal

lation

ofDe

tector

s

Instal

lation

ofMa

nual

PullS

tation

Voice

Evac

uatio

n

Instal

lation

ofEm

erge

ncy&

Exit

Lights

Inst.o

fCCT

V

Inst.o

fInter

com

Inst.o

fBMS

Devic

es

(10%) (10%)Grids(5%)(50%)

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th

68th

69th

70th

71st

72nd

73rd

74th

75th

76th

77th

78th

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th

80th

81st

82nd

83rd

84th

85th

86th

Roof

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. MEP Progress as of 30-Sep-14 Page 6 of 6 Printed On: 9/30/2014 at 2:35 PM

Page 143: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 5

Finishes Progress

Page 144: Monthly Progress Report - September 2014

Architectural Work Progress

Floor BlockWork

Marking,Cutting &Chasing

DoorsSub

frameFixing

Plaster FloorScreed

Painting -Primer

Painting -Stucco

False CeilingSuspension

FalseCeilingTiling /

Boardin

Painting -1st Coat

FloorTiles

Timber Doors&

IronmongeryWardrobe

FinalPaintCoat

BlockWork

Marking,Cutting &Chasing

DoorsSub

frameFixing

Plaster Waterproofing

FloorScreed

Painting -Primer

Painting -Stucco Wall Tiles

FalseCeiling

Suspension

FalseCeilingTiling /

Boarding

Painting -1st Coat

FloorTiles

CabinetCarcass

VanityCounters& Tops

KitchenCabinet

Timber Doors&

Ironmongery

ShowerEnclosure

FinalPaintCoat

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Wet Area (Kitchen, Bathroom and Balacony)Dry Area (Bed Room and Living Room)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 95% 0% 100% 95% 0% 80% 60% 15% 0% 0% 0% 0% 0% 0% 95% 0% 100% 90% 10% 0% 20% 20% 60% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 95% 0% 100% 95% 0% 80% 60% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 10% 0% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 95% 0% 100% 95% 0% 80% 60% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 95% 0% 100% 95% 0% 80% 60% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 95% 0% 100% 95% 0% 80% 50% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 95% 0% 100% 95% 0% 80% 40% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 95% 0% 100% 95% 0% 60% 40% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 95% 0% 100% 95% 0% 50% 20% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%13th 95% 0% 100% 95% 0% 50% 20% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 95% 0% 100% 95% 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 50% 0% 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 50% 0% 40% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 95% 0% 100% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 95% 0% 100% 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 95% 0% 100% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 100% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 95% 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%28th 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Finishes Progress as of 30-Sep-14 Page 1 of 4 Printed On: 9/30/2014 at 11:13 AM

Page 145: Monthly Progress Report - September 2014

Architectural Work Progress

Floor BlockWork

Marking,Cutting &Chasing

DoorsSub

frameFixing

Plaster FloorScreed

Painting -Primer

Painting -Stucco

False CeilingSuspension

FalseCeilingTiling /

Boardin

Painting -1st Coat

FloorTiles

Timber Doors&

IronmongeryWardrobe

FinalPaintCoat

BlockWork

Marking,Cutting &Chasing

DoorsSub

frameFixing

Plaster Waterproofing

FloorScreed

Painting -Primer

Painting -Stucco Wall Tiles

FalseCeiling

Suspension

FalseCeilingTiling /

Boarding

Painting -1st Coat

FloorTiles

CabinetCarcass

VanityCounters& Tops

KitchenCabinet

Timber Doors&

Ironmongery

ShowerEnclosure

FinalPaintCoat

Wet Area (Kitchen, Bathroom and Balacony)Dry Area (Bed Room and Living Room)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Finishes Progress as of 30-Sep-14 Page 2 of 4 Printed On: 9/30/2014 at 11:13 AM

Page 146: Monthly Progress Report - September 2014

Floor

B5B4B3B2

Architectural Work Progress

Marking,Cutting & Chasing

Doors Subframe Fixing Plaster Floor Screed Painting -

PrimerPainting -

Stucco Floor Tiles Floor Epoxy Wall Tiles False CeilingSuspension

False CeilingTiling /

Boarding

Painting - 1stCoat Steel Doors Final Paint

CoatMarking,Cuttin

g & Chasing Plaster Floor Screed Painting -Primer

Painting -Stucco Floor Epoxy Painting - 1st

CoatFinal Paint

CoatHandrailFixing

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Corridors and Service Rooms Stairs

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

B1GP1P2P3P4P56th7th8th9th

10th11th12th13th

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 80% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 80% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 80% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 60% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 60% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 60% 40% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 50% 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 50% 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%13th14th15th16th17th18th19th20th21st22nd23rd24th25th26th27th28th

0% 100% 95% 0% 50% 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 20% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 40% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 70% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 100% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%28th29th30th31st32nd33rd34th35th36th37th38th39th40th41st42nd43rd

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Finishes Progress as of 30-Sep-14 Page 3 of 4 Printed On: 9/30/2014 at 11:13 AM

Page 147: Monthly Progress Report - September 2014

Floor

44th45th46th47th

Architectural Work Progress

Marking,Cutting & Chasing

Doors Subframe Fixing Plaster Floor Screed Painting -

PrimerPainting -

Stucco Floor Tiles Floor Epoxy Wall Tiles False CeilingSuspension

False CeilingTiling /

Boarding

Painting - 1stCoat Steel Doors Final Paint

CoatMarking,Cuttin

g & Chasing Plaster Floor Screed Painting -Primer

Painting -Stucco Floor Epoxy Painting - 1st

CoatFinal Paint

CoatHandrailFixing

Corridors and Service Rooms Stairs

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th49th50th51st52nd53rd54th55th56th57th58th59th60th61st62nd

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%62nd63rd64th65th66th67th68th69th70th71st72nd73rd74th75th76th77th

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%77th78th79th80th81st82nd83rd84th85th86thRoof

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Finishes Progress as of 30-Sep-14 Page 4 of 4 Printed On: 9/30/2014 at 11:13 AM

Page 148: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 6

Ext. Facade Progress

Page 149: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan with

Insulation

GlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes

SeeSide

CayanTowerSide

Stick Curtain Wall Progress

MarriotSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Stick Curtain Wall (From Slab to Slab)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

/Profile Insulation Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 52% 52% 52% 26% 0% 92% 92% 92% 46% 0% 61% 61% 61% 0% 0% 87% 87% 87% 40% 0% 44% 78% 46% 73%

7th 52% 52% 52% 26% 0% 92% 92% 92% 46% 0% 61% 61% 61% 0% 0% 87% 87% 87% 43% 0% 44% 78% 46% 74%

8th 52% 52% 52% 26% 0% 92% 92% 92% 46% 0% 61% 61% 61% 0% 0% 87% 87% 87% 40% 0% 44% 78% 46% 73%

9th 52% 52% 52% 26% 0% 92% 92% 92% 46% 0% 61% 61% 61% 0% 0% 87% 87% 87% 43% 0% 44% 78% 46% 74%

10th 52% 52% 52% 26% 0% 92% 92% 92% 46% 0% 61% 61% 61% 0% 0% 87% 87% 87% 43% 0% 44% 78% 46% 74%

11th 52% 52% 52% 26% 0% 92% 92% 92% 46% 0% 61% 61% 61% 0% 0% 87% 87% 87% 43% 0% 44% 78% 46% 74%

12th 52% 52% 52% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 44% 62% 24% 58%

13th 52% 52% 26% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 35% 62% 24% 58%

14th 52% 52% 26% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 35% 62% 24% 58%

15th 52% 52% 26% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 35% 62% 24% 58%

16th 52% 52% 26% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 35% 62% 24% 58%

17th 52% 52% 26% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 35% 62% 24% 58%17th 52% 52% 26% 26% 0% 92% 92% 46% 46% 0% 61% 61% 0% 0% 0% 87% 87% 43% 43% 0% 35% 62% 24% 58%

18th 52% 52% 26% 0% 0% 92% 92% 0% 0% 0% 61% 30% 0% 0% 0% 87% 30% 0% 0% 0% 30% 37% 14% 15%

19th 52% 42% 0% 0% 0% 92% 45% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 17% 20% 0% 0%

20th 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

21st 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

22nd 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

23rd 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

24th 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

25th 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

26th 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

27th 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

28th 30% 25% 0% 0% 0% 50% 35% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 10% 15% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 150: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan with

Insulation

GlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes

SeeSide

CayanTowerSide

Stick Curtain Wall Progress

MarriotSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Stick Curtain Wall (From Slab to Slab)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

/Profile Insulation Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 151: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan with

Insulation

GlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes

SeeSide

CayanTowerSide

Stick Curtain Wall Progress

MarriotSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Stick Curtain Wall (From Slab to Slab)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

/Profile Insulation Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 152: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Unitized Curtain Wall Progress

Unitized Curtain Wall(On the Slab Edge)

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

/Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 4% 4% 4% 4%

7th 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 4% 4% 4% 4%

8th 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 80% 0% 0% 0% 0% 4% 4% 4% 4%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 153: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Unitized Curtain Wall Progress

Unitized Curtain Wall(On the Slab Edge)

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

/Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 154: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withGlassPanels

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Unitized Curtain Wall Progress

Unitized Curtain Wall(On the Slab Edge)

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

/Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes /Profile withInsulation

Panels Finsihes

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 155: Monthly Progress Report - September 2014

Floor BracketsACP for

DrainageEnclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Partition Progress

Balcony Partition

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Enclosure Partition Finsihes Enclosure Partition Finsihes Enclosure Partition Finsihes Enclosure Partition Finsihes

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 156: Monthly Progress Report - September 2014

Floor BracketsACP for

DrainageEnclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Partition Progress

Balcony Partition

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Enclosure Partition Finsihes Enclosure Partition Finsihes Enclosure Partition Finsihes Enclosure Partition Finsihes

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 157: Monthly Progress Report - September 2014

Floor BracketsACP for

DrainageEnclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes Brackets

ACP forDrainage

Enclosure

GlassPartition

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Partition Progress

Balcony Partition

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Enclosure Partition Finsihes Enclosure Partition Finsihes Enclosure Partition Finsihes Enclosure Partition Finsihes

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 158: Monthly Progress Report - September 2014

Floor Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Balustrade Progress

Balcony Balustrade

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Handrail Finsihes Handrail Finsihes Handrail Finsihes Handrail Finsihes

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 26% 0% 0% 0% 44% 0% 0% 0% 25% 0% 0% 0% 40% 0% 0% 0% 1% 2% 1% 2%

7th 26% 0% 0% 0% 44% 0% 0% 0% 25% 0% 0% 0% 40% 0% 0% 0% 1% 2% 1% 2%

8th 26% 0% 0% 0% 44% 0% 0% 0% 25% 0% 0% 0% 40% 0% 0% 0% 1% 2% 1% 2%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 159: Monthly Progress Report - September 2014

Floor Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Balustrade Progress

Balcony Balustrade

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Handrail Finsihes Handrail Finsihes Handrail Finsihes Handrail Finsihes

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 160: Monthly Progress Report - September 2014

Floor Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes Brackets AluminiumHandrail Vision Glass Saelant

Finsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Balustrade Progress

Balcony Balustrade

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Handrail Finsihes Handrail Finsihes Handrail Finsihes Handrail Finsihes

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 161: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Cladding Progress

Balcony Cladding (ACP)

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

/Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:26 PM

Page 162: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Cladding Progress

Balcony Cladding (ACP)

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

/Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:26 PM

Page 163: Monthly Progress Report - September 2014

Floor BracketsAluminium

Frame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes Brackets

AluminiumFrame/Profile

AluminumBackpan

withAluminumCladding

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Balcony Cladding Progress

Balcony Cladding (ACP)

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

/Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes /Profile withInsulation

Cladding Finsihes

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:26 PM

Page 164: Monthly Progress Report - September 2014

Floor

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Doors Progress

Doors

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 165: Monthly Progress Report - September 2014

Floor

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Doors Progress

Doors

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 166: Monthly Progress Report - September 2014

Floor

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Doors Progress

Doors

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

Brac

kets

Alum

iniu

mFr

ame/P

rofil

e

Door

Ironm

onge

ry

Saela

ntFi

nsih

es

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:25 PM

Page 167: Monthly Progress Report - September 2014

Floor Brackets AluminiumFrame/Profile Louver Tension

RodSaelantFinsihes Brackets Aluminium

Frame Louver TensionRod

SaelantFinsihes Brackets Aluminium

Frame/Profile Louver TensionRod

SaelantFinsihes Brackets Aluminium

Frame Louver TensionRod

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Louvers Progress

Louvers

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Frame/Profile Rod Finsihes Frame Rod Finsihes Frame/Profile Rod Finsihes Frame Rod Finsihes

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 3:26 PM

Page 168: Monthly Progress Report - September 2014

Floor Brackets AluminiumFrame/Profile Louver Tension

RodSaelantFinsihes Brackets Aluminium

Frame Louver TensionRod

SaelantFinsihes Brackets Aluminium

Frame/Profile Louver TensionRod

SaelantFinsihes Brackets Aluminium

Frame Louver TensionRod

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Louvers Progress

Louvers

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Frame/Profile Rod Finsihes Frame Rod Finsihes Frame/Profile Rod Finsihes Frame Rod Finsihes

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 3:26 PM

Page 169: Monthly Progress Report - September 2014

Floor Brackets AluminiumFrame/Profile Louver Tension

RodSaelantFinsihes Brackets Aluminium

Frame Louver TensionRod

SaelantFinsihes Brackets Aluminium

Frame/Profile Louver TensionRod

SaelantFinsihes Brackets Aluminium

Frame Louver TensionRod

SaelantFinsihes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Louvers Progress

Louvers

MarriotSide

CayanTowerSide

SeeSide

MarinaSide

Marriot Side Cayan Tower Side See Side Marina Side

Frame/Profile Rod Finsihes Frame Rod Finsihes Frame/Profile Rod Finsihes Frame Rod Finsihes

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

87th 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Facade Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 3:26 PM

Page 170: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 7

Lifts Progress

Page 171: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

Lift CarCabin

Lift Machine RoomLiftCar

Cabin(5%)

Lifts Work Progress (Lift - L1)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftShaft(70%)

Lift Entrance DoorLift Shaft

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Rails Rails Platfor bly y Frames Fixing

B5 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A 0% 13% 0% N/A 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 5% 0% N/A N/A

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/AFile: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 172: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

Lift CarCabin

Lift Machine RoomLiftCar

Cabin(5%)

Lifts Work Progress (Lift - L1)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftShaft(70%)

Lift Entrance DoorLift Shaft

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

54th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

55th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

56th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

57th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0% 0% 0% 0% 0% 0% N/A N/A N/A 0% N/A

58th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

59th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

60th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

61st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

62nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

63rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

64th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

65th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

66th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

67th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 173: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

Lift CarCabin

Lift Machine RoomLiftCar

Cabin(5%)

Lifts Work Progress (Lift - L1)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftShaft(70%)

Lift Entrance DoorLift Shaft

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Rails Rails Platfor bly y Frames Fixing

68th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

69th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

70th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

71st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

72nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

73rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

74th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

75th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

76th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

77th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

78th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

79th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A79th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

80th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

81st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

82nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

83rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

84th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

85th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

86th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Roof N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1% N/A 1% N/A 1% N/A

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 174: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L2)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A 0% 13% 0% N/A 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 5% 0% N/A N/A

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/AFile: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 175: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L2)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

54th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

55th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

56th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

57th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0% 0% 0% 0% 0% 0% N/A N/A N/A 0% N/A

58th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

59th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

60th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

61st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

62nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

63rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

64th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

65th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

66th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

67th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 176: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L2)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

69th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

70th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

71st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

72nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

73rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

74th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

75th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

76th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

77th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

78th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

79th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A79th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

80th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

81st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

82nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

83rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

84th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

85th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

86th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Roof N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1% N/A 1% N/A 1% N/A

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 177: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L3)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A 0% 13% 0% N/A 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 5% 0% N/A N/A

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/AFile: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 178: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L3)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A N/A N/A N/A N/A N/A N/A 0% 0% N/A N/A

54th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

55th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

56th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

57th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0% 0% 0% 0% 0% 0% N/A N/A N/A 0% N/A

58th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

59th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

60th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

61st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

62nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

63rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

64th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

65th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

66th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

67th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 179: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L3)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

69th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

70th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

71st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

72nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

73rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

74th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

75th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

76th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

77th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

78th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

79th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A79th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

80th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

81st N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

82nd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

83rd N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

84th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

85th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

86th N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Roof N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1% N/A 1% N/A 1% N/A

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:41 PM

Page 180: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L4)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 13% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 181: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L4)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 182: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L4)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 183: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L5)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 13% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 184: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L5)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 185: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L5)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 186: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L6)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 13% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 187: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L6)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 188: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - L6)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 189: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M7)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 190: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M7)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 191: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M7)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1% 1% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 192: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M8)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 193: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M8)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 194: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M8)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1% 1% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 195: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M9)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 196: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M9)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 197: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - M9)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1% 1% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:42 PM

Page 198: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H10)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 199: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H10)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 200: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H10)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 201: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H11)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

Rails Rails Platfor bly y Frames Fixing

B5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 202: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H11)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 203: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H11)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 204: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H12)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

Rails Rails Platfor bly y Frames Fixing

B5 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 0%

B4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%6th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%File: 01. Lift Progress as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 205: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H12)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

Rails Rails Platfor bly y Frames Fixing

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: 01. Lift Progress as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 206: Monthly Progress Report - September 2014

FloorPrelim.

Works (Incl.Scaffolding)

SeperatorSteel

Beams

LiftCabin

Bracket

CounterWeightBracket

LiftCabinGuideRails

CounterWeightGuideRails

LiftCabinFrame

&Platfor

CounterWeightFrame

LiftCabinAssem

bly

CounterWeight

Assembly

Roping Elec.Wiring

ShaftLighting

LandingEntrance

DoorFrames

LandingEntrance

DoorFixing

LandingEntrance

Door Panels

Elec.Wiring Brakes Motor

V3FControlSystem

Auto.LevelingDevice

Auto.RescueDevice

Wiring FinalFinishes

LiftMachineRoom(15%)

LiftCar

Cabin(5%)

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Lifts Work Progress (Lift - H12)

Lift Shaft Lift Entrance Door Lift Machine RoomLift CarCabin

LiftShaft(70%)

LiftEntr.Door(10%)

Rails Rails Platfor bly y Frames Fixing

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 1%

File: 01. Lift Progress as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:43 PM

Page 207: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 8

Garbage ChuteProgress

Page 208: Monthly Progress Report - September 2014

FloorChute

SupportFrame

Chute TubeWater

Supply Linefor Cleaning

WaterSupply Line

for FireFighting

ElectricalCables

Chute IntakeDoor

FireSprilnklers

CleaningSprilnklers

AutomaticBrushing

Device

FlushingSpray Head Wire Mesh Exhaust Fan

ChuteCovering in

SlopeContainers Fire Shutter

DoorGarbage

CompactorPanel

Installation

Top Roof VentGarbage Room in Typical

FloorsShaft Works Garbage Room in Ground Floor Garbage

Room inGroundFloor

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Top RoofVente

ShaftWorks

Garbage Chute Progress

GarbageRoom inTypicalFloors

B5

B4

B3

B2

B1

G 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P2 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P4 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

P5 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

6th 100% 100% 100% 100% 100% 0% 0% 0% 100% 0%

7th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

8th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

9th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

11th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

12th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

13th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

14th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

15th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

16th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

17th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

18th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

19th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

20th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

21st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

22nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

23rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

24th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

25th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

26th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

27th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

28th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

29th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%30th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

31st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Garbage Chute as of 30-Sep-14 Page 1 of 3 Printed On: 9/30/2014 at 12:45 PM

Page 209: Monthly Progress Report - September 2014

FloorChute

SupportFrame

Chute TubeWater

Supply Linefor Cleaning

WaterSupply Line

for FireFighting

ElectricalCables

Chute IntakeDoor

FireSprilnklers

CleaningSprilnklers

AutomaticBrushing

Device

FlushingSpray Head Wire Mesh Exhaust Fan

ChuteCovering in

SlopeContainers Fire Shutter

DoorGarbage

CompactorPanel

Installation

Top Roof VentGarbage Room in Typical

FloorsShaft Works Garbage Room in Ground Floor Garbage

Room inGroundFloor

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Top RoofVente

ShaftWorks

Garbage Chute Progress

GarbageRoom inTypicalFloors

32nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

33rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

34th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

35th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

36th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

37th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

38th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

39th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

40th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

41st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

42nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

43rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

44th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

45th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

46th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

48th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

49th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

50th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

51st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

52nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

53rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

54th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

55th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

56th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

57th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

58th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

59th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

60th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

61st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

63rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

64th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

65th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

66th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%67th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

68th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

File: Garbage Chute as of 30-Sep-14 Page 2 of 3 Printed On: 9/30/2014 at 12:45 PM

Page 210: Monthly Progress Report - September 2014

FloorChute

SupportFrame

Chute TubeWater

Supply Linefor Cleaning

WaterSupply Line

for FireFighting

ElectricalCables

Chute IntakeDoor

FireSprilnklers

CleaningSprilnklers

AutomaticBrushing

Device

FlushingSpray Head Wire Mesh Exhaust Fan

ChuteCovering in

SlopeContainers Fire Shutter

DoorGarbage

CompactorPanel

Installation

Top Roof VentGarbage Room in Typical

FloorsShaft Works Garbage Room in Ground Floor Garbage

Room inGroundFloor

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Top RoofVente

ShaftWorks

Garbage Chute Progress

GarbageRoom inTypicalFloors

69th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

70th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

71st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

72nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

73rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

74th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

75th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

76th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

77th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

78th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

79th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

80th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

81st 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

82nd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

83rd 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

84th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

85th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

86th 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Roof 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% 0% 1%

File: Garbage Chute as of 30-Sep-14 Page 3 of 3 Printed On: 9/30/2014 at 12:45 PM

Page 211: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 9

Long Lead Items Log

Page 212: Monthly Progress Report - September 2014

Long Lead Items Status

Planned Actual Planned Actual PlannedExpected/

Actual

Planned

Days

Actual

DaysOrigin Method Arrival Custom Planned

Expected/

Actual

Mechanical

HVAC Works

1 FAHU 08.Mai.14 03.Mär.14 25.Mai.14 10.Jun.14 03.Jun.14 22.Jun.14 160 14.Dez.14 15.Dez.14 Behind -1

2 Fans (Pressurization, Parking Extract,etc) Nuaire 14.Jun.14 12.Mär.14 30.Jun.14 01.Jul.14 08.Jul.14 22.Jul.14 160 19.Jän.15 15.Nov.14 Ahead 65

3 Chilled Water Pumps ALLIED 14.Jun.14 05.Mär.14 30.Jun.14 19.Jul.14 08.Jul.14 24.Aug.14 160 19.Jän.15 30.Nov.14 Ahead 50

4 Cooling Tower 18.Dez.14 25.Mai.14 05.Jän.15 07.Aug.14 13.Jän.15 15.Okt.14 160 22.Jul.15 13.Feb.15 Ahead 159

5 Chiller 08.Jun.14 08.Mär.14 24.Jun.14 23.Jul.14 02.Jul.14 21.Jun.14 180 05.Feb.15 15.Mär.15 Behind -38

6 Heat Exchanger (HEX) Faisal jassim 15.Mai.14 02.Feb.14 02.Jun.14 03.Jul.14 10.Jun.14 22.Jul.14 160 21.Dez.14 30.Okt.14 Ahead 52

7 Air Outlet

Plumbing

1 Sump Pump 29.Sep.14 29-Jun-14 18.Okt.14 14-Aug-14 27.Okt.14 15.Okt.14 120 18.Mär.15 15.Dez.14 Ahead 93

2 Booster Pump 29.Sep.14 3-Jun-14 18.Okt.14 8-Jul-14 27.Okt.14 15.Okt.14 120 18.Mär.15

3 Transfer Pump 29.Sep.14 3-Jun-14 18.Okt.14 8-Jul-14 27.Okt.14 15.Okt.14 120 18.Mär.15

4 Sewage Pump 29.Sep.14 29-Jun-14 18.Okt.14 14-Aug-14 27.Okt.14 15.Okt.14 120 18.Mär.15 15.Dez.14 Ahead 93

5 GRP Water Tank 4-Jun-14 14-Aug-14 15.Okt.14

Fire Fighting

1 Fire Pump 08.Jun.14 18-May-14 24.Jun.14 5-Jun-14 02.Jul.14 15.Okt.14 180 05.Feb.15 15.Mär.15 Behind -38

2 FM 200 System 07.Okt.14 23.Okt.14 02.Nov.14 180 03.Jun.15

3 Foam Spray System for Generator 14-May-14 8-Jul-14

4 Fire Alarm Devices 11.Mär.14 16-Feb-14 27.Mär.14 4-Jun-14 05.Apr.14 23.Jun.14 150 30.Sep.14 30.Sep.14 Ahead 0

Electrical

Electrical

1 Bus Bars 26.Jul.14 05.Mär.14 13.Aug.14 22.Jun.14 21.Aug.14 15.Okt.14 120 14.Jän.15 15.Feb.15 Behind -32

2 Wiring Accessories 12.Nov.14 16.Apr.14 29.Nov.14 02.Jun.14 08.Dez.14 15.Okt.14 100 05.Apr.15 15.Dez.14 Ahead 111

3 LV Panels and Switchgear 25.Jun.14 18.Mär.14 12.Jul.14 21.Jul.14 20.Jul.14 15.Okt.14 120 14.Dez.14 15.Feb.15 Behind -63

4 Generators 02.Aug.14 24.Aug.14 18.Aug.14 16.Sep.14 26.Aug.14 15.Okt.14 180 30.Mär.15 15.Feb.15 Ahead 43

5 LV Cables

6 MV Cables 26.Mai.14

7 UPS

Low Current System

1 BMS 12.Nov.14 25.Mai.14 29.Nov.14 08.Sep.14 08.Dez.14 15.Okt.14 120 28.Apr.15 15.Jän.15 Ahead 103

2 FA System Panels 03.Apr.14 16-Feb-14 20.Apr.14 4-Jun-14 28.Apr.14 23.Jun.14 150 27.Okt.14 30.Sep.14 Ahead 27

3 Access Control System 07.Apr.14 21.Aug.14

4 Audio Itercom System 09.Apr.14 25.Sep.14

5 CCTV System 07.Apr.14 21.Aug.14

6 Central Battery System 18.Feb.14 15.Jul.14

7 GSM System

Notes:

The Forecast Delivery Dates were given by ATC/REMCO.

Material Submittal Submittal Approval SHIPMENTRequired On Site

(Delivery Date)Delay

Ahead/

Behind

DAMAC Gulf Properties L.L.C

DAMAC Heights at Dubai Marina

Purchase OrderFabrication and Delivery

PeriodSPECS

SectionMATERIAL DESCRIPTION

Supplier/

Subcont.

File :- Page 1 of 1 Printed On :- 13.10.2014 at 13:19

Page 213: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 10

Provisional SumNomination Log

Page 214: Monthly Progress Report - September 2014

Branded Apartments

Sanitary Wares:

Bathtub, Wash Basin, WC and Bidets 20.Apr.14 Alamana Building Materials Re-nomination will be done

Light Fittings

Kitchen Sink and Sink Mixers 30.Apr.14 Teka Kuchentechnik

Fit Out

Toilet Access:

Bidet mixer, Basin Mixer, Shower set,

Bath mixer, Hand spray, Toilet paper

holder, Towel ring, Towel rail, Soap

dish, Robe hook, Bath grip.

01.Jun.14 Paradosso Trading L.L.C

Shower Enclosures

Non Branded Apartments

Sanitary Wares:

Bathtub, Wash Basin, WC and Bidets 20.Apr.14 Danube Building Materials Re-nomination will be done

Light Fittings 20.Apr.14Istanbul Electrical Ware

Trading

Fit Out :

Timber Doors

Ironmongery

Wardrobes

Kitchen Cabinets

Vanities

Mirrors

GRC Cornice

Shower Enclosures

Toilet Access.

03.Apr.14

JC Maclean International

Toilet Access:

Bidet mixer, Basin Mixer, Bath mixer,

Shower set, Hand spray and Toilet

paper holder.

01.Jun.14 Shamsi Gen. Trading

Kitchen Sink and Sink Mixers 28.Mai.14

Kitchen Sink: United Supplies

Materials

Sink Mixers: Danube Building

Materials

Planned (as per TCP-Rev 02) Actual

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Items Notes

Nominations of PS Items

LOI Issuance by

DAMAC

Contract Signed

by ATC

LON Issued by

DAMAC

Contract Signed

by Both Parties

Nomination

Status

Contract

Signature

Status

Engieer

InstructionATC Acceptance

Sub-Contractors / Suppliers

File:- Page1 of 2 Printed On: 08.10.2014 at 13:21

Page 215: Monthly Progress Report - September 2014

Planned (as per TCP-Rev 02) Actual

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Items Notes

Nominations of PS Items

LOI Issuance by

DAMAC

Contract Signed

by ATC

LON Issued by

DAMAC

Contract Signed

by Both Parties

Nomination

Status

Contract

Signature

Status

Engieer

InstructionATC Acceptance

Sub-Contractors / Suppliers

Ground Floor

Sanitary Wares:

Bathtub, Wash Basin, WC and Bidets 20.Apr.14 Alamana Building Materials Re-nomination will be done

Fendi Fit Out (Entrance Lobby

,Corridor, Reception Area, Lift Lobby,

Lift Car):

Ceiling, Flooring and Walls

Light Fittings

FF&E

Life Style (Podium 5)

Sanitary Wares 20.Apr.14 Alamana Building Materials Re-nomination will be done

Fit Out:

Ceiling, Flooring and Walls

Light Fittings

FF&E

Lockers

Steam and Sauna

Jacuzzi

Acrylic Panel enclosures for Jacuzzi

Pool Furniture

Hard and Soft Landscaping Package 09.Jun.14 Jobian Concept

Swimming Pool Package

Public Areas

Electromechanical Package 17.Jul.13 REMCO

Lifts Package 16.Jän.13 Toshiba

BMU Package 17.Nov.13 Danway

Façade Aluminum Package 08.Okt.13 ALICO

Façade Lighting Package

Steel Structure Package 04.Dez.14 15.Dez.14 08.Apr.14Noterdam Metal

Construction

Light Fittings for BOH 12.Okt.14 25.Okt.14 24.Mär.14Istanbul Electrical Ware

Trading

Light Fittings for Corridors 20.Apr.14Istanbul Electrical Ware

Trading

Steel doors for service rooms for Non

Branded Apartments floors25.Aug.14 Qatar Metal Const. Ind LLC

Internal and External Signage

File:- Page2 of 2 Printed On: 08.10.2014 at 13:21

Page 216: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 11

Building Permit Status

Page 217: Monthly Progress Report - September 2014

Building Permit Status

Risk Score

1 Closed

2 Closed

3 Low

4 Low

5 Low

6 Closed

7 Closed

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

Risk Score Breakdown

Thermal insulation approval from DM and ventilation for Chillers:

Obtained.AECOM Closed

FIC final approval:

Obtained.AECOM Closed

Letter of appointment for Notre Dame Steel:

It will be submitted when the shop drawings are ready. Condition to

cleared prior to commencement of the related work.ATC / Notredam Open

Acceptance of the External paving:

To be approved prior to Building Completion Certificate application.ATC Open

Description Status Owner

Structural Steel Shop Drawing Approval:

Condition to be cleared prior to commencement of the related work

above lev el 84.

Closed

OpenATC / Notredam

Ramboll

AECOM

DCD approval on level P5:

(Awaiting RME package). Condition to be cleared prior to casting

level 45.Closed

DCA NOC for Building height:

Obtained

0

1

2

3

4

5

Medium Low Closed

Medium

Low

Closed

File :- Page 1 of 1 Printed On :- 08.10.2014 at 13:19

Page 218: Monthly Progress Report - September 2014

إدارة߰المباني

قسم߰تراخيص߰البناءتصريح߰أعمال߰تعديلت

187558 - 34 - 1تاريخ߰الصدار رقم߰التصريح :

اسم߰المالك :

اسم߰المنطقة : :

:

نوع߰الرخصة :

وصف߰العمل :

17/09/2014

داماك الخليج للعقارات - ش.ذ.م.م

3920569 مرسى دبي

ترخيص أعمال تعديلت وإضافات بسيطة )استشاري، مقاول(

إلغاء شرط الدفاع المدني للطابق الخامس من المعاملة رقم 1-25-187558

تاريخ߰الطباعة : 17/09/2014

رقم߰المبنى:2

رقم߰الرض߰

)ايكوم ميدل ايست ليمتد )فرع دبى الستشاري044391001رقم߰الرخصة الفاكس : 044391000 الهاتف : 120196:

:

3404004رقم߰الرخصة الفاكس : 3400700 الهاتف :

)ارابتك للنشاءات )ش.ذ.م.م

216599 :

الشركة߰المنفذة :

00:00:00 2014/12/31قيمة߰تأمين߰المقاول

17/09/2014

:

:

التاريخ

التاريخ

G022940

201400457848

:

:

رقم߰اليصال

رقم߰اليصال

ضمان بنكي

325 قيمة߰الرسوم:

:

: التجديد الرقــــم : التاريخ :التجديدات

الهاتف : الفاكس : رقم߰الرخصة:

المقاول߰الثانوي :

الستشاري߰القديم :المجموعة الستشارية العالمية

تسمية المقاول لعمال المنشآت الحديدية القياسية )قبل بدء العمل( إعتماد مخططات المنشأ الحديدي )قبل بدء العمل(

المراجعة بخصوص الرصف الخارجي قبل النجاز )قبل اصدار شهادة النجاز(

اشتراطات߰خاصة:

اشتراطات߰عامة:1.߰ يسمح߰للمقاول߰المذكور߰بالعمل߰طبق߰ا߰للمخططات߰المعتمدة߰مع߰هذا߰الترخيص߰مع߰اللتزام߰التام߰بقواعد߰المن߰والسلمة߰بموقع߰العمل.

العمل߰خلل߰ستة߰أشهر߰من߰تاريخ߰الصدار߰أو߰إذا߰توقف߰العمل߰كلي߰ا߰في߰الموقع߰لمدة߰تزيد߰عن߰ستة߰أشهر. 2. يلغى߰الترخيص߰إذا߰لم߰يبد߰أ

3.߰على߰المقاول߰اغلق߰المعاملت߰المفتوحة߰واصدار߰شهادة߰النجاز߰واسترداد߰التأمبن߰عند߰النتهاء߰من߰العمل߰.

4.߰يجب߰إبلغ߰قسم߰الطوارئ߰߰في߰حال߰حدوث߰أي߰إصابات߰أو߰أضرار߰في߰الفراد߰أو߰الممتلكات߰أو߰الجوار߰.

مدير߰إدارة߰المباني

.߰߰ 5.߰يجب߰إتباع߰الوامر߰المحلية߰والقوانين߰والشتراطات߰الخاصة߰بالبناء

6.߰على߰المقاول߰إزالة߰النقاض߰ومخلفات߰العمل߰والمحافظة߰على߰نظافة߰الموقع߰والجوار.

هاتف߰طوارئ߰البلدية߰:)2232323(߰)8004999(.رؤيتنا߰:߰مبانينا߰حلم߰العالم

2 من 1صفحة

.7߰على߰الستشاري߰والمقاول߰الرئيسي߰التأكد߰من߰أن߰كافة߰المقاولين߰الفرعيين߰لديهم߰رخص߰سارية߰المفعول߰في߰امارة߰دبي.

8.߰للطلع߰على߰كافة߰الشروط߰وأنظمة߰البناء߰المعتمدة߰يرجى߰الرجوع߰للنظام߰اللكتروني.

17/09/14

3920569

187558-34-1

Page 219: Monthly Progress Report - September 2014

قسم߰تراخيص߰البناء

إدارة߰المبانيتصريح߰أعمال߰تعديلت

1 - 34 - 187558رقم߰التصريح : تاريخ߰الصدار

اسم߰المالك :

اسم߰المنطقة : :

: 17/09/2014

داماك الخليج للعقارات - ش.ذ.م.م

مرسى دبي 3920569

تاريخ߰الطباعة : 17/09/2014

رقم߰الرض߰الجديد

شروط߰الخدمات:

ةقفاوم߰(߰لصتال߰تامدخ )تالصت߰ا

معتمدة ߰المهندس߰: قرار

All Etisalat requirements should be provided as per 2013 Etisalat design guideline for fiber to home

considering the following conditions:•12U cabinet to be fixed at a height of 40cm to 120cm from finished

floor level•MIN Tel box size should be 40x60x12 for residential premises which have more than two bed

room •12U size should be 60x60x30 for commercial•42Ucabinet to be provided in Etisalat room with

required ODFs and splitters •The 12u cab or MINI Tel should be equipped with the following:oPatch panels

suiting the required no of RJ45 socketsoPower socket oAir circulationoVertical cable managementoMini

ODFoNote:-The above items should be provided as shown on Etisalat guide lines amendments. •Fiber optic

cable should comply with ITU-T G652B and terminated with SC/APC connectors • 2core fib

مدير߰إدارة߰المبانيهاتف߰طوارئ߰البلدية߰:)2232323(߰)8004999(.

:߰مبانينا߰حلم߰العالم رؤيتن߰ا 2 من 2صفحة

Page 220: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 12

Technical Review Log

Page 221: Monthly Progress Report - September 2014

Technical Review Reports

Report #

(FH/DH/R/..) To Ref. Date

0001 Design Review MEP Peer Review Reports MEP 0 DAMAC 0010 03-Mär-14

0002 Handover DAMAC Heights Project Handover Report General 0 DAMAC 0023 03-Mär-14

0003 Design Review DAMAC Heights Design Review Report General 0 DAMAC 0026 03-Mär-14

0004 SH&E AECOM HSE Interim Status Report SH&E 0 DAMAC 0033 10-Mär-14

0005 Factory Visit Low Voltage Switchgear Assembly Electrical 0 DAMAC 0291 24-Apr-14

0006 Tender Analysis Report Metal Doors Package Architectural 0 DAMAC 0332 28-Apr-14

0007 Factory Visit Low Voltage Switchgear Assembly Electrical 1 ATC 0354 29-Apr-14

0008 Technical Report Design Conflicts and Proposed Solutions Architectural 0 DAMAC 0480 15-Mai-14

0009 Factory VisitAssessment of Performance and Quality of Ready mix

BetonStructural 0 DAMAC 0513 19-Mai-14 RE

0010 Technical ReportDiaphragm Walls Inspection and Recommendation -

Ground Voids & Water Seepage AssessmentStructural 0 DAMAC 0518 19-Mai-14

0011 Tender Analysis ReportEvaluation of Bidders for ID Fit-out and FF&E Works

(Fendi GF and P5)Architectural 0 DAMAC 0519 27-Mai-14

0012 Technical Report Material Submit for Façade Lighting - TEO 24 Electrical 0 DAMAC 0555 22-Mai-14

0013 Evaluation Report REMCO Performance MEP 0 DAMAC 0674 09-Jun-14

0014 Design ReviewMEP Peer Review Reports - Comments Response /

FeedbackMEP 1 DAMAC 0675 10-Jun-14 R# 0001

0015 Tender Analysis Report Metal Doors Package Architectural 1 DAMAC 0701 11-Jun-14 R# 0006

0016 Snag Report Mock-up Flat Unit 7307 (Ocean Heights) General 0 DAMAC 0743 16-Jun-14

0017 Technical Report Design Conflicts and Proposed Solutions (RFIs) Architectural 0 DAMAC 0782 22-Jun-14

0018 Technical Report Assessment of Slipform System Structural 0 DAMAC 0785 22-Jun-14

0019 Technical Report Service Doors Assessments Architectural 0 DAMAC 0844 30-Jun-14 PE

0020 Technical Report Pressure Grouting Structural 0 DAMAC 0864 07-Jul-14

0021 SH&E Safety Review Report - AECOM CSO Site Visit SH&E 0Andy

Peters- 21-Jul-14

0022 Tender Analysis Report Metal Doors Package (Responsibility Matrix) Architectural 2 DAMAC 1000 24-Jul-14

0023 Technical Report AECOM Review of Basement Cracks Structural 0 DAMAC 1049 11-Aug-14

0024 Tender Analysis ReportEvaluation of Bidders for Interior Fit-out Works Package

(Fendi Apartments L43-L84)Architectural 0 DAMAC 1107 10-Aug-14

0025 Technical Report Balcony Drain Pipe Enclosure Proposal Architectural 0 DAMAC 1299 03-Sep-14

0026 Technical ReportDiscrepancies in Kitchen Architectural Layout (Level 26 -

Level 42)Architectural 0 DAMAC 1381 16-Sep-14

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

RemarksCategory Details Discipline RevisionTransmission Provisional Sum

Ref.

File: Page 1 of 2 Printed On:08.10.2014 at 13:38

Page 222: Monthly Progress Report - September 2014

Technical Review Reports

Report #

(FH/DH/R/..) To Ref. Date

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

RemarksCategory Details Discipline RevisionTransmission Provisional Sum

Ref.

0027 Technical ReportWater Ingress Through Diaphragm Wall Joint - 17

September 2014Structural 0 DAMAC 1432 23-Sep-14

File: Page 2 of 2 Printed On:08.10.2014 at 13:38

Page 223: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 13

Outstanding RFIs

Page 224: Monthly Progress Report - September 2014

Outstanding Request for Information (RFIs)

RFI No. Rev. Discipline Date Raised DescriptionAECOM

Reciept

Due for

Response

Current

Date

No of Days

PendingForwarded to

AECOM

Reponse

218 1 Structural 18-Aug-14 Grade of Concrete to be used inside lift pit. 18-Aug-14 1-Sep-14 30-Sep-14 -29 Reuben

291 1 Structural 31-Mar-14Design Parameters & Sequence to Dismantle Section D-D Steel Strutting

Members31-Mar-14 14-Apr-14 30-Sep-14

Reuben /

To Ramboll on

10.04.14 via

Ramboll Returned -

No action from

Ramboll

422 1 Architectural 6-Apr-14 Balcony Drain Pipes. 6-Apr-14 20-Apr-14 30-Sep-14Bassem / Commetns

to client27-May-14

454 1 Structural 31-Mar-14 Struts Removal Phases 31-Mar-14 14-Apr-14 30-Sep-14 -169 Reuben Client to advise

534 1 Architectural 16-Apr-14 Insulation Aluminium Panel Cladding 17-Sep-14 1-Oct-14 30-Sep-14 1

537 2 Architectural 25-Aug-14 Thickness for cabin interior finishes for elevators 26-Aug-14 9-Sep-14 30-Sep-14 -21 Ramon / Haddad

579 2 Architectural 23-Aug-14 Revised Elevation and section for GR to P5 24-Aug-14 7-Sep-14 30-Sep-14 -23 Ramon / Haddad

597 0 Architectural 4-Jun-14 LF-22 Storage Cabinet 4-Jun-14 18-Jun-14 30-Sep-14Ramon /

To Damac on 28-Aug-14

626 1 Architectural 3-Aug-14 Structural steel metal works drawings for mechanical plant room floors 3-Aug-14 17-Aug-14 30-Sep-14 -44 Ramon / Haddad

630 0 Architectural 7-Jul-14 Balcony drain pipes enclosure in elevation building elevations 7-Jul-14 21-Jul-14 30-Sep-14 -71 Ramon / Haddad

636 1 Architectural 3-Aug-14 Slab Edge Drawings not matching with architectural drawings 3-Aug-14 17-Aug-14 30-Sep-14 -44Reuben / To Ramboll

on 25.08.2014

652 0 Architectural 17-Jul-14 Corewall openings at level 30 17-Jul-14 31-Jul-14 30-Sep-14 Haddad 23-Jul-14

666 0 Architectural 3-Aug-14 Door Type WD55 3-Aug-14 17-Aug-14 30-Sep-14 -44 Ramon / Haddad

667 0 Architectural 3-Aug-14 WD51 - Concrete opening unified size 3-Aug-14 17-Aug-14 30-Sep-14 Haddad 18-Aug-14

681 0Architectural /

Structural13-Aug-14 Clashes between BMU and the Corewall at Axis (E) 16-Aug-14 30-Aug-14 30-Sep-14 -31

Reuben / To Ramboll

on 17.08.2014 /

683 0 Structural 14-Aug-14 Level 86 Thickness and SSL 14-Aug-14 28-Aug-14 30-Sep-14 -33Reuben / To Ramboll

on 25.08.2014

684 1 Architectural 27-Aug-14 Steel Support for Curtain Wall at P5 28-Aug-14 11-Sep-14 30-Sep-14 -19 Ramon / Haddad

685 0 Mechanical 16-Aug-14 Exit Light above stair case door 18-Aug-14 1-Sep-14 30-Sep-14 -29 Ramon / Haddad

694 1 Architectural 28-Sep-14 Discrepancies in Bathrooms Architectural Layout ( 31st to 42nd Floors ) 28-Sep-14 12-Oct-14 30-Sep-14 12 Haddad

710 0Architectural /

Mechanical / Electrical 4-Sep-14 DB / ONTB Recessed in concrete wall (to 43rd to 85th Floors) 6-Sep-14 20-Sep-14 30-Sep-14 -10

686 0 Architectural 19-Aug-14 Discrepancy in plans & elevations for Kitchen type K-26 Level 26 to 27 20-Aug-14 3-Sep-14 30-Sep-14 Haddad 6-Sep-14

715 0Architectural /

Structural / Mechanical 6-Sep-14 ID Drawings 8-Sep-14 22-Sep-14 30-Sep-14 -8

Haddad / Raouf /

Reuben

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

File:- Page1 of 2 Printed On:12.10.2014 at 07:12

Page 225: Monthly Progress Report - September 2014

Outstanding Request for Information (RFIs)

RFI No. Rev. Discipline Date Raised DescriptionAECOM

Reciept

Due for

Response

Current

Date

No of Days

PendingForwarded to

AECOM

Reponse

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

721 0 Architectural 8-Sep-14 Required Counter Depth for Microwave Oven 9-Sep-14 23-Sep-14 30-Sep-14 -7

728 0Architectural /

Structural / Mechanical 11-Sep-14 Head Room Clearance at Level 86 11-Sep-14 25-Sep-14 30-Sep-14 -5

724 0Architectural /

Structural / Mechanical 10-Sep-14 FFL and SSL from Levels 80 to 88 13-Sep-14 27-Sep-14 30-Sep-14 -3

730 0 Architectural 14-Sep-14 Gap between Spandrel Glass Curtain Wall and Corewall 15-Sep-14 29-Sep-14 30-Sep-14 -1 Haddad

732 1 Mechanical 21-Sep-14 Requirment of Water Heater & Water Supply at 69th Floor 21-Sep-14 5-Oct-14 30-Sep-14 5

733 0 Architectural 14-Sep-14 Paint Color Finishes - Parking levels and corridor at non-branded floors 15-Sep-14 29-Sep-14 30-Sep-14 -1RE /

letter send to damac

735 0Architectural /

Structural18-Sep-14 L86 - Slab System BMU - Connection Details 18-Sep-14 2-Oct-14 30-Sep-14 2

To Ramboll

21.09.2014

736 0 Mechanical 21-Sep-14 Parking Drain Location at Podium 2 21-Sep-14 5-Oct-14 30-Sep-14 5

740 0 Mechanical 25-Sep-14 AC Design Drawing for Typical Floors (43rd to 55th floors) 25-Sep-14 9-Oct-14 30-Sep-14 9

739 0 Architectural 25-Sep-14 Block Wal near fire hose cabinet at corridor 2 25-Sep-14 9-Oct-14 30-Sep-14 9

737 0 Architectural 29-Sep-14 Façade Light cabling arrangement for UCW corner panels 29-Sep-14 13-Oct-14 30-Sep-14 13

743 0 Architectural 30-Sep-14 Inaccessible Telephone Room at level 86 30-Sep-14 14-Oct-14 30-Sep-14 14

741 0 Structural 30-Sep-14 Missing lines of RC slanted columns ends at SSL of level 62 30-Sep-14 14-Oct-14 30-Sep-14 14

Legend

Under AECOM Review

Under Contractor Preparation

Overdue (Review)

File:- Page2 of 2 Printed On:12.10.2014 at 07:12

Page 226: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 14

Outstanding ShopDrawings

Page 227: Monthly Progress Report - September 2014

Outstanding Shop Drawings

TR.No. Rev.Drawin

g No.

Dwg

Rev.Description Discipline From To

Date of

Receipt

Due for

Response

Current

Date

Days

PendingDate Returned Action code

0326 05 ATC F07 SD 1087 05 Slab Edges of Level-8 Structural Arabtec Reuben 19-Mar-14 02.Apr.14 30-Sep-14 30.Mar.14 NA

0328 12 ATC F09 SD 1088 05 Slab edges of level 9 Structural Arabtec Reuben 19-Mar-14 02.Apr.14 30-Sep-14 30.Mar.14 NA

0328 12 ATC F10 SD 1089 05 Slab edges of level 10 Structural Arabtec Reuben 19-Mar-14 02.Apr.14 30-Sep-14 30.Mar.14 NA

1399 01 ATC GF SD1174

117501 Ground floor to podium-5 staircase-1 Plans & Sections (Sheets 1 & 2) Structural Arabtec Reuben 7-Apr-14 21.Apr.14 30-Sep-14 24.Apr.14 No status

1400 01 ATC GF SD 1180 01 Ground Floor to Podium-5 Staircase-2 Plan & section (Sheets 1 & 2) Structural Arabtec Reuben 7-Apr-14 21.Apr.14 30-Sep-14 24.Apr.14 No status

1503 04 ATC F08 SD 1185 04 Level 8 - General Arrangement Plan and Sections (Sheet 1 of 2) Structural Arabtec Rueben 13-Mar-14 27.Mär.14 30-Sep-14 30.Mar.14 NA

1503 04 ATC F08 SD 1185 04 Level 8 - General Arrangement Plan and Sections (Sheet 2 of 2) Structural Arabtec Rueben 13-Mar-14 27.Mär.14 30-Sep-14 30.Mar.14 NA

1801 02 S01 P5 SD 2579 02 Wall W-01 reinforcement detail (Zone A1) Lvl +25.550 to Level 6 Structural Arabtec Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 NA

1801 02 S01 P5 SD 2580 02 Wall W-01 reinforcement detail (Zone A1) Lvl +25.550 to Level 6 Structural Arabtec Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 NA

1801 02 S01 P5 SD 2590 02 Wall W-02 & Wing Walls Reinforcement detail (Pouring 2) Lvl +25.550 to Level 6 (sheet 1 of 2) Structural Arabtec Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 NA

1801 02 S01 P5 SD 2591 02 Wall W-02 & Wing Walls Reinforcement detail (Pouring 2) Lvl +25.550 to Level 6 (sheet 2 of 2) Structural Arabtec Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 NA

1801 02 S01 P5 SD 2794 00 Wall (W-2, W-4,W-6, W-8,9) Reinforcement Details Podium-5 to Level-6 (Sheet 5 of 5) Structural Arabtec Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 NA

1808 02 S01 P5 SD 2561 02 Wall (W02, W04, W06, W08 & W09) Reinforcement Details Podium-5 to +25.550 (Sheet 1 of 2) Structural CICON Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 AAN & RR

1808 02 S01 P5 SD 2562 02 Wall (W02, W04, W06, W08 & W09) Reinforcement Details Podium-5 to +25.550 (Sheet 2 of 2) Structural CICON Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 AAN & RR

1808 02 S01 P5 BBS BBS for the above mentioned drawing. Structural CICON Junaid 14-Jan-14 28.Jän.14 30-Sep-14 23.Jan.14 AAN & RR

2007 01 S01 B3 SD2735

273601

Column - Zone B (B3 to U/s B2) Reinforcement Detail PC-25, PC-26, PC-27 & PC-17 (Sheet 1 of

4) Column - Zone B (B3 to U/s B2) Reinforcement Detail PC-23, PC-24, PC-16 & PC-18

(Sheet 2 of 4)

Structural CICON Reuben 18-Sep-14 02.Okt.14 30-Sep-14 2

2108 00 ATC GEN SK 623 00 Podium-5 Secondary Slab Structural Arabtec Junaid 16.01.2014 30.Jän.14 30-Sep-14 19.Jan.14 NA

2118 01 S16 PD4 SD 15609 01 Podium-2 Floor Plan voice/Data Layout. Electrical REMCO Zahid 02.02.2014 16.Feb.14 30-Sep-14 5.Feb.14 NA

2118 01 S16 PD7 SD 15612 00 Podium-3 Floor Plan voice/Data Layout. Electrical REMCO Zahid 02.02.2014 16.Feb.14 30-Sep-14 5.Feb.14 NA

2230 01 S16 B02 SD 15103 01 Basement 2 floor plan lighting layout Electrical REMCOFw to

AECOM on 27.02.2014 13.Mär.14 30-Sep-14 18.Mar.14 NA

2230 01 S16 B01 SD 15104 01 Basement 1 floor plan lighting layout Electrical REMCOFw to

AECOM on 27.02.2014 13.Mär.14 30-Sep-14 18.Mar.14 NA

2238 00 S16 F22 SD 16521 00 22nd floor plan water supply layout Mechanical REMCO Basel 02.02.2014 16.Feb.14 30-Sep-14 15.Feb.14 NA

2276 01 S16 F13 SD 15314 01 Level 13th floor plan Emergency and Exit Lighting Layout. Electrical REMCO Zahid 13-Feb-14 27.Feb.14 30-Sep-14

2324 00 S16 F20 SD 16620 00 Typical (20th & 21st Floor Drainage Layout) Mechanical REMCO Basel 13.02.2014 27.Feb.14 30-Sep-14 26.Feb.14 NA

2325 00 S16 F13 SD 15114 00 Level - 13th floor plan lighting layout. Electrical REMCO Zahid 13.02.2014 27.Feb.14 30-Sep-14 19.Feb.14 NA

2395 01 S16 B05 SD 16500 01 Basement-5 Plan Sheet 1 of 2 Water Supply layout (Sheet 1 of 2) Mechanical REMCO Aiman 18.03.2014 01.Apr.14 30-Sep-14 18.Mar.14 NA

2395 01 S16 B05 SD 16500 01 Basement-5 Plan Sheet 1 of 2 Water Supply layout (Sheet 2 of 2) Mechanical REMCO Aiman 18.03.2014 01.Apr.14 30-Sep-14 18.Mar.14 NA

2395 01 S16 B04 SD 16501 01 Basement-4 Plan Water Supply Layout Mechanical REMCO Aiman 18.03.2014 01.Apr.14 30-Sep-14 18.Mar.14 NA

2395 01 S16 B03 SD 16502 01 Basement-3 Plan Water Supply Layout Mechanical REMCO Aiman 18.03.2014 01.Apr.14 30-Sep-14 18.Mar.14 NA

2395 01 S16 B02 SD 16503 01 Basement-2 Plan Water Supply Layout Mechanical REMCO Aiman 18.03.2014 01.Apr.14 30-Sep-14 18.Mar.14 NA

2395 01 S16 B01 SD 16504 01 Basement-1 Plan Water Supply Layout Mechanical REMCO Aiman 18.03.2014 01.Apr.14 30-Sep-14 18.Mar.14 NA

2404 01 ATC F47 SD 1444 01 Slab Edges of Level-48 and coordinates Structural Arabtec Reuben 17-Aug-14 31.Aug.14 30-Sep-14 -30

2405 01 ATC F49 SD 1445 01 Slab Edges of Level-49 Structural Arabtec Reuben 19-Aug-14 02.Sep.14 30-Sep-14 -28

2406 01 ATC F50 SD 1446 01 Slab Edges of Level-50 Structural Arabtec Reuben 19-Aug-14 02.Sep.14 30-Sep-14 -28

2480 01 S01 L10 SD3204

3205 01 BBS for the above mentioned drawing. Structural CICON Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

00 ATC B04 DAB2062,20

70 to 00 Slab Reinforcement details. (Total 23 drawings) - Draft As-built Structural CICON Reuben 23.02.2014 09.Mär.14 30-Sep-14 1.Apr.14 NA

2421 01 ATCF51

F52SD

1447

144801 Slab Edges of Level-51 & 52 Structural Arabtec 28-Aug-14 11.Sep.14 30-Sep-14 -19 10.Sep.14

2433 01 S01 L11 SD3173

3174 01 Level-11 PT Slab reinforcement details top and bottom (B2 & T1) Sheet 1 to 5 Structural CICON Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

File: Page 1 of 6 Printed On: 12.10.2014 at 09:33

Page 228: Monthly Progress Report - September 2014

Outstanding Shop Drawings

TR.No. Rev.Drawin

g No.

Dwg

Rev.Description Discipline From To

Date of

Receipt

Due for

Response

Current

Date

Days

PendingDate Returned Action code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

2434 00 ATC B03 DAB2050 to

211500 Reinforcement drawings (Total 44 drawings) - As-built Structural CICON Reuben 26.02.2014 12.Mär.14 30-Sep-14 2.Apr.14 NA

2451 01 S01 L12 SD3183

3184 01 Level-12 PT Slab Reinforcement Details Top and Bottom Structural CICON Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

2452 01 S01 L13 SD3194

3195 01 Level-13 PT Slab Reinforcement Details Top and Bottom Structural CICON Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

2501 01 ATCF58

F59SD

1454

145501 Slab Edges of Level 58 and coordinates Slab Edges of Level 59 and coordinates Structural Arabtec Reuben 17-Sep-14 01.Okt.14 30-Sep-14 1

2507 S16 PD1 SD 16006-1 01 Podium 1 - 1 floor plan A/C Ventilatiomn Sections & Details Mechanical REMCO Aiman 17.04.2014 01.Mai.14 30-Sep-14 27.Apr.14 NA

2507 S16 PD1 SD 16006-2 01 Podium 2 - 1 floor plan A/C Ventilatiomn layout Mechanical REMCO Aiman 17.04.2014 01.Mai.14 30-Sep-14 27.Apr.14 NA

2507 02 S16 PD1 SD 16006 02 Podium 1 floor plan A/C Ventilatiomn layout Mechanical REMCO Aiman 08.06.2014 22.Jun.14 30-Sep-14 16.Jun.14 NA

2536 00 S16 F06 SD 16813 00 Level 6th floor plan MEP coordination layout Mechanical REMCO Aiman 12.03.2014 26.Mär.14 30-Sep-14 30.Mar.14 NA

2542 00 S16 F20 SD 15420 00 20th & 21st Foors plan (typical) fire alarm & voice evacuation layout Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 18.Mar.14 NA

2542 00 S16 F22 SD 15421 00 22nd Floor plan fire alarm & voice evacuation layout Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 18.Mar.14 NA

2543 00 S16 B05 SD 15600 00 Basement to 5th floor plan voice & data layout Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 18.Mar.14 NA

2543 00 S16 B04 SD 15601 00 Basement to 4th floor plan voice & data layout Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 18.Mar.14 NA

2543 00 S16 B03 SD 15602 00 Basement to 3th floor plan voice & data layout Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 18.Mar.14 NA

2543 00 S16 B02 SD 15603 00 Basement to 2th floor plan voice & data layout Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 18.Mar.14 NA

2553 00 S16 F14 SD 15115 00 14th & 15th levels lighting plan Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 30.Mar.14 NA

2553 00 S16 F15 SD 15116 00 16th level lighting plan Electrical REMCO Faisal 13.03.2014 27.Mär.14 30-Sep-14 30.Mar.14 NA

2578 01 S16 PD2 SD 16007 01 Podium - 2 Floor Plan HVAC Layout Mechanical REMCO Aiman 04.06.2014 18.Jun.14 30-Sep-14 10.Jun.14 NA

2621 DAB ATC B01 DAB2180 -

2201DAB Draft as built drawings for reinforcement details - As-built Structural CICON Reuben 25.03.2014 08.Apr.14 30-Sep-14 2.Apr.14 NA

2621 DAB ATC B01 DAB2180 -

2201DAB Draft as built drawings for reinforcement details - As-built Structural CICON Reuben 05.04.2014 19.Apr.14 30-Sep-14 DAB DAB

2456 DAB S01 RFT DAB2001-

2075DAB1 Raft Lift Pit pouring - As-built Structural CICON Reuben 01.03.2014 15.Mär.14 30-Sep-14 2.Apr.14 NA

2455 DAB ATC B02 DAB2116-

2179DAB Slab Pouring - As-built Structural CICON Reuben 01.03.2014 15.Mär.14 30-Sep-14 2.Apr.14 NA

2434 00 ATC B04 DAB2062,

2070-DAB Slab & Beam pull out bar reinforcement details - Draft As-built Drawings Structural CICON Reuben 03.04.2014 17.Apr.14 30-Sep-14 DAB DAB

2434 00 ATC B03 DAB2050-

2115DAB Wall W-01 Reinforcement Details (pouring 2) Basement 3 - Draft As-built Drawings Structural CICON Reuben 03.04.2014 17.Apr.14 30-Sep-14 DAB DAB

2455 00 ATC B02 DAB2116-

2179DAB B2 Slab Pouring - 1 Reinforcement Bottom Layer B1-Draft As-built Drawings Structural CICON Reuben 03.04.2014 17.Apr.14 30-Sep-14 DAB DAB

2456 00 S01 RFT DAB2001 -

2075DAB1 Raft Lift pouring - 1- Bottom. Structural CICON Reuben 03.04.2014 17.Apr.14 30-Sep-14 DAB DAB

2709 00 S18F23

F24 SD

8517

8518 00 23, 24 & 25 Floor Embedment Layout Architectural ALICO Bassem 08.04.2014 22.Apr.14 30-Sep-14 17.Apr.14 NA

2731 DAB S01 P2 DAB2202 -

2241DAB

Column reinforcement details A1 Part 1 Podium 2-4 Column PC-06,08,09,10,11,07,22, Slab

reinforcement details inside corewallStructural CICON Reuben 15.04.2014 29.Apr.14 30-Sep-14 DAB DAB

2747 00 S16 F19 SD 16619 00 19th Floor Drainage Layout Mechanical REMCO Aiman 16.04.2014 30.Apr.14 30-Sep-14 22.Apr.14 NA

2748 01 S16 GFL SD16005

1607301 Ground Floor Plan HVAC Layout & Section Details Mechanical REMCO Aiman 17.06.2014 01.Jul.14 30-Sep-14 22.Jun.14 NA

2758 00 S21 ELV SD5101

5102 00 Façade access system restraint socket elevation @ North East Architectural DANWAY Bassem 17.04.2014 01.Mai.14 30-Sep-14 7.May.14 NA

2785 00 S16 GFL SD 16605 00 Ground Floor Drainage Layout Mechanical REMCO Aiman 21.04.2014 05.Mai.14 30-Sep-14 29.Apr.14 NA

2819 00 S16 GEN SD 17373 00 Fire Alarm, Emergency & Exit Light Installation Electrical REMCO Faisal 28.04.2014 12.Mai.14 30-Sep-14 1.May.14 NA

2903 02 S21

F43

F48

F52

F55

SD

5114

5115

5116

5117

00

Façade access system restraint socket location plan @ 43rd and 46th floor

Façade access system restraint socket location plan @ 48th and 49th floor

Façade access system restraint socket location plan @ 52nd and 53rd floor

Façade access system restraint socket location plan @ 55th and 58th floor

Architectural DANWAY Ramon 23.08.2014 06.Sep.14 30-Sep-14 25.Sep.14 NA

2907 01 S01 L21 SD2895

2896 01 Level 21 - PT slab reinforcement Detials top & bottom 6 sheets Structural CICON Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

2908 01 S01 L22 SD2919

2920 01 Level 22 - PT slab reinforcement Detials top & bottom 6 sheets Structural CICON Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

2911 00 S21 F45 SD 5118 00 Restraint Socket fixing details at transom and floor slab area Structural DANWAY Ramon 13.05.2014 27.Mai.14 30-Sep-14 29.May.14 NA

2915 00 S16GFL

PD5SD

16705

1671000 Ground floor & Podium 5 Fire Fighting Layout Mechanical REMCO Aiman 13.05.2014 27.Mai.14 30-Sep-14 19.May.14 NA

File: Page 2 of 6 Printed On: 12.10.2014 at 09:33

Page 229: Monthly Progress Report - September 2014

Outstanding Shop Drawings

TR.No. Rev.Drawin

g No.

Dwg

Rev.Description Discipline From To

Date of

Receipt

Due for

Response

Current

Date

Days

PendingDate Returned Action code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

2942 00 S01 RFT DAB

2142

to

2314

DABDRAFT AS-BUILT DRAWINGS - raft pouring, slab pouring, corewall horizontal reinforcement,

corewall sectional elevation, corewall vertical reinforcement, etc.Structural CICON Reuben 15-May-14 29.Mai.14 30-Sep-14

2983 00 ATC F17 DAB 1038 DAB DRAFT AS-BUILT DRAWINGS - Level 17 slab edges and coordinates Structural Arabtec Reuben 19.05.2014 02.Jun.14 30-Sep-14 22.May.14 NA

2986 00 ATC

F16

F17

F18

F19

SD

6082

6099

6100

6101

00 16,17,18 and 19 floors block wall general arrangement plan & sections details) Architectural Arabtec Ramon 19.05.2014 02.Jun.14 30-Sep-14 1.Jun.14 NA

3046 01 S01 L23 SD2928

2929 01 Level 23 PT Slab reinforcement details top and bottom Sheets 1 to 6 Structural CICON Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

3057 00 S16 F30 SD 16030 00 Level 30th floor plan HVAC Layout (2 sheets) Mechanical REMCO Aiman 29.05.2014 12.Jun.14 30-Sep-14 5.Jun.14 NA

3066 01 S01 L24 SD2935

2936 01 Level 24 PT slab reinforcement details top and bottom (B2 & T1) (6 sheets) Structural CICON Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

3100 00 S16 F30 SD 16670 00 Level 30th Mechanical Floor High Level Drainage Layout Mechanical REMCO Aiman 02.06.2014 16.Jun.14 30-Sep-14 8.Jun.14 NA

3149 00 ATC GEN SD

0633

0635

0636

00 Water tank water proofing details (sheets 1 to 4) Structural Arabtec Reuben 09.06.2014 23.Jun.14 30-Sep-14 12.Jun.14 NA

3204 00 S22 WP SD 5301 00 Waterproofing details for wet area Architectural Procare Ramon 16.06.2014 30.Jun.14 30-Sep-14 7.Jul.14 NA

3254 01 S01L26

L28SD

3100

327901

Beam Reinforcement Details 26th floor beam (Sheet 1) Beam Reinforcement

Details 28th floor beam (Sheet 3) Structural CICON Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

3267 01 S01 L29 SD3285

3286 01 29th floor slab and beam pull out bar B2 & T1 Layer sheets 1 to 3 Structural Arabtec Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

3281 01 S01 L29 SD3302

3303 01 Level 29 PT Slab reinforcement details top & bottom (B2 & T1) (Sheets 1 to 7) Structural REMCO Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

3288 01 S16F77

F80 SD

16753

1675501

Level 77th to 79th Typical Floor Fire Fighting Layout Level 80th to 84th Typical Floor Fire

Fighting LayoutMechanical Arabtec Raouf 10.09.2014 24.Sep.14 30-Sep-14 18.Sep.14 AAN/NA

3305 00 S16

D81

F83

F85

SD

16756

16757

16758

0081 & 82 Typical Floor fire fighting layout 83 & 84 Typical Floor fire

fighting layout 85 floor fire fighting layoutMechanical REMCO Aiman 28.06.2014 12.Jul.14 30-Sep-14 6.Jul.14 NA

3303 01 S16 F53 SD 16938 01 53rd Floor / slab MEP builder works layout Mechanical REMCO Aiman 02.09.2014 16.Sep.14 30-Sep-14 8.Sep.14 NA

3325 00 S16 F64 SD 16045 00 Level 64th to 66th floor plan HVAC Layout Mechanical Arabtec Aiman 30.06.2014 14.Jul.14 30-Sep-14 12.Jul.14 NA

3368 01 S16 F30 SD

16829

16865

16866

16882

01

Level 30th Floor Plan MEP Coordination (High Level) Sheet 1 of 4

Level 30th Floor Plan MEP Coordination (Low Level) Sheet 2 of 4

Level 30th Floor Plan MEP Section & Details Sheet 3 of 4 Level 30th Floor Plan MEP Section &

Details Sheet 4 of 4

Mechanical REMCO Raouf 10.09.2014 24.Sep.14 30-Sep-14 13.Sep.14 NA

3414 00 S16F57

F63 SD

16940

16942 00

57th to 61st Typical floor / slab MEP builder works layout

63rd floor / slab MEP builder works layout 64th to 66th Typical Floor / Mechanical REMCO Aiman 13.07.2014 27.Jul.14 30-Sep-14 21.Jul.14 NA

3418 01 S01 L30 SD

3327

3328

3329

3330

3331

01Level 30 RC Slab reinforcement details bottom (B1) (B2), top (T1) (T2), additional bar top,

trimmer bar, punching shear details Structural CICON Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

3475 00 S16

B05

F30

F42

F56

SD

16700

16727

16735

16739

00Basement 5, 42nd, 56th, (57th to 61st Typical) 75th, 86th, roof & upper roof Floor Fire Fighting

layout. 30th & 62nd floors mechanical floor fire fighting layoutMechanical REMCO Aiman 19.07.2014 02.Aug.14 30-Sep-14 31.Jul.14 NA

3475 01 S16 F62 SD 16741 01 62nd Mechanical Floor Fire Fighting layout Mechanical REMCO Raouf 10.09.2014 24.Sep.14 30-Sep-14 20.Sep.14 NA

3474 01 S01F70

F77 SD

16547

16553 01

70th to 76th Typical Floor Plan Water Supply Layout 77th to 79th Typical Floor Plan Water

Supply Layout 84th Floor Plan Water Supply LayoutMechanical REMCO Raouf 14.09.2014 28.Sep.14 30-Sep-14 22.Sep.14

AAN

NA

3505 00 S16 GR SD 15305 00 Ground floor plan emergency & exit lighting layout Electrical REMCO Faisal 22.07.2014 05.Aug.14 30-Sep-14 9.Aug.14 NA

3495 00 S16F73

F75SD

16650

1665100 73rd, 74th & 75th Floors Drainage Layout Mechanical REMCO Aiman 22.07.2014 05.Aug.14 30-Sep-14 4.Aug.14 NA

3510 01 S03 SSW SD 4011 01 Zone 4 plan & Retaining wall section details Structural Al Shirawi Reuben 22-Sep-14 06.Okt.14 30-Sep-14 6

3537 01 S16 F85 SD 16558 01 85th Floor Plan Water Supply Layout Mechanical REMCO Raouf 23.09.2014 07.Okt.14 30-Sep-14 29.Sep.14 NA

3531 00 S16F68

F76SD

16645

1665200 68th & 76th floor drainage layout Mechanical REMCO Aiman 26.07.2014 09.Aug.14 30-Sep-14 5.Aug.14 NA

File: Page 3 of 6 Printed On: 12.10.2014 at 09:33

Page 230: Monthly Progress Report - September 2014

Outstanding Shop Drawings

TR.No. Rev.Drawin

g No.

Dwg

Rev.Description Discipline From To

Date of

Receipt

Due for

Response

Current

Date

Days

PendingDate Returned Action code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

3553 00 S16 F78 SD 16654 00 78 & 79 Typical Floors draiange layout Mechanical REMCO Aiman 27.07.2014 10.Aug.14 30-Sep-14 7.Aug.14 NA

3559 00 ATC GEN SD6212

6213 00 Typical floor corridor tiling layout plan (Sheets 1 to 7) Architectural Arabtec

Haddad /

Ramon 27-Jul-14 10.Aug.14 30-Sep-14 -51

3590 00 S25F06

F07 SD

19301

19302 00

Drywall partition plan and details level 6 & 7 Drywall typical

details (Sheets 1 & 2) Architectural Batimat Haddad 2-Aug-14 16.Aug.14 30-Sep-14 -45 1.Sep.14

3593 ST S01P4 P2

GF DAB

2423

2424 DAB Podium 4 zaone A1, zone A2 reinforcement details - DRAFT AS-BUILT DRAWINGS Structural CICON Reuben 03.08.2014 17.Aug.14 30-Sep-14 DAB DAB

3592 00 S01GF

P1 P2 DAB

2281

2282 DAB GF, P1, P2 & P4 Slab & Beam pull out bar reinforcement details - DRAFT AS-BUILT DRAWINGS Structural CICON Reuben 03.08.2014 17.Aug.14 30-Sep-14 DAB DAB

3601 00 ATC F09 SD6170

617100 Toilets tiling layout Level 9 Unit 3 (Type 11 & 16) Architectural Arabtec Haddad 3-Aug-14 17.Aug.14 30-Sep-14 -44

3600 00 ATC F11 SD 6222 00 Toilets tiling layout Level 11 Unit 4 (Type 50) Architectural Arabtec Haddad 3-Aug-14 17.Aug.14 30-Sep-14 -44

3604 00 S21MP86

SEC-A SD

5119

5120 00 Façade acces system machine manuevering layout at 86th floor Architectural Arabtec Haddad 04.08.2014 18.Aug.14 30-Sep-14 24.Sep.14 NA

3612 01 S16 GEN SD16075

1607601

Level 31st to 62nd floor Chilled Water Schematic Riser Diagram Sheets 2 to 3

Level 62nd to 88th Floor Chilled Water Schematic Riser Diagram Sheets 3 to 3 Mechanical REMCO Raouf 10-Sep-14 24.Sep.14 30-Sep-14 -6

3611 00 S01 F32 SD

3464

3465

3466

00 Reinforcement Details of Columns TC-01 & TC-02 - 32nd to U/S 34th floor (Sheets 1 to 4) Structural CICON Reuben 5-Aug-14 19.Aug.14 30-Sep-14 -42

3651 00 S25F08

F09SD

19303

1930400 Drywall partition plan and details level 8 & 9 (Sheets 1 & 2) Architectural Batimat Ramon 10-Aug-14 24.Aug.14 30-Sep-14 -37 9.Sep.14

3698 01 S05 B05 SD4225

4227 01

Zone - B Level B5 retaining wall from Axis (3) to Axis (8) formwork - Anchor layout (Sheet 1 of

2) - Pour 1 - Pour 2 - Pour 3 & 4Structural Peri Reuben 25.08.2014 08.Sep.14 30-Sep-14 28.Aug.14 NA

3699 00 S25F06

GENSD

19013

19092

19093

00 Reflected ceiling plan & details (level 06, Sheet 1 of 2) Architectural Batimat Ramon 16.08.2014 30.Aug.14 30-Sep-14 18.Aug.14 ANN/NA

3732 00 S01 L30 SD 3695 00 Level 30 RC slab foundation reinforcement details plinth & upstand for GRP water tank Structural Arabtec Reuben 20-Aug-14 03.Sep.14 30-Sep-14 -27

3739 00 S01 F40 SD3659

3660 00 Reinforcement Detail of Wing Wall 1, 3, 5 and 7 and 2, 4, 6, 8 and 9 (Level 40-42) Structural Arabtec Reuben 20-Aug-14 03.Sep.14 30-Sep-14 -27

3736 00 S13 F42 SD4687

4688 00 Level 42, 43 and 44 tendon profiles Structural Arabtec Reuben 20-Aug-14 03.Sep.14 30-Sep-14 -27

3741 00 S16 F30 SD17701

1770200 Level 30 Floor Plan - Floatinf Ref. for MEP Equipment and Foundation with out equipment

Mechancal /

ElectricalArabtec

Ahmed /

Auday20-Aug-14 03.Sep.14 30-Sep-14 -27

3762 01 S02 L44SD

BSS

3700

3701

3702

3703

3704

3705

3706

3707

3708

01

Level 43 PT Slab Reinforecement Details Bottom (B1) Sheet 1 of 10

Level 43 PT Slab Reinforecement Details Top (T2) Sheet 2 of 10

Level 43 PT Slab Reinforecement Details Bottom (B2) Sheet 1 of 10

Level 43 PT Slab Reinforecement Details Top (T1) Sheet 4 of 10

Level 43 PT Slab Reinforecement Details Additional Bar Bottom & Top (T2) Sheet 5 of 10

Level 43 PT Slab Reinforecement Details Trimmer Bar, Axial Lateral Sheet 6 of 10

Level 43 PT Slab Reinforecement Details Punching Shear Links Sheet 7 of 10

Level 43 PT Slab Reinforecement Details Punching Shear Links Sheet 8 of 10

Level 43 PT Slab Reinforecement Details Section 9 of 10 Level 43 PT

Slab Reinforecement Details Post Tension Layout 10 of 10 BBS

for the above mentioned drawings

Structural CICON Reuben 22-Sep-14 06.Okt.14 30-Sep-14 6

0 00 - - - - 00 Typical Section for Micropile and PVC Pipes Structural IGS Reuben 25-Aug-14 08.Sep.14 30-Sep-14 -22

3765 00 S05 B05 SD4226

4230 00 Zone B - Level B5 retaining wall from Axis (1 - 3) - Anchor layout, Pour 5, 6, 7 and 8) Structural Peri Reuben 25.08.2014 08.Sep.14 30-Sep-14 12.Oct.14 NA

3774 00 S01 L28 SD3668

3669 00

Staircase 1 Reinforcement Detail Plan 28th Floor to 30th Floor Sheet 1 of 4

Staircase 1 Reinforcement Detail Plan 30th Floor to 31st Floor Sheet 2 of 4 Structural CICON Reuben 28-Aug-14 11.Sep.14 30-Sep-14 -19

3803 00 S05 L32 SD

4234

4235

4236

4237

4238

00

Slab & Beam formwork layout level 32 to 35 (Part 1) PD8/Multiplex with GT24 sheets 1 to 5

Slab & Beam formwork layout level 32 to 35 (Part 2) PD8/Multiplex with GT24 sheets 2 to 5

Slab & Beam formwork layout level 32 to 35 (Part 3) PD8/Multiplex with GT24 sheets 3 to 5

Slab & Beam formwork layout level 32 to 35 (Part 4) PD8/Multiplex with GT24 sheets 4 to 5

Slab & Beam formwork Sections & Details level 32 to 35 (Part 1) PD8/Multiplex with GT24 sheets

1 to 5

Structural PERI LLC Reuben 12-Oct-14 26.Okt.14 30-Sep-14 26 9.Sep.14

File: Page 4 of 6 Printed On: 12.10.2014 at 09:33

Page 231: Monthly Progress Report - September 2014

Outstanding Shop Drawings

TR.No. Rev.Drawin

g No.

Dwg

Rev.Description Discipline From To

Date of

Receipt

Due for

Response

Current

Date

Days

PendingDate Returned Action code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

3878 00 ATC B04 SD

1605

1606

1607

00

Slab Construction Joint Location for Zone - B from Basement - 4 to Ground Floor (Sheet 1 of 3)

Slab Construction Joint Location for Zone - B from Basement - 4 to Ground Floor (Sheet 2 of 3)

Slab Construction Joint Location for Zone - B from Basement - 4 to Ground Floor (Sheet 3 of 3)

Structural Arabtec Reuben 11.09.2014 25.Sep.14 30-Sep-14 22.Sep.14 NA

3905 00 ATC F11 SD

6273

6274

6275

00Toilets tiling layout level-11, unit-6 (Type-T17) Toilets tiling layout level-11, unit-6 (Type-

T20) Toilets tiling layout level-11, unit-6 (Type-T18)Architectural Arabtec Haddad 15-Sep-14 29.Sep.14 30-Sep-14 -1

3907 00 ATC F11 SD

6314

6315

6316

6317

00Toilets tiling Layout Level-11, unit-8 Type - 42 Toilets tiling Layout Level-11, unit-8 Type - 1

Toilets tiling Layout Level-11, unit-9 Type - T2 Toilets tiling Layout Level-11, unit-9 Type - 1Architectural Arabtec Haddad 15-Sep-14 29.Sep.14 30-Sep-14 -1

3912 00 ATC F12 SD6293

629400

Toilets tiling Layout Level-12, Unit-8 (Living &

Dining Toilet) Toilets tiling Layout Level-12, Unit-8 (BR-

1Toilet)

Architectural Arabtec Haddad 16-Sep-14 30.Sep.14 30-Sep-14 0

3922 00 ATC F09 SD

6231

6232

6233

00Toilets tiling Layout Level-9, Unit-7 (Type-40) Toilets tiling Layout Level-9, Unit-7 (Type-31)

Toilets tiling Layout Level-9, Unit-7 (Type-19)Architectural Arabtec Haddad 16-Sep-14 30.Sep.14 30-Sep-14 0

3936 00 ATC F55 SD

1385

1386

1601

1602

00 Level 55 General Arrangement plan and sections (Sheets 1 to 4) Structural Arabtec Reuben 21-Sep-14 05.Okt.14 30-Sep-14 5

3942 00 S25

F12

F13

F14

F15

SD

19307

19308

19309

19310

00 Drywall partition plan and details (levels 12, 13, 14, 15) & and reference sheets (1 & 2) Architectural Batimat Haddad 21-Sep-14 05.Okt.14 30-Sep-14 5

3941 00 ATC F12 SD

6296

6297

6298

6299

00

Toilets tiling layout level 12 Unit 9 (Type 1) Toilets tiling layout level 12 Unit 9

(Type T2) Toilets tiling layout level 12 Unit 10 (Type 24)

Toilets tiling layout level 12 Unit 10 (Type 22) Toilets tiling layout level 12 Unit 10

(Type 23)

Architectural Arabtec Haddad 21-Sep-14 05.Okt.14 30-Sep-14 5

3940 00 ATC F56 SD

1387

1388

1608

1609

00 Level 56 General arrangement plan & sections (Sheets 1 to 4) Structural Arabtec Reuben 21-Sep-14 05.Okt.14 30-Sep-14 5

3939 00 ATC F60 SD 1610 00 Slab edges and coordinated level 60 Structural Arabtec Reuben 21-Sep-14 05.Okt.14 30-Sep-14 5

3945 00 ATCF10

F11SD

6308

6309

6310

6311

00

Toilet tiling layout level 10, Unit 10, Type 24 Toilet tiling layout level 10, Unit 10,

Type 23 Toilet tiling layout level 10, Unit 10, Type 22 Toilet tiling

layout level 11, Unit 10, Type 24 Toilet tiling layout level 11, Unit 10, Type 23

Toilet tiling layout level 11, Unit 10, Type 22

Structural Arabtec Reuben 22-Sep-14 06.Okt.14 30-Sep-14 6

3951 00 ATC F55 SD1615

1616 00 Core wall plan and elevation 1 to 9 Level 55 to level 58 -(Sheets 1 to 11) Structural Arabtec Reuben 24-Sep-14 08.Okt.14 30-Sep-14 8

3787 DAB S01 B02 DAB

2149

2156

2157

2158

DABDRAFT AS-BUILT DRAWINGS - Level Basement 02, Basement 03 Ground, Podium 3, Podium 4,

Podium 1, & Podium 2 slab & beam pull out bar reinforcement detailsStructural Arabtec Reuben 27-Aug-14 10.Sep.14 30-Sep-14 DAB

3959 00 ATC F57 SD1389

1390 00 Level 57 General Arrangement Plan & Sections (Sheets 1 to 4) Structural Arabtec Reuben 25-Sep-14 09.Okt.14 30-Sep-14 9

3960 00 S16 F41 SD 17346 00 Level 41st floor bedroom & Living Room Ceiling Electrical Co-ordination Layout Electrical REMCO Faisal 25-Sep-14 09.Okt.14 30-Sep-14 9 29.Sep.14

3966 00 ATC F58 SD1391

1392 00 Level 58 General Arrangement plan & sections (Sheets 1 to 4) Structural Arabtec Reuben 27-Sep-14 11.Okt.14 30-Sep-14 11

3972 00 S01 B02 SD3763

3764 00 Columns zone B basement 2 to U/S ground floor reinforcement details ( sheets 1 to 3) Structural Arabtec Reuben 28-Sep-14 12.Okt.14 30-Sep-14 12

File: Page 5 of 6 Printed On: 12.10.2014 at 09:33

Page 232: Monthly Progress Report - September 2014

Outstanding Shop Drawings

TR.No. Rev.Drawin

g No.

Dwg

Rev.Description Discipline From To

Date of

Receipt

Due for

Response

Current

Date

Days

PendingDate Returned Action code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

3976 00 S05 L45 SD4244

4245 00

Slab & beam formwork layout level 41 to 49 (part 1,2,3,4 &5)PD8 / Multiflex with GT24 (Sheets 1

to 5)Structural PERI LLC Reuben 29-Sep-14 13.Okt.14 30-Sep-14 13

3986 00 S13F45

F46 SD

4711

4712 00 Levels 45 (Sheets 1 & 2), 46 (Sheets 1 & 2) & 47 (Sheets 1 & 2) Tendon profiles . Structural CCL Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

3985 00 ATC F59 SD1393

1394 00 Level 59 General Arrangement Plan & Sections (Sheets 1 to 4) Structural Arabtec Reuben 30-Sep-14 14.Okt.14 30-Sep-14 14

3984 00 ATC F36 SD 6320 00 36th floor block wall general arrangment (plan & sections details) Architectural Arabtec Haddad 30-Sep-14 14.Okt.14 30-Sep-14 14

Legend

Under AECOM Review

Under Contractor Preparation

Overdue (Review)

File: Page 6 of 6 Printed On: 12.10.2014 at 09:33

Page 233: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 15

Outstanding MaterialSubmittals

Page 234: Monthly Progress Report - September 2014

Outstanding Material Submittals

TR.

No.Rev Description Discipline

Contractor /

Supplier

Forwarded

ToSample

Date of

Receipt

Due for

Submission

Current

Date

Days

Pending

Date

Returned

Action

code

2069 2 Motorized Fire & Smoke Dampers Mechanical SafidAiman / To

Damac on No 06.Mär.14 20.Mär.14 30-Sep-14 2.Apr.14 NA

2134 2 Sound Attenuator. Mechanical REMCORaouf /

To DAMAC on No 25.Sep.14 09.Okt.14 30-Sep-14 9

2347 0 Backup Rod Architectural ALICO Arkan No 16.Feb.14 02.Mär.14 30-Sep-14 23.Feb.14

2342 0 Fire Alarm System (Value Engineering) Electrical REMCO Zahid Yes 16.Feb.14 02.Mär.14 30-Sep-14 25.Feb.14 NA

2617 0 Tile Grout Architectural Sodamco Bassem Yes 25.Mär.14 08.Apr.14 30-Sep-14 20.Apr.14 NA

2788 0Extruded Polystyrene Rigid Insulation

(Esscofoam) (35-38 Kg) m3Structural

Teejan General

Trading LLCReuben Yes 21.Apr.14 05.Mai.14 30-Sep-14 10.May.14 NA

2817 0Material Submittal for Separol FP 15 - Oil

based, anti corrosive shutter release agent Structural Sika

Reuben /

To DAMAC on

06.05.2014 /

Yes 27.Apr.14 11.Mai.14 30-Sep-14 12.May.14 NA

2831 2

Material Sample for RAL Colour for emergency

exit doors for lifts in match with the color of

painted wall: 1. Sample from

JOTUN brand.

Architectural Toshiba

Ramon /

Haddad To

Damac on

07.08.2014 /

Yes 22.Jul.14 05.Aug.14 30-Sep-14 12.Aug.14 NA

2932 2Foam system (Generator room)

Value engineeringMechanical Juma Al Majid

Raouf /

To Damac on

29.09.2014

No 25.Sep.14 09.Okt.14 30-Sep-14 9

2975 1 Fire Pump Set (Value Engineering) Mechanical REMCO

Raouf /

To Damac on

29.09.2014

No 28.Sep.14 12.Okt.14 30-Sep-14 12

3012 2Black Nero Marquina - 20mm thick polished

(Marble)Architectural JC Maclean

Haddad /

To Damac on

24.09.2014

Yes 25.Aug.14 08.Sep.14 30-Sep-14 -22

3017 2

Beech solidwood and 44mm Thick NFR

KINGSA Door Core in White Matt PU Paint

Finish

Architectural JC Maclean

Haddad / To

DAMAC on

10.09.2014 /

From DAMAC

Yes 21.Aug.14 04.Sep.14 30-Sep-14 16.Sep.14 NA

3016 2

Beech solidwood and 54mm Thick FR

HALSPAN Door Core in White Matt PU Paint

Finish

Architectural JC Maclean

Haddad / To

DAMAC on

10.09.2014 /

Yes 21.Aug.14 04.Sep.14 30-Sep-14 16.Sep.14 NA

3026 2Cooling Tower (Reply to Consultant

Comments) Mechanical REMCO

Raouf / To

Damac on

08.09.2014

No 02.Sep.14 16.Sep.14 30-Sep-14 -14

3029 0Aggregates (Crushed) 5mm Interlocking sand

& 10 to 20mmStructural

Dubai Al Ahlia

Transport.Reuben No 25.Mai.14 08.Jun.14 30-Sep-14 Cancelled

3039 0 MV Cables ElectricalAl Jalal Trading /

Ducab

Faisal

/ To Damac on

01.06.2014 /

Yes 26.Mai.14 09.Jun.14 30-Sep-14 4.Jun.14 NA

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

File: Page 1 of 3 Printed On: 12.10.2014 at 07:43

Page 235: Monthly Progress Report - September 2014

Outstanding Material Submittals

TR.

No.Rev Description Discipline

Contractor /

Supplier

Forwarded

ToSample

Date of

Receipt

Due for

Submission

Current

Date

Days

Pending

Date

Returned

Action

code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

3028 0Aggregates (Crushed) 5mm Interlocking sand

& 10 to 20mmStructural

New Generation

Gen.Land Tpt. CoReuben No 26.Mai.14 09.Jun.14 30-Sep-14 Cancelled

3037 2NAFS125 Clean Agent System (Value

Engineering)Mechanical

Al Arabia/ Juma Al

Majid

Raouf /

To Damac on

24.08.14 /

From Damac

No 20.Aug.14 03.Sep.14 30-Sep-14 8.Sep.14 NA

3147 2 Control & Instrumentation Cables Electrical REMCO

Faisal /

To Damac on

28.09.2014

Yes 25.Sep.14 09.Okt.14 30-Sep-14 9

3161 1 False Ceiling and Drywall Partitions Architectural Batimat

Haddad / To

DAMAC on

31.08.2014 /

From DAMAC

Yes 31.Jul.14 14.Aug.14 30-Sep-14 -47

3228 1Grade B 500B Steel Reinforcement Bar

(Deforemed) to be used in production of wheel Structural

Arabtec Precast

LLCReuben / No 14.Sep.14 28.Sep.14 30-Sep-14 -2

3390 1 Cat Ladder at roof, lift pit and water tank Architectural WMS Haddad Yes 25.Aug.14 08.Sep.14 30-Sep-14 24.Sep.14 NA

3446 04mm thick stone-look ALUPEX -FR cladding

for podium façadeArchitectural ALICO

Ramon /

Haddad / To

Damac on

No 16.Jul.14 30.Jul.14 30-Sep-14 16.Sep.14 NA

3479 3

Paint System No.1

1 Coat Kem Epoxy Primer Sealer

1 Coat Tile Clad Spray Texture Hi Build Part A

Architectural Sherwin Williams Haddad Yes 27.Sep.14 11.Okt.14 30-Sep-14 11

3551 1Material Submittal for 250mm wide removal

painted steel grating at trenchesArchitectural Arabtec

Haddad /

To Damac on

25.09.2014 /

Yes 25.Aug.14 08.Sep.14 30-Sep-14 28.Sep.14 NA

3688 0Material submittal for non-fore rated sealant

(Alternative Supplier)Architectural Arabtec Ramon No 14.Aug.14 28.Aug.14 30-Sep-14 7.Sep.14 NA

3689 1 Dynamic Balancing Valve (Value Engineering) Mechanical REMCO

Raouf /

To Damac on

30.09.2014

No 25.Sep.14 09.Okt.14 30-Sep-14 9

3692 0 Sanitary Ware and stainless steel kitchensink Mechanical Milano

Raouf /

To DAMAC on

18.08.2014

Yes 16.Aug.14 30.Aug.14 30-Sep-14 -31

3705 0GL-5: Tempered Sandblasted Glass - 10mm

ThickArchitectural JC Maclean

Haddad / To

DAMAC on

10.09.2014 /

Yes 18.Aug.14 01.Sep.14 30-Sep-14 16.Sep.14 NA

File: Page 2 of 3 Printed On: 12.10.2014 at 07:43

Page 236: Monthly Progress Report - September 2014

Outstanding Material Submittals

TR.

No.Rev Description Discipline

Contractor /

Supplier

Forwarded

ToSample

Date of

Receipt

Due for

Submission

Current

Date

Days

Pending

Date

Returned

Action

code

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

3854 1Light Fittings for Back of House (BOH) Areas -

Submitted for (D1) color approval

Mechanical /

ElectricalArabtec

Raouf /

To Damac on

28.09.2014

Yes 25.Sep.14 09.Okt.14 30-Sep-14 9

3871 1Transfer of Water Supply Riser Support

SystemMechanical Arabtec

Raouf /

To Damac on

30.09.2014

Yes 27.Sep.14 11.Okt.14 30-Sep-14 11

3930 0Chilled, Condenser Water Treatment & Side

Stream Filtration SystemMechanical Remco Raouf Yes 18.Sep.14 02.Okt.14 30-Sep-14 23.Sep.14 NA

3931 0GRP Pipes & Fittings (200mm Water Transfer

Line)Mechanical Remco

Raouf /

To Damac on

24.09.2014 /

Yes 20.Sep.14 04.Okt.14 30-Sep-14 30.Sep.14 NA

3957 0

1.Pyroplex UK - Timber Fire Door Seals Tripple

Flipper 2.Pyroplex UK -

Timber Fire Door Seals for 30 and 60 minutes-

Architectural JC Maclean Haddad Yes 25.Sep.14 09.Okt.14 30-Sep-14 9

3955 0 Black Absolute Marble Architectural JC Maclean Haddad Yes 25.Sep.14 09.Okt.14 30-Sep-14 9

3956 01. Mirror Stainless Steel - Color Silver

2 & 3. Brushed Stainless Steel - Color : SilverArchitectural JC Maclean Haddad Yes 25.Sep.14 09.Okt.14 30-Sep-14 9

3962 0

Joinery Accessories:

1. Full Overlay Hinges

2. Half Overlay Hinges

Architectural JC Maclean Haddad Yes 25.Sep.14 09.Okt.14 30-Sep-14 9

3969 0FCU's Acoustic Study (Level 6th to mLevel

42nd)Mechanical REMCO

Raouf /

To Damac on

30.09.2014

No 28.Sep.14 12.Okt.14 30-Sep-14 12

3971 0Stainless Steel Strip (To be used between

marble and porcelain tiles) Architectural Arabtec Haddad Yes 28.Sep.14 12.Okt.14 30-Sep-14 12

Legend

Under AECOM Review

Under Contractor Preparation

Overdue (Review)

File: Page 3 of 3 Printed On: 12.10.2014 at 07:43

Page 237: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 16

OutstandingPre-qualifications

Page 238: Monthly Progress Report - September 2014

Outstadning Pre-Qualification Submittals

2546 0Sub contractor approval - Prequalification documents pf PT

ddesign & Inspection (m/s. CCL Engineering)Structural ATC/CCL 13-Mar-14 27.Mär.14 30-Sep-14 16-Mar-14 NA

Legend

Under AECOM Review

Under Contractor Preparation

Overdue (Review)

Days Pending Date Returned Action codeForwarded

To Date of Receipt Due for Submission Current Date

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

TR. No. Rev. Description DisciplineContractor/

Subcontractor/ Supplier

File:- Page 1 of 1 Printed On: 12.10.2014 at 07:17

Page 239: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 17

OutstandingMethod Statements

Page 240: Monthly Progress Report - September 2014

Outstanding Method Statements

TR.No. Rev. Description DisciplineContractor /

SupplierTo Date of Receipt

Due for

SubmissionCurrent Date Days Pending Date Returned Action code

2273 0 Method Statement for Bitumen Protective Coating Application. Architecutural Arabtec Arkan 06.Feb.14 20.Feb.14 30-Sep-14 11.Feb.14 AAN & RR

2312 2 Method Statement for installation of Structured Cabling System Electrical REMCO Faisal 08.Apr.14 22.Apr.14 30-Sep-14 20.Apr.14 NA

2328 0 Method Statement for installation of plate heat exchangers Mechanical REMCO Basel 13.Feb.14 27.Feb.14 30-Sep-14 26.Feb.14 NA

2510 1 Method Statement for Installation of Cooling Towers Mechanical REMCO Aiman 21.Sep.14 05.Okt.14 30-Sep-14 23.Sep.14 NA

3386 1Method statement for fabrication, erection and installation of roof steel

structureStructural Arabtec Reuben 28.Aug.14 11.Sep.14 30-Sep-14 06.Aug.14 NA

3388 1 Method statement for dismantling and re-erection of tower crane TC # 2 Structural Arabtec Reuben 21.Sep.14 05.Okt.14 30-Sep-14 5

3751 0 Method Statement for Installation of BMU Systems Structural Danway Reuben 21.Aug.14 04.Sep.14 30-Sep-14 02.Sep.14 NA

Legend

Under AECOM Review

Under Contractor Preparation

Overdue (Review)

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

File: Page 1 of 1 Printed On: 12.10.2014 at 06:33

Page 241: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 18

NCRs Report

Page 242: Monthly Progress Report - September 2014

Non-Conformance Report Register

NCR No. ATC Replied DateAECOM Response

Date

009 Pile Head Repair. GCI ZETAS 20-Oct-12

071 Defects on level 12 AECOM ATC 19-May-14 9-Sep-14

074 Defects on Level 16 AECOM ATC 10-Jun-14 5-Jul-14 7-Jul-14

083 Concrete Defects on Podium AECOM ATC 26-Aug-14

085 Core wall, Column and Slab edge not within tolerance AECOM ATC 26-Aug-14

087 Improper storage of GI Duct at P4 AECOM ATC 27-Aug-14 16-Sep-14

090 Core wall, Column and Slab edge not within tolerance AECOM ATC 26-Aug-14

096 DEWA and Shop Drawing AECOM ATC 14-Sep-14

099 FCU Storage on Site AECOM ATC 16-Sep-14 29-Sep-14 30-Sep-14

100 Concrete Defects on Level 30 AECOM ATC 17-Sep-14

101 Concrete Defects on level 31 AECOM ATC 23-Sep-14

102 FCU installed on site AECOM ATC 23-Sep-14

104Application of waterproofing at level 8 not as per

product recommendationAECOM ATC 28-Sep-14

DAMAC Gulf Properties L.L.C DAMAC Heights at Dubai Marina

O

Title Engineer Issued To Date Issued Status

File: Page 1 of 1 Printed On :- 12.10.2014 at 12:30

Page 243: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 19

Actions Log

Page 244: Monthly Progress Report - September 2014

Issue

No.

Date

Identified

Opened

By

Trans.

No.

Double

Click

Issue Description Owner Client

Input?

Original

Due Date

Revised /

Closed

Date

Variance

(Calendar

Days)

RAGC Recommended Solution(s) / Alternative(s)

General Aspects

G001 AECOM Updated Building Permit with the revised conditions (Related to DCD approval on level P5) RME Yes Closed

Updated Building Permit with the revised conditions (Related to DCA NOC for building height) AECOM No Closed

Updated Building Permit with the revised conditions (Related to Structural Steel Shop Drawing

Approval)ATC/Notr No Low

Item 3: Related to Structural Steel Shop Drawing

Approval: Condition to be cleared prior to

commencement of the related work above lev el 84.

Updated Building Permit with the revised conditions (Related to Letter of appointment for Notre

Dame Steel)ATC/Notr No Low

Item 4: Related to Letter of appointment for Notre

Dame Steel: it will be submitted when the shop

drawings are ready. Condition to cleared prior to

commencement of the related work.

Updated Building Permit with the revised conditions (Related to External paving) ATC No LowItem 5: Related to External paving: to be approved

prior to Building Completion Certificate application.

Updated Building Permit with the revised conditions (Related to Thermal insulation approval

from DM and ventilation for Chillers)

AECOM/D

MNo Closed

Updated Building Permit with the revised conditions (FIC final approval)AECOM/D

MNo Closed

Nominations of PS itemsFENDI Flats

N001 DAMAC Fit Out DAMAC 13.Nov.14 Med

N002 DAMACLight fittings

DAMAC 22.Mär.15 Low

N003 DAMACShower enclosures

DAMAC 13.Nov.14 Med

Ground Floor

N004 DAMACFit-out for the main entrances of branded and non-branded

DAMAC 07.Mai.15 Low

N005 DAMACFF & E

DAMAC 07.Mai.15 Low

N006 DAMACLight fittings

DAMAC Low

P5 - Life Style

N007 DAMACP5 fit out

DAMAC 29.Dez.14 Med

N008 DAMACP5 light fittings

DAMAC Med

N009 DAMACFFE of lifestyle

DAMAC 29.Dez.14 Med

N010 DAMACP5 Lockers

DAMAC 30.Mär.15 Low

N011 DAMACP5 Jacuzzi & Steam Sauna

DAMAC 12.Feb.15 Low

N012 DAMACP5 Acrylic panel enclosure for Jacuzzi

DAMAC 30.Jul.15 Low

N013 DAMACSwimming pool package

DAMAC 20.Aug.14 High

N014 DAMAC Swimming Pool Furniture DAMAC Low

General

N015 DAMAC

Façade lighting

DAMAC 24.Feb.14 High

N016 DAMACMetal doors

DAMAC 26.Aug.14 Closed Has been nominated on 26 Aug-14.

N017 DAMACTimber Doors

DAMAC Closed There are no timber doors in the corridors.

N018 DAMAC Internal/ external Signage DAMAC 20.Apr.15 Low

DAMAC Gulf Properties L.L.C

DAMAC Heights at Dubai Marina

Project Issues / Actions Log as of 30 September 2014

Issues - Actions Log Page 1 of 3 Printed on: 13.10.2014 at 12:17

Page 245: Monthly Progress Report - September 2014

Issue

No.

Date

Identified

Opened

By

Trans.

No.

Double

Click

Issue Description Owner Client

Input?

Original

Due Date

Revised /

Closed

Date

Variance

(Calendar

Days)

RAGC Recommended Solution(s) / Alternative(s)

DAMAC Gulf Properties L.L.C

DAMAC Heights at Dubai Marina

Project Issues / Actions Log as of 30 September 2014

Structural Works

S001 AECOM Zone B de-strutting sequencing and design (Variation to the scope). AECOM 15.Okt.14 HighAECOM to propose the sequencing (Variation to the

scope).

S002 ATCStructural steel framing at P5 to 6 floor and mechanical floors not updated (reference FAC

drawings).DAMAC Closed

ALICO produced the design of secondary steel

structure.

S003 ALICO Slab edge clashes with the façade various upper levels 69,70 and 71.ALICO/ATC/

RMEMed

ATC/ALICO has to advice which cut out to follow @

level 69,70 and 71.

S004 AECOM Leaks along diaphragm walls are causing delays to enabling works in raft, section B.AECOM/DA

MACHigh Allow IGS to contain the leaks.

S005 AECOM Seepage through a hole in the diaphragm wall occurred in section DD.AECOM/DA

MAC15.Okt.14 High

AECOM to submit proposal to have permanent

solution to the diaphragm wall.

S006 ATC Water proofing membrane for Landscaping area has to be changedAECOM/DA

MACClosed

Material submitted by ATC and it is approved.

Architectural Works

A001 DAMAC Service access doors assessment. DAMAC HighSupplier will submit the material submittal to DAMAC

approval.

A002 ATC Lift Lobby Marble to be finalized.AECOM/DA

MACMed

ATC submitted prices and samples and

AECOM/DAMAC to review and advice.

A003 ATC Corridor tiles ATC Med Tiles ordered by ATC. Mock up to be done.

A004 DAMAC (Skim coat + paint) vs. (plaster and paint) cost savings comparison was submitted by ATC. DAMAC Low DAMAC to decide.

A005 DAMAC Paint: Select another supplier instead of ''Sherwin Williams''AECOM/DA

MACClosed

A006 ATC RFI 572 – Approved Kitchen Equipment’s Catalogue or Technical information and installation DAMAC ClosedCatalogue was provided. ATC to follow the IFC

drawings.

A007 ATC RFI 656 – Bedroom Door – Marble Threshold Under the Door DAMAC Closed

A008 AECOM Material Submittal 3445 - Glass for Balustrade and Glass Fin ATC Closed Sample is approved on 14-Septembe-14.

A009 ATC The IFC for level 43 to 55 issued without doors and internal finishes schedules. RME Closed IFC submitted by RME.

A010 AECOM Mock up for tiling works ATC HighATC to expedite the mock up to enable the work to

progress in line with the programme of work.

A011 AECOM Lack of progress in False Ceiling installation. ATC HighATC to expedite the work to progress in line with the

programme of work.

MEP and Specialists Works M001 AECOM Cooling Towers material submittal approval. DAMAC Closed Material submittal is approved on 6-Aug-14.

M002 REMCOD14 and D29 VE items to be finalized commercially. D14:Chilled Water Pump

D29: Corridor Pressurization

ATC Closed

M003 08.Jul.14 Phoenician Swimming pool plant design Phoenician MedAwaiting pool designer's full design package to be

issued in order to allow DAMAC to proceed with the

nomination.

M004 Jobian

Concept

Water feature design (the scope of the services is within LON of the hard and soft landscape

nomination however there is no design i.e. shape height etc..)RME Med

DAMAC/Ramboll input is required.

M005 REMCO Cost savings for PIR/ GI ducting ATC Closed

M006 ATCLack of ID-IFC drawings for GF,P5,69th and 70th floors withhold issuing the sanitary wares

purchase order.DAMAC Med

DAMAC input is required to issue ID package with

Toilet accessories details and then DAMAC has to

issue the nomination for sanitary ware in these floors.

M007 ATC There are missing electrical points in floors 43rd and above RME Closed

M008 AECOMAECOM advised that level P5 ( F.F. / F.A.) has been submitted to DCD however Ramboll Arch

drawing should be updated in line with DM requirements.RME Low

Ramboll to update the architectural drawings for level

P5.

Issues - Actions Log Page 2 of 3 Printed on: 13.10.2014 at 12:17

Page 246: Monthly Progress Report - September 2014

Issue

No.

Date

Identified

Opened

By

Trans.

No.

Double

Click

Issue Description Owner Client

Input?

Original

Due Date

Revised /

Closed

Date

Variance

(Calendar

Days)

RAGC Recommended Solution(s) / Alternative(s)

DAMAC Gulf Properties L.L.C

DAMAC Heights at Dubai Marina

Project Issues / Actions Log as of 30 September 2014

M009 AECOM DEWA submittal pending renewal NOC for power allocation.AECOM/DA

MACHigh

AECOM/DAMAC are following up with Emmar for the

NOC letter addressed to DEWA.

M010 AECOMBalcony rain water risers coordination with the façade.

DAMAC LowProposal was submitted to DAMAC.

M011 AECOMRCP plans / MEP Services in Non False Ceiling Area at Living / Dining & Bedrooms (L 6 - L38).

RME Closed

M012 AECOMMEP discrepancies in the typical floors (Level 43-84).

RME Closed

M013 AECOMDiscrepancies in Lift machine rooms at Level 63-68 .

RME Closed

M014 AECOMMissing Electrical points (Level 43 and above).

RME Closed

M015 AECOMElectrical Load Schedule.

RME Closed

M016 ATC Re-nomination of sanitary wares to be done by DAMAC. DAMAC MedDAMAC to re-nominate the package.

M017 AECOM LPO for Bus Bars and LV Panels. REMCO HighREMCO has to Release the LPO for Bus Bars and LV

Panels

Façade Works

F001 ALICO Composite panel mock up approval pending. DAMAC Closed Color is selected by DAMAC.

F002 DAMAC Stone Cladding/ composite cladding. ATC LowDAMAC advised that the decision is to proceed with

stone cladding. Sample sent to ATC.

F003 ATC Openings in level 86 have to be given for BMU operation. ALICO MedALICO to provide opening provisions in coordinations

with BMU requirments.

F004 ATC Areas that arent accessable for glass replacement at SE and NW elevations. ATC MedATC to coordinate with ALICO and Danway to

propose a solution.

F005 AECOM Production and shop drawings for secondary steel structure. ATC HighATC to submit the shop drawings for approval in

order to proceed with releasing the purchase order.

This Week's totalsTotal 11 High

64 15 Med15 Low23 Closed

Issues - Actions Log Page 3 of 3 Printed on: 13.10.2014 at 12:17

Page 247: Monthly Progress Report - September 2014

QATARACCOUNT

MANAGEMENTPROGRAM

Damac HeightsAppendix 20

AECOM’s OrganizationChart

Page 248: Monthly Progress Report - September 2014

AECOM Organization Chart

DAMAC Gulf Properties L.L.CDAMAC Heights at Dubai Marina

Stru

ctu

ral

Arc

hit

ectu

ral

Ele

ctro

mec

han

ical

Stru

ctu

ral

Arc

hit

ectu

ral

Ele

ctro

mec

han

ical

Project DirectorFuad HasanPeer Review Team

(Abu Dhabi)

Resident EngineerRadhi Mohamed

Document ControllerAbdul Latheef

Sr. Electrical EngineerMateen Khawajah

Planning ManagerSameh Kandil

Sr. ArchitectAyman Haddad

Sr. Structural EngineerReuben Samaniego

Sr. HSE OfficerMohammad Faisi

Project SecretaryAbdulla Muhyideen

MEP Manager / MechanicalAhmed Raouf

Hasan AbuhaibaStakeholder Manager

LegendManagement StaffSupervision Staff

Doc

um

ents

Con

trol

Doc

um

ents

Con

trol

Pro

ject

Con

trol

Hel

ath

and

Safe

ty

Pro

ject

Con

trol

Hel

ath

and

Safe

ty

Mateen Khawajah Sameh Kandil Ayman Haddad Reuben Samaniego Mohammad Faisi

Electrical InspectorShibu Mathew

Mechanical InspectorPercival Vicente Architectural Inspector

Sanat Rane

Architectural InspectorTBA

Structural InspectorRoberto Magtira

Structural InspectorFrederick Abellar

Ahmed Raouf

Page 249: Monthly Progress Report - September 2014