cover september 2019 monthly progress report drafthartdocs.honolulu.gov › docushare › dsweb ›...
TRANSCRIPT
HONOLULU RAIL TRANSIT PROJECT
September 2019 MONTHLY PROGRESS REPORT
www.HonoluluTransit.org
Honolulu Rail Transit Project Monthly Progress Report September 2019
2 | P a g e
DISCLAIMER NOTICE This document is disseminated under the sponsorship of the United States Department of Transportation, Federal Transit Administration (FTA), in the interest of information exchange. The United States Government assumes no liability for the contents or use thereof. The United States Government does not endorse products or manufacturers. Any trade or manufacturers' names appear herein solely because they are considered essential to the contents of the report.
NO RELIANCE BY THIRD PARTIES This report and all subsidiary reports are prepared solely for the FTA, and should not be relied upon by any party, except the FTA, its Project Management Oversight Contractors (PMOC), and the Honolulu Authority for Rapid Transportation (HART) Board of Directors, in accordance with the purpose as described in the next section.
REPORT FORMAT AND FOCUS This document is submitted in compliance with the terms of FTA Contract No. DTFT60-09-D-00012, Task Order No. 2. Its purpose is to provide information and data to assist the FTA as it continually monitors HART's technical capability and capacity to execute a project efficiently and effectively, and hence, whether HART continues to be ready to receive federal funds for further project development. This document covers the project and quality management activities on the Honolulu Rail Transit Project managed by HART as the project sponsor and partially financed by the FTA under the Full Funding Grant Agreement (FFGA). Concurrent non-project activities and other items not covered by the FFGA may not be included.
INFORMATION REGARDING FORWARD-LOOKING STATEMENTS This document includes forward-looking information. The words "believe”, "anticipate", "expect", "intend", "aim", "plan", "predict", "continue", "assume", "positioned", "may", "will", "should", "shall", "risk" and any other similar expressions that are predictions of or indicate future events and future trends identifies forward-looking information. Forward-looking information includes all matters that are not historical facts. Readers should not place undue reliance on forward-looking information because it involves known and unknown risks, uncertainties and other factors that are in many cases beyond HART's control. By its nature, forward-looking information involves risks and uncertainties because it relates to events and depends on circumstances that may or may not occur in the future. Forward-looking information is not a guarantee of future performance, and HART's actual results of operations, financial condition, and the development of the industry in which it operates may differ materially from those made in or suggested by forward-looking information contained in this document. The cautionary statements set forth above should be considered in connection with any subsequent forward-looking information that HART, or persons acting on its behalf, may issue. Factors that may cause HART's actual results to differ materially from those expressed or implied by the forward-looking statements in this document include but are not limited to the risks described in HART's annual report. For projects funded through the FTA's New Starts program, the FTA and its PMOC use a risk-based assessment process to review and validate a project sponsor's budget and schedule. Any results of an FTA or PMOC risk-based assessment represent a "snapshot in time" for a particular project under the conditions known at that same point in time. The status of any assessment may be altered at any time by new information, changes in circumstances, or further developments in the project. Furthermore, any forward looking statements contained in this document are made as of the date of this report, and HART does not undertake any obligation to update publicly or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by law. ON THE COVER: Left: Pearlridge Station construction. Upper Right: Construction at the Aloha Stadium Station site. Lower Right: Guideway construction on the eastern section of the alignment.
Honolulu Rail Transit Project Monthly Progress Report September 2019
3 | P a g e
Table of Contents LIST OF ACRONYMS .......................................................................................................................................................................... 4 PROJECT MAP ................................................................................................................................................................................... 9 1 SUMMARY .............................................................................................................................................................................. 10 2 OVERALL PROJECT PROGRESS AND FINANCIALS ................................................................................................................... 13
2.1 Project Progress .................................................................................................................................................... 13 2.2 Project Budget ...................................................................................................................................................... 15 2.3 Project Funding ..................................................................................................................................................... 16
3 SCHEDULE .............................................................................................................................................................................. 18 4 CONTRACT STATUS ................................................................................................................................................................ 21
4.1 System-wide .......................................................................................................................................................... 22 4.2 Section I – West O'ahu/Farrington Highway: East Kapolei to Pearl Highlands ..................................................... 32 4.3 Section II – Kamehameha Highway: Pearl Highlands to Aloha Stadium ............................................................... 43 4.4 Section III – Airport: Aloha Stadium to Middle Street Transit Center Station ...................................................... 53 4.5 Section IV – City Center: Middle Street Transit Center Station to Ala Moana Center .......................................... 56 4.6 Project-Wide ......................................................................................................................................................... 60 4.7 Contract Status by CPP ......................................................................................................................................... 71
5 OVERALL PROJECT-WIDE ACTIVITIES ..................................................................................................................................... 73 5.1 Overall Key Issues ................................................................................................................................................. 73 5.2 Permits .................................................................................................................................................................. 74 5.3 Hawai'i Department of Transportation (HDOT) Agreements ............................................................................... 74 5.4 Utility Agreements ................................................................................................................................................ 75 5.5 Right-of-Way ......................................................................................................................................................... 77
6 MANAGEMENT AND ADMINISTRATIVE UPDATES ................................................................................................................. 87 6.1 Safety and Security (S&S) ...................................................................................................................................... 87 6.2 Quality Management ............................................................................................................................................ 90 6.3 Buy America Compliance (49 CFR 661 and 49 CFR 663) ....................................................................................... 92 6.4 Disadvantaged Business Enterprise (DBE) ............................................................................................................ 92 6.5 Art-in-Transit (AIT) Program ................................................................................................................................. 93 6.6 Planning and Environment .................................................................................................................................... 94 6.7 Risk Management ................................................................................................................................................. 95 6.8 Construction Claims .............................................................................................................................................. 99 6.9 Community Outreach .......................................................................................................................................... 100 6.10 Staffing ................................................................................................................................................................ 101 6.11 HART Baseline Plans and Procedures Status List ................................................................................................ 102 6.12 Readiness and Activation .................................................................................................................................... 105
APPENDICES ................................................................................................................................................................................. 107 A. Project Costs by SCC – Level 2 ............................................................................................................................ 108 B. Construction Progress Interim Opening ............................................................................................................. 110 C. Project Organization Chart ................................................................................................................................. 111
Table of Figures
Figure 1. Overall Project Progress (% Complete) .................................................................................................................. 13 Figure 2. Construction Progress (% Complete) ..................................................................................................................... 13 Figure 3. Design Progress (% Complete) ............................................................................................................................... 14 Figure 4. Planned vs. Received Project Funding ................................................................................................................... 16 Figure 5. New Starts Drawdown by Federal Fiscal Year ........................................................................................................ 17 Figure 6. HRTP Master Project Schedule Summary (MPSS) .................................................................................................. 20 Figure 7. Right-of-Way Status for the Parcels ....................................................................................................................... 79 Figure 8. Relocation Status for the Occupants ..................................................................................................................... 79 Figure 9. Temporary Construction Easements and Utility .................................................................................................... 79 Figure 10. Inter-Governmental Agreement Status ............................................................................................................... 80 Figure 11. Cost Probability Curve, September 2019 Risk Data ............................................................................................. 96 Figure 12. Schedule Probability Curve, September 2019 Risk Data ...................................................................................... 97 Figure 13. Staffing Activities ............................................................................................................................................... 101
Honolulu Rail Transit Project Monthly Progress Report September 2019
4 | P a g e
A&E Architect/Engineer AAN Accepted as Noted
AANR Accepted as noted, resubmit AC Asphalt Concrete
ACHP Advisory Council on Historic Preservation ACI Application Centric Infrastructure ACS Access Control System ADA Americans with Disabilities Act AFA Air Force Association AFE Authorized for Expenditure AG Attorney General
AGS Airport Guideway and Stations AIS Archaeological Inventory Survey AIT Art-in-Transit ALS Aloha Stadium Station
AMP Archaeological Monitoring Plan ANR Accepted as Noted–Resubmit APE Area of Potential Effect API Application Program Interface APS Auxiliary Power Supply
APTA American Public Transportation Association ARRA American Recovery and Reinvestment Act
ASG Airport Station Group ASI Architect Supplemental Information
ASTM American Society for Testing and Materials ASU Airport Section Utilities ATB Asphalt Treated Base ATC Automatic Train Control ATO Automatic Train Operation ATP Automatic Train Protection ATS Automatic Train Supervision AVA Anil Verma Associates, Inc. AVS Address Verification Systems
AW0 Assigned Weight, Empty Vehicle (rail car weight with no passengers) AW3 Assigned Weight, Crush Load (empty weight plus crush load of
standees) BA Buy America
BAC Buy America Compliance BACM Buy America Compliance Matrix BAFO Best and Final Offer
BANCT Best Available Noise Control Technology BAP Buy America Plan
BART Bay Area Rapid Transit BCS Balanced Cantilever System
BFMP Bus Fleet Management Plan BFS Budget and Fiscal Services BIC Ball in Court BLS Blue Light Station
BMP Best Management Practice BOD Board of Directors BOH Bank of Hawaii BPS Baseline Project Schedule BUE Bottom-Up Estimate
BUEG Back-up Emergency Generator BWS Board of Water Supply CAD Computer-Aided Design
CAM Construction Access Milestone CAP Corrective Action Plan CAR Corrective Actions CC2 City Center Phase 2 CC3 City Center Phase 3 ccd Consecutive Calendar Days
CCGS City Center Guideway and Stations CCH City and County of Honolulu CCO Contract Change Order
CCTV Closed Circuit Television CCUG City Center Section Utilities and Guideway CCUR City Center Utilities Relocation
CDC Compendium of Design Criteria CDL Commercial Driver License CDR Conceptual Design Review
CDRL Contract Document Requirements List CE&I Construction Engineering and Inspection
CEB Civil Engineering Branch CEL Certifiable Elements List
CFMP Configuration Management Plan CFO Chief Financial Officer CHB Car History Book CIC Communication Interface Cabinet CIL Certifiable Items List CIP Cast-in-place CJA Condon‐Johnson & Associates
CLOMR Conditional Letter of Map Revision CLR Cultural Landscape Report
CLSM Controlled Low-strength Material CM Construction Manager
CMP Construction Management Plan CMS Contract Management System CMU Concrete Masonry Unit
CNMMP Construction Noise Mitigation and Monitoring Plan CO Change Order
COI Conflict of Interest COMMs Communications CONRAC Consolidated Rental Car Facility
COR Corporation Counsel CORP Central Oahu Regional Park
CP Contractor Proposed CPC Cost Proposals by Consultant
CPM Critical Path Method CPO Chief Procurement Officer CPP Contract Packaging Plan
CR Consolidated Resolution CRM Customer-Relationship Management
CRMS Customer Relational Management System CROE Construction Right-of-Entry CRRB Car Readiness Review Board
CSC Core Systems Contract CSCC Construction Specification Conformance Checklists
CSD Department of Customer Services CSDBOM Core System Design-Build-Operate-Maintain
CSL Cross Hole Sonic Logging CSOC Core Systems Oversight Consultant CSSC Core System Support Consultant
CSSM Construction Safety and Security Manager CSSP Construction Safety & Security Plan
CST Customer Service Terminal CTP Central Test Procedure CTS Communications Transmission System CW Corridor-Wide
CWA Clean Water Act CWR Continuous Welded Rail
CWRM Commission on Water Resource Management CZM Coastal Zone Management
DAGS Department of Accounting & General Services DAV Disabled American Veterans
DB Design-Build DBB Design-Bid-Build DBE Disadvantaged Business Enterprise
DBEDT Department of Business, Economic Development and Tourism DBF Design-Build-Finance
DBFOM Design-Build-Finance-Operate-Maintain DBOM Design-Build-Operate-Maintain DCAB Disability and Communication Access Board DCCC Design Criteria Conformance Checklists DCN Design Change Notice
DD Definitive Design DDC Department of Design and Construction
DDC-MED Department of Design & Construction-Mechanical & Electrical Division
DES Department of Environmental Services DF Direct Fixation
DFF Direct Fixation Fastener DFIM Design Furnish Install Maintain DFM Department of Facility Maintenance
DHHL Department of Hawaiian Homelands DHR Department of Human Resources
LIST OF ACRONYMS
Honolulu Rail Transit Project Monthly Progress Report September 2019
5 | P a g e
DIT Department of Information Technology DKSG Dillingham and Kaka'ako Station Group DLIR Hawai'i Department of Labor and Industrial Relations
DLNR Department of Land and Natural Resources DOE Department of Education DOH Department of Health DOJ Department of Justice DOL Department of Labor
DPM Deputy Project Managers DPP Department of Planning and Permitting DPR Department of Parks and Recreation DPS Department of Public Safety
DS Downstream DSDC Design Services During Construction
DTS Department of Transportation Services DTU Dillingham Temporary Utilities DUF Division of Urban Forestry DVT Design Verification Test E&E Elevators and Escalators E&O Errors and Omissions
EA Environmental Assessment EAC Estimate at Completion
EB East Bound EC Environmental Compliance
ECP Environmental Compliance Plan EDD Executive Decision Document E/E Elevator/Escalator
EHE-EHMP Environmental Hazard Evaluation and Environmental Hazard Management Plan
EIS Environmental Impact Statement EKP East Kapolei
EMC Electromagnetic Compatibility EMF Electromagnetic Forces EMI Electromagnetic Interference
EMP Emergency Management Panel EMR Elevator Machine Room EMT Electrical Metallic Tubing EOM End of Month EOR Engineer of Record EOS Electrically Operated Switch EPA Environmental Protection Agency EPB Emergency Push Button ESA Environmental Site Assessment ETC Estimate to Complete EV Expected Value
FAA Federal Aviation Administration FACI First Article Configuration Inspection
FAI First Article Inspection FAR Floor Area Ratios FAT Factory Acceptance Tests
FC Fare Collection FCC Federal Communications Commission FCN Field Change Notice FCU Fan Coil Units
FD Final Design FDAS Fire Detection Alarm System
FDC Field Design Change FDR Final Design Review FEIS Final Environmental Impact Statement
FEMA Federal Emergency Management Agency FFC Fixed Facility Contractor
FFGA Full Funding Grant Agreement FHB First Hawaiian Bank
FHSG Farrington Highway Station Group FHWA Federal Highway Administration
FISC Fleet and Industrial Supply Center FIT Field Integration Test
FLSWG Fire/Life-Safety Working Group FM Force Main
FMEA Failure Modes and Effects Analysis FMECA Failure Modes, Effects, and Criticality Analysis
FO Fiber Optic FOCN Fiber Optic Communication Network FOM Finding of Merit/No Merit
FP Fix Panel FPM Fix Panel Mono FPO Federal Preservation Officer FSC Fare Systems Contract FTA Federal Transit Administration FTE Full-Time Equivalent FUT Factory Unit Testing FWS Fish and Wildlife Service
FY Fiscal Year GAT Great Aleutian Tsunami GBS Gap Breaker Station GDR Geotechnical Data Report GEC General Engineering Consultant GER Geotechnical Engineering Report GET General Excise and Use Tax GGP General Growth Properties GIS Geographic Information System
GOE Grant of Easement GPR Ground Penetrating Radar GRP Glass Reinforced Plastic GSA General Services Administration
GT General Terms GW Guideway HA Hazard Analysis
HABS Historic American Buildings Survey HACBED Hawai‘i Alliance for Community-Based Economic Development
HAER Historic American Engineering Record HALS Historic American Landscape Survey HAR Hawai‘i Administrative Rules
HART Honolulu Authority for Rapid Transportation HCC Honolulu Community College
HCDA Hawai‘i Community Development Authority HCS Historic Context Studies
HCSD Hawai'i Capital Special District HDCC Hawaiian Dredging Construction Company HDOE Hawai'i Department of Education HDOH Hawai'i Department of Health HDOT Hawai'i Department of Transportation
HDOT-A Hawai'i Department of Transportation Airports Division HDPE High-density polyethylene HECO Hawaiian Electric Company
HEI High Energy Inc. HFD Honolulu Fire Department HHC Howard Hughes Corp HHF Historic Hawai'i Foundation
HHFDC Hawaii Housing Finance & Development Corporation HHM Hardy Heck Moore
HHPRB Hawai'i Historic Places Review Board HIA Honolulu International Airport HIE Hawaii Independent Energy
HILT Hawaiian Islands Land Trust HIOSH Hawaii Occupational Safety and Health Division
HOP Ho'opili HP Historic Preservation
HPC Historic Preservation Committee HPCA Historic Preservation Certification Application
HPCAT Historic Preservation & Cultural Awareness Training HPD Honolulu Police Department HPF Historic Preservation Fund HPL Horizon Partners Ltd. HPU Hawai‘i Pacific University HRH Hitachi Rail Honolulu Joint Venture
HRHP Hawai'i Register of Historic Places HRI Hitachi Rail Italy
HRR Heat Release Rate HRTP Honolulu Rail Transit Project HRU Hitachi Rail USA, Inc.
HSNWG Hawaiian Station Naming Working Group HSQE Health, Safety, Quality and Environment
HSSQE Health Safety Security Quality and Environment HTI Hawaiian Telcom HTL Hazard Tracking Log HV High Voltage
HVAC Heating, Ventilation and Air Conditioning
Honolulu Rail Transit Project Monthly Progress Report September 2019
6 | P a g e
I&T Inspection & Testing IAMR Interstate Access Modification Report IBEW International Brotherhood of Electrical Workers
IC Interim Certification ICCS Integrated Communications Control System ICD Interface Control Documents ICE Independent Cost Estimate
ICM Interface Control Manual ICWG Interim Certification Working Group
IDIQ Indefinite Delivery/Indefinite Quantity IDS Intrusion Detection System IFB Issued for Bid IFC Issued for Construction
IJ Isolation Joint IMP Interface Management Plan
INMS Integrated Network Management System IOMP Intermediate Operations and Maintenance Period
IP Implementing Procedures ITP Inspection and Test Plan ITS Intelligent Transportation Systems IVR Interactive Voice Response
JTMC Joint Traffic Management Center JTMS Joint Traffic Management System JU&O Joint Use & Occupancy JUOA Joint Use and Occupancy Agreement
JV Joint Venture KCC Kapi‘olani Community College
KCDD Kaka'ako Community Development District KCH Kanehili Cultural Hui KHG Kamehameha Highway Guideway KHR Kamehameha Highway Resurfacing
KHSG Kamehameha Highway Station Group KIWC Kiewit Infrastructure West Company KKJV Kiewit/Kobayashi Joint Venture
KPI Key Performance Indicator L+E Lea +Elliott LCC Leeward Community College LCP Local Control Panel LD Lagoon Drive
LEED Leadership in Energy and Environmental Design LF Linear Feet
LOO Letter of Offer LOTB Log of Test Borings
LPR License Plate Reader LRV Light Rail Vehicle
LT Load Test LVPS Low Voltage Power Supply MAI Mason Architects MCY Makai Casting Yard MEP Mechanical, Electrical and Plumbing MIM Manufacture-Install-Maintain MIP Manufacturing and Inspection Plans
MITT Multimodal Integration Technical Team MMIS Maintenance Management Information System MMP Mitigation Monitoring Program MOA Memorandum of Agreement MOS Minimum Operable Segment MOT Maintenance of Traffic MOU Memorandum of Understanding
MOW Maintenance of Way MPD Multiple Property Documentation MPS Master Project Schedule
MPSS Master Project Schedule Summary MPV Multiple Purpose Vehicle MPY Makai Precast Yard MS4 Municipal Separate Storm Sewer System
MSDS Material Safety Data Sheet MSE Mechanically Stabilized Earth MSF Maintenance and Storage Facility
MSTC Middle Street Transit Center MSTCS Middle Street Transit Center Station
MTM Modern Track Machineries NCE Non-Conformance Evaluation NCR Non-Conformance Report
NDC Notice of Design Change NEPA National Environmental Policy Act NFPA National Fire Protection Association NGO Non-governmental Organization NHL National Historic Landmark NOI Notice of Intent
NPDES National Pollutant Discharge Elimination System NPS National Park Service NR National Register
NRHP National Register of Historic Places NSM Negotiation Strategy Memo NTE Not to Exceed NTP Notice to Proceed NTS Network Time Server
O&M Operations and Maintenance OCC Operations Control Center
OCCC Oahu Community Correctional Center OCCL Office of Conservation and Coastal Lands OCIP Owner-Controlled Insurance Program ODC Other Direct Costs
OEQC Office of Environmental Quality Control OH Overhead
OHA Office of Hawaiian Affairs OIBC O'ahu Island Burial Council
OIC Officer-in-Charge OIL Open Items List OIP Order of Immediate Possession
OMP Operation and Management Plan OMPO Oahu Metropolitan Planning Organization
OP Oversight Procedure OR&L Oahu Railway & Land Co. ORCC Operational Readiness Conformance Checklist
OSB Operations and Servicing Building OSHA Occupational Safety and Health Administration OSM Owner Supplied Materials
OTDR Optical Time Domain Reflectometer OTR One-Time Review OTS Oahu Transit Services
OTW Oceanic Time Warner OTWC Oceanic Time Warner Cable OWG Operation Working Group
P3 Public-Private Partnership PA Programmatic Agreement
PAIS Programmatic Agreement Implementation Schedule PARs Preventative Actions PAT Production Acceptance Test
PB Parsons Brinckerhoff, Inc. PCCP Portland Cement Concrete Pavement
PCI Payment Card Industry PCN Potential Change Notice
PD Position Description PDR Preliminary Design Review
PE Preliminary Engineering PF Power Frequency
PFP Project Financial Plan PGC Pacific Guardian Center PHA Preliminary Hazard Analysis
PHGTC Pearl Highlands Parking Garage and Transit Center PHL Pearl Highlands Station
PHNB Pearl Harbor Naval Base PHPR Pearl Highlands Park and Ride
PHS Pearl Harbor Station PI Public Involvement
PICM Project Interface Control Manual PID Parcel Identification Number PIG Permitted Interaction Group PIM Project Interface Manager PIP Public Involvement Plan PIS Passenger Information Systems
PLA Project Labor Agreement PLO Priority-Listed Offerors PLR Pearlridge Station PM Project Managers
PMC Project Management Consultant
Honolulu Rail Transit Project Monthly Progress Report September 2019
7 | P a g e
PMIM Project Management and Interface Management PMOC Project Management Oversight Contractor
PMP Project Management Plan PMSC Program Management Support Consultant
PNR Park-and-Ride POC Project Oversight Committee POS Point of Sales PPE Personal Protective Equipment
PRTCC Pre-revenue Testing Conform Checklist PSC Personal Services Contract PSG Platform Screen Gate
PSGS Platform Screen Gate System PSIT Pre-shipment Inspection Test
PT Post-tensioned PTG Parsons Transportation Group PUA Possession and Use Agreements PUC Public Utilities Commission PUP Property Utilization Plan
PV Passenger Vehicle QA Quality Assurance
QAM Quality Assurance Manager QAP Quality Assurance Plan
QC Quality Control QMP Quality Management Plan QMS Quality Management System QTF Quality Task Force R&A Readiness and Activation R&R Revise & Re-submit
RA Risk Assessment RAC Rail Activation Committee
RAMP Real Estate Acquisition and Management Plan RAP Rail Activation Plan RAT Routine Acceptance Test
RC Reinforced Concrete RCMP Risk and Contingency Management Plan
RCP Reinforced Concrete Pipe RE Resident Engineer
READ Real Estate Acquisition Database RFB Request for Bids RFC Request for Change
RFCC Request for Change from Contractor RFCR Request for Change by HART RFHB Request for High Bids
RFI Request for Information RFID Requests for Interface Data
RFMP Rail Fleet Management Plan RFP Request for Proposals RFQ Request for Qualifications RFV Request for Variance RHB Road and Highway Builders, LLC RLB Rider Levett Bucknall RLS Request for Legal Services
RMS Risk Management System RNR Revise and Resubmit ROC Rail Operations Center ROD Record of Decision ROE Right of Entry ROH Revised Ordinances of Honolulu
ROM Rough Order of Magnitude ROW Right-of-Way
RP Recovery Plan RR Risk Register
RSD Revenue Service Date RST Retail Sales Device Training
RTM Requirements Traceability Matrix RTSA Regional Transit Stabilization Agreement
S&S Safety and Security S1 Segment 1
SAIS Supplemental Archaeological Inventory Survey SC Substantial Completion
SCADA Supervisory Control and Data Acquisition SCAP Stream Channel Alteration Permit
SCC Standard Cost Category SCH Satellite City Hall
SHPD State Historic Preservation Division SHPO State Historic Preservation Officer
SIC Sandwich Isle Communications SIT System Integration Testing
SITP System Integration and Test Plan SL Street Light
SLAN Secured Local Area Network SLR Sea Level Rise
SMA Special Management Area SMS Structural Monitoring Solutions SOG Slab on Grade SOI Secretary of the Interior
SON Summary of Negotiations SOP Standard Operating Procedures
SOW Scope of Work SP Special Provisions
SQP Supplemental Quality Plan SSC Safety Security Certification
SSCP Safety and Security Certification Plan SSCWG Safety and Security Certification Working Group
SSI Sensitive Security Information SSMP Safety and Security Management Plan SSRC Safety and Security Review Committee SSSP Site Safety Security Plan
STATCOM Static Synchronous Compensator STCC Specification Testing Conformance Checklists STG Shimmick/Traylor/Granite, Joint Venture STP System Test Procedure
SUBD Subdivision Branch SUE Subsurface Utility Engineering
SWPPP Storm Water Pollution Prevention Plan SwRI Southwest Research Institute T&M Time and Material TAC Transit Art Committee TAP Track Allocation Procedure TAT Transient Accommodation Tax
TC Train Control TCA Temporary Configuration Change
TCCR Train Control and Communications Room TCE Temporary Construction Easement TCO Temporary Certificate Occupancy TCP Traffic Control Plan TCS Train Control System
TDM Transportation Demand Management TES Traction Electrification System TIA Time Impact Analysis
TIGER Transportation Investment Generating Economic Recovery TIP Transportation Improvement Program
TMK Tax Map Key TMP Traffic Management Plan
TO Task Order TOC The Outdoor Circle TOD Transit-Oriented Development
TP&R Temporary Park & Ride TPO Thermoplastic Polyolefin
TPSS Traction Power Substation TS Traffic Signal
TSA Transportation Security Administration TSI Transportation Safety Institute
TUT Temporary Utility Take TVA Threat and Vulnerability Assessment
TVM Ticket Vending Machine TWF Train Wash Facility UCA Utility Construction Agreement
UFRCRA Utility Facilities Relocation and Cost Reimbursement Agreement UG Underground UH University of Hawai'i
UHPRB UH West O‘ahu Park and Ride & UHWO Campus Road “B” UHWO University of Hawai'i West O'ahu
UL Underwriters Laboratories UPS Uninterruptible Power Supply URA Uniform Relocation Assistance and Real Property Acquisition
Policies Act USACE U.S. Army Corps of Engineers
Honolulu Rail Transit Project Monthly Progress Report September 2019
8 | P a g e
USDOL United States Department of Labor USDOT U.S. Department of Transportation
USN United States Navy USPS U.S. Postal Service
UST Underground Storage Tank VAR Volt-Ampere Reactive VCR Vertical Conduit Raceway
VE Value Engineering VECP Value Engineering Change Proposal
VISTA Volunteers in Service to America VMS Variable Message Sign VRC Vertical Raceway Column
VRCS Voice Radio Communication System VRF Variable Refrigerant Flow VTP Vehicle Test Procedure WA Work Area
WHS Waipahu High School WKM Walters, Kimoda, Motoda, Inc.
WL West Loch WLO West Loch
WOEDA West Oahu Economic Development Association WOFH West O'ahu/Farrington Highway WOSG West O'ahu Station Group
WQC Water Quality Certification WSS West Side Stations
WSSG West Side Station Group WTB Wheel Truing Building WTC Waipahu Transit Center WTP Wayside Test Procedure
WWB Wastewater Branch WWPS Wastewater pump station
WYL West Yard Lead YCB Yard Control Bungalow YOE Year of Expenditure
Honolulu Rail Transit Project Monthly Progress Report September 2019
9 | P a g e
Rail Stations Kualaka‘i Station at East Kapolei Keone‘ae Station at UH West O‘ahu Honouliuli Station at Ho‘opili Hō‘ae‘ae Station at West Loch Pouhala Station at Waipahu Transit Center Hālaulani Station at Leeward Community College Waiawa Station at Pearl Highlands Kalauao Station at Pearlridge Hālawa Station at Aloha Stadium TBD Station at Pearl Harbor Naval Base TBD Station at Honolulu International Airport TBD Station at Lagoon Drive TBD Station at Middle Street Transit Center TBD Station at Kalihi TBD Station at Kapalama TBD Station at Iwilei TBD Station at Chinatown TBD Station at Downtown TBD Station at Civic Center TBD Station at Kaka‘ako TBD Station at Ala Moana Center
PROJECT MAP
Honolulu Rail Transit Project Monthly Progress Report September 2019
10 | P a g e
1 SUMMARY
REPORTING DATE AND SUBSEQUENT EVENTS This report was published on Oct. 31, 2019, for the PMOC meeting scheduled for Nov. 13, 2019. Data is presented with a reporting cutoff
date of Sept. 30, 2019, unless otherwise noted.
KEY ACTIVITIES IN SEPTEMBER Project Overview The Honolulu Authority for Rapid Transportation (HART) received approval from the Federal Transit Administration (FTA) of its Recovery Plan for the Honolulu Rail Transit Project. This approval clears the way for the FTA to begin releasing the remaining $744 million – which is part of the city’s Full Funding Grant Agreement with the federal government – once the cost of the City Center procurement is identified and shown to be within HART’s ability to finance it.
HART Board of Directors In September, the members of the HART Board of Directors unanimously elected Tobias “Toby” Martyn Chair of the Board, and Terrence Lee as Vice Chair. Martyn succeeds Damien Kim, who served as the Board Chair since November 2016. Lee has served as the Vice Chair since November 2016.
Lynn McCrory has been appointed by State House Speaker Scott Saiki to serve on the HART Board of Directors as a non-voting member. She is currently the Senior Vice President of Government Affairs for land and resource management company Pulama Lana‘i. She replaces Kamani Kuala‘au, who left the Board in August. Her term runs through December 2021.
COST (as of Sept. 30, 2019)
Project Cost Summary ($ in millions)
Description Original FFGA
Budget Recovery Plan
Budget*
Current Estimate at Completion
(EAC)* Incurred To
Date
Project Capital Costs
Base Cost without Contingency $4,305 $7,312 $7,344 $3,864
Allocated Contingency $542 $765 $733 $0
Unallocated Contingency $102 $222 $88 $0
Total Project Capital Costs $4,949 $8,299 $8,165 $3,864
FFGA Finance Charges $173 $609 $547 $18
Total FFGA Project Costs $5,122 $8,908 $8,712 $3,882
Post-RSD Finance Charges $42 $231 $293 $0
Total Project Costs $5,164 $9,139 $9,005 $3,882
*Total Project Costs excludes Operations and Maintenance.
Original FFGA Budget The Original FFGA Budget reflects the full build-out of the project as executed by the Full Funding Grant Agreement in December 2012.
The contingency is a reserve to cover known and unknown, but anticipated, project execution costs and uncertainty due to risk factors such as unresolved design issues, unknown site conditions, schedule impacts and market fluctuations. The Original FFGA Budget reflects $644 million in total contingency.
Recovery Plan Budget Total The approved Recovery Plan Project capital cost estimate is $8,299 million (excluding finance costs). The total project cost is $9,139 million, which includes post-Revenue Service Date (RSD) financing costs of $231 million and $8,908 million in FFGA project costs (which includes $765 million in allocated contingency, $222 million in unallocated contingency, and $609 million in financing costs). While this cost is $134 million greater than HART’s cost estimate of $8,165 million, HART has revised the Project cost estimate and identified the additional funding to meet the higher estimate.
The Recovery Plan Budget reflects $987 million of total contingency or 13% of the base cost estimate which reflects available funding capacity. Based on FTA requirements on contingency for the current phase of the project, the 13% is sufficient reserve to cover against the risk of cost increases during development of the project.
Honolulu Rail Transit Project Monthly Progress Report September 2019
11 | P a g e
Current Estimate at Completion (EAC) The current project capital Estimate at Completion (EAC) is $8,712 million, including $821 million in total contingency ($733 million in allocated contingency and $88 million in unallocated contingency) and $547 million in financing costs. The total project costs including post-Revenue Service Date (RSD) financing costs of $293 million is $9,005 million. The total project contingency is based on a December 2025 RSD. Incurred to Date The Incurred-to-date costs are cumulative through September 2019, and exclude third-party reimbursement costs. The $3,882 million to date represents 53% of the base Current EAC. The Incurred-to-date costs increased by $53 million for the period. SCHEDULE The progress reported in the table below provides percent complete based on construction and design contracts. The early and late plans are based on baseline schedules for active contracts and forecasts of future contracts.
Project Progress* Through Sept. 27, 2019
Actual Early Plan Late Plan
Overall Project Progress 52.9% 62.1% 55.7%
Construction Progress 48.1% 57.6% 52.2%
Design Progress 79.4% 75.9% 74%
*Reported percentages complete are based on the Estimate at Completion for the
Minimum Operable Segment (MOS) and December 2025 Revenue Service Date (RSD).
BOARD MEETING Q&A Listed below are questions raised by community members at the Sept. 19, 2019 HART Board meeting:
Question: Will there be security on trains? Answer: Yes. HART is currently working with the Department of Transportation Services (DTS) on security, including code of conduct and enforcement of rules.
Question: During power outages, will train doors open automatically? Answer: No; doors will have interlocks to prevent them from opening unless the train is stopped.
Question: Will there be space for people in wheelchairs on the trains, as well as ramps at the stations for when the elevators go out? Answer: There will be space for mobility devices on the trains. Elevators will be equipped with backup batteries in the event of power outages.
PROGRESS REPORT SUMMARY OF CHANGES The following is a brief summary of major changes that have occurred from the previous month’s report. For more information and detail, please refer to the respective pages in the report.
The Project Cost Summary table has been updated to reflect the approved Recovery Plan Budget numbers. In addition, the current EAC total amount has been updated to reflect finance charge amounts from the approved Recovery Plan. Please see pages 10 and 15.
The Board Meeting Q&A section has been included, as there were public questions posed at the September meeting. Please see page 11.
Contract Status
Core Systems Contract (CSC) o The current contract value amount has increased due to change orders. Please see page 22.
Elevators and Escalators Manufacture-Install-Maintain (MIM) o The current contract value amount has increased due to a change order. Please see page 26.
University of Hawai‘i West O‘ahu (UHWO) Station Temporary Park-and-Ride & UHWO Campus Road “B” o The projected completion of work date has changed from September 2019 to October 2019. Please see page 34.
Honolulu Rail Transit Project Monthly Progress Report September 2019
12 | P a g e
o The schedule status has changed from “2 months behind” to “3 months behind.” Please see page 34.
Farrington Highway Station Group (FHSG) o The current contract value amount has decreased due to a change order. Please see page 39.
Ramp H2R2 o The current contract value amount has decreased due to a change order. Please see page 45.
Kamehameha Highway Resurfacing (KHR) o The projected completion of work date has changed from November 2019 to December 2019. Please see page
49. o The schedule status has changed from “2 months behind” to “3 months behind.” Please see page 49.
Airport Section Guideway and Stations (AGS) o The current contract value amount has increased due to change orders. Please see page 53.
City Center Section Utilities and Guideway (CCUG) Final Design o The contract substantial completion date has changed from September 2019 to December 2019. Please see page
56. o The schedule status has changed from “3 months behind” to “On time.” Please see page 56.
Core Systems Support o The contract completion date has changed from Sept. 9, 2019 to Nov. 29, 2019, due to the execution of a no
cost change order to extend the contract. Please see page 69.
Honolulu Rail Transit Project Monthly Progress Report September 2019
13 | P a g e
2 OVERALL PROJECT PROGRESS AND FINANCIALS
2.1 Project Progress (data as of Sept. 27, 2019) Reported percentages complete are based on the Estimate at Completion for the MOS and December 2025 RSD. HART will revise its progress curves further when the in-process change orders are executed. This revision is expected to lower the plan values. Note:
Actual = Actual cost of work performed, based on reported work-in-place.
Early Plan = Earliest dates activities can begin and finish, based on logic and durations used in the schedule.
Late Plan = Latest dates activities can begin and finish and not have an impact on completion date, based on logic and durations used in the schedule.
Figure 1. Overall Project Progress (% Complete)
At present "overall" project progress is based on the weighted value progress of the individual construction and design contracts (Design-Build [DB], Design-Bid-Build [DBB], Design-Build-Operate-Maintain [DBOM], Elevator/Escalator Manufacture-Install-Test-Maintain [MIM], Final Design [FD] and DB-DBOM design levels of effort), not including City or non-design consultant labor.
Figure 2. Construction Progress (% Complete)
Overall construction progress is based on the weighted average progress of the individual DBB and E/E MIM construction contracts and the DB-DBOM construction levels of effort, not including consultant Construction Engineering and Inspection (CE&I) services.
Honolulu Rail Transit Project Monthly Progress Report September 2019
14 | P a g e
Figure 3. Design Progress (% Complete)
Overall design progress is based on the weighted average progress of the individual FD contracts and the design levels of effort of the DB and DBOM construction contracts, not including City or non-design consultant labor.
Honolulu Rail Transit Project Monthly Progress Report September 2019
15 | P a g e
2.2 Project Budget (data as of Sept. 30, 2019)
Project Cost Summary ($ in millions)
Description Original FFGA
Budget Recovery Plan
Budget* Current Estimate at Completion (EAC)*
Project Capital Costs
Base Cost without Contingency $4,305 $7,312 $7,344
Allocated Contingency $542 $765 $733
Unallocated Contingency $102 $222 $88
Total Project Capital Costs $4,949 $8,299 $8,165
FFGA Finance Charges $173 $609 $547
Total FFGA Project Costs $5,122 $8,908 $8,712
Post-RSD Finance Charges $42 $231 $293
Total Project Costs $5,164 $9,139 $9,005
*Total Project Costs excludes Operations and Maintenance.
The Original FFGA Budget reflects the full build-out of the project as executed by the Full Funding Grant Agreement in December 2012. The approved Recovery Plan Project capital cost estimate is $8,299 million (excluding finance costs). While this cost is $134 million greater than HART’s cost estimate of $8,165 million, HART has revised the Project cost estimate and identified the additional funding to meet the higher estimate. Total project contingency decreased to $821 million ($733 million in allocated contingency and $88 million in unallocated contingency) since last updated.
Contingency Drawdown Curve
$0
$200
$400
$600
$800
$1,000
$1,200
Q3
201
8
Q4
201
8
Q1
201
9
Q2
201
9
Q3
201
9
Q4
201
9
Q1
202
0
Q2
202
0
Q3
202
0
Q4
202
0
Q1
202
1
Q2
202
1
Q3
202
1
Q4
202
1
Q1
202
2
Q2
202
2
Q3
202
2
Q4
202
2
Q1
202
3
Q2
202
3
Q3
202
3
Q4
202
3
Q1
202
4
Q2
202
4
Q3
202
4
Q4
202
4
Q1
202
5
Q2
202
5
Q3
202
5
Q4
202
5
Q1
202
6
Q2
202
6
Q3
202
6
Q4
202
6
Q1
202
7
Q2
202
7
Q3
202
7
Q4
202
7
Tota
l Co
nti
nge
ncy
Re
mai
nin
g (M
)
FTA Additional Recommend
Recovery Plan EAC Baseline
FTA Recommended Level
HART Actual
FTA Actual
Date Mar-2020 Oct-2020 Mar-2021 Feb-2022 Feb-2024 Dec-2025
Milestone P3 NTPInterim
Opening
DB450
Construction
Complete
DBB511
Construction
Complete
P3
Construction
Complete
RSD
FTA Minimum Level ($M) 732 623 546 446 282 134
HART Minimum Level ($M) 598 489 412 312 171 85
Honolulu Rail Transit Project Monthly Progress Report September 2019
16 | P a g e
2.3 Project Funding
Figure 4. Planned vs. Received Project Funding
Planned vs. Received Project Funding
Funding Source
Pre-FFGA Project1
Project Funding Total
Project
2007 - 2009 Actuals
Received
Planned2 2009 -
Present Actuals
Received
2007 - Present Actuals
Received
Actuals Received in
Sep 2019 ($YOE M)
Beginning Project Cash Balance3 - 298 298 - -
Interest Income on Cash Balance5 7 1 7 14 0
FTA Section 5309 New Starts Revenue4 - 1,550 806 806 -
ARRA Funds - 4 4 4 -
EPA Brownfields Grant (FY2018-FY2021)6 - 1 0 0 -
Net General Excise Tax (GET) Surcharge revenues FY2010-FY2031 378 5,990 2,142 2,520 -
Transient Accommodation Tax (TAT) revenue FY2018-FY2031 - 1,182 81 81 -
City Subsidy - HART Administration FY2018-FY2031 - 214 44 44 -
Total 385 9,240 3,382 3,469 0
1 GET and Interest Income received during Pre-Preliminary Engineering (pre-PE) phase prior to entry into PE. 2 Updated to Chapter 6 - Project Finance, Figure 6-2 of HART's Approved Recovery Plan (for beginning cash balance, GET, TAT, grant revenue, city subsidy and interest income).
3 Beginning Project Cash Balance at Entry into Preliminary Engineering (PE) on October 16, 2009 (the FFGA Project start date) = Pre-PE GET, investment and miscellaneous income minus pre-PE expenditures. The $298 million is included in the Pre-FFGA actual amounts received between 2007-2009 of $378 million.
4 New Starts Funds Obligated Through Federal Fiscal Year 2014 Totals $806.3 million. 5 Interest Income received in September 2019 $378,059.70 6 EPA $900,000 Brownfields Grant must be used by 12/31/2020 - to plan and subsidize the environmental cleanup activities
EPA Brownfields Grant revenue received to date - $55,260.87
Honolulu Rail Transit Project Monthly Progress Report September 2019
17 | P a g e
Figure 5. New Starts Drawdown by Federal Fiscal Year
New Starts Grant Information by Federal Fiscal Year (Amounts in Italics are Pending)
Federal Fiscal Year (FFY) Allocation
FTA Obligated Amounts
Actual Drawdown Amounts to Date
Available Balance
FFGA Base Case Cash Flow
2008 $15,190,000 $15,190,000 $0
2009 $19,800,000 $19,800,000 $0
2010 $30,000,000 $30,000,000 $0
2011 $55,000,000 $55,000,000 $0 $20,607,242
2012 $200,000,000 $200,000,000 $0 $99,382,758
2013 $236,277,358 $236,277,358 $0 $258,280,277
2014 $250,000,000 $249,991,376 $8,624 $441,719,724
2015* $250,000,000 $0 $0 $0
2016* $250,000,000 $0 $0 $0
2017* $243,732,642 $0 $0 $0
2018 $0 $0 $0 $0
2019 $0 $0 $0 $0
2020 $0 $0 $100,000,000 $100,000,000
2021 $0 $0 $150,000,000 $150,000,000
2022 $0 $0 $150,000,000 $150,000,000
2023 $0 $0 $150,000,000 $150,000,000
2024 $0 $0 $100,000,000 $100,000,000
2025 $0 $0 $50,000,000 $50,000,000
2026 $0 $0 $43,732,642 $30,010,000
Total $1,550,000,000 $806,258,734 $743,741,266 $1,550,000,000 *These years' awards have not been available for drawdown. The availability of dollars are expected to follow the approved HART Recovery Plan and are reflected in the Available Balance column.
Honolulu Rail Transit Project Monthly Progress Report September 2019
18 | P a g e
3 SCHEDULE (data as of Sept. 27, 2019)
Critical Path Analysis Interim Revenue Service Date is planned for no later than December 2020.
o The critical path for Interim Opening of the passenger rail system from East Kapolei Station to Aloha Stadium Station is updated to Waipahu Transit Center Station’s sitework and station entrance finishes, followed by the installation of Supervisory Control and Data Acquisition (SCADA) cables, Core Systems installation/test, System Integration Testing, leading to Pre-Revenue Service Demonstration, and Interim Revenue Service Date.
o Ho‘opili Station canopy installation and Core Systems communications cable installation are on the near critical path.
Revenue Service Date (RSD) is planned for no later than December 2025. o The critical path for RSD of the rail system from East Kapolei Station to Ala Moana Station continues with
Department of Planning and Permitting (DPP) permitting and City Center utilities relocation task order #28. This work is followed by Ala Moana Station’s Area 6, drilled shafts, guideway installation, and construction of Ala Moana Station, and Core Systems installation and testing.
o Kapalama Station activities are on the near critical path. Three-Month Look Ahead
Station construction for the west station groups continues to include the following: o Canopy assembly, and installation for all west station groups. o Permanent power at University of Hawai‘i (UH) West O‘ahu, Pearl Highlands, Pearlridge and Aloha Stadium
Stations. o The partial access milestones planned to be handed over to the Core Systems Contractor for systems
installation include: Two Balance of Structures milestones planned on west station group contracts Five Access to Platform milestones planned on the west station group contracts
o Sitework and station finishes at Pearl Highlands and Pearlridge Stations. Traction power substation energization to commence at Pearlridge Station. Electrical equipment termination at ancillary room for Aloha Stadium Station.
Complete Hawaiian Electric Company (HECO) cable pull, finishes, and landscaping at University of Hawai‘i West O‘ahu (UHWO) Road B.
Continue escalator and elevator installations at Pearl Highlands, Pearlridge and Aloha Stadium Stations. Core Systems continues to install/test communications, SCADA, and Fire Detection Alarm System (FDAS)
subsystems. Design work, foundations, columns, and span erection are ongoing for the Airport Guideway and Stations (AGS)
contract. Continue segment erection east of Pearl Harbor Station and near the Honolulu International Airport Station with two gantry cranes. Continue HECO Zone 3 and 4 infrastructure work and utility work in Reach C, D and E. Commence HECO Zone 6, 8 and 9 infrastructure work.
For AGS stations, Pearl Harbor Station continues underground conduit installation and backfill at this station’s Train Control and Communications Room (TCCR). Installation of underground mechanical work at the station entrance and the reinstallation of underground plumbing at the ancillary building. Honolulu International Airport Station to install 24-inch storm drainpipe in Lot J and install new HECO service infrastructure. Lagoon Drive Station to continue underground conduit installation and backfill at the TCCR. Installation of pedestals and stem walls for the station’s mauka entrance. Middle Street Transit Center Station to construct temporary pedestrian access and start micropiles.
Wet utilities and fuel lines relocation for the City Center Utilities Relocation contract continues.
Honolulu Rail Transit Project Monthly Progress Report September 2019
19 | P a g e
Key Schedule Issues Installation of canopies continue to be an area of concern at West O‘ahu Station Group (WOSG), Farrington
Highway Station Group (FHSG) and Kamehameha Highway Station Group (KHSG). This impacts the conduits for Core Systems installation, signage and speakers. This key schedule issue continues to be evaluated for mitigating initiatives to not impact Interim Revenue Service.
Schedule mitigation effort for the Kamehameha Highway Resurfacing contract to complete ahead of the Hawai‘i Department of Transportation’s (HDOT) holiday road closures.
The Ka‘aahi Substation requires a supplemental agreement for HECO to start construction. The construction duration is approximately 12 months and required by late 2020 to serve anticipated load.
HART rejected Shimmick/Traylor/Granite, JV (STG’s) August Schedule as ‘Revise and Resubmit,’ which was forecasting an October 2022 Substantial Completion (SC) date. The AGS contractor resubmitted the August schedule with an offer to mitigate the SC by resequencing the work, with a SC date of January 2022. The AGS contractor also submitted a Time Impact Analysis (TIA) to justify the schedule slippage from May 2021 to January 2022, which is under evaluation.
Accelerate Right-of-Way (ROW) acquisition for City Center properties ahead of needs for the City Center Utilities Relocation contract. Additionally, establish a schedule for ROW eminent domain parcels.
For the critical path, DPP permitting impacts the City Center Utilities Relocation contract. Schedule Contingency Drawdown Curve
DPP permit activities impact the critical path for CCUR Task Order #28 which requires signed and sealed drawings for work area 6 (Kona to Kona Iki). This is a predecessor to utility relocations, followed by drilled shafts, guideway, stations and testing by the City Center Guideway & Stations developer. Although the potential impact to schedule contingency is recognized now, the impact to work is not projected until summer 2021 giving the project team opportunity to mitigate the impact.
Honolulu Rail Transit Project Monthly Progress Report September 2019
20 | P a g e
Figure 6. HRTP Master Project Schedule Summary (MPSS) The Master Program Summary Schedule reflects currently approved schedule end dates for contracts that have been awarded, and planned dates for future contracts.
Honolulu Rail Transit Project Monthly Progress Report September 2019
21 | P a g e
4 CONTRACT STATUS
Contracts in Procurement
Overview Awarded Contracts:
o None.
Active Procurements: o City Center Guideway and Stations / Pearl Highlands Design-Build Finance Operate and Maintain Request
for Proposals (RFP) qualifications proposals in response to RFP Part 1 were received on April 12, 2019. HART released RFP Part 2 to the priority list of offerors on May 3, 2019. Due to the bidders requesting additional time to prepare bids, the due date for the technical proposals has been extended from November 2019 to January 2020. As such, the NTP date has moved from February 2020 to March 2020. Despite these changes, the planned full revenue service date remains at December 2025.
o Real Estate Mapping and Surveying Request for Qualifications was issued on Feb. 15, 2019. Statements of Qualifications submissions were received on March 15, 2019 and are currently being evaluated.
o Traction Power Backup Generators Request for Bids was issued on July 31, 2019. Bids were received on Sept. 6, 2019.
o Art-in-Transit: HART continues its negotiations with the highest-ranked artists for each of the stations. To date, twelve (12) contracts have been awarded.
Active Procurements
Contract Code
Contract Name Advertise
Date
Bids or Proposals
Due Issue NTP
Projected Contract
Substantial Completion
Date
AP-00 Art-in-Transit May 09 '13
12 contracts awarded;
active procurement for remaining
stations
Staggered Staggered
DB-550 City Center Guideway and Stations / Pearl Highlands Design-Build Finance Operate And Maintain (DBFOM)
Sep 28 ‘18 Apr 12 ‘19 (RFP Pt. 1)
Mar ‘20 TBD
MM-937 Real Estate Mapping and Surveying Feb 15 ‘19 Mar 15 ‘19 Oct ‘19 TBD
MI-940 Traction Power Backup Generators Jul 31 ‘19 Sep 6 ‘19 Oct 24 ‘19 Feb 10 ‘21
Upcoming Procurement Under Evaluation Contract Code Contract Name Issue Date
AP-00 Art-in-Transit, Windscreen
FD-600 Permanent Park & Ride Lots Final Design (UHWO & East Kapolei)
DBB-600 UHWO Permanent Park & Ride DBB Construction
DBB-600 East Kapolei Permanent Park & Ride DBB Construction
MM-960 Archaeological and Cultural Survey Dec ‘19
MM-920 HDOT Design Review Support – WOFH TBD
MM-915 HDOT/DTS Traffic Management Coordination Dec ‘19
MM-921 Passenger Vehicle WiFi Oct ‘19
Honolulu Rail Transit Project Monthly Progress Report September 2019
22 | P a g e
4.1 System-wide
A. Core Systems Contract (CSC) CPP No.: DBOM-920 DBOM Contractor: Hitachi Rail Honolulu Joint Venture (HRH) Contract Start Date: January 2012 Contract Substantial Completion: June 1, 2019 Projected Completion of Work: July 2025
Project Description: A design, build, operate and maintain contract to provide rail passenger vehicles, automated train control system, traction electrification system (TES), communication systems, passenger platform screen gates (PSGs), and operation and maintenance of the Core Systems.
Design & Construction Vehicles Schedule Status
Physical % Complete 65.4% 63.0% On time for 2025
opening Early Plan* 79.7% 94.6%
Late Plan* 54.7% 52.4% *Data as of Sept. 27, 2019. The progress chart reflects early program expectations. Progress is being tracked against interim Construction Access Milestone dates, which show the project is "On-Time".
________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $419,568
DBE % Attained: 0.068%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $203,179,969
00053 CCO 0053 TVM and Gate Interfaces $1,206,790
00054 CCO 54: HVAC for TCCRs at Airport St GP $518,192
00058 Comms Redesign for Honolulu AP Station $33,311
Cumulative Current Report $204,938,262
Original Contract: $573,782,793 Incurred-to-Date: $395,588,411
Current Contract Value1: $778,721,055 Incurred in September: $1,037,922
Outstanding Issues: 6 Contractor CP Amount: $9,976,835
1Current Contract Value = Original contract value (excluding original O&M budget) + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
23 | P a g e
SCHEDULE: Upcoming Schedule Status:
MSF 2 completion is planned for November 2019. West Loch Platform Screen Gate System (PSGS) installation completion is planned for October 2019. Waipahu Transit Center PSGS installation completion is planned for November 2019. Onsite Functional Test for PSGS at Ho‘opili is planned for completion in October 2019. Supervisory Control and Data Acquisition (SCADA) testing with Waipahu and West Loch Traction Power
Substations (TPSSs) are scheduled to start in October 2019. Automatic Train Control (ATC) in functional section point to point test with Operations Control Center (OCC) is
planned for completion in October 2019. ________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS:
Base Design
Percent Complete East Kapolei –
Aloha Stadium Design Aloha Stadium –
Middle Street Design
Passenger Vehicles 97%
PSGS 100%
Communications 80% 89% 27%
Fire Detection 100% 100% 0%
ATC / SCADA 100% 100% 100%
TES 100% 100% 100%
Activities this Month: Design: Review of design submittals is ongoing. Continued coordination between HRH and the AGS contractor for integration
of Core Systems requirements. Working to complete Requirements Traceability Matrix (RTM) for all
subsystems. Continued to conduct reviews of Communications Final Design documents
and System Test procedures to meet MSF operational schedule objective. Final design of the Passenger Vehicle (PV) heat shield retrofit has been
submitted. Manufacturing: Hitachi Rail USA, Inc. (HRU) is continuing with the production of Trains #7
through #15 in Pittsburg, CA. PV assembly activities have been re-sequenced to accommodate the underfloor heat shield retrofit.
Completed final inspection of Train #12 E1 and M1, complete with the heat shield retrofit. This is the first train of the interim opening fleet.
Installation, Testing and Commissioning: HRH continues with SCADA cable installation for the peripheral equipment in
the MSF. Work is pending design completion for peripheral equipment termination.
HRH completed Access Control System/Intrusion Detection System (ACS/IDS) termination, tagging and remediation work in the MSF.
HRH completed installation of Communication Interface Cabinets (CIC) and fiber termination at Waipahu, West Loch and Ho‘opili TPSS.
HRH completed remediation work related to the Passenger Information Systems (PIS) system in the yard.
HRH installed batteries for Waipahu and Leeward Community College (LCC) Uninterruptible Power Supply (UPS).
HRH completed Train Control (TC) cable and fibers pull in Aloha Stadium Train Control and Communications Room (TCCR).
HRH continues with TC cable and fibers pull in Pearlridge TCCR. HRH completed installation of TES feeders at LCC Gap Breaker Station (GBS).
Look Ahead: Design: Close out of open comments to
finalize Final Design of all subsystems.
Continue coordination between HRH and WOSG/FHSG/KHSG/AGS.
Complete Communications Final Design for AGS and CCGS segments.
Manufacturing: Passenger Vehicle truck fabrication
– continue truck frame and bolster delivery from Italy.
Complete car shell fabrication activities in Italy. Only 1 car shell remaining to be fabricated.
Continue manufacturing of communications, traction power, and other subsystems equipment.
Installation, Testing and Commissioning: Continue remaining termination
and tagging of COMM ACS/IDS, PIS and Closed Circuit Television (CCTV) equipment cabling in MSF TPSS, once field installation drawing is received.
Complete SCADA testing with MSF TPSS and Electrically Operated Switches (EOSs), and other peripheral devices in the MSF, after installation is completed.
Honolulu Rail Transit Project Monthly Progress Report September 2019
24 | P a g e
Activities this Month (continued): HRH continues with the installation of TES feeders in Pearl Highlands TPSS. HRH continues Onsite Inspection and Test for the PSGS system in Ho‘opili
(HOP) Station. HRH continues with ATC wayside inter-station testing between TCCRs in the
functional section. HRH continues with official Secured Local Area Network (SLAN) and
Communications Transmission System (CTS) testing in the yard. HRH completed braking performance adjustments with AW0 (Train #3) with a
Knorr engineer on-site. Continued remediation of corrosion issues with the PSGS components. HRH continues with the installation of PSGS towers in LCC Station. HRH completed PSGS towers installation in Waipahu station. HRH provided a proposal for the remediation of corrosion and heat buildup in
the yard CIC cabinets. One cabinet has been remediated as a pilot cabinet to test the correction.
HRH continues to install peripheral equipment around Pearlridge and Aloha Stadium TPSS, and installed generators to power these two TPSSs for testing.
ATC network between the OCC and Functional Section Stations was established.
Completed internal braking design verification tests using Trains #1 and #3. Completed Fiber Connection between the OCC and West Loch and Waipahu
TPSSs.
Look Ahead (continued): MSF SLAN and CTS Acceptance Test
to continue. Continue PSGS electrical
installation at West Loch, Waipahu and LCC stations.
Commence TES feeder installation at Aloha Stadium TPSS.
Complete Vehicle Test Procedure, Central Test Procedure, and System Test Procedure in MSF.
Complete Vehicle Test Procedure, Central Test Procedure, and System Test Procedure in Functional Section.
Continue System Integration Testing with train(s) in the Yard.
Complete remediation of corrosion issues with the PSGS components.
Complete testing for 3rd rail energization of HOP and East Kapolei (EKP) TPSS.
_______________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font): The CSC's Communications System design is delayed. The CSC is working to submit final revisions of all MSF,
Segment 1 & 2 designs. HART is monitoring this subsystem delay as it is a key component needed for system integration testing. HART continues to meet with HRH/Nokia weekly to monitor progress.
HECO identified a possible power quality issue involved with HART traction power loads. HART continues to coordinate with HECO regarding analysis of the 12kV feeders’ voltages and potential mitigations. Procurement for Static Synchronous Compensator (STATCOM) to address this issue with HECO is pending. ATC train scheduling function will help mitigate HECO concerns for Segment 1 until such time that the STATCOM devices are installed and operational.
HART has conducted Configuration Control audits of all subsystems under HRH’s scope. Of the original 15 Non-Conformance Items, HRH has been able to address and close out 13. HART continues to monitor HRH’s progress to comply with the Configuration Management Plan.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY MILESTONES: Complete MSF Phase 2 in November 2019. Train was able to run in automatic mode on functional section in September 2019. Energization of Segment 1 in January 2020.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT: Retrofit of car shell underframe to rectify aluminum extrusion defects continues in Italy. Five (5) retrofit car
shells have been received in Pittsburg, CA.
CSC NCR Log (Issued by HRH)
Total Closed Open
HRH & Subs 54 51 3
Hitachi Rail 1,922 1,637 285
TOTAL 1,976 1,688 288
Honolulu Rail Transit Project Monthly Progress Report September 2019
25 | P a g e
TRAIN DELIVERY SCHEDULE:
Forecast Train Delivery Schedule
Train #
HRH PR85 Scheduled Ship Date
from Pittsburg
HRH PR85 Scheduled Arrival Date to Honolulu
Forecast Ship Date from Pittsburg, CA
Forecast Delivery to MSF
Actual Delivery Date
Train 1 SHIPPED DELIVERED SHIPPED DELIVERED April 16, 2016
Train 2 SHIPPED DELIVERED SHIPPED DELIVERED May 23, 2017
Train 3 SHIPPED DELIVERED SHIPPED DELIVERED August 6, 2018
Train 4 SHIPPED DELIVERED SHIPPED DELIVERED December 1, 2018
Train 5 SHIPPED DELIVERED SHIPPED DELIVERED January 19, 2019
Train 6 SHIPPED DELIVERED SHIPPED DELIVERED March 2, 2019
Train 7 March 13, 2019 April 9, 2019 TBD TBD
Train 8 April 22, 2019 May 19, 2019 February 2020 March 2020
Train 9 May 27, 2019 June 23, 2019 January 2020 February 2020
Train 10 July 1, 2019 July 28, 2019 November 2019 December 2019
Train 11 July 31, 2019 August 27, 2019 December 2019 January 2020
Train 12 August 30, 2019 September 26, 2019 October 2019 November 2019
Train 13 September 29, 2019 October 26, 2019 March 2020 April 2020
Train 14 October 29, 2019 November 25, 2019 TBD TBD
Train 15 November 28, 2019 December 26, 2019 TBD TBD
Train 16 December 23, 2019 January 19, 2020 TBD TBD
Train 17 January 17, 2020 February 13, 2020 TBD TBD
Train 18 February 11, 2020 March 9, 2020 TBD TBD
Train 19 March 7, 2020 April 3, 2020 TBD TBD
Train 20 April 1, 2020 April 28, 2020 TBD TBD
*HART is working with HRH to develop an updated Vehicle delivery schedule.
Honolulu Rail Transit Project Monthly Progress Report September 2019
26 | P a g e
B. Elevators and Escalators Manufacture-Install-Maintain (MIM) CPP No.: MI-930 Contractor: Schindler Elevator Corporation Contract Start Date: August 2013 Contract Substantial Completion: May 2021 Projected Completion of Work: February 2024 (see the Schedule section below) Project Description: A contract to design, fabricate, install, test, commission, and maintain all elevators and escalators at all 21 stations.
Progress Schedule Status
Physical % Complete 40.9%
Just in Time** Early Plan* 56.3%
Late Plan* TBD *Data as of Sept. 27, 2019. **The E&E schedule is dependent on other contractors' schedules. Actual release for manufacturing will be coordinated for a 'just in time' delivery.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $0
DBE % Attained: 0%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $3,938,754
00024 Aloha Stadium Escalator 2 OT $10,000
Cumulative Current Report $3,948,754
_______________________________________________________________________________________________________
SCHEDULE:
The Elevators and Escalators (E&E) contract substantial completion date is May 2021, based on the AGS contract substantial completion date. The final completion date for the E&E contract will be based on the CCGS contract’s scheduled installation dates after award of the CCGS contract.
Original Contract: $50,982,714 Incurred-to-Date: $22,018,951
Current Contract Value1: $54,931,468 Incurred in September: $0
Outstanding Issues: 0 Contractor CP Amount: $0
1Current Contract Value = Original contract value with Design Allowance + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
27 | P a g e
WORK PROGRESS:
Activities this Month: Initial elevator pit and elevator shaft steel is continuing
to be erected at the KHSG stations. Elevator and Escalator CE&I inspections are occurring at the KHSG stations to ensure that the required specifications for the elevator and escalator supplier are met.
HART is continuing to coordinate with the AGS contractor and the E&E contractor to firm up required equipment installation dates. The ordering of the equipment has begun based on anticipated need dates.
At Pearl Highlands Station, installation of Elevators #1 and #2 are continuing. Expected completion is mid-November. Installation of Escalators #3, #4 and #6 is continuing.
Elevator #1 for Pearlridge Station arrived and installation has begun.
Look Ahead: The E&E substantial completion date for the
remaining eight east-side stations will be established once the contract is awarded for the CCGS and the schedule for this contract is accepted.
At Pearl Highlands Station, Elevator #1 and Elevator #2 installations will continue as well as installation of Escalators #3, #4 and #6, with an estimated completion date of mid-November.
Elevator #2 for Pearlridge Station is scheduled to arrive in mid-October.
_______________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font):
The release for manufacturing date of the E&E equipment is being coordinated for a 'just in time' delivery. The equipment for the eight stations included in the City Center Guideway and Stations contract are on hold pending award of the construction of these stations. The solicitation package contains the size and configuration of the elevators and escalators purchased for these remaining stations.
The current completion date of the City Center section of guideway with stations will impact the completion of the Elevator and Escalator contract and will have cost impacts to the material and labor escalation.
_______________________________________________________________________________________________________
KEY MILESTONES:
Preventive maintenance requirements along with the required final testing is continuing for the elevators that have been installed. The only remaining elevators to be installed are at Pearlridge Station (1) and at Aloha Stadium Station (2 each).
_______________________________________________________________________________________________________
QUALITY MANAGEMENT:
Elevators and Escalators NCR Log (Issued by Schindler)
Total NCRs Issued To Date Closed Open
0 0 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
28 | P a g e
C. Fare Collection System CPP No.: MI-900 Contractor: INIT, Innovations in Transportation, Inc. Contract Start Date: April 2016 Projected Completion of Design-Build Work: December 2025
Project Description: The fare collection system is a joint HART and City and County of Honolulu [Department of Transportation Services (DTS), Department of Information Technology (DIT), Budget and Fiscal Services (BFS)] project that will consist of a multi-modal, closed loop, account based smart card system. The Fare System vendor, INIT Innovations in Transportation, Inc., is responsible for design, manufacture, testing, installation and operation of the entire system inclusive of hardware and software. The rail portion of the project will consist of Ticket Vending Machines (TVMs) and fare gates at stations that accept smart cards which can also be used for payment on board TheBus and facilitate a seamless transfer between modes. Equipment and software to be used by both HART and the City and County will include transaction processing, fare equipment monitoring, and customer service systems, as well as a Data Warehouse. TheBus equipment will consist of stand-alone smart card readers on board.
Progress Schedule Status
Percent Complete 34.6% 12 Months Behind Milestone Schedule
Payment** Early Plan* 74.1%
Late Plan* 66.3% *Data as of Sept. 27, 2019. Planned information is being evaluated based on the current (full-alignment) scope versus the revised requirements of the Interim Revenue Service completion date. **Although the contract is 12 months behind schedule, it does not impact the Interim Opening or the RSD.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $0
DBE % Attained: 0%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $361,470
None N/A ---
Cumulative Current Report $361,470
_______________________________________________________________________________________________________
SCHEDULE: The baseline schedule for the fare systems project is currently 12 months behind schedule and failed to make
delivery of the final Key Performance Indicator (KPI) reports for the Field Integration Test (FIT) and Pilot milestone. These items are now anticipated for delivery by Oct. 30, 2019.
Original Contract: $15,464,198 Incurred-to-Date: $5,468,495
Current Contract Value1: $15,825,668 Incurred in September: $0
Outstanding Issues: 0 Contractor CP Amount: $0
1Current Contract Value = Original contract value with Design Allowance + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
29 | P a g e
WORK PROGRESS: Activities this Month: Completed Factory Acceptance Tests (FAT) Test Plans and FAT
for TVMs; started FAT for faregates. Created draft Fare System Installation Sequencing schedule. Provided on site review of conduit for KHG and AGS stations. CEO to CEO letter sent to Init requesting a schedule for October
2020 limited opening. Troubleshot customer interface issues with website, call center
and pass office. Launched 6 additional institutional customers, including City
staff with pre-tax program. Confirmed August and September daily settlement reconciliation
with WorldPay automation reconciles within SAGE and continued to monitor.
Continued to work with UH Mānoa on distribution options for HOLO and brought in Hawai‘i Pacific University (HPU) to discuss roll out options with their new chip card.
Continued cascading 6 week action plan for agency management through Pilot.
Reviewed interface requirements for installation with the Core Systems team and Hitachi; began revisions to installation plans.
Issued Amendment 6 to Init for signature. Confirmed senior bulk load process and started mail outs for
November cards. Attended 3 day senior fair at Blaisdell and issued over 500 cards. Confirmed TVM screen layout. Confirmed the approach and timeline for the start of Satellite
City Hall (SCH) roll out beginning the week of Nov. 18 at Kapalama.
Finalized Draft Ops Plan. Working to complete two additional appendices with procedures.
Look Ahead: Complete change order (CO) for Middle
Street phase. Complete Pilot documentation and
invoicing for milestone. Begin 3 Month System Acceptance
Period. Review and augment Production
Acceptance Test (PAT) plans for TVMs and faregates.
Finalize Memorandum of Understanding (MOU) with the City for cost sharing of card distribution.
Complete Operations Plan. Continue onboarding institutions to
HOLO. Monitor call center and sales staff
additional training needs with Pilot launch.
Finalize roll out at all TIMES and Foodland stores on O‘ahu. Continue to work with 7-Eleven on roll out options.
Begin roll out of translated 7 additional languages at website and Interactive Voice Response (IVR).
Continue in field monitoring of TVM and fare gate stub ups at station entrances. Confirm conduit is correct.
Continue to monitor the City’s Request for Information (RFI) and RFP process for outsourcing HOLO O&M. Develop back up plans.
_______________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font):
DTS does not envision having a contractor in place to manage HOLO with the handover on Feb. 1, 2020, nor having funds for card distribution and marketing until June/July 2020.
The contractor missed the provision of KPI reports for finalization of the Pilot. This delays the Pilot Milestone by an additional month and pushes Systems Acceptance for Bus and Back Office out to the end of January 2020.
_______________________________________________________________________________________________________________________________________
KEY MILESTONES:
Pilot Acceptance October 2019. System Acceptance Bus and Back Office Jan. 30, 2020. Rail Functional Unit Testing December 2019. Rail System Integration Testing March 2020.
_______________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT:
Fare Collection NCR Log (Issued by INIT)
Total NCRs Issued To Date Closed Open
0 0 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
30 | P a g e
D. On-Call Construction IV CPP No.: MM-949 Contractor: Royal Contracting Co., Ltd. Contract Start Date: January 2018 Contract Substantial Completion: January 2023 Projected Completion of Work: January 2023 Project Description: This is an on-call contract to perform a variety of construction services by issuance of Task Orders. The construction services to be provided will include, but are not limited to, maintenance, renovations to existing privately owned properties, demolition of buildings/structures, repairs to existing HART facilities, temporary utilities installations, utilities relocation, new construction projects or services, maintenance of roadways inclusive of, filling potholes, removing dead animals, landscape maintenance, repairing/replacing signage, and other such activities to HDOT and/or City and County of Honolulu standards, work in support of HART’s ongoing construction activities, and work in support of other HART contractors.
Progress Schedule Status
Physical % Complete* 51.6%
On Time Early Plan* 87.5%
Late Plan* TBD *Data as of Sept. 27, 2019.
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
DBE Participation Task Orders
Actual DBE Participation: $0
Number of Task Orders Issued
Amount ($)
DBE % Attained: 0% Task Orders Previously Issued 58 $38,418,166
Task Orders Issued this Month 2 $1,185,258
Amendments to Task Orders 5 $166,116
Total Task Orders Issued 60 $39,769,540
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
SCHEDULE:
The On-Call Contract is a Task Order based Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The work consists of meeting the objectivities of HART’s Joint Use and Occupancy Agreements (JUOA) requirements, maintaining HART properties, performing Cost to Cure activities, and performing permanent utility relocation work. Each Task Order has its own start and finish date, and as such, there is no overall schedule requirements for the On-Call contract proper. The contract NTP was issued on Jan. 8, 2018 and ends on Jan. 7, 2023 with two one-year options.
Original Contract: $46,000,000 Incurred-to-Date: $20,258,143
Current Contract Value1: $46,000,000 Incurred in September: $1,577,156 1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
31 | P a g e
WORK PROGRESS: Activities this Month: Continued maintenance of the HDOT roadways, per
the JUOA. Tie-in to the existing waterline was completed in
September. Work on new sidewalk, new curb and gutter, and road
widening at Cutter Dodge, Stuart Plaza and UH Urban Gardens is continuing.
Continued to complete HDOT elements of work as required by the HDOT agreements.
Continued to work on AGS HECO Zone’s 3, 4 and 9. Continued work at Dillingham Plaza which is a cost to
cure activity. Continued work at LCC on the Ka‘aahi Substation and
storage area for HECO vehicles.
Look Ahead: Continue to maintain HDOT roadways, as required
by the JUOA. Continue work on new sidewalk, new curb and
gutter, and road widening at Cutter Dodge, Stuart Plaza and UH Urban Gardens.
Removal of the redundant 24 inch waterline has begun and is expected to be complete in October 2019.
Continue to complete HDOT elements of work as required by the HDOT agreements.
Continue to work on Cost to Cure property’s located on Dillingham Boulevard.
The planned completion of HECO Zone 3 is scheduled for October, and completion for HECO Zone 4 is November 2019.
_______________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font): Need to receive timely Right of Entry agreements.
Need to continue to have Maintenance of Traffic plans reviewed and accepted in a reasonable time frame. Need to receive timely outage requests from HECO in order to meet the AGS contractor’s schedule.
_______________________________________________________________________________________________________________________________________
KEY MILESTONES: The required hydro testing, flushing, and chlorination, and final tie-ins for the 24” waterline was completed in
September 2019. Complete utility and road widening on both Halekauwila and Nimitz by the end of 2020.
_______________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT:
On-Call Construction IV NCR Log (Issued by Royal Contracting)
Total NCRs Issued To Date Closed Open
0 0 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
32 | P a g e
4.2 Section I – West O'ahu/Farrington Highway: East Kapolei to Pearl Highlands
A. West O'ahu/Farrington Highway Guideway (WOFH) CPP No.: DB-120 DB Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: December 2009 Date of Substantial Completion Notification: December 13, 2018
Project Description: Design and construction of 6.8 miles of rail alignment, starting at the East Kapolei Station and ending at the Pearl Highlands Station.
Progress Schedule Status
Physical % Complete 100% Substantial Completion Obtained**
Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $17,119,976
DBE % Attained: 2.57%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $185,351,685
None N/A ---
Cumulative Current Report $185,351,685
_______________________________________________________________________________________________
SCHEDULE:
Final Record drawing to be submitted by October. Start installation of the acoustical monitoring – October 2019. Complete acoustical monitoring installation – December 2019.
_______________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: Finalization of record drawings continues. Compilation of closeout documentation continues. Deck shrinkage cracking repair underway.
Look Ahead: Contractor to finalize and submit record drawings. KIWC to provide required deliverables in
accordance with Contract Change Order (CCO) No. 00170.
Installation of the acoustical monitoring system. KIWC to continue repair of guideway deck
shrinkage cracks. Complete closeout documentation. Complete certified payroll issues.
Original Contract: $482,430,201 Incurred-to-Date: $667,781,906
Current Contract Value1: $667,781,886 Incurred in September: $0
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
33 | P a g e
KEY ISSUES (new issues are in bold font):
Installation and commissioning of the Acoustical Monitoring System. _______________________________________________________________________________________________________
KEY MILESTONES:
One-year project warranty period commenced on Jan. 14, 2019, per CCO No. 00170. _______________________________________________________________________________________________________
SUBSTANTIAL COMPLETION:
Substantial Completion is Dec. 13, 2018. _______________________________________________________________________________________________________
QUALITY MANAGEMENT:
Warranty issue: Guideway deck shrinkage cracks – repair underway.
WOFH NCR LOG (Issued by KIWC)
Total NCRs Issued to Date Closed Open
586 586 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
34 | P a g e
B. University of Hawai‘i West O‘ahu (UHWO) Station Temporary Park-and-Ride & UHWO Campus Road “B” CPP No.: DBB-602 Contractor: Nan, Inc. Contract Start Date: December 2017 Contract Substantial Completion: July 2019 (Pending contract amendments to move substantial completion date to October 2019) Projected Completion of Work: October 2019 Project Description: The project consists of the construction of a temporary park & ride, Road “B” and associated site work in the vicinity of UH West O‘ahu Station. The project includes clearing, grubbing, erosion and dust control, grading and hauling, drainage, installation of underground and overhead utilities, installation of traffic signal, street lighting, and park & ride area electrical and communication systems, concrete curbs, sidewalks and wheelchair ramps, asphalt and concrete pavement structures, signing and striping, bus shelters, landscaping including installation of an irrigation system, and other appurtenances associated with roadway and park & ride facilities.
Progress Schedule Status
Physical % Complete 77.5% 3 months
behind Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. NTP issued Dec. 15, 2017.
_______________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $108,454
DBE % Attained: 0.86%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $1,392,023
None N/A ---
Cumulative Current Report $1,392,023
_______________________________________________________________________________________________________________________________________
SCHEDULE:
Time Impact Analysis (TIA) 1 will extend contract completion to Sept. 10, 2019. Additional TIAs may extend the contract completion to October 2019. Traffic signal duct installation completed. Park and Ride paving completed. Park and Ride striping completed. Traffic signal foundation installation completed.
Original Contract: $11,589,300 Incurred-to-Date: $10,238,437
Current Contract Value1: $12,981,323 Incurred in September: $510,427
Outstanding Issues: 5 Contractor CP Amount: $701,632
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
35 | P a g e
WORK PROGRESS: Activities this Month: Landscaping. Irrigation. Bus shelter roof installation. Traffic signalization. Sidewalk installation. Park and Ride final paving. Road B final paving.
Look Ahead: Bus shelter roof painting. HECO to pull cable for power for station
energization. Topsoil and landscaping installation of Road B. Traffic signalization. Final paving of Road B intersection, and signage.
_______________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font):
Mitigating schedule impacts from the materials and cul-de-sac change order. Approved Finding of Merit/No Merit (FOMs) pending executed change orders:
o Issue 00001 TIA #1
o Issue 0006 Delete Traffic Signal o Issue 00015 CIC Conduit
Pending FOMs: Issue 00003 TIA 2; Issue 00010 Contour Grades. _______________________________________________________________________________________________________________________________________
KEY MILESTONES:
Final paving of Park and Ride completed. Road B final lift of asphalt concrete (AC) paving - October 2019.
_______________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT:
UHWO Station Temporary Park-and-Ride & UHWO Campus Road “B” NCR Log
(Issued by Nan)
Total NCRs Issued to Date Closed Open
2 0 2
Honolulu Rail Transit Project Monthly Progress Report September 2019
36 | P a g e
C. West O'ahu Station Group (WOSG) CPP No.: DBB-171 Contractor: Nan, Inc. Contract Start Date: October 2015 Contract Substantial Completion: March 2019 Projected Completion of Work: January 2020
Project Description: The West O'ahu Station Group construction contract includes services to build three (3) transit stations along Kualaka'i Parkway and Farrington Highway. The stations are East Kapolei (EKP), UH West O'ahu (UHWO), and Ho'opili (HOP) Stations. In addition to the transit stations, operational ancillary buildings, a traction power substation, and adjacent areas are included in this project.
Progress Schedule Status
Physical % Complete 88.6% 10 months behind**
Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. Plan reflects expected completion of May 2019. **Further explanation is provided in the Schedule section.
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $758,121
DBE % Attained: 1.22%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $19,725,979
None N/A ---
Cumulative Current Report $19,725,979
Original Contract: $56,088,470 Incurred-to-Date: $62,805,820
Current Contract Value1: $75,814,449 Incurred in September: $3,045,509
Outstanding Issues: 35 Contractor CP Amount: $30,897,132
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
37 | P a g e
SCHEDULE: Continuing to work with the contractor to mitigate the previous delays. Coordinating with CSC and the contractor to meet HRH’s schedule for access turnover for functional testing and
interim service milestones. Replace UHWO and HOP canopy arms – November 2019.
WORK PROGRESS: Activities this Month: East Kapolei
Completed conduit installation. Installing balustrades at concourse level. Faregate cabinet installation. Utility room painting. Utility room door installation work. Water and sewer work. Channel sitework. Platform end cabinet installation. Service post conduit installation. End of Platform Gate installation.
UH West O‘ahu Painting of stations. Interior finishes in west entrance building ground floor
rooms. Rough-in for the service and light posts is ongoing.
Faregate wall installation, including tile work, continues. Electrical rough-in for platform service and light posts. Platform cabinet installation completed. Service post conduit installation. Architect Supplemental Information (ASI) 22 lightning
protection work completed. End of Platform Gate installation completed. Faregate cabinet installation completed.
Ho‘opili Faregate area conduit. Site work utilities and sidewalk construction. Painting of balustrade at stairs, landing and platforms. Heating, Ventilation and Air Conditioning (HVAC) wiring
and controls installation completed. HVAC testing and balancing completed. Faregate cabinet installation completed.
Look Ahead: East Kapolei
Complete site utility work. Complete channel sitework. HVAC wiring and controls. Complete platform cabinet work. Service post conduit installation. End of Platform Gate installation.
UH West O‘ahu HECO to install transformer and cable from
Road B into the station. Completion of site work around west
entrance building. Painting west entrance building and faregate. Completion of faregate area walls including
the exterior tile work. Completion of electrical rough-in for platform
service and light posts. HVAC wiring and controls. Grounding work. Service post conduit.
Ho‘opili Paint balustrade at stairs, landings and
platforms. Installation of architectural fence at Entrance
Area. Service post conduit.
KEY ISSUES (new issues are in bold font): UHWO Station power – TBD. Mitigate project schedule. Canopy installation for UHWO and HOP stations. Turnover/Access of station areas to the CSC contractor. Approved Finding of Merit/No Merit (FOMs) pending COs (Not in Consolidated Resolution [CR]):
o Issue 00047 Traffic Signal Modification o Issue 00301 HVAC Wiring
Honolulu Rail Transit Project Monthly Progress Report September 2019
38 | P a g e
KEY MILESTONES: HOP Station: Canopy arms removed from platform for repair. Dynamic envelope testing passed. HVAC system fully operational.
UHWO Station: Canopy arms removed from platform for repair. Faregate cabinets installed.
EKP Station: Faregate cabinets installed. Faregate gate installed.
QUALITY MANAGEMENT: Conducted bi-weekly Quality Task Force Meetings.
WOSG NCR Log (Issued by Nan)
NCRs Issued to Date
Closed Open
East Kapolei 10 9 1
UH West O‘ahu 34 31 3
Ho‘opili 27 23 4
Contract Wide 9 9 0
TOTAL 80 72 8
Honolulu Rail Transit Project Monthly Progress Report September 2019
39 | P a g e
D. Farrington Highway Station Group (FHSG) CPP No.: DBB-271 Contractor: Hawaiian Dredging Construction Company, Inc. (HDCC) Contract Start Date: August 2015 Contract Substantial Completion: January 2019 Projected Completion of Work: December 2019
Project Description: The Farrington Highway Station Group construction contract includes services to build three (3) transit stations along Farrington Highway. The stations are West Loch (WLO), Waipahu Transit Center (WTC), and Leeward Community College (LCC) Stations. The station work includes operational ancillary buildings, a traction power substation at WLO, and a Kiss-and-Ride lot at WLO.
Progress Schedule Status
Physical % Complete 91.9% 11 months
behind Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019.
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $4,118,510
DBE % Attained: 5%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $17,796,520
00031 WLO Street Light Trenching ($8,161)
Cumulative Current Report $17,788,359
Original Contract: $78,999,000 Incurred-to-Date: $83,224,433
Current Contract Value1: $96,787,359 Incurred in September: $1,496,847
Outstanding Issues: 34 Contractor CP Amount: $32,753,129
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
40 | P a g e
SCHEDULE: Station completion is on track for October 2019, with the exception of canopy/fabric and signage installation. LCC canopy arms began to arrive Sept. 26, 2019. WLO canopy arms to arrive Oct. 31, 2019. WTC canopy arms to arrive Nov. 28, 2019. Canopy arm completion is scheduled for December 2019.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: West Loch
Placed decorative concrete Makai Station side. Installation of simulated stone at station entrances. NCR’s and change order items. Installation of signs. Preliminary site walks and punchlist generation. Began landscaping.
Waipahu Transit Center
Installed Outrigger stair railing. Architectural fence installation change order work is ongoing. Continued station painting.
Leeward Community College
Received canopy frames onsite. Installation of signs. Punchlist checklist. Parking area striping.
All Stations
Coordinating canopy installation and installation sequencing.
Look Ahead: West Loch
Kiss n Ride pavement striping. Faregate Canopy. Service Posts.
Waipahu Transit Center
Moloalo sidewalk redesign. Faregate Canopy. Signs. Service Posts.
Leeward Community College
Punchlist work. All Stations
Canopy installation.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font): Platform canopy structural redesign – design and shop drawings are complete, and fabrication is underway. Finalize shop drawings and fabrication of faregate canopies.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY MILESTONES: Canopy Structure installation is scheduled to be complete December 2019.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT: The CE&I team is working with HDCC to ensure required submittals are approved prior to related construction
activities.
FHSG NCR Log (Issued by HDCC)
NCRs Issued to Date
Closed Open
West Loch 32 31 1
Waipahu Transit Center 18 15 3
West Loch/Waipahu Transit Center 3 0 3
Leeward Community College 18 14 4
Contract Wide 19 14 5
TOTAL 90 74 16
Honolulu Rail Transit Project Monthly Progress Report September 2019
41 | P a g e
E. Maintenance and Storage Facility (MSF) CPP No.: DB-200 Contractor: Kiewit/Kobayashi Joint Venture (KKJV) Contract Start Date: July 25, 2011 Contract Substantial Completion Date: July 2, 2016
Project Description: The MSF contract consists of the Operations and Servicing Building (OSB), Maintenance of Way (MOW), Train Wash Facility (TWF) and Wheel Truing Building (WTB). In addition to the four (4) facility buildings, MSF includes rail procurement, special trackwork, ties, third rail and other track material for the four guideway segments on the project.
Progress Schedule Status
Physical % Complete 100% Substantial Completion Obtained*
Early Plan 100%
Late Plan 100% *Further explanation is provided in the Schedule section.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $710,987
DBE % Attained: 0.25%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $86,517,032
None N/A ---
Cumulative Current Report $86,517,032
______________________________________________________________________________________________________________________________________________________
SCHEDULE:
HART to complete deductive change order in October. HART to close remaining issues by fourth quarter 2019.
______________________________________________________________________________________________________________________________________________________
WORK PROGRESS:
Activities this Month: HART continues to investigate track settlement issues
raised by the CSC.
Look Ahead: Execute deductive change order. Final Acceptance Letter from HART. Process final payment.
MSF Construction Status 100% Complete Overall
Element % Complete*
OSB 100%
MOW Building 100%
WTB 100%
TWF 100%
Rail 100%
Paving 100% *Not including testing and commissioning.
Original Contract: $195,258,000 Incurred-to-Date: $281,793,419
Current Contract Value1: $281,775,032 Incurred in September: $0
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
42 | P a g e
KEY ISSUES (new issues are in bold font): MSF Closeout/Final Acceptance. KKJV’s request has been submitted. This contract is pending closure by fourth
quarter 2019. _______________________________________________________________________________________________________
KEY MILESTONES:
None. _______________________________________________________________________________________________________
QUALITY MANAGEMENT: Overall quality of the contract is good.
MSF NCR Log (Issued by KKJV)
Total NCRs Issued to Date Closed Open
37 37 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
43 | P a g e
4.3 Section II – Kamehameha Highway: Pearl Highlands to Aloha Stadium A. Kamehameha Highway Guideway (KHG)
CPP No.: DB-320 Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: June 2011 Date of Substantial Completion Notification: December 13, 2018
Project Description: Kamehameha Highway Guideway DB Contract (KHG) consists of 3.9 miles and starts 400 feet east of the Pearl Highlands Station and terminates 1,400 feet beyond the Aloha Stadium Station. KHG work scope is made up of utility relocations, traffic signal improvements, highway widening, drilled shaft foundations, columns, and aerial structure.
Progress Schedule Status
Physical % Complete 100% Substantial Completion Obtained**
Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $860,191
DBE % Attained: 0.22%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $31,405,774
None N/A ---
Cumulative Current Report $31,405,774
SCHEDULE: Final Record drawings – October 2019. Final certified payrolls – October 2019.
_______________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: Back checking KIWC corrections to record drawings. Compilation of closeout documentation.
Look Ahead: Contractor to finalize and submit record drawings. Complete certified payroll issues. Complete closeout documentation.
Original Contract: $372,150,000 Incurred-to-Date: $403,589,030
Current Contract Value1: $403,555,774 Incurred in September: $0
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
44 | P a g e
KEY ISSUES (new issues are in bold font):
N/A. _______________________________________________________________________________________________________
KEY MILESTONES:
One-year project warranty period commenced on Jan. 14, 2019, in accordance with CCO No. 00076. _______________________________________________________________________________________________________
SUBSTANTIAL COMPLETION:
Substantial Completion is Dec. 13, 2018. _______________________________________________________________________________________________________
QUALITY MANAGEMENT:
KHG NCR Log (Issued by KIWC)
Total NCRs Issued to Date Closed Open
252 252 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
45 | P a g e
B. Ramp H2R2 CPP No.: DBB-385 Contractor: Royal Contracting Co. Ltd. Contract Start Date: May 2015 Contract Substantial Completion: November 2017 Completion of Work: February 2018
Project Description: The construction of Ramp H2R2 and associated roadway work within the Waiawa Interchange. The Ramp H2R2 will provide access to the Pearl Highlands Station from eastbound Farrington Highway and connects to eastbound Kamehameha Highway.
Progress Schedule Status
Physical % Complete 100% Work
Completed Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. This project is not on the Critical Path.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $838,995
DBE % Attained: 14.74%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $633,875
00009 Reconciliation of Allowances ($301,625)
Cumulative Current Report $332,250
________________________________________________________________________________________________________________________________________________________________________________________________________________________
SCHEDULE: Close contract 4th quarter 2019.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS: Activities this Month:
Routing of closeout checklist was signed by all. Final payment to documentation provided to contractor.
Look Ahead: Contract closure.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font): N/A.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY MILESTONES: Close contract.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT:
Ramp H2R2 NCR Log (Issued by Royal Contracting)
Total NCRs Issued to Date Closed Open
12 12 0
Original Contract: $5,203,646 Incurred-to-Date: $5,542,482
Current Contract Value1: $5,535,896 Incurred in September: $0
Outstanding Issues: 0 Contractor CP Amount: $0 1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
46 | P a g e
C. Kamehameha Highway Station Group (KHSG) CPP No.: DBB-371 Contractor: Nan, Inc. Contract Start Date:
Notice to Commence Administrative Work: April 2016 Notice to Commence Investigative/Pre-Construction Work at Pearl Highlands: July 2016 Full Notice to Proceed (NTP): October 3, 2016
Contract Substantial Completion: May 17, 2019 Projected Completion of Work: December 2019
Project Description: The Kamehameha Highway Station Group construction contract includes services to build three (3) transit stations along Kamehameha Highway. The stations are Pearl Highlands Station (PHL), Pearlridge Station (PLR), and Aloha Stadium Station (ALS). Operational ancillary buildings, pedestrian crossing improvements, Train Control and Communications Rooms (TCCRs), and landscaping of the station sites are included in addition to the transit stations. The Pearl Highlands Station will include a transit center. The Pearl Highlands and Aloha Stadium Stations include both a Park-and-Ride lot and a Kiss-and-Ride lot.
Progress Schedule Status
Physical % Complete 78.4% 7 months behind**
Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $0
DBE % Attained: 0%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $8,478,418
None N/A ---
Cumulative Current Report $8,478,418
Original Contract: $115,805,845 Incurred-to-Date: $93,592,017
Current Contract Value1: $124,284,263 Incurred in September: $9,579,307
Outstanding Issues: 22 Contractor CP Amount: $17,079,625
1Current Contract Value = Original contract value with Design Allowance + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
47 | P a g e
SCHEDULE: Ongoing coordination with CSC and the contractor to meet HRH’s schedule for access turnover and interim
opening. Schedule delayed by canopy delivery. Working with the station and systems contractors to mitigate any impact on
interim opening resulting from canopy design revisions in progress. ________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: Pearl Highlands
Continued installation of vertical ductbank to transformer pad. Commenced forming transformer platform. Commenced paving Kamehameha Highway eastbound. Commenced site bioswale installation. Continued entrance light fixture installation. Continued balustrade and railing installation. Continued site excavation at the entrance ground level. Continued painting stairway canopy. Completed stair/escalator tile and plaster installation.
Pearlridge Continued pouring mauka slab-on-grade. Completed mauka architectural fence installation. Completed pouring makai slab-on-grade. Completed makai architectural fence installation. Continued storm drain pipe installation. Continued painting structural steel. Completed pouring concourse topping slab. Continued elevator shaft window frame installation. Commenced gravel installation at the Mauka electrical
equipment yard. Aloha Stadium
Continued concrete pours for driveway A rigid paving. Continued parking lot entrance canopy sheeting. Commenced parking lot entrance canopy roofing installation. Commenced pouring station slab-on-grade and curb fronting
driveway B. Continued subgrade preparation for driveway B. Commenced pouring plaza colored concrete slab-on-grade. Completed establishing subgrade for non-paid area plaza slab-
on-grade and commenced forming and reinforcement. Continued stair canopy structural steel erection. Completed drain line B storm drain line and manhole installation. Commenced sewer line installation in driveway B. Commenced PSG bolt and grout pad installation.
Look Ahead: Pearl Highlands
Complete transformer platform and vertical ductbank installation.
Continue balustrade and railing installation. Continue site excavation at the entrance
ground level and commence installation of pedestrian ramp.
Complete paving Kamehameha Highway eastbound.
Pearlridge Complete pouring mauka slab-on-grade. Continue balustrade and handrail
installation. Commence platform pedestrian bridge
topping slab pours. Continue elevator shaft window frame
installation. Complete gravel installation at the Mauka
electrical equipment yard. Aloha Stadium
Continue roofing at parking lot entrance canopies.
Continue driveway A and B rigid paving concrete pours.
Continue station slab-on-grade. Continue stair canopy structural steel
erection. Complete PSG bolt and grout pad
installation. Complete sewer line installation in driveway
B.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font):
Canopy Fabrication Coordination – HART continues discussion with the contractor and the Engineer of Record (EORs) on canopies and Pearlridge entry module fabrication issues.
Passenger Screen Gate Plate Coordination – Pearl Highlands and Pearlridge plates, bolts and pavers have been installed. Aloha Stadium Station plate installation is complete and bolt installation is in progress and expected to be complete in October.
Aloha Stadium Permanent Power – HART is awaiting approval of an easement for the transformer for HECO to begin pulling wires.
Coordinating with the CSC in order to meet need dates.
Honolulu Rail Transit Project Monthly Progress Report September 2019
48 | P a g e
KEY MILESTONES:
Pearlridge Station TCCR and UPS Building – Pathway to guideway conduit installation is complete. TCCR and UPS rooms are now being shared with the Core Systems Contractor.
Aloha Stadium Station TCCR and UPS Rooms – Pathway to guideway conduits complete. TCCR and UPS rooms are now being shared with the Core Systems Contractor.
Current canopy delivery schedule: PHL - October 2019, PLR - November 2019, ALS – Pending redesign. Working with the contractor to improve the schedule.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT:
KHSG NCR Log (Issued by Nan)
NCRs Issued to Date
Closed Open
Pearl Highlands 22 20 2
Pearlridge 21 20 1
Aloha Stadium 2 1 1
Contract Wide 0 0 0
TOTAL 45 41 4
Honolulu Rail Transit Project Monthly Progress Report September 2019
49 | P a g e
D. Kamehameha Highway Resurfacing (KHR) CPP No.: DBB-701 Contractor: Road and Highway Builders, LLC (RHB) Contract Start Date: Notice to Proceed NTP #1: August 2018 Contract Substantial Completion: September 2019 Projected Completion of Work: December 2019
Project Description: The project consists of pavement resurfacing and other roadway reconstruction associated with completion of the Kamehameha Highway Guideway contract. Construction includes, but is not limited to, clearing, grubbing, erosion and dust control, grading and hauling, maintenance of traffic, pavement resurfacing, and installation of pavement markings and striping, roadway signs, curb ramps, drainage, waterlines, gas lines, traffic signal loop detectors, retaining wall, guard railing, fencing and bus shelters.
Progress Schedule Status
Physical % Complete 82.1% 3 months
behind Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019.
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $1,319,673
DBE % Attained: 5.08%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $880,521
None N/A ---
Cumulative Current Report $880,521
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
SCHEDULE: Completed mill and overlay paving activities from Kaonohi Street to Aloha Stadium. The projected completion date has been pushed out due to delays in road widening at Kaahumanu Street and
additional HDOT requested work. A time extension is pending. Complete overlay by Nov. 27, 2019.
_______________________________________________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: Held various meetings, such as pre-activity, progress, environmental,
traffic quality, safety, and public interface meetings. Completed bus pad reconstruction. Completed repaving work from Kaonohi Street to Aloha Stadium. Continued concrete flatwork and utility work at Kaonohi Street
widening. Continued permanent striping work between Kuleana Road to Aloha
Stadium.
Look Ahead: Begin streetlight and traffic signals,
and retaining wall construction at Kaonohi Street.
Begin median concrete work between Kanuku Street and Kaonohi Street.
Begin asphalt treated base (ATB) work for road widening between Kanuku Street and Kaonohi Street.
Original Contract: $25,989,989 Incurred-to-Date: $19,544,678
Current Contract Value1: $26,870,510 Incurred in September: $2,342,807
Outstanding Issues: 0 Contractor CP Amount: $0
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
50 | P a g e
KEY ISSUES (new issues are in bold font):
Defining HDOT expectations and requirements for all civil, traffic signal, and intelligent transportation system work currently not in the KHR contract to allow transfer of the roadway back to HDOT.
HDOT is requesting additional work be done, including removal of pavement from gutter pans, additional reconstruction areas, additional paving from Aloha Stadium to Salt Lake Boulevard, additional sidewalk work and changing of lane striping to conform with new HDOT best practices.
There are right-of-entry issues that prevent the contractor from starting work at Retaining Wall 9 and right-of-way issues at bus stops near Pearlridge mall. Right of entry to be granted in October 2019.
Issues with the relocation of overhead electrical lines is preventing roadway widening work at Kaonohi pedestrian islands from starting.
_______________________________________________________________________________________________________________________________________
KEY MILESTONES:
Completed mill and overlay paving from Kaonohi Street to ALS. _______________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT:
KHR continues to follow established quality processes through quality monitoring and audits.
KHR NCR Log (Issued by Road and Highway Builders)
Total NCRs Issued to Date Closed Open
0 0 0
Honolulu Rail Transit Project Monthly Progress Report September 2019
51 | P a g e
E. Design Services for 138kV Utilities Relocation at KHG
CPP No.: FD-700 Contractor: R.M. Towill Corporation Contract Start Date: September 2018 Contract Substantial Completion: November 2021 Project Description: Architectural and Engineering Services for the final design to relocate the existing 138kV overhead electrical lines to underground lines at Kamehameha Highway Guideway and Stations.
Progress Schedule Status
Based on Expenditures* 34.3%
TBD Early Plan* 36.8%
Late Plan* 25.0% *Data as of Sept. 27, 2019.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $0
DBE % Attained: 0%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $0
None N/A ---
Cumulative Current Report $0
_______________________________________________________________________________________________________
SCHEDULE:
HECO reviewed our schedule and wished to accelerate the design and construction work; HECO requested a design charrette in an effort to achieve this. The charrette has been completed, and HECO reviewed four 138kV alignment schemes developed at the charrette. Following the charrette, HART and our consultant team provided information to HECO, as requested. On May 24, 2019, HECO selected one of the four alignment schemes (partial overhead/underground scheme). The charrette closeout documents were prepared to reflect HECO’s selected alignment scheme. Design work on the preliminary design is being performed, and the preliminary submittal (to HECO) is scheduled for Oct. 7, 2019.
_______________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: HART’s design consultant continues to validate assumptions made in
developing the selected scheme in order to proceed with design work. In addition, HART’s design consultant has updated the design schedule, as we updated the procurement and construction schedule, based on the selected alignment scheme. The updated schedule has been transmitted to HECO for coordination. We are waiting for additional comments on the schedule from HECO, but we will continue to follow our schedule.
Look Ahead: Continue periodic HECO meetings. Continue design work for preliminary
design. Complete charrette closeout
documents.
Original Contract: $8,766,327 Incurred-to-Date: $2,594,149
Current Contract Value1: $8,766,327 Incurred in September: $0 1Current Contract Value = Original contract value with Design Allowance + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
52 | P a g e
Activities this Month (continued): Charrette closeout documents were prepared. The closeout
documents include baseline plans for the selected alignment. It will likely be discussed with HECO during the upcoming monthly Administrative Meeting scheduled for Oct. 8, 2019.
Subsurface utility location field work is complete. A portion of the thermal resistivity geotechnical field work was
completed at the end of September 2019. The remainder of the thermal resistivity geotechnical field work will be performed toward the end of this year, or the beginning of next year.
Continuing design work for the preliminary design. Preliminary Submittal to HART has been made and is currently under review (it is planned to go to HECO for review on Oct. 7, 2019).
_______________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font):
Charrette closeout documents have been prepared. The closeout documents include baseline plans for the selected alignment.
_______________________________________________________________________________________________________
KEY MILESTONES:
Based on schedule information we currently have, key upcoming milestones are as follows: o Preliminary Design: Oct. 7, 2019. o Prefinal Design: Oct. 14, 2020. o Final Design: April 21, 2021.
Note: The above dates have tentatively been revised subject to coordination with HECO.
Honolulu Rail Transit Project Monthly Progress Report September 2019
53 | P a g e
4.4 Section III – Airport: Aloha Stadium to Middle Street Transit Center Station A. Airport Section Guideway and Stations (AGS)
CPP No.: DB-450 Contractor: Shimmick/Traylor/Granite, JV (STG) Contract Start Date: December 2016 Contract Substantial Completion: May 2021 Projected Completion of Work: TBD
Project Description: The Airport Guideway and Stations Design-Build contract consists of the design and construction of 5.2 miles of elevated guideway, four (4) stations, and associated facilities between Aloha Stadium and the Middle Street Transit Center. The contractor will begin by interfacing with design disciplines, third-party stakeholders, and construction contracts within the corridor of the project to coordinate and resolve utilities conflicts. Design field verification efforts (potholing and geotechnical exploration) will be followed by construction activities once design packages have been approved.
Progress Schedule Status
Physical % Complete* 54.1%
Under Review** Early Plan* 74.8%
Late Plan 61.8% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $36,891,184
DBE % Attained: 4.25%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $468,063
00014 As-Is Precast Yard $534,675
00015 RFCR 00020 and RFCR 00021 $628,500
Cumulative Current Report $1,631,238
Original Contract: $874,750,000 Incurred-to-Date: $474,307,432
Current Contract Value1: $876,381,238 Incurred in September: $17,058,383
Outstanding Issues: 3 Contractor CP Amount: $2,423,372
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
54 | P a g e
SCHEDULE: The current Schedule Update was returned to STG Approved for Payment only in August 2019. A series of schedule workshops are continuing in order to achieve a new updated schedule including details for
station activities. We are aiming to have this issue resolved by the end of October 2019, due to new information received concerning HECO design completion for Zone 8.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS: AGS Construction Status as of 09/30/2019
Guideway Structure Element
Total to Date
Total Qty % Complete
Shafts 158 225 70.2%
Columns 130 232 56.0%
Segment Casting 2,060 2,703 76.2%
Spans Stressed 59 211 28.0%
Spans Grouted 56 211 26.5%
Trackwork 0 * 0.0%
Third Rail 0 * 0.0%
Mill & Overlay 0 * 0.0% * Amounts to be determined.
Activities this Month: Drilled shafts continued in Reach E. Continued rebar fabrication and preparation for
shafts in Reaches C and E, and columns in Reaches C and E.
Both gantry cranes continued to move forward installing subsequent spans.
Continued casting segments for Reaches C and E spans.
Continued installation of permanent street lighting throughout the AGS project.
Drilled shafts completed in the Airport Station area. Worked on infrastructure for electrical Zones 3 and 4. Continued dismantling the trestle and moving it to
Middle Street Station Area. Received the Outage request to begin utility
relocations in front of the Rental Car facility from the HDOT Airport in preparation for drilled shaft construction.
Look Ahead: Form/rebar/pour Reaches C and E columns and
segment casting. Continue pouring C-Bents and Straddle Bents Columns
in Reach B and Reach C. Utility work to continue in Zones 3 and 4; start in
Zones 6A, 8 and 9. Coordination taking place with third-parties. Continue drilled shaft construction in Reaches C and E. Design Submittals:
o Reach A, B, C and E – Civil and Composite Utilities IFC
o Civil Common Drawings and Intelligent Transportation Systems (ITS) IFC
Continue to dismantle the trestle and move it to the Middle Street Station Area.
Begin micro-piles for Middle Street Transit Center (MSTC).
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font): STG is in need of additional electrical crews to complete the remaining electrical infrastructure to allow for the
construction of the remaining drill shafts and columns. STG & HECO Zone 8 IFC Design completion and detailed electrical construction schedule; pending approval of
Zone 8 infrastructure design submittal to advance design to HECO. HART anticipates receiving the HECO Zone 8 design in early October, which will facilitate construction. Zone 8 design was originally expected to be completed at a much later date that impacted the completion of the AGS contract.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY MILESTONES: Segment 2,000 was cast. Grouting of spans is occurring within two weeks of post tensioning.
Honolulu Rail Transit Project Monthly Progress Report September 2019
55 | P a g e
QUALITY MANAGEMENT:
Pre-Activity Meetings continue.
AGS NCR Log (Issued by STG)
NCRs Issued to Date
Closed Open
Guideway 227 176 51 Pearl Harbor Naval Base Station 25 11 14 Honolulu International Airport Station 12 3 9 Lagoon Drive Station 4 4 0 Middle Street Transit Center Station 0 0 0 Contract Wide 14 14 0 TOTAL 282 208 74
Honolulu Rail Transit Project Monthly Progress Report September 2019
56 | P a g e
4.5 Section IV – City Center: Middle Street Transit Center Station to Ala Moana Center A. City Center Section Utilities and Guideway
CPP No.: FD-530 Contractor: AECOM Technical Services, Inc., Final Design Consultant (Engineer of Record) Contract Start Date: July 2012 Contract Substantial Completion: December 2019 Projected Completion of Work: December 2019
Project Description: The original City Center Section Utilities and Guideway (CCUG) final design contract consisted of utility relocations, roadway widening, and 4.12 miles of elevated transit guideway serving eight (8) passenger stations. The scope of the CCUG contract has been reduced to include only the design of utility relocations and roadway widening to facilitate future guideway design and construction by others. The remaining work is herein referred to as the City Center Utilities Relocation (CCUR) design.
Progress Schedule Status
Based on Expenditures* 96.2%
On time** Early Plan* 100%
Late Plan* 100% *Data as of Sept. 27, 2019. **Further explanation is provided in the Schedule section.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $191,227
DBE % Attained: 0.41%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $13,941,087
None N/A ---
Cumulative Current Report $13,941,087
SCHEDULE: Due to changes to save cost and delays by third party reviews, CCUR final design is scheduled to conclude in
fourth quarter 2019. __________________________________________________________________________________________________ WORK PROGRESS: Activities this Month: Continuing coordination with HECO and other concerned third party utility
agencies (i.e. Board of Water Supply [BWS], Hawaiian Telcom [HTI], etc.) on proposed concept of keeping the existing 138kV circuit overhead and cross over to makai from an existing pole along Dillingham, pole 32i.
Coordination with City and utility third parties to address review comments for Task Orders (TOs) still within the review process: TO 12 Rev. E (8/16/19), TO27 Rev. E (9/23/19), TO22 Rev. D (7/10/19), TO24 Rev. D (7/26/19), TO28 Rev. D (7/31/19, 8/6/19), TO23A Rev. D (8/16/19), TO2A Rev. D (8/26/19), TO32 Rev. D (8/30/19) and TO23B Rev. D (8/30/19).
Look Ahead: Secure and finalize details with
HECO for proposals at Oahu Community Correctional Center (OCCC) and Honolulu Community College (HCC) for 138kV circuits.
Complete coordination and confirm location for all HECO structures i.e. 138kV riser poles within City Center.
Original Contract: $43,948,220 Incurred-to-Date: $55,396,817
Current Contract Value1: $57,889,307 Incurred in September: $0
1Current Contract Value = Original contract value with Design Allowance + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
57 | P a g e
Activities this Month (continued): Design Package submittals/resubmittals this month included: TO2B Rev. D to City,
Hawai‘i Gas and DTS (9/6/19); TO27 Rev. E dry utilities to HDOT and Utilities (9/23/19).
Received official comments for TO2A from DTS (9/13/19); TO2B from Hawai‘i Gas (9/9/19) and DTS (9/26/19); TO12 Rev. E from HTI (9/4/19), HECO (9/13/19), Charter (9/17/19); TO23A Rev. D from AT&T (9/11/19), HTI (9/17/19), HECO (9/29/19) and Charter (9/30/19); TO23B Rev. D from AT&T (9/20/19) and HTI (9/27/19); TO24 from BWS (9/19/19), DPP Wastewater Branch (WWB) (9/19/19) and DPP Subdivision Branch (SUBD) (9/19/19); TO27 Rev. E from HTI (9/25/19); TO28 Rev. D from Charter (9/26/19); and TO32 Rev. D from AT&T (9/16/19), DTS (9/24/19) and HTI (9/30/19).
Coordination with landowners and their consultants/contractors for developments within City Center, i.e. Howard Hughes for projects on Halekauwila, Ward and Queen Street, etc.
Continued Request for Information (RFI) support with CCUR contractors. Continued coordination with utilities for all utility layouts for remaining dry utility
task order packages, Traffic Signal and Street Light Packages. Coordination with third parties to process One-Time Review (OTR) approvals as
well as HDOT approvals for construction to start. Continued coordination with ROW team for ongoing negotiations for acquisitions. Continued coordination and bi-weekly meetings with the DPP Director and staff
for ongoing design task order packages review.
Look Ahead (continued): Complete and submit final design
drawings for TOs 12, 17, 22, 24, 23A, 23B, 32, 25, 28, 2 and 13.
Continue coordination with third parties on seeking variances to allow reduced spacing between utilities relative to preferred spacing requirements, especially on Dillingham.
Third party review and comments for Task Orders 27, 12, 24, 17, 28, 2, 13, 26, 25, Street Lights and Traffic Signal Packages.
Finalize details for 138kV steel pole foundation design.
Finalize details for micropile needed for 138kV / BWS facilities crossing(s) on Dillingham Boulevard.
Finalize hydraulic/hydrology analysis for Kapalama Canal.
________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font): HART had been examining the existing utility designs and construction methodology for CCUR to incorporate the
use of a trenchless concept. The intent was to further identify ways to save on schedule and cost to prepare for the P3 contractor. In September, a decision to proceed with open-cut trenching, as opposed to the trenchless concept, was made. As stated in previous reports, AECOM had been instructed to provide a proposal for the incorporation of a trenchless concept in the CCUR designs; this effort is now canceled as of this month.
Key issues relating to the existing Airport-Iwilei 138kV circuit overhead from Middle Street. Based on meetings with third party utilities, i.e. HECO and BWS, HART considered keeping the existing Airport-Iwilei 138kV circuit overhead in Area 1C from Kokea Street to Iwilei Station, fronting UH HCC campus, but is opting to underground all overhead facilities in Area 1C.
Several utility facilities have been identified by HART to remain in place and not be relocated as per design. HART, AECOM and CCUR contractors are now in consultation with third parties to approve proposed work.
One change order was processed and approved: CC18 time extension with no net change to the contract amount to account for delay in review time by third party utilities.
________________________________________________________________________________________________________________________
KEY MILESTONES: Current contract milestones have been restructured within current configuration to account for wet and dry
packages divided into task orders rather than Dillingham and Kaka‘ako sections. These task order packages also include roadway, traffic signals and street light respective layouts as background information.
Traffic signal package for Dillingham are split into two (Middle Street-Kapalama Canal and Kapalama Canal-Ka‘aahi) and Kaka‘ako in two (Ka‘aahi-Nimitz/Richards Street-Ala Moana and Nimitz).
Submittal of Task Order 2B and TO27 Rev. E in September 2019, as per schedule. Task Orders now in development for OTR submittal are, in no particular order: 25, 26, 13, Traffic Signals and Street
Light Packages.
Honolulu Rail Transit Project Monthly Progress Report September 2019
58 | P a g e
B. City Center Utilities Relocation (CCUR) Indefinite Delivery/Indefinite Quantity (IDIQ) CPP No.: DBB-511 Contractor: Nan, Inc. Contract Start Date: May 2018 Contract Term Completion: May 2022 Projected Completion of Relocation Work: February 2022
Project Description: The CCUR contract is a unit priced, task order contract that relocates utilities in advance of the City Center Guideway and Stations construction work. It provides utility relocation construction services for a variety of utilities along the civil roadway construction throughout the City Center segment of the HRTP. The construction services to be provided will include, but are not limited to, permanent and temporary wet and dry utility relocation work which will include miscellaneous, as-needed site work, installation of permanent/temporary utility poles, duct bank construction, and other utility installation support structures.
Progress Schedule Status
Physical % Complete* 2.5%**
Under Review*** Early Plan* 26.5%
Late Plan* 18.4% *Data as of Sept. 27, 2019. **The % complete is for work in place and does not include eliminated scope. ***Execution Plan under review based on work in place and assessment of design alternatives.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
DBE Participation Task Orders
Actual DBE Participation: $0 Number of Task
Orders Issued Amount ($)
DBE % Attained: 0% Task Orders Previously Issued 13 $223,510,109
Task Orders Issued this Month 1 $146,388,344
Amendments to Task Orders 1 $1,538,897
Total Task Orders Issued 14 $371,437,350
Original Contract: $400,000,000 Incurred-to-Date: $12,616,382
Current Contract Value1: $400,000,000 Incurred in September: $3,307,921
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
59 | P a g e
SCHEDULE: 100% design complete – end of 2019. All Wet Utility task orders under construction first quarter 2020. All Dry Utility task orders under construction first quarter 2020. HECO completes all electrical design requirements fourth quarter 2020.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: Issued one (1) task order and one (1) amendment worth
$147.9 million for remaining wet and dry utility relocations along Dillingham Boulevard from Middle Street to Kaaahi Street.
Continuing construction in 5 different areas – Middle Street/Dillingham Boulevard, Kaaahi Street, Nimitz Highway, Queen Street and Kona Street; started probing and layout on Kona Street in anticipation of permits.
Tiger team continued efforts to resolve issues along Dillingham Boulevard – alternatives being reviewed.
Processing four (4) task order closeouts; expect to return $20.4 million back to the overall budget.
Look Ahead: Finalize decision on design alternatives for
Dillingham and Halekauwila. Start roadway improvements on Nimitz. Start roadway improvements and communications
ductbanks on Dillingham between Middle Street and Mokauea Street to verify actual location.
Begin probing all wet and dry facilities along Dillingham Boulevard.
Receive trenching permits and begin construction on Queen Street and Kona Street.
__________________________________________________________________________________________________________________________________________________________
KEY ISSUES (new issues are in bold font):
Cost or schedule for the CCUR contract may be impacted significantly if these issues aren’t resolved: o Design Finalization: Completion of the dry utility plans by AECOM, and approval by the utilities. Design
decisions are being finalized and incorporated into plans and profiles for review for approval by the utilities.
o HART Right-of-Way is currently working to complete acquisition of property within CCUR. Current focus is on the following properties: Ala Moana Station, Blood Bank, Takara Printing, Iwilei Station, Honolulu Community College and Department of Accounting & General Services (DAGS).
o Permitting: Trenching and street usage permits are taking a significant amount of time and coordination to obtain. The contractor is doing what it can to respond to concerns and issues, but concerns such as controlled access along Dillingham, or lane restrictions on Nimitz, require more time for planning and higher-level agreements. These efforts are currently underway in order to ensure a high degree of collaboration amongst all stakeholders.
o HECO Agreements: The Nov. 25, 2013 agreement with HECO allows HECO to complete the electrical design up to 2 years after receiving the final infrastructure design. Completion of relocation activities relies on 9-month design completion in order to meet the February 2022 substantial completion date. HART and HECO are currently working together to ensure the construction schedule is met.
__________________________________________________________________________________________________________________________________________________________
KEY MILESTONES: Cleared 22% of proposed shaft locations, based on current design decisions. 100% design complete – end of 2019. All Wet Utility task orders under construction first quarter 2020. All Dry Utility task orders under construction first quarter 2020. HECO completes all electrical design requirements fourth quarter 2020.
__________________________________________________________________________________________________________________________________________________________
QUALITY MANAGEMENT: No major quality issues identified this period.
CCUR NCR Log (Issued by Nan)
Total NCRs Issued to Date Closed Open
5 3 2
Honolulu Rail Transit Project Monthly Progress Report September 2019
60 | P a g e
4.6 Project-Wide A. Program Management Contractor Contract
CPP No.: MM-902 Contractor: HDR Engineering, Inc. Contract Start Date: January 1, 2017 Contract Completion Date: December 31, 2022 Description of Work: Oversee the successful design and construction of the full Honolulu Rail Transit Project (HRTP), which includes providing personnel with relevant transit design, construction and operations experience and leadership in the various areas, including construction management, design management, project controls, procurement and contracts, right of way, public and business outreach, safety and security, quality assurance, environmental planning, and federal programmatic compliance.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $0
DBE % Attained: 0%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $0
None N/A ---
Cumulative Current Report $0
Jan
-17
Feb
-17
Mar
-17
Ap
r-1
7
May
-17
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
Dec
-17
Jan
-18
Feb
-18
Mar
-18
Ap
r-1
8
May
-18
Jun
-18
Jul-
18
Au
g-1
8
Sep
-18
Oct
-18
No
v-1
8
Dec
-18
Jan
-19
Feb
-19
Mar
-19
Ap
r-1
9
May
-19
Jun
-19
Jul-
19
Au
g-1
9
Sep
-19
Oct
-19
No
v-1
9
Dec
-19
Jan
-20
Feb
-20
Mar
-20
Ap
r-2
0
May
-20
Jun
-20
Jul-
20
Au
g-2
0
Sep
-20
Oct
-20
No
v-2
0
Dec
-20
Jan
-21
Feb
-21
Mar
-21
Ap
r-2
1
May
-21
Jun
-21
Jul-
21
Au
g-2
1
Sep
-21
Oct
-21
No
v-2
1
Dec
-21
Jan
-22
Feb
-22
Mar
-22
Ap
r-2
2
May
-22
Jun
-22
Jul-
22
Au
g-2
2
Sep
-22
Oct
-22
No
v-2
2
Dec
-22
Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %
Actual 51.7 %
9/1/2019
Original Contract: $63,522,953 Incurred-to-Date: $29,935,821
Current Contract Value1: $63,522,953 Incurred in September: $133,203
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
61 | P a g e
WORK PROGRESS: Activities this Month:
21 HDR staff contracted through HART. On Sept. 27, 2019, SC Infrastructure, Inc. completed their short-
term assistance with the western stations, and project delivery schedules and review of the P3 approach.
Look Ahead: Continue to support the design
and construction of the HRTP, including assessing management needs in Project Controls.
KEY ISSUES:
Based on the average monthly expenditure rate, the current contract total will be exhausted by June 2021.
Subcontractor charges paid to date (from beginning of contract) is $4,963,636.05.
Honolulu Rail Transit Project Monthly Progress Report September 2019
62 | P a g e
B. Construction Engineering and Inspection (CE&I) West CPP No.: MM-290 Contractor: PGH Wong Engineering, Inc. Contract Start Date: January 9, 2014 Contract Completion Date: January 9, 2020 Description of Work: Provides construction, engineering, and inspection services for construction contract compliance, construction scheduling, construction cost estimating, support, on-site field oversight, project controls and related construction support for the west section of the project.
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $11,102,364
DBE % Attained: 15.81%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $36,000,000
None N/A ---
Cumulative Current Report $36,000,000
______________________________________________________________________________________________________
WORK PROGRESS: Activities this Month:
Resident Engineers (REs) provided the weekly project status and issues briefings at the weekly HART Project Managers (PM) meetings.
Look Ahead: Turnover of facilities work to allow
Core Systems to continue their installation.
Jan
-14
Mar
-14
May
-14
Jul-
14
Sep
-14
No
v-1
4
Jan
-15
Mar
-15
May
-15
Jul-
15
Sep
-15
No
v-1
5
Jan
-16
Mar
-16
May
-16
Jul-
16
Sep
-16
No
v-1
6
Jan
-17
Mar
-17
May
-17
Jul-
17
Sep
-17
No
v-1
7
Jan
-18
Mar
-18
May
-18
Jul-
18
Sep
-18
No
v-1
8
Jan
-19
Mar
-19
May
-19
Jul-
19
Sep
-19
No
v-1
9
Jan
-20
Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %
Actual 93.6 %
9/1/2019
Original Contract: $54,232,480 Incurred-to-Date: $81,344,135
Current Contract Value1: $90,232,480 Incurred in September: $1,000,262
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
63 | P a g e
Activities this Month (continued): RE’s managed assigned projects as the HART on-site field
representatives for CE&I, managing contract correspondence and contract change administrative processes, issuing Field Change Notices (FCNs) when required, and overseeing work.
Continued to pursue resolution of design and fabrication issues related to the station canopies for all 9 stations and to assess potential critical impacts to the project schedule.
Updated Monthly Progress Report Dashboards for all stations. Work-off of backlogged claims and changes progressed.
Look Ahead (continued): Monitor and track station canopy
fabrication and installation activities to mitigate impacts to contract schedules and completion.
Present the Monthly Progress Report Dashboards for all projects.
Oversee construction of assigned projects.
_______________________________________________________________________________________________________
KEY ISSUES:
Completing Core Systems access requirements and balance of structures conduit for CSC follow on work.
Completion of canopy installation.
Continue working-off of backlog of outstanding claims/change issues.
Development of CR document packages.
Extend contract end date to July 6, 2020 to assist with westside contract closeout (no additional funding will be requested).
Honolulu Rail Transit Project Monthly Progress Report September 2019
64 | P a g e
C. Construction Engineering and Inspection (CE&I) East CPP No.: MM-596 Contractor: Stantec Consulting Services Inc. Contract Start Date: September 14, 2015 Contract Completion Date: December 31, 2021 Description of Work: Provides construction, engineering, and inspection services for construction contract compliance, construction scheduling, construction cost estimating, support, on-site field oversight, project controls and related construction support for the east section of the project.
_______________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $18,164,607
DBE % Attained: 33%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $47,000,000
None N/A ---
Cumulative Current Report $47,000,000
WORK PROGRESS: Activities this Month: Performed CE&I services for the AGS DB, On-Call III,
On-Call IV, CCGS DB/P3, and CCUR projects throughout the east section project limits.
Supported activities for the CCUR project and executed task orders.
Supported HART’s overall delivery of the east section construction activities and projects in support of the overall HRTP.
Look Ahead: Monitor drilling activities of the foundations
throughout the AGS DB project corridor. Monitor construction activities of the columns
throughout the AGS DB project corridor. Monitor construction activities of pre-cast segments
at the casting yard for the AGS DB guideway. Monitor the continuation of the AGS DB segment
erection.
Sep
-15
Oct
-15
No
v-1
5
Dec
-15
Jan
-16
Feb
-16
Mar
-16
Ap
r-1
6
May
-16
Jun
-16
Jul-
16
Au
g-1
6
Sep
-16
Oct
-16
No
v-1
6
Dec
-16
Jan
-17
Feb
-17
Mar
-17
Ap
r-1
7
May
-17
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
Dec
-17
Jan
-18
Feb
-18
Mar
-18
Ap
r-1
8
May
-18
Jun
-18
Jul-
18
Au
g-1
8
Sep
-18
Oct
-18
No
v-1
8
Dec
-18
Jan
-19
Feb
-19
Mar
-19
Ap
r-1
9
May
-19
Jun
-19
Jul-
19
Au
g-1
9
Sep
-19
Oct
-19
No
v-1
9
Dec
-19
Jan
-20
Feb
-20
Mar
-20
Ap
r-2
0
May
-20
Jun
-20
Jul-
20
Au
g-2
0
Sep
-20
Oct
-20
No
v-2
0
Dec
-20
Jan
-21
Feb
-21
Mar
-21
Ap
r-2
1
May
-21
Jun
-21
Jul-
21
Au
g-2
1
Sep
-21
Oct
-21
No
v-2
1
Dec
-21
Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %
Actual 54.8 %
9/1/2019
Original Contract: $55,036,130 Incurred-to-Date: $52,024,277
Current Contract Value1: $102,036,130 Incurred in September: $2,119,506
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
65 | P a g e
Activities this Month (continued): Continued support to HART on the CCGS P3
procurement process. Supported HART with design solutions and resolution
to issues with HECO, Board of Water Supply (BWS), HDOT, and various stakeholder requested changes.
Working with HART to continue to advance the CCUR wet/dry utility permits and construction.
Working with HART to support the Public Information group as construction activity continues to expand throughout the east section.
Look Ahead (continued): Monitor construction activities for the four stations
within the AGS DB corridor. Monitor construction of CCUR task orders. Support HART with the review and analysis of the
construction options and schedule along Dillingham for the HECO 138kV and 46kV lines.
_______________________________________________________________________________________________________
KEY ISSUES:
No current contractual issues.
Honolulu Rail Transit Project Monthly Progress Report September 2019
66 | P a g e
D. General Engineering Consultant CPP No.: MM-913 Contractor: CH2M Hill, Inc. Contract Start Date: December 5, 2013 Contract Completion Date: July 4, 2021 Description of Work: Task 01 – Scheduling and Estimating Support: Task Order 01 provides staff augmentation to support scheduling and cost estimating services through the design and construction phase of the Project.
Task 02 – Interface Management and Coordination: Provide oversight of technical coordination and Configuration Management.
Task 03 – Environmental and Planning: Provide environmental and planning support to ensure compliance with appropriate decision documents for the Project; integration with other applicable state or city entities for systems, station, land use, and operation planning.
Task 04 – Design Management Services: Engineering and architectural design management services for the duration of the project.
Task 05 – Program Management and Deliverables: Program Management services throughout the entire duration of the Project to include, but not limited to the Work Breakdown Structure, Budget Staffing Plan, Monthly Progress and Status Reports, and Contract Administration.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Task Description Original Value Current Value Incurred-to-Date
1 Scheduling and Estimating Support $13,187,310 $22,556,723 $16,809,860
2 Interface Management and Coordination $5,644,829 $4,097,085 $3,228,140
3 Environmental and Planning $6,537,705 $20,303,965 $11,123,012
4 Design Management Services $16,986,250 $34,866,501 $27,097,332
5 Program Management and Deliverables $2,434,232 $1,565,057 $1,273,824
OD Other Direct Expenses $1,352,951 $1,339,444 $965,507
Total $46,143,277 $84,728,775 $60,497,676
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $7,644,864
DBE % Attained: 11.99%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $38,585,498
None N/A ---
Cumulative Current Report $38,585,498
Original Contract: $46,143,277 Incurred-to-Date: $60,497,676
Current Contract Value1: $84,728,775 Incurred in September: $527,442
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
67 | P a g e
________________________________________________________________________________________________________________________________________________________________________________________________________________________
WORK PROGRESS: Activities this Month: Look Ahead: Task 01: Produced August schedule updates for PMOC meetings. Outlined
schedule updates and progress. Maintained Master Project Integrated Schedule. Produced Monthly Internal Schedule Progress Report. Maintained Interim Opening Schedule. Analysis impact of canopy re-
design delays. Analysis of HECO impacts on AGS schedule. Rejected August Schedule
and marked as ‘Revise and Resubmit.’ Reevaluated the CCGS and CCUR schedule to accurately reflect the
current execution plan. Updated the Master Project Integrated Schedule for August and
forwarded to PMOC with highlights outlined.
Task 01: On-going support of Independent Cost Estimate
(ICE) development or reviews of cost estimates prepared by the CE&I team for independent quality assessments.
Continue updates of Monthly Schedule reports and analysis.
Prepare ICE’s for various design and construction changes/task orders including several ICE’s to address changes due to canopy redesign.
Work on implementing a new CCUR schedule to reflect final design decisions made by management.
Task 02: Resolved interface issues are described below:
o The design issues for installation of the anchor bolts for the End of Platform cabinets and service posts at East Kapolei Station have been resolved.
o The contractor has remedied the encroachment of the Ho‘opili Station platform into the passenger vehicle’s dynamic envelope.
o HVAC issues at Ho‘opili Station TCCR have been resolved. o Previously installed canopy arms at UH West O‘ahu and Ho‘opili
stations have been removed in preparation for remedial work. o Numerous Interface Control Documents were mutually signed off
by all interfacing partners for the following packages: o Notice of Design Change (NDC) 59 for the Pearl Harbor
Station Main Stairs (AGS-EE) o NDC 60, 71 & 72 for the Honolulu Airport Station Revisions
(AGC – CSC, EE & Fare Systems Contract [FSC]) o NDC 42 for Guideway Reach E1A Revisions (AGS – CSC) o NDC 40 for Pearl Harbor Station Fire Detection (AGS – CSC) o NDC 43 for Lagoon Drive Air Conditioning and Fire
Detection (AGS – CSC) o Issued for Construction (IFC) Package 44 for Middle Street
Station (AGS – CSC, EE & FSC)
Task 02: Configuration Management and Close-out activities
that will be worked on are: o Continue compiling and refining a list of
configurable items for the west-side stations contracts.
o Compile lists of additional materials and spare parts for west-side stations contracts from specifications.
o Research and compile a proposed list of configurable items for the AGS contract.
o Collaborate with the HART Computer-Aided Design (CAD) Manager to ascertain the status of contract drawings for completed contracts.
o Compilation of a list of owner’s manuals from west-side stations contractors’ specifications.
o Create a matrix of project elements and functions that may fall under the sphere of Configuration Management.
Dec
-13
Feb
-14
Ap
r-1
4
Jun
-14
Au
g-1
4
Oct
-14
Dec
-14
Feb
-15
Ap
r-1
5
Jun
-15
Au
g-1
5
Oct
-15
Dec
-15
Feb
-16
Ap
r-1
6
Jun
-16
Au
g-1
6
Oct
-16
Dec
-16
Feb
-17
Ap
r-1
7
Jun
-17
Au
g-1
7
Oct
-17
Dec
-17
Feb
-18
Ap
r-1
8
Jun
-18
Au
g-1
8
Oct
-18
Dec
-18
Feb
-19
Ap
r-1
9
Jun
-19
Au
g-1
9
Oct
-19
Dec
-19
Feb
-20
Ap
r-2
0
Jun
-20
Au
g-2
0
Oct
-20
Dec
-20
Feb
-21
Ap
r-2
1
Jun
-21
Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %
Actual 76.2 %
9/1/2019
Honolulu Rail Transit Project Monthly Progress Report September 2019
68 | P a g e
Activities this Month (continued): Task 03: Permits – assisted in submitting the application to continue the City Center
noise permit to the Department of Health. Drafted a letter to the U.S. Army Corps of Engineers requesting extension of the individual (Section 404) permit for construction in Waiawa Stream.
Environmental Analyses and Documentation – submitted for FTA review a draft Post-Record of Decision (ROD) environmental evaluation for the HECO antenna at Ka‘aahi Substation (near LCC).
Programmatic Agreement (PA) Compliance – subconsultants HHF Planners and Mason Architects assisted with a workshop on the cultural landscape reports for Irwin Park, Walker Park, and Mother Waldron Park held during the Consulting Parties comment period. Subconsultant HACBED/Purple Maia demonstrated substantial progress on prototypes of a children’s mobile game and a mobile app developed in compliance with PA Stipulation VII.
Design Reviews – completed 3 design reviews of AGS submittals. On-Call Support for Right of Way, Utilities, Environmental Planning –
developed a preliminary 3D digital model of the rail system on Dillingham Boulevard in the vicinity of Mokauea Street and the Kapalama Canal. Subconsultant arborist Steve Nimz submitted a quarterly inspection report on the condition of coconut palms transplanted from the Nimitz Highway median to Irwin Park.
Look Ahead (continued): Task 03: Permits – prepare applications to continue the
Kamehameha Highway Guideway noise permit and noise variance. Review plans for installation of telecommunication poles on the guideway and assess requirements for environmental clearance and permits.
Environmental Analyses & Documentation – complete the draft Post-ROD environmental evaluation for the Ho‘opili park-and-ride facility.
PA Compliance – assist in preparing for Consulting Parties review of Stipulation VII deliverables—the interpretive plan, color brochure and coloring book.
On-Call Support for Right of Way, Utilities, Environmental Planning – evaluate potential locations to plant true Kamani trees (to mitigate loss of those removed from Dillingham Boulevard) and begin preparing a planting plan.
Task 04: Continued to coordinate and lead daily reporting huddles between HART,
station contractors, and the Engineer of Record (EOR) to track and expedite the development of Station Canopy “Plan B” revisions to the canopy arm design for the WOSGC, FHSGC, and KHSGC contracts.
Coordinated data collection for a no-rise analysis of the proposed Waipahu Transit Center Station Makai Entrance Building to meet the City’s flood hazard ordinance.
Reviewed 11 design submittals, 29 NCRs, 8 Field Design Changes, and 11 Notice of Design Changes for the Airport Guideway and Stations contract. Attended Task Force Meetings, presubmittal workshops and comment resolution meetings.
Concluded drilling geotechnical test borings to investigate track settlement issues at the MSF. Reviewed geotechnical boring data and began analyzing core samples.
Reviewing Kamehameha Highway 138kV Undergrounding preliminary plan submittal.
Reviewing Kamehameha Highway Left Turn into Kuala Street final plans submittal.
Task 04: Analyze core samples from the geotechnical borings at
the maintenance yard to determine the cause of track settlement experienced there and draft a preliminary report summarizing the findings.
Continue to provide engineering support to CCUR to evaluate possible guideway configuration changes to minimize utility relocation costs.
Continue to provide technical support to the CE&I team overseeing the Airport Guideway and Stations contract.
Continue participation in third-party coordination meetings (technical meetings and management meetings) for various contracts. Third parties include HECO, HDOT, Department of Health (DOH), Airport, Navy and UH West O‘ahu.
Continue to perform design reviews in support of the KHG 138kV undergrounding contract.
Continue to provide construction support for the Kamehameha Highway Resurfacing project.
Task 05: Discussed performance of various tasks. Monitored contract labor and sub-consultant expenditures. Updated Monthly Estimate at Completion (EAC). Participated in preparation of monthly reports. Prepared input on Consultant Evaluations. Extended subcontracts of necessary sub-consultants.
Task 05: Discuss various tasks. Continue to monitor contract labor and sub-consultant
expenditures. Update Monthly EAC. Participate in preparation of monthly reports.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY ISSUES: Task 01:
No current contractual issues. Task 02:
No current contractual issues. Task 03:
No current contractual issues. Task 04:
No current contractual issues. Task 05:
No current contractual issues.
Honolulu Rail Transit Project Monthly Progress Report September 2019
69 | P a g e
E. Core Systems Support CPP No.: MM-962 Contractor: Lea+Elliott, Inc. Contract Start Date: February 11, 2014 Contract Completion Date: November 29, 2019 Description of Work: Provide design and construction management oversight for the Core System Design-Build-Operate-Maintain (CSDBOM) Contract, to include system commissioning, passenger services start-up, and pre-revenue operations and maintenance activities.
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
COST INFORMATION:
Disadvantaged Business Enterprise (DBE) Participation
Actual DBE Participation: $1,426,418
DBE % Attained: 3.24%
Contract Changes in September
Change No. Description Amount ($)
Cumulative Previously Reported $0
None N/A ---
Cumulative Current Report $0
WORK PROGRESS: Activities this Month: On-Going Activities:
o Project management support and Changes & Claims management support o Construction management and installation oversight o Review and approve contractor’s design, work plans, test procedures,
technical notes, and other submittals
Look Ahead: Continue to monitor, observe,
and report on the Core Systems Contractor’s daily activities on-site and at the factories.
Feb
-14
Mar
-14
Ap
r-1
4
May
-14
Jun
-14
Jul-
14
Au
g-1
4
Sep
-14
Oct
-14
No
v-1
4
Dec
-14
Jan
-15
Feb
-15
Mar
-15
Ap
r-1
5
May
-15
Jun
-15
Jul-
15
Au
g-1
5
Sep
-15
Oct
-15
No
v-1
5
Dec
-15
Jan
-16
Feb
-16
Mar
-16
Ap
r-1
6
May
-16
Jun
-16
Jul-
16
Au
g-1
6
Sep
-16
Oct
-16
No
v-1
6
Dec
-16
Jan
-17
Feb
-17
Mar
-17
Ap
r-1
7
May
-17
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
Dec
-17
Jan
-18
Feb
-18
Mar
-18
Ap
r-1
8
May
-18
Jun
-18
Jul-
18
Au
g-1
8
Sep
-18
Oct
-18
No
v-1
8
Dec
-18
Jan
-19
Feb
-19
Mar
-19
Ap
r-1
9
May
-19
Jun
-19
Jul-
19
Au
g-1
9
Sep
-19
Incurred $ per Month Early Plan % Late Plan % Actual % Forecast %
Actual 98.3 %
9/1/2019
Original Contract: $43,988,989 Incurred-to-Date: $41,555,799
Current Contract Value1: $43,988,989 Incurred in September: $655,296
1Current Contract Value = Original contract value + executed Change Orders
Honolulu Rail Transit Project Monthly Progress Report September 2019
70 | P a g e
Activities this Month (continued): o Core Systems interface oversight support on the stations and AGS project o Vehicle and system equipment manufacturing and assembly oversight o Conduct final inspection of Train #12 which includes the first installation of
heat shield retrofit. o Testing, commissioning and operational readiness oversight and support o Operation and maintenance support o Conducted weekly meetings to resolve remaining PV design issues.
Key Activities: o Continued to address and resolve outstanding design issues with the CSC
on the Communications system. Increased site resources to support the Lead Communications Engineer in the review and oversight of HRH/Nokia Communications activities, specifically documentation review and acceptance, cabinet installation remediation, and provisioning readiness to support ongoing MSF commissioning activities. A design review workshop was held this month to resolve open items.
o Continued oversight of train manufacturing activities and Buy America compliance in Pittsburg, CA. Manufacturing activities continue for Trains #7 thru #15.
o Continued oversight of installation and testing activities of ATC, TES, UPS, SCADA, PSGS, Passenger Vehicle, Fire Detection Alarm System (FDAS) and Communications System.
o Continued to monitor HRH in achieving their monthly installation and testing goals.
o Increased site resources to support the Site Commissioning Lead in witnessing testing activities.
o Continued to coordinate with HECO on power load forecasts for system testing periods and issue reports.
o Witnessed third rail shoe test in functional section; clearance test in functional section; UPS testing in LCC, WLO and HOP stations; PSGS Onsite Installation Inspection and Onsite functional test at HOP station; SLAN testing in the yard; train dynamic qualification test in the dynamic section; Train #2 Vehicle Test Procedure (VTP) testing in the yard; ATC wayside testing in HOP, WTC and LCC.
o Assisted HART to achieve Interim Certification for Train #4. o Continued to support Safety in closeout of the various Design
Conformance Checklist, Subsystem Hazard Analysis, Failure Modes, Effects, and Criticality Analysis (FMECA’s), and other Safety related submittals and tasks.
o Worked with subconsultant to conduct quarterly delay claim assessment and review of HRH’s monthly schedule.
o Continued to monitor HRH’s configuration management control. o Continued to support HART with Onboard Wi-Fi. o Continued to implement the HART Track Allocation Procedure. o Supported activities to energize and start functional section testing on
Sept. 30, 2019. o Conducted joint Quality Assurance (QA) audit with HART QA at final
assembly facility in Pittsburg, CA. o Supported HART with P3 procurement activities. o Supported HART with Readiness & Activation for O&M design activities.
Look Ahead (continued): Continue to assist HART with
resolution of change and claim issues.
Continue to assist HART with the Track Allocation Procedure.
Continue to monitor and witness system testing activities.
Continue to support HART to address outstanding issues related to construction access at stations.
Continue to support HART to meet MSF Operational schedule objective and Interim Opening activities.
Continue to support HART to prepare the functional section to start integration testing on the mainline.
Support HART on P3 activities, as required.
Continue to work with HART and the CSC to address PSG installation issues.
Continue to coordinate and monitor HRH’s progress on post audit configuration control activities.
Continue to work on power quality and mitigation analysis.
Support the technical resolution of the Train Wash to HRH interface.
Continue construction oversight of HRH equipment and cable installations.
Oversee HRH testing schedule adherence in preparation for the MSF#2 readiness completion.
Review final design submittal of heat shield retrofit.
Continue to assist HART with Wi-Fi and STATCOM procurement.
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
KEY ISSUES:
L+E three year contract extension expected to go to HART Board in October.
Ho
no
lulu
Rai
l Tra
nsi
t P
roje
ct M
on
thly
Pro
gre
ss R
ep
ort
Se
pte
mb
er
20
19
71
| P
ag
e
4.7
C
on
trac
t St
atu
s b
y C
PP
Co
ntr
act
Su
mm
ary
by C
PP
(data
as
of
Sep
30
, 2
01
9)
A
B
C =
A +
B
D
E =
D /
C
CP
P #
C
on
tract
Desc
rip
tio
n
Ori
gin
al
Co
ntr
act
Valu
e
Ch
an
ge
Ord
ers
Cu
rren
t
Co
ntr
act
Valu
e
Incu
rred
%
Ex
p.
Aw
ard
Date
Ori
gin
al
Co
mp
leti
on
Date
Revis
ed
Co
mp
leti
on
Date
DB
-120
W
est
Oah
u/F
arr
ing
ton
Hw
y G
uid
ew
ay
482,4
30,2
01
185,3
51,6
85
667,7
81,8
86
667,7
81,9
06
100%
N
ov-2
009
O
ct-2
013
Dec-
2018
DB
-320
K
am
eh
am
eh
a H
wy G
uid
ew
ay
372,1
50,0
00
31,4
05,7
74
403,5
55,7
74
403,5
89,0
30
100%
Ju
n-2
011
Oct
-2014
Dec-
2018
DB
-200
M
ain
ten
an
ce &
Sto
rag
e F
aci
lity
195,2
58,0
00
86,5
17,0
32
281,7
75,0
32
281,7
93,4
19
100%
Ju
n-2
011
Dec-
2014
Ju
l-2016
DB
-450
A
irp
ort
Sect
ion
Gu
idew
ay/S
tati
on
s 874,7
50,0
00
1,6
31,2
38
876,3
81,2
38
474,3
07,4
32
54%
Sep
-2016
May-2
021
M
ay-2
021
DB
B-1
71
West
Oah
u S
tati
on
Gro
up
56,0
88,4
70
19,7
25,9
79
75,8
14,4
49
62,8
05,8
20
83%
Ju
l-2015
Mar-
2018
M
ar-
2019
DB
B-2
71
Farr
ing
ton
Hig
hw
ay S
tati
on
Gro
up
78,9
99,0
00
17,7
88,3
59
96,7
87,3
59
83,2
24,4
33
86%
Ju
n-2
015
Jan
-2018
Ja
n-2
019
DB
B-3
71
Kam
eh
am
eh
a H
wy S
tati
on
Gro
up
115,8
05,8
45
8,4
78,4
18
124,2
84,2
63
93,5
92,0
17
75%
Ja
n-2
016
M
ay-2
019
M
ay-2
019
DB
B-3
85
Ram
p H
2R
2
5,2
03,6
46
332,2
50
5,5
35,8
96
5,5
42,4
82
100%
M
ay-2
015
O
ct-2
016
No
v-2
017
DB
B-5
05
Air
po
rt S
ect
ion
Uti
liti
es
Co
nst
ruct
ion
27,9
93,2
90
726,2
00
28,7
19,4
89
28,7
19,4
89
100%
Ju
n-2
014
Feb
-2016
Oct
-2016
DB
B-5
11
Cit
y C
en
ter
Uti
liti
es
Relo
cati
on
Co
nst
ruct
ion
400,0
00,0
00
0
400,0
00,0
00
12,6
16,3
82
3%
M
ay-2
018
M
ay-2
020
M
ay-2
022
DB
B-5
25
Air
po
rt S
ect
ion
Gu
idew
ay 7
-Pie
r 3,9
73,0
00
54,8
43
4,0
27,8
43
4,0
27,8
43
100%
Sep
-2014
Feb
-2015
Ap
r-2015
DB
B-6
02
UH
WO
Tem
p P
nR
an
d C
am
pu
s R
d B
11,5
89,3
00
1,3
92,0
23
12,9
81,3
23
10,2
38,4
37
79%
D
ec-
2017
Ju
l-2019
Jul-
2019
DB
B-7
01
Kam
eh
am
eh
a H
igh
way R
esu
rfaci
ng
25,9
89,9
89
880,5
21
26,8
70,5
10
19,5
44,6
78
73%
Ju
l-2018
Sep
-2019
Sep
-2019
DB
OM
-920
C
ore
Syst
em
s D
esi
gn
Bu
ild
O/M
573,7
82,7
93
204,9
38,2
62
778,7
21,0
55
395,5
88,4
11
51%
N
ov-2
011
M
ar-
2019
Ja
n-2
025
MI-
900
Fare
Co
llect
ion
DFI
15,4
64,1
98
361,4
70
15,8
25,6
68
5,4
68,4
95
35%
M
ar-
2016
Ja
n-2
029
Ja
n-2
029
MI-
930
Ele
vato
rs &
Esc
ala
tors
In
stall/M
ain
t 50,9
82,7
14
3,9
48,7
54
54,9
31,4
68
22,0
18,9
51
40%
Ju
l-2013
May-2
018
M
ay-2
021
MM
-945
On
-Call C
on
stru
ctio
n I
1,0
00,0
00
1,0
00,0
00
2,0
00,0
00
1,9
99,9
83
100%
A
ug
-2014
Ju
l-2019
Dec-
2016
MM
-947
On
-Call C
on
stru
ctio
n II
7,5
00,0
00
0
7,5
00,0
00
7,4
95,7
72
100%
M
ay-2
015
M
ay-2
020
M
ay-2
020
MM
-948
On
-Call C
on
stru
ctio
n III
20,0
00,0
00
6,0
00,0
00
26,0
00,0
00
25,5
38,7
07
98%
M
ay-2
016
M
ay-2
023
M
ay-2
023
MM
-949
On
-Call C
on
stru
ctio
n IV
46,0
00,0
00
0
46,0
00,0
00
20,2
58,1
43
44%
Ja
n-2
018
N
ov-2
024
N
ov-2
024
DB
-550
C
ity C
tr S
ect
ion
Gu
idew
ay a
nd
Sta
DB
100,0
00
134,0
00
234,0
00
206,5
46
88%
O
ct-2
014
Sep
-2015
Jul-
2017
FD
-140
W
est
Oah
u S
tati
on
Gro
up
7,7
89,0
00
5,6
42,9
95
13,4
31,9
95
12,9
00,3
14
96%
Ju
n-2
012
No
v-2
016
M
ay-2
020
FD
-240
Farr
ing
ton
Hig
hw
ay S
tati
on
s G
rou
p
9,3
00,6
96
7,1
97,1
20
16,4
97,8
16
16,0
59,1
94
97%
Ja
n-2
011
N
ov-2
016
M
ar-
2020
FD
-340
K
am
eh
am
eh
a H
wy S
tati
on
Gro
up
8,7
02,5
92
4,2
77,3
59
12,9
79,9
51
12,2
81,8
12
95%
N
ov-2
012
Ju
n-2
017
No
v-2
019
FD
-430
A
irp
ort
Sect
. G
uid
ew
ay/U
til
38,8
40,9
60
4,1
11,4
40
42,9
52,4
00
42,3
71,3
74
99%
D
ec-
2011
A
ug
-2013
Ju
n-2
017
FD
-440
A
irp
ort
Sta
tio
n G
rou
p
10,1
77,3
65
(117,5
45)
10,0
59,8
20
10,0
59,8
20
100%
N
ov-2
012
Ja
n-2
014
Ju
l-2015
FD
-530
C
ity C
en
ter
Gu
idew
ay/U
til
43,9
48,2
20
13,9
41,0
87
57,8
89,3
07
55,3
96,8
17
96%
Ju
l-2012
Mar-
2014
D
ec-
2019
FD
-550
D
illin
gh
am
an
d K
aka'a
ko
Sta
tio
n G
rou
p
18,3
21,9
18
(6,0
20,8
37)
12,3
01,0
81
12,3
41,5
65
100%
A
ug
-2013
Sep
-2014
Au
g-2
016
FD
-700
D
esi
gn
Serv
ices
for
138kV
Uti
l. R
elo
c. a
t K
HG
8,7
66,3
27
0
8,7
66,3
27
2,5
94,1
49
30%
A
ug
-2018
N
ov-2
021
N
ov-2
021
FD
-701
K
H C
ivil D
esi
gn
60,0
00
0
60,0
00
60,0
00
100%
Ja
n-2
018
Ja
n-2
019
Ja
n-2
019
Sou
rce:
HA
RT
CM
S.
No
te: E
xclu
des
Rig
ht-
of-
Way
tra
nsa
ctio
ns,
deb
t fi
nan
cin
g co
sts,
an
d C
ity/
HA
RT
con
trac
t p
acka
ges,
wh
ich
are
incl
ud
ed in
Ap
pen
dix
A.
Ho
no
lulu
Rai
l Tra
nsi
t P
roje
ct M
on
thly
Pro
gre
ss R
ep
ort
Se
pte
mb
er
20
19
72
| P
ag
e
Co
ntr
act
Su
mm
ary
by C
PP
(data
as
of
Sep
30
, 2
01
9)
A
B
C =
A +
B
D
E =
D /
C
CP
P #
C
on
tract
Desc
rip
tio
n
Ori
gin
al
Co
ntr
act
Valu
e
Ch
an
ge
Ord
ers
Cu
rren
t
Co
ntr
act
Valu
e
Incu
rred
%
Ex
p.
Aw
ard
Date
Ori
gin
al
Co
mp
leti
on
Date
Revis
ed
Co
mp
leti
on
Date
MM
-290
Co
nst
ruct
ion
En
grg
& In
sp C
EI W
est
54,2
32,4
80
36,0
00,0
00
90,2
32,4
80
81,3
44,1
35
90%
Ja
n-2
014
Ja
n-2
020
Ja
n-2
020
MM
-595
Co
nst
ruct
ion
En
grg
& In
sp C
EI East
I
63,0
83,4
17
(50,3
77,3
17)
12,7
06,1
00
12,7
11,3
66
100%
Ja
n-2
014
Ja
n-2
019
Ja
n-2
016
MM
-596
Co
nst
ruct
ion
En
grg
& In
sp C
EI East
II
55,0
36,1
30
47,0
00,0
00
102,0
36,1
30
52,0
24,2
77
51%
Sep
-2015
Dec-
2019
D
ec-
2021
MM
-901
Pro
gra
m M
gt
Su
pp
ort
Co
nsl
t II
33,3
76,8
97
16,3
59,7
65
49,7
36,6
62
49,7
36,6
62
100%
Feb
-2012
Mar-
2015
M
ar-
2017
MM
-902
Pro
gra
m M
gt
Su
pp
ort
Co
nsl
t III
63,5
22,9
53
0
63,5
22,9
53
29,9
35,8
21
47%
Ja
n-2
017
D
ec-
2022
D
ec-
2022
MM
-905
MM
-905 G
en
En
grg
Co
nsl
t EIS
/PE
0
75,9
95,9
82
75,9
95,9
82
75,9
95,9
82
100%
A
ug
-2007
Feb
-2010
Feb
-2011
MM
-910
MM
-910 G
en
En
grg
Co
nsl
t FD
-Co
nst
ruct
150,2
26,2
65
0
150,2
26,2
65
150,2
26,2
65
100%
Ju
n-2
011
Dec-
2014
D
ec-
2014
MM
-913
MM
-913 G
en
En
grg
Reco
mp
ete
46,1
43,2
77
38,5
85,4
98
84,7
28,7
75
60,4
97,6
76
71%
D
ec-
2013
A
pr-
2019
Ju
l-2021
MM
-915
HD
OT T
raff
ic M
gm
t. C
on
sult
. 1,6
00,0
00
5,0
10,0
00
6,6
10,0
00
5,7
55,9
56
87%
Ju
n-2
012
Jun
-2017
Jun
-2019
MM
-920
HD
OT C
oo
rdin
ati
on
Co
nsl
t W
OFH
3,0
00,0
00
6,5
00,0
00
9,5
00,0
00
9,4
77,8
17
100%
Ju
n-2
011
Jun
-2016
Dec-
2018
MM
-921
HD
OT C
oo
rdin
ati
on
Co
nsl
t K
HG
16,1
38,3
90
(1,4
00,0
00)
14,7
38,3
90
7,5
34,2
32
51%
Ju
n-2
012
Feb
-2025
Feb
-2025
MM
-922
HD
OT C
oo
rdin
ati
on
Co
nsl
t. E
ast
17,5
60,0
00
(7,6
31,3
60)
9,9
28,6
40
5,4
35,5
87
55%
Ju
n-2
012
Dec-
2024
D
ec-
2024
MM
-925
HD
OT -
WO
FH
/KH
G Im
prv
Ag
reem
en
ts
550,0
00
2,8
65,6
33
3,4
15,6
33
2,6
59,9
82
78%
O
ct-2
010
Oct
-2019
Oct
-2019
MM
-930
HD
OT S
tate
SO
A M
an
ag
er
& C
on
sult
an
t 1,2
72,4
00
583,1
42
1,8
55,5
42
990,4
37
53%
Feb
-2012
Au
g-2
017
A
ug
-2017
MM
-940
Kako
'o C
on
sult
an
t I
1,0
00,0
00
(3,1
06)
996,8
94
531,6
09
53%
M
ar-
2012
M
ar-
2022
M
ar-
2022
MM
-941
Kako
'o C
on
sult
an
t II
200,0
00
200,0
00
400,0
00
291,6
67
73%
D
ec-
2015
Ja
n-2
018
Ja
n-2
020
MM
-946
On
-Call H
azm
at
Ass
ess
men
t C
on
sult
an
t 12,0
06,2
27
2,0
75,0
00
14,0
81,2
27
6,5
07,0
94
46%
Feb
-2018
Feb
-2023
Feb
-2023
MM
-950
OC
IP C
on
sult
an
t I
1,2
50,0
00
0
1,2
50,0
00
1,2
50,0
00
100%
M
ay-2
012
Ju
n-2
017
May-2
017
MM
-951
Ow
ner-
Co
ntr
olled
In
sura
nce
Pro
gra
m
41,0
00,0
00
2,2
00,0
00
43,2
00,0
00
43,2
80,0
07
100%
A
pr-
2014
A
pr-
2020
M
ar-
2019
MM
-953
OC
IP C
on
sult
an
t II
415,0
00
0
415,0
00
317,5
12
77%
M
ay-2
017
M
ay-2
020
M
ay-2
020
MM
-960
Arc
heo
log
ical &
Cu
ltu
ral M
on
ito
rin
g
2,4
89,7
48
0
2,4
89,7
48
2,6
44,3
50
106%
Ja
n-2
014
Ja
n-2
019
Ja
n-2
019
MM
-962
Co
re S
yst
em
s Su
pp
ort
43,9
88,9
89
0
43,9
88,9
89
41,5
55,7
99
95%
Feb
-2014
Sep
-2019
No
v-2
019
MM
-964
Safe
ty a
nd
Secu
rity
Co
nsu
ltan
t 21,6
99,2
79
5,5
49,1
88
27,2
48,4
68
12,6
26,8
51
46%
A
pr-
2014
Ja
n-2
017
Ja
n-2
019
MM
-970
Fare
Co
llect
ion
Co
nsu
ltan
t 1,1
78,3
00
244,3
22
1,4
22,6
22
807,2
26
57%
Sep
-2015
Dec-
2019
D
ec-
2019
MM
-975
LEED
Co
mm
issi
on
ing
Serv
ices
for
MSF
278,6
30
7,8
45
286,4
75
286,4
75
100%
O
ct-2
010
Jan
-2016
A
ug
-2017
PA
-102
P
rog
ram
mati
c A
gre
em
en
t H
PC
667,2
75
(175,9
47)
491,3
29
274,0
53
56%
Ju
l-2013
Jan
-2019
Ja
n-2
019
AR
T
AR
T C
on
tract
s 2,1
39,5
00
10,0
00
2,1
49,5
00
436,5
25
20%
Ja
n-2
016
Ju
l-2019
Jul-
2019
MM
-935
Real Est
ate
Co
nsu
ltan
t 3,0
00,0
00
5,0
77,6
65
8,0
77,6
65
7,5
04,9
10
93%
M
ar-
2012
M
ar-
2017
M
ar-
2017
MM
-936
Real Est
ate
Co
nsu
ltan
t II
8,1
90,0
00
0
8,1
90,0
00
5,4
02,8
89
66%
Sep
-2016
Sep
-2020
Sep
-2020
MM
-937
Real Est
ate
Co
nsu
ltan
t -
Map
s/Su
rv.
2,9
98,0
00
1,1
30,0
00
4,1
28,0
00
2,9
30,7
93
71%
M
ay-2
014
M
ay-2
017
M
ay-2
019
MM
-981
Co
mp
lex
Real P
rop
ert
y N
eg
o. Lit
. Su
p
600,0
00
(21)
599,9
79
602,2
41
100%
Sep
-2016
Sep
-2018
Sep
-2018
MM
-982
On
Call A
pp
rais
er
4,0
00,0
00
0
4,0
00,0
00
486,5
21
12%
Ju
n-2
016
Dec-
2022
D
ec-
2022
MM
-983
Lan
d C
ou
rt P
eti
tio
n S
erv
ices
1,2
00,0
00
0
1,2
00,0
00
63,4
92
5%
O
ct-2
016
Oct
-2019
Oct
-2019
MM
-985
On
Call A
pp
rais
ers
II
1,2
61,3
08
0
1,2
61,3
08
330,5
82
26%
A
pr-
2017
A
pr-
2022
A
pr-
2022
MM
-986
Real Est
ate
Leg
al Serv
ices
5,8
00,0
00
0
5,8
00,0
00
1,5
07,6
45
26%
O
ct-2
017
Dec-
2022
D
ec-
2022
MM
-990
Desi
gn
Revie
w C
on
sult
an
t 4,0
27,7
81
0
4,0
27,7
81
277,3
29
7%
M
ar-
2018
D
ec-
2024
D
ec-
2024
MM
-991
P3 F
inan
cial Leg
al Serv
ices
4,2
82,3
33
3,4
00,0
00
7,6
82,3
33
4,2
84,0
41
56%
O
ct-2
018
TB
D
TB
D
UTIL
U
tility
Co
ntr
act
s an
d A
gre
em
en
ts
144,0
24,4
72
27,6
32,8
34
171,6
57,3
06
70,2
30,9
19
41%
D
ec-
2009
D
ec-
2018
Ju
n-2
018
4,3
24
,40
6,5
75
8
16
,53
7,5
51
5
,14
0,9
44
,12
7
3,5
39
,18
0,1
45
So
urc
e: H
AR
T C
MS.
N
ote
: Exc
lud
es R
igh
t-o
f-W
ay t
ran
sact
ion
s, d
ebt
fin
anci
ng
cost
s, a
nd
Cit
y/H
AR
T co
ntr
act
pac
kage
s, w
hic
h a
re in
clu
ded
in A
pp
end
ix A
.
Honolulu Rail Transit Project Monthly Progress Report September 2019
73 | P a g e
5 OVERALL PROJECT-WIDE ACTIVITIES
5.1 Overall Key Issues Overview
Permanent Power: Receiving permanent power for TPSS System site - Progress has been made. At UHWO Station, infrastructure and energization are pending resolution of a payment discrepancy between UH and HECO. HECO is working with HART to energize the stations where the infrastructure is complete and HART has right of entry.
Experienced Personnel: Having experienced and qualified personnel from HRH to deal with all challenges between now and Interim Opening is being addressed as a top priority. This includes personnel in management, testing, commissioning, construction, quality and safety certification.
O&M Documentation: HRH has assigned prime responsibility for documentation development to Horizon Partners Ltd. (HPL). All operations documents will be submitted in CMS by the first week of October with Health, Safety, Quality and Environment (HSQE) to follow.
HRH’s development of the Maintenance Management Information System (MMIS) (Maximo) is critical for Interim Opening. HPL completed an analysis of Maximo development, and has shared their gap analysis for HART review. Based on this review, HRH is engaging an MMIS consultant to provide a service proven rail transit solution and is still targeting Q1 2020 for data entry.
Automated Yard Operation: Closure of open design issues of the DBOM Core Systems contract is needed, particularly the Communications system design and the integration with the vehicles and automated train control systems. It is critical that all communications system’s updated 125 design submittals and test plans are submitted by HRH and approved by HART to meet the mid-November completion date.
Functional Track integration testing is planned to be completed in three phases: (1) ATC/ PSG Integration, (2) Communications without canopies, and (3) final communications after installation of the canopies (scheduled to be completed between Thanksgiving and the end of the year). All Core Systems-related Fixed Facilities work and Core Systems installation work at Ho‘opili, West Loch, Waipahu stations and the associated guideway must be completed, energized (including LCC), and tested prior to integration testing.
Station Canopies: Fabrication of the Plan B lower arms are complete for UHWO and HOP. They are scheduled to arrive in mid-October. EKP canopy fabric installation is scheduled to start on Oct. 14, 2019. LCC station arms are scheduled to be installed in October. Fabrication for the WLO, WTC, PHL and PLR stations continue. Issued for Construction (IFC) drawings for ALS are scheduled for late October. Mitigation efforts to have the six (6) side platform stations (less Aloha Stadium) installed by December 2019 continue. Workarounds to progress systems work are being undertaken in order to lessen the impact of the delay.
The AGS contractor is dependent on HECO review and approval of the infrastructure design that is required for the relocation of power lines that impact the construction of the AGS guideway. HART is dependent on the electrical design prepared by HECO for the electrical power line relocation work that must be performed by HART’s On Call / CCUR contractor. The timeliness of these approvals and design work is critical to the ability of the AGS contractor to meet the contractual substantial completion date of their contract. HART’s and HECO’s management are meeting on a regular basis to ensure that adequate progress is made to accommodate the schedule. HECO is expected to complete their design for the electrical Zone 8 much earlier than expected, which is a result of the ongoing HART and HECO management meetings.
Honolulu Rail Transit Project Monthly Progress Report September 2019
74 | P a g e
5.2 Permits Permits Submitted and In-Progress
HART received the National Pollutant Discharge Elimination System (NPDES) permit extension for the Hō‘ae‘ae, Pouhala, and Hālaulani stations. HART began preconstruction water sampling in compliance with the Clean Water Act Section 401 Applicable Monitoring and Assessment Plan for Kalihi Stream construction.
HART continues to submit the City Center noise variance notification to the Hawai‘i Department of Health (HDOH).
HART submitted an extension of the City Center Community Noise Permit for construction. HART submitted a request for time extension of the permit for construction in waters of the U.S. affecting
Waiawa Stream and Waiawa Tributary. Look Ahead
HART will be submitting permit applications for the Kamehameha Highway 138kV activities. HART will submit a Noise Variance extension for the Kamehameha Highway section and the West O‘ahu
Farrington Highway section of the project. HART will submit a Community Noise Permit extension for the Kamehameha Highway section.
5.3 Hawai'i Department of Transportation (HDOT) Agreements Activities this Month
The WOFH Master Agreement and Joint Use and Occupancy Agreement (JUOA) Amendment 1 draft resolutions are routing; currently, HART and DTS are going through comment resolution.
Ongoing tracking of the progress of the projects for the Highway Improvement Agreement. Coordinating documentation of the highway improvement projects with HDOT and Federal Highway Administration (FHWA) for reimbursement. Ongoing activity in conjunction with highway improvement project work.
Airport Guideway Section Partial Assignment document executed. Look Ahead
Execution of the City Center Joint Use and Occupancy Agreement. Execution was previously planned to be in conjunction with the start of P3 contractor construction on Nimitz Highway, pending P3 procurement, however, the direction has changed to accommodate CCUR construction activities. The agreement is currently with HDOT for review/signature. Expected execution by October 2019.
Route externally for execution of the West O‘ahu Farrington Highway Master Agreement and Joint Use and Occupancy Agreement Amendment 1. Upon concurrence between HART and DTS, it will be routed to BFS, HDOT, followed by final legal review, estimated fourth quarter 2019. Presentation to the Board and City Council to follow, estimated first quarter 2020.
Honolulu Rail Transit Project Monthly Progress Report September 2019
75 | P a g e
5.4 Utility Agreements
Utility Agreements Status Matrix
Utility Owner Status WOFH KHG Airport City Center
ESA UCA ESA UCA UCA COMBINED ESA UCA
AT&T (Corporation)
Executed 05/11/11 12/20/11 5/18/12
Including with ESA
Not Required
12/26/13 05/03/17 NTP 05/12/11 12/21/11
Amd 01 07/01/11 HRS Ch. 104 11/22/16
AT&T Corp. (Public Sector)
Executed 12/26/13 08/27/18 12/26/13
NTP
Chevron
Executed 12/04/09
11/04/11
NTP 12/22/09 11/15/11
Amd 01 07/01/11
Hawaiian Telcom
Executed 05/20/10 11/17/14 05/10/12 12/31/14 05/28/15 09/27/13 04/06/17
NTP 06/14/10 11/18/14
Amd 01 07/01/11 04/13/15 05/11/17 11/19/18 09/20/19 – Executed
Amd 02 05/10/12
HECO
Design
Services Construction
Services Design
Services Construction
Services Design
Services Construction
Services Design
Services Construction
Services
Executed 11/20/13 11/29/13 11/20/13 11/29/13 11/20/13
11/25/13
NTP 11/20/13 11/29/13 11/20/13 11/29/13 11/20/13 11/25/13
Executed 05/16/18
Change Order 01
06/30/17
Working to
execute Change Order No. 1
02/22/18
Change Order 02
02/22/18
Working to execute Change
Order No. 2
Mem
ora
nd
um
s o
f U
nd
erst
and
ing
08/07/14 – Construction Drawings
05/01/15 – Access
05/15/15 – Derrick Truck
06/23/15 – Master Agreement
06/09/15 – MSF Advanced Construction
09/16/15 – Right of Entry
10/12/15 – Clearance (West) 11/10/15 – Dillingham Blvd Materials
Clearance (West) AMD 01
07/13/16 – KHG Vertical Clearance
Power Quality MOU (Working on MOU)
08/16/18 - Airport Clearance Agreement
05/15/19 – Vehicle Storage MOU
Airport Energization MOU 08/13/19 - Executed
Charter Communications/Oceanic Time Warner Cable
Executed 12/08/09 12/21/11 01/09/12 06/02/14 12/19/14
04/03/13 9/22/16
NTP 12/22/09 04/04/13 9/30/16
Amd 01 07/01/11 02/27/14 HRS Ch. 104 07/06/18
Final Draft sent to
Charter/ OTWC.
Amd 02 10/07/13 HRS Ch. 104
Honolulu Rail Transit Project Monthly Progress Report September 2019
76 | P a g e
Utility Agreements Status Matrix
Utility Owner Status WOFH KHG Airport City Center
ESA UCA ESA UCA UCA COMBINED ESA UCA
Pacific Lightnet/ Wavecom
Executed 04/28/10 03/12/12 02/15/12
NTP 04/29/10 03/13/12 02/16/12
Amd 01 07/01/11 HRS Ch. 104
Sandwich Isle Communications
Executed 05/20/10 04/20/12
NTP 06/08/10
Amd 01 07/01/11
Hawai'i GAS
Executed 12/18/09 06/30/11 06/01/12 04/14/14
08/19/14 09/27/13
05/08/15
NTP 12/22/09 07/12/11 08/20/14 05/11/15
Amd 01 07/01/11 10/17/14 08/28/14 08/31/17 10/24/17
Amd 02 05/09/16 10/23/15
Amd 03 HRS Ch. 104
Level 3/TW Telecom
Executed 12/02/09
02/14/12 Oceanic to relocate for TW Telecom
10/11/12 Oceanic to relocate for TW Telecom NTP 12/22/09 02/16/12
Amd 01 07/01/11
Tesoro
Executed
02/15/12 09/12/13
08/27/13
NTP 02/16/12 09/03/13
Amd 01 09/12/14
Amd 02 05/13/15
Amd 03 HRS Ch. 104
Legend = Action this month COR = Corporation Counsel UCA = Utility Construction Agreement
= Not applicable ESA = Engineering Services Agreement
UFRCRA = Combined Engineering and Construction Utility Agreement
Overall Key Issues
No key issues to report this month. HECO
Ka‘aahi Substation near MSF area – On May 3, 2019, the State Public Utilities Commission (PUC) approved HECO’s application for construction of the new substation. HART’s contractor has completed substation site grading and made it available to HECO on July 5, 2019. The issue regarding the need for a supplemental agreement to cover costs if project costs exceeds 60-month revenues has been elevated to HART and HECO upper management. HECO continues to take the position that it will not start substation construction until this issue has been settled.
Mitigation of Horizontal Working Clearance Requirements – At a HART/HECO Executive meeting on Sept. 18, HECO indicated that a WOFH/KHG Clearance Agreement amendment may not be needed if the KHG ESA and UCA change orders are approved. HART is planning to send those change orders to HECO for signatures on Oct. 2, 2019. HART’s designer for the KHG 138kV Relocation Project, R.M. Towill and High Energy Inc. sent 30% design drawings to HART on Sept. 23 for review; this will then be provided to HECO for review on Oct. 7. HART continues to prepare the Specialized Vehicle Storage Yard. HECO received the first 138kV vehicle (Skybird) on Sept. 27 and will need to do testing and training before delivery to the storage yard.
Honolulu Rail Transit Project Monthly Progress Report September 2019
77 | P a g e
5.5 Right-of-Way Key Issues
ROW is continuing its engagement with property owners along the City Center Guideway and Stations (CCGS) Section to acquire the requisite property rights via Right of Entry and Possession and Use Agreements (ROE/PUA) for Land Court properties pending final Grant of Easement or Warranty Deed or other permanent property rights where appropriate. When acquisition by purchase is not reasonably available, ROW uses eminent domain to acquire the requisite property interests. HART’s counsel prosecutes its eminent domain actions and the respective motions for immediate possession of the property so that the construction access may be obtained. ROW continues to move properties through the prescribed eminent domain authorization process.
The Howard Hughes properties continue to be a focus of ROW’s efforts and resources. The parties are working together on plans for demolition of existing improvements and construction of the guideway station. The condemnation action is moving forward to settle the valuation of the property taken. HART filed its eminent domain action and motion for order putting HART in possession of Parcel Identification Number (PID) 433 HECO Iwilei. HECO filed a challenge to HART’s Order of Possession of the property for the HECO Dillingham Avenue property; a hearing on those challenges is scheduled in October. The parties are currently negotiating access for HART to perform a Phase II environmental survey on the property. HART is also working with HECO to get access to HECO’s downtown property on Ala Moana Boulevard to perform a Phase II environmental survey.
o West O‘ahu/Farrington: One case is filed with the court and is active (PID 102 R. Lee). While HART has possession of the
property, there continues to be unfulfilled duties of the Lees to remediate contamination on the parcel. The judge overseeing this case has been serving as a mediator and facilitator, assisting the property owner in completing its obligations under the settlement. The judge holds biweekly status conferences with the parties and has engaged the Hawai‘i Department of Health (HDOH) in facilitating the completion of the remediation of the property. The HDOH has issued one “no further action” letter and there now remain three sections of the property to remediate. Progress has been made in getting HDOH’s approval of the owners’ remediation plans for the remaining sections.
o Kamehameha: One case is closed (PID 201 Stuart Plaza).
o Airport: Four cases are filed with the court and are active. Two cases (PID 302 Kronick and PID 318
Masters) both have Order of Immediate Possession (OIP). Additionally, PID 318 Masters completed the Land Court process and a revised Letter of Offer (LOO) was sent to the owners who responded with a counter offer. An agreement has been reached and a settlement offer and ROE/PUA is in process between the parties for a fee take of the required area. For one case, PID 306 SCI, (partial fee and easement) HART has an irrevocable ROE/PUA dated March 18, 2016, and recorded Docs. # T-9573088 A & B and T-9573089. The condemnation action for PID 306 SCI was filed on Aug. 18, 2018, and an OIP was also issued for the property. PID 319 SCI was filed on March 20, 2019.
o City Center: Eight cases are filed with the court and are active (PID 400 Blood Bank, PID 472A Desky, PID 439
Yamauchi, PID 485 Scott Shoe, Howard Hughes various parcels, PID 433 HECO Iwilei, PID 502 Yung Soon Tajima Trust, PID 503 JY Trading Co.). For PID 439 Yamauchi, a fully-executed settlement agreement was received from the parcel owners and outside counsel will formally dismiss this case once the Land Court process is completed. OIPs have been granted for PID 400 Blood Bank, PID 472A Desky, 485 Scott Shoe, and 503 JY Trading Co. For PID 400 Blood Bank, a trial date of Jan. 13, 2020 has been set.
Two cases are complete and the Final Order of Condemnation was recorded on Sept. 13, 2018 (PID 429 Kalahiki) and April 27, 2018 (PID 483 Hardwoods).
Honolulu Rail Transit Project Monthly Progress Report September 2019
78 | P a g e
Twelve cases were authorized by the City Council for eminent domain proceedings via resolution (36 Tax Map Keys) (Resolution 2017-12 [VW],-14 [HECO],-15 [Four K],-16 [Otani],-17 [PGC],-18 [HECO],-19 [Wong],-20 [Servco],-21 [Fuji Sake],-23 [Sanno], Resolution 2018-13 [JY Trading Co.], -16 [Yung Soon Tajima Trust]).Additional cases will be processed as needed over the next several months. We continue to cooperate and assist the Government Affairs team in these efforts. Please note that PID 439 Yamauchi, PID 436 Four K, PID 444 Wong, PID 448 Fuji Sake, and PID 494 Sanno all have either executed ROE/PUAs or signed the LOO.
Negotiations with the private property owners are ongoing with the goal of reaching mutually-acceptable agreements. The total number of Tax Map Keys (section 1 – 4) authorized by the City Council via eminent domain proceedings is 87 Tax Map Keys (TMKs), and out of 87 TMKs, 16 eminent domain cases have been filed.
One parcel PID 403C RPTeixeira LLC has been acquired.
At the request of the CCUR team, active acquisition efforts for HECO 138kV easements for PID 423A Kapalama Bridge/Canal and PID 501 Kalihi Kai Elementary are on hold pending final CCUR design decision. PID 424A Honolulu Community College is pending a construction ROE with HCC prior to an easement acquisition going forward. ROW stands ready to re-engage when requested. Discussions with the CCUR team indicate there may be additional parcels required once the design is finalized.
During the month of May, the FTA conducted a review of the relocation program which included an examination of parcel files which had been part of audits conducted in 2017 by Overland Pacific Cutler on behalf of HART. The FTA issued a report on Sept. 23, 2019 regarding its findings. The report details measures that must be taken to bring the closed relocation files into compliance, including interviewing the relocated parties. The report states a deadline for a written plan by Oct. 31, 2019, and completion of the plan by Sept. 30, 2020.
Regular meetings between the CCUR team, Project Controls and ROW to track progress, identify opportunities and foresee obstacles to access for critically needed parcels are ongoing.
The FTA agreed to the proposed multi-agency approach to the acquisition and tenant relocations for PID 493 Watumull which is the site for the Ala Moana Station. HART has partnered with the City and County of Honolulu’s (CCH) DTS, Department of Design and Construction (DDC), and BFS to facilitate. The appraisal and review are complete and a concurrence request will be sent to the FTA.
In July, the FTA approved HART’s plan for the acquisition and potential relocation of the tenant at PID 404 Takara (a critical path CCUR parcel). The appraisal update is complete and an offer will be presented in the near future.
ROW continues to monitor negotiations between Design and Construction and HECO regarding issues involving clearance requirements due to maintenance equipment staging needs for 138kV poles and lines located next to the HART guideway system. These discussions will likely identify additional acquisitions of non-asset easements that will eventually be assigned to HECO or other utility agencies and/or companies.
Negotiations are continuing with UH, including securing a construction ROE Agreement with the Honolulu
Community College.
HECO utility easement requirements remain a concern to HART and ROW. The following are a couple of issues that ROW is working to resolve: 1) how to transfer electrical easements acquired by HART on behalf of HECO. There is no current mechanism for transferring these easements to HECO. COR is currently reviewing the situation to make a determination on a viable solution. 2) HECO and HART are having ongoing discussions to address energization issues (e.g., Navy land).
Honolulu Rail Transit Project Monthly Progress Report September 2019
79 | P a g e
Colliers International is currently in Task Order 3 to do relocations work. HART is currently working with Colliers to execute Task Order 4 for acquisitions.
Acquisitions Figure 7. Right-of-Way Status for the Parcels
Relocations Figure 8. Relocation Status for the Occupants
Non-Right of Way Figure 9. Temporary Construction Easements and Utility
Honolulu Rail Transit Project Monthly Progress Report September 2019
80 | P a g e
Status of Inter-Governmental Agreements Figure 10. Inter-Governmental Agreement Status The status of agreements between HART and other government entities. Objectives are:
1) Obtain Construction Right of Entry, Executive Orders, Set Asides, Jurisdiction Transfers, Joint Use Agreements, licenses, easements, Memorandum of Understanding (MOUs), Memorandum of Agreement (MOAs), etc. with impacted government agencies. Government agencies HART is working with include: Federal (GSA, Navy, USPS, Office of Interior), State (HDOT-Hwys & Air, DLNR, DAGS, HCDA, DOE, Aloha Stadium, UH), and County Agencies (DTS, DPP, DFM, BFS, DDC, Parks, DLM, ENV). Some government agencies may choose to issue the final documents after construction is substantially underway or near completion.
2) To help negotiate and/or obtain Rights of Entry for certain other construction-related activities as requested by Design and Construction. Such agreements may include: geotechnical borings, soil testing, environmental surveys, bus stop agreements, construction lay down surveys, and other construction-related needs. There may be other Rights of Entry and Agreements which may not involve ROW acquisition or relocation. ROW will assist other HART departments, should requests be authorized and funded.
3) Agreements to be executed are in white. Executed agreements are in grey at the end of the table, and while these parcels may be accessible at this time for construction, further documentation may also be required to complete the acquisition.
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
STATE AGREEMENTS
UH – University of Hawai‘i, West O‘ahu (UHWO-125)
Construction Right of Entry and Occupancy & Use Agreement for East Kapolei Park & Ride
TBD/ Estimate
2021
WOFH Yes Temporary park and ride and Road B (connector road) nearing completion on UH property. 3rd Amendment to CROE has been
fully executed. It allows for installation of electrical
connections from Road B to station area and subsequently into
interim parking.
UH – Urban Gardens (201A) Conveyance to HDOT (H) – Dept. of Transportation Highways
January 2020
KHG Yes
2nd Amendment to HART ROE fully executed. Royal Contracting
secured ROE for road, retaining wall, and concrete culvert
improvements. Based on final Phase II results, HDOT has issued
concurrence letter. Construction is nearing completion. Quitclaim deed under review by HDOT-Highways. Subdivision map
tentative approval by DPP still under review and approximately 1
month away.
Honolulu Rail Transit Project Monthly Progress Report September 2019
81 | P a g e
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
UH – Honolulu Community College (HCC) (424A)
Construction Right of Entry for guideway & station
October 2019
City Center No Pending design finalization. Working with UH regarding ROE
Agreement. Draft ROE Agreement under review by COR. ROE will be broken down into phases starting
with least intrusive activity. Demolition and preliminary
construction activities completed under letter agreement with Royal
Construction.
DLNR – Dept of Land & Natural Resources (124)
Kapolei Easement Agreement for overhead guideway and for park and ride facility
November 2019
WOFH
Yes In process. DPP approved subdivision application.
Transmitted to DLNR for land court submittal. Discussions are
ongoing regarding language permitting guideway easement.
DLNR/C&C Wastewater Div (437B)
Easement Agreement December 2019
City Center In process. DLNR working with DAGS survey group to address
questions regarding final easement map. Ongoing
discussion with DLNR regarding easement agreement terms.
DOE - Waipahu H.S. (118) Permanent Easement (State owned portion)
May 2020
WOFH Yes
In process. Construction is not impacted as the ROE for right to access and construct is executed.
With DOE for review. Working with DLNR for permanent rights.
DOE – Waipahu H.S (117) Memorandum of Understanding (City owned portion)
November 2019
WOFH Yes Draft 1st Amendment to ROE sent to DOE, BFS, DLM, and HECO for comments on 4/18. Comments received from everyone except
DOE.
Met with DOE 10/3/18. Proposed MOU with DTS comments
submitted for DOE and Attorney General (AG) review. Negotiations
have stalled until the DOE sees progress towards satisfactory
settlement in its claim against the contractor. Construction is not
impacted as the ROE for right to access and construct is executed. Working with City for permanent
rights.
DOE – Waipahu H.S. (117) Permanent Easement (City portion)
May 2020
WOFH Yes Permanent easement from City in process. DLM has indicated they will delay the transfer of the City portion to the State until HART has permanent entitlements in
place. HART is revisiting this strategy. Construction is not
impacted as the Master/ Construction Agreement is
executed. Working with BFS for permanent rights.
Honolulu Rail Transit Project Monthly Progress Report September 2019
82 | P a g e
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
Aloha Stadium / Dept. of Accounting & General Services (DAGS) (207A to C)
Easement Agreement January 2020
KHG Yes In process. Pursuing map approvals from Stadium Authority, DAGS, and DLNR. Construction is
not impacted as the ROE for access and construction is
executed. Working on permanent easement agreement.
Aloha Stadium/ DAGS (207B)
Agreement for bus interface and shared parking area
January 2020
KHG Yes In process. Agreement format may impact map approvals from
Stadium Authority, DAGS, and DLNR. Construction is not
impacted as the ROE for right to access and construct is executed. Working on permanent easement
agreement. DAGS and Stadium Authority have engaged HART in
discussions regarding relocation of shared parking and bus interface to accommodate TOD upzoning.
HDOT(H) – Dept. of Transportation Highways (100,100-A, 304, 400-A, 400-B)
Master Agreement Amendment
October 2019
WOFH Yes Construction is not impacted as the Joint Use & Occupancy (JU&O) Agreement for right to access and
construct is executed.
HDOT(H) and (A) – Dept of Transportation Highways & Airports (100,100-A, 301, 304, 304, 400-A, 400-B)
Master Agreement for KHG, Airport and City Center Amendment
October 2019
KHG, Airport,
City Center
Yes for KHG & Airport
Construction is not impacted as the JU&O for right to access and construct for City Center will be
executed when the Notice to Proceed (NTP) is issued.
HDOT(H) (100,100-A, 304, 400-A, 400-B)
JU&O Sub-agreement October 2019
WOFH Yes In process. Construction is not impacted as the JU&O for right to access and construct is executed.
HDOT(H) (100,100-A, 304, 400-A, 400-B)
JU&O Sub-agreement October 2019
City Center In process. Construction is not impacted as the JU&O will be executed when NTP is issued.
HCDA -HI Community Development Authority (444A, 450,463BE-5-B, 475)
Construction ROE, License Agreement, & Final Disposition
December 2019
City Center Coordination is ongoing. ROE for Royal Contracting pre-
construction activities extended. HART will need to appear before HCDA board for construction ROE
(construction of guideway improvements and utility
relocation) approval.
DAGS (441-A) Construction Right of Entry October 2019
City Center A street is being designed substantially within the footprint of Easement U as requested by DAGS as a precondition to ROE.
The street will be provided as in-kind consideration for a staging yard for the 3rd party contractor.
Survey for staging area being conducted and street concept plan undergoing refinement.
DAGS (441-A) Guideway and Utility Easement Agreement
August 2020 City Center In process.
Honolulu Rail Transit Project Monthly Progress Report September 2019
83 | P a g e
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
Kalihi Kai Elementary (501) Right of Entry from DOE/DLNR
December 2019
City Center On hold pending design finalization.
Kalihi Kai Elementary (501) Easement Agreement 2020 City Center On hold pending design finalization. Once ROE is in place, subdivision map to be completed
and submitted to DPP.
State of Hawaii - DOT (504) Easement Agreement Pending City Center Draft ROE/GOE request prepared. Under HECO review.
FEDERAL AGREEMENTS
USPS (301) Permanent Easement 2020 Airport Via GOE Construction is not impacted. Grant of Easements were
recorded in Regular System to facilitate entry onto property for
construction even though the property is registered in Land Court. Now petitions for Land
Court designation of easements are being developed for submittal
to Land Court.
U.S. Gov't/General Services Administration (GSA)/Federal Courthouse (443C)
Master Agreement, Security & Landscape License Agreement, Utility License Agreement, Guideway License Agreement
December 2019
City Center Master Agreement fully executed on 8/13/19.
Preparing Security & Landscape
License Agreement for finalization.
GSA Federal Courthouse Quitclaim Easement Documents for Utility and Guideway Easements
2020 City Center Under review.
CITY AGREEMENTS
BFS – Dept. of Budget & Fiscal Svcs (204A)
Intra-Agency coordination which may take the form of a ROE, letter agreement, or license (Continental Investment)
2020 KHG Via intra-agency
coordination
In process.
DFM (423A) Work Permit (Kapalama Stream for Street, Bridge, and Guideway Improvements)
October 2019
City Center Per BFS, no ROE necessary. Only a work permit will be needed. The
contractor and HART Planning and Construction departments are in
process of obtaining a work permit. Possible adjustments to design are being contemplated
and may change this.
DFM (423A) Easement Agreement for Utilities
2020 City Center Utility agreements on hold pending design finalization.
DTS – Dept. of Transportation Svcs (322)
Intra-Agency coordination which may take the form of a ROE, letter agreement, or license (Middle Street Station)
2020 Airport Via intra agency
coordination
In process.
OTHER AGREEMENTS
Honolulu Rail Transit Project Monthly Progress Report September 2019
84 | P a g e
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
D.R. Horton (101B) MOU Construction Right of Entry Amendment – D.R. Horton & HART Easement Agreement – D.R. Horton & HECO
December 2019
WOFH Yes ROE amendment on hold until maps with new TMK are finalized.
EDD has been approved. Rights and Responsibilities letter has
been agreed to by D.R. Horton. Post ROD, appraisal supporting
license fee, and Letter of Intent in process. MOU pending. Appraisal
in process and draft anticipated within the month.
D.R. Horton Final Easement Agreement January 2020
WOFH Yes In process and subject to owner’s development plans. Construction
is not impacted. EXECUTED
AGREEMENTS CITY AGREEMENTS
BFS (205A) Jurisdictional transfer from DFM to HART of Kamehameha Hwy/Makalapa Manor
Airport Yes Jurisdictional Transfer from BFS Letter dated 8/26/11.
DPR - Dept. of Parks & Recreation (119)
Construction consent to construct for MSF drainage
WOFH Yes
BFS / DFM (Dept. of Facility & Maintenance) (437C)
Jurisdictional Transfer (Awa Triangle, N. Nimitz & Awa St.)
City Center Jurisdictional transfer completed July 9, 2018.
STATE AGREEMENTS
DLNR/C&C Wastewater Div (437B)
Construction Right of Entry
City Center Yes Construction ROE obtained from
DLNR 10/21/17. Subdivision submitted with DPP 1/1/18.
UH – University of Hawai‘i Master Agreement is not needed as the ROE for right to access and construct will be executed separately by each campus.
WOFH, KHG, City
Center
Will be executed by each campus
Construction is not impacted as the ROE for right to access and
construct will be executed by each campus.
UH Pre-Construction Right of Entry and Amendment
WOFH, KHG, City
Center
Yes
UH - West O‘ahu (UHWO) (125)
Construction Right of Entry for Station, Temporary Park & Ride, and Amendment for Construction of Road B
WOFH Yes
UH - Leeward Community College (LCC) (122)
Construction Right of Entry for Guideway
WOFH Yes
UH – LCC (122) Construction Right of Entry for Station
WOFH Yes
UH - Urban Gardens (201A)
Construction Right of Entry KHG Yes
DLNR – Dept. of Land and Natural Resources (124)
Kapolei Construction Right of Entry for overhead guideway and for park and ride facility
WOFH Yes CROE has been granted once a year by letter. Working on
permanent Easement with DLNR. Currently with DPP for
subdivision.
Honolulu Rail Transit Project Monthly Progress Report September 2019
85 | P a g e
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
DLNR (320) Keehi Lagoon Construction Right of Entry
Airport Yes
DOE – Dept. of Education Waipahu H.S. (117, 118)
Master/Construction Agreement
WOFH Yes
DOE/DLNR for Waipahu H.S. (118)
Construction Right of Entry WOFH Yes Executed by DLNR with DOE concurrence.
Aloha Stadium / Dept of Accounting & General Services (DAGS) (207)
MOU for guideway & station KHG Yes
Aloha Stadium/DAGS Construction Right of Entry for guideway
KHG Yes
Aloha Stadium/DAGS Construction Right of Entry for station park and ride
KHG Yes
HDOT(H) – Dept. of Transportation Highways (100)
Master Agreement for HDOT Highways for WOFH
WOFH Yes
HDOT(H) and (A) – Dept. of Transportation Highways & Airports
Master Agreement for HDOT Highways and Airports, for KHG, Airport and City Center Sections
KHG, Airport,
City Center
Yes except for City Center
whose JU&O will be
executed when the NTP
is issued
HDOT(H) JU&O Sub-agreement WOFH Yes
HDOT(H) JU&O Sub-agreement KHG Yes
HDOT(H) JU&O Sub-agreement Airport Yes
HDOT (A) - Dept. of Transportation Airports
Airport Special Provisions for Right of Entry
Airport Yes
HDOT(A) JU&O Sub-agreement for Airport Division parcels
Airport Yes
HDOT(A) (301A) Easement document for Airport Division parcel (Main guideway easement)
Airport Yes Ongoing intra-agency coordination. Construction is not
impacted as the Special Provisions and the JU&O for right to access
and construct is executed.
DHHL - Dept. of Hawaiian Home Lands (Exchange w/ Varona Village) (115A)
MOA, License/ROE from DHHL, City Council Resolution
WOFH, MSF Yes DLNR approves withdraw from GEO 571 7/14/17. DFM accepts
road widening and now City jurisdiction.
OCCC - Dept. of Public Safety, Oahu Community Correctional Center (400A)
MOU
City Center Yes
OCCC/DLNR Construction Right of Entry
City Center Yes
DLNR/OCCC Letter of Responsibility from City-DFM/Road
City Center Yes
HCDA -HI Community Development Authority (444A, 450, 463B, E-5-B, 475)
Pre-construction Right of Entry
City Center Yes, effective upon request
Verbal approval granted by the HCDA Board in 6/2016.
Honolulu Rail Transit Project Monthly Progress Report September 2019
86 | P a g e
Inter-Governmental Agreements
Agency
Pending Agreements (Executed Agreements
are shaded grey)
Target
Section
Construction Right of Entry
(CROE) Obtained
Notes/Remarks
FEDERAL AGREEMENTS
U.S. Navy (116A) Grant of Easements for Maintenance & Storage Facility (MSF)/Rail Operations Center (ROC) offsite drainage and sewer easements
WOFH Yes Per Letter #N62478-12-RP00011 dated 6/28/12 confirming
easement from Navy.
U.S. Navy (300) Licenses/Construction Right of Entry
WOFH, KHG,
Airport
Yes 6/22/15 – 5 Yrs. License ends in 2020. All utility work needs to be
completed by then.
U.S. Navy Easement Agreements WOFH, KHG,
Airport
Yes Grant of Easement executed. Grant of Easement 8/22/16.
U.S. Navy Pearl Harbor Station Acquisition of Fee Transfer
Airport Yes Quitclaim deed executed 2/25/16.
U.S. Post Office (USPS) (301)
Honolulu Processing Center acquisition
Airport Yes Acquisition completed in regular system. Need to process through Land Court to complete process. Funds already paid. USPS Land
Court share to complete process is in escrow.
OTHER AGREEMENTS
D.R. Horton Construction Right of Entry - D.R. Horton & HECO
WOFH Yes Executed 5/11/2018.
Honolulu Rail Transit Project Monthly Progress Report September 2019
87 | P a g e
6 MANAGEMENT AND ADMINISTRATIVE UPDATES
6.1 Safety and Security (S&S)
Key Issues HART Safety has been working with the Core Systems Oversight Consultant (CSOC) to oversee HRH preparations
for energization and vehicle testing on the Functional Track section between LCC and Ho‘opili Station platforms. o Phase 1 initial energization test is scheduled for Oct. 2. o Over the shoulder review of the Dynamic Testing and Commissioning Safety Plan was completed. o With a projected completion in November 2019, Phase 2 of Initial Energization (LCC to Ho‘opili using TPSS
from Waipahu, West Loch, and Ho‘opili and LCC GBS) is underway.
Scheduled certification milestones pending design and/or construction approved documentation: o MSF Yard Control Bungalow (YCB) civil contract certification – pending approved construction submittals.
Discussed in Bi-weekly HRH Coordination Meeting and HRH Certification meeting; no updates. 4 open items on the Construction Specification Conformance Checklists (CSCC).
o Maintenance of Way (MOW) 9 (nine) vehicles certification – pending approved design documentation. Discussed during Bi-weekly HRH Coordination Meeting and HRH Certification meeting.
2 open items on Design Criteria Conformance Checklists (DCCC) 10 open items for vehicle acceptance documentation on Specification Testing Conformance
Checklists (STCC). 6.1.1 Safety and Security Certification Twelve (12) Month Projected Milestones and Work Priority
12 - Month Certification Projected Milestones Contract and Interim Certificates (IC) Next 30-90
days Next 90-180
days Next 180-270
days Next 270-365
days
X – Projected Month, TBD – To be Determined – Pending Documentation
Oct 2019
Nov 2019
Dec 2019
Jan 2020
Feb 2020
Mar 2020
Apr 2020
May 2020
June 2020
July 2020
Aug 2020
Sept 2020
1. MSF – IC Unattended Driving
2. PV-005, IC to enter Dynamic Testing
3. PV-006, IC to enter Dynamic Testing
4. FHSG Civil Contract Certification
5. Functional Section – IC 3rd Rail Energization (Phase 2)
6. Functional Section - IC Attended Driving
7. Functional Section – IC Unattended Driving
8. WOSG Civil Contract Certification
9. KHSG Civil Contract Certification
10. Elevator/Escalator Certifications FHSG/WOSG/KHSG
11. PV-012, IC to enter Dynamic Testing
6.1.2 Project Overall Certification Status
Project Overall Certification Status - Progress Historical Record Jul/19 Aug/19 Sept/19 Final Revenue Overall % 42% 44% 44%
- Interim Revenue Service - 12/2020 59% 60% 60%
- Phase II Revenue Service - 12/2025 25% 27% 28%
Honolulu Rail Transit Project Monthly Progress Report September 2019
88 | P a g e
6.1.3 Interim Revenue Service Date Certification Status
Interim Revenue Service (2020) Certification Status - Progress Historical Record Jul/19 Aug/19 Sept/19 Major Components
- MSF (Civil & Systems) 88% 88% 88%
- Guideway (Civil & Systems) 97% 97% 97%
- Stations & Parking (Civil & Systems) 76% 81% 82%
- Passenger Train (PT 1-20) 26% 26% 26%
- Fare Vending 9% 9% 9%
- Traction Electrification System (TES) 71% 71% 71%
- ATC / SCADA 81% 81% 81%
- Communication 68% 68% 68%
- System Integration Testing (SIT) 42% 42% 42%
- Operational Readiness 16% 16% 16%
- Risk Management 65% 65% 65%
6.1.4 Phase II Revenue Service Date Certification Status
Phase II Revenue Service (2025) Certification Status - Progress Historical Record Jul/19 Aug/19 Sept/19 Major Components
- Guideway (Civil & Systems) 27% 28% 28%
- Stations & Parking (Civil & Systems) 19% 19% 20%
- Fare Vending 7% 7% 7%
- Traction Electrification System 7% 7% 7%
- ATC / SCADA 80% 80% 80%
- Communication 13% 13% 13%
- System Integration Testing 0% 0% 0%
- Operational Readiness 0% 0% 0%
- Risk Management 32% 58% 63%
6.1.5 S&S Open Items List Status
"Open Items List" "Open Items" - Design/Construction and Verification Issues
Month 2019
Total # Total # Open
Total # Closed
% Closed Overall
# Closed In Month
% Closed In Month
Jul 297 22 275 93% 0 0%
Aug 297 22 275 93% 0 0%
Sep 298 21 277 93% 2 1%
6.1.6 Construction Safety and Security: Safety and Security Incidents
Incidents for Sept. 1-30, 2019: o FHSG: A generator and items were stolen from a work container on site. o CSC: Batteries were stolen from 2 aerial lifts located near Pearl Highlands traction power substation.
Honolulu Rail Transit Project Monthly Progress Report September 2019
89 | P a g e
Honolulu Rail Transit Project Monthly Progress Report September 2019
90 | P a g e
6.2 Quality Management Key Issues
HART NCR Log
Total NCRs Issued To Date Closed Open
92 (Audits) 89 3
1 (Construction) 1 0 Note: HART Issued NCRs for Construction are shown on each respective contract.
Resolution of major NCRs that need to be addressed and corrected to prevent recurrence, and to mitigate impact on
the overall progress of the project. The major NCRs are described below: o Retrofit of Eight (8) Car Shells under frame to rectify aluminum extrusion defects continues. Retrofit of car shell
underframe to rectify aluminum extrusion defects continues in Italy. Five (5) out of six (6) retrofitted car shells have been received in Pittsburg, CA. The remaining two (2) of eight (8) car shells to be retrofitted are still in Honolulu, which will be shipped to Italy later, after Train #1 and Train #2 are shipped to the Pittsburg facility.
o Cracks in Canopy Structural Steel Members. Cracks on the Canopy Structural Steel members were found in the WOSG and FHSG station groups. HART is in the process of finding the “root cause” of the defects, the disposition, and appropriate corrective action to prevent recurrence. All lower portions of the canopy arms (grade 100 steel) will be replaced at WOSG, FHSG and KHSG. Fabrication of the Plan B lower arms are complete for UHWO and HOP. They are scheduled to arrive in mid-October. EKP canopy fabric installation is scheduled to start on Oct. 14, 2019. LCC station arms are scheduled to be installed in October. Fabrication for the WLO, WTC, PHL and PLR stations continue. IFC drawings for ALS are scheduled for late October. Mitigation efforts to have the six (6) side platform stations (less Aloha Stadium) installed by December 2019 continue. Workarounds to progress systems work are being undertaken in order to lessen the impact of the delay.
Audit Look Ahead
Prepared and issued (Revision 8) the Project Combined Management System Audit Schedule for 2019 to HART and all contractors, consultants and suppliers.
Planning for the audits to be performed in October 2019: Audit No. 19-015 KHSG – Combined Quality Assurance (QA), Buy America (BA) and Environmental Compliance (EC) Audit of Nan Inc. on Oct. 3-4, 2019; and Audit No. 19-016 CEI-East Combined QA and EC Audit of Stantec on Oct. 24-25, 2019.
Issued Audit Report on Audit 19-010 CSC QA of HRH on Aug. 1, 2019. The Audit Team found one (1) Positive Finding and three (3) Observations. Waiting for HRH’s response and preventative actions.
Issued Audit Report on Audit 19-010 CSC EC of HRH on Aug. 27, 2019. The Audit Team found one (1) Positive Finding, three (3) Non-conformances, and five (5) Observations. Waiting for HRH’s response, and corrective and preventative actions, respectively.
A Closeout Letter on Audit No. 19-011 FHSG Combined QA, BA, and EC Audit of HDCC was issued on Sept. 23, 2019. Performed Audit 19-012 WOSG Combined QA, BA and EC Audit of Nan Inc. on Sept. 9-10, 2019. The Audit Team found
six (6) Positives (3-QA/3-EC) and one (1) EC Observation. Performed Audit 19-013 HRU and 19-014 HRI Joint HART/HRH QA Audit of Hitachi Rail USA and Hitachi Rail Italy on
Sept. 18-20, 2019. The Joint Audit Team found one (1) HRU Positive and seven (7) Observations (5-HRU/2-HRI). Oversight and Monitoring
Conducted Bi-weekly Quality Task Force Meetings including a review of the status of NCRs and Corrective Actions to prevent their recurrence and improve processes. Performed QA/Quality Control (QC) surveillance of construction sites after the Quality Task Force (QTF).
Attended and participated in the Safety and Security Review Committee (SSRC), Rail Activation Committee (RAC), Car Readiness Review Board (CRRB) and Operation Working Group (OWG) meetings.
Attended and participated in Pre-activity meetings on the project: o FHSG: Structural Steel Canopy Erection o AGS: Existing Fuel Line Removal
Prepared and issued Project NCRs Trend Analysis from January to September 2019. The trend for this month: Trains: went up thirteen (13) from 13 to 26; Core System: did not change, remains zero (0); Fixed Facilities: went up seven (7) from 17 to 24. See the next page for the Project NCRs Trend Analysis.
Honolulu Rail Transit Project Monthly Progress Report September 2019
91 | P a g e
Honolulu Rail Transit Project Monthly Progress Report September 2019
92 | P a g e
6.3 Buy America Compliance (49 CFR 661 and 49 CFR 663) Overview and Key Issues
HRH continues to execute the corrective action plan to meet the PV Buy America requirements. The Core Systems Oversight Consultant (CSOC) conducted a visit to the Interior Lining supplier on Sept. 26, 2019 to confirm the continued implementation of the production activities related to the Hitachi/ULTIMATE Corrective Action Plan. ULTIMATE has discontinued the application of the interior panel primer and final finish coating at their Hayward, CA facility and have indicated they plan to engage an alternate domestic subcontractor to complete this activity outside of California. The implementation of all required corrective action identified in the Post-Delivery Report, has not yet been completed on all previously delivered trains. The CSC will be updating the monthly Buy America compliance report with the Buy America retrofit status of each train to demonstrate compliance with the Corrective Action Plan. A final documentation audit for the compliance of the fleet will need to be conducted when the last train is delivered and commissioned. The following is the general Buy America compliance status by train:
o Trains #1 and 2 are not yet fully compliant with the Buy America requirements and will require retrofit in accordance with the Hitachi Corrective Action Plan. These trains will be returned to the Pittsburg, CA final assembly facility for car shell structural retrofit, fire resistivity retrofit, and Buy America retrofit.
o Corrective action on Train #3, which has been delivered to Honolulu, to replace specific foreign-manufactured equipment with domestic-manufactured equipment is not yet complete. The Traction Inverters and Auxiliary Power Supplies have been replaced on Train #3 M-Cars. However, the specific foreign-manufactured interior panels on M-Cars have not yet been replaced.
o The retrofit of Trains #4 and 5 must still be fully completed and documented in accordance with the HRH Buy America Corrective Action Plan.
o Train #6 has been delivered to Honolulu compliant with the Buy America requirements and does not require additional retrofit to comply with Buy America requirements.
o Trains #7-11 have been delayed pending retrofit of the heat shields on the underfloor. o The next train scheduled for shipment to Honolulu is Train #12 in October and will include the floor heat
shield retrofit. The train includes the corrective actions to be compliant with the requirements of Buy America. The Car History Book (CHB) presented for over-the-shoulder review included tables for each car that uniquely identify the compliant interior panels.
o Train #10 is scheduled for delivery after Train #12 with fully Buy America compliant interior linings. o Future shipments of Trains #8, 9, 11 and 13 for the Interim Opening fleet will include the required
corrective actions to comply with the requirements of Buy America. o The addition of the heat shields that Hitachi has procured from a foreign supplier will have a slight
negative impact on the domestic content of each car-type. Hitachi has estimated this worst-case impact at 0.3%. This will still meet Buy America requirements for the lowest domestic content car-types. HART has requested Hitachi to update this estimate in their monthly Buy America (BA) summary to reflect the actual heat shield costs per train (once established) and re-confirm compliance. However, Hitachi has not yet updated this impact due to pending negotiations with their subcontractors/suppliers.
6.4 Disadvantaged Business Enterprise (DBE) Activities this Month
$133,315,519 = total dollar participation for all DBEs on all HART contracts from 9/24/07 to 9/30/19 o 16.54% = DBE utilization on total disbursed FTA funds received to date ($133,315,519 divided by
$806,258,734) o 7.56% = DBE utilization to date on total Project FTA funds ($133,315,519 divided by $1,763,903,901) o 8.60% = DBE utilization to date on 5309 Project FTA funds ($133,315,519 divided by $1,550,000,000)
Honolulu Rail Transit Project Monthly Progress Report September 2019
93 | P a g e
6.5 Art-in-Transit (AIT) Program The Honolulu Rail Transit Project's December 2012 FFGA grant (Sitework and Special Conditions) includes a public art program. In addition, the Revised Ordinances of Honolulu (ROH) Section 3-2.7, "Art in City Buildings," provides for the inclusion of art in city-owned buildings frequented by the public. For the rail project, the AIT staff negotiates and manages contracts for the west-side stations and AGS. AIT contracts are managed in five NTP phases:
NTP1 - Conceptual design NTP2 - Design development, final design, and construction documents NTP3 - Mobilization NTP4 - Fabrication, transportation, and installation NTP5 - Final acceptance
Conceptual and final designs are presented to the Mayor's Commission on Culture and the Arts for review and comment. The Transit Art Committee (TAC) evaluates and makes the final recommendation and approval.
Station / Facility Name Artist Name NTP Phase Comments
East Kapolei Station Robert Flint NTP3
Working with artist on required technical documentation and Material Safety Data Sheet (MSDS) information for Safety & Security Design Criteria Conformance Checklist review.
University of Hawai‘i West O‘ahu Station
Satoru Abe NTP3 Fabricator making a full-scale mock up for Safety and Security Certification.
Ho‘opili Station Karen Lucas NTP3
Assisting artist and her fabricator on translating designs into glass mosaics that reflect the original drawings; selection of color palette, technical and sequence installation issues.
West Loch Station Hans Ladislaus NTP3
Working with the artist on required technical documentation and MSDS information for Safety & Security Design Criteria Conformance Checklist review. The artist needs to provide scaled depth and texture studies.
Waipahu Transit Center Station
John Koga NTP1 TAC reviewed conceptual design submittal #5; revisions recommended.
Rail Operations Center – Operations & Servicing Building
Shigeru Miyamoto
NTP3
Working with the artist on required technical documentation and MSDS information for Safety & Security Design Criteria Conformance Checklist review. The artist needs to submit color samples during NTP3 and NTP4.
Leeward Community College
Donald Lipski NTP3
Working with the artist on required technical documentation and MSDS information for Safety & Security Design Criteria Conformance Checklist review. Waiting for shop drawings and confirmation of fabrication sequence.
Pearlridge Station Robert Kushner NTP4
Safety & Security Review Committee approved AIT Design Criteria Conformance Checklist for the two glass and stone mosaics. NTP4 released.
Aloha Stadium Station Jay Wilson NTP1 Revising conceptual design.
Pearl Harbor Naval Base Station
Carol Bennett NTP2 Conceptual design accepted, moved to NTP2.
Honolulu International Airport Station
Mamoru Sato NTP1
The artist is exploring conceptual and design revisions to the Mauka portion of artwork and refinement of the Makai design. Design work is pending refinement of mullion system used for artwork installation.
Lagoon Drive Station Carol Yotsuda NTP1 Revising conceptual design.
Honolulu Rail Transit Project Monthly Progress Report September 2019
94 | P a g e
6.6 Planning and Environment Activities this Month
Environmental Compliance o Environmental Due Diligence: Staff met with the HDOH to address comments to the work plan for the
HECO downtown Phase II Environmental Site Assessment (ESA). Staff completed the review of the Civic Center Station Phase II ESA work plan and will submit to HDOH next month.
o City Center Contract Development: Staff are providing responses to Request for Information requests from the P3 bid package. Staff are also providing updated permits for the bidders.
o Intelligent Transportation Systems (ITS): HART continues to work with the State Historic Preservation Division (SHPD) to finalize an amendment of the Area of Potential Effect (APE) to cover ITS work outside of the Project’s APE.
o Ka‘aahi Substation Antenna: Staff are working with FTA to evaluate HECO’s planned installation of a 58-foot antenna pole at the Ka‘aahi electrical substation, located adjacent to the Hālaulani (Leeward Community College) rail station. HECO intends to use the antenna to support a wireless connection to provide SCADA communication, rather than the previously-planned fiber optic cables.
Project Mitigation Commitments o Historic Resource Documentation: HART staff continue to support historic building preservation efforts
within the APE for the rail project. Staff continued preparation of a comment review matrix for the Historic American Buildings Survey (HABS) documentation for Chinatown, additional peer review comments were received for Chapters 1-3 of the pre-draft of the Historic Context Studies (HHM), and the pre-draft of the Chinatown Historic District Update is still under review. Revisions to pre-draft National Register of Historic Places (NRHP) nominations that were requested by SHPD were started for Holau Market and the Ai-Goto Building. Staff also initiated revisions to the pre-draft NRHP nomination for the Wo Fat Chop Sui House that resulted from new information identified during preparation of the Historic Preservation Certification Application (HPCA).
o Cultural Landscape Reports: Draft Cultural Landscape Reports (CLR) have been prepared for three historic parks located adjacent to the rail line: Irwin Park, Walker Park, and Mother Waldron Park. The Consulting Party (CP) and stakeholder comment period ended on Sept. 13, and staff are preparing responses to all comments received. Staff also met with the property owner and CPs regarding Irwin Park on Sept. 23.
o Interpretive and Educational Materials: Staff continue to work with contractors to develop prototype mobile applications that will highlight the history and culture of the communities along the rail system, educational materials as well as a field guide to nearby historic buildings and structures. Staff also continue to review a draft interpretive plan. A color brochure and coloring book are also being developed. The Stipulation VII work plan was approved by SHPD and is being finalized.
o Section 106 Annual Meeting: HART and the FTA completed a response to the 2018 Kāko‘o annual report and distributed it to CPs on Sept. 30. The FTA annual meeting minutes are complete and was sent to the Kāko‘o for distribution to the CPs.
o Reporting: The PA required Semi-Annual report is complete and was submitted to the Kāko‘o for distribution to the CPs. The 2019 Quarter 3 Mitigation Monitoring Program report is being prepared.
o Station Names: The HART Board deferred action on approving the remaining station names due to quorum issues, and will take it up at the October Board meeting.
Sustainable Mobility o Sustainability: Staff submitted an application for technical assistance support under the United States
Environmental Protection Agency (EPA) Local Foods, Local Places program. Staff intend to use the technical assistance to work with community stakeholders to develop an action plan for providing mobile food markets at rail stations.
Honolulu Rail Transit Project Monthly Progress Report September 2019
95 | P a g e
Look Ahead
Preparation of Post-ROD documentation: o West Park-and-Ride Lots: The reconfiguration of the 1,000-stall permanent park-and-ride lot at the
Keone‘ae (University of Hawai‘i West O‘ahu) station and a 900-stall park-and-ride lot at the Kualaka‘i (East Kapolei) station will be assessed.
o Dillingham Boulevard: Assessment of project impacts along Dillingham Boulevard in Kalihi is pending development of final design details.
o City Center/Pearl Highlands: Any project final design refinements or new right-of-way takes will be assessed and submitted to the FTA, as appropriate.
o Kamehameha 138kV Relocation: Overhead 138kV lines are to be relocated between the Waiau Power Plant and the Aloha Stadium in order to provide the required working clearances around the guideway. Analysis is pending development of the preliminary design drawings.
6.7 Risk Management The HART program’s Risk Management System (RMS) focuses on mitigation strategies to assist the project teams in successful project delivery. The bottoms-up risk assessments for all projects in the program have been updated monthly by the project teams since the RMS was implemented in the spring of 2016. A network model is then updated to evaluate the cost and schedule contingencies of the program, including relationships between each of the individual projects and contracts. Risk assessment discussions with the project teams are held quarterly to identify, assess, prioritize, manage and mitigate risk exposure, and develop prudent contingency plans. The Project Risk Register (RR) is the repository for all risks identified for the Project. Every month, risks contained in the RR are reviewed to confirm risks are appropriately identified, identify new risks, and close out risks that no longer pose an issue. The individual project risks are now updated monthly and input into the RR. Outputs from the RR are now being transitioned as a batch input to the overall cost forecasting reports. The RMS quantifies each risk as a schedule impact or as a direct cost impact independently. The schedule impact is then monetized if it is a critical-path risk, based in the model and based upon the contracts impacted. The top risks to the program are then evaluated on both schedule and cost. As HART implements the risk management system focused on mitigation, monitoring, and control, the PMOC had requested to work with HART to develop a new tracking mechanism or data reporting set to better assist in the oversight of the program. As a result, the HART risk manager reports risk updates by project on a monthly basis and performs a model update of the program on a quarterly basis. The latest quarterly update took place in August 2019. The latest monthly update took place in September 2019, but it was a limited review with updates from several projects, because the full Risk Refresh was already conducted one month earlier in August 2019. Beginning in the year 2020, risk updates for ongoing projects will transition from monthly to quarterly. This change is because the west station projects are nearing completion and are planned to be closed out in 2020, and HART anticipates that the P3 will be underway by then having incorporated much of the remaining work required of the Core Systems Contractor. The P3, as well as the ongoing AGS project, should only require quarterly risk updates which will provide HART with sufficient cost and schedule forecast information to help in managing the remaining work on the overall Project. This plan has been discussed by HART with FTA and PMOC representatives who have concurred. Notes of Significance
Beginning with this report of the risk update for September 2019, FTA through PMOC has advised HART to report the P65 cost and schedule forecast for the Project. Previously, HART had been reporting the P80 cost forecast in order to be modestly more conservative in our cost projection; however, P65 is technically FTA’s standard for cost projections, so from this point forward, HART will report on the P65 result. HART has been projecting the P65 schedule result since the spring of 2016 when the current risk modeling format was implemented on the Project.
The most recent monthly risk update occurred in September 2019, the results of which are discussed herein. (Normally the Quarterly Risk Refresh would have been held in September, but HART advanced it by 1 month to have the results ready for the FTA Quarterly Meeting being held in early September 2019.) The P65 results now place the projected forecast at $8.101 billion. The results place the projected forecast at $64 million below HART’s
Honolulu Rail Transit Project Monthly Progress Report September 2019
96 | P a g e
budget goal of $8.165 billion, and $198 million below the overall budget goal of $8.299 billion as recommended by PMOC and FTA. At the previous quarterly update held in August 2019, the Risk Refresh was facilitated by the Risk Manager. This involved face to face meetings with project team members to review each risk, discuss their validity and if any adjustments are needed to the post-mitigated responses, discuss if any new risks are necessary, and to explore ongoing risk mitigation efforts. The results of the August 2019 Risk Refresh were summarized in last month’s report, and was discussed in detail with FTA and the PMOC in early September 2019.
The effects of the change to P3 project delivery for the CCGS and PHGTC had been evaluated in the P3 Risk Assessment (RA) that was held in March 2019, and as reflected in the Cost and Schedule Probability Curves beginning in the April 2019 Monthly Report, and continuing through to the present HART Monthly Report for September 2019.
Several adjustments in the August 2019 Risk Refresh included: adjustments to the risk values for the western stations contracts based on the CEI team’s evaluation of the canopy arm issue requiring replacement of the lower sections of the arms with grade 50 versus grade 100 steel; potential exposure to claims; procurement risks; Right-of-Way risks; utilities risks; as well as other miscellaneous project risk adjustments.
FTA has stated in its report from its independent Risk Refresh by PMOC in February 2018 that HART’s budget should be increased by $134 million to a total of $8.299 billion, although HART has said we will still consider our budget target to be $8.165 billion. The schedule recommendation by FTA is for full Revenue Service in September 2026; however, HART is still targeting December 2025.
HART has undertaken reviews of soft cost budgets, including Professional Services contracts. The RMS provides forecasts of extended soft costs based on risks within projects and overall project progress. The Risk Manager will continue to meet with contract managers and Project Controls to evaluate any forecast revisions to the budgets considering a planned P3 delivery approach for CCGS and PHGTC, as well as for the other ongoing projects.
Areas of Focus A) September 2019 Risk Update – The cost and schedule probability curves are updated monthly. The September 2019 update will be presented to HART management and the PMOC at the October 2019 meeting (see Figures 11 and 12 below). The update shown in Figure 11 resulted in a $41.56 million increase to the P65 risk expected value when comparing the September 2019 update (shown below) to the August 2019 update (shown in the prior report). This increase is due to miscellaneous risk adjustments over the last month that will be discussed in detail with HART Management, the FTA and the PMOC in the next monthly meeting. The P65 for the overall HART project is now $8.101 billion, which remains below HART’s budget goal of $8.165 billion and also below FTA/PMOC’s recommended budget of $8.299 billion.
Figure 11. Cost Probability Curve, September 2019 Risk Data
Honolulu Rail Transit Project Monthly Progress Report September 2019
97 | P a g e
The schedule update shown in Figure 12 resulted in no change to the P65 schedule risk assessment when comparing the September 2019 update (shown below) to the August 2019 update (shown in the prior report). Schedule risks will be discussed in detail with HART Management, the FTA and the PMOC in the next monthly meeting. The P65 for the overall HART project remains at February 2026 which is just beyond HART’s stated schedule goal of December 2025 (but well within the PMOC recommended target date of September 2026) for meeting final revenue service. HART believes that this time can be made up within the project delivery timeframe for CCGS to still accomplish the full RSD by December 2025. The current schedule risk forecast identifies potential concerns with risks in the categories of Environmental, Archaeological, Right-of-Way, Utilities, and Procurement. The schedule risk forecast suggests if ongoing mitigation efforts related to these risks fail, the delay consequences could be severe. However, if mitigations continue successfully there is the opportunity for the current post-response P65 forecast of February 2026 for Full Revenue Service to be met, or potentially improved upon to meet the goal of December 2025 for Full Revenue Service.
Figure 12. Schedule Probability Curve, September 2019 Risk Data
HART’s Cost and Schedule Contingency:
Remaining Contingency as of the end of September 2019 is $821 million, of which $733 million is allocated contingency, and $88 million is unallocated contingency. The value referenced above is the Project’s Available Contingency as calculated by Project Controls in the September 2019 Monthly Progress Report Section 2.2 – Project Budget. Risk Management holds a modestly different contingency value, but that is because fully committed changes are still held in the Risk column (versus the budgeted column) until such time as the changes are fully executed.
Refer to the September 2019 Monthly Progress Report, Section 3 – Schedule, by Project Controls, for a discussion of schedule progress and assumptions on the project. Project Controls’ schedule forecast still shows December 2025 for full RSD with the recent change from DB delivery to P3 delivery for CCGS. The forecast P65 post-response risk evaluation leads to a February 2026 completion date as discussed in the schedule risk section above in Figure 12, which is very close to the forecast by Project Controls.
B) Risk Expected Value (EV) Report – The Risk Manager now prepares the monthly Risk EV Report, which is intended to provide an independent view of the project cost at completion and schedule completion, in order to inform HART management of the health of the project. Project Controls utilizes this information and compares it to their own projection of project cost and schedule completion, and necessary use of allocated and unallocated contingency on the project.
Honolulu Rail Transit Project Monthly Progress Report September 2019
98 | P a g e
C) Risk Comparison Reports – The Risk Manager is producing a report comparing the summation of cost and schedule risks by project, from one month to the next. The latest reports were presented to HART management and PMOC in August 2019 reflecting data from the July 2019 Risk Refresh compared to June 2019 risk data on a project by project (versus individual risk) basis. Another comparison will be provided to PMOC in November 2019 comparing the September 2019 risk update compared to the August 2019 risk data. D) Risk “Hit List” Reports – The Risk Manager is producing Risk “Hit List” reports, which provide tornado diagrams for the top ten cost and schedule risks for each project as well as the overall HART Project. The tornado diagrams compare the pre-response strategy (red bar) to post-response strategy (green bar) for each risk. These reports are provided to HART construction management teams for their information as to how the Risk Management System views the risks on their projects and to make sure that the risks are fully communicated and understood by those who are responsible for on time and on budget delivery of each project. E) Cost Containment/Cost Reduction Workshops including Secondary Mitigations – In case the affordability limit is exceeded for the design-build-finance (DBF) portion of the project (for CCGS, PHGTC and associated Core Systems work within the DBF), HART will work with P3 proponents to identify which Secondary Mitigations can and should be included and implemented in the Project scope that will keep the overall Project within budget. Within the P3 procurement, HART will be utilizing an Alternate Technical Concept (ATC) process whereby P3 proponents may propose, on a confidential basis, changes to the RFP and innovations that may be included in their proposals that seek to reduce the overall cost and increase the value to taxpayers in regard to building and operating the CCGS and PHGTC less expensively, but still fulfill the basic requirements and functionalities of the DBF and O&M portions of the Project. Using these approaches, HART will have an early notification of issues during the procurement process regarding affordability of the CCGS and PHGTC components of the Project such that effective management decisions can be made on the deployment of ATC's and possible and available secondary mitigation measures. F) Market Conditions
The Rider Levett Bucknall (RLB) 4th Quarter 2018 Construction Cost Index shows Hawai‘i with a comparative cost index of +1.92% for the fourth quarter of 2018 compared to the year prior. This means that construction costs have shown a slight increase compared to a year ago. However, nationally, the comparative cost of construction in Hawai‘i (index of 24,520 in October 2018) is still substantially higher than many other US cities, such as Phoenix with an index of 15,013, Portland (index of 16,315) or Seattle (index of 17,810). The cost of construction in Hawai‘i (index of 24,520) compares to other high-cost US cities including San Francisco (26,294), New York (26,000), Chicago (22,416), Boston (22,086), and Los Angeles (21,567). Hawai‘i news has reported local shortages in skilled labor, particularly electricians. Continued pricing pressures in the market could still lead to higher than expected price proposals and bids. HART’s estimators continue to monitor the indexed construction cost data for Honolulu in preparation of remaining project estimates including CCGS. A recent article in Pacific Business News, dated Jan. 23, 2019, quoting an RLB report, rates Honolulu as having the 4th highest construction costs in the world. Although specific construction cost indexes are not yet published for 2019, the highest city construction costs reported by RLB are: Oslo, Norway (highest cost), then San Francisco, then New York, then Honolulu, then Paris.
The Hawai‘i Department of Business, Economic Development & Tourism, 3rd Quarter 2018 Report, states “Construction has been one of the steady contributors to job growth in Hawai‘i over the past few years. In the second quarter of 2018, the number of jobs in the construction sector was unchanged compared with the same quarter of 2017.” This is an indication that the construction market in Hawai‘i is continuing at the same pace as it had in 2017. Table E-7 from this same report “Honolulu Construction Cost Index: High-Risk Building” identifies the annual average construction cost index, and the percentage change from the prior year by quarter, from 1982 to 2017 (with final results for 2018 derived from Q1 and Q2 data). Over the last 15 years (from 2004 to 2018) the annual percentage change has averaged 4.0%. Within the last 5 years (from 2014 to 2018) the annual percentage change has averaged 2.7%.
Honolulu Rail Transit Project Monthly Progress Report September 2019
99 | P a g e
In spite of the latest RLB report showing escalation as being slightly higher in Q4 of 2018 compared to Q4 of 2017, and due to local data from the Hawai‘i Department of Business, Economic Development & Tourism showing an average of 4% escalation over the last 15 years, an escalation assumption of 4% per year continues to be used within the Risk Management System for all risks on remaining work, in order to provide a reasonable level of conservatism in our forecasts.
Special focus will be on the procurement of the CCGS contract given that it is a significant contract affected by market conditions.
G) Utilities – Utilities continue to be an issue for the project, as they are for most transit and rail projects. Mitigation Progress:
In September 2019, HART concluded the evaluation of the optimal construction method for implementing the underground utility work along the Dillingham business corridor that could have the potential to reduce overall construction duration and inconvenience to the neighborhood.
Resources to relocate HECO facilities are now keeping up with scheduled requests to resolve utility conflicts through improved coordination efforts between agencies at all levels from project management to executive levels.
Identifying existing utilities along the City Center corridor. Resolve utility conflicts prior to construction contracts being issued. Sign construction agreements with utilities for the City Center construction area. Weekly meetings are held between HART and HECO to discuss the planned scope of and design progress for
undergrounding the 138kV power lines along certain sections of the eastern route of the guideway. Implementing the City Center utilities relocation package. The CCUR work is being followed by the P3
procurement for the City Center Guideway and Stations project. The start and initial phase of the P3 is planned to overlap the completion of the CCUR project in time to allow the P3 to proceed with shafts and guideway work unencumbered by utility relocation work.
HART has formed a “Tiger Team” including representatives from HART, AECOM, Stantec, Nan Construction, and Royal Construction that is focusing on removing obstacles that could keep the CCUR contract from moving ahead as quickly as possible. Recent areas of focus have included expediting the city and third-party review and permitting process, and advancing the potholing efforts to specifically identify utility locations and avoid unnecessary relocations wherever possible.
H) Right-of-Way – While construction access for nearly all west-side acquisitions is complete, progress is being made on east-side acquisitions with numerous properties still in active negotiations for construction access and acquisition. The goal is to provide site access to the contractors for the entire project to avoid or mitigate against associated inefficiencies related to re-sequencing the work plan which would have a negative impact to the revenue service date. Refer to the Right-of-Way section of the report for current status of Right-of-Way activities. There is currently an increased focus on the status of Right-of-Way acquisitions in order to reduce the risk of delay on the CCGS section once the P3 developer is on board.
6.8 Construction Claims Pursuant to FTA Circular 4220.1F, HART is obligated to notify the FTA and PMOC about third-party claims and litigation with which it is involved. HART considers a “claim” to arise when a third-party contractor submits a request for a final written decision by the Contracting Officer. Pursuant to Hawai‘i Revised Statutes Section 103D-711 and Hawai‘i Administrative Rules Section 3-126-28, the Contracting Officer’s decision is deemed final and the basis on which the aggrieved party can initiate an action in Circuit Court within six (6) months of receipt of the Contracting Officer’s decision.
Honolulu Rail Transit Project Monthly Progress Report September 2019
100 | P a g e
HART is tracking the following claims:
Contract Contractor Claim Description Claim Amount Status
KHSG Nan, Inc. Nan claims 161 days of compensable delay based on a rate of $30,000/day due to alleged design changes at the Pearl Highlands Station.
$4,830,000 Nan submitted a request for a final written decision by the Contracting Officer on April 3, 2018. On May 21, 2018, Nan requested a stay in the issuance of the Contracting Officer’s decision until Aug. 31, 2018 pending the parties’ good faith discussions. In a letter dated Aug. 31, 2018, Nan requested a continued stay in the issuance of the Contracting Officer’s decision until Oct. 31, 2018, which HART granted. At Nan’s request and in light of the parties’ continued good-faith discussions, this stay has been further extended several times, and is currently set to expire on Oct. 31, 2019.
FHSG Hawaiian Dredging
Construction Co.
HDCC seeks compensation for premium costs to furnish manpower from out-of-state for the period from April 2017 through August 2017 due to the unavailability of local manpower.
$103,167 HDCC submitted a request for a final written decision by the Contracting Officer on Jan. 22, 2019. This matter has been taken under consideration.
FHSG Hawaiian Dredging
Construction Co.
HDCC seeks compensation for additional staffing and resources from Notice to Proceed through January 2018.
$3,438,061 HDCC submitted a request for a final written decision by the Contracting Officer on Feb. 12, 2019. This matter has been taken under consideration.
FHSG Hawaiian Dredging
Construction Co.
HDCC seeks compensation for providing NEMA Type 4X, stainless steel electrical enclosures.
$194,360 HDCC submitted a request for a final written decision by the Contracting Officer on Jan. 22, 2019. This matter has been taken under consideration.
FHSG Hawaiian Dredging
Construction Co.
HDCC seeks compensation for shoring for the Waipahu Transit Center platform box girder construction.
$670,060 HDCC submitted a request for a final written decision by the Contracting Officer on Jan. 22, 2019. This matter has been taken under consideration.
6.9 Community Outreach Overview
Since the inception of HART, the outreach team has participated in: o 1,394 Public Presentations and Events
10 Events and Presentations in September 2019. The HART Public Involvement team participated in the 2019 Young at Heart (senior’s) Expo, HART in the Community Day at Ka Makana Ali‘i (shopping center), and the Council for Native Hawaiian Advancement’s (CNHA’s) 2019 Native Hawaiian Convention. The Public Involvement team also presented the HART Community Town Hall meeting in Mililani, a HART construction community outreach meeting in the Downtown and Chinatown area, and continued its City Center Condominium Association Update Meetings.
o 846 Neighborhood Board Meetings 10 Neighborhood Board Meetings in September 2019.
Community Input HART's public outreach team responded to 57 public inquiries and comments via the 24-hour project hotline and
project email ([email protected]) during the month of September. Inquiries were generally related to construction issues along the 20-mile corridor.
Honolulu Rail Transit Project Monthly Progress Report September 2019
101 | P a g e
6.10 Staffing Overview
Organization: The latest organizational chart is dated May 20, 2019. Please see Appendix C. A revision is currently in progress.
Project Staffing: o Target (current organization): 135 Full-Time Equivalent (FTE) City Staff o Actual City Staff Total: 115 Employees (4 Civil Service and 111 Personal Services Contract [PSC] Employees) o Project Management Support Consultant (HDR) Staff Total: 18 HDR employees embedded in the HART
organization directly participating in the management of the project, 2 HDR employees working for the State Historic Preservation Division (SHPD) providing support services, and 1 HDR employee assisting HART on a part-time basis with risk modeling (statistical analysis and risk report production).
o Combined Project Management Staff (City plus embedded HDR): 133 Personnel (reflects current month arrivals and departures. Does not include projected arrivals or HDR employees working for SHPD or assisting HART on a part-time basis).
o HART also has 9 part-time Student Interns on staff serving in various areas of the organization. Positions Filled in September:
o Construction Claims Specialist, Construction Claims – September o Deputy Area Manager, Design and Construction (Internal fill) – September
Projected Position Fills: o Chief Financial Officer, Budget & Finance (Internal fill) – October o Scheduler, Project Controls (Internal fill) – October o Senior Clerk, Executive Management – October o Internal Controls Analyst III – November o Internal Controls Analyst II (Internal fill) – November o Multimedia Administrator – November
September Departures: o Accountant IV
Figure 13. Staffing Activities
Staffing Activities
Title Group
New/Existing HART
Position (City or PMC)
Position Status* Start
Month
Executive Management
Senior Clerk Executive Management Existing (City) Selected - PSC Oct
Procurement, Contracts & Construction Claims
Director of Procurement, Contracts and Construction Claims
Procurement, Contracts and Construction Claims
Existing (City) Recruiting – PSC
Procurement Compliance Manager Procurement, Contracts and Construction Claims
New (City) Recruiting – PSC
Construction Claims Specialist Construction Claims, Utility, and Third Party Contracts
New (City) Filled - PSC Sep
Deputy Director of Contract Administration
Contract Administration Existing (HDR) New (City)
Recruiting – PSC or HDR
Procurement & Specifications Specialists (2)
Procurement & Consultant Contracts
Existing (City) Recruiting - PSC
Deputy Director of Construction Claims, Utility, and Third Party Contracts
Construction Claims, Utility, and Third Party Contracts
Existing (City) Recruiting - PSC
Transit Property Acquisition & Relocation
Right of Way Agent (2) Transit Property Acquisition & Relocation
Existing (City) Recruiting - PSC
Budget & Finance
Chief Financial Officer (CFO) Budget & Finance Existing (City) Selected/Processing - PSC Oct
Honolulu Rail Transit Project Monthly Progress Report September 2019
102 | P a g e
Staffing Activities
Title Group
New/Existing HART
Position (City or PMC)
Position Status* Start
Month
Internal Controls Analyst II Budget & Finance Existing (City) Selected/Processing – (Internal fill) PSC
Nov
Internal Controls Analyst III Budget & Finance Existing (City) Selected/Processing - PSC Nov
Fiscal Officer Budget & Finance Existing (City) Recruiting - PSC
Accountants (2) Budget & Accounting Existing (City) Recruiting - PSC
Design & Construction
Deputy Area Manager (East) East Area Construction Existing (City) Filled - PSC Sep
Civil Engineer (Assistant Area Manager) East Area Construction Existing (City) Recruiting - PSC
Project Manager (Production) West Area Construction Existing (City) Recruiting - PSC
Traffic Engineer/Planner Third Party and Traffic Engineering New (City) Recruiting/Interviewing - PSC
Readiness and Activation
Engineer Readiness and Activation New (City) Recruiting/Interviewing - PSC
Project Controls
Financial Analysts (2) Project Controls Existing (City) Recruiting - PSC
Scheduler Project Controls Existing (City) Filled - PSC Oct
Public Involvement
Public Involvement Officer Public Involvement Existing (City) Recruiting/Interviewing - PSC
Multimedia Administrator Public Involvement Existing (City) Selected/Processing - PSC Nov
System Safety and Security
Safety Specialist Safety Existing (City) Recruiting/Interviewing - PSC
*Personal Services Contracts are limited to one year per the Revised Charter of the City and County of Honolulu, Sec. 6-1103(g).
6.11 HART Baseline Plans and Procedures Status List The status of the Baseline Plans and Procedures is shown below (NOTE: changes, if any, are in bold font):
Owner Plan/Procedure Revision Level Date Approved Status
Project Management (Sam Carnaggio)
Project Management Plan (PMP)
7.0 December 10, 2018 Approved/Baselined
Safety and Security (Ralph McKinney)
Construction Safety and Security Plan (CSSP)
5.0 March 5, 2019 Approved/Baselined
Safety and Security Certification Plan (SSCP)
7.0 January 30, 2019 Approved/Baselined
Safety and Security Management Plan (SSMP)
8.0 February 11, 2019 Approved/Baselined
Sensitive Safety Information Plan
1.0 December 13, 2017 Approved/Baselined
Preliminary Hazard Analysis (PHA)
4.0 July 3, 2019 Approved/Baselined
Threat and Vulnerability Assessment (TVA)
2.0 January 12, 2018 Approved/Baselined
Incident Investigation Procedure
0.0 February 28, 2019 Approved/Baselined
Honolulu Rail Transit Project Monthly Progress Report September 2019
103 | P a g e
Owner Plan/Procedure Revision Level Date Approved Status
Quality Assurance (Alberto Bonifacio)
1.PP-02, Project Procedure and Plan Revision and Control Procedure
4.0 February 22, 2019 Approved/Baselined
1.PP-03, Standard Terms, Definitions, and Acronyms Procedure
3.0 February 21, 2019 Approved/Baselined
3.PM-05, Meeting Minutes Procedure
4.0 January 28, 2019 Approved/Baselined
6.CM-01, Submittal Processing Procedure
4.0 January 28, 2019 Approved/Baselined
Quality Management Plan (QMP)
4.0 November 9, 2018 Approved/Baselined
Procurement, Contracts, and Construction Claims (Paula Youngling)
2.PA-09, Procurement Standards of Conduct Procedure
2.0 March 6, 2019 Approved/Baselined
2.PA-10, Procurement Methods Procedure
1.0 February 13, 2019 Approved/Baselined
2.PA-11, Procurement Full and Open Competition Procedure
1.0 February 13, 2019 Approved/Baselined
2.PA-12, Procurement Federal Compliance Procedure
1.0 March 5, 2019 Approved/Baselined
2.PA-13, Procurement Protests Procedure
2.0 February 13, 2019 Approved/Baselined
2.PA-14, Procurement Record-keeping Procedure
1.0 April 2, 2019 Approved/Baselined
2.PA-15, Stipend Payment Procedure
1.0 February 11, 2019 Approved/Baselined
2.PA-16 Executive Decision Document (EDD) Procedure
0.0 January 24, 2019 Approved/Baselined
5.CA-06, Project Closeout Procedure
3.0 April 23, 2019 Approved/Baselined
5.CA-11, Contract Changes Procedure
5.0 April 25, 2019 Approved/Baselined
Buy America Plan (BAP) 3.0 April 9, 2019 Approved/Baselined
HART Procurement Manual
1.0 April 25, 2019 Approved/Baselined
Project Controls (Nate Meddings)
2.PA-04, Project-wide Document Control and Project Library Procedure
3.0 March 21, 2019 Approved/Baselined
3.PM-01, Contract Management System Procedure
3.0 March 13, 2019 Approved/Baselined
Honolulu Rail Transit Project Monthly Progress Report September 2019
104 | P a g e
Owner Plan/Procedure Revision Level Date Approved Status
4.PC-03, Project Progress Report Procedure
3.0 March 19, 2019 Approved/Baselined
4.PC-04, Project Scheduling Procedure
4.0 August 15, 2018 Approved/Baselined
4.PC-06, Cost Estimating Procedure
3.0 December 13, 2017 Approved/Baselined
4.PC-07, Cost Control Procedure
3.0 March 25, 2019 Approved/Baselined
4.PC-09, Contingency Management Procedure
2.0 March 5, 2019 Approved/Baselined
Contract Packaging Plan (CPP)
6.0 October 4, 2018 Approved/Baselined
Budget and Finance (Ruth Lohr)
5.CA-03, Contractor Payment Application Procedure
3.0 March 22, 2019 Approved/Baselined
5.CA-10, Consultant Invoice Payment Procedure
1.0 March 27, 2019 Approved/Baselined
7.GA-04, Petty Cash Procedure
3.0 January 9, 2019 Approved/Baselined
7.GA-06, Travel Procedure
3.0 March 29, 2019 Approved/Baselined
Project Financial Plan (PFP): Revised Recovery Plan
1.0 November 19, 2018 Approved/Baselined
Planning and Permitting (Ryan Tam)
6.CM-08, Environmental Procedure
1.0 April 1, 2019 Approved/Baselined
Before-and-After Study Plan
1.0 March 25, 2019 Approved/Baselined
Bus Fleet Management Plan (BFMP)
5.0 April 15, 2019 Approved/Baselined
Mitigation Monitoring Plan (MMP)
3.0 March 7, 2019 Approved/Baselined
Right-of-Way (Dylan Jones)
Real Estate Acquisition Management Plan (RAMP)
7.0 January 23, 2019 Approved/Baselined
Public Information (Bill Brennan)
2.PA-06, Community Relations and Media Contacts Procedure
3.0 March 6, 2019 Approved/Baselined
3.PM-04, Public Involvement Communications Procedure
3.0 March 6, 2019 Approved/Baselined
Public Involvement Plan (PIP)
2.0 March 4, 2019 Approved/Baselined
Design and Construction (Frank Kosich)
6.CM-02, Request for Information (RFI) Processing Procedure
3.0 March 15, 2019 Approved/Baselined
CADD Procedures 2.0 March 19, 2019 Approved/Baselined
Honolulu Rail Transit Project Monthly Progress Report September 2019
105 | P a g e
Owner Plan/Procedure Revision Level Date Approved Status
Configuration Management Plan (CFMP)
4.0 March 27, 2019 Approved/Baselined
Construction Management Plan (CMP)
4.0 March 25, 2019 Approved/Baselined
Operation and Maintenance (Robert Good)
Interface Management Plan (IMP)
4.0 March 6, 2019 Approved/Baselined
System Integration and Test Plan (SITP)
2.0 March 1, 2019 Approved/Baselined
Rail Fleet Management Plan (RFMP)
2.0 March 28, 2019 Approved/Baselined
Operation and Management Plan (OMP)
2.0 March 28, 2019 Approved/Baselined
Rail Activation Plan 2.0 February 11, 2019 Approved/Baselined
2. PA-17 DTS – HART Communication Procedure
0.0 July 15, 2019 Approved/Baselined
Administrative Services (Paul Romaine)
1.PP-05, Identification Badge Procedure
3.0 January 24, 2019 Approved/Baselined
2.PA-03, Email Management Procedure
3.0 January 31, 2019 Approved/Baselined
2.PA-07, Training Procedure
3.0 January 31, 2019 Approved/Baselined
Staffing and Succession Plan
6.0 March 20, 2019 Approved/Baselined
Risk Management (Paul Johnson)
4.PC-08, Risk Management Procedure
3.0 March 8, 2019 Approved/Baselined
Risk and Contingency Management Plan (RCMP)
3.0 March 8, 2019 Approved/Baselined
6.12 Readiness and Activation
Overview of Key Responsibilities Oversight of the Core System Contractor’s Operations and Maintenance (O&M) development and mobilization. Review and support of HART project activities with an emphasis on O&M impact assessment. Collaborating with DTS to ensure readiness for O&M responsibilities.
Ongoing Activities
Supporting DTS O&M contract negotiations and P3 technical specification development. Key HRH Mobilization Activities
o All operations documents will be submitted in CMS by the first week of October with HSQE to follow. o HRH O&M has developed a new organizational chart
O&M Mobilization Team will be supported by 24 FTE experienced rail consultants. o HRH O&M has developed a mobilization roadmap that is being detailed by an experienced scheduler
(consultant). Mobilization plan over the shoulder review by the end of October. o HRH O&M completed training needs analysis workshop Sept. 9-13.
Honolulu Rail Transit Project Monthly Progress Report September 2019
106 | P a g e
HRH O&M developed Training Management Process Continuing to develop training needs analysis and individual role training plans
o HRH continues to actively recruit key positions and experienced rail transit personnel. Identified a candidate for ATC & Systems manager Actively recruiting for Rolling Stock, MOW, and Engineering manager positions
Maintenance Activities o HRH O&M Maintenance Director started Sept. 6.
HRH O&M developed an asset and maintenance management model HRH O&M is performing a maintenance gap analysis.
o HRH O&M is engaging Oxplus for a service proven, transit-oriented MMIS solution. Targeting MMIS data entry Q1 2020
o Actively recruiting the HART position to support HRH Mobilization oversight, technical reviews, and asset management program development.
o Continued oversight and auditing of the HRH maintenance program and KPIs. o Finalizing Rail Operations Center (ROC) Transfer of Assets. o Coordinating asset onboarding information with the Fixed Facility Contractors (FFCs) and the interface
team. o Supporting Operational Readiness Conformance Checklist (ORCC) development.
DTS and project stakeholder coordination o Facilitate Interim Opening Task Force Meeting with DTS, BFS and City Stakeholders. o Supporting document reviews per HART Charter Amendment 4 MOU procedure.
3 MOUs executed, 5 agreed to in principle o Supporting development of joint HART-DTS schedule and identification of critical path items for
Intermediate Operations and Maintenance Period (IOMP) 1. o Supporting Transit Agency Rail Safety Plan and System Security Plan Development. o Supporting data retention policy in coordination with DTS, DIT and Department of Customer Services (CSD). o Supporting the Crisis management plan working group.
Fare Systems (see Fare Systems section of report). Look Ahead
HRH Asset Management Plan.
Honolulu Rail Transit Project Monthly Progress Report September 2019
107 | P a g e
APPENDICES
Ho
no
lulu
Rai
l Tra
nsi
t P
roje
ct M
on
thly
Pro
gre
ss R
ep
ort
Se
pte
mb
er
20
19
10
8 |
Pa
ge
A
pp
en
dix
A.
Pro
ject
Co
sts
by
SCC
– L
eve
l 2 (d
ata
as o
f Se
pt.
30
, 20
19
)
Co
st r
epo
rts
are
run
fro
m t
he
HA
RT
Co
ntr
act
Man
agem
ent
Syst
em
(C
MS)
SCC
De
scri
pti
on
Bas
e C
ost
Co
nti
nge
ncy
Tota
lB
ase
Co
stC
on
tin
gen
cyTo
tal
Incu
rre
d
10
GU
IDEW
AY
& T
RA
CK
ELE
MEN
TS1
,38
5,6
13
,35
0
2
22
,86
8,3
25
1,6
08
,48
1,6
75
1,4
17
,11
4,8
67
19
1,3
66
,80
9
1
,60
8,4
81
,67
6
8
23
,64
6,3
85
10
.02
Gu
ide
wa
y: A
t-gr
ad
e s
em
i-e
xclu
sive
17
,37
8
-
1
7,3
78
17
,37
8
-
1
7,3
78
17
,37
8
1
0.0
4G
uid
ew
ay:
Ae
ria
l str
uct
ure
1,2
43
,17
0,3
39
21
4,6
68
,32
5
1
,45
7,8
38
,66
4
1
,27
4,6
71
,85
6
1
83
,16
6,8
09
1,4
57
,83
8,6
65
73
8,2
79
,74
3
1
0.0
5G
uid
ew
ay:
Bu
ilt-
up
fill
-
-
-
-
-
-
5,0
54
,74
4
1
0.0
6G
uid
ew
ay:
Un
de
rgro
un
d C
ut
& C
vr-
-
-
-
-
-
(1
,22
8,0
00
)
10
.08
Gu
ide
wa
y: R
eta
ine
d c
ut
or
fill
14
2,4
25
,63
3
8
,20
0,0
00
15
0,6
25
,63
3
1
42
,42
5,6
33
8,2
00
,00
0
1
50
,62
5,6
33
-
10
.09
Tra
ck: D
ire
ct fi
xati
on
-
-
-
-
-
-
77
,59
7,2
71
1
0.1
1Tr
ack
: Ba
lla
ste
d-
-
-
-
-
-
2
,39
4,3
73
10
.12
Tra
ck: S
pe
cia
l (sw
itch
es,
tu
rno
uts
)-
-
-
-
-
-
1
,53
0,8
76
20
STA
TIO
NS,
STO
PS,
TER
MIN
ALS
, IN
TER
MO
DA
74
0,2
78
,87
9
9
1,4
23
,19
5
83
1,7
02
,07
4
8
34
,13
9,1
93
(1,5
28
,24
5)
8
32
,61
0,9
48
21
8,1
49
,62
9
2
0.0
1A
t-gr
ad
e s
tati
on
, sto
p, s
he
lte
r, m
all
, te
rmin
al,
pla
tfo
rm4
,95
6,1
81
8,5
05
,32
5
1
3,4
61
,50
6
4,9
56
,18
1
8
,50
5,3
25
13
,46
1,5
06
1
74
,59
0
20
.02
Ae
ria
l sta
tio
n, s
top
, sh
elt
er,
ma
ll, t
erm
ina
l, p
latf
orm
54
8,2
19
,00
8
5
4,4
96
,45
3
60
2,7
15
,46
1
6
48
,29
6,8
77
(44
,67
2,5
42
)
6
03
,62
4,3
35
20
6,0
49
,12
5
2
0.0
4O
the
r st
ati
on
s, la
nd
ings
, te
rmin
al
-
-
-
-
-
-
-
20
.06
Au
tom
ob
ile
pa
rkin
g m
ult
i-st
ory
str
uct
ure
12
1,6
09
,47
3
2
6,6
32
,47
5
14
8,2
41
,94
8
1
23
,25
9,4
73
24
,98
2,4
75
1
48
,24
1,9
48
-
20
.07
Ele
vato
rs, e
sca
lato
rs6
5,4
94
,21
7
1,7
88
,94
2
6
7,2
83
,15
9
57
,62
6,6
62
9
,65
6,4
97
67
,28
3,1
59
1
1,9
25
,91
4
30
SUP
PO
RT
FAC
ILIT
IES:
YA
RD
S, S
HO
PS,
AD
MIN
. BLD
GS
10
0,8
06
,85
4
-
1
00
,80
6,8
54
10
0,8
06
,85
4
-
1
00
,80
6,8
54
12
2,2
67
,69
2
3
0.0
1A
dm
inis
tra
tio
n B
uil
din
g: O
ffic
e, S
ale
s-
-
-
-
-
-
2
31
,25
0
30
.02
Ligh
t M
ain
ten
an
ce F
aci
lity
3
,05
7,2
40
-
3,0
57
,24
0
3
,05
7,2
40
-
3,0
57
,24
0
7
,58
2,7
04
30
.03
He
avy
Ma
inte
na
nce
Fa
cili
ty6
4,4
79
,55
6
-
64
,47
9,5
56
6
4,4
79
,55
6
-
64
,47
9,5
56
4
6,2
95
,36
6
30
.04
Sto
rage
or
Ma
inte
na
nce
of W
ay
Bu
ild
ing
8,6
19
,23
0
-
8
,61
9,2
30
8,6
19
,23
0
-
8
,61
9,2
30
8,8
92
,73
9
3
0.0
5Ya
rd a
nd
Ya
rd T
rack
24
,65
0,8
28
-
2
4,6
50
,82
8
24
,65
0,8
28
-
2
4,6
50
,82
8
59
,26
5,6
33
4
0SI
TEW
OR
K &
SP
ECIA
L C
ON
DIT
ION
S2
,31
5,2
94
,49
0
2
30
,44
2,9
32
2,5
45
,73
7,4
22
2,1
81
,30
4,3
64
35
8,5
11
,41
6
2
,53
9,8
15
,78
0
9
73
,80
2,4
95
40
.01
De
mo
liti
on
, Cle
ari
ng,
Ea
rth
wo
rk3
3,4
46
,02
9
1,0
38
,00
0
3
4,4
84
,02
9
33
,44
6,0
29
1
,03
8,0
00
34
,48
4,0
29
9
,67
9,6
97
40
.02
Site
Uti
liti
es,
Uti
lity
Re
loca
tio
n7
84
,99
3,4
74
97
,12
6,8
74
8
82
,12
0,3
48
77
5,3
73
,62
1
9
9,7
40
,08
5
87
5,1
13
,70
6
2
06
,53
8,6
00
40
.03
Ha
z. M
at’
l, c
on
tam
’d s
oil
re
mo
val/
mit
iga
tio
n, g
rou
nd
wa
ter
tre
atm
en
ts3
3,8
29
,68
3
51
5,0
00
3
4,3
44
,68
3
33
,82
9,6
83
5
15
,00
0
34
,34
4,6
83
1
7,3
07
,45
9
40
.04
Envi
ron
me
nta
l mit
iga
tio
n, e
.g. w
etl
an
ds,
his
tori
c/a
rch
eo
logi
c, p
ark
s5
,51
8,8
64
-
5,5
18
,86
4
8
,41
7,8
64
(2,8
99
,00
0)
5
,51
8,8
64
15
,13
3,5
43
4
0.0
5Si
te s
tru
ctu
res
incl
ud
ing
reta
inin
g w
all
s, s
ou
nd
wa
lls
21
,76
4,9
85
6
,88
4,5
11
28
,64
9,4
96
2
1,7
64
,98
5
6,8
84
,51
1
2
8,6
49
,49
6
14
,33
8,1
04
4
0.0
6P
ed
est
ria
n /
bik
e a
cce
ss a
nd
acc
om
mo
da
tio
n, l
an
dsc
ap
ing
14
,74
4,2
76
5
00
,00
0
15
,24
4,2
76
1
4,7
44
,27
6
50
0,0
00
1
5,2
44
,27
6
2,0
56
,59
0
4
0.0
7A
uto
mo
bil
e, b
us,
va
n a
cce
ssw
ays
incl
ud
ing
roa
ds,
pa
rkin
g lo
ts2
64
,58
0,5
24
29
,23
7,5
68
2
93
,81
8,0
92
27
0,8
61
,28
2
2
2,9
56
,81
0
29
3,8
18
,09
2
7
6,4
13
,34
8
40
.08
Tem
po
rary
Fa
cili
tie
s a
nd
oth
er
ind
ire
ct c
ost
s d
uri
ng
con
stru
ctio
n1
,15
6,4
16
,65
5
9
5,1
40
,97
9
1,2
51
,55
7,6
34
1,0
22
,86
6,6
24
22
9,7
76
,01
0
1
,25
2,6
42
,63
4
6
32
,33
5,1
53
50
SYST
EMS
31
3,9
83
,93
9
1
6,0
33
,66
8
33
0,0
17
,60
7
3
29
,42
5,4
72
5,0
44
,90
3
3
34
,47
0,3
75
14
9,7
59
,84
3
5
0.0
1Tr
ain
co
ntr
ol a
nd
sig
na
ls1
57
,07
7,7
32
7,7
56
,52
2
1
64
,83
4,2
54
17
1,8
46
,75
9
(2
,55
9,7
37
)
16
9,2
87
,02
2
6
3,2
58
,76
0
50
.02
Tra
ffic
sig
na
ls a
nd
cro
ssin
g p
rote
ctio
n3
,17
2,1
31
59
8,7
25
3
,77
0,8
56
3,1
72
,13
1
5
98
,72
5
3,7
70
,85
6
9
8,0
00
50
.03
Tra
ctio
n p
ow
er
sup
ply
: su
bst
ati
on
s 3
2,3
96
,80
8
-
32
,39
6,8
08
3
2,3
96
,80
8
-
32
,39
6,8
08
4
,26
6,4
43
50
.04
Tra
ctio
n p
ow
er
dis
trib
uti
on
: ca
ten
ary
an
d t
hir
d r
ail
37
,12
0,9
77
-
3
7,1
20
,97
7
37
,12
0,9
77
-
3
7,1
20
,97
7
39
,42
7,5
42
5
0.0
5C
om
mu
nic
ati
on
s6
5,3
90
,74
2
-
65
,39
0,7
42
6
5,3
90
,74
2
-
65
,39
0,7
42
3
5,2
18
,35
7
50
.06
Fare
co
lle
ctio
n s
yste
m a
nd
eq
uip
me
nt
15
,01
5,2
06
7
,67
8,4
21
22
,69
3,6
27
1
5,6
87
,71
2
7,0
05
,91
5
2
2,6
93
,62
7
4,6
01
,58
0
5
0.0
7C
en
tra
l Co
ntr
ol
3,8
10
,34
3
-
3
,81
0,3
43
3,8
10
,34
3
-
3
,81
0,3
43
2,8
89
,16
1
C
on
stru
ctio
n S
ub
tota
l (1
0 –
50
)4
,85
5,9
77
,51
2
5
60
,76
8,1
20
5,4
16
,74
5,6
32
4,8
62
,79
0,7
50
55
3,3
94
,88
3
5
,41
6,1
85
,63
3
2
,28
7,6
26
,04
3
Re
cove
ry P
lan
Bu
dge
tEs
tim
ate
At
Co
mp
leti
on
Ho
no
lulu
Rai
l Tra
nsi
t P
roje
ct M
on
thly
Pro
gre
ss R
ep
ort
Se
pte
mb
er
20
19
10
9 |
Pa
ge
SCC
De
scri
pti
on
Bas
e C
ost
Co
nti
nge
ncy
Tota
lB
ase
Co
stC
on
tin
gen
cyTo
tal
Incu
rre
d
60
RO
W, L
AN
D, E
XIS
TIN
G IM
PR
OV
EMEN
TS2
54
,83
5,5
74
10
6,7
89
,89
0
3
61
,62
5,4
64
26
3,6
35
,57
4
9
7,9
89
,89
0
36
1,6
25
,46
4
1
74
,26
9,9
54
60
.01
Pu
rch
ase
or
lea
se o
f re
al e
sta
te
17
1,4
00
,00
0
1
01
,50
0,0
00
27
2,9
00
,00
0
1
80
,20
0,0
00
92
,70
0,0
00
2
72
,90
0,0
00
17
3,9
92
,15
4
6
0.0
2R
elo
cati
on
of e
xist
ing
ho
use
ho
lds
an
d b
usi
ne
sse
s8
3,4
35
,57
4
5,2
89
,89
0
8
8,7
25
,46
4
83
,43
5,5
74
5
,28
9,8
90
88
,72
5,4
64
2
77
,80
0
70
VEH
ICLE
S2
11
,38
9,9
52
-
21
1,3
89
,95
2
2
11
,38
9,9
52
-
21
1,3
89
,95
2
1
18
,65
1,5
52
70
.01
Ligh
t R
ail
19
0,3
83
,69
4
-
1
90
,38
3,6
94
19
0,3
83
,69
4
-
1
90
,38
3,6
94
10
6,1
26
,79
4
7
0.0
2H
ea
vy R
ail
-
-
-
-
-
-
-
70
.05
Oth
er
12
8,7
00
-
1
28
,70
0
12
8,7
00
-
1
28
,70
0
49
3,7
00
7
0.0
6N
on
-re
ven
ue
ve
hic
les
14
,37
1,3
44
-
1
4,3
71
,34
4
14
,37
1,3
44
-
1
4,3
71
,34
4
12
,03
1,0
58
7
0.0
7Sp
are
pa
rts
6,5
06
,21
4
-
6
,50
6,2
14
6,5
06
,21
4
-
6
,50
6,2
14
-
80
PR
OFE
SSIO
NA
L SE
RV
ICES
1,9
89
,87
0,7
25
97
,63
0,1
39
2
,08
7,5
00
,86
4
2
,00
6,0
98
,45
5
8
1,9
62
,40
9
2,0
88
,06
0,8
64
1,2
83
,59
4,9
21
80
.01
Pre
lim
ina
ry E
ngi
ne
eri
ng
54
,75
3,8
40
-
5
4,7
53
,84
0
54
,75
3,8
40
-
5
4,7
53
,84
0
18
0,7
05
,91
6
8
0.0
2Fi
na
l De
sign
58
4,1
49
,89
9
3
1,5
12
,69
7
61
5,6
62
,59
6
5
86
,47
7,6
29
29
,18
4,9
67
6
15
,66
2,5
96
35
9,6
77
,53
7
8
0.0
3P
roje
ct M
an
age
me
nt
for
De
sign
an
d C
on
stru
ctio
n6
68
,55
7,9
25
29
,85
1,8
33
6
98
,40
9,7
58
66
8,5
57
,92
5
2
9,8
51
,83
3
69
8,4
09
,75
8
4
63
,67
6,9
68
80
.04
Co
nst
ruct
ion
Ad
min
istr
ati
on
& M
an
age
me
nt
27
8,6
40
,42
0
2
8,2
20
,00
8
30
6,8
60
,42
8
2
92
,54
0,4
20
14
,32
0,0
08
3
06
,86
0,4
28
19
6,1
37
,43
2
8
0.0
5P
rofe
ssio
na
l Lia
bil
ity
an
d o
the
r N
on
-Co
nst
ruct
ion
Insu
ran
ce
99
,34
0,0
00
4
,00
0,0
00
10
3,3
40
,00
0
9
9,3
40
,00
0
4,0
00
,00
0
1
03
,34
0,0
00
45
,54
8,0
19
8
0.0
6Le
gal;
Pe
rmit
s; R
evi
ew
Fe
es
by
oth
er
age
nci
es,
cit
ies,
etc
.9
9,9
28
,69
8
3,7
68
,43
9
1
03
,69
7,1
37
99
,92
8,6
98
3
,76
8,4
39
10
3,6
97
,13
7
3
2,1
31
,33
9
80
.07
Surv
eys
, Te
stin
g, In
vest
iga
tio
n, I
nsp
ect
ion
14
1,6
86
,62
2
2
77
,16
2
14
1,9
63
,78
4
1
41
,68
6,6
22
27
7,1
62
1
41
,96
3,7
84
4,1
08
,83
7
8
0.0
8St
art
up
62
,81
3,3
21
-
6
2,8
13
,32
1
62
,81
3,3
21
5
60
,00
0
63
,37
3,3
21
1
,60
8,8
73
90
Sub
tota
l (1
0 –
80
)7
,31
2,0
73
,76
3
7
65
,18
8,1
49
8,0
77
,26
1,9
12
7,3
43
,91
4,7
31
73
3,3
47
,18
2
8
,07
7,2
61
,91
3
3
,86
4,1
42
,47
0
U
NA
LLO
CA
TED
CO
NTI
NG
ENC
Y-
2
21
,73
8,0
87
22
1,7
38
,08
7
-
8
7,7
92
,27
9
87
,79
2,2
79
1
00
Sub
tota
l (1
0 –
90
)7
,31
2,0
73
,76
3
9
86
,92
6,2
36
8,2
98
,99
9,9
99
7,3
43
,91
4,7
31
82
1,1
39
,46
1
8
,16
5,0
54
,19
2
3
,86
4,1
42
,47
0
FI
NA
NC
E C
HA
RG
ES6
09
,00
0,0
00
-
60
9,0
00
,00
0
5
47
,00
0,0
00
-
54
7,0
00
,00
0
1
7,5
49
,28
4
Tota
l Pro
ject
Co
st (1
0 –
10
0)
7,9
21
,07
3,7
63
98
6,9
26
,23
6
8
,90
7,9
99
,99
9
7
,89
0,9
14
,73
1
8
21
,13
9,4
61
8,7
12
,05
4,1
92
3,8
81
,69
1,7
54
Tota
l FFG
A P
roje
ct C
ost
(10
– 1
00
)7
,92
1,0
73
,76
3
9
86
,92
6,2
36
8,9
07
,99
9,9
99
7,8
90
,91
4,7
31
82
1,1
39
,46
1
8
,71
2,0
54
,19
2
3
,88
1,6
91
,75
4
Esti
mat
e A
t C
om
ple
tio
nR
eco
very
Pla
n B
ud
get
Ho
no
lulu
Rai
l Tra
nsi
t P
roje
ct M
on
thly
Pro
gre
ss R
ep
ort
Se
pte
mb
er
20
19
11
0 |
Pa
ge
A
pp
en
dix
B.
Co
nst
ruct
ion
Pro
gre
ss In
teri
m O
pe
nin
g
Honolulu Rail Transit Project Monthly Progress Report September 2019
111 | P a g e
Appendix C. Project Organization Chart