HONOLULU RAIL TRANSIT PROJECT 

 

 

September 2019 MONTHLY PROGRESS REPORT 

  

   

www.HonoluluTransit.org  

  

Page 2: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

2 | P a g e

DISCLAIMER NOTICE This document is disseminated under the sponsorship of the United States Department of Transportation, Federal Transit Administration (FTA), in the interest of information exchange. The United States Government assumes no liability for the contents or use thereof. The United States Government does not endorse products or manufacturers. Any trade or manufacturers' names appear herein solely because they are considered essential to the contents of the report.

NO RELIANCE BY THIRD PARTIES This report and all subsidiary reports are prepared solely for the FTA, and should not be relied upon by any party, except the FTA, its Project Management Oversight Contractors (PMOC), and the Honolulu Authority for Rapid Transportation (HART) Board of Directors, in accordance with the purpose as described in the next section.

REPORT FORMAT AND FOCUS This document is submitted in compliance with the terms of FTA Contract No. DTFT60-09-D-00012, Task Order No. 2. Its purpose is to provide information and data to assist the FTA as it continually monitors HART's technical capability and capacity to execute a project efficiently and effectively, and hence, whether HART continues to be ready to receive federal funds for further project development. This document covers the project and quality management activities on the Honolulu Rail Transit Project managed by HART as the project sponsor and partially financed by the FTA under the Full Funding Grant Agreement (FFGA). Concurrent non-project activities and other items not covered by the FFGA may not be included.

INFORMATION REGARDING FORWARD-LOOKING STATEMENTS This document includes forward-looking information. The words "believe”, "anticipate", "expect", "intend", "aim", "plan", "predict", "continue", "assume", "positioned", "may", "will", "should", "shall", "risk" and any other similar expressions that are predictions of or indicate future events and future trends identifies forward-looking information. Forward-looking information includes all matters that are not historical facts. Readers should not place undue reliance on forward-looking information because it involves known and unknown risks, uncertainties and other factors that are in many cases beyond HART's control. By its nature, forward-looking information involves risks and uncertainties because it relates to events and depends on circumstances that may or may not occur in the future. Forward-looking information is not a guarantee of future performance, and HART's actual results of operations, financial condition, and the development of the industry in which it operates may differ materially from those made in or suggested by forward-looking information contained in this document. The cautionary statements set forth above should be considered in connection with any subsequent forward-looking information that HART, or persons acting on its behalf, may issue. Factors that may cause HART's actual results to differ materially from those expressed or implied by the forward-looking statements in this document include but are not limited to the risks described in HART's annual report. For projects funded through the FTA's New Starts program, the FTA and its PMOC use a risk-based assessment process to review and validate a project sponsor's budget and schedule. Any results of an FTA or PMOC risk-based assessment represent a "snapshot in time" for a particular project under the conditions known at that same point in time. The status of any assessment may be altered at any time by new information, changes in circumstances, or further developments in the project. Furthermore, any forward looking statements contained in this document are made as of the date of this report, and HART does not undertake any obligation to update publicly or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by law. ON THE COVER: Left: Pearlridge Station construction. Upper Right: Construction at the Aloha Stadium Station site. Lower Right: Guideway construction on the eastern section of the alignment.

Page 3: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

3 | P a g e

Table of Contents LIST OF ACRONYMS .......................................................................................................................................................................... 4 PROJECT MAP ................................................................................................................................................................................... 9 1 SUMMARY .............................................................................................................................................................................. 10 2 OVERALL PROJECT PROGRESS AND FINANCIALS ................................................................................................................... 13

2.1 Project Progress .................................................................................................................................................... 13 2.2 Project Budget ...................................................................................................................................................... 15 2.3 Project Funding ..................................................................................................................................................... 16

3 SCHEDULE .............................................................................................................................................................................. 18 4 CONTRACT STATUS ................................................................................................................................................................ 21

4.1 System-wide .......................................................................................................................................................... 22 4.2 Section I – West O'ahu/Farrington Highway: East Kapolei to Pearl Highlands ..................................................... 32 4.3 Section II – Kamehameha Highway: Pearl Highlands to Aloha Stadium ............................................................... 43 4.4 Section III – Airport: Aloha Stadium to Middle Street Transit Center Station ...................................................... 53 4.5 Section IV – City Center: Middle Street Transit Center Station to Ala Moana Center .......................................... 56 4.6 Project-Wide ......................................................................................................................................................... 60 4.7 Contract Status by CPP ......................................................................................................................................... 71

5 OVERALL PROJECT-WIDE ACTIVITIES ..................................................................................................................................... 73 5.1 Overall Key Issues ................................................................................................................................................. 73 5.2 Permits .................................................................................................................................................................. 74 5.3 Hawai'i Department of Transportation (HDOT) Agreements ............................................................................... 74 5.4 Utility Agreements ................................................................................................................................................ 75 5.5 Right-of-Way ......................................................................................................................................................... 77

6 MANAGEMENT AND ADMINISTRATIVE UPDATES ................................................................................................................. 87 6.1 Safety and Security (S&S) ...................................................................................................................................... 87 6.2 Quality Management ............................................................................................................................................ 90 6.3 Buy America Compliance (49 CFR 661 and 49 CFR 663) ....................................................................................... 92 6.4 Disadvantaged Business Enterprise (DBE) ............................................................................................................ 92 6.5 Art-in-Transit (AIT) Program ................................................................................................................................. 93 6.6 Planning and Environment .................................................................................................................................... 94 6.7 Risk Management ................................................................................................................................................. 95 6.8 Construction Claims .............................................................................................................................................. 99 6.9 Community Outreach .......................................................................................................................................... 100 6.10 Staffing ................................................................................................................................................................ 101 6.11 HART Baseline Plans and Procedures Status List ................................................................................................ 102 6.12 Readiness and Activation .................................................................................................................................... 105

APPENDICES ................................................................................................................................................................................. 107 A. Project Costs by SCC – Level 2 ............................................................................................................................ 108 B. Construction Progress Interim Opening ............................................................................................................. 110 C. Project Organization Chart ................................................................................................................................. 111

Table of Figures

Figure 1. Overall Project Progress (% Complete) .................................................................................................................. 13 Figure 2. Construction Progress (% Complete) ..................................................................................................................... 13 Figure 3. Design Progress (% Complete) ............................................................................................................................... 14 Figure 4. Planned vs. Received Project Funding ................................................................................................................... 16 Figure 5. New Starts Drawdown by Federal Fiscal Year ........................................................................................................ 17 Figure 6. HRTP Master Project Schedule Summary (MPSS) .................................................................................................. 20 Figure 7. Right-of-Way Status for the Parcels ....................................................................................................................... 79 Figure 8. Relocation Status for the Occupants ..................................................................................................................... 79 Figure 9. Temporary Construction Easements and Utility .................................................................................................... 79 Figure 10. Inter-Governmental Agreement Status ............................................................................................................... 80 Figure 11. Cost Probability Curve, September 2019 Risk Data ............................................................................................. 96 Figure 12. Schedule Probability Curve, September 2019 Risk Data ...................................................................................... 97 Figure 13. Staffing Activities ............................................................................................................................................... 101

Page 4: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

4 | P a g e

A&E Architect/Engineer AAN Accepted as Noted

AANR Accepted as noted, resubmit AC Asphalt Concrete

ACHP Advisory Council on Historic Preservation ACI Application Centric Infrastructure ACS Access Control System ADA Americans with Disabilities Act AFA Air Force Association AFE Authorized for Expenditure AG Attorney General

AGS Airport Guideway and Stations AIS Archaeological Inventory Survey AIT Art-in-Transit ALS Aloha Stadium Station

AMP Archaeological Monitoring Plan ANR Accepted as Noted–Resubmit APE Area of Potential Effect API Application Program Interface APS Auxiliary Power Supply

APTA American Public Transportation Association ARRA American Recovery and Reinvestment Act

ASG Airport Station Group ASI Architect Supplemental Information

ASTM American Society for Testing and Materials ASU Airport Section Utilities ATB Asphalt Treated Base ATC Automatic Train Control ATO Automatic Train Operation ATP Automatic Train Protection ATS Automatic Train Supervision AVA Anil Verma Associates, Inc. AVS Address Verification Systems

AW0 Assigned Weight, Empty Vehicle (rail car weight with no passengers) AW3 Assigned Weight, Crush Load (empty weight plus crush load of

standees) BA Buy America

BAC Buy America Compliance BACM Buy America Compliance Matrix BAFO Best and Final Offer

BANCT Best Available Noise Control Technology BAP Buy America Plan

BART Bay Area Rapid Transit BCS Balanced Cantilever System

BFMP Bus Fleet Management Plan BFS Budget and Fiscal Services BIC Ball in Court BLS Blue Light Station

BMP Best Management Practice BOD Board of Directors BOH Bank of Hawaii BPS Baseline Project Schedule BUE Bottom-Up Estimate

BUEG Back-up Emergency Generator BWS Board of Water Supply CAD Computer-Aided Design

CAM Construction Access Milestone CAP Corrective Action Plan CAR Corrective Actions CC2 City Center Phase 2 CC3 City Center Phase 3 ccd Consecutive Calendar Days

CCGS City Center Guideway and Stations CCH City and County of Honolulu CCO Contract Change Order

CCTV Closed Circuit Television CCUG City Center Section Utilities and Guideway CCUR City Center Utilities Relocation

CDC Compendium of Design Criteria CDL Commercial Driver License CDR Conceptual Design Review

CDRL Contract Document Requirements List CE&I Construction Engineering and Inspection

CEB Civil Engineering Branch CEL Certifiable Elements List

CFMP Configuration Management Plan CFO Chief Financial Officer CHB Car History Book CIC Communication Interface Cabinet CIL Certifiable Items List CIP Cast-in-place CJA Condon‐Johnson & Associates

CLOMR Conditional Letter of Map Revision CLR Cultural Landscape Report

CLSM Controlled Low-strength Material CM Construction Manager

CMP Construction Management Plan CMS Contract Management System CMU Concrete Masonry Unit

CNMMP Construction Noise Mitigation and Monitoring Plan CO Change Order

COI Conflict of Interest COMMs Communications CONRAC Consolidated Rental Car Facility

COR Corporation Counsel CORP Central Oahu Regional Park

CP Contractor Proposed CPC Cost Proposals by Consultant

CPM Critical Path Method CPO Chief Procurement Officer CPP Contract Packaging Plan

CR Consolidated Resolution CRM Customer-Relationship Management

CRMS Customer Relational Management System CROE Construction Right-of-Entry CRRB Car Readiness Review Board

CSC Core Systems Contract CSCC Construction Specification Conformance Checklists

CSD Department of Customer Services CSDBOM Core System Design-Build-Operate-Maintain

CSL Cross Hole Sonic Logging CSOC Core Systems Oversight Consultant CSSC Core System Support Consultant

CSSM Construction Safety and Security Manager CSSP Construction Safety & Security Plan

CST Customer Service Terminal CTP Central Test Procedure CTS Communications Transmission System CW Corridor-Wide

CWA Clean Water Act CWR Continuous Welded Rail

CWRM Commission on Water Resource Management CZM Coastal Zone Management

DAGS Department of Accounting & General Services DAV Disabled American Veterans

DB Design-Build DBB Design-Bid-Build DBE Disadvantaged Business Enterprise

DBEDT Department of Business, Economic Development and Tourism DBF Design-Build-Finance

DBFOM Design-Build-Finance-Operate-Maintain DBOM Design-Build-Operate-Maintain DCAB Disability and Communication Access Board DCCC Design Criteria Conformance Checklists DCN Design Change Notice

DD Definitive Design DDC Department of Design and Construction

DDC-MED Department of Design & Construction-Mechanical & Electrical Division

DES Department of Environmental Services DF Direct Fixation

DFF Direct Fixation Fastener DFIM Design Furnish Install Maintain DFM Department of Facility Maintenance

DHHL Department of Hawaiian Homelands DHR Department of Human Resources

LIST OF ACRONYMS

Page 5: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

5 | P a g e

DIT Department of Information Technology DKSG Dillingham and Kaka'ako Station Group DLIR Hawai'i Department of Labor and Industrial Relations

DLNR Department of Land and Natural Resources DOE Department of Education DOH Department of Health DOJ Department of Justice DOL Department of Labor

DPM Deputy Project Managers DPP Department of Planning and Permitting DPR Department of Parks and Recreation DPS Department of Public Safety

DS Downstream DSDC Design Services During Construction

DTS Department of Transportation Services DTU Dillingham Temporary Utilities DUF Division of Urban Forestry DVT Design Verification Test E&E Elevators and Escalators E&O Errors and Omissions

EA Environmental Assessment EAC Estimate at Completion

EB East Bound EC Environmental Compliance

ECP Environmental Compliance Plan EDD Executive Decision Document E/E Elevator/Escalator

EHE-EHMP Environmental Hazard Evaluation and Environmental Hazard Management Plan

EIS Environmental Impact Statement EKP East Kapolei

EMC Electromagnetic Compatibility EMF Electromagnetic Forces EMI Electromagnetic Interference

EMP Emergency Management Panel EMR Elevator Machine Room EMT Electrical Metallic Tubing EOM End of Month EOR Engineer of Record EOS Electrically Operated Switch EPA Environmental Protection Agency EPB Emergency Push Button ESA Environmental Site Assessment ETC Estimate to Complete EV Expected Value

FAA Federal Aviation Administration FACI First Article Configuration Inspection

FAI First Article Inspection FAR Floor Area Ratios FAT Factory Acceptance Tests

FC Fare Collection FCC Federal Communications Commission FCN Field Change Notice FCU Fan Coil Units

FD Final Design FDAS Fire Detection Alarm System

FDC Field Design Change FDR Final Design Review FEIS Final Environmental Impact Statement

FEMA Federal Emergency Management Agency FFC Fixed Facility Contractor

FFGA Full Funding Grant Agreement FHB First Hawaiian Bank

FHSG Farrington Highway Station Group FHWA Federal Highway Administration

FISC Fleet and Industrial Supply Center FIT Field Integration Test

FLSWG Fire/Life-Safety Working Group FM Force Main

FMEA Failure Modes and Effects Analysis FMECA Failure Modes, Effects, and Criticality Analysis

FO Fiber Optic FOCN Fiber Optic Communication Network FOM Finding of Merit/No Merit

FP Fix Panel FPM Fix Panel Mono FPO Federal Preservation Officer FSC Fare Systems Contract FTA Federal Transit Administration FTE Full-Time Equivalent FUT Factory Unit Testing FWS Fish and Wildlife Service

FY Fiscal Year GAT Great Aleutian Tsunami GBS Gap Breaker Station GDR Geotechnical Data Report GEC General Engineering Consultant GER Geotechnical Engineering Report GET General Excise and Use Tax GGP General Growth Properties GIS Geographic Information System

GOE Grant of Easement GPR Ground Penetrating Radar GRP Glass Reinforced Plastic GSA General Services Administration

GT General Terms GW Guideway HA Hazard Analysis

HABS Historic American Buildings Survey HACBED Hawai‘i Alliance for Community-Based Economic Development

HAER Historic American Engineering Record HALS Historic American Landscape Survey HAR Hawai‘i Administrative Rules

HART Honolulu Authority for Rapid Transportation HCC Honolulu Community College

HCDA Hawai‘i Community Development Authority HCS Historic Context Studies

HCSD Hawai'i Capital Special District HDCC Hawaiian Dredging Construction Company HDOE Hawai'i Department of Education HDOH Hawai'i Department of Health HDOT Hawai'i Department of Transportation

HDOT-A Hawai'i Department of Transportation Airports Division HDPE High-density polyethylene HECO Hawaiian Electric Company

HEI High Energy Inc. HFD Honolulu Fire Department HHC Howard Hughes Corp HHF Historic Hawai'i Foundation

HHFDC Hawaii Housing Finance & Development Corporation HHM Hardy Heck Moore

HHPRB Hawai'i Historic Places Review Board HIA Honolulu International Airport HIE Hawaii Independent Energy

HILT Hawaiian Islands Land Trust HIOSH Hawaii Occupational Safety and Health Division

HOP Ho'opili HP Historic Preservation

HPC Historic Preservation Committee HPCA Historic Preservation Certification Application

HPCAT Historic Preservation & Cultural Awareness Training HPD Honolulu Police Department HPF Historic Preservation Fund HPL Horizon Partners Ltd. HPU Hawai‘i Pacific University HRH Hitachi Rail Honolulu Joint Venture

HRHP Hawai'i Register of Historic Places HRI Hitachi Rail Italy

HRR Heat Release Rate HRTP Honolulu Rail Transit Project HRU Hitachi Rail USA, Inc.

HSNWG Hawaiian Station Naming Working Group HSQE Health, Safety, Quality and Environment

HSSQE Health Safety Security Quality and Environment HTI Hawaiian Telcom HTL Hazard Tracking Log HV High Voltage

HVAC Heating, Ventilation and Air Conditioning

Page 6: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

6 | P a g e

I&T Inspection & Testing IAMR Interstate Access Modification Report IBEW International Brotherhood of Electrical Workers

IC Interim Certification ICCS Integrated Communications Control System ICD Interface Control Documents ICE Independent Cost Estimate

ICM Interface Control Manual ICWG Interim Certification Working Group

IDIQ Indefinite Delivery/Indefinite Quantity IDS Intrusion Detection System IFB Issued for Bid IFC Issued for Construction

IJ Isolation Joint IMP Interface Management Plan

INMS Integrated Network Management System IOMP Intermediate Operations and Maintenance Period

IP Implementing Procedures ITP Inspection and Test Plan ITS Intelligent Transportation Systems IVR Interactive Voice Response

JTMC Joint Traffic Management Center JTMS Joint Traffic Management System JU&O Joint Use & Occupancy JUOA Joint Use and Occupancy Agreement

JV Joint Venture KCC Kapi‘olani Community College

KCDD Kaka'ako Community Development District KCH Kanehili Cultural Hui KHG Kamehameha Highway Guideway KHR Kamehameha Highway Resurfacing

KHSG Kamehameha Highway Station Group KIWC Kiewit Infrastructure West Company KKJV Kiewit/Kobayashi Joint Venture

KPI Key Performance Indicator L+E Lea +Elliott LCC Leeward Community College LCP Local Control Panel LD Lagoon Drive

LEED Leadership in Energy and Environmental Design LF Linear Feet

LOO Letter of Offer LOTB Log of Test Borings

LPR License Plate Reader LRV Light Rail Vehicle

LT Load Test LVPS Low Voltage Power Supply MAI Mason Architects MCY Makai Casting Yard MEP Mechanical, Electrical and Plumbing MIM Manufacture-Install-Maintain MIP Manufacturing and Inspection Plans

MITT Multimodal Integration Technical Team MMIS Maintenance Management Information System MMP Mitigation Monitoring Program MOA Memorandum of Agreement MOS Minimum Operable Segment MOT Maintenance of Traffic MOU Memorandum of Understanding

MOW Maintenance of Way MPD Multiple Property Documentation MPS Master Project Schedule

MPSS Master Project Schedule Summary MPV Multiple Purpose Vehicle MPY Makai Precast Yard MS4 Municipal Separate Storm Sewer System

MSDS Material Safety Data Sheet MSE Mechanically Stabilized Earth MSF Maintenance and Storage Facility

MSTC Middle Street Transit Center MSTCS Middle Street Transit Center Station

MTM Modern Track Machineries NCE Non-Conformance Evaluation NCR Non-Conformance Report

NDC Notice of Design Change NEPA National Environmental Policy Act NFPA National Fire Protection Association NGO Non-governmental Organization NHL National Historic Landmark NOI Notice of Intent

NPDES National Pollutant Discharge Elimination System NPS National Park Service NR National Register

NRHP National Register of Historic Places NSM Negotiation Strategy Memo NTE Not to Exceed NTP Notice to Proceed NTS Network Time Server

O&M Operations and Maintenance OCC Operations Control Center

OCCC Oahu Community Correctional Center OCCL Office of Conservation and Coastal Lands OCIP Owner-Controlled Insurance Program ODC Other Direct Costs

OEQC Office of Environmental Quality Control OH Overhead

OHA Office of Hawaiian Affairs OIBC O'ahu Island Burial Council

OIC Officer-in-Charge OIL Open Items List OIP Order of Immediate Possession

OMP Operation and Management Plan OMPO Oahu Metropolitan Planning Organization

OP Oversight Procedure OR&L Oahu Railway & Land Co. ORCC Operational Readiness Conformance Checklist

OSB Operations and Servicing Building OSHA Occupational Safety and Health Administration OSM Owner Supplied Materials

OTDR Optical Time Domain Reflectometer OTR One-Time Review OTS Oahu Transit Services

OTW Oceanic Time Warner OTWC Oceanic Time Warner Cable OWG Operation Working Group

P3 Public-Private Partnership PA Programmatic Agreement

PAIS Programmatic Agreement Implementation Schedule PARs Preventative Actions PAT Production Acceptance Test

PB Parsons Brinckerhoff, Inc. PCCP Portland Cement Concrete Pavement

PCI Payment Card Industry PCN Potential Change Notice

PD Position Description PDR Preliminary Design Review

PE Preliminary Engineering PF Power Frequency

PFP Project Financial Plan PGC Pacific Guardian Center PHA Preliminary Hazard Analysis

PHGTC Pearl Highlands Parking Garage and Transit Center PHL Pearl Highlands Station

PHNB Pearl Harbor Naval Base PHPR Pearl Highlands Park and Ride

PHS Pearl Harbor Station PI Public Involvement

PICM Project Interface Control Manual PID Parcel Identification Number PIG Permitted Interaction Group PIM Project Interface Manager PIP Public Involvement Plan PIS Passenger Information Systems

PLA Project Labor Agreement PLO Priority-Listed Offerors PLR Pearlridge Station PM Project Managers

PMC Project Management Consultant

Page 7: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

7 | P a g e

PMIM Project Management and Interface Management PMOC Project Management Oversight Contractor

PMP Project Management Plan PMSC Program Management Support Consultant

PNR Park-and-Ride POC Project Oversight Committee POS Point of Sales PPE Personal Protective Equipment

PRTCC Pre-revenue Testing Conform Checklist PSC Personal Services Contract PSG Platform Screen Gate

PSGS Platform Screen Gate System PSIT Pre-shipment Inspection Test

PT Post-tensioned PTG Parsons Transportation Group PUA Possession and Use Agreements PUC Public Utilities Commission PUP Property Utilization Plan

PV Passenger Vehicle QA Quality Assurance

QAM Quality Assurance Manager QAP Quality Assurance Plan

QC Quality Control QMP Quality Management Plan QMS Quality Management System QTF Quality Task Force R&A Readiness and Activation R&R Revise & Re-submit

RA Risk Assessment RAC Rail Activation Committee

RAMP Real Estate Acquisition and Management Plan RAP Rail Activation Plan RAT Routine Acceptance Test

RC Reinforced Concrete RCMP Risk and Contingency Management Plan

RCP Reinforced Concrete Pipe RE Resident Engineer

READ Real Estate Acquisition Database RFB Request for Bids RFC Request for Change

RFCC Request for Change from Contractor RFCR Request for Change by HART RFHB Request for High Bids

RFI Request for Information RFID Requests for Interface Data

RFMP Rail Fleet Management Plan RFP Request for Proposals RFQ Request for Qualifications RFV Request for Variance RHB Road and Highway Builders, LLC RLB Rider Levett Bucknall RLS Request for Legal Services

RMS Risk Management System RNR Revise and Resubmit ROC Rail Operations Center ROD Record of Decision ROE Right of Entry ROH Revised Ordinances of Honolulu

ROM Rough Order of Magnitude ROW Right-of-Way

RP Recovery Plan RR Risk Register

RSD Revenue Service Date RST Retail Sales Device Training

RTM Requirements Traceability Matrix RTSA Regional Transit Stabilization Agreement

S&S Safety and Security S1 Segment 1

SAIS Supplemental Archaeological Inventory Survey SC Substantial Completion

SCADA Supervisory Control and Data Acquisition SCAP Stream Channel Alteration Permit

SCC Standard Cost Category SCH Satellite City Hall

SHPD State Historic Preservation Division SHPO State Historic Preservation Officer

SIC Sandwich Isle Communications SIT System Integration Testing

SITP System Integration and Test Plan SL Street Light

SLAN Secured Local Area Network SLR Sea Level Rise

SMA Special Management Area SMS Structural Monitoring Solutions SOG Slab on Grade SOI Secretary of the Interior

SON Summary of Negotiations SOP Standard Operating Procedures

SOW Scope of Work SP Special Provisions

SQP Supplemental Quality Plan SSC Safety Security Certification

SSCP Safety and Security Certification Plan SSCWG Safety and Security Certification Working Group

SSI Sensitive Security Information SSMP Safety and Security Management Plan SSRC Safety and Security Review Committee SSSP Site Safety Security Plan

STATCOM Static Synchronous Compensator STCC Specification Testing Conformance Checklists STG Shimmick/Traylor/Granite, Joint Venture STP System Test Procedure

SUBD Subdivision Branch SUE Subsurface Utility Engineering

SWPPP Storm Water Pollution Prevention Plan SwRI Southwest Research Institute T&M Time and Material TAC Transit Art Committee TAP Track Allocation Procedure TAT Transient Accommodation Tax

TC Train Control TCA Temporary Configuration Change

TCCR Train Control and Communications Room TCE Temporary Construction Easement TCO Temporary Certificate Occupancy TCP Traffic Control Plan TCS Train Control System

TDM Transportation Demand Management TES Traction Electrification System TIA Time Impact Analysis

TIGER Transportation Investment Generating Economic Recovery TIP Transportation Improvement Program

TMK Tax Map Key TMP Traffic Management Plan

TO Task Order TOC The Outdoor Circle TOD Transit-Oriented Development

TP&R Temporary Park & Ride TPO Thermoplastic Polyolefin

TPSS Traction Power Substation TS Traffic Signal

TSA Transportation Security Administration TSI Transportation Safety Institute

TUT Temporary Utility Take TVA Threat and Vulnerability Assessment

TVM Ticket Vending Machine TWF Train Wash Facility UCA Utility Construction Agreement

UFRCRA Utility Facilities Relocation and Cost Reimbursement Agreement UG Underground UH University of Hawai'i

UHPRB UH West O‘ahu Park and Ride & UHWO Campus Road “B” UHWO University of Hawai'i West O'ahu

UL Underwriters Laboratories UPS Uninterruptible Power Supply URA Uniform Relocation Assistance and Real Property Acquisition

Policies Act USACE U.S. Army Corps of Engineers

Page 8: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

8 | P a g e

USDOL United States Department of Labor USDOT U.S. Department of Transportation

USN United States Navy USPS U.S. Postal Service

UST Underground Storage Tank VAR Volt-Ampere Reactive VCR Vertical Conduit Raceway

VE Value Engineering VECP Value Engineering Change Proposal

VISTA Volunteers in Service to America VMS Variable Message Sign VRC Vertical Raceway Column

VRCS Voice Radio Communication System VRF Variable Refrigerant Flow VTP Vehicle Test Procedure WA Work Area

WHS Waipahu High School WKM Walters, Kimoda, Motoda, Inc.

WL West Loch WLO West Loch

WOEDA West Oahu Economic Development Association WOFH West O'ahu/Farrington Highway WOSG West O'ahu Station Group

WQC Water Quality Certification WSS West Side Stations

WSSG West Side Station Group WTB Wheel Truing Building WTC Waipahu Transit Center WTP Wayside Test Procedure

WWB Wastewater Branch WWPS Wastewater pump station

WYL West Yard Lead YCB Yard Control Bungalow YOE Year of Expenditure

Page 9: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

9 | P a g e

Rail Stations Kualaka‘i Station at East Kapolei Keone‘ae Station at UH West O‘ahu Honouliuli Station at Ho‘opili Hō‘ae‘ae Station at West Loch Pouhala Station at Waipahu Transit Center Hālaulani Station at Leeward Community College Waiawa Station at Pearl Highlands Kalauao Station at Pearlridge Hālawa Station at Aloha Stadium TBD Station at Pearl Harbor Naval Base TBD Station at Honolulu International Airport TBD Station at Lagoon Drive TBD Station at Middle Street Transit Center TBD Station at Kalihi TBD Station at Kapalama TBD Station at Iwilei TBD Station at Chinatown TBD Station at Downtown TBD Station at Civic Center TBD Station at Kaka‘ako TBD Station at Ala Moana Center

PROJECT MAP

Page 10: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

10 | P a g e

1 SUMMARY

REPORTING DATE AND SUBSEQUENT EVENTS This report was published on Oct. 31, 2019, for the PMOC meeting scheduled for Nov. 13, 2019. Data is presented with a reporting cutoff

date of Sept. 30, 2019, unless otherwise noted.

KEY ACTIVITIES IN SEPTEMBER Project Overview The Honolulu Authority for Rapid Transportation (HART) received approval from the Federal Transit Administration (FTA) of its Recovery Plan for the Honolulu Rail Transit Project. This approval clears the way for the FTA to begin releasing the remaining $744 million – which is part of the city’s Full Funding Grant Agreement with the federal government – once the cost of the City Center procurement is identified and shown to be within HART’s ability to finance it.

HART Board of Directors In September, the members of the HART Board of Directors unanimously elected Tobias “Toby” Martyn Chair of the Board, and Terrence Lee as Vice Chair. Martyn succeeds Damien Kim, who served as the Board Chair since November 2016. Lee has served as the Vice Chair since November 2016.

Lynn McCrory has been appointed by State House Speaker Scott Saiki to serve on the HART Board of Directors as a non-voting member. She is currently the Senior Vice President of Government Affairs for land and resource management company Pulama Lana‘i. She replaces Kamani Kuala‘au, who left the Board in August. Her term runs through December 2021.

COST (as of Sept. 30, 2019)

Project Cost Summary ($ in millions)

Description Original FFGA

Budget Recovery Plan

Budget*

Current Estimate at Completion

(EAC)* Incurred To

Date

Project Capital Costs

Base Cost without Contingency $4,305 $7,312 $7,344 $3,864

Allocated Contingency $542 $765 $733 $0

Unallocated Contingency $102 $222 $88 $0

Total Project Capital Costs $4,949 $8,299 $8,165 $3,864

FFGA Finance Charges $173 $609 $547 $18

Total FFGA Project Costs $5,122 $8,908 $8,712 $3,882

Post-RSD Finance Charges $42 $231 $293 $0

Total Project Costs $5,164 $9,139 $9,005 $3,882

*Total Project Costs excludes Operations and Maintenance.

Original FFGA Budget The Original FFGA Budget reflects the full build-out of the project as executed by the Full Funding Grant Agreement in December 2012.

The contingency is a reserve to cover known and unknown, but anticipated, project execution costs and uncertainty due to risk factors such as unresolved design issues, unknown site conditions, schedule impacts and market fluctuations. The Original FFGA Budget reflects $644 million in total contingency.

Recovery Plan Budget Total The approved Recovery Plan Project capital cost estimate is $8,299 million (excluding finance costs). The total project cost is $9,139 million, which includes post-Revenue Service Date (RSD) financing costs of $231 million and $8,908 million in FFGA project costs (which includes $765 million in allocated contingency, $222 million in unallocated contingency, and $609 million in financing costs). While this cost is $134 million greater than HART’s cost estimate of $8,165 million, HART has revised the Project cost estimate and identified the additional funding to meet the higher estimate.

The Recovery Plan Budget reflects $987 million of total contingency or 13% of the base cost estimate which reflects available funding capacity. Based on FTA requirements on contingency for the current phase of the project, the 13% is sufficient reserve to cover against the risk of cost increases during development of the project.

Page 11: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

11 | P a g e

Current Estimate at Completion (EAC) The current project capital Estimate at Completion (EAC) is $8,712 million, including $821 million in total contingency ($733 million in allocated contingency and $88 million in unallocated contingency) and $547 million in financing costs. The total project costs including post-Revenue Service Date (RSD) financing costs of $293 million is $9,005 million. The total project contingency is based on a December 2025 RSD. Incurred to Date The Incurred-to-date costs are cumulative through September 2019, and exclude third-party reimbursement costs. The $3,882 million to date represents 53% of the base Current EAC. The Incurred-to-date costs increased by $53 million for the period. SCHEDULE The progress reported in the table below provides percent complete based on construction and design contracts. The early and late plans are based on baseline schedules for active contracts and forecasts of future contracts.

Project Progress* Through Sept. 27, 2019

Actual Early Plan Late Plan

Overall Project Progress 52.9% 62.1% 55.7%

Construction Progress 48.1% 57.6% 52.2%

Design Progress 79.4% 75.9% 74%

*Reported percentages complete are based on the Estimate at Completion for the

Minimum Operable Segment (MOS) and December 2025 Revenue Service Date (RSD).

BOARD MEETING Q&A Listed below are questions raised by community members at the Sept. 19, 2019 HART Board meeting:

Question: Will there be security on trains? Answer: Yes. HART is currently working with the Department of Transportation Services (DTS) on security, including code of conduct and enforcement of rules.

Question: During power outages, will train doors open automatically? Answer: No; doors will have interlocks to prevent them from opening unless the train is stopped.

Question: Will there be space for people in wheelchairs on the trains, as well as ramps at the stations for when the elevators go out? Answer: There will be space for mobility devices on the trains. Elevators will be equipped with backup batteries in the event of power outages.

PROGRESS REPORT SUMMARY OF CHANGES The following is a brief summary of major changes that have occurred from the previous month’s report. For more information and detail, please refer to the respective pages in the report.

The Project Cost Summary table has been updated to reflect the approved Recovery Plan Budget numbers. In addition, the current EAC total amount has been updated to reflect finance charge amounts from the approved Recovery Plan. Please see pages 10 and 15.

The Board Meeting Q&A section has been included, as there were public questions posed at the September meeting. Please see page 11.

Contract Status

Core Systems Contract (CSC) o The current contract value amount has increased due to change orders. Please see page 22.

Elevators and Escalators Manufacture-Install-Maintain (MIM) o The current contract value amount has increased due to a change order. Please see page 26.

University of Hawai‘i West O‘ahu (UHWO) Station Temporary Park-and-Ride & UHWO Campus Road “B” o The projected completion of work date has changed from September 2019 to October 2019. Please see page 34.

Page 12: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

12 | P a g e

o The schedule status has changed from “2 months behind” to “3 months behind.” Please see page 34.

Farrington Highway Station Group (FHSG) o The current contract value amount has decreased due to a change order. Please see page 39.

Ramp H2R2 o The current contract value amount has decreased due to a change order. Please see page 45.

Kamehameha Highway Resurfacing (KHR) o The projected completion of work date has changed from November 2019 to December 2019. Please see page

49. o The schedule status has changed from “2 months behind” to “3 months behind.” Please see page 49.

Airport Section Guideway and Stations (AGS) o The current contract value amount has increased due to change orders. Please see page 53.

City Center Section Utilities and Guideway (CCUG) Final Design o The contract substantial completion date has changed from September 2019 to December 2019. Please see page

56. o The schedule status has changed from “3 months behind” to “On time.” Please see page 56.

Core Systems Support o The contract completion date has changed from Sept. 9, 2019 to Nov. 29, 2019, due to the execution of a no

cost change order to extend the contract. Please see page 69.

Page 13: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

13 | P a g e

2 OVERALL PROJECT PROGRESS AND FINANCIALS

2.1 Project Progress (data as of Sept. 27, 2019) Reported percentages complete are based on the Estimate at Completion for the MOS and December 2025 RSD. HART will revise its progress curves further when the in-process change orders are executed. This revision is expected to lower the plan values. Note:

Actual = Actual cost of work performed, based on reported work-in-place.

Early Plan = Earliest dates activities can begin and finish, based on logic and durations used in the schedule.

Late Plan = Latest dates activities can begin and finish and not have an impact on completion date, based on logic and durations used in the schedule.

Figure 1. Overall Project Progress (% Complete)

At present "overall" project progress is based on the weighted value progress of the individual construction and design contracts (Design-Build [DB], Design-Bid-Build [DBB], Design-Build-Operate-Maintain [DBOM], Elevator/Escalator Manufacture-Install-Test-Maintain [MIM], Final Design [FD] and DB-DBOM design levels of effort), not including City or non-design consultant labor.

Figure 2. Construction Progress (% Complete)

Overall construction progress is based on the weighted average progress of the individual DBB and E/E MIM construction contracts and the DB-DBOM construction levels of effort, not including consultant Construction Engineering and Inspection (CE&I) services.

Page 14: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

14 | P a g e

Figure 3. Design Progress (% Complete)

Overall design progress is based on the weighted average progress of the individual FD contracts and the design levels of effort of the DB and DBOM construction contracts, not including City or non-design consultant labor.

Page 15: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

15 | P a g e

2.2 Project Budget (data as of Sept. 30, 2019)

Project Cost Summary ($ in millions)

Description Original FFGA

Budget Recovery Plan

Budget* Current Estimate at Completion (EAC)*

Project Capital Costs

Base Cost without Contingency $4,305 $7,312 $7,344

Allocated Contingency $542 $765 $733

Unallocated Contingency $102 $222 $88

Total Project Capital Costs $4,949 $8,299 $8,165

FFGA Finance Charges $173 $609 $547

Total FFGA Project Costs $5,122 $8,908 $8,712

Post-RSD Finance Charges $42 $231 $293

Total Project Costs $5,164 $9,139 $9,005

*Total Project Costs excludes Operations and Maintenance.

The Original FFGA Budget reflects the full build-out of the project as executed by the Full Funding Grant Agreement in December 2012. The approved Recovery Plan Project capital cost estimate is $8,299 million (excluding finance costs). While this cost is $134 million greater than HART’s cost estimate of $8,165 million, HART has revised the Project cost estimate and identified the additional funding to meet the higher estimate. Total project contingency decreased to $821 million ($733 million in allocated contingency and $88 million in unallocated contingency) since last updated.

Contingency Drawdown Curve

$0

$200

$400

$600

$800

$1,000

$1,200

Q3

201

8

Q4

201

8

Q1

201

9

Q2

201

9

Q3

201

9

Q4

201

9

Q1

202

0

Q2

202

0

Q3

202

0

Q4

202

0

Q1

202

1

Q2

202

1

Q3

202

1

Q4

202

1

Q1

202

2

Q2

202

2

Q3

202

2

Q4

202

2

Q1

202

3

Q2

202

3

Q3

202

3

Q4

202

3

Q1

202

4

Q2

202

4

Q3

202

4

Q4

202

4

Q1

202

5

Q2

202

5

Q3

202

5

Q4

202

5

Q1

202

6

Q2

202

6

Q3

202

6

Q4

202

6

Q1

202

7

Q2

202

7

Q3

202

7

Q4

202

7

Tota

l Co

nti

nge

ncy

Re

mai

nin

g (M

)

FTA Additional Recommend

Recovery Plan EAC Baseline

FTA Recommended Level

HART Actual

FTA Actual

Date Mar-2020 Oct-2020 Mar-2021 Feb-2022 Feb-2024 Dec-2025

Milestone P3 NTPInterim

Opening

DB450

Construction

Complete

DBB511

Construction

Complete

P3

Construction

Complete

RSD

FTA Minimum Level ($M) 732 623 546 446 282 134

HART Minimum Level ($M) 598 489 412 312 171 85

Page 16: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

16 | P a g e

2.3 Project Funding

Figure 4. Planned vs. Received Project Funding

Planned vs. Received Project Funding

Funding Source

Pre-FFGA Project1

Project Funding Total

Project

2007 - 2009 Actuals

Received

Planned2 2009 -

Present Actuals

Received

2007 - Present Actuals

Received

Actuals Received in

Sep 2019 ($YOE M)

Beginning Project Cash Balance3 - 298 298 - -

Interest Income on Cash Balance5 7 1 7 14 0

FTA Section 5309 New Starts Revenue4 - 1,550 806 806 -

ARRA Funds - 4 4 4 -

EPA Brownfields Grant (FY2018-FY2021)6 - 1 0 0 -

Net General Excise Tax (GET) Surcharge revenues FY2010-FY2031 378 5,990 2,142 2,520 -

Transient Accommodation Tax (TAT) revenue FY2018-FY2031 - 1,182 81 81 -

City Subsidy - HART Administration FY2018-FY2031 - 214 44 44 -

Total 385 9,240 3,382 3,469 0

1 GET and Interest Income received during Pre-Preliminary Engineering (pre-PE) phase prior to entry into PE. 2 Updated to Chapter 6 - Project Finance, Figure 6-2 of HART's Approved Recovery Plan (for beginning cash balance, GET, TAT, grant revenue, city subsidy and interest income).

3 Beginning Project Cash Balance at Entry into Preliminary Engineering (PE) on October 16, 2009 (the FFGA Project start date) = Pre-PE GET, investment and miscellaneous income minus pre-PE expenditures. The $298 million is included in the Pre-FFGA actual amounts received between 2007-2009 of $378 million.

4 New Starts Funds Obligated Through Federal Fiscal Year 2014 Totals $806.3 million. 5 Interest Income received in September 2019 $378,059.70 6 EPA $900,000 Brownfields Grant must be used by 12/31/2020 - to plan and subsidize the environmental cleanup activities

EPA Brownfields Grant revenue received to date - $55,260.87

Page 17: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

17 | P a g e

Figure 5. New Starts Drawdown by Federal Fiscal Year

New Starts Grant Information by Federal Fiscal Year (Amounts in Italics are Pending)

Federal Fiscal Year (FFY) Allocation

FTA Obligated Amounts

Actual Drawdown Amounts to Date

Available Balance

FFGA Base Case Cash Flow

2008 $15,190,000 $15,190,000 $0

2009 $19,800,000 $19,800,000 $0

2010 $30,000,000 $30,000,000 $0

2011 $55,000,000 $55,000,000 $0 $20,607,242

2012 $200,000,000 $200,000,000 $0 $99,382,758

2013 $236,277,358 $236,277,358 $0 $258,280,277

2014 $250,000,000 $249,991,376 $8,624 $441,719,724

2015* $250,000,000 $0 $0 $0

2016* $250,000,000 $0 $0 $0

2017* $243,732,642 $0 $0 $0

2018 $0 $0 $0 $0

2019 $0 $0 $0 $0

2020 $0 $0 $100,000,000 $100,000,000

2021 $0 $0 $150,000,000 $150,000,000

2022 $0 $0 $150,000,000 $150,000,000

2023 $0 $0 $150,000,000 $150,000,000

2024 $0 $0 $100,000,000 $100,000,000

2025 $0 $0 $50,000,000 $50,000,000

2026 $0 $0 $43,732,642 $30,010,000

Total $1,550,000,000 $806,258,734 $743,741,266 $1,550,000,000 *These years' awards have not been available for drawdown. The availability of dollars are expected to follow the approved HART Recovery Plan and are reflected in the Available Balance column.

Page 18: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

18 | P a g e

3 SCHEDULE (data as of Sept. 27, 2019)

Critical Path Analysis Interim Revenue Service Date is planned for no later than December 2020.

o The critical path for Interim Opening of the passenger rail system from East Kapolei Station to Aloha Stadium Station is updated to Waipahu Transit Center Station’s sitework and station entrance finishes, followed by the installation of Supervisory Control and Data Acquisition (SCADA) cables, Core Systems installation/test, System Integration Testing, leading to Pre-Revenue Service Demonstration, and Interim Revenue Service Date.

o Ho‘opili Station canopy installation and Core Systems communications cable installation are on the near critical path.

Revenue Service Date (RSD) is planned for no later than December 2025. o The critical path for RSD of the rail system from East Kapolei Station to Ala Moana Station continues with

Department of Planning and Permitting (DPP) permitting and City Center utilities relocation task order #28. This work is followed by Ala Moana Station’s Area 6, drilled shafts, guideway installation, and construction of Ala Moana Station, and Core Systems installation and testing.

o Kapalama Station activities are on the near critical path. Three-Month Look Ahead

Station construction for the west station groups continues to include the following: o Canopy assembly, and installation for all west station groups. o Permanent power at University of Hawai‘i (UH) West O‘ahu, Pearl Highlands, Pearlridge and Aloha Stadium

Stations. o The partial access milestones planned to be handed over to the Core Systems Contractor for systems

installation include: Two Balance of Structures milestones planned on west station group contracts Five Access to Platform milestones planned on the west station group contracts

o Sitework and station finishes at Pearl Highlands and Pearlridge Stations. Traction power substation energization to commence at Pearlridge Station. Electrical equipment termination at ancillary room for Aloha Stadium Station.

Complete Hawaiian Electric Company (HECO) cable pull, finishes, and landscaping at University of Hawai‘i West O‘ahu (UHWO) Road B.

Continue escalator and elevator installations at Pearl Highlands, Pearlridge and Aloha Stadium Stations. Core Systems continues to install/test communications, SCADA, and Fire Detection Alarm System (FDAS)

subsystems. Design work, foundations, columns, and span erection are ongoing for the Airport Guideway and Stations (AGS)

contract. Continue segment erection east of Pearl Harbor Station and near the Honolulu International Airport Station with two gantry cranes. Continue HECO Zone 3 and 4 infrastructure work and utility work in Reach C, D and E. Commence HECO Zone 6, 8 and 9 infrastructure work.

For AGS stations, Pearl Harbor Station continues underground conduit installation and backfill at this station’s Train Control and Communications Room (TCCR). Installation of underground mechanical work at the station entrance and the reinstallation of underground plumbing at the ancillary building. Honolulu International Airport Station to install 24-inch storm drainpipe in Lot J and install new HECO service infrastructure. Lagoon Drive Station to continue underground conduit installation and backfill at the TCCR. Installation of pedestals and stem walls for the station’s mauka entrance. Middle Street Transit Center Station to construct temporary pedestrian access and start micropiles.

Wet utilities and fuel lines relocation for the City Center Utilities Relocation contract continues.

Page 19: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

19 | P a g e

Key Schedule Issues Installation of canopies continue to be an area of concern at West O‘ahu Station Group (WOSG), Farrington

Highway Station Group (FHSG) and Kamehameha Highway Station Group (KHSG). This impacts the conduits for Core Systems installation, signage and speakers. This key schedule issue continues to be evaluated for mitigating initiatives to not impact Interim Revenue Service.

Schedule mitigation effort for the Kamehameha Highway Resurfacing contract to complete ahead of the Hawai‘i Department of Transportation’s (HDOT) holiday road closures.

The Ka‘aahi Substation requires a supplemental agreement for HECO to start construction. The construction duration is approximately 12 months and required by late 2020 to serve anticipated load.

HART rejected Shimmick/Traylor/Granite, JV (STG’s) August Schedule as ‘Revise and Resubmit,’ which was forecasting an October 2022 Substantial Completion (SC) date. The AGS contractor resubmitted the August schedule with an offer to mitigate the SC by resequencing the work, with a SC date of January 2022. The AGS contractor also submitted a Time Impact Analysis (TIA) to justify the schedule slippage from May 2021 to January 2022, which is under evaluation.

Accelerate Right-of-Way (ROW) acquisition for City Center properties ahead of needs for the City Center Utilities Relocation contract. Additionally, establish a schedule for ROW eminent domain parcels.

For the critical path, DPP permitting impacts the City Center Utilities Relocation contract. Schedule Contingency Drawdown Curve

DPP permit activities impact the critical path for CCUR Task Order #28 which requires signed and sealed drawings for work area 6 (Kona to Kona Iki). This is a predecessor to utility relocations, followed by drilled shafts, guideway, stations and testing by the City Center Guideway & Stations developer. Although the potential impact to schedule contingency is recognized now, the impact to work is not projected until summer 2021 giving the project team opportunity to mitigate the impact.

Page 20: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

20 | P a g e

Figure 6. HRTP Master Project Schedule Summary (MPSS) The Master Program Summary Schedule reflects currently approved schedule end dates for contracts that have been awarded, and planned dates for future contracts.

Page 21: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

21 | P a g e

4 CONTRACT STATUS

Contracts in Procurement

Overview Awarded Contracts:

o None.

Active Procurements: o City Center Guideway and Stations / Pearl Highlands Design-Build Finance Operate and Maintain Request

for Proposals (RFP) qualifications proposals in response to RFP Part 1 were received on April 12, 2019. HART released RFP Part 2 to the priority list of offerors on May 3, 2019. Due to the bidders requesting additional time to prepare bids, the due date for the technical proposals has been extended from November 2019 to January 2020. As such, the NTP date has moved from February 2020 to March 2020. Despite these changes, the planned full revenue service date remains at December 2025.

o Real Estate Mapping and Surveying Request for Qualifications was issued on Feb. 15, 2019. Statements of Qualifications submissions were received on March 15, 2019 and are currently being evaluated.

o Traction Power Backup Generators Request for Bids was issued on July 31, 2019. Bids were received on Sept. 6, 2019.

o Art-in-Transit: HART continues its negotiations with the highest-ranked artists for each of the stations. To date, twelve (12) contracts have been awarded.

Active Procurements

Contract Code

Contract Name Advertise

Date

Bids or Proposals

Due Issue NTP

Projected Contract

Substantial Completion

Date

AP-00 Art-in-Transit May 09 '13

12 contracts awarded;

active procurement for remaining

stations

Staggered Staggered

DB-550 City Center Guideway and Stations / Pearl Highlands Design-Build Finance Operate And Maintain (DBFOM)

Sep 28 ‘18 Apr 12 ‘19 (RFP Pt. 1)

Mar ‘20 TBD

MM-937 Real Estate Mapping and Surveying Feb 15 ‘19 Mar 15 ‘19 Oct ‘19 TBD

MI-940 Traction Power Backup Generators Jul 31 ‘19 Sep 6 ‘19 Oct 24 ‘19 Feb 10 ‘21

Upcoming Procurement Under Evaluation Contract Code Contract Name Issue Date

AP-00 Art-in-Transit, Windscreen

FD-600 Permanent Park & Ride Lots Final Design (UHWO & East Kapolei)

DBB-600 UHWO Permanent Park & Ride DBB Construction

DBB-600 East Kapolei Permanent Park & Ride DBB Construction

MM-960 Archaeological and Cultural Survey Dec ‘19

MM-920 HDOT Design Review Support – WOFH TBD

MM-915 HDOT/DTS Traffic Management Coordination Dec ‘19

MM-921 Passenger Vehicle WiFi Oct ‘19

Page 22: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

22 | P a g e

4.1 System-wide

A. Core Systems Contract (CSC) CPP No.: DBOM-920 DBOM Contractor: Hitachi Rail Honolulu Joint Venture (HRH) Contract Start Date: January 2012 Contract Substantial Completion: June 1, 2019 Projected Completion of Work: July 2025

Project Description: A design, build, operate and maintain contract to provide rail passenger vehicles, automated train control system, traction electrification system (TES), communication systems, passenger platform screen gates (PSGs), and operation and maintenance of the Core Systems.

Design & Construction Vehicles Schedule Status

Physical % Complete 65.4% 63.0% On time for 2025

opening Early Plan* 79.7% 94.6%

Late Plan* 54.7% 52.4% *Data as of Sept. 27, 2019. The progress chart reflects early program expectations. Progress is being tracked against interim Construction Access Milestone dates, which show the project is "On-Time".

________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $419,568

DBE % Attained: 0.068%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $203,179,969

00053 CCO 0053 TVM and Gate Interfaces $1,206,790

00054 CCO 54: HVAC for TCCRs at Airport St GP $518,192

00058 Comms Redesign for Honolulu AP Station $33,311

Cumulative Current Report $204,938,262

Original Contract: $573,782,793 Incurred-to-Date: $395,588,411

Current Contract Value1: $778,721,055 Incurred in September: $1,037,922

Outstanding Issues: 6 Contractor CP Amount: $9,976,835

1Current Contract Value = Original contract value (excluding original O&M budget) + executed Change Orders

Page 23: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

23 | P a g e

SCHEDULE: Upcoming Schedule Status:

MSF 2 completion is planned for November 2019. West Loch Platform Screen Gate System (PSGS) installation completion is planned for October 2019. Waipahu Transit Center PSGS installation completion is planned for November 2019. Onsite Functional Test for PSGS at Ho‘opili is planned for completion in October 2019. Supervisory Control and Data Acquisition (SCADA) testing with Waipahu and West Loch Traction Power

Substations (TPSSs) are scheduled to start in October 2019. Automatic Train Control (ATC) in functional section point to point test with Operations Control Center (OCC) is

planned for completion in October 2019. ________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS:

Base Design

Percent Complete East Kapolei –

Aloha Stadium Design Aloha Stadium –

Middle Street Design

Passenger Vehicles 97%

PSGS 100%

Communications 80% 89% 27%

Fire Detection 100% 100% 0%

ATC / SCADA 100% 100% 100%

TES 100% 100% 100%

Activities this Month: Design: Review of design submittals is ongoing. Continued coordination between HRH and the AGS contractor for integration

of Core Systems requirements. Working to complete Requirements Traceability Matrix (RTM) for all

subsystems. Continued to conduct reviews of Communications Final Design documents

and System Test procedures to meet MSF operational schedule objective. Final design of the Passenger Vehicle (PV) heat shield retrofit has been

submitted. Manufacturing: Hitachi Rail USA, Inc. (HRU) is continuing with the production of Trains #7

through #15 in Pittsburg, CA. PV assembly activities have been re-sequenced to accommodate the underfloor heat shield retrofit.

Completed final inspection of Train #12 E1 and M1, complete with the heat shield retrofit. This is the first train of the interim opening fleet.

Installation, Testing and Commissioning: HRH continues with SCADA cable installation for the peripheral equipment in

the MSF. Work is pending design completion for peripheral equipment termination.

HRH completed Access Control System/Intrusion Detection System (ACS/IDS) termination, tagging and remediation work in the MSF.

HRH completed installation of Communication Interface Cabinets (CIC) and fiber termination at Waipahu, West Loch and Ho‘opili TPSS.

HRH completed remediation work related to the Passenger Information Systems (PIS) system in the yard.

HRH installed batteries for Waipahu and Leeward Community College (LCC) Uninterruptible Power Supply (UPS).

HRH completed Train Control (TC) cable and fibers pull in Aloha Stadium Train Control and Communications Room (TCCR).

HRH continues with TC cable and fibers pull in Pearlridge TCCR. HRH completed installation of TES feeders at LCC Gap Breaker Station (GBS).

Look Ahead: Design: Close out of open comments to

finalize Final Design of all subsystems.

Continue coordination between HRH and WOSG/FHSG/KHSG/AGS.

Complete Communications Final Design for AGS and CCGS segments.

Manufacturing: Passenger Vehicle truck fabrication

– continue truck frame and bolster delivery from Italy.

Complete car shell fabrication activities in Italy. Only 1 car shell remaining to be fabricated.

Continue manufacturing of communications, traction power, and other subsystems equipment.

Installation, Testing and Commissioning: Continue remaining termination

and tagging of COMM ACS/IDS, PIS and Closed Circuit Television (CCTV) equipment cabling in MSF TPSS, once field installation drawing is received.

Complete SCADA testing with MSF TPSS and Electrically Operated Switches (EOSs), and other peripheral devices in the MSF, after installation is completed.

Page 24: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

24 | P a g e

Activities this Month (continued): HRH continues with the installation of TES feeders in Pearl Highlands TPSS. HRH continues Onsite Inspection and Test for the PSGS system in Ho‘opili

(HOP) Station. HRH continues with ATC wayside inter-station testing between TCCRs in the

functional section. HRH continues with official Secured Local Area Network (SLAN) and

Communications Transmission System (CTS) testing in the yard. HRH completed braking performance adjustments with AW0 (Train #3) with a

Knorr engineer on-site. Continued remediation of corrosion issues with the PSGS components. HRH continues with the installation of PSGS towers in LCC Station. HRH completed PSGS towers installation in Waipahu station. HRH provided a proposal for the remediation of corrosion and heat buildup in

the yard CIC cabinets. One cabinet has been remediated as a pilot cabinet to test the correction.

HRH continues to install peripheral equipment around Pearlridge and Aloha Stadium TPSS, and installed generators to power these two TPSSs for testing.

ATC network between the OCC and Functional Section Stations was established.

Completed internal braking design verification tests using Trains #1 and #3. Completed Fiber Connection between the OCC and West Loch and Waipahu

TPSSs.

Look Ahead (continued): MSF SLAN and CTS Acceptance Test

to continue. Continue PSGS electrical

installation at West Loch, Waipahu and LCC stations.

Commence TES feeder installation at Aloha Stadium TPSS.

Complete Vehicle Test Procedure, Central Test Procedure, and System Test Procedure in MSF.

Complete Vehicle Test Procedure, Central Test Procedure, and System Test Procedure in Functional Section.

Continue System Integration Testing with train(s) in the Yard.

Complete remediation of corrosion issues with the PSGS components.

Complete testing for 3rd rail energization of HOP and East Kapolei (EKP) TPSS.

_______________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font): The CSC's Communications System design is delayed. The CSC is working to submit final revisions of all MSF,

Segment 1 & 2 designs. HART is monitoring this subsystem delay as it is a key component needed for system integration testing. HART continues to meet with HRH/Nokia weekly to monitor progress.

HECO identified a possible power quality issue involved with HART traction power loads. HART continues to coordinate with HECO regarding analysis of the 12kV feeders’ voltages and potential mitigations. Procurement for Static Synchronous Compensator (STATCOM) to address this issue with HECO is pending. ATC train scheduling function will help mitigate HECO concerns for Segment 1 until such time that the STATCOM devices are installed and operational.

HART has conducted Configuration Control audits of all subsystems under HRH’s scope. Of the original 15 Non-Conformance Items, HRH has been able to address and close out 13. HART continues to monitor HRH’s progress to comply with the Configuration Management Plan.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY MILESTONES: Complete MSF Phase 2 in November 2019. Train was able to run in automatic mode on functional section in September 2019. Energization of Segment 1 in January 2020.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT: Retrofit of car shell underframe to rectify aluminum extrusion defects continues in Italy. Five (5) retrofit car

shells have been received in Pittsburg, CA.

CSC NCR Log (Issued by HRH)

Total Closed Open

HRH & Subs 54 51 3

Hitachi Rail 1,922 1,637 285

TOTAL 1,976 1,688 288

Page 25: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

25 | P a g e

TRAIN DELIVERY SCHEDULE:

Forecast Train Delivery Schedule

Train #

HRH PR85 Scheduled Ship Date

from Pittsburg

HRH PR85 Scheduled Arrival Date to Honolulu

Forecast Ship Date from Pittsburg, CA

Forecast Delivery to MSF

Actual Delivery Date

Train 1 SHIPPED DELIVERED SHIPPED DELIVERED April 16, 2016

Train 2 SHIPPED DELIVERED SHIPPED DELIVERED May 23, 2017

Train 3 SHIPPED DELIVERED SHIPPED DELIVERED August 6, 2018

Train 4 SHIPPED DELIVERED SHIPPED DELIVERED December 1, 2018

Train 5 SHIPPED DELIVERED SHIPPED DELIVERED January 19, 2019

Train 6 SHIPPED DELIVERED SHIPPED DELIVERED March 2, 2019

Train 7 March 13, 2019 April 9, 2019 TBD TBD

Train 8 April 22, 2019 May 19, 2019 February 2020 March 2020

Train 9 May 27, 2019 June 23, 2019 January 2020 February 2020

Train 10 July 1, 2019 July 28, 2019 November 2019 December 2019

Train 11 July 31, 2019 August 27, 2019 December 2019 January 2020

Train 12 August 30, 2019 September 26, 2019 October 2019 November 2019

Train 13 September 29, 2019 October 26, 2019 March 2020 April 2020

Train 14 October 29, 2019 November 25, 2019 TBD TBD

Train 15 November 28, 2019 December 26, 2019 TBD TBD

Train 16 December 23, 2019 January 19, 2020 TBD TBD

Train 17 January 17, 2020 February 13, 2020 TBD TBD

Train 18 February 11, 2020 March 9, 2020 TBD TBD

Train 19 March 7, 2020 April 3, 2020 TBD TBD

Train 20 April 1, 2020 April 28, 2020 TBD TBD

*HART is working with HRH to develop an updated Vehicle delivery schedule.

Page 26: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

26 | P a g e

B. Elevators and Escalators Manufacture-Install-Maintain (MIM) CPP No.: MI-930 Contractor: Schindler Elevator Corporation Contract Start Date: August 2013 Contract Substantial Completion: May 2021 Projected Completion of Work: February 2024 (see the Schedule section below) Project Description: A contract to design, fabricate, install, test, commission, and maintain all elevators and escalators at all 21 stations.

Progress Schedule Status

Physical % Complete 40.9%

Just in Time** Early Plan* 56.3%

Late Plan* TBD *Data as of Sept. 27, 2019. **The E&E schedule is dependent on other contractors' schedules. Actual release for manufacturing will be coordinated for a 'just in time' delivery.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $0

DBE % Attained: 0%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $3,938,754

00024 Aloha Stadium Escalator 2 OT $10,000

Cumulative Current Report $3,948,754

_______________________________________________________________________________________________________

SCHEDULE:

The Elevators and Escalators (E&E) contract substantial completion date is May 2021, based on the AGS contract substantial completion date. The final completion date for the E&E contract will be based on the CCGS contract’s scheduled installation dates after award of the CCGS contract.

Original Contract: $50,982,714 Incurred-to-Date: $22,018,951

Current Contract Value1: $54,931,468 Incurred in September: $0

Outstanding Issues: 0 Contractor CP Amount: $0

1Current Contract Value = Original contract value with Design Allowance + executed Change Orders

Page 27: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

27 | P a g e

WORK PROGRESS:

Activities this Month: Initial elevator pit and elevator shaft steel is continuing

to be erected at the KHSG stations. Elevator and Escalator CE&I inspections are occurring at the KHSG stations to ensure that the required specifications for the elevator and escalator supplier are met.

HART is continuing to coordinate with the AGS contractor and the E&E contractor to firm up required equipment installation dates. The ordering of the equipment has begun based on anticipated need dates.

At Pearl Highlands Station, installation of Elevators #1 and #2 are continuing. Expected completion is mid-November. Installation of Escalators #3, #4 and #6 is continuing.

Elevator #1 for Pearlridge Station arrived and installation has begun.

Look Ahead: The E&E substantial completion date for the

remaining eight east-side stations will be established once the contract is awarded for the CCGS and the schedule for this contract is accepted.

At Pearl Highlands Station, Elevator #1 and Elevator #2 installations will continue as well as installation of Escalators #3, #4 and #6, with an estimated completion date of mid-November.

Elevator #2 for Pearlridge Station is scheduled to arrive in mid-October.

_______________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font):

The release for manufacturing date of the E&E equipment is being coordinated for a 'just in time' delivery. The equipment for the eight stations included in the City Center Guideway and Stations contract are on hold pending award of the construction of these stations. The solicitation package contains the size and configuration of the elevators and escalators purchased for these remaining stations.

The current completion date of the City Center section of guideway with stations will impact the completion of the Elevator and Escalator contract and will have cost impacts to the material and labor escalation.

_______________________________________________________________________________________________________

KEY MILESTONES:

Preventive maintenance requirements along with the required final testing is continuing for the elevators that have been installed. The only remaining elevators to be installed are at Pearlridge Station (1) and at Aloha Stadium Station (2 each).

_______________________________________________________________________________________________________

QUALITY MANAGEMENT:

Elevators and Escalators NCR Log (Issued by Schindler)

Total NCRs Issued To Date Closed Open

0 0 0

Page 28: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

28 | P a g e

C. Fare Collection System CPP No.: MI-900 Contractor: INIT, Innovations in Transportation, Inc. Contract Start Date: April 2016 Projected Completion of Design-Build Work: December 2025

Project Description: The fare collection system is a joint HART and City and County of Honolulu [Department of Transportation Services (DTS), Department of Information Technology (DIT), Budget and Fiscal Services (BFS)] project that will consist of a multi-modal, closed loop, account based smart card system. The Fare System vendor, INIT Innovations in Transportation, Inc., is responsible for design, manufacture, testing, installation and operation of the entire system inclusive of hardware and software. The rail portion of the project will consist of Ticket Vending Machines (TVMs) and fare gates at stations that accept smart cards which can also be used for payment on board TheBus and facilitate a seamless transfer between modes. Equipment and software to be used by both HART and the City and County will include transaction processing, fare equipment monitoring, and customer service systems, as well as a Data Warehouse. TheBus equipment will consist of stand-alone smart card readers on board.

Progress Schedule Status

Percent Complete 34.6% 12 Months Behind Milestone Schedule

Payment** Early Plan* 74.1%

Late Plan* 66.3% *Data as of Sept. 27, 2019. Planned information is being evaluated based on the current (full-alignment) scope versus the revised requirements of the Interim Revenue Service completion date. **Although the contract is 12 months behind schedule, it does not impact the Interim Opening or the RSD.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $0

DBE % Attained: 0%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $361,470

None N/A ---

Cumulative Current Report $361,470

_______________________________________________________________________________________________________

SCHEDULE: The baseline schedule for the fare systems project is currently 12 months behind schedule and failed to make

delivery of the final Key Performance Indicator (KPI) reports for the Field Integration Test (FIT) and Pilot milestone. These items are now anticipated for delivery by Oct. 30, 2019.

Original Contract: $15,464,198 Incurred-to-Date: $5,468,495

Current Contract Value1: $15,825,668 Incurred in September: $0

Outstanding Issues: 0 Contractor CP Amount: $0

1Current Contract Value = Original contract value with Design Allowance + executed Change Orders

Page 29: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

29 | P a g e

WORK PROGRESS: Activities this Month: Completed Factory Acceptance Tests (FAT) Test Plans and FAT

for TVMs; started FAT for faregates. Created draft Fare System Installation Sequencing schedule. Provided on site review of conduit for KHG and AGS stations. CEO to CEO letter sent to Init requesting a schedule for October

2020 limited opening. Troubleshot customer interface issues with website, call center

and pass office. Launched 6 additional institutional customers, including City

staff with pre-tax program. Confirmed August and September daily settlement reconciliation

with WorldPay automation reconciles within SAGE and continued to monitor.

Continued to work with UH Mānoa on distribution options for HOLO and brought in Hawai‘i Pacific University (HPU) to discuss roll out options with their new chip card.

Continued cascading 6 week action plan for agency management through Pilot.

Reviewed interface requirements for installation with the Core Systems team and Hitachi; began revisions to installation plans.

Issued Amendment 6 to Init for signature. Confirmed senior bulk load process and started mail outs for

November cards. Attended 3 day senior fair at Blaisdell and issued over 500 cards. Confirmed TVM screen layout. Confirmed the approach and timeline for the start of Satellite

City Hall (SCH) roll out beginning the week of Nov. 18 at Kapalama.

Finalized Draft Ops Plan. Working to complete two additional appendices with procedures.

Look Ahead: Complete change order (CO) for Middle

Street phase. Complete Pilot documentation and

invoicing for milestone. Begin 3 Month System Acceptance

Period. Review and augment Production

Acceptance Test (PAT) plans for TVMs and faregates.

Finalize Memorandum of Understanding (MOU) with the City for cost sharing of card distribution.

Complete Operations Plan. Continue onboarding institutions to

HOLO. Monitor call center and sales staff

additional training needs with Pilot launch.

Finalize roll out at all TIMES and Foodland stores on O‘ahu. Continue to work with 7-Eleven on roll out options.

Begin roll out of translated 7 additional languages at website and Interactive Voice Response (IVR).

Continue in field monitoring of TVM and fare gate stub ups at station entrances. Confirm conduit is correct.

Continue to monitor the City’s Request for Information (RFI) and RFP process for outsourcing HOLO O&M. Develop back up plans.

_______________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font):

DTS does not envision having a contractor in place to manage HOLO with the handover on Feb. 1, 2020, nor having funds for card distribution and marketing until June/July 2020.

The contractor missed the provision of KPI reports for finalization of the Pilot. This delays the Pilot Milestone by an additional month and pushes Systems Acceptance for Bus and Back Office out to the end of January 2020.

_______________________________________________________________________________________________________________________________________

KEY MILESTONES:

Pilot Acceptance October 2019. System Acceptance Bus and Back Office Jan. 30, 2020. Rail Functional Unit Testing December 2019. Rail System Integration Testing March 2020.

_______________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT:

Fare Collection NCR Log (Issued by INIT)

Total NCRs Issued To Date Closed Open

0 0 0

Page 30: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

30 | P a g e

D. On-Call Construction IV CPP No.: MM-949 Contractor: Royal Contracting Co., Ltd. Contract Start Date: January 2018 Contract Substantial Completion: January 2023 Projected Completion of Work: January 2023 Project Description: This is an on-call contract to perform a variety of construction services by issuance of Task Orders. The construction services to be provided will include, but are not limited to, maintenance, renovations to existing privately owned properties, demolition of buildings/structures, repairs to existing HART facilities, temporary utilities installations, utilities relocation, new construction projects or services, maintenance of roadways inclusive of, filling potholes, removing dead animals, landscape maintenance, repairing/replacing signage, and other such activities to HDOT and/or City and County of Honolulu standards, work in support of HART’s ongoing construction activities, and work in support of other HART contractors.

Progress Schedule Status

Physical % Complete* 51.6%

On Time Early Plan* 87.5%

Late Plan* TBD *Data as of Sept. 27, 2019.

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

DBE Participation Task Orders

Actual DBE Participation: $0

Number of Task Orders Issued

Amount ($)

DBE % Attained: 0% Task Orders Previously Issued 58 $38,418,166

Task Orders Issued this Month 2 $1,185,258

Amendments to Task Orders 5 $166,116

Total Task Orders Issued 60 $39,769,540

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

SCHEDULE:

The On-Call Contract is a Task Order based Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The work consists of meeting the objectivities of HART’s Joint Use and Occupancy Agreements (JUOA) requirements, maintaining HART properties, performing Cost to Cure activities, and performing permanent utility relocation work. Each Task Order has its own start and finish date, and as such, there is no overall schedule requirements for the On-Call contract proper. The contract NTP was issued on Jan. 8, 2018 and ends on Jan. 7, 2023 with two one-year options.

Original Contract: $46,000,000 Incurred-to-Date: $20,258,143

Current Contract Value1: $46,000,000 Incurred in September: $1,577,156 1Current Contract Value = Original contract value + executed Change Orders

Page 31: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

31 | P a g e

WORK PROGRESS: Activities this Month: Continued maintenance of the HDOT roadways, per

the JUOA. Tie-in to the existing waterline was completed in

September. Work on new sidewalk, new curb and gutter, and road

widening at Cutter Dodge, Stuart Plaza and UH Urban Gardens is continuing.

Continued to complete HDOT elements of work as required by the HDOT agreements.

Continued to work on AGS HECO Zone’s 3, 4 and 9. Continued work at Dillingham Plaza which is a cost to

cure activity. Continued work at LCC on the Ka‘aahi Substation and

storage area for HECO vehicles.

Look Ahead: Continue to maintain HDOT roadways, as required

by the JUOA. Continue work on new sidewalk, new curb and

gutter, and road widening at Cutter Dodge, Stuart Plaza and UH Urban Gardens.

Removal of the redundant 24 inch waterline has begun and is expected to be complete in October 2019.

Continue to complete HDOT elements of work as required by the HDOT agreements.

Continue to work on Cost to Cure property’s located on Dillingham Boulevard.

The planned completion of HECO Zone 3 is scheduled for October, and completion for HECO Zone 4 is November 2019.

_______________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font): Need to receive timely Right of Entry agreements.

Need to continue to have Maintenance of Traffic plans reviewed and accepted in a reasonable time frame. Need to receive timely outage requests from HECO in order to meet the AGS contractor’s schedule.

_______________________________________________________________________________________________________________________________________

KEY MILESTONES: The required hydro testing, flushing, and chlorination, and final tie-ins for the 24” waterline was completed in

September 2019. Complete utility and road widening on both Halekauwila and Nimitz by the end of 2020.

_______________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT:

On-Call Construction IV NCR Log (Issued by Royal Contracting)

Total NCRs Issued To Date Closed Open

0 0 0

Page 32: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

32 | P a g e

4.2 Section I – West O'ahu/Farrington Highway: East Kapolei to Pearl Highlands

A. West O'ahu/Farrington Highway Guideway (WOFH) CPP No.: DB-120 DB Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: December 2009 Date of Substantial Completion Notification: December 13, 2018

Project Description: Design and construction of 6.8 miles of rail alignment, starting at the East Kapolei Station and ending at the Pearl Highlands Station.

Progress Schedule Status

Physical % Complete 100% Substantial Completion Obtained**

Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $17,119,976

DBE % Attained: 2.57%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $185,351,685

None N/A ---

Cumulative Current Report $185,351,685

_______________________________________________________________________________________________

SCHEDULE:

Final Record drawing to be submitted by October. Start installation of the acoustical monitoring – October 2019. Complete acoustical monitoring installation – December 2019.

_______________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: Finalization of record drawings continues. Compilation of closeout documentation continues. Deck shrinkage cracking repair underway.

Look Ahead: Contractor to finalize and submit record drawings. KIWC to provide required deliverables in

accordance with Contract Change Order (CCO) No. 00170.

Installation of the acoustical monitoring system. KIWC to continue repair of guideway deck

shrinkage cracks. Complete closeout documentation. Complete certified payroll issues.

Original Contract: $482,430,201 Incurred-to-Date: $667,781,906

Current Contract Value1: $667,781,886 Incurred in September: $0

1Current Contract Value = Original contract value + executed Change Orders

Page 33: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

33 | P a g e

KEY ISSUES (new issues are in bold font):

Installation and commissioning of the Acoustical Monitoring System. _______________________________________________________________________________________________________

KEY MILESTONES:

One-year project warranty period commenced on Jan. 14, 2019, per CCO No. 00170. _______________________________________________________________________________________________________

SUBSTANTIAL COMPLETION:

Substantial Completion is Dec. 13, 2018. _______________________________________________________________________________________________________

QUALITY MANAGEMENT:

Warranty issue: Guideway deck shrinkage cracks – repair underway.

WOFH NCR LOG (Issued by KIWC)

Total NCRs Issued to Date Closed Open

586 586 0

Page 34: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

34 | P a g e

B. University of Hawai‘i West O‘ahu (UHWO) Station Temporary Park-and-Ride & UHWO Campus Road “B” CPP No.: DBB-602 Contractor: Nan, Inc. Contract Start Date: December 2017 Contract Substantial Completion: July 2019 (Pending contract amendments to move substantial completion date to October 2019) Projected Completion of Work: October 2019 Project Description: The project consists of the construction of a temporary park & ride, Road “B” and associated site work in the vicinity of UH West O‘ahu Station. The project includes clearing, grubbing, erosion and dust control, grading and hauling, drainage, installation of underground and overhead utilities, installation of traffic signal, street lighting, and park & ride area electrical and communication systems, concrete curbs, sidewalks and wheelchair ramps, asphalt and concrete pavement structures, signing and striping, bus shelters, landscaping including installation of an irrigation system, and other appurtenances associated with roadway and park & ride facilities.

Progress Schedule Status

Physical % Complete 77.5% 3 months

behind Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. NTP issued Dec. 15, 2017.

_______________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $108,454

DBE % Attained: 0.86%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $1,392,023

None N/A ---

Cumulative Current Report $1,392,023

_______________________________________________________________________________________________________________________________________

SCHEDULE:

Time Impact Analysis (TIA) 1 will extend contract completion to Sept. 10, 2019. Additional TIAs may extend the contract completion to October 2019. Traffic signal duct installation completed. Park and Ride paving completed. Park and Ride striping completed. Traffic signal foundation installation completed.

Original Contract: $11,589,300 Incurred-to-Date: $10,238,437

Current Contract Value1: $12,981,323 Incurred in September: $510,427

Outstanding Issues: 5 Contractor CP Amount: $701,632

1Current Contract Value = Original contract value + executed Change Orders

Page 35: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

35 | P a g e

WORK PROGRESS: Activities this Month: Landscaping. Irrigation. Bus shelter roof installation. Traffic signalization. Sidewalk installation. Park and Ride final paving. Road B final paving.

Look Ahead: Bus shelter roof painting. HECO to pull cable for power for station

energization. Topsoil and landscaping installation of Road B. Traffic signalization. Final paving of Road B intersection, and signage.

_______________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font):

Mitigating schedule impacts from the materials and cul-de-sac change order. Approved Finding of Merit/No Merit (FOMs) pending executed change orders:

o Issue 00001 TIA #1

o Issue 0006 Delete Traffic Signal o Issue 00015 CIC Conduit

Pending FOMs: Issue 00003 TIA 2; Issue 00010 Contour Grades. _______________________________________________________________________________________________________________________________________

KEY MILESTONES:

Final paving of Park and Ride completed. Road B final lift of asphalt concrete (AC) paving - October 2019.

_______________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT:

UHWO Station Temporary Park-and-Ride & UHWO Campus Road “B” NCR Log

(Issued by Nan)

Total NCRs Issued to Date Closed Open

2 0 2

Page 36: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

36 | P a g e

C. West O'ahu Station Group (WOSG) CPP No.: DBB-171 Contractor: Nan, Inc. Contract Start Date: October 2015 Contract Substantial Completion: March 2019 Projected Completion of Work: January 2020

Project Description: The West O'ahu Station Group construction contract includes services to build three (3) transit stations along Kualaka'i Parkway and Farrington Highway. The stations are East Kapolei (EKP), UH West O'ahu (UHWO), and Ho'opili (HOP) Stations. In addition to the transit stations, operational ancillary buildings, a traction power substation, and adjacent areas are included in this project.

Progress Schedule Status

Physical % Complete 88.6% 10 months behind**

Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. Plan reflects expected completion of May 2019. **Further explanation is provided in the Schedule section.

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $758,121

DBE % Attained: 1.22%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $19,725,979

None N/A ---

Cumulative Current Report $19,725,979

Original Contract: $56,088,470 Incurred-to-Date: $62,805,820

Current Contract Value1: $75,814,449 Incurred in September: $3,045,509

Outstanding Issues: 35 Contractor CP Amount: $30,897,132

1Current Contract Value = Original contract value + executed Change Orders

Page 37: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

37 | P a g e

SCHEDULE: Continuing to work with the contractor to mitigate the previous delays. Coordinating with CSC and the contractor to meet HRH’s schedule for access turnover for functional testing and

interim service milestones. Replace UHWO and HOP canopy arms – November 2019.

WORK PROGRESS: Activities this Month: East Kapolei

Completed conduit installation. Installing balustrades at concourse level. Faregate cabinet installation. Utility room painting. Utility room door installation work. Water and sewer work. Channel sitework. Platform end cabinet installation. Service post conduit installation. End of Platform Gate installation.

UH West O‘ahu Painting of stations. Interior finishes in west entrance building ground floor

rooms. Rough-in for the service and light posts is ongoing.

Faregate wall installation, including tile work, continues. Electrical rough-in for platform service and light posts. Platform cabinet installation completed. Service post conduit installation. Architect Supplemental Information (ASI) 22 lightning

protection work completed. End of Platform Gate installation completed. Faregate cabinet installation completed.

Ho‘opili Faregate area conduit. Site work utilities and sidewalk construction. Painting of balustrade at stairs, landing and platforms. Heating, Ventilation and Air Conditioning (HVAC) wiring

and controls installation completed. HVAC testing and balancing completed. Faregate cabinet installation completed.

Look Ahead: East Kapolei

Complete site utility work. Complete channel sitework. HVAC wiring and controls. Complete platform cabinet work. Service post conduit installation. End of Platform Gate installation.

UH West O‘ahu HECO to install transformer and cable from

Road B into the station. Completion of site work around west

entrance building. Painting west entrance building and faregate. Completion of faregate area walls including

the exterior tile work. Completion of electrical rough-in for platform

service and light posts. HVAC wiring and controls. Grounding work. Service post conduit.

Ho‘opili Paint balustrade at stairs, landings and

platforms. Installation of architectural fence at Entrance

Area. Service post conduit.

KEY ISSUES (new issues are in bold font): UHWO Station power – TBD. Mitigate project schedule. Canopy installation for UHWO and HOP stations. Turnover/Access of station areas to the CSC contractor. Approved Finding of Merit/No Merit (FOMs) pending COs (Not in Consolidated Resolution [CR]):

o Issue 00047 Traffic Signal Modification o Issue 00301 HVAC Wiring

Page 38: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

38 | P a g e

KEY MILESTONES: HOP Station: Canopy arms removed from platform for repair. Dynamic envelope testing passed. HVAC system fully operational.

UHWO Station: Canopy arms removed from platform for repair. Faregate cabinets installed.

EKP Station: Faregate cabinets installed. Faregate gate installed.

QUALITY MANAGEMENT: Conducted bi-weekly Quality Task Force Meetings.

WOSG NCR Log (Issued by Nan)

NCRs Issued to Date

Closed Open

East Kapolei 10 9 1

UH West O‘ahu 34 31 3

Ho‘opili 27 23 4

Contract Wide 9 9 0

TOTAL 80 72 8

Page 39: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

39 | P a g e

D. Farrington Highway Station Group (FHSG) CPP No.: DBB-271 Contractor: Hawaiian Dredging Construction Company, Inc. (HDCC) Contract Start Date: August 2015 Contract Substantial Completion: January 2019 Projected Completion of Work: December 2019

Project Description: The Farrington Highway Station Group construction contract includes services to build three (3) transit stations along Farrington Highway. The stations are West Loch (WLO), Waipahu Transit Center (WTC), and Leeward Community College (LCC) Stations. The station work includes operational ancillary buildings, a traction power substation at WLO, and a Kiss-and-Ride lot at WLO.

Progress Schedule Status

Physical % Complete 91.9% 11 months

behind Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019.

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $4,118,510

DBE % Attained: 5%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $17,796,520

00031 WLO Street Light Trenching ($8,161)

Cumulative Current Report $17,788,359

Original Contract: $78,999,000 Incurred-to-Date: $83,224,433

Current Contract Value1: $96,787,359 Incurred in September: $1,496,847

Outstanding Issues: 34 Contractor CP Amount: $32,753,129

1Current Contract Value = Original contract value + executed Change Orders

Page 40: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

40 | P a g e

SCHEDULE: Station completion is on track for October 2019, with the exception of canopy/fabric and signage installation. LCC canopy arms began to arrive Sept. 26, 2019. WLO canopy arms to arrive Oct. 31, 2019. WTC canopy arms to arrive Nov. 28, 2019. Canopy arm completion is scheduled for December 2019.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: West Loch

Placed decorative concrete Makai Station side. Installation of simulated stone at station entrances. NCR’s and change order items. Installation of signs. Preliminary site walks and punchlist generation. Began landscaping.

Waipahu Transit Center

Installed Outrigger stair railing. Architectural fence installation change order work is ongoing. Continued station painting.

Leeward Community College

Received canopy frames onsite. Installation of signs. Punchlist checklist. Parking area striping.

All Stations

Coordinating canopy installation and installation sequencing.

Look Ahead: West Loch

Kiss n Ride pavement striping. Faregate Canopy. Service Posts.

Waipahu Transit Center

Moloalo sidewalk redesign. Faregate Canopy. Signs. Service Posts.

Leeward Community College

Punchlist work. All Stations

Canopy installation.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font): Platform canopy structural redesign – design and shop drawings are complete, and fabrication is underway. Finalize shop drawings and fabrication of faregate canopies.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY MILESTONES: Canopy Structure installation is scheduled to be complete December 2019.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT: The CE&I team is working with HDCC to ensure required submittals are approved prior to related construction

activities.

FHSG NCR Log (Issued by HDCC)

NCRs Issued to Date

Closed Open

West Loch 32 31 1

Waipahu Transit Center 18 15 3

West Loch/Waipahu Transit Center 3 0 3

Leeward Community College 18 14 4

Contract Wide 19 14 5

TOTAL 90 74 16

Page 41: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

41 | P a g e

E. Maintenance and Storage Facility (MSF) CPP No.: DB-200 Contractor: Kiewit/Kobayashi Joint Venture (KKJV) Contract Start Date: July 25, 2011 Contract Substantial Completion Date: July 2, 2016

Project Description: The MSF contract consists of the Operations and Servicing Building (OSB), Maintenance of Way (MOW), Train Wash Facility (TWF) and Wheel Truing Building (WTB). In addition to the four (4) facility buildings, MSF includes rail procurement, special trackwork, ties, third rail and other track material for the four guideway segments on the project.

Progress Schedule Status

Physical % Complete 100% Substantial Completion Obtained*

Early Plan 100%

Late Plan 100% *Further explanation is provided in the Schedule section.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $710,987

DBE % Attained: 0.25%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $86,517,032

None N/A ---

Cumulative Current Report $86,517,032

______________________________________________________________________________________________________________________________________________________

SCHEDULE:

HART to complete deductive change order in October. HART to close remaining issues by fourth quarter 2019.

______________________________________________________________________________________________________________________________________________________

WORK PROGRESS:

Activities this Month: HART continues to investigate track settlement issues

raised by the CSC.

Look Ahead: Execute deductive change order. Final Acceptance Letter from HART. Process final payment.

MSF Construction Status 100% Complete Overall

Element % Complete*

OSB 100%

MOW Building 100%

WTB 100%

TWF 100%

Rail 100%

Paving 100% *Not including testing and commissioning.

Original Contract: $195,258,000 Incurred-to-Date: $281,793,419

Current Contract Value1: $281,775,032 Incurred in September: $0

1Current Contract Value = Original contract value + executed Change Orders

Page 42: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

42 | P a g e

KEY ISSUES (new issues are in bold font): MSF Closeout/Final Acceptance. KKJV’s request has been submitted. This contract is pending closure by fourth

quarter 2019. _______________________________________________________________________________________________________

KEY MILESTONES:

None. _______________________________________________________________________________________________________

QUALITY MANAGEMENT: Overall quality of the contract is good.

MSF NCR Log (Issued by KKJV)

Total NCRs Issued to Date Closed Open

37 37 0

Page 43: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

43 | P a g e

4.3 Section II – Kamehameha Highway: Pearl Highlands to Aloha Stadium A. Kamehameha Highway Guideway (KHG)

CPP No.: DB-320 Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: June 2011 Date of Substantial Completion Notification: December 13, 2018

Project Description: Kamehameha Highway Guideway DB Contract (KHG) consists of 3.9 miles and starts 400 feet east of the Pearl Highlands Station and terminates 1,400 feet beyond the Aloha Stadium Station. KHG work scope is made up of utility relocations, traffic signal improvements, highway widening, drilled shaft foundations, columns, and aerial structure.

Progress Schedule Status

Physical % Complete 100% Substantial Completion Obtained**

Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $860,191

DBE % Attained: 0.22%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $31,405,774

None N/A ---

Cumulative Current Report $31,405,774

SCHEDULE: Final Record drawings – October 2019. Final certified payrolls – October 2019.

_______________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: Back checking KIWC corrections to record drawings. Compilation of closeout documentation.

Look Ahead: Contractor to finalize and submit record drawings. Complete certified payroll issues. Complete closeout documentation.

Original Contract: $372,150,000 Incurred-to-Date: $403,589,030

Current Contract Value1: $403,555,774 Incurred in September: $0

1Current Contract Value = Original contract value + executed Change Orders

Page 44: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

44 | P a g e

KEY ISSUES (new issues are in bold font):

N/A. _______________________________________________________________________________________________________

KEY MILESTONES:

One-year project warranty period commenced on Jan. 14, 2019, in accordance with CCO No. 00076. _______________________________________________________________________________________________________

SUBSTANTIAL COMPLETION:

Substantial Completion is Dec. 13, 2018. _______________________________________________________________________________________________________

QUALITY MANAGEMENT:

KHG NCR Log (Issued by KIWC)

Total NCRs Issued to Date Closed Open

252 252 0

Page 45: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

45 | P a g e

B. Ramp H2R2 CPP No.: DBB-385 Contractor: Royal Contracting Co. Ltd. Contract Start Date: May 2015 Contract Substantial Completion: November 2017 Completion of Work: February 2018

Project Description: The construction of Ramp H2R2 and associated roadway work within the Waiawa Interchange. The Ramp H2R2 will provide access to the Pearl Highlands Station from eastbound Farrington Highway and connects to eastbound Kamehameha Highway.

Progress Schedule Status

Physical % Complete 100% Work

Completed Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. This project is not on the Critical Path.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $838,995

DBE % Attained: 14.74%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $633,875

00009 Reconciliation of Allowances ($301,625)

Cumulative Current Report $332,250

________________________________________________________________________________________________________________________________________________________________________________________________________________________

SCHEDULE: Close contract 4th quarter 2019.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS: Activities this Month:

Routing of closeout checklist was signed by all. Final payment to documentation provided to contractor.

Look Ahead: Contract closure.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font): N/A.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY MILESTONES: Close contract.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT:

Ramp H2R2 NCR Log (Issued by Royal Contracting)

Total NCRs Issued to Date Closed Open

12 12 0

Original Contract: $5,203,646 Incurred-to-Date: $5,542,482

Current Contract Value1: $5,535,896 Incurred in September: $0

Outstanding Issues: 0 Contractor CP Amount: $0 1Current Contract Value = Original contract value + executed Change Orders

Page 46: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

46 | P a g e

C. Kamehameha Highway Station Group (KHSG) CPP No.: DBB-371 Contractor: Nan, Inc. Contract Start Date:

Notice to Commence Administrative Work: April 2016 Notice to Commence Investigative/Pre-Construction Work at Pearl Highlands: July 2016 Full Notice to Proceed (NTP): October 3, 2016

Contract Substantial Completion: May 17, 2019 Projected Completion of Work: December 2019

Project Description: The Kamehameha Highway Station Group construction contract includes services to build three (3) transit stations along Kamehameha Highway. The stations are Pearl Highlands Station (PHL), Pearlridge Station (PLR), and Aloha Stadium Station (ALS). Operational ancillary buildings, pedestrian crossing improvements, Train Control and Communications Rooms (TCCRs), and landscaping of the station sites are included in addition to the transit stations. The Pearl Highlands Station will include a transit center. The Pearl Highlands and Aloha Stadium Stations include both a Park-and-Ride lot and a Kiss-and-Ride lot.

Progress Schedule Status

Physical % Complete 78.4% 7 months behind**

Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $0

DBE % Attained: 0%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $8,478,418

None N/A ---

Cumulative Current Report $8,478,418

Original Contract: $115,805,845 Incurred-to-Date: $93,592,017

Current Contract Value1: $124,284,263 Incurred in September: $9,579,307

Outstanding Issues: 22 Contractor CP Amount: $17,079,625

1Current Contract Value = Original contract value with Design Allowance + executed Change Orders

Page 47: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

47 | P a g e

SCHEDULE: Ongoing coordination with CSC and the contractor to meet HRH’s schedule for access turnover and interim

opening. Schedule delayed by canopy delivery. Working with the station and systems contractors to mitigate any impact on

interim opening resulting from canopy design revisions in progress. ________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: Pearl Highlands

Continued installation of vertical ductbank to transformer pad. Commenced forming transformer platform. Commenced paving Kamehameha Highway eastbound. Commenced site bioswale installation. Continued entrance light fixture installation. Continued balustrade and railing installation. Continued site excavation at the entrance ground level. Continued painting stairway canopy. Completed stair/escalator tile and plaster installation.

Pearlridge Continued pouring mauka slab-on-grade. Completed mauka architectural fence installation. Completed pouring makai slab-on-grade. Completed makai architectural fence installation. Continued storm drain pipe installation. Continued painting structural steel. Completed pouring concourse topping slab. Continued elevator shaft window frame installation. Commenced gravel installation at the Mauka electrical

equipment yard. Aloha Stadium

Continued concrete pours for driveway A rigid paving. Continued parking lot entrance canopy sheeting. Commenced parking lot entrance canopy roofing installation. Commenced pouring station slab-on-grade and curb fronting

driveway B. Continued subgrade preparation for driveway B. Commenced pouring plaza colored concrete slab-on-grade. Completed establishing subgrade for non-paid area plaza slab-

on-grade and commenced forming and reinforcement. Continued stair canopy structural steel erection. Completed drain line B storm drain line and manhole installation. Commenced sewer line installation in driveway B. Commenced PSG bolt and grout pad installation.

Look Ahead: Pearl Highlands

Complete transformer platform and vertical ductbank installation.

Continue balustrade and railing installation. Continue site excavation at the entrance

ground level and commence installation of pedestrian ramp.

Complete paving Kamehameha Highway eastbound.

Pearlridge Complete pouring mauka slab-on-grade. Continue balustrade and handrail

installation. Commence platform pedestrian bridge

topping slab pours. Continue elevator shaft window frame

installation. Complete gravel installation at the Mauka

electrical equipment yard. Aloha Stadium

Continue roofing at parking lot entrance canopies.

Continue driveway A and B rigid paving concrete pours.

Continue station slab-on-grade. Continue stair canopy structural steel

erection. Complete PSG bolt and grout pad

installation. Complete sewer line installation in driveway

B.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font):

Canopy Fabrication Coordination – HART continues discussion with the contractor and the Engineer of Record (EORs) on canopies and Pearlridge entry module fabrication issues.

Passenger Screen Gate Plate Coordination – Pearl Highlands and Pearlridge plates, bolts and pavers have been installed. Aloha Stadium Station plate installation is complete and bolt installation is in progress and expected to be complete in October.

Aloha Stadium Permanent Power – HART is awaiting approval of an easement for the transformer for HECO to begin pulling wires.

Coordinating with the CSC in order to meet need dates.

Page 48: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

48 | P a g e

KEY MILESTONES:

Pearlridge Station TCCR and UPS Building – Pathway to guideway conduit installation is complete. TCCR and UPS rooms are now being shared with the Core Systems Contractor.

Aloha Stadium Station TCCR and UPS Rooms – Pathway to guideway conduits complete. TCCR and UPS rooms are now being shared with the Core Systems Contractor.

Current canopy delivery schedule: PHL - October 2019, PLR - November 2019, ALS – Pending redesign. Working with the contractor to improve the schedule.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT:

KHSG NCR Log (Issued by Nan)

NCRs Issued to Date

Closed Open

Pearl Highlands 22 20 2

Pearlridge 21 20 1

Aloha Stadium 2 1 1

Contract Wide 0 0 0

TOTAL 45 41 4

Page 49: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

49 | P a g e

D. Kamehameha Highway Resurfacing (KHR) CPP No.: DBB-701 Contractor: Road and Highway Builders, LLC (RHB) Contract Start Date: Notice to Proceed NTP #1: August 2018 Contract Substantial Completion: September 2019 Projected Completion of Work: December 2019

Project Description: The project consists of pavement resurfacing and other roadway reconstruction associated with completion of the Kamehameha Highway Guideway contract. Construction includes, but is not limited to, clearing, grubbing, erosion and dust control, grading and hauling, maintenance of traffic, pavement resurfacing, and installation of pavement markings and striping, roadway signs, curb ramps, drainage, waterlines, gas lines, traffic signal loop detectors, retaining wall, guard railing, fencing and bus shelters.

Progress Schedule Status

Physical % Complete 82.1% 3 months

behind Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019.

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $1,319,673

DBE % Attained: 5.08%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $880,521

None N/A ---

Cumulative Current Report $880,521

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

SCHEDULE: Completed mill and overlay paving activities from Kaonohi Street to Aloha Stadium. The projected completion date has been pushed out due to delays in road widening at Kaahumanu Street and

additional HDOT requested work. A time extension is pending. Complete overlay by Nov. 27, 2019.

_______________________________________________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: Held various meetings, such as pre-activity, progress, environmental,

traffic quality, safety, and public interface meetings. Completed bus pad reconstruction. Completed repaving work from Kaonohi Street to Aloha Stadium. Continued concrete flatwork and utility work at Kaonohi Street

widening. Continued permanent striping work between Kuleana Road to Aloha

Stadium.

Look Ahead: Begin streetlight and traffic signals,

and retaining wall construction at Kaonohi Street.

Begin median concrete work between Kanuku Street and Kaonohi Street.

Begin asphalt treated base (ATB) work for road widening between Kanuku Street and Kaonohi Street.

Original Contract: $25,989,989 Incurred-to-Date: $19,544,678

Current Contract Value1: $26,870,510 Incurred in September: $2,342,807

Outstanding Issues: 0 Contractor CP Amount: $0

1Current Contract Value = Original contract value + executed Change Orders

Page 50: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

50 | P a g e

KEY ISSUES (new issues are in bold font):

Defining HDOT expectations and requirements for all civil, traffic signal, and intelligent transportation system work currently not in the KHR contract to allow transfer of the roadway back to HDOT.

HDOT is requesting additional work be done, including removal of pavement from gutter pans, additional reconstruction areas, additional paving from Aloha Stadium to Salt Lake Boulevard, additional sidewalk work and changing of lane striping to conform with new HDOT best practices.

There are right-of-entry issues that prevent the contractor from starting work at Retaining Wall 9 and right-of-way issues at bus stops near Pearlridge mall. Right of entry to be granted in October 2019.

Issues with the relocation of overhead electrical lines is preventing roadway widening work at Kaonohi pedestrian islands from starting.

_______________________________________________________________________________________________________________________________________

KEY MILESTONES:

Completed mill and overlay paving from Kaonohi Street to ALS. _______________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT:

KHR continues to follow established quality processes through quality monitoring and audits.

KHR NCR Log (Issued by Road and Highway Builders)

Total NCRs Issued to Date Closed Open

0 0 0

Page 51: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

51 | P a g e

E. Design Services for 138kV Utilities Relocation at KHG

CPP No.: FD-700 Contractor: R.M. Towill Corporation Contract Start Date: September 2018 Contract Substantial Completion: November 2021 Project Description: Architectural and Engineering Services for the final design to relocate the existing 138kV overhead electrical lines to underground lines at Kamehameha Highway Guideway and Stations.

Progress Schedule Status

Based on Expenditures* 34.3%

TBD Early Plan* 36.8%

Late Plan* 25.0% *Data as of Sept. 27, 2019.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $0

DBE % Attained: 0%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $0

None N/A ---

Cumulative Current Report $0

_______________________________________________________________________________________________________

SCHEDULE:

HECO reviewed our schedule and wished to accelerate the design and construction work; HECO requested a design charrette in an effort to achieve this. The charrette has been completed, and HECO reviewed four 138kV alignment schemes developed at the charrette. Following the charrette, HART and our consultant team provided information to HECO, as requested. On May 24, 2019, HECO selected one of the four alignment schemes (partial overhead/underground scheme). The charrette closeout documents were prepared to reflect HECO’s selected alignment scheme. Design work on the preliminary design is being performed, and the preliminary submittal (to HECO) is scheduled for Oct. 7, 2019.

_______________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: HART’s design consultant continues to validate assumptions made in

developing the selected scheme in order to proceed with design work. In addition, HART’s design consultant has updated the design schedule, as we updated the procurement and construction schedule, based on the selected alignment scheme. The updated schedule has been transmitted to HECO for coordination. We are waiting for additional comments on the schedule from HECO, but we will continue to follow our schedule.

Look Ahead: Continue periodic HECO meetings. Continue design work for preliminary

design. Complete charrette closeout

documents.

Original Contract: $8,766,327 Incurred-to-Date: $2,594,149

Current Contract Value1: $8,766,327 Incurred in September: $0 1Current Contract Value = Original contract value with Design Allowance + executed Change Orders

Page 52: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

52 | P a g e

Activities this Month (continued): Charrette closeout documents were prepared. The closeout

documents include baseline plans for the selected alignment. It will likely be discussed with HECO during the upcoming monthly Administrative Meeting scheduled for Oct. 8, 2019.

Subsurface utility location field work is complete. A portion of the thermal resistivity geotechnical field work was

completed at the end of September 2019. The remainder of the thermal resistivity geotechnical field work will be performed toward the end of this year, or the beginning of next year.

Continuing design work for the preliminary design. Preliminary Submittal to HART has been made and is currently under review (it is planned to go to HECO for review on Oct. 7, 2019).

_______________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font):

Charrette closeout documents have been prepared. The closeout documents include baseline plans for the selected alignment.

_______________________________________________________________________________________________________

KEY MILESTONES:

Based on schedule information we currently have, key upcoming milestones are as follows: o Preliminary Design: Oct. 7, 2019. o Prefinal Design: Oct. 14, 2020. o Final Design: April 21, 2021.

Note: The above dates have tentatively been revised subject to coordination with HECO.

Page 53: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

53 | P a g e

4.4 Section III – Airport: Aloha Stadium to Middle Street Transit Center Station A. Airport Section Guideway and Stations (AGS)

CPP No.: DB-450 Contractor: Shimmick/Traylor/Granite, JV (STG) Contract Start Date: December 2016 Contract Substantial Completion: May 2021 Projected Completion of Work: TBD

Project Description: The Airport Guideway and Stations Design-Build contract consists of the design and construction of 5.2 miles of elevated guideway, four (4) stations, and associated facilities between Aloha Stadium and the Middle Street Transit Center. The contractor will begin by interfacing with design disciplines, third-party stakeholders, and construction contracts within the corridor of the project to coordinate and resolve utilities conflicts. Design field verification efforts (potholing and geotechnical exploration) will be followed by construction activities once design packages have been approved.

Progress Schedule Status

Physical % Complete* 54.1%

Under Review** Early Plan* 74.8%

Late Plan 61.8% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $36,891,184

DBE % Attained: 4.25%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $468,063

00014 As-Is Precast Yard $534,675

00015 RFCR 00020 and RFCR 00021 $628,500

Cumulative Current Report $1,631,238

Original Contract: $874,750,000 Incurred-to-Date: $474,307,432

Current Contract Value1: $876,381,238 Incurred in September: $17,058,383

Outstanding Issues: 3 Contractor CP Amount: $2,423,372

1Current Contract Value = Original contract value + executed Change Orders

Page 54: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

54 | P a g e

SCHEDULE: The current Schedule Update was returned to STG Approved for Payment only in August 2019. A series of schedule workshops are continuing in order to achieve a new updated schedule including details for

station activities. We are aiming to have this issue resolved by the end of October 2019, due to new information received concerning HECO design completion for Zone 8.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS: AGS Construction Status as of 09/30/2019

Guideway Structure Element

Total to Date

Total Qty % Complete

Shafts 158 225 70.2%

Columns 130 232 56.0%

Segment Casting 2,060 2,703 76.2%

Spans Stressed 59 211 28.0%

Spans Grouted 56 211 26.5%

Trackwork 0 * 0.0%

Third Rail 0 * 0.0%

Mill & Overlay 0 * 0.0% * Amounts to be determined.

Activities this Month: Drilled shafts continued in Reach E. Continued rebar fabrication and preparation for

shafts in Reaches C and E, and columns in Reaches C and E.

Both gantry cranes continued to move forward installing subsequent spans.

Continued casting segments for Reaches C and E spans.

Continued installation of permanent street lighting throughout the AGS project.

Drilled shafts completed in the Airport Station area. Worked on infrastructure for electrical Zones 3 and 4. Continued dismantling the trestle and moving it to

Middle Street Station Area. Received the Outage request to begin utility

relocations in front of the Rental Car facility from the HDOT Airport in preparation for drilled shaft construction.

Look Ahead: Form/rebar/pour Reaches C and E columns and

segment casting. Continue pouring C-Bents and Straddle Bents Columns

in Reach B and Reach C. Utility work to continue in Zones 3 and 4; start in

Zones 6A, 8 and 9. Coordination taking place with third-parties. Continue drilled shaft construction in Reaches C and E. Design Submittals:

o Reach A, B, C and E – Civil and Composite Utilities IFC

o Civil Common Drawings and Intelligent Transportation Systems (ITS) IFC

Continue to dismantle the trestle and move it to the Middle Street Station Area.

Begin micro-piles for Middle Street Transit Center (MSTC).

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font): STG is in need of additional electrical crews to complete the remaining electrical infrastructure to allow for the

construction of the remaining drill shafts and columns. STG & HECO Zone 8 IFC Design completion and detailed electrical construction schedule; pending approval of

Zone 8 infrastructure design submittal to advance design to HECO. HART anticipates receiving the HECO Zone 8 design in early October, which will facilitate construction. Zone 8 design was originally expected to be completed at a much later date that impacted the completion of the AGS contract.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY MILESTONES: Segment 2,000 was cast. Grouting of spans is occurring within two weeks of post tensioning.

Page 55: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

55 | P a g e

QUALITY MANAGEMENT:

Pre-Activity Meetings continue.

AGS NCR Log (Issued by STG)

NCRs Issued to Date

Closed Open

Guideway 227 176 51 Pearl Harbor Naval Base Station 25 11 14 Honolulu International Airport Station 12 3 9 Lagoon Drive Station 4 4 0 Middle Street Transit Center Station 0 0 0 Contract Wide 14 14 0 TOTAL 282 208 74

Page 56: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

56 | P a g e

4.5 Section IV – City Center: Middle Street Transit Center Station to Ala Moana Center A. City Center Section Utilities and Guideway

CPP No.: FD-530 Contractor: AECOM Technical Services, Inc., Final Design Consultant (Engineer of Record) Contract Start Date: July 2012 Contract Substantial Completion: December 2019 Projected Completion of Work: December 2019

Project Description: The original City Center Section Utilities and Guideway (CCUG) final design contract consisted of utility relocations, roadway widening, and 4.12 miles of elevated transit guideway serving eight (8) passenger stations. The scope of the CCUG contract has been reduced to include only the design of utility relocations and roadway widening to facilitate future guideway design and construction by others. The remaining work is herein referred to as the City Center Utilities Relocation (CCUR) design.

Progress Schedule Status

Based on Expenditures* 96.2%

On time** Early Plan* 100%

Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $191,227

DBE % Attained: 0.41%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $13,941,087

None N/A ---

Cumulative Current Report $13,941,087

SCHEDULE: Due to changes to save cost and delays by third party reviews, CCUR final design is scheduled to conclude in

fourth quarter 2019. __________________________________________________________________________________________________ WORK PROGRESS: Activities this Month: Continuing coordination with HECO and other concerned third party utility

agencies (i.e. Board of Water Supply [BWS], Hawaiian Telcom [HTI], etc.) on proposed concept of keeping the existing 138kV circuit overhead and cross over to makai from an existing pole along Dillingham, pole 32i.

Coordination with City and utility third parties to address review comments for Task Orders (TOs) still within the review process: TO 12 Rev. E (8/16/19), TO27 Rev. E (9/23/19), TO22 Rev. D (7/10/19), TO24 Rev. D (7/26/19), TO28 Rev. D (7/31/19, 8/6/19), TO23A Rev. D (8/16/19), TO2A Rev. D (8/26/19), TO32 Rev. D (8/30/19) and TO23B Rev. D (8/30/19).

Look Ahead: Secure and finalize details with

HECO for proposals at Oahu Community Correctional Center (OCCC) and Honolulu Community College (HCC) for 138kV circuits.

Complete coordination and confirm location for all HECO structures i.e. 138kV riser poles within City Center.

Original Contract: $43,948,220 Incurred-to-Date: $55,396,817

Current Contract Value1: $57,889,307 Incurred in September: $0

1Current Contract Value = Original contract value with Design Allowance + executed Change Orders

Page 57: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

57 | P a g e

Activities this Month (continued): Design Package submittals/resubmittals this month included: TO2B Rev. D to City,

Hawai‘i Gas and DTS (9/6/19); TO27 Rev. E dry utilities to HDOT and Utilities (9/23/19).

Received official comments for TO2A from DTS (9/13/19); TO2B from Hawai‘i Gas (9/9/19) and DTS (9/26/19); TO12 Rev. E from HTI (9/4/19), HECO (9/13/19), Charter (9/17/19); TO23A Rev. D from AT&T (9/11/19), HTI (9/17/19), HECO (9/29/19) and Charter (9/30/19); TO23B Rev. D from AT&T (9/20/19) and HTI (9/27/19); TO24 from BWS (9/19/19), DPP Wastewater Branch (WWB) (9/19/19) and DPP Subdivision Branch (SUBD) (9/19/19); TO27 Rev. E from HTI (9/25/19); TO28 Rev. D from Charter (9/26/19); and TO32 Rev. D from AT&T (9/16/19), DTS (9/24/19) and HTI (9/30/19).

Coordination with landowners and their consultants/contractors for developments within City Center, i.e. Howard Hughes for projects on Halekauwila, Ward and Queen Street, etc.

Continued Request for Information (RFI) support with CCUR contractors. Continued coordination with utilities for all utility layouts for remaining dry utility

task order packages, Traffic Signal and Street Light Packages. Coordination with third parties to process One-Time Review (OTR) approvals as

well as HDOT approvals for construction to start. Continued coordination with ROW team for ongoing negotiations for acquisitions. Continued coordination and bi-weekly meetings with the DPP Director and staff

for ongoing design task order packages review.

Look Ahead (continued): Complete and submit final design

drawings for TOs 12, 17, 22, 24, 23A, 23B, 32, 25, 28, 2 and 13.

Continue coordination with third parties on seeking variances to allow reduced spacing between utilities relative to preferred spacing requirements, especially on Dillingham.

Third party review and comments for Task Orders 27, 12, 24, 17, 28, 2, 13, 26, 25, Street Lights and Traffic Signal Packages.

Finalize details for 138kV steel pole foundation design.

Finalize details for micropile needed for 138kV / BWS facilities crossing(s) on Dillingham Boulevard.

Finalize hydraulic/hydrology analysis for Kapalama Canal.

________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font): HART had been examining the existing utility designs and construction methodology for CCUR to incorporate the

use of a trenchless concept. The intent was to further identify ways to save on schedule and cost to prepare for the P3 contractor. In September, a decision to proceed with open-cut trenching, as opposed to the trenchless concept, was made. As stated in previous reports, AECOM had been instructed to provide a proposal for the incorporation of a trenchless concept in the CCUR designs; this effort is now canceled as of this month.

Key issues relating to the existing Airport-Iwilei 138kV circuit overhead from Middle Street. Based on meetings with third party utilities, i.e. HECO and BWS, HART considered keeping the existing Airport-Iwilei 138kV circuit overhead in Area 1C from Kokea Street to Iwilei Station, fronting UH HCC campus, but is opting to underground all overhead facilities in Area 1C.

Several utility facilities have been identified by HART to remain in place and not be relocated as per design. HART, AECOM and CCUR contractors are now in consultation with third parties to approve proposed work.

One change order was processed and approved: CC18 time extension with no net change to the contract amount to account for delay in review time by third party utilities.

________________________________________________________________________________________________________________________

KEY MILESTONES: Current contract milestones have been restructured within current configuration to account for wet and dry

packages divided into task orders rather than Dillingham and Kaka‘ako sections. These task order packages also include roadway, traffic signals and street light respective layouts as background information.

Traffic signal package for Dillingham are split into two (Middle Street-Kapalama Canal and Kapalama Canal-Ka‘aahi) and Kaka‘ako in two (Ka‘aahi-Nimitz/Richards Street-Ala Moana and Nimitz).

Submittal of Task Order 2B and TO27 Rev. E in September 2019, as per schedule. Task Orders now in development for OTR submittal are, in no particular order: 25, 26, 13, Traffic Signals and Street

Light Packages.

Page 58: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

58 | P a g e

B. City Center Utilities Relocation (CCUR) Indefinite Delivery/Indefinite Quantity (IDIQ) CPP No.: DBB-511 Contractor: Nan, Inc. Contract Start Date: May 2018 Contract Term Completion: May 2022 Projected Completion of Relocation Work: February 2022

Project Description: The CCUR contract is a unit priced, task order contract that relocates utilities in advance of the City Center Guideway and Stations construction work. It provides utility relocation construction services for a variety of utilities along the civil roadway construction throughout the City Center segment of the HRTP. The construction services to be provided will include, but are not limited to, permanent and temporary wet and dry utility relocation work which will include miscellaneous, as-needed site work, installation of permanent/temporary utility poles, duct bank construction, and other utility installation support structures.

Progress Schedule Status

Physical % Complete* 2.5%**

Under Review*** Early Plan* 26.5%

Late Plan* 18.4% *Data as of Sept. 27, 2019. **The % complete is for work in place and does not include eliminated scope. ***Execution Plan under review based on work in place and assessment of design alternatives.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

DBE Participation Task Orders

Actual DBE Participation: $0 Number of Task

Orders Issued Amount ($)

DBE % Attained: 0% Task Orders Previously Issued 13 $223,510,109

Task Orders Issued this Month 1 $146,388,344

Amendments to Task Orders 1 $1,538,897

Total Task Orders Issued 14 $371,437,350

Original Contract: $400,000,000 Incurred-to-Date: $12,616,382

Current Contract Value1: $400,000,000 Incurred in September: $3,307,921

1Current Contract Value = Original contract value + executed Change Orders

Page 59: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

59 | P a g e

SCHEDULE: 100% design complete – end of 2019. All Wet Utility task orders under construction first quarter 2020. All Dry Utility task orders under construction first quarter 2020. HECO completes all electrical design requirements fourth quarter 2020.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: Issued one (1) task order and one (1) amendment worth

$147.9 million for remaining wet and dry utility relocations along Dillingham Boulevard from Middle Street to Kaaahi Street.

Continuing construction in 5 different areas – Middle Street/Dillingham Boulevard, Kaaahi Street, Nimitz Highway, Queen Street and Kona Street; started probing and layout on Kona Street in anticipation of permits.

Tiger team continued efforts to resolve issues along Dillingham Boulevard – alternatives being reviewed.

Processing four (4) task order closeouts; expect to return $20.4 million back to the overall budget.

Look Ahead: Finalize decision on design alternatives for

Dillingham and Halekauwila. Start roadway improvements on Nimitz. Start roadway improvements and communications

ductbanks on Dillingham between Middle Street and Mokauea Street to verify actual location.

Begin probing all wet and dry facilities along Dillingham Boulevard.

Receive trenching permits and begin construction on Queen Street and Kona Street.

__________________________________________________________________________________________________________________________________________________________

KEY ISSUES (new issues are in bold font):

Cost or schedule for the CCUR contract may be impacted significantly if these issues aren’t resolved: o Design Finalization: Completion of the dry utility plans by AECOM, and approval by the utilities. Design

decisions are being finalized and incorporated into plans and profiles for review for approval by the utilities.

o HART Right-of-Way is currently working to complete acquisition of property within CCUR. Current focus is on the following properties: Ala Moana Station, Blood Bank, Takara Printing, Iwilei Station, Honolulu Community College and Department of Accounting & General Services (DAGS).

o Permitting: Trenching and street usage permits are taking a significant amount of time and coordination to obtain. The contractor is doing what it can to respond to concerns and issues, but concerns such as controlled access along Dillingham, or lane restrictions on Nimitz, require more time for planning and higher-level agreements. These efforts are currently underway in order to ensure a high degree of collaboration amongst all stakeholders.

o HECO Agreements: The Nov. 25, 2013 agreement with HECO allows HECO to complete the electrical design up to 2 years after receiving the final infrastructure design. Completion of relocation activities relies on 9-month design completion in order to meet the February 2022 substantial completion date. HART and HECO are currently working together to ensure the construction schedule is met.

__________________________________________________________________________________________________________________________________________________________

KEY MILESTONES: Cleared 22% of proposed shaft locations, based on current design decisions. 100% design complete – end of 2019. All Wet Utility task orders under construction first quarter 2020. All Dry Utility task orders under construction first quarter 2020. HECO completes all electrical design requirements fourth quarter 2020.

__________________________________________________________________________________________________________________________________________________________

QUALITY MANAGEMENT: No major quality issues identified this period.

CCUR NCR Log (Issued by Nan)

Total NCRs Issued to Date Closed Open

5 3 2

Page 60: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

60 | P a g e

4.6 Project-Wide A. Program Management Contractor Contract

CPP No.: MM-902 Contractor: HDR Engineering, Inc. Contract Start Date: January 1, 2017 Contract Completion Date: December 31, 2022 Description of Work: Oversee the successful design and construction of the full Honolulu Rail Transit Project (HRTP), which includes providing personnel with relevant transit design, construction and operations experience and leadership in the various areas, including construction management, design management, project controls, procurement and contracts, right of way, public and business outreach, safety and security, quality assurance, environmental planning, and federal programmatic compliance.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $0

DBE % Attained: 0%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $0

None N/A ---

Cumulative Current Report $0

Jan

-17

Feb

-17

Mar

-17

Ap

r-1

7

May

-17

Jun

-17

Jul-

17

Au

g-1

7

Sep

-17

Oct

-17

No

v-1

7

Dec

-17

Jan

-18

Feb

-18

Mar

-18

Ap

r-1

8

May

-18

Jun

-18

Jul-

18

Au

g-1

8

Sep

-18

Oct

-18

No

v-1

8

Dec

-18

Jan

-19

Feb

-19

Mar

-19

Ap

r-1

9

May

-19

Jun

-19

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

Dec

-19

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Jul-

20

Au

g-2

0

Sep

-20

Oct

-20

No

v-2

0

Dec

-20

Jan

-21

Feb

-21

Mar

-21

Ap

r-2

1

May

-21

Jun

-21

Jul-

21

Au

g-2

1

Sep

-21

Oct

-21

No

v-2

1

Dec

-21

Jan

-22

Feb

-22

Mar

-22

Ap

r-2

2

May

-22

Jun

-22

Jul-

22

Au

g-2

2

Sep

-22

Oct

-22

No

v-2

2

Dec

-22

Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %

Actual 51.7 %

9/1/2019

Original Contract: $63,522,953 Incurred-to-Date: $29,935,821

Current Contract Value1: $63,522,953 Incurred in September: $133,203

1Current Contract Value = Original contract value + executed Change Orders

Page 61: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

61 | P a g e

WORK PROGRESS: Activities this Month:

21 HDR staff contracted through HART. On Sept. 27, 2019, SC Infrastructure, Inc. completed their short-

term assistance with the western stations, and project delivery schedules and review of the P3 approach.

Look Ahead: Continue to support the design

and construction of the HRTP, including assessing management needs in Project Controls.

KEY ISSUES:

Based on the average monthly expenditure rate, the current contract total will be exhausted by June 2021.

Subcontractor charges paid to date (from beginning of contract) is $4,963,636.05.

Page 62: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

62 | P a g e

B. Construction Engineering and Inspection (CE&I) West CPP No.: MM-290 Contractor: PGH Wong Engineering, Inc. Contract Start Date: January 9, 2014 Contract Completion Date: January 9, 2020 Description of Work: Provides construction, engineering, and inspection services for construction contract compliance, construction scheduling, construction cost estimating, support, on-site field oversight, project controls and related construction support for the west section of the project.

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $11,102,364

DBE % Attained: 15.81%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $36,000,000

None N/A ---

Cumulative Current Report $36,000,000

______________________________________________________________________________________________________

WORK PROGRESS: Activities this Month:

Resident Engineers (REs) provided the weekly project status and issues briefings at the weekly HART Project Managers (PM) meetings.

Look Ahead: Turnover of facilities work to allow

Core Systems to continue their installation.

Jan

-14

Mar

-14

May

-14

Jul-

14

Sep

-14

No

v-1

4

Jan

-15

Mar

-15

May

-15

Jul-

15

Sep

-15

No

v-1

5

Jan

-16

Mar

-16

May

-16

Jul-

16

Sep

-16

No

v-1

6

Jan

-17

Mar

-17

May

-17

Jul-

17

Sep

-17

No

v-1

7

Jan

-18

Mar

-18

May

-18

Jul-

18

Sep

-18

No

v-1

8

Jan

-19

Mar

-19

May

-19

Jul-

19

Sep

-19

No

v-1

9

Jan

-20

Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %

Actual 93.6 %

9/1/2019

Original Contract: $54,232,480 Incurred-to-Date: $81,344,135

Current Contract Value1: $90,232,480 Incurred in September: $1,000,262

1Current Contract Value = Original contract value + executed Change Orders

Page 63: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

63 | P a g e

Activities this Month (continued): RE’s managed assigned projects as the HART on-site field

representatives for CE&I, managing contract correspondence and contract change administrative processes, issuing Field Change Notices (FCNs) when required, and overseeing work.

Continued to pursue resolution of design and fabrication issues related to the station canopies for all 9 stations and to assess potential critical impacts to the project schedule.

Updated Monthly Progress Report Dashboards for all stations. Work-off of backlogged claims and changes progressed.

Look Ahead (continued): Monitor and track station canopy

fabrication and installation activities to mitigate impacts to contract schedules and completion.

Present the Monthly Progress Report Dashboards for all projects.

Oversee construction of assigned projects.

_______________________________________________________________________________________________________

KEY ISSUES:

Completing Core Systems access requirements and balance of structures conduit for CSC follow on work.

Completion of canopy installation.

Continue working-off of backlog of outstanding claims/change issues.

Development of CR document packages.

Extend contract end date to July 6, 2020 to assist with westside contract closeout (no additional funding will be requested).

Page 64: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

64 | P a g e

C. Construction Engineering and Inspection (CE&I) East CPP No.: MM-596 Contractor: Stantec Consulting Services Inc. Contract Start Date: September 14, 2015 Contract Completion Date: December 31, 2021 Description of Work: Provides construction, engineering, and inspection services for construction contract compliance, construction scheduling, construction cost estimating, support, on-site field oversight, project controls and related construction support for the east section of the project.

_______________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $18,164,607

DBE % Attained: 33%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $47,000,000

None N/A ---

Cumulative Current Report $47,000,000

WORK PROGRESS: Activities this Month: Performed CE&I services for the AGS DB, On-Call III,

On-Call IV, CCGS DB/P3, and CCUR projects throughout the east section project limits.

Supported activities for the CCUR project and executed task orders.

Supported HART’s overall delivery of the east section construction activities and projects in support of the overall HRTP.

Look Ahead: Monitor drilling activities of the foundations

throughout the AGS DB project corridor. Monitor construction activities of the columns

throughout the AGS DB project corridor. Monitor construction activities of pre-cast segments

at the casting yard for the AGS DB guideway. Monitor the continuation of the AGS DB segment

erection.

Sep

-15

Oct

-15

No

v-1

5

Dec

-15

Jan

-16

Feb

-16

Mar

-16

Ap

r-1

6

May

-16

Jun

-16

Jul-

16

Au

g-1

6

Sep

-16

Oct

-16

No

v-1

6

Dec

-16

Jan

-17

Feb

-17

Mar

-17

Ap

r-1

7

May

-17

Jun

-17

Jul-

17

Au

g-1

7

Sep

-17

Oct

-17

No

v-1

7

Dec

-17

Jan

-18

Feb

-18

Mar

-18

Ap

r-1

8

May

-18

Jun

-18

Jul-

18

Au

g-1

8

Sep

-18

Oct

-18

No

v-1

8

Dec

-18

Jan

-19

Feb

-19

Mar

-19

Ap

r-1

9

May

-19

Jun

-19

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

Dec

-19

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Jul-

20

Au

g-2

0

Sep

-20

Oct

-20

No

v-2

0

Dec

-20

Jan

-21

Feb

-21

Mar

-21

Ap

r-2

1

May

-21

Jun

-21

Jul-

21

Au

g-2

1

Sep

-21

Oct

-21

No

v-2

1

Dec

-21

Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %

Actual 54.8 %

9/1/2019

Original Contract: $55,036,130 Incurred-to-Date: $52,024,277

Current Contract Value1: $102,036,130 Incurred in September: $2,119,506

1Current Contract Value = Original contract value + executed Change Orders

Page 65: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

65 | P a g e

Activities this Month (continued): Continued support to HART on the CCGS P3

procurement process. Supported HART with design solutions and resolution

to issues with HECO, Board of Water Supply (BWS), HDOT, and various stakeholder requested changes.

Working with HART to continue to advance the CCUR wet/dry utility permits and construction.

Working with HART to support the Public Information group as construction activity continues to expand throughout the east section.

Look Ahead (continued): Monitor construction activities for the four stations

within the AGS DB corridor. Monitor construction of CCUR task orders. Support HART with the review and analysis of the

construction options and schedule along Dillingham for the HECO 138kV and 46kV lines.

_______________________________________________________________________________________________________

KEY ISSUES:

No current contractual issues.

Page 66: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

66 | P a g e

D. General Engineering Consultant CPP No.: MM-913 Contractor: CH2M Hill, Inc. Contract Start Date: December 5, 2013 Contract Completion Date: July 4, 2021 Description of Work: Task 01 – Scheduling and Estimating Support: Task Order 01 provides staff augmentation to support scheduling and cost estimating services through the design and construction phase of the Project.

Task 02 – Interface Management and Coordination: Provide oversight of technical coordination and Configuration Management.

Task 03 – Environmental and Planning: Provide environmental and planning support to ensure compliance with appropriate decision documents for the Project; integration with other applicable state or city entities for systems, station, land use, and operation planning.

Task 04 – Design Management Services: Engineering and architectural design management services for the duration of the project.

Task 05 – Program Management and Deliverables: Program Management services throughout the entire duration of the Project to include, but not limited to the Work Breakdown Structure, Budget Staffing Plan, Monthly Progress and Status Reports, and Contract Administration.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Task Description Original Value Current Value Incurred-to-Date

1 Scheduling and Estimating Support $13,187,310 $22,556,723 $16,809,860

2 Interface Management and Coordination $5,644,829 $4,097,085 $3,228,140

3 Environmental and Planning $6,537,705 $20,303,965 $11,123,012

4 Design Management Services $16,986,250 $34,866,501 $27,097,332

5 Program Management and Deliverables $2,434,232 $1,565,057 $1,273,824

OD Other Direct Expenses $1,352,951 $1,339,444 $965,507

Total $46,143,277 $84,728,775 $60,497,676

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $7,644,864

DBE % Attained: 11.99%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $38,585,498

None N/A ---

Cumulative Current Report $38,585,498

Original Contract: $46,143,277 Incurred-to-Date: $60,497,676

Current Contract Value1: $84,728,775 Incurred in September: $527,442

1Current Contract Value = Original contract value + executed Change Orders

Page 67: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

67 | P a g e

________________________________________________________________________________________________________________________________________________________________________________________________________________________

WORK PROGRESS: Activities this Month: Look Ahead: Task 01: Produced August schedule updates for PMOC meetings. Outlined

schedule updates and progress. Maintained Master Project Integrated Schedule. Produced Monthly Internal Schedule Progress Report. Maintained Interim Opening Schedule. Analysis impact of canopy re-

design delays. Analysis of HECO impacts on AGS schedule. Rejected August Schedule

and marked as ‘Revise and Resubmit.’ Reevaluated the CCGS and CCUR schedule to accurately reflect the

current execution plan. Updated the Master Project Integrated Schedule for August and

forwarded to PMOC with highlights outlined.

Task 01: On-going support of Independent Cost Estimate

(ICE) development or reviews of cost estimates prepared by the CE&I team for independent quality assessments.

Continue updates of Monthly Schedule reports and analysis.

Prepare ICE’s for various design and construction changes/task orders including several ICE’s to address changes due to canopy redesign.

Work on implementing a new CCUR schedule to reflect final design decisions made by management.

Task 02: Resolved interface issues are described below:

o The design issues for installation of the anchor bolts for the End of Platform cabinets and service posts at East Kapolei Station have been resolved.

o The contractor has remedied the encroachment of the Ho‘opili Station platform into the passenger vehicle’s dynamic envelope.

o HVAC issues at Ho‘opili Station TCCR have been resolved. o Previously installed canopy arms at UH West O‘ahu and Ho‘opili

stations have been removed in preparation for remedial work. o Numerous Interface Control Documents were mutually signed off

by all interfacing partners for the following packages: o Notice of Design Change (NDC) 59 for the Pearl Harbor

Station Main Stairs (AGS-EE) o NDC 60, 71 & 72 for the Honolulu Airport Station Revisions

(AGC – CSC, EE & Fare Systems Contract [FSC]) o NDC 42 for Guideway Reach E1A Revisions (AGS – CSC) o NDC 40 for Pearl Harbor Station Fire Detection (AGS – CSC) o NDC 43 for Lagoon Drive Air Conditioning and Fire

Detection (AGS – CSC) o Issued for Construction (IFC) Package 44 for Middle Street

Station (AGS – CSC, EE & FSC)

Task 02: Configuration Management and Close-out activities

that will be worked on are: o Continue compiling and refining a list of

configurable items for the west-side stations contracts.

o Compile lists of additional materials and spare parts for west-side stations contracts from specifications.

o Research and compile a proposed list of configurable items for the AGS contract.

o Collaborate with the HART Computer-Aided Design (CAD) Manager to ascertain the status of contract drawings for completed contracts.

o Compilation of a list of owner’s manuals from west-side stations contractors’ specifications.

o Create a matrix of project elements and functions that may fall under the sphere of Configuration Management.

Dec

-13

Feb

-14

Ap

r-1

4

Jun

-14

Au

g-1

4

Oct

-14

Dec

-14

Feb

-15

Ap

r-1

5

Jun

-15

Au

g-1

5

Oct

-15

Dec

-15

Feb

-16

Ap

r-1

6

Jun

-16

Au

g-1

6

Oct

-16

Dec

-16

Feb

-17

Ap

r-1

7

Jun

-17

Au

g-1

7

Oct

-17

Dec

-17

Feb

-18

Ap

r-1

8

Jun

-18

Au

g-1

8

Oct

-18

Dec

-18

Feb

-19

Ap

r-1

9

Jun

-19

Au

g-1

9

Oct

-19

Dec

-19

Feb

-20

Ap

r-2

0

Jun

-20

Au

g-2

0

Oct

-20

Dec

-20

Feb

-21

Ap

r-2

1

Jun

-21

Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %

Actual 76.2 %

9/1/2019

Page 68: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

68 | P a g e

Activities this Month (continued): Task 03: Permits – assisted in submitting the application to continue the City Center

noise permit to the Department of Health. Drafted a letter to the U.S. Army Corps of Engineers requesting extension of the individual (Section 404) permit for construction in Waiawa Stream.

Environmental Analyses and Documentation – submitted for FTA review a draft Post-Record of Decision (ROD) environmental evaluation for the HECO antenna at Ka‘aahi Substation (near LCC).

Programmatic Agreement (PA) Compliance – subconsultants HHF Planners and Mason Architects assisted with a workshop on the cultural landscape reports for Irwin Park, Walker Park, and Mother Waldron Park held during the Consulting Parties comment period. Subconsultant HACBED/Purple Maia demonstrated substantial progress on prototypes of a children’s mobile game and a mobile app developed in compliance with PA Stipulation VII.

Design Reviews – completed 3 design reviews of AGS submittals. On-Call Support for Right of Way, Utilities, Environmental Planning –

developed a preliminary 3D digital model of the rail system on Dillingham Boulevard in the vicinity of Mokauea Street and the Kapalama Canal. Subconsultant arborist Steve Nimz submitted a quarterly inspection report on the condition of coconut palms transplanted from the Nimitz Highway median to Irwin Park.

Look Ahead (continued): Task 03: Permits – prepare applications to continue the

Kamehameha Highway Guideway noise permit and noise variance. Review plans for installation of telecommunication poles on the guideway and assess requirements for environmental clearance and permits.

Environmental Analyses & Documentation – complete the draft Post-ROD environmental evaluation for the Ho‘opili park-and-ride facility.

PA Compliance – assist in preparing for Consulting Parties review of Stipulation VII deliverables—the interpretive plan, color brochure and coloring book.

On-Call Support for Right of Way, Utilities, Environmental Planning – evaluate potential locations to plant true Kamani trees (to mitigate loss of those removed from Dillingham Boulevard) and begin preparing a planting plan.

Task 04: Continued to coordinate and lead daily reporting huddles between HART,

station contractors, and the Engineer of Record (EOR) to track and expedite the development of Station Canopy “Plan B” revisions to the canopy arm design for the WOSGC, FHSGC, and KHSGC contracts.

Coordinated data collection for a no-rise analysis of the proposed Waipahu Transit Center Station Makai Entrance Building to meet the City’s flood hazard ordinance.

Reviewed 11 design submittals, 29 NCRs, 8 Field Design Changes, and 11 Notice of Design Changes for the Airport Guideway and Stations contract. Attended Task Force Meetings, presubmittal workshops and comment resolution meetings.

Concluded drilling geotechnical test borings to investigate track settlement issues at the MSF. Reviewed geotechnical boring data and began analyzing core samples.

Reviewing Kamehameha Highway 138kV Undergrounding preliminary plan submittal.

Reviewing Kamehameha Highway Left Turn into Kuala Street final plans submittal.

Task 04: Analyze core samples from the geotechnical borings at

the maintenance yard to determine the cause of track settlement experienced there and draft a preliminary report summarizing the findings.

Continue to provide engineering support to CCUR to evaluate possible guideway configuration changes to minimize utility relocation costs.

Continue to provide technical support to the CE&I team overseeing the Airport Guideway and Stations contract.

Continue participation in third-party coordination meetings (technical meetings and management meetings) for various contracts. Third parties include HECO, HDOT, Department of Health (DOH), Airport, Navy and UH West O‘ahu.

Continue to perform design reviews in support of the KHG 138kV undergrounding contract.

Continue to provide construction support for the Kamehameha Highway Resurfacing project.

Task 05: Discussed performance of various tasks. Monitored contract labor and sub-consultant expenditures. Updated Monthly Estimate at Completion (EAC). Participated in preparation of monthly reports. Prepared input on Consultant Evaluations. Extended subcontracts of necessary sub-consultants.

Task 05: Discuss various tasks. Continue to monitor contract labor and sub-consultant

expenditures. Update Monthly EAC. Participate in preparation of monthly reports.

________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY ISSUES: Task 01:

No current contractual issues. Task 02:

No current contractual issues. Task 03:

No current contractual issues. Task 04:

No current contractual issues. Task 05:

No current contractual issues.

Page 69: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

69 | P a g e

E. Core Systems Support CPP No.: MM-962 Contractor: Lea+Elliott, Inc. Contract Start Date: February 11, 2014 Contract Completion Date: November 29, 2019 Description of Work: Provide design and construction management oversight for the Core System Design-Build-Operate-Maintain (CSDBOM) Contract, to include system commissioning, passenger services start-up, and pre-revenue operations and maintenance activities.

_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

COST INFORMATION:

Disadvantaged Business Enterprise (DBE) Participation

Actual DBE Participation: $1,426,418

DBE % Attained: 3.24%

Contract Changes in September

Change No. Description Amount ($)

Cumulative Previously Reported $0

None N/A ---

Cumulative Current Report $0

WORK PROGRESS: Activities this Month: On-Going Activities:

o Project management support and Changes & Claims management support o Construction management and installation oversight o Review and approve contractor’s design, work plans, test procedures,

technical notes, and other submittals

Look Ahead: Continue to monitor, observe,

and report on the Core Systems Contractor’s daily activities on-site and at the factories.

Feb

-14

Mar

-14

Ap

r-1

4

May

-14

Jun

-14

Jul-

14

Au

g-1

4

Sep

-14

Oct

-14

No

v-1

4

Dec

-14

Jan

-15

Feb

-15

Mar

-15

Ap

r-1

5

May

-15

Jun

-15

Jul-

15

Au

g-1

5

Sep

-15

Oct

-15

No

v-1

5

Dec

-15

Jan

-16

Feb

-16

Mar

-16

Ap

r-1

6

May

-16

Jun

-16

Jul-

16

Au

g-1

6

Sep

-16

Oct

-16

No

v-1

6

Dec

-16

Jan

-17

Feb

-17

Mar

-17

Ap

r-1

7

May

-17

Jun

-17

Jul-

17

Au

g-1

7

Sep

-17

Oct

-17

No

v-1

7

Dec

-17

Jan

-18

Feb

-18

Mar

-18

Ap

r-1

8

May

-18

Jun

-18

Jul-

18

Au

g-1

8

Sep

-18

Oct

-18

No

v-1

8

Dec

-18

Jan

-19

Feb

-19

Mar

-19

Ap

r-1

9

May

-19

Jun

-19

Jul-

19

Au

g-1

9

Sep

-19

Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %

Actual 98.3 %

9/1/2019

Original Contract: $43,988,989 Incurred-to-Date: $41,555,799

Current Contract Value1: $43,988,989 Incurred in September: $655,296

1Current Contract Value = Original contract value + executed Change Orders

Page 70: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

70 | P a g e

Activities this Month (continued): o Core Systems interface oversight support on the stations and AGS project o Vehicle and system equipment manufacturing and assembly oversight o Conduct final inspection of Train #12 which includes the first installation of

heat shield retrofit. o Testing, commissioning and operational readiness oversight and support o Operation and maintenance support o Conducted weekly meetings to resolve remaining PV design issues.

Key Activities: o Continued to address and resolve outstanding design issues with the CSC

on the Communications system. Increased site resources to support the Lead Communications Engineer in the review and oversight of HRH/Nokia Communications activities, specifically documentation review and acceptance, cabinet installation remediation, and provisioning readiness to support ongoing MSF commissioning activities. A design review workshop was held this month to resolve open items.

o Continued oversight of train manufacturing activities and Buy America compliance in Pittsburg, CA. Manufacturing activities continue for Trains #7 thru #15.

o Continued oversight of installation and testing activities of ATC, TES, UPS, SCADA, PSGS, Passenger Vehicle, Fire Detection Alarm System (FDAS) and Communications System.

o Continued to monitor HRH in achieving their monthly installation and testing goals.

o Increased site resources to support the Site Commissioning Lead in witnessing testing activities.

o Continued to coordinate with HECO on power load forecasts for system testing periods and issue reports.

o Witnessed third rail shoe test in functional section; clearance test in functional section; UPS testing in LCC, WLO and HOP stations; PSGS Onsite Installation Inspection and Onsite functional test at HOP station; SLAN testing in the yard; train dynamic qualification test in the dynamic section; Train #2 Vehicle Test Procedure (VTP) testing in the yard; ATC wayside testing in HOP, WTC and LCC.

o Assisted HART to achieve Interim Certification for Train #4. o Continued to support Safety in closeout of the various Design

Conformance Checklist, Subsystem Hazard Analysis, Failure Modes, Effects, and Criticality Analysis (FMECA’s), and other Safety related submittals and tasks.

o Worked with subconsultant to conduct quarterly delay claim assessment and review of HRH’s monthly schedule.

o Continued to monitor HRH’s configuration management control. o Continued to support HART with Onboard Wi-Fi. o Continued to implement the HART Track Allocation Procedure. o Supported activities to energize and start functional section testing on

Sept. 30, 2019. o Conducted joint Quality Assurance (QA) audit with HART QA at final

assembly facility in Pittsburg, CA. o Supported HART with P3 procurement activities. o Supported HART with Readiness & Activation for O&M design activities.

Look Ahead (continued): Continue to assist HART with

resolution of change and claim issues.

Continue to assist HART with the Track Allocation Procedure.

Continue to monitor and witness system testing activities.

Continue to support HART to address outstanding issues related to construction access at stations.

Continue to support HART to meet MSF Operational schedule objective and Interim Opening activities.

Continue to support HART to prepare the functional section to start integration testing on the mainline.

Support HART on P3 activities, as required.

Continue to work with HART and the CSC to address PSG installation issues.

Continue to coordinate and monitor HRH’s progress on post audit configuration control activities.

Continue to work on power quality and mitigation analysis.

Support the technical resolution of the Train Wash to HRH interface.

Continue construction oversight of HRH equipment and cable installations.

Oversee HRH testing schedule adherence in preparation for the MSF#2 readiness completion.

Review final design submittal of heat shield retrofit.

Continue to assist HART with Wi-Fi and STATCOM procurement.

_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

KEY ISSUES:

L+E three year contract extension expected to go to HART Board in October.

Page 71: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Ho

no

lulu

Rai

l Tra

nsi

t P

roje

ct M

on

thly

Pro

gre

ss R

ep

ort

Se

pte

mb

er

20

19

71

| P

ag

e

4.7

C

on

trac

t St

atu

s b

y C

PP

Co

ntr

act

Su

mm

ary

by C

PP

(data

as

of

Sep

30

, 2

01

9)

A

B

C =

A +

B

D

E =

D /

C

CP

P #

C

on

tract

Desc

rip

tio

n

Ori

gin

al

Co

ntr

act

Valu

e

Ch

an

ge

Ord

ers

Cu

rren

t

Co

ntr

act

Valu

e

Incu

rred

%

Ex

p.

Aw

ard

Date

Ori

gin

al

Co

mp

leti

on

Date

Revis

ed

Co

mp

leti

on

Date

DB

-120

W

est

Oah

u/F

arr

ing

ton

Hw

y G

uid

ew

ay

482,4

30,2

01

185,3

51,6

85

667,7

81,8

86

667,7

81,9

06

100%

N

ov-2

009

O

ct-2

013

Dec-

2018

DB

-320

K

am

eh

am

eh

a H

wy G

uid

ew

ay

372,1

50,0

00

31,4

05,7

74

403,5

55,7

74

403,5

89,0

30

100%

Ju

n-2

011

Oct

-2014

Dec-

2018

DB

-200

M

ain

ten

an

ce &

Sto

rag

e F

aci

lity

195,2

58,0

00

86,5

17,0

32

281,7

75,0

32

281,7

93,4

19

100%

Ju

n-2

011

Dec-

2014

Ju

l-2016

DB

-450

A

irp

ort

Sect

ion

Gu

idew

ay/S

tati

on

s 874,7

50,0

00

1,6

31,2

38

876,3

81,2

38

474,3

07,4

32

54%

Sep

-2016

May-2

021

M

ay-2

021

DB

B-1

71

West

Oah

u S

tati

on

Gro

up

56,0

88,4

70

19,7

25,9

79

75,8

14,4

49

62,8

05,8

20

83%

Ju

l-2015

Mar-

2018

M

ar-

2019

DB

B-2

71

Farr

ing

ton

Hig

hw

ay S

tati

on

Gro

up

78,9

99,0

00

17,7

88,3

59

96,7

87,3

59

83,2

24,4

33

86%

Ju

n-2

015

Jan

-2018

Ja

n-2

019

DB

B-3

71

Kam

eh

am

eh

a H

wy S

tati

on

Gro

up

115,8

05,8

45

8,4

78,4

18

124,2

84,2

63

93,5

92,0

17

75%

Ja

n-2

016

M

ay-2

019

M

ay-2

019

DB

B-3

85

Ram

p H

2R

2

5,2

03,6

46

332,2

50

5,5

35,8

96

5,5

42,4

82

100%

M

ay-2

015

O

ct-2

016

No

v-2

017

DB

B-5

05

Air

po

rt S

ect

ion

Uti

liti

es

Co

nst

ruct

ion

27,9

93,2

90

726,2

00

28,7

19,4

89

28,7

19,4

89

100%

Ju

n-2

014

Feb

-2016

Oct

-2016

DB

B-5

11

Cit

y C

en

ter

Uti

liti

es

Relo

cati

on

Co

nst

ruct

ion

400,0

00,0

00

0

400,0

00,0

00

12,6

16,3

82

3%

M

ay-2

018

M

ay-2

020

M

ay-2

022

DB

B-5

25

Air

po

rt S

ect

ion

Gu

idew

ay 7

-Pie

r 3,9

73,0

00

54,8

43

4,0

27,8

43

4,0

27,8

43

100%

Sep

-2014

Feb

-2015

Ap

r-2015

DB

B-6

02

UH

WO

Tem

p P

nR

an

d C

am

pu

s R

d B

11,5

89,3

00

1,3

92,0

23

12,9

81,3

23

10,2

38,4

37

79%

D

ec-

2017

Ju

l-2019

Jul-

2019

DB

B-7

01

Kam

eh

am

eh

a H

igh

way R

esu

rfaci

ng

25,9

89,9

89

880,5

21

26,8

70,5

10

19,5

44,6

78

73%

Ju

l-2018

Sep

-2019

Sep

-2019

DB

OM

-920

C

ore

Syst

em

s D

esi

gn

Bu

ild

O/M

573,7

82,7

93

204,9

38,2

62

778,7

21,0

55

395,5

88,4

11

51%

N

ov-2

011

M

ar-

2019

Ja

n-2

025

MI-

900

Fare

Co

llect

ion

DFI

15,4

64,1

98

361,4

70

15,8

25,6

68

5,4

68,4

95

35%

M

ar-

2016

Ja

n-2

029

Ja

n-2

029

MI-

930

Ele

vato

rs &

Esc

ala

tors

In

stall/M

ain

t 50,9

82,7

14

3,9

48,7

54

54,9

31,4

68

22,0

18,9

51

40%

Ju

l-2013

May-2

018

M

ay-2

021

MM

-945

On

-Call C

on

stru

ctio

n I

1,0

00,0

00

1,0

00,0

00

2,0

00,0

00

1,9

99,9

83

100%

A

ug

-2014

Ju

l-2019

Dec-

2016

MM

-947

On

-Call C

on

stru

ctio

n II

7,5

00,0

00

0

7,5

00,0

00

7,4

95,7

72

100%

M

ay-2

015

M

ay-2

020

M

ay-2

020

MM

-948

On

-Call C

on

stru

ctio

n III

20,0

00,0

00

6,0

00,0

00

26,0

00,0

00

25,5

38,7

07

98%

M

ay-2

016

M

ay-2

023

M

ay-2

023

MM

-949

On

-Call C

on

stru

ctio

n IV

46,0

00,0

00

0

46,0

00,0

00

20,2

58,1

43

44%

Ja

n-2

018

N

ov-2

024

N

ov-2

024

DB

-550

C

ity C

tr S

ect

ion

Gu

idew

ay a

nd

Sta

DB

100,0

00

134,0

00

234,0

00

206,5

46

88%

O

ct-2

014

Sep

-2015

Jul-

2017

FD

-140

W

est

Oah

u S

tati

on

Gro

up

7,7

89,0

00

5,6

42,9

95

13,4

31,9

95

12,9

00,3

14

96%

Ju

n-2

012

No

v-2

016

M

ay-2

020

FD

-240

Farr

ing

ton

Hig

hw

ay S

tati

on

s G

rou

p

9,3

00,6

96

7,1

97,1

20

16,4

97,8

16

16,0

59,1

94

97%

Ja

n-2

011

N

ov-2

016

M

ar-

2020

FD

-340

K

am

eh

am

eh

a H

wy S

tati

on

Gro

up

8,7

02,5

92

4,2

77,3

59

12,9

79,9

51

12,2

81,8

12

95%

N

ov-2

012

Ju

n-2

017

No

v-2

019

FD

-430

A

irp

ort

Sect

. G

uid

ew

ay/U

til

38,8

40,9

60

4,1

11,4

40

42,9

52,4

00

42,3

71,3

74

99%

D

ec-

2011

A

ug

-2013

Ju

n-2

017

FD

-440

A

irp

ort

Sta

tio

n G

rou

p

10,1

77,3

65

(117,5

45)

10,0

59,8

20

10,0

59,8

20

100%

N

ov-2

012

Ja

n-2

014

Ju

l-2015

FD

-530

C

ity C

en

ter

Gu

idew

ay/U

til

43,9

48,2

20

13,9

41,0

87

57,8

89,3

07

55,3

96,8

17

96%

Ju

l-2012

Mar-

2014

D

ec-

2019

FD

-550

D

illin

gh

am

an

d K

aka'a

ko

Sta

tio

n G

rou

p

18,3

21,9

18

(6,0

20,8

37)

12,3

01,0

81

12,3

41,5

65

100%

A

ug

-2013

Sep

-2014

Au

g-2

016

FD

-700

D

esi

gn

Serv

ices

for

138kV

Uti

l. R

elo

c. a

t K

HG

8,7

66,3

27

0

8,7

66,3

27

2,5

94,1

49

30%

A

ug

-2018

N

ov-2

021

N

ov-2

021

FD

-701

K

H C

ivil D

esi

gn

60,0

00

0

60,0

00

60,0

00

100%

Ja

n-2

018

Ja

n-2

019

Ja

n-2

019

Sou

rce:

HA

RT

CM

S.

No

te: E

xclu

des

Rig

ht-

of-

Way

tra

nsa

ctio

ns,

deb

t fi

nan

cin

g co

sts,

an

d C

ity/

HA

RT

con

trac

t p

acka

ges,

wh

ich

are

incl

ud

ed in

Ap

pen

dix

A.

Page 72: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Ho

no

lulu

Rai

l Tra

nsi

t P

roje

ct M

on

thly

Pro

gre

ss R

ep

ort

Se

pte

mb

er

20

19

72

| P

ag

e

Co

ntr

act

Su

mm

ary

by C

PP

(data

as

of

Sep

30

, 2

01

9)

A

B

C =

A +

B

D

E =

D /

C

CP

P #

C

on

tract

Desc

rip

tio

n

Ori

gin

al

Co

ntr

act

Valu

e

Ch

an

ge

Ord

ers

Cu

rren

t

Co

ntr

act

Valu

e

Incu

rred

%

Ex

p.

Aw

ard

Date

Ori

gin

al

Co

mp

leti

on

Date

Revis

ed

Co

mp

leti

on

Date

MM

-290

Co

nst

ruct

ion

En

grg

& In

sp C

EI W

est

54,2

32,4

80

36,0

00,0

00

90,2

32,4

80

81,3

44,1

35

90%

Ja

n-2

014

Ja

n-2

020

Ja

n-2

020

MM

-595

Co

nst

ruct

ion

En

grg

& In

sp C

EI East

I

63,0

83,4

17

(50,3

77,3

17)

12,7

06,1

00

12,7

11,3

66

100%

Ja

n-2

014

Ja

n-2

019

Ja

n-2

016

MM

-596

Co

nst

ruct

ion

En

grg

& In

sp C

EI East

II

55,0

36,1

30

47,0

00,0

00

102,0

36,1

30

52,0

24,2

77

51%

Sep

-2015

Dec-

2019

D

ec-

2021

MM

-901

Pro

gra

m M

gt

Su

pp

ort

Co

nsl

t II

33,3

76,8

97

16,3

59,7

65

49,7

36,6

62

49,7

36,6

62

100%

Feb

-2012

Mar-

2015

M

ar-

2017

MM

-902

Pro

gra

m M

gt

Su

pp

ort

Co

nsl

t III

63,5

22,9

53

0

63,5

22,9

53

29,9

35,8

21

47%

Ja

n-2

017

D

ec-

2022

D

ec-

2022

MM

-905

MM

-905 G

en

En

grg

Co

nsl

t EIS

/PE

0

75,9

95,9

82

75,9

95,9

82

75,9

95,9

82

100%

A

ug

-2007

Feb

-2010

Feb

-2011

MM

-910

MM

-910 G

en

En

grg

Co

nsl

t FD

-Co

nst

ruct

150,2

26,2

65

0

150,2

26,2

65

150,2

26,2

65

100%

Ju

n-2

011

Dec-

2014

D

ec-

2014

MM

-913

MM

-913 G

en

En

grg

Reco

mp

ete

46,1

43,2

77

38,5

85,4

98

84,7

28,7

75

60,4

97,6

76

71%

D

ec-

2013

A

pr-

2019

Ju

l-2021

MM

-915

HD

OT T

raff

ic M

gm

t. C

on

sult

. 1,6

00,0

00

5,0

10,0

00

6,6

10,0

00

5,7

55,9

56

87%

Ju

n-2

012

Jun

-2017

Jun

-2019

MM

-920

HD

OT C

oo

rdin

ati

on

Co

nsl

t W

OFH

3,0

00,0

00

6,5

00,0

00

9,5

00,0

00

9,4

77,8

17

100%

Ju

n-2

011

Jun

-2016

Dec-

2018

MM

-921

HD

OT C

oo

rdin

ati

on

Co

nsl

t K

HG

16,1

38,3

90

(1,4

00,0

00)

14,7

38,3

90

7,5

34,2

32

51%

Ju

n-2

012

Feb

-2025

Feb

-2025

MM

-922

HD

OT C

oo

rdin

ati

on

Co

nsl

t. E

ast

17,5

60,0

00

(7,6

31,3

60)

9,9

28,6

40

5,4

35,5

87

55%

Ju

n-2

012

Dec-

2024

D

ec-

2024

MM

-925

HD

OT -

WO

FH

/KH

G Im

prv

Ag

reem

en

ts

550,0

00

2,8

65,6

33

3,4

15,6

33

2,6

59,9

82

78%

O

ct-2

010

Oct

-2019

Oct

-2019

MM

-930

HD

OT S

tate

SO

A M

an

ag

er

& C

on

sult

an

t 1,2

72,4

00

583,1

42

1,8

55,5

42

990,4

37

53%

Feb

-2012

Au

g-2

017

A

ug

-2017

MM

-940

Kako

'o C

on

sult

an

t I

1,0

00,0

00

(3,1

06)

996,8

94

531,6

09

53%

M

ar-

2012

M

ar-

2022

M

ar-

2022

MM

-941

Kako

'o C

on

sult

an

t II

200,0

00

200,0

00

400,0

00

291,6

67

73%

D

ec-

2015

Ja

n-2

018

Ja

n-2

020

MM

-946

On

-Call H

azm

at

Ass

ess

men

t C

on

sult

an

t 12,0

06,2

27

2,0

75,0

00

14,0

81,2

27

6,5

07,0

94

46%

Feb

-2018

Feb

-2023

Feb

-2023

MM

-950

OC

IP C

on

sult

an

t I

1,2

50,0

00

0

1,2

50,0

00

1,2

50,0

00

100%

M

ay-2

012

Ju

n-2

017

May-2

017

MM

-951

Ow

ner-

Co

ntr

olled

In

sura

nce

Pro

gra

m

41,0

00,0

00

2,2

00,0

00

43,2

00,0

00

43,2

80,0

07

100%

A

pr-

2014

A

pr-

2020

M

ar-

2019

MM

-953

OC

IP C

on

sult

an

t II

415,0

00

0

415,0

00

317,5

12

77%

M

ay-2

017

M

ay-2

020

M

ay-2

020

MM

-960

Arc

heo

log

ical &

Cu

ltu

ral M

on

ito

rin

g

2,4

89,7

48

0

2,4

89,7

48

2,6

44,3

50

106%

Ja

n-2

014

Ja

n-2

019

Ja

n-2

019

MM

-962

Co

re S

yst

em

s Su

pp

ort

43,9

88,9

89

0

43,9

88,9

89

41,5

55,7

99

95%

Feb

-2014

Sep

-2019

No

v-2

019

MM

-964

Safe

ty a

nd

Secu

rity

Co

nsu

ltan

t 21,6

99,2

79

5,5

49,1

88

27,2

48,4

68

12,6

26,8

51

46%

A

pr-

2014

Ja

n-2

017

Ja

n-2

019

MM

-970

Fare

Co

llect

ion

Co

nsu

ltan

t 1,1

78,3

00

244,3

22

1,4

22,6

22

807,2

26

57%

Sep

-2015

Dec-

2019

D

ec-

2019

MM

-975

LEED

Co

mm

issi

on

ing

Serv

ices

for

MSF

278,6

30

7,8

45

286,4

75

286,4

75

100%

O

ct-2

010

Jan

-2016

A

ug

-2017

PA

-102

P

rog

ram

mati

c A

gre

em

en

t H

PC

667,2

75

(175,9

47)

491,3

29

274,0

53

56%

Ju

l-2013

Jan

-2019

Ja

n-2

019

AR

T

AR

T C

on

tract

s 2,1

39,5

00

10,0

00

2,1

49,5

00

436,5

25

20%

Ja

n-2

016

Ju

l-2019

Jul-

2019

MM

-935

Real Est

ate

Co

nsu

ltan

t 3,0

00,0

00

5,0

77,6

65

8,0

77,6

65

7,5

04,9

10

93%

M

ar-

2012

M

ar-

2017

M

ar-

2017

MM

-936

Real Est

ate

Co

nsu

ltan

t II

8,1

90,0

00

0

8,1

90,0

00

5,4

02,8

89

66%

Sep

-2016

Sep

-2020

Sep

-2020

MM

-937

Real Est

ate

Co

nsu

ltan

t -

Map

s/Su

rv.

2,9

98,0

00

1,1

30,0

00

4,1

28,0

00

2,9

30,7

93

71%

M

ay-2

014

M

ay-2

017

M

ay-2

019

MM

-981

Co

mp

lex

Real P

rop

ert

y N

eg

o. Lit

. Su

p

600,0

00

(21)

599,9

79

602,2

41

100%

Sep

-2016

Sep

-2018

Sep

-2018

MM

-982

On

Call A

pp

rais

er

4,0

00,0

00

0

4,0

00,0

00

486,5

21

12%

Ju

n-2

016

Dec-

2022

D

ec-

2022

MM

-983

Lan

d C

ou

rt P

eti

tio

n S

erv

ices

1,2

00,0

00

0

1,2

00,0

00

63,4

92

5%

O

ct-2

016

Oct

-2019

Oct

-2019

MM

-985

On

Call A

pp

rais

ers

II

1,2

61,3

08

0

1,2

61,3

08

330,5

82

26%

A

pr-

2017

A

pr-

2022

A

pr-

2022

MM

-986

Real Est

ate

Leg

al Serv

ices

5,8

00,0

00

0

5,8

00,0

00

1,5

07,6

45

26%

O

ct-2

017

Dec-

2022

D

ec-

2022

MM

-990

Desi

gn

Revie

w C

on

sult

an

t 4,0

27,7

81

0

4,0

27,7

81

277,3

29

7%

M

ar-

2018

D

ec-

2024

D

ec-

2024

MM

-991

P3 F

inan

cial Leg

al Serv

ices

4,2

82,3

33

3,4

00,0

00

7,6

82,3

33

4,2

84,0

41

56%

O

ct-2

018

TB

D

TB

D

UTIL

U

tility

Co

ntr

act

s an

d A

gre

em

en

ts

144,0

24,4

72

27,6

32,8

34

171,6

57,3

06

70,2

30,9

19

41%

D

ec-

2009

D

ec-

2018

Ju

n-2

018

4,3

24

,40

6,5

75

8

16

,53

7,5

51

5

,14

0,9

44

,12

7

3,5

39

,18

0,1

45

So

urc

e: H

AR

T C

MS.

N

ote

: Exc

lud

es R

igh

t-o

f-W

ay t

ran

sact

ion

s, d

ebt

fin

anci

ng

cost

s, a

nd

Cit

y/H

AR

T co

ntr

act

pac

kage

s, w

hic

h a

re in

clu

ded

in A

pp

end

ix A

.

Page 73: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

73 | P a g e

5 OVERALL PROJECT-WIDE ACTIVITIES

5.1 Overall Key Issues Overview

Permanent Power: Receiving permanent power for TPSS System site - Progress has been made. At UHWO Station, infrastructure and energization are pending resolution of a payment discrepancy between UH and HECO. HECO is working with HART to energize the stations where the infrastructure is complete and HART has right of entry.

Experienced Personnel: Having experienced and qualified personnel from HRH to deal with all challenges between now and Interim Opening is being addressed as a top priority. This includes personnel in management, testing, commissioning, construction, quality and safety certification.

O&M Documentation: HRH has assigned prime responsibility for documentation development to Horizon Partners Ltd. (HPL). All operations documents will be submitted in CMS by the first week of October with Health, Safety, Quality and Environment (HSQE) to follow.

HRH’s development of the Maintenance Management Information System (MMIS) (Maximo) is critical for Interim Opening. HPL completed an analysis of Maximo development, and has shared their gap analysis for HART review. Based on this review, HRH is engaging an MMIS consultant to provide a service proven rail transit solution and is still targeting Q1 2020 for data entry.

Automated Yard Operation: Closure of open design issues of the DBOM Core Systems contract is needed, particularly the Communications system design and the integration with the vehicles and automated train control systems. It is critical that all communications system’s updated 125 design submittals and test plans are submitted by HRH and approved by HART to meet the mid-November completion date.

Functional Track integration testing is planned to be completed in three phases: (1) ATC/ PSG Integration, (2) Communications without canopies, and (3) final communications after installation of the canopies (scheduled to be completed between Thanksgiving and the end of the year). All Core Systems-related Fixed Facilities work and Core Systems installation work at Ho‘opili, West Loch, Waipahu stations and the associated guideway must be completed, energized (including LCC), and tested prior to integration testing.

Station Canopies: Fabrication of the Plan B lower arms are complete for UHWO and HOP. They are scheduled to arrive in mid-October. EKP canopy fabric installation is scheduled to start on Oct. 14, 2019. LCC station arms are scheduled to be installed in October. Fabrication for the WLO, WTC, PHL and PLR stations continue. Issued for Construction (IFC) drawings for ALS are scheduled for late October. Mitigation efforts to have the six (6) side platform stations (less Aloha Stadium) installed by December 2019 continue. Workarounds to progress systems work are being undertaken in order to lessen the impact of the delay.

The AGS contractor is dependent on HECO review and approval of the infrastructure design that is required for the relocation of power lines that impact the construction of the AGS guideway. HART is dependent on the electrical design prepared by HECO for the electrical power line relocation work that must be performed by HART’s On Call / CCUR contractor. The timeliness of these approvals and design work is critical to the ability of the AGS contractor to meet the contractual substantial completion date of their contract. HART’s and HECO’s management are meeting on a regular basis to ensure that adequate progress is made to accommodate the schedule. HECO is expected to complete their design for the electrical Zone 8 much earlier than expected, which is a result of the ongoing HART and HECO management meetings.

Page 74: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

74 | P a g e

5.2 Permits Permits Submitted and In-Progress

HART received the National Pollutant Discharge Elimination System (NPDES) permit extension for the Hō‘ae‘ae, Pouhala, and Hālaulani stations. HART began preconstruction water sampling in compliance with the Clean Water Act Section 401 Applicable Monitoring and Assessment Plan for Kalihi Stream construction.

HART continues to submit the City Center noise variance notification to the Hawai‘i Department of Health (HDOH).

HART submitted an extension of the City Center Community Noise Permit for construction. HART submitted a request for time extension of the permit for construction in waters of the U.S. affecting

Waiawa Stream and Waiawa Tributary. Look Ahead

HART will be submitting permit applications for the Kamehameha Highway 138kV activities. HART will submit a Noise Variance extension for the Kamehameha Highway section and the West O‘ahu

Farrington Highway section of the project. HART will submit a Community Noise Permit extension for the Kamehameha Highway section.

5.3 Hawai'i Department of Transportation (HDOT) Agreements Activities this Month

The WOFH Master Agreement and Joint Use and Occupancy Agreement (JUOA) Amendment 1 draft resolutions are routing; currently, HART and DTS are going through comment resolution.

Ongoing tracking of the progress of the projects for the Highway Improvement Agreement. Coordinating documentation of the highway improvement projects with HDOT and Federal Highway Administration (FHWA) for reimbursement. Ongoing activity in conjunction with highway improvement project work.

Airport Guideway Section Partial Assignment document executed. Look Ahead

Execution of the City Center Joint Use and Occupancy Agreement. Execution was previously planned to be in conjunction with the start of P3 contractor construction on Nimitz Highway, pending P3 procurement, however, the direction has changed to accommodate CCUR construction activities. The agreement is currently with HDOT for review/signature. Expected execution by October 2019.

Route externally for execution of the West O‘ahu Farrington Highway Master Agreement and Joint Use and Occupancy Agreement Amendment 1. Upon concurrence between HART and DTS, it will be routed to BFS, HDOT, followed by final legal review, estimated fourth quarter 2019. Presentation to the Board and City Council to follow, estimated first quarter 2020.

Page 75: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

75 | P a g e

5.4 Utility Agreements

Utility Agreements Status Matrix

Utility Owner Status WOFH KHG Airport City Center

ESA UCA ESA UCA UCA COMBINED ESA UCA

AT&T (Corporation)

Executed 05/11/11 12/20/11 5/18/12

Including with ESA

Not Required

12/26/13 05/03/17 NTP 05/12/11 12/21/11

Amd 01 07/01/11 HRS Ch. 104 11/22/16

AT&T Corp. (Public Sector)

Executed 12/26/13 08/27/18 12/26/13

NTP

Chevron

Executed 12/04/09

11/04/11

NTP 12/22/09 11/15/11

Amd 01 07/01/11

Hawaiian Telcom

Executed 05/20/10 11/17/14 05/10/12 12/31/14 05/28/15 09/27/13 04/06/17

NTP 06/14/10 11/18/14

Amd 01 07/01/11 04/13/15 05/11/17 11/19/18 09/20/19 – Executed

Amd 02 05/10/12

HECO

Design

Services Construction

Services Design

Services Construction

Services Design

Services Construction

Services Design

Services Construction

Services

Executed 11/20/13 11/29/13 11/20/13 11/29/13 11/20/13

11/25/13

NTP 11/20/13 11/29/13 11/20/13 11/29/13 11/20/13 11/25/13

Executed 05/16/18

Change Order 01

06/30/17

Working to

execute Change Order No. 1

02/22/18

Change Order 02

02/22/18

Working to execute Change

Order No. 2

Mem

ora

nd

um

s o

f U

nd

erst

and

ing

08/07/14 – Construction Drawings

05/01/15 – Access

05/15/15 – Derrick Truck

06/23/15 – Master Agreement

06/09/15 – MSF Advanced Construction

09/16/15 – Right of Entry

10/12/15 – Clearance (West) 11/10/15 – Dillingham Blvd Materials

Clearance (West) AMD 01

07/13/16 – KHG Vertical Clearance

Power Quality MOU (Working on MOU)

08/16/18 - Airport Clearance Agreement

05/15/19 – Vehicle Storage MOU

Airport Energization MOU 08/13/19 - Executed

Charter Communications/Oceanic Time Warner Cable

Executed 12/08/09 12/21/11 01/09/12 06/02/14 12/19/14

04/03/13 9/22/16

NTP 12/22/09 04/04/13 9/30/16

Amd 01 07/01/11 02/27/14 HRS Ch. 104 07/06/18

Final Draft sent to

Charter/ OTWC.

Amd 02 10/07/13 HRS Ch. 104

Page 76: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

76 | P a g e

Utility Agreements Status Matrix

Utility Owner Status WOFH KHG Airport City Center

ESA UCA ESA UCA UCA COMBINED ESA UCA

Pacific Lightnet/ Wavecom

Executed 04/28/10 03/12/12 02/15/12

NTP 04/29/10 03/13/12 02/16/12

Amd 01 07/01/11 HRS Ch. 104

Sandwich Isle Communications

Executed 05/20/10 04/20/12

NTP 06/08/10

Amd 01 07/01/11

Hawai'i GAS

Executed 12/18/09 06/30/11 06/01/12 04/14/14

08/19/14 09/27/13

05/08/15

NTP 12/22/09 07/12/11 08/20/14 05/11/15

Amd 01 07/01/11 10/17/14 08/28/14 08/31/17 10/24/17

Amd 02 05/09/16 10/23/15

Amd 03 HRS Ch. 104

Level 3/TW Telecom

Executed 12/02/09

02/14/12 Oceanic to relocate for TW Telecom

10/11/12 Oceanic to relocate for TW Telecom NTP 12/22/09 02/16/12

Amd 01 07/01/11

Tesoro

Executed

02/15/12 09/12/13

08/27/13

NTP 02/16/12 09/03/13

Amd 01 09/12/14

Amd 02 05/13/15

Amd 03 HRS Ch. 104

Legend = Action this month COR = Corporation Counsel UCA = Utility Construction Agreement

= Not applicable ESA = Engineering Services Agreement

UFRCRA = Combined Engineering and Construction Utility Agreement

Overall Key Issues

No key issues to report this month. HECO

Ka‘aahi Substation near MSF area – On May 3, 2019, the State Public Utilities Commission (PUC) approved HECO’s application for construction of the new substation. HART’s contractor has completed substation site grading and made it available to HECO on July 5, 2019. The issue regarding the need for a supplemental agreement to cover costs if project costs exceeds 60-month revenues has been elevated to HART and HECO upper management. HECO continues to take the position that it will not start substation construction until this issue has been settled.

Mitigation of Horizontal Working Clearance Requirements – At a HART/HECO Executive meeting on Sept. 18, HECO indicated that a WOFH/KHG Clearance Agreement amendment may not be needed if the KHG ESA and UCA change orders are approved. HART is planning to send those change orders to HECO for signatures on Oct. 2, 2019. HART’s designer for the KHG 138kV Relocation Project, R.M. Towill and High Energy Inc. sent 30% design drawings to HART on Sept. 23 for review; this will then be provided to HECO for review on Oct. 7. HART continues to prepare the Specialized Vehicle Storage Yard. HECO received the first 138kV vehicle (Skybird) on Sept. 27 and will need to do testing and training before delivery to the storage yard.

Page 77: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

77 | P a g e

5.5 Right-of-Way Key Issues

ROW is continuing its engagement with property owners along the City Center Guideway and Stations (CCGS) Section to acquire the requisite property rights via Right of Entry and Possession and Use Agreements (ROE/PUA) for Land Court properties pending final Grant of Easement or Warranty Deed or other permanent property rights where appropriate. When acquisition by purchase is not reasonably available, ROW uses eminent domain to acquire the requisite property interests. HART’s counsel prosecutes its eminent domain actions and the respective motions for immediate possession of the property so that the construction access may be obtained. ROW continues to move properties through the prescribed eminent domain authorization process.

The Howard Hughes properties continue to be a focus of ROW’s efforts and resources. The parties are working together on plans for demolition of existing improvements and construction of the guideway station. The condemnation action is moving forward to settle the valuation of the property taken. HART filed its eminent domain action and motion for order putting HART in possession of Parcel Identification Number (PID) 433 HECO Iwilei. HECO filed a challenge to HART’s Order of Possession of the property for the HECO Dillingham Avenue property; a hearing on those challenges is scheduled in October. The parties are currently negotiating access for HART to perform a Phase II environmental survey on the property. HART is also working with HECO to get access to HECO’s downtown property on Ala Moana Boulevard to perform a Phase II environmental survey.

o West O‘ahu/Farrington: One case is filed with the court and is active (PID 102 R. Lee). While HART has possession of the

property, there continues to be unfulfilled duties of the Lees to remediate contamination on the parcel. The judge overseeing this case has been serving as a mediator and facilitator, assisting the property owner in completing its obligations under the settlement. The judge holds biweekly status conferences with the parties and has engaged the Hawai‘i Department of Health (HDOH) in facilitating the completion of the remediation of the property. The HDOH has issued one “no further action” letter and there now remain three sections of the property to remediate. Progress has been made in getting HDOH’s approval of the owners’ remediation plans for the remaining sections.

o Kamehameha: One case is closed (PID 201 Stuart Plaza).

o Airport: Four cases are filed with the court and are active. Two cases (PID 302 Kronick and PID 318

Masters) both have Order of Immediate Possession (OIP). Additionally, PID 318 Masters completed the Land Court process and a revised Letter of Offer (LOO) was sent to the owners who responded with a counter offer. An agreement has been reached and a settlement offer and ROE/PUA is in process between the parties for a fee take of the required area. For one case, PID 306 SCI, (partial fee and easement) HART has an irrevocable ROE/PUA dated March 18, 2016, and recorded Docs. # T-9573088 A & B and T-9573089. The condemnation action for PID 306 SCI was filed on Aug. 18, 2018, and an OIP was also issued for the property. PID 319 SCI was filed on March 20, 2019.

o City Center: Eight cases are filed with the court and are active (PID 400 Blood Bank, PID 472A Desky, PID 439

Yamauchi, PID 485 Scott Shoe, Howard Hughes various parcels, PID 433 HECO Iwilei, PID 502 Yung Soon Tajima Trust, PID 503 JY Trading Co.). For PID 439 Yamauchi, a fully-executed settlement agreement was received from the parcel owners and outside counsel will formally dismiss this case once the Land Court process is completed. OIPs have been granted for PID 400 Blood Bank, PID 472A Desky, 485 Scott Shoe, and 503 JY Trading Co. For PID 400 Blood Bank, a trial date of Jan. 13, 2020 has been set.

Two cases are complete and the Final Order of Condemnation was recorded on Sept. 13, 2018 (PID 429 Kalahiki) and April 27, 2018 (PID 483 Hardwoods).

Page 78: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

78 | P a g e

Twelve cases were authorized by the City Council for eminent domain proceedings via resolution (36 Tax Map Keys) (Resolution 2017-12 [VW],-14 [HECO],-15 [Four K],-16 [Otani],-17 [PGC],-18 [HECO],-19 [Wong],-20 [Servco],-21 [Fuji Sake],-23 [Sanno], Resolution 2018-13 [JY Trading Co.], -16 [Yung Soon Tajima Trust]).Additional cases will be processed as needed over the next several months. We continue to cooperate and assist the Government Affairs team in these efforts. Please note that PID 439 Yamauchi, PID 436 Four K, PID 444 Wong, PID 448 Fuji Sake, and PID 494 Sanno all have either executed ROE/PUAs or signed the LOO.

Negotiations with the private property owners are ongoing with the goal of reaching mutually-acceptable agreements. The total number of Tax Map Keys (section 1 – 4) authorized by the City Council via eminent domain proceedings is 87 Tax Map Keys (TMKs), and out of 87 TMKs, 16 eminent domain cases have been filed.

One parcel PID 403C RPTeixeira LLC has been acquired.

At the request of the CCUR team, active acquisition efforts for HECO 138kV easements for PID 423A Kapalama Bridge/Canal and PID 501 Kalihi Kai Elementary are on hold pending final CCUR design decision. PID 424A Honolulu Community College is pending a construction ROE with HCC prior to an easement acquisition going forward. ROW stands ready to re-engage when requested. Discussions with the CCUR team indicate there may be additional parcels required once the design is finalized.

During the month of May, the FTA conducted a review of the relocation program which included an examination of parcel files which had been part of audits conducted in 2017 by Overland Pacific Cutler on behalf of HART. The FTA issued a report on Sept. 23, 2019 regarding its findings. The report details measures that must be taken to bring the closed relocation files into compliance, including interviewing the relocated parties. The report states a deadline for a written plan by Oct. 31, 2019, and completion of the plan by Sept. 30, 2020.

Regular meetings between the CCUR team, Project Controls and ROW to track progress, identify opportunities and foresee obstacles to access for critically needed parcels are ongoing.

The FTA agreed to the proposed multi-agency approach to the acquisition and tenant relocations for PID 493 Watumull which is the site for the Ala Moana Station. HART has partnered with the City and County of Honolulu’s (CCH) DTS, Department of Design and Construction (DDC), and BFS to facilitate. The appraisal and review are complete and a concurrence request will be sent to the FTA.

In July, the FTA approved HART’s plan for the acquisition and potential relocation of the tenant at PID 404 Takara (a critical path CCUR parcel). The appraisal update is complete and an offer will be presented in the near future.

ROW continues to monitor negotiations between Design and Construction and HECO regarding issues involving clearance requirements due to maintenance equipment staging needs for 138kV poles and lines located next to the HART guideway system. These discussions will likely identify additional acquisitions of non-asset easements that will eventually be assigned to HECO or other utility agencies and/or companies.

Negotiations are continuing with UH, including securing a construction ROE Agreement with the Honolulu

Community College.

HECO utility easement requirements remain a concern to HART and ROW. The following are a couple of issues that ROW is working to resolve: 1) how to transfer electrical easements acquired by HART on behalf of HECO. There is no current mechanism for transferring these easements to HECO. COR is currently reviewing the situation to make a determination on a viable solution. 2) HECO and HART are having ongoing discussions to address energization issues (e.g., Navy land).

Page 79: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

79 | P a g e

Colliers International is currently in Task Order 3 to do relocations work. HART is currently working with Colliers to execute Task Order 4 for acquisitions.

Acquisitions Figure 7. Right-of-Way Status for the Parcels

Relocations Figure 8. Relocation Status for the Occupants

Non-Right of Way Figure 9. Temporary Construction Easements and Utility

Page 80: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

80 | P a g e

Status of Inter-Governmental Agreements Figure 10. Inter-Governmental Agreement Status The status of agreements between HART and other government entities. Objectives are:

1) Obtain Construction Right of Entry, Executive Orders, Set Asides, Jurisdiction Transfers, Joint Use Agreements, licenses, easements, Memorandum of Understanding (MOUs), Memorandum of Agreement (MOAs), etc. with impacted government agencies. Government agencies HART is working with include: Federal (GSA, Navy, USPS, Office of Interior), State (HDOT-Hwys & Air, DLNR, DAGS, HCDA, DOE, Aloha Stadium, UH), and County Agencies (DTS, DPP, DFM, BFS, DDC, Parks, DLM, ENV). Some government agencies may choose to issue the final documents after construction is substantially underway or near completion.

2) To help negotiate and/or obtain Rights of Entry for certain other construction-related activities as requested by Design and Construction. Such agreements may include: geotechnical borings, soil testing, environmental surveys, bus stop agreements, construction lay down surveys, and other construction-related needs. There may be other Rights of Entry and Agreements which may not involve ROW acquisition or relocation. ROW will assist other HART departments, should requests be authorized and funded.

3) Agreements to be executed are in white. Executed agreements are in grey at the end of the table, and while these parcels may be accessible at this time for construction, further documentation may also be required to complete the acquisition.

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

STATE AGREEMENTS

UH – University of Hawai‘i, West O‘ahu (UHWO-125)

Construction Right of Entry and Occupancy & Use Agreement for East Kapolei Park & Ride

TBD/ Estimate

2021

WOFH Yes Temporary park and ride and Road B (connector road) nearing completion on UH property. 3rd Amendment to CROE has been

fully executed. It allows for installation of electrical

connections from Road B to station area and subsequently into

interim parking.

UH – Urban Gardens (201A) Conveyance to HDOT (H) – Dept. of Transportation Highways

January 2020

KHG Yes

2nd Amendment to HART ROE fully executed. Royal Contracting

secured ROE for road, retaining wall, and concrete culvert

improvements. Based on final Phase II results, HDOT has issued

concurrence letter. Construction is nearing completion. Quitclaim deed under review by HDOT-Highways. Subdivision map

tentative approval by DPP still under review and approximately 1

month away.

Page 81: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

81 | P a g e

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

UH – Honolulu Community College (HCC) (424A)

Construction Right of Entry for guideway & station

October 2019

City Center No Pending design finalization. Working with UH regarding ROE

Agreement. Draft ROE Agreement under review by COR. ROE will be broken down into phases starting

with least intrusive activity. Demolition and preliminary

construction activities completed under letter agreement with Royal

Construction.

DLNR – Dept of Land & Natural Resources (124)

Kapolei Easement Agreement for overhead guideway and for park and ride facility

November 2019

WOFH

Yes In process. DPP approved subdivision application.

Transmitted to DLNR for land court submittal. Discussions are

ongoing regarding language permitting guideway easement.

DLNR/C&C Wastewater Div (437B)

Easement Agreement December 2019

City Center In process. DLNR working with DAGS survey group to address

questions regarding final easement map. Ongoing

discussion with DLNR regarding easement agreement terms.

DOE - Waipahu H.S. (118) Permanent Easement (State owned portion)

May 2020

WOFH Yes

In process. Construction is not impacted as the ROE for right to access and construct is executed.

With DOE for review. Working with DLNR for permanent rights.

DOE – Waipahu H.S (117) Memorandum of Understanding (City owned portion)

November 2019

WOFH Yes Draft 1st Amendment to ROE sent to DOE, BFS, DLM, and HECO for comments on 4/18. Comments received from everyone except

DOE.

Met with DOE 10/3/18. Proposed MOU with DTS comments

submitted for DOE and Attorney General (AG) review. Negotiations

have stalled until the DOE sees progress towards satisfactory

settlement in its claim against the contractor. Construction is not

impacted as the ROE for right to access and construct is executed. Working with City for permanent

rights.

DOE – Waipahu H.S. (117) Permanent Easement (City portion)

May 2020

WOFH Yes Permanent easement from City in process. DLM has indicated they will delay the transfer of the City portion to the State until HART has permanent entitlements in

place. HART is revisiting this strategy. Construction is not

impacted as the Master/ Construction Agreement is

executed. Working with BFS for permanent rights.

Page 82: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

82 | P a g e

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

Aloha Stadium / Dept. of Accounting & General Services (DAGS) (207A to C)

Easement Agreement January 2020

KHG Yes In process. Pursuing map approvals from Stadium Authority, DAGS, and DLNR. Construction is

not impacted as the ROE for access and construction is

executed. Working on permanent easement agreement.

Aloha Stadium/ DAGS (207B)

Agreement for bus interface and shared parking area

January 2020

KHG Yes In process. Agreement format may impact map approvals from

Stadium Authority, DAGS, and DLNR. Construction is not

impacted as the ROE for right to access and construct is executed. Working on permanent easement

agreement. DAGS and Stadium Authority have engaged HART in

discussions regarding relocation of shared parking and bus interface to accommodate TOD upzoning.

HDOT(H) – Dept. of Transportation Highways (100,100-A, 304, 400-A, 400-B)

Master Agreement Amendment

October 2019

WOFH Yes Construction is not impacted as the Joint Use & Occupancy (JU&O) Agreement for right to access and

construct is executed.

HDOT(H) and (A) – Dept of Transportation Highways & Airports (100,100-A, 301, 304, 304, 400-A, 400-B)

Master Agreement for KHG, Airport and City Center Amendment

October 2019

KHG, Airport,

City Center

Yes for KHG & Airport

Construction is not impacted as the JU&O for right to access and construct for City Center will be

executed when the Notice to Proceed (NTP) is issued.

HDOT(H) (100,100-A, 304, 400-A, 400-B)

JU&O Sub-agreement October 2019

WOFH Yes In process. Construction is not impacted as the JU&O for right to access and construct is executed.

HDOT(H) (100,100-A, 304, 400-A, 400-B)

JU&O Sub-agreement October 2019

City Center In process. Construction is not impacted as the JU&O will be executed when NTP is issued.

HCDA -HI Community Development Authority (444A, 450,463BE-5-B, 475)

Construction ROE, License Agreement, & Final Disposition

December 2019

City Center Coordination is ongoing. ROE for Royal Contracting pre-

construction activities extended. HART will need to appear before HCDA board for construction ROE

(construction of guideway improvements and utility

relocation) approval.

DAGS (441-A) Construction Right of Entry October 2019

City Center A street is being designed substantially within the footprint of Easement U as requested by DAGS as a precondition to ROE.

The street will be provided as in-kind consideration for a staging yard for the 3rd party contractor.

Survey for staging area being conducted and street concept plan undergoing refinement.

DAGS (441-A) Guideway and Utility Easement Agreement

August 2020 City Center In process.

Page 83: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

83 | P a g e

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

Kalihi Kai Elementary (501) Right of Entry from DOE/DLNR

December 2019

City Center On hold pending design finalization.

Kalihi Kai Elementary (501) Easement Agreement 2020 City Center On hold pending design finalization. Once ROE is in place, subdivision map to be completed

and submitted to DPP.

State of Hawaii - DOT (504) Easement Agreement Pending City Center Draft ROE/GOE request prepared. Under HECO review.

FEDERAL AGREEMENTS

USPS (301) Permanent Easement 2020 Airport Via GOE Construction is not impacted. Grant of Easements were

recorded in Regular System to facilitate entry onto property for

construction even though the property is registered in Land Court. Now petitions for Land

Court designation of easements are being developed for submittal

to Land Court.

U.S. Gov't/General Services Administration (GSA)/Federal Courthouse (443C)

Master Agreement, Security & Landscape License Agreement, Utility License Agreement, Guideway License Agreement

December 2019

City Center Master Agreement fully executed on 8/13/19.

Preparing Security & Landscape

License Agreement for finalization.

GSA Federal Courthouse Quitclaim Easement Documents for Utility and Guideway Easements

2020 City Center Under review.

CITY AGREEMENTS

BFS – Dept. of Budget & Fiscal Svcs (204A)

Intra-Agency coordination which may take the form of a ROE, letter agreement, or license (Continental Investment)

2020 KHG Via intra-agency

coordination

In process.

DFM (423A) Work Permit (Kapalama Stream for Street, Bridge, and Guideway Improvements)

October 2019

City Center Per BFS, no ROE necessary. Only a work permit will be needed. The

contractor and HART Planning and Construction departments are in

process of obtaining a work permit. Possible adjustments to design are being contemplated

and may change this.

DFM (423A) Easement Agreement for Utilities

2020 City Center Utility agreements on hold pending design finalization.

DTS – Dept. of Transportation Svcs (322)

Intra-Agency coordination which may take the form of a ROE, letter agreement, or license (Middle Street Station)

2020 Airport Via intra agency

coordination

In process.

OTHER AGREEMENTS

Page 84: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

84 | P a g e

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

D.R. Horton (101B) MOU Construction Right of Entry Amendment – D.R. Horton & HART Easement Agreement – D.R. Horton & HECO

December 2019

WOFH Yes ROE amendment on hold until maps with new TMK are finalized.

EDD has been approved. Rights and Responsibilities letter has

been agreed to by D.R. Horton. Post ROD, appraisal supporting

license fee, and Letter of Intent in process. MOU pending. Appraisal

in process and draft anticipated within the month.

D.R. Horton Final Easement Agreement January 2020

WOFH Yes In process and subject to owner’s development plans. Construction

is not impacted. EXECUTED

AGREEMENTS CITY AGREEMENTS

BFS (205A) Jurisdictional transfer from DFM to HART of Kamehameha Hwy/Makalapa Manor

Airport Yes Jurisdictional Transfer from BFS Letter dated 8/26/11.

DPR - Dept. of Parks & Recreation (119)

Construction consent to construct for MSF drainage

WOFH Yes

BFS / DFM (Dept. of Facility & Maintenance) (437C)

Jurisdictional Transfer (Awa Triangle, N. Nimitz & Awa St.)

City Center Jurisdictional transfer completed July 9, 2018.

STATE AGREEMENTS

DLNR/C&C Wastewater Div (437B)

Construction Right of Entry

City Center Yes Construction ROE obtained from

DLNR 10/21/17. Subdivision submitted with DPP 1/1/18.

UH – University of Hawai‘i Master Agreement is not needed as the ROE for right to access and construct will be executed separately by each campus.

WOFH, KHG, City

Center

Will be executed by each campus

Construction is not impacted as the ROE for right to access and

construct will be executed by each campus.

UH Pre-Construction Right of Entry and Amendment

WOFH, KHG, City

Center

Yes

UH - West O‘ahu (UHWO) (125)

Construction Right of Entry for Station, Temporary Park & Ride, and Amendment for Construction of Road B

WOFH Yes

UH - Leeward Community College (LCC) (122)

Construction Right of Entry for Guideway

WOFH Yes

UH – LCC (122) Construction Right of Entry for Station

WOFH Yes

UH - Urban Gardens (201A)

Construction Right of Entry KHG Yes

DLNR – Dept. of Land and Natural Resources (124)

Kapolei Construction Right of Entry for overhead guideway and for park and ride facility

WOFH Yes CROE has been granted once a year by letter. Working on

permanent Easement with DLNR. Currently with DPP for

subdivision.

Page 85: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

85 | P a g e

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

DLNR (320) Keehi Lagoon Construction Right of Entry

Airport Yes

DOE – Dept. of Education Waipahu H.S. (117, 118)

Master/Construction Agreement

WOFH Yes

DOE/DLNR for Waipahu H.S. (118)

Construction Right of Entry WOFH Yes Executed by DLNR with DOE concurrence.

Aloha Stadium / Dept of Accounting & General Services (DAGS) (207)

MOU for guideway & station KHG Yes

Aloha Stadium/DAGS Construction Right of Entry for guideway

KHG Yes

Aloha Stadium/DAGS Construction Right of Entry for station park and ride

KHG Yes

HDOT(H) – Dept. of Transportation Highways (100)

Master Agreement for HDOT Highways for WOFH

WOFH Yes

HDOT(H) and (A) – Dept. of Transportation Highways & Airports

Master Agreement for HDOT Highways and Airports, for KHG, Airport and City Center Sections

KHG, Airport,

City Center

Yes except for City Center

whose JU&O will be

executed when the NTP

is issued

HDOT(H) JU&O Sub-agreement WOFH Yes

HDOT(H) JU&O Sub-agreement KHG Yes

HDOT(H) JU&O Sub-agreement Airport Yes

HDOT (A) - Dept. of Transportation Airports

Airport Special Provisions for Right of Entry

Airport Yes

HDOT(A) JU&O Sub-agreement for Airport Division parcels

Airport Yes

HDOT(A) (301A) Easement document for Airport Division parcel (Main guideway easement)

Airport Yes Ongoing intra-agency coordination. Construction is not

impacted as the Special Provisions and the JU&O for right to access

and construct is executed.

DHHL - Dept. of Hawaiian Home Lands (Exchange w/ Varona Village) (115A)

MOA, License/ROE from DHHL, City Council Resolution

WOFH, MSF Yes DLNR approves withdraw from GEO 571 7/14/17. DFM accepts

road widening and now City jurisdiction.

OCCC - Dept. of Public Safety, Oahu Community Correctional Center (400A)

MOU

City Center Yes

OCCC/DLNR Construction Right of Entry

City Center Yes

DLNR/OCCC Letter of Responsibility from City-DFM/Road

City Center Yes

HCDA -HI Community Development Authority (444A, 450, 463B, E-5-B, 475)

Pre-construction Right of Entry

City Center Yes, effective upon request

Verbal approval granted by the HCDA Board in 6/2016.

Page 86: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

86 | P a g e

Inter-Governmental Agreements

Agency

Pending Agreements (Executed Agreements

are shaded grey)

Target

Section

Construction Right of Entry

(CROE) Obtained

Notes/Remarks

FEDERAL AGREEMENTS

U.S. Navy (116A) Grant of Easements for Maintenance & Storage Facility (MSF)/Rail Operations Center (ROC) offsite drainage and sewer easements

WOFH Yes Per Letter #N62478-12-RP00011 dated 6/28/12 confirming

easement from Navy.

U.S. Navy (300) Licenses/Construction Right of Entry

WOFH, KHG,

Airport

Yes 6/22/15 – 5 Yrs. License ends in 2020. All utility work needs to be

completed by then.

U.S. Navy Easement Agreements WOFH, KHG,

Airport

Yes Grant of Easement executed. Grant of Easement 8/22/16.

U.S. Navy Pearl Harbor Station Acquisition of Fee Transfer

Airport Yes Quitclaim deed executed 2/25/16.

U.S. Post Office (USPS) (301)

Honolulu Processing Center acquisition

Airport Yes Acquisition completed in regular system. Need to process through Land Court to complete process. Funds already paid. USPS Land

Court share to complete process is in escrow.

OTHER AGREEMENTS

D.R. Horton Construction Right of Entry - D.R. Horton & HECO

WOFH Yes Executed 5/11/2018.

Page 87: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

87 | P a g e

6 MANAGEMENT AND ADMINISTRATIVE UPDATES

6.1 Safety and Security (S&S)

Key Issues HART Safety has been working with the Core Systems Oversight Consultant (CSOC) to oversee HRH preparations

for energization and vehicle testing on the Functional Track section between LCC and Ho‘opili Station platforms. o Phase 1 initial energization test is scheduled for Oct. 2. o Over the shoulder review of the Dynamic Testing and Commissioning Safety Plan was completed. o With a projected completion in November 2019, Phase 2 of Initial Energization (LCC to Ho‘opili using TPSS

from Waipahu, West Loch, and Ho‘opili and LCC GBS) is underway.

Scheduled certification milestones pending design and/or construction approved documentation: o MSF Yard Control Bungalow (YCB) civil contract certification – pending approved construction submittals.

Discussed in Bi-weekly HRH Coordination Meeting and HRH Certification meeting; no updates. 4 open items on the Construction Specification Conformance Checklists (CSCC).

o Maintenance of Way (MOW) 9 (nine) vehicles certification – pending approved design documentation. Discussed during Bi-weekly HRH Coordination Meeting and HRH Certification meeting.

2 open items on Design Criteria Conformance Checklists (DCCC) 10 open items for vehicle acceptance documentation on Specification Testing Conformance

Checklists (STCC). 6.1.1 Safety and Security Certification Twelve (12) Month Projected Milestones and Work Priority

12 - Month Certification Projected Milestones Contract and Interim Certificates (IC) Next 30-90

days Next 90-180

days Next 180-270

days Next 270-365

days

X – Projected Month, TBD – To be Determined – Pending Documentation

Oct 2019

Nov 2019

Dec 2019

Jan 2020

Feb 2020

Mar 2020

Apr 2020

May 2020

June 2020

July 2020

Aug 2020

Sept 2020

1. MSF – IC Unattended Driving

2. PV-005, IC to enter Dynamic Testing

3. PV-006, IC to enter Dynamic Testing

4. FHSG Civil Contract Certification

5. Functional Section – IC 3rd Rail Energization (Phase 2)

6. Functional Section - IC Attended Driving

7. Functional Section – IC Unattended Driving

8. WOSG Civil Contract Certification

9. KHSG Civil Contract Certification

10. Elevator/Escalator Certifications FHSG/WOSG/KHSG

11. PV-012, IC to enter Dynamic Testing

6.1.2 Project Overall Certification Status

Project Overall Certification Status - Progress Historical Record Jul/19 Aug/19 Sept/19 Final Revenue Overall % 42% 44% 44%

- Interim Revenue Service - 12/2020 59% 60% 60%

- Phase II Revenue Service - 12/2025 25% 27% 28%

Page 88: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

88 | P a g e

6.1.3 Interim Revenue Service Date Certification Status

Interim Revenue Service (2020) Certification Status - Progress Historical Record Jul/19 Aug/19 Sept/19 Major Components

- MSF (Civil & Systems) 88% 88% 88%

- Guideway (Civil & Systems) 97% 97% 97%

- Stations & Parking (Civil & Systems) 76% 81% 82%

- Passenger Train (PT 1-20) 26% 26% 26%

- Fare Vending 9% 9% 9%

- Traction Electrification System (TES) 71% 71% 71%

- ATC / SCADA 81% 81% 81%

- Communication 68% 68% 68%

- System Integration Testing (SIT) 42% 42% 42%

- Operational Readiness 16% 16% 16%

- Risk Management 65% 65% 65%

6.1.4 Phase II Revenue Service Date Certification Status

Phase II Revenue Service (2025) Certification Status - Progress Historical Record Jul/19 Aug/19 Sept/19 Major Components

- Guideway (Civil & Systems) 27% 28% 28%

- Stations & Parking (Civil & Systems) 19% 19% 20%

- Fare Vending 7% 7% 7%

- Traction Electrification System 7% 7% 7%

- ATC / SCADA 80% 80% 80%

- Communication 13% 13% 13%

- System Integration Testing 0% 0% 0%

- Operational Readiness 0% 0% 0%

- Risk Management 32% 58% 63%

6.1.5 S&S Open Items List Status

"Open Items List" "Open Items" - Design/Construction and Verification Issues

Month 2019

Total # Total # Open

Total # Closed

% Closed Overall

# Closed In Month

% Closed In Month

Jul 297 22 275 93% 0 0%

Aug 297 22 275 93% 0 0%

Sep 298 21 277 93% 2 1%

6.1.6 Construction Safety and Security: Safety and Security Incidents

Incidents for Sept. 1-30, 2019: o FHSG: A generator and items were stolen from a work container on site. o CSC: Batteries were stolen from 2 aerial lifts located near Pearl Highlands traction power substation.

Page 89: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

89 | P a g e

Page 90: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

90 | P a g e

6.2 Quality Management Key Issues

HART NCR Log

Total NCRs Issued To Date Closed Open

92 (Audits) 89 3

1 (Construction) 1 0 Note: HART Issued NCRs for Construction are shown on each respective contract.

Resolution of major NCRs that need to be addressed and corrected to prevent recurrence, and to mitigate impact on

the overall progress of the project. The major NCRs are described below: o Retrofit of Eight (8) Car Shells under frame to rectify aluminum extrusion defects continues. Retrofit of car shell

underframe to rectify aluminum extrusion defects continues in Italy. Five (5) out of six (6) retrofitted car shells have been received in Pittsburg, CA. The remaining two (2) of eight (8) car shells to be retrofitted are still in Honolulu, which will be shipped to Italy later, after Train #1 and Train #2 are shipped to the Pittsburg facility.

o Cracks in Canopy Structural Steel Members. Cracks on the Canopy Structural Steel members were found in the WOSG and FHSG station groups. HART is in the process of finding the “root cause” of the defects, the disposition, and appropriate corrective action to prevent recurrence. All lower portions of the canopy arms (grade 100 steel) will be replaced at WOSG, FHSG and KHSG. Fabrication of the Plan B lower arms are complete for UHWO and HOP. They are scheduled to arrive in mid-October. EKP canopy fabric installation is scheduled to start on Oct. 14, 2019. LCC station arms are scheduled to be installed in October. Fabrication for the WLO, WTC, PHL and PLR stations continue. IFC drawings for ALS are scheduled for late October. Mitigation efforts to have the six (6) side platform stations (less Aloha Stadium) installed by December 2019 continue. Workarounds to progress systems work are being undertaken in order to lessen the impact of the delay.

Audit Look Ahead

Prepared and issued (Revision 8) the Project Combined Management System Audit Schedule for 2019 to HART and all contractors, consultants and suppliers.

Planning for the audits to be performed in October 2019: Audit No. 19-015 KHSG – Combined Quality Assurance (QA), Buy America (BA) and Environmental Compliance (EC) Audit of Nan Inc. on Oct. 3-4, 2019; and Audit No. 19-016 CEI-East Combined QA and EC Audit of Stantec on Oct. 24-25, 2019.

Issued Audit Report on Audit 19-010 CSC QA of HRH on Aug. 1, 2019. The Audit Team found one (1) Positive Finding and three (3) Observations. Waiting for HRH’s response and preventative actions.

Issued Audit Report on Audit 19-010 CSC EC of HRH on Aug. 27, 2019. The Audit Team found one (1) Positive Finding, three (3) Non-conformances, and five (5) Observations. Waiting for HRH’s response, and corrective and preventative actions, respectively.

A Closeout Letter on Audit No. 19-011 FHSG Combined QA, BA, and EC Audit of HDCC was issued on Sept. 23, 2019. Performed Audit 19-012 WOSG Combined QA, BA and EC Audit of Nan Inc. on Sept. 9-10, 2019. The Audit Team found

six (6) Positives (3-QA/3-EC) and one (1) EC Observation. Performed Audit 19-013 HRU and 19-014 HRI Joint HART/HRH QA Audit of Hitachi Rail USA and Hitachi Rail Italy on

Sept. 18-20, 2019. The Joint Audit Team found one (1) HRU Positive and seven (7) Observations (5-HRU/2-HRI). Oversight and Monitoring

Conducted Bi-weekly Quality Task Force Meetings including a review of the status of NCRs and Corrective Actions to prevent their recurrence and improve processes. Performed QA/Quality Control (QC) surveillance of construction sites after the Quality Task Force (QTF).

Attended and participated in the Safety and Security Review Committee (SSRC), Rail Activation Committee (RAC), Car Readiness Review Board (CRRB) and Operation Working Group (OWG) meetings.

Attended and participated in Pre-activity meetings on the project: o FHSG: Structural Steel Canopy Erection o AGS: Existing Fuel Line Removal

Prepared and issued Project NCRs Trend Analysis from January to September 2019. The trend for this month: Trains: went up thirteen (13) from 13 to 26; Core System: did not change, remains zero (0); Fixed Facilities: went up seven (7) from 17 to 24. See the next page for the Project NCRs Trend Analysis.

Page 91: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

91 | P a g e

Page 92: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

92 | P a g e

6.3 Buy America Compliance (49 CFR 661 and 49 CFR 663) Overview and Key Issues

HRH continues to execute the corrective action plan to meet the PV Buy America requirements. The Core Systems Oversight Consultant (CSOC) conducted a visit to the Interior Lining supplier on Sept. 26, 2019 to confirm the continued implementation of the production activities related to the Hitachi/ULTIMATE Corrective Action Plan. ULTIMATE has discontinued the application of the interior panel primer and final finish coating at their Hayward, CA facility and have indicated they plan to engage an alternate domestic subcontractor to complete this activity outside of California. The implementation of all required corrective action identified in the Post-Delivery Report, has not yet been completed on all previously delivered trains. The CSC will be updating the monthly Buy America compliance report with the Buy America retrofit status of each train to demonstrate compliance with the Corrective Action Plan. A final documentation audit for the compliance of the fleet will need to be conducted when the last train is delivered and commissioned. The following is the general Buy America compliance status by train:

o Trains #1 and 2 are not yet fully compliant with the Buy America requirements and will require retrofit in accordance with the Hitachi Corrective Action Plan. These trains will be returned to the Pittsburg, CA final assembly facility for car shell structural retrofit, fire resistivity retrofit, and Buy America retrofit.

o Corrective action on Train #3, which has been delivered to Honolulu, to replace specific foreign-manufactured equipment with domestic-manufactured equipment is not yet complete. The Traction Inverters and Auxiliary Power Supplies have been replaced on Train #3 M-Cars. However, the specific foreign-manufactured interior panels on M-Cars have not yet been replaced.

o The retrofit of Trains #4 and 5 must still be fully completed and documented in accordance with the HRH Buy America Corrective Action Plan.

o Train #6 has been delivered to Honolulu compliant with the Buy America requirements and does not require additional retrofit to comply with Buy America requirements.

o Trains #7-11 have been delayed pending retrofit of the heat shields on the underfloor. o The next train scheduled for shipment to Honolulu is Train #12 in October and will include the floor heat

shield retrofit. The train includes the corrective actions to be compliant with the requirements of Buy America. The Car History Book (CHB) presented for over-the-shoulder review included tables for each car that uniquely identify the compliant interior panels.

o Train #10 is scheduled for delivery after Train #12 with fully Buy America compliant interior linings. o Future shipments of Trains #8, 9, 11 and 13 for the Interim Opening fleet will include the required

corrective actions to comply with the requirements of Buy America. o The addition of the heat shields that Hitachi has procured from a foreign supplier will have a slight

negative impact on the domestic content of each car-type. Hitachi has estimated this worst-case impact at 0.3%. This will still meet Buy America requirements for the lowest domestic content car-types. HART has requested Hitachi to update this estimate in their monthly Buy America (BA) summary to reflect the actual heat shield costs per train (once established) and re-confirm compliance. However, Hitachi has not yet updated this impact due to pending negotiations with their subcontractors/suppliers.

6.4 Disadvantaged Business Enterprise (DBE) Activities this Month

$133,315,519 = total dollar participation for all DBEs on all HART contracts from 9/24/07 to 9/30/19 o 16.54% = DBE utilization on total disbursed FTA funds received to date ($133,315,519 divided by

$806,258,734) o 7.56% = DBE utilization to date on total Project FTA funds ($133,315,519 divided by $1,763,903,901) o 8.60% = DBE utilization to date on 5309 Project FTA funds ($133,315,519 divided by $1,550,000,000)

Page 93: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

93 | P a g e

6.5 Art-in-Transit (AIT) Program The Honolulu Rail Transit Project's December 2012 FFGA grant (Sitework and Special Conditions) includes a public art program. In addition, the Revised Ordinances of Honolulu (ROH) Section 3-2.7, "Art in City Buildings," provides for the inclusion of art in city-owned buildings frequented by the public. For the rail project, the AIT staff negotiates and manages contracts for the west-side stations and AGS. AIT contracts are managed in five NTP phases:

NTP1 - Conceptual design NTP2 - Design development, final design, and construction documents NTP3 - Mobilization NTP4 - Fabrication, transportation, and installation NTP5 - Final acceptance

Conceptual and final designs are presented to the Mayor's Commission on Culture and the Arts for review and comment. The Transit Art Committee (TAC) evaluates and makes the final recommendation and approval.

Station / Facility Name Artist Name NTP Phase Comments

East Kapolei Station Robert Flint NTP3

Working with artist on required technical documentation and Material Safety Data Sheet (MSDS) information for Safety & Security Design Criteria Conformance Checklist review.

University of Hawai‘i West O‘ahu Station

Satoru Abe NTP3 Fabricator making a full-scale mock up for Safety and Security Certification.

Ho‘opili Station Karen Lucas NTP3

Assisting artist and her fabricator on translating designs into glass mosaics that reflect the original drawings; selection of color palette, technical and sequence installation issues.

West Loch Station Hans Ladislaus NTP3

Working with the artist on required technical documentation and MSDS information for Safety & Security Design Criteria Conformance Checklist review. The artist needs to provide scaled depth and texture studies.

Waipahu Transit Center Station

John Koga NTP1 TAC reviewed conceptual design submittal #5; revisions recommended.

Rail Operations Center – Operations & Servicing Building

Shigeru Miyamoto

NTP3

Working with the artist on required technical documentation and MSDS information for Safety & Security Design Criteria Conformance Checklist review. The artist needs to submit color samples during NTP3 and NTP4.

Leeward Community College

Donald Lipski NTP3

Working with the artist on required technical documentation and MSDS information for Safety & Security Design Criteria Conformance Checklist review. Waiting for shop drawings and confirmation of fabrication sequence.

Pearlridge Station Robert Kushner NTP4

Safety & Security Review Committee approved AIT Design Criteria Conformance Checklist for the two glass and stone mosaics. NTP4 released.

Aloha Stadium Station Jay Wilson NTP1 Revising conceptual design.

Pearl Harbor Naval Base Station

Carol Bennett NTP2 Conceptual design accepted, moved to NTP2.

Honolulu International Airport Station

Mamoru Sato NTP1

The artist is exploring conceptual and design revisions to the Mauka portion of artwork and refinement of the Makai design. Design work is pending refinement of mullion system used for artwork installation.

Lagoon Drive Station Carol Yotsuda NTP1 Revising conceptual design.

Page 94: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

94 | P a g e

6.6 Planning and Environment Activities this Month

Environmental Compliance o Environmental Due Diligence: Staff met with the HDOH to address comments to the work plan for the

HECO downtown Phase II Environmental Site Assessment (ESA). Staff completed the review of the Civic Center Station Phase II ESA work plan and will submit to HDOH next month.

o City Center Contract Development: Staff are providing responses to Request for Information requests from the P3 bid package. Staff are also providing updated permits for the bidders.

o Intelligent Transportation Systems (ITS): HART continues to work with the State Historic Preservation Division (SHPD) to finalize an amendment of the Area of Potential Effect (APE) to cover ITS work outside of the Project’s APE.

o Ka‘aahi Substation Antenna: Staff are working with FTA to evaluate HECO’s planned installation of a 58-foot antenna pole at the Ka‘aahi electrical substation, located adjacent to the Hālaulani (Leeward Community College) rail station. HECO intends to use the antenna to support a wireless connection to provide SCADA communication, rather than the previously-planned fiber optic cables.

Project Mitigation Commitments o Historic Resource Documentation: HART staff continue to support historic building preservation efforts

within the APE for the rail project. Staff continued preparation of a comment review matrix for the Historic American Buildings Survey (HABS) documentation for Chinatown, additional peer review comments were received for Chapters 1-3 of the pre-draft of the Historic Context Studies (HHM), and the pre-draft of the Chinatown Historic District Update is still under review. Revisions to pre-draft National Register of Historic Places (NRHP) nominations that were requested by SHPD were started for Holau Market and the Ai-Goto Building. Staff also initiated revisions to the pre-draft NRHP nomination for the Wo Fat Chop Sui House that resulted from new information identified during preparation of the Historic Preservation Certification Application (HPCA).

o Cultural Landscape Reports: Draft Cultural Landscape Reports (CLR) have been prepared for three historic parks located adjacent to the rail line: Irwin Park, Walker Park, and Mother Waldron Park. The Consulting Party (CP) and stakeholder comment period ended on Sept. 13, and staff are preparing responses to all comments received. Staff also met with the property owner and CPs regarding Irwin Park on Sept. 23.

o Interpretive and Educational Materials: Staff continue to work with contractors to develop prototype mobile applications that will highlight the history and culture of the communities along the rail system, educational materials as well as a field guide to nearby historic buildings and structures. Staff also continue to review a draft interpretive plan. A color brochure and coloring book are also being developed. The Stipulation VII work plan was approved by SHPD and is being finalized.

o Section 106 Annual Meeting: HART and the FTA completed a response to the 2018 Kāko‘o annual report and distributed it to CPs on Sept. 30. The FTA annual meeting minutes are complete and was sent to the Kāko‘o for distribution to the CPs.

o Reporting: The PA required Semi-Annual report is complete and was submitted to the Kāko‘o for distribution to the CPs. The 2019 Quarter 3 Mitigation Monitoring Program report is being prepared.

o Station Names: The HART Board deferred action on approving the remaining station names due to quorum issues, and will take it up at the October Board meeting.

Sustainable Mobility o Sustainability: Staff submitted an application for technical assistance support under the United States

Environmental Protection Agency (EPA) Local Foods, Local Places program. Staff intend to use the technical assistance to work with community stakeholders to develop an action plan for providing mobile food markets at rail stations.

Page 95: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

95 | P a g e

Look Ahead

Preparation of Post-ROD documentation: o West Park-and-Ride Lots: The reconfiguration of the 1,000-stall permanent park-and-ride lot at the

Keone‘ae (University of Hawai‘i West O‘ahu) station and a 900-stall park-and-ride lot at the Kualaka‘i (East Kapolei) station will be assessed.

o Dillingham Boulevard: Assessment of project impacts along Dillingham Boulevard in Kalihi is pending development of final design details.

o City Center/Pearl Highlands: Any project final design refinements or new right-of-way takes will be assessed and submitted to the FTA, as appropriate.

o Kamehameha 138kV Relocation: Overhead 138kV lines are to be relocated between the Waiau Power Plant and the Aloha Stadium in order to provide the required working clearances around the guideway. Analysis is pending development of the preliminary design drawings.

6.7 Risk Management The HART program’s Risk Management System (RMS) focuses on mitigation strategies to assist the project teams in successful project delivery. The bottoms-up risk assessments for all projects in the program have been updated monthly by the project teams since the RMS was implemented in the spring of 2016. A network model is then updated to evaluate the cost and schedule contingencies of the program, including relationships between each of the individual projects and contracts. Risk assessment discussions with the project teams are held quarterly to identify, assess, prioritize, manage and mitigate risk exposure, and develop prudent contingency plans. The Project Risk Register (RR) is the repository for all risks identified for the Project. Every month, risks contained in the RR are reviewed to confirm risks are appropriately identified, identify new risks, and close out risks that no longer pose an issue. The individual project risks are now updated monthly and input into the RR. Outputs from the RR are now being transitioned as a batch input to the overall cost forecasting reports. The RMS quantifies each risk as a schedule impact or as a direct cost impact independently. The schedule impact is then monetized if it is a critical-path risk, based in the model and based upon the contracts impacted. The top risks to the program are then evaluated on both schedule and cost. As HART implements the risk management system focused on mitigation, monitoring, and control, the PMOC had requested to work with HART to develop a new tracking mechanism or data reporting set to better assist in the oversight of the program. As a result, the HART risk manager reports risk updates by project on a monthly basis and performs a model update of the program on a quarterly basis. The latest quarterly update took place in August 2019. The latest monthly update took place in September 2019, but it was a limited review with updates from several projects, because the full Risk Refresh was already conducted one month earlier in August 2019. Beginning in the year 2020, risk updates for ongoing projects will transition from monthly to quarterly. This change is because the west station projects are nearing completion and are planned to be closed out in 2020, and HART anticipates that the P3 will be underway by then having incorporated much of the remaining work required of the Core Systems Contractor. The P3, as well as the ongoing AGS project, should only require quarterly risk updates which will provide HART with sufficient cost and schedule forecast information to help in managing the remaining work on the overall Project. This plan has been discussed by HART with FTA and PMOC representatives who have concurred. Notes of Significance

Beginning with this report of the risk update for September 2019, FTA through PMOC has advised HART to report the P65 cost and schedule forecast for the Project. Previously, HART had been reporting the P80 cost forecast in order to be modestly more conservative in our cost projection; however, P65 is technically FTA’s standard for cost projections, so from this point forward, HART will report on the P65 result. HART has been projecting the P65 schedule result since the spring of 2016 when the current risk modeling format was implemented on the Project.

The most recent monthly risk update occurred in September 2019, the results of which are discussed herein. (Normally the Quarterly Risk Refresh would have been held in September, but HART advanced it by 1 month to have the results ready for the FTA Quarterly Meeting being held in early September 2019.) The P65 results now place the projected forecast at $8.101 billion. The results place the projected forecast at $64 million below HART’s

Page 96: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

96 | P a g e

budget goal of $8.165 billion, and $198 million below the overall budget goal of $8.299 billion as recommended by PMOC and FTA. At the previous quarterly update held in August 2019, the Risk Refresh was facilitated by the Risk Manager. This involved face to face meetings with project team members to review each risk, discuss their validity and if any adjustments are needed to the post-mitigated responses, discuss if any new risks are necessary, and to explore ongoing risk mitigation efforts. The results of the August 2019 Risk Refresh were summarized in last month’s report, and was discussed in detail with FTA and the PMOC in early September 2019.

The effects of the change to P3 project delivery for the CCGS and PHGTC had been evaluated in the P3 Risk Assessment (RA) that was held in March 2019, and as reflected in the Cost and Schedule Probability Curves beginning in the April 2019 Monthly Report, and continuing through to the present HART Monthly Report for September 2019.

Several adjustments in the August 2019 Risk Refresh included: adjustments to the risk values for the western stations contracts based on the CEI team’s evaluation of the canopy arm issue requiring replacement of the lower sections of the arms with grade 50 versus grade 100 steel; potential exposure to claims; procurement risks; Right-of-Way risks; utilities risks; as well as other miscellaneous project risk adjustments.

FTA has stated in its report from its independent Risk Refresh by PMOC in February 2018 that HART’s budget should be increased by $134 million to a total of $8.299 billion, although HART has said we will still consider our budget target to be $8.165 billion. The schedule recommendation by FTA is for full Revenue Service in September 2026; however, HART is still targeting December 2025.

HART has undertaken reviews of soft cost budgets, including Professional Services contracts. The RMS provides forecasts of extended soft costs based on risks within projects and overall project progress. The Risk Manager will continue to meet with contract managers and Project Controls to evaluate any forecast revisions to the budgets considering a planned P3 delivery approach for CCGS and PHGTC, as well as for the other ongoing projects.

Areas of Focus A) September 2019 Risk Update – The cost and schedule probability curves are updated monthly. The September 2019 update will be presented to HART management and the PMOC at the October 2019 meeting (see Figures 11 and 12 below). The update shown in Figure 11 resulted in a $41.56 million increase to the P65 risk expected value when comparing the September 2019 update (shown below) to the August 2019 update (shown in the prior report). This increase is due to miscellaneous risk adjustments over the last month that will be discussed in detail with HART Management, the FTA and the PMOC in the next monthly meeting. The P65 for the overall HART project is now $8.101 billion, which remains below HART’s budget goal of $8.165 billion and also below FTA/PMOC’s recommended budget of $8.299 billion.

Figure 11. Cost Probability Curve, September 2019 Risk Data

Page 97: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

97 | P a g e

The schedule update shown in Figure 12 resulted in no change to the P65 schedule risk assessment when comparing the September 2019 update (shown below) to the August 2019 update (shown in the prior report). Schedule risks will be discussed in detail with HART Management, the FTA and the PMOC in the next monthly meeting. The P65 for the overall HART project remains at February 2026 which is just beyond HART’s stated schedule goal of December 2025 (but well within the PMOC recommended target date of September 2026) for meeting final revenue service. HART believes that this time can be made up within the project delivery timeframe for CCGS to still accomplish the full RSD by December 2025. The current schedule risk forecast identifies potential concerns with risks in the categories of Environmental, Archaeological, Right-of-Way, Utilities, and Procurement. The schedule risk forecast suggests if ongoing mitigation efforts related to these risks fail, the delay consequences could be severe. However, if mitigations continue successfully there is the opportunity for the current post-response P65 forecast of February 2026 for Full Revenue Service to be met, or potentially improved upon to meet the goal of December 2025 for Full Revenue Service.

Figure 12. Schedule Probability Curve, September 2019 Risk Data

HART’s Cost and Schedule Contingency:

Remaining Contingency as of the end of September 2019 is $821 million, of which $733 million is allocated contingency, and $88 million is unallocated contingency. The value referenced above is the Project’s Available Contingency as calculated by Project Controls in the September 2019 Monthly Progress Report Section 2.2 – Project Budget. Risk Management holds a modestly different contingency value, but that is because fully committed changes are still held in the Risk column (versus the budgeted column) until such time as the changes are fully executed.

Refer to the September 2019 Monthly Progress Report, Section 3 – Schedule, by Project Controls, for a discussion of schedule progress and assumptions on the project. Project Controls’ schedule forecast still shows December 2025 for full RSD with the recent change from DB delivery to P3 delivery for CCGS. The forecast P65 post-response risk evaluation leads to a February 2026 completion date as discussed in the schedule risk section above in Figure 12, which is very close to the forecast by Project Controls.

B) Risk Expected Value (EV) Report – The Risk Manager now prepares the monthly Risk EV Report, which is intended to provide an independent view of the project cost at completion and schedule completion, in order to inform HART management of the health of the project. Project Controls utilizes this information and compares it to their own projection of project cost and schedule completion, and necessary use of allocated and unallocated contingency on the project.

Page 98: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

98 | P a g e

C) Risk Comparison Reports – The Risk Manager is producing a report comparing the summation of cost and schedule risks by project, from one month to the next. The latest reports were presented to HART management and PMOC in August 2019 reflecting data from the July 2019 Risk Refresh compared to June 2019 risk data on a project by project (versus individual risk) basis. Another comparison will be provided to PMOC in November 2019 comparing the September 2019 risk update compared to the August 2019 risk data. D) Risk “Hit List” Reports – The Risk Manager is producing Risk “Hit List” reports, which provide tornado diagrams for the top ten cost and schedule risks for each project as well as the overall HART Project. The tornado diagrams compare the pre-response strategy (red bar) to post-response strategy (green bar) for each risk. These reports are provided to HART construction management teams for their information as to how the Risk Management System views the risks on their projects and to make sure that the risks are fully communicated and understood by those who are responsible for on time and on budget delivery of each project. E) Cost Containment/Cost Reduction Workshops including Secondary Mitigations – In case the affordability limit is exceeded for the design-build-finance (DBF) portion of the project (for CCGS, PHGTC and associated Core Systems work within the DBF), HART will work with P3 proponents to identify which Secondary Mitigations can and should be included and implemented in the Project scope that will keep the overall Project within budget. Within the P3 procurement, HART will be utilizing an Alternate Technical Concept (ATC) process whereby P3 proponents may propose, on a confidential basis, changes to the RFP and innovations that may be included in their proposals that seek to reduce the overall cost and increase the value to taxpayers in regard to building and operating the CCGS and PHGTC less expensively, but still fulfill the basic requirements and functionalities of the DBF and O&M portions of the Project. Using these approaches, HART will have an early notification of issues during the procurement process regarding affordability of the CCGS and PHGTC components of the Project such that effective management decisions can be made on the deployment of ATC's and possible and available secondary mitigation measures. F) Market Conditions

The Rider Levett Bucknall (RLB) 4th Quarter 2018 Construction Cost Index shows Hawai‘i with a comparative cost index of +1.92% for the fourth quarter of 2018 compared to the year prior. This means that construction costs have shown a slight increase compared to a year ago. However, nationally, the comparative cost of construction in Hawai‘i (index of 24,520 in October 2018) is still substantially higher than many other US cities, such as Phoenix with an index of 15,013, Portland (index of 16,315) or Seattle (index of 17,810). The cost of construction in Hawai‘i (index of 24,520) compares to other high-cost US cities including San Francisco (26,294), New York (26,000), Chicago (22,416), Boston (22,086), and Los Angeles (21,567). Hawai‘i news has reported local shortages in skilled labor, particularly electricians. Continued pricing pressures in the market could still lead to higher than expected price proposals and bids. HART’s estimators continue to monitor the indexed construction cost data for Honolulu in preparation of remaining project estimates including CCGS. A recent article in Pacific Business News, dated Jan. 23, 2019, quoting an RLB report, rates Honolulu as having the 4th highest construction costs in the world. Although specific construction cost indexes are not yet published for 2019, the highest city construction costs reported by RLB are: Oslo, Norway (highest cost), then San Francisco, then New York, then Honolulu, then Paris.

The Hawai‘i Department of Business, Economic Development & Tourism, 3rd Quarter 2018 Report, states “Construction has been one of the steady contributors to job growth in Hawai‘i over the past few years. In the second quarter of 2018, the number of jobs in the construction sector was unchanged compared with the same quarter of 2017.” This is an indication that the construction market in Hawai‘i is continuing at the same pace as it had in 2017. Table E-7 from this same report “Honolulu Construction Cost Index: High-Risk Building” identifies the annual average construction cost index, and the percentage change from the prior year by quarter, from 1982 to 2017 (with final results for 2018 derived from Q1 and Q2 data). Over the last 15 years (from 2004 to 2018) the annual percentage change has averaged 4.0%. Within the last 5 years (from 2014 to 2018) the annual percentage change has averaged 2.7%.

Page 99: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

99 | P a g e

In spite of the latest RLB report showing escalation as being slightly higher in Q4 of 2018 compared to Q4 of 2017, and due to local data from the Hawai‘i Department of Business, Economic Development & Tourism showing an average of 4% escalation over the last 15 years, an escalation assumption of 4% per year continues to be used within the Risk Management System for all risks on remaining work, in order to provide a reasonable level of conservatism in our forecasts.

Special focus will be on the procurement of the CCGS contract given that it is a significant contract affected by market conditions.

G) Utilities – Utilities continue to be an issue for the project, as they are for most transit and rail projects. Mitigation Progress:

In September 2019, HART concluded the evaluation of the optimal construction method for implementing the underground utility work along the Dillingham business corridor that could have the potential to reduce overall construction duration and inconvenience to the neighborhood.

Resources to relocate HECO facilities are now keeping up with scheduled requests to resolve utility conflicts through improved coordination efforts between agencies at all levels from project management to executive levels.

Identifying existing utilities along the City Center corridor. Resolve utility conflicts prior to construction contracts being issued. Sign construction agreements with utilities for the City Center construction area. Weekly meetings are held between HART and HECO to discuss the planned scope of and design progress for

undergrounding the 138kV power lines along certain sections of the eastern route of the guideway. Implementing the City Center utilities relocation package. The CCUR work is being followed by the P3

procurement for the City Center Guideway and Stations project. The start and initial phase of the P3 is planned to overlap the completion of the CCUR project in time to allow the P3 to proceed with shafts and guideway work unencumbered by utility relocation work.

HART has formed a “Tiger Team” including representatives from HART, AECOM, Stantec, Nan Construction, and Royal Construction that is focusing on removing obstacles that could keep the CCUR contract from moving ahead as quickly as possible. Recent areas of focus have included expediting the city and third-party review and permitting process, and advancing the potholing efforts to specifically identify utility locations and avoid unnecessary relocations wherever possible.

H) Right-of-Way – While construction access for nearly all west-side acquisitions is complete, progress is being made on east-side acquisitions with numerous properties still in active negotiations for construction access and acquisition. The goal is to provide site access to the contractors for the entire project to avoid or mitigate against associated inefficiencies related to re-sequencing the work plan which would have a negative impact to the revenue service date. Refer to the Right-of-Way section of the report for current status of Right-of-Way activities. There is currently an increased focus on the status of Right-of-Way acquisitions in order to reduce the risk of delay on the CCGS section once the P3 developer is on board.

6.8 Construction Claims Pursuant to FTA Circular 4220.1F, HART is obligated to notify the FTA and PMOC about third-party claims and litigation with which it is involved. HART considers a “claim” to arise when a third-party contractor submits a request for a final written decision by the Contracting Officer. Pursuant to Hawai‘i Revised Statutes Section 103D-711 and Hawai‘i Administrative Rules Section 3-126-28, the Contracting Officer’s decision is deemed final and the basis on which the aggrieved party can initiate an action in Circuit Court within six (6) months of receipt of the Contracting Officer’s decision.

Page 100: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

100 | P a g e

HART is tracking the following claims:

Contract Contractor Claim Description Claim Amount Status

KHSG Nan, Inc. Nan claims 161 days of compensable delay based on a rate of $30,000/day due to alleged design changes at the Pearl Highlands Station.

$4,830,000 Nan submitted a request for a final written decision by the Contracting Officer on April 3, 2018. On May 21, 2018, Nan requested a stay in the issuance of the Contracting Officer’s decision until Aug. 31, 2018 pending the parties’ good faith discussions. In a letter dated Aug. 31, 2018, Nan requested a continued stay in the issuance of the Contracting Officer’s decision until Oct. 31, 2018, which HART granted. At Nan’s request and in light of the parties’ continued good-faith discussions, this stay has been further extended several times, and is currently set to expire on Oct. 31, 2019.

FHSG Hawaiian Dredging

Construction Co.

HDCC seeks compensation for premium costs to furnish manpower from out-of-state for the period from April 2017 through August 2017 due to the unavailability of local manpower.

$103,167 HDCC submitted a request for a final written decision by the Contracting Officer on Jan. 22, 2019. This matter has been taken under consideration.

FHSG Hawaiian Dredging

Construction Co.

HDCC seeks compensation for additional staffing and resources from Notice to Proceed through January 2018.

$3,438,061 HDCC submitted a request for a final written decision by the Contracting Officer on Feb. 12, 2019. This matter has been taken under consideration.

FHSG Hawaiian Dredging

Construction Co.

HDCC seeks compensation for providing NEMA Type 4X, stainless steel electrical enclosures.

$194,360 HDCC submitted a request for a final written decision by the Contracting Officer on Jan. 22, 2019. This matter has been taken under consideration.

FHSG Hawaiian Dredging

Construction Co.

HDCC seeks compensation for shoring for the Waipahu Transit Center platform box girder construction.

$670,060 HDCC submitted a request for a final written decision by the Contracting Officer on Jan. 22, 2019. This matter has been taken under consideration.

6.9 Community Outreach Overview

Since the inception of HART, the outreach team has participated in: o 1,394 Public Presentations and Events

10 Events and Presentations in September 2019. The HART Public Involvement team participated in the 2019 Young at Heart (senior’s) Expo, HART in the Community Day at Ka Makana Ali‘i (shopping center), and the Council for Native Hawaiian Advancement’s (CNHA’s) 2019 Native Hawaiian Convention. The Public Involvement team also presented the HART Community Town Hall meeting in Mililani, a HART construction community outreach meeting in the Downtown and Chinatown area, and continued its City Center Condominium Association Update Meetings.

o 846 Neighborhood Board Meetings 10 Neighborhood Board Meetings in September 2019.

Community Input HART's public outreach team responded to 57 public inquiries and comments via the 24-hour project hotline and

project email ([email protected]) during the month of September. Inquiries were generally related to construction issues along the 20-mile corridor.

Page 101: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

101 | P a g e

6.10 Staffing Overview

Organization: The latest organizational chart is dated May 20, 2019. Please see Appendix C. A revision is currently in progress.

Project Staffing: o Target (current organization): 135 Full-Time Equivalent (FTE) City Staff o Actual City Staff Total: 115 Employees (4 Civil Service and 111 Personal Services Contract [PSC] Employees) o Project Management Support Consultant (HDR) Staff Total: 18 HDR employees embedded in the HART

organization directly participating in the management of the project, 2 HDR employees working for the State Historic Preservation Division (SHPD) providing support services, and 1 HDR employee assisting HART on a part-time basis with risk modeling (statistical analysis and risk report production).

o Combined Project Management Staff (City plus embedded HDR): 133 Personnel (reflects current month arrivals and departures. Does not include projected arrivals or HDR employees working for SHPD or assisting HART on a part-time basis).

o HART also has 9 part-time Student Interns on staff serving in various areas of the organization. Positions Filled in September:

o Construction Claims Specialist, Construction Claims – September o Deputy Area Manager, Design and Construction (Internal fill) – September

Projected Position Fills: o Chief Financial Officer, Budget & Finance (Internal fill) – October o Scheduler, Project Controls (Internal fill) – October o Senior Clerk, Executive Management – October o Internal Controls Analyst III – November o Internal Controls Analyst II (Internal fill) – November o Multimedia Administrator – November

September Departures: o Accountant IV

Figure 13. Staffing Activities

Staffing Activities

Title Group

New/Existing HART

Position (City or PMC)

Position Status* Start

Month

Executive Management

Senior Clerk Executive Management Existing (City) Selected - PSC Oct

Procurement, Contracts & Construction Claims

Director of Procurement, Contracts and Construction Claims

Procurement, Contracts and Construction Claims

Existing (City) Recruiting – PSC

Procurement Compliance Manager Procurement, Contracts and Construction Claims

New (City) Recruiting – PSC

Construction Claims Specialist Construction Claims, Utility, and Third Party Contracts

New (City) Filled - PSC Sep

Deputy Director of Contract Administration

Contract Administration Existing (HDR) New (City)

Recruiting – PSC or HDR

Procurement & Specifications Specialists (2)

Procurement & Consultant Contracts

Existing (City) Recruiting - PSC

Deputy Director of Construction Claims, Utility, and Third Party Contracts

Construction Claims, Utility, and Third Party Contracts

Existing (City) Recruiting - PSC

Transit Property Acquisition & Relocation

Right of Way Agent (2) Transit Property Acquisition & Relocation

Existing (City) Recruiting - PSC

Budget & Finance

Chief Financial Officer (CFO) Budget & Finance Existing (City) Selected/Processing - PSC Oct

Page 102: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

102 | P a g e

Staffing Activities

Title Group

New/Existing HART

Position (City or PMC)

Position Status* Start

Month

Internal Controls Analyst II Budget & Finance Existing (City) Selected/Processing – (Internal fill) PSC

Nov

Internal Controls Analyst III Budget & Finance Existing (City) Selected/Processing - PSC Nov

Fiscal Officer Budget & Finance Existing (City) Recruiting - PSC

Accountants (2) Budget & Accounting Existing (City) Recruiting - PSC

Design & Construction

Deputy Area Manager (East) East Area Construction Existing (City) Filled - PSC Sep

Civil Engineer (Assistant Area Manager) East Area Construction Existing (City) Recruiting - PSC

Project Manager (Production) West Area Construction Existing (City) Recruiting - PSC

Traffic Engineer/Planner Third Party and Traffic Engineering New (City) Recruiting/Interviewing - PSC

Readiness and Activation

Engineer Readiness and Activation New (City) Recruiting/Interviewing - PSC

Project Controls

Financial Analysts (2) Project Controls Existing (City) Recruiting - PSC

Scheduler Project Controls Existing (City) Filled - PSC Oct

Public Involvement

Public Involvement Officer Public Involvement Existing (City) Recruiting/Interviewing - PSC

Multimedia Administrator Public Involvement Existing (City) Selected/Processing - PSC Nov

System Safety and Security

Safety Specialist Safety Existing (City) Recruiting/Interviewing - PSC

*Personal Services Contracts are limited to one year per the Revised Charter of the City and County of Honolulu, Sec. 6-1103(g).

6.11 HART Baseline Plans and Procedures Status List The status of the Baseline Plans and Procedures is shown below (NOTE: changes, if any, are in bold font):

Owner Plan/Procedure Revision Level Date Approved Status

Project Management (Sam Carnaggio)

Project Management Plan (PMP)

7.0 December 10, 2018 Approved/Baselined

Safety and Security (Ralph McKinney)

Construction Safety and Security Plan (CSSP)

5.0 March 5, 2019 Approved/Baselined

Safety and Security Certification Plan (SSCP)

7.0 January 30, 2019 Approved/Baselined

Safety and Security Management Plan (SSMP)

8.0 February 11, 2019 Approved/Baselined

Sensitive Safety Information Plan

1.0 December 13, 2017 Approved/Baselined

Preliminary Hazard Analysis (PHA)

4.0 July 3, 2019 Approved/Baselined

Threat and Vulnerability Assessment (TVA)

2.0 January 12, 2018 Approved/Baselined

Incident Investigation Procedure

0.0 February 28, 2019 Approved/Baselined

Page 103: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

103 | P a g e

Owner Plan/Procedure Revision Level Date Approved Status

Quality Assurance (Alberto Bonifacio)

1.PP-02, Project Procedure and Plan Revision and Control Procedure

4.0 February 22, 2019 Approved/Baselined

1.PP-03, Standard Terms, Definitions, and Acronyms Procedure

3.0 February 21, 2019 Approved/Baselined

3.PM-05, Meeting Minutes Procedure

4.0 January 28, 2019 Approved/Baselined

6.CM-01, Submittal Processing Procedure

4.0 January 28, 2019 Approved/Baselined

Quality Management Plan (QMP)

4.0 November 9, 2018 Approved/Baselined

Procurement, Contracts, and Construction Claims (Paula Youngling)

2.PA-09, Procurement Standards of Conduct Procedure

2.0 March 6, 2019 Approved/Baselined

2.PA-10, Procurement Methods Procedure

1.0 February 13, 2019 Approved/Baselined

2.PA-11, Procurement Full and Open Competition Procedure

1.0 February 13, 2019 Approved/Baselined

2.PA-12, Procurement Federal Compliance Procedure

1.0 March 5, 2019 Approved/Baselined

2.PA-13, Procurement Protests Procedure

2.0 February 13, 2019 Approved/Baselined

2.PA-14, Procurement Record-keeping Procedure

1.0 April 2, 2019 Approved/Baselined

2.PA-15, Stipend Payment Procedure

1.0 February 11, 2019 Approved/Baselined

2.PA-16 Executive Decision Document (EDD) Procedure

0.0 January 24, 2019 Approved/Baselined

5.CA-06, Project Closeout Procedure

3.0 April 23, 2019 Approved/Baselined

5.CA-11, Contract Changes Procedure

5.0 April 25, 2019 Approved/Baselined

Buy America Plan (BAP) 3.0 April 9, 2019 Approved/Baselined

HART Procurement Manual

1.0 April 25, 2019 Approved/Baselined

Project Controls (Nate Meddings)

2.PA-04, Project-wide Document Control and Project Library Procedure

3.0 March 21, 2019 Approved/Baselined

3.PM-01, Contract Management System Procedure

3.0 March 13, 2019 Approved/Baselined

Page 104: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

104 | P a g e

Owner Plan/Procedure Revision Level Date Approved Status

4.PC-03, Project Progress Report Procedure

3.0 March 19, 2019 Approved/Baselined

4.PC-04, Project Scheduling Procedure

4.0 August 15, 2018 Approved/Baselined

4.PC-06, Cost Estimating Procedure

3.0 December 13, 2017 Approved/Baselined

4.PC-07, Cost Control Procedure

3.0 March 25, 2019 Approved/Baselined

4.PC-09, Contingency Management Procedure

2.0 March 5, 2019 Approved/Baselined

Contract Packaging Plan (CPP)

6.0 October 4, 2018 Approved/Baselined

Budget and Finance (Ruth Lohr)

5.CA-03, Contractor Payment Application Procedure

3.0 March 22, 2019 Approved/Baselined

5.CA-10, Consultant Invoice Payment Procedure

1.0 March 27, 2019 Approved/Baselined

7.GA-04, Petty Cash Procedure

3.0 January 9, 2019 Approved/Baselined

7.GA-06, Travel Procedure

3.0 March 29, 2019 Approved/Baselined

Project Financial Plan (PFP): Revised Recovery Plan

1.0 November 19, 2018 Approved/Baselined

Planning and Permitting (Ryan Tam)

6.CM-08, Environmental Procedure

1.0 April 1, 2019 Approved/Baselined

Before-and-After Study Plan

1.0 March 25, 2019 Approved/Baselined

Bus Fleet Management Plan (BFMP)

5.0 April 15, 2019 Approved/Baselined

Mitigation Monitoring Plan (MMP)

3.0 March 7, 2019 Approved/Baselined

Right-of-Way (Dylan Jones)

Real Estate Acquisition Management Plan (RAMP)

7.0 January 23, 2019 Approved/Baselined

Public Information (Bill Brennan)

2.PA-06, Community Relations and Media Contacts Procedure

3.0 March 6, 2019 Approved/Baselined

3.PM-04, Public Involvement Communications Procedure

3.0 March 6, 2019 Approved/Baselined

Public Involvement Plan (PIP)

2.0 March 4, 2019 Approved/Baselined

Design and Construction (Frank Kosich)

6.CM-02, Request for Information (RFI) Processing Procedure

3.0 March 15, 2019 Approved/Baselined

CADD Procedures 2.0 March 19, 2019 Approved/Baselined

Page 105: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

105 | P a g e

Owner Plan/Procedure Revision Level Date Approved Status

Configuration Management Plan (CFMP)

4.0 March 27, 2019 Approved/Baselined

Construction Management Plan (CMP)

4.0 March 25, 2019 Approved/Baselined

Operation and Maintenance (Robert Good)

Interface Management Plan (IMP)

4.0 March 6, 2019 Approved/Baselined

System Integration and Test Plan (SITP)

2.0 March 1, 2019 Approved/Baselined

Rail Fleet Management Plan (RFMP)

2.0 March 28, 2019 Approved/Baselined

Operation and Management Plan (OMP)

2.0 March 28, 2019 Approved/Baselined

Rail Activation Plan 2.0 February 11, 2019 Approved/Baselined

2. PA-17 DTS – HART Communication Procedure

0.0 July 15, 2019 Approved/Baselined

Administrative Services (Paul Romaine)

1.PP-05, Identification Badge Procedure

3.0 January 24, 2019 Approved/Baselined

2.PA-03, Email Management Procedure

3.0 January 31, 2019 Approved/Baselined

2.PA-07, Training Procedure

3.0 January 31, 2019 Approved/Baselined

Staffing and Succession Plan

6.0 March 20, 2019 Approved/Baselined

Risk Management (Paul Johnson)

4.PC-08, Risk Management Procedure

3.0 March 8, 2019 Approved/Baselined

Risk and Contingency Management Plan (RCMP)

3.0 March 8, 2019 Approved/Baselined

6.12 Readiness and Activation

Overview of Key Responsibilities Oversight of the Core System Contractor’s Operations and Maintenance (O&M) development and mobilization. Review and support of HART project activities with an emphasis on O&M impact assessment. Collaborating with DTS to ensure readiness for O&M responsibilities.

Ongoing Activities

Supporting DTS O&M contract negotiations and P3 technical specification development. Key HRH Mobilization Activities

o All operations documents will be submitted in CMS by the first week of October with HSQE to follow. o HRH O&M has developed a new organizational chart

O&M Mobilization Team will be supported by 24 FTE experienced rail consultants. o HRH O&M has developed a mobilization roadmap that is being detailed by an experienced scheduler

(consultant). Mobilization plan over the shoulder review by the end of October. o HRH O&M completed training needs analysis workshop Sept. 9-13.

Page 106: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

106 | P a g e

HRH O&M developed Training Management Process Continuing to develop training needs analysis and individual role training plans

o HRH continues to actively recruit key positions and experienced rail transit personnel. Identified a candidate for ATC & Systems manager Actively recruiting for Rolling Stock, MOW, and Engineering manager positions

Maintenance Activities o HRH O&M Maintenance Director started Sept. 6.

HRH O&M developed an asset and maintenance management model HRH O&M is performing a maintenance gap analysis.

o HRH O&M is engaging Oxplus for a service proven, transit-oriented MMIS solution. Targeting MMIS data entry Q1 2020

o Actively recruiting the HART position to support HRH Mobilization oversight, technical reviews, and asset management program development.

o Continued oversight and auditing of the HRH maintenance program and KPIs. o Finalizing Rail Operations Center (ROC) Transfer of Assets. o Coordinating asset onboarding information with the Fixed Facility Contractors (FFCs) and the interface

team. o Supporting Operational Readiness Conformance Checklist (ORCC) development.

DTS and project stakeholder coordination o Facilitate Interim Opening Task Force Meeting with DTS, BFS and City Stakeholders. o Supporting document reviews per HART Charter Amendment 4 MOU procedure.

3 MOUs executed, 5 agreed to in principle o Supporting development of joint HART-DTS schedule and identification of critical path items for

Intermediate Operations and Maintenance Period (IOMP) 1. o Supporting Transit Agency Rail Safety Plan and System Security Plan Development. o Supporting data retention policy in coordination with DTS, DIT and Department of Customer Services (CSD). o Supporting the Crisis management plan working group.

Fare Systems (see Fare Systems section of report). Look Ahead

HRH Asset Management Plan.

Page 107: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

107 | P a g e

APPENDICES

Page 108: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Ho

no

lulu

Rai

l Tra

nsi

t P

roje

ct M

on

thly

Pro

gre

ss R

ep

ort

Se

pte

mb

er

20

19

10

8 |

Pa

ge

A

pp

en

dix

A.

Pro

ject

Co

sts

by

SCC

– L

eve

l 2 (d

ata

as o

f Se

pt.

30

, 20

19

)

Co

st r

epo

rts

are

run

fro

m t

he

HA

RT

Co

ntr

act

Man

agem

ent

Syst

em

(C

MS)

SCC

De

scri

pti

on

Bas

e C

ost

Co

nti

nge

ncy

Tota

lB

ase

Co

stC

on

tin

gen

cyTo

tal

Incu

rre

d

10

GU

IDEW

AY

& T

RA

CK

ELE

MEN

TS1

,38

5,6

13

,35

0

2

22

,86

8,3

25

1,6

08

,48

1,6

75

1,4

17

,11

4,8

67

19

1,3

66

,80

9

1

,60

8,4

81

,67

6

8

23

,64

6,3

85

10

.02

Gu

ide

wa

y: A

t-gr

ad

e s

em

i-e

xclu

sive

17

,37

8

-

1

7,3

78

17

,37

8

-

1

7,3

78

17

,37

8

1

0.0

4G

uid

ew

ay:

Ae

ria

l str

uct

ure

1,2

43

,17

0,3

39

21

4,6

68

,32

5

1

,45

7,8

38

,66

4

1

,27

4,6

71

,85

6

1

83

,16

6,8

09

1,4

57

,83

8,6

65

73

8,2

79

,74

3

1

0.0

5G

uid

ew

ay:

Bu

ilt-

up

fill

-

-

-

-

-

-

5,0

54

,74

4

1

0.0

6G

uid

ew

ay:

Un

de

rgro

un

d C

ut

& C

vr-

-

-

-

-

-

(1

,22

8,0

00

)

10

.08

Gu

ide

wa

y: R

eta

ine

d c

ut

or

fill

14

2,4

25

,63

3

8

,20

0,0

00

15

0,6

25

,63

3

1

42

,42

5,6

33

8,2

00

,00

0

1

50

,62

5,6

33

-

10

.09

Tra

ck: D

ire

ct fi

xati

on

-

-

-

-

-

-

77

,59

7,2

71

1

0.1

1Tr

ack

: Ba

lla

ste

d-

-

-

-

-

-

2

,39

4,3

73

10

.12

Tra

ck: S

pe

cia

l (sw

itch

es,

tu

rno

uts

)-

-

-

-

-

-

1

,53

0,8

76

20

STA

TIO

NS,

STO

PS,

TER

MIN

ALS

, IN

TER

MO

DA

74

0,2

78

,87

9

9

1,4

23

,19

5

83

1,7

02

,07

4

8

34

,13

9,1

93

(1,5

28

,24

5)

8

32

,61

0,9

48

21

8,1

49

,62

9

2

0.0

1A

t-gr

ad

e s

tati

on

, sto

p, s

he

lte

r, m

all

, te

rmin

al,

pla

tfo

rm4

,95

6,1

81

8,5

05

,32

5

1

3,4

61

,50

6

4,9

56

,18

1

8

,50

5,3

25

13

,46

1,5

06

1

74

,59

0

20

.02

Ae

ria

l sta

tio

n, s

top

, sh

elt

er,

ma

ll, t

erm

ina

l, p

latf

orm

54

8,2

19

,00

8

5

4,4

96

,45

3

60

2,7

15

,46

1

6

48

,29

6,8

77

(44

,67

2,5

42

)

6

03

,62

4,3

35

20

6,0

49

,12

5

2

0.0

4O

the

r st

ati

on

s, la

nd

ings

, te

rmin

al

-

-

-

-

-

-

-

20

.06

Au

tom

ob

ile

pa

rkin

g m

ult

i-st

ory

str

uct

ure

12

1,6

09

,47

3

2

6,6

32

,47

5

14

8,2

41

,94

8

1

23

,25

9,4

73

24

,98

2,4

75

1

48

,24

1,9

48

-

20

.07

Ele

vato

rs, e

sca

lato

rs6

5,4

94

,21

7

1,7

88

,94

2

6

7,2

83

,15

9

57

,62

6,6

62

9

,65

6,4

97

67

,28

3,1

59

1

1,9

25

,91

4

30

SUP

PO

RT

FAC

ILIT

IES:

YA

RD

S, S

HO

PS,

AD

MIN

. BLD

GS

10

0,8

06

,85

4

-

1

00

,80

6,8

54

10

0,8

06

,85

4

-

1

00

,80

6,8

54

12

2,2

67

,69

2

3

0.0

1A

dm

inis

tra

tio

n B

uil

din

g: O

ffic

e, S

ale

s-

-

-

-

-

-

2

31

,25

0

30

.02

Ligh

t M

ain

ten

an

ce F

aci

lity

3

,05

7,2

40

-

3,0

57

,24

0

3

,05

7,2

40

-

3,0

57

,24

0

7

,58

2,7

04

30

.03

He

avy

Ma

inte

na

nce

Fa

cili

ty6

4,4

79

,55

6

-

64

,47

9,5

56

6

4,4

79

,55

6

-

64

,47

9,5

56

4

6,2

95

,36

6

30

.04

Sto

rage

or

Ma

inte

na

nce

of W

ay

Bu

ild

ing

8,6

19

,23

0

-

8

,61

9,2

30

8,6

19

,23

0

-

8

,61

9,2

30

8,8

92

,73

9

3

0.0

5Ya

rd a

nd

Ya

rd T

rack

24

,65

0,8

28

-

2

4,6

50

,82

8

24

,65

0,8

28

-

2

4,6

50

,82

8

59

,26

5,6

33

4

0SI

TEW

OR

K &

SP

ECIA

L C

ON

DIT

ION

S2

,31

5,2

94

,49

0

2

30

,44

2,9

32

2,5

45

,73

7,4

22

2,1

81

,30

4,3

64

35

8,5

11

,41

6

2

,53

9,8

15

,78

0

9

73

,80

2,4

95

40

.01

De

mo

liti

on

, Cle

ari

ng,

Ea

rth

wo

rk3

3,4

46

,02

9

1,0

38

,00

0

3

4,4

84

,02

9

33

,44

6,0

29

1

,03

8,0

00

34

,48

4,0

29

9

,67

9,6

97

40

.02

Site

Uti

liti

es,

Uti

lity

Re

loca

tio

n7

84

,99

3,4

74

97

,12

6,8

74

8

82

,12

0,3

48

77

5,3

73

,62

1

9

9,7

40

,08

5

87

5,1

13

,70

6

2

06

,53

8,6

00

40

.03

Ha

z. M

at’

l, c

on

tam

’d s

oil

re

mo

val/

mit

iga

tio

n, g

rou

nd

wa

ter

tre

atm

en

ts3

3,8

29

,68

3

51

5,0

00

3

4,3

44

,68

3

33

,82

9,6

83

5

15

,00

0

34

,34

4,6

83

1

7,3

07

,45

9

40

.04

Envi

ron

me

nta

l mit

iga

tio

n, e

.g. w

etl

an

ds,

his

tori

c/a

rch

eo

logi

c, p

ark

s5

,51

8,8

64

-

5,5

18

,86

4

8

,41

7,8

64

(2,8

99

,00

0)

5

,51

8,8

64

15

,13

3,5

43

4

0.0

5Si

te s

tru

ctu

res

incl

ud

ing

reta

inin

g w

all

s, s

ou

nd

wa

lls

21

,76

4,9

85

6

,88

4,5

11

28

,64

9,4

96

2

1,7

64

,98

5

6,8

84

,51

1

2

8,6

49

,49

6

14

,33

8,1

04

4

0.0

6P

ed

est

ria

n /

bik

e a

cce

ss a

nd

acc

om

mo

da

tio

n, l

an

dsc

ap

ing

14

,74

4,2

76

5

00

,00

0

15

,24

4,2

76

1

4,7

44

,27

6

50

0,0

00

1

5,2

44

,27

6

2,0

56

,59

0

4

0.0

7A

uto

mo

bil

e, b

us,

va

n a

cce

ssw

ays

incl

ud

ing

roa

ds,

pa

rkin

g lo

ts2

64

,58

0,5

24

29

,23

7,5

68

2

93

,81

8,0

92

27

0,8

61

,28

2

2

2,9

56

,81

0

29

3,8

18

,09

2

7

6,4

13

,34

8

40

.08

Tem

po

rary

Fa

cili

tie

s a

nd

oth

er

ind

ire

ct c

ost

s d

uri

ng

con

stru

ctio

n1

,15

6,4

16

,65

5

9

5,1

40

,97

9

1,2

51

,55

7,6

34

1,0

22

,86

6,6

24

22

9,7

76

,01

0

1

,25

2,6

42

,63

4

6

32

,33

5,1

53

50

SYST

EMS

31

3,9

83

,93

9

1

6,0

33

,66

8

33

0,0

17

,60

7

3

29

,42

5,4

72

5,0

44

,90

3

3

34

,47

0,3

75

14

9,7

59

,84

3

5

0.0

1Tr

ain

co

ntr

ol a

nd

sig

na

ls1

57

,07

7,7

32

7,7

56

,52

2

1

64

,83

4,2

54

17

1,8

46

,75

9

(2

,55

9,7

37

)

16

9,2

87

,02

2

6

3,2

58

,76

0

50

.02

Tra

ffic

sig

na

ls a

nd

cro

ssin

g p

rote

ctio

n3

,17

2,1

31

59

8,7

25

3

,77

0,8

56

3,1

72

,13

1

5

98

,72

5

3,7

70

,85

6

9

8,0

00

50

.03

Tra

ctio

n p

ow

er

sup

ply

: su

bst

ati

on

s 3

2,3

96

,80

8

-

32

,39

6,8

08

3

2,3

96

,80

8

-

32

,39

6,8

08

4

,26

6,4

43

50

.04

Tra

ctio

n p

ow

er

dis

trib

uti

on

: ca

ten

ary

an

d t

hir

d r

ail

37

,12

0,9

77

-

3

7,1

20

,97

7

37

,12

0,9

77

-

3

7,1

20

,97

7

39

,42

7,5

42

5

0.0

5C

om

mu

nic

ati

on

s6

5,3

90

,74

2

-

65

,39

0,7

42

6

5,3

90

,74

2

-

65

,39

0,7

42

3

5,2

18

,35

7

50

.06

Fare

co

lle

ctio

n s

yste

m a

nd

eq

uip

me

nt

15

,01

5,2

06

7

,67

8,4

21

22

,69

3,6

27

1

5,6

87

,71

2

7,0

05

,91

5

2

2,6

93

,62

7

4,6

01

,58

0

5

0.0

7C

en

tra

l Co

ntr

ol

3,8

10

,34

3

-

3

,81

0,3

43

3,8

10

,34

3

-

3

,81

0,3

43

2,8

89

,16

1

C

on

stru

ctio

n S

ub

tota

l (1

0 –

50

)4

,85

5,9

77

,51

2

5

60

,76

8,1

20

5,4

16

,74

5,6

32

4,8

62

,79

0,7

50

55

3,3

94

,88

3

5

,41

6,1

85

,63

3

2

,28

7,6

26

,04

3

Re

cove

ry P

lan

Bu

dge

tEs

tim

ate

At

Co

mp

leti

on

Page 109: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Ho

no

lulu

Rai

l Tra

nsi

t P

roje

ct M

on

thly

Pro

gre

ss R

ep

ort

Se

pte

mb

er

20

19

10

9 |

Pa

ge

SCC

De

scri

pti

on

Bas

e C

ost

Co

nti

nge

ncy

Tota

lB

ase

Co

stC

on

tin

gen

cyTo

tal

Incu

rre

d

60

RO

W, L

AN

D, E

XIS

TIN

G IM

PR

OV

EMEN

TS2

54

,83

5,5

74

10

6,7

89

,89

0

3

61

,62

5,4

64

26

3,6

35

,57

4

9

7,9

89

,89

0

36

1,6

25

,46

4

1

74

,26

9,9

54

60

.01

Pu

rch

ase

or

lea

se o

f re

al e

sta

te

17

1,4

00

,00

0

1

01

,50

0,0

00

27

2,9

00

,00

0

1

80

,20

0,0

00

92

,70

0,0

00

2

72

,90

0,0

00

17

3,9

92

,15

4

6

0.0

2R

elo

cati

on

of e

xist

ing

ho

use

ho

lds

an

d b

usi

ne

sse

s8

3,4

35

,57

4

5,2

89

,89

0

8

8,7

25

,46

4

83

,43

5,5

74

5

,28

9,8

90

88

,72

5,4

64

2

77

,80

0

70

VEH

ICLE

S2

11

,38

9,9

52

-

21

1,3

89

,95

2

2

11

,38

9,9

52

-

21

1,3

89

,95

2

1

18

,65

1,5

52

70

.01

Ligh

t R

ail

19

0,3

83

,69

4

-

1

90

,38

3,6

94

19

0,3

83

,69

4

-

1

90

,38

3,6

94

10

6,1

26

,79

4

7

0.0

2H

ea

vy R

ail

-

-

-

-

-

-

-

70

.05

Oth

er

12

8,7

00

-

1

28

,70

0

12

8,7

00

-

1

28

,70

0

49

3,7

00

7

0.0

6N

on

-re

ven

ue

ve

hic

les

14

,37

1,3

44

-

1

4,3

71

,34

4

14

,37

1,3

44

-

1

4,3

71

,34

4

12

,03

1,0

58

7

0.0

7Sp

are

pa

rts

6,5

06

,21

4

-

6

,50

6,2

14

6,5

06

,21

4

-

6

,50

6,2

14

-

80

PR

OFE

SSIO

NA

L SE

RV

ICES

1,9

89

,87

0,7

25

97

,63

0,1

39

2

,08

7,5

00

,86

4

2

,00

6,0

98

,45

5

8

1,9

62

,40

9

2,0

88

,06

0,8

64

1,2

83

,59

4,9

21

80

.01

Pre

lim

ina

ry E

ngi

ne

eri

ng

54

,75

3,8

40

-

5

4,7

53

,84

0

54

,75

3,8

40

-

5

4,7

53

,84

0

18

0,7

05

,91

6

8

0.0

2Fi

na

l De

sign

58

4,1

49

,89

9

3

1,5

12

,69

7

61

5,6

62

,59

6

5

86

,47

7,6

29

29

,18

4,9

67

6

15

,66

2,5

96

35

9,6

77

,53

7

8

0.0

3P

roje

ct M

an

age

me

nt

for

De

sign

an

d C

on

stru

ctio

n6

68

,55

7,9

25

29

,85

1,8

33

6

98

,40

9,7

58

66

8,5

57

,92

5

2

9,8

51

,83

3

69

8,4

09

,75

8

4

63

,67

6,9

68

80

.04

Co

nst

ruct

ion

Ad

min

istr

ati

on

& M

an

age

me

nt

27

8,6

40

,42

0

2

8,2

20

,00

8

30

6,8

60

,42

8

2

92

,54

0,4

20

14

,32

0,0

08

3

06

,86

0,4

28

19

6,1

37

,43

2

8

0.0

5P

rofe

ssio

na

l Lia

bil

ity

an

d o

the

r N

on

-Co

nst

ruct

ion

Insu

ran

ce

99

,34

0,0

00

4

,00

0,0

00

10

3,3

40

,00

0

9

9,3

40

,00

0

4,0

00

,00

0

1

03

,34

0,0

00

45

,54

8,0

19

8

0.0

6Le

gal;

Pe

rmit

s; R

evi

ew

Fe

es

by

oth

er

age

nci

es,

cit

ies,

etc

.9

9,9

28

,69

8

3,7

68

,43

9

1

03

,69

7,1

37

99

,92

8,6

98

3

,76

8,4

39

10

3,6

97

,13

7

3

2,1

31

,33

9

80

.07

Surv

eys

, Te

stin

g, In

vest

iga

tio

n, I

nsp

ect

ion

14

1,6

86

,62

2

2

77

,16

2

14

1,9

63

,78

4

1

41

,68

6,6

22

27

7,1

62

1

41

,96

3,7

84

4,1

08

,83

7

8

0.0

8St

art

up

62

,81

3,3

21

-

6

2,8

13

,32

1

62

,81

3,3

21

5

60

,00

0

63

,37

3,3

21

1

,60

8,8

73

90

Sub

tota

l (1

0 –

80

)7

,31

2,0

73

,76

3

7

65

,18

8,1

49

8,0

77

,26

1,9

12

7,3

43

,91

4,7

31

73

3,3

47

,18

2

8

,07

7,2

61

,91

3

3

,86

4,1

42

,47

0

U

NA

LLO

CA

TED

CO

NTI

NG

ENC

Y-

2

21

,73

8,0

87

22

1,7

38

,08

7

-

8

7,7

92

,27

9

87

,79

2,2

79

1

00

Sub

tota

l (1

0 –

90

)7

,31

2,0

73

,76

3

9

86

,92

6,2

36

8,2

98

,99

9,9

99

7,3

43

,91

4,7

31

82

1,1

39

,46

1

8

,16

5,0

54

,19

2

3

,86

4,1

42

,47

0

FI

NA

NC

E C

HA

RG

ES6

09

,00

0,0

00

-

60

9,0

00

,00

0

5

47

,00

0,0

00

-

54

7,0

00

,00

0

1

7,5

49

,28

4

Tota

l Pro

ject

Co

st (1

0 –

10

0)

7,9

21

,07

3,7

63

98

6,9

26

,23

6

8

,90

7,9

99

,99

9

7

,89

0,9

14

,73

1

8

21

,13

9,4

61

8,7

12

,05

4,1

92

3,8

81

,69

1,7

54

Tota

l FFG

A P

roje

ct C

ost

(10

– 1

00

)7

,92

1,0

73

,76

3

9

86

,92

6,2

36

8,9

07

,99

9,9

99

7,8

90

,91

4,7

31

82

1,1

39

,46

1

8

,71

2,0

54

,19

2

3

,88

1,6

91

,75

4

Esti

mat

e A

t C

om

ple

tio

nR

eco

very

Pla

n B

ud

get

Page 110: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Ho

no

lulu

Rai

l Tra

nsi

t P

roje

ct M

on

thly

Pro

gre

ss R

ep

ort

Se

pte

mb

er

20

19

11

0 |

Pa

ge

A

pp

en

dix

B.

Co

nst

ruct

ion

Pro

gre

ss In

teri

m O

pe

nin

g

Page 111: Cover September 2019 Monthly Progress Report DRAFThartdocs.honolulu.gov › docushare › dsweb › Get › Document-23216 › … · September 2019 MONTHLY PROGRESS REPORT ... DPS

Honolulu Rail Transit Project Monthly Progress Report September 2019

111 | P a g e

Appendix C. Project Organization Chart