MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 No.07-05/SG-9B-II/3274 Jabalpur, dated 22 /10/2013 To As per distribution list Sub: Agenda of 36 th meeting of Operation and Coordination Committee of MP. The Agenda of 36 th meeting of the Operation and Coordination Committee of MP scheduled on 26 th October 2013 at 11.00 AM at State Load Despatch Centre, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. ( K.K.Prabhakar) Member Secretary, OCC S. E. (LD), SLDC MPPTCL, Jabalpur Encl : As above. vkbZ ,l vks : 9001-2008 ISO: 9001-2008

Upload: others

Post on 28-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

MP POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343

No.07-05/SG-9B-II/3274 Jabalpur, dated 22 /10/2013

To

As per distribution list

Sub: Agenda of 36th meeting of Operation and Coordination Committee of MP.

The Agenda of 36th meeting of the Operation and Coordination Committee of MP

scheduled on 26th October 2013 at 11.00 AM at State Load Despatch Centre, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be

downloaded.

( K.K.Prabhakar) Member Secretary, OCC

S. E. (LD), SLDC MPPTCL, Jabalpur

Encl : As above.

vkbZ ,l vks : 9001-2008

ISO: 9001-2008

Page 2: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Distribution List

The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710

The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore Fax No- 0731-2421554.

The Chief Engineer (T&P), MP Power Transmission Co. Limited, Jabalpur Fax No- 0761-2665593.

The Superintending Engineer (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur. Fax No- 0761-2668503

The Chief Engineer (Plg & PS), MP Power Transmission Co. Limited, Jabalpur Fax No- 0761-2665593

The Executive Engineer, DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal. Fax No- 0755-2580611

The Executive Director (O&M:Gen.), MP Power Generating Co. Limited, Jabalpur. Fax No- 0761-2664572

The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013. Fax No- 0755-4030130

The Chief Engineer (O&M:Hydel), MP Power Generating Co. Limited, Jabalpur. Fax No- 0761-2664746

The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119. Fax No- 07323-284080

The General Manager (PM), MP Power Management Company, Jabalpur. Fax No- 0761-2664749

The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554. Fax No- 07280-271703

The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore Fax No- 0731-2874515

The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal Fax No- 0755-2885220

The Sr. Vice President Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar Fax No. 07580-277200

Shri Rajiv Keskar, E. A. to Chairman MPPMCL, Energy Department, Vallabh Bhawan, Bhopal. Fax No- 0755-2600191

The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551 Fax No. 07791-243667 / 243669

Page 3: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

AGENDA FOR 36TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP

TO BE HELD ON 26TH OCTOBER 2013 AT 11.00 AM AT STATE LOAD DESPATCH CENTRE, MPPTCL, JABALPUR

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 35th meeting of Operation & coordination committee of MP held on 23.08.2013 at State Load Despatch Centre were forwarded to the committee members vide No. 07-05/SG-9B-II/2971 dated 28.09.2013. No comments have been received from the members. [Committee may confirm the minutes] ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS August 2013 TO

September 2013. 2.1 Frequency Particulars : During September 2013 the system frequency was below 49.7 Hz for 1.51% of time against 0.6% of time during August 2013. The system frequency was within the IEGC range of 49.7-50.2 Hz for 89.24 % of the time during September 2013 against 75.17 % of time during August 2013. The average monthly frequency was 50.02 Hz during September 2013 whereas it was 50.11 Hz in the month of August 2013. Regarding operation in high frequency range, frequency during the month of September 2013 was above 50.20 Hz for 9.25% of time against 24.11% of time during August 2013. The system frequency did not touched 48.8 Hz during the above period.

The detailed frequency particulars for the month of August 2013 and September 2013 are enclosed at Annexure-2.1. The brief details of frequency profile is given here under :

Month Average

frequency minimum integrated frequency over an hour

maximum integrated frequency over an hour

Instantaneous minimum frequency

Instantaneous maximum frequency

August 2013 50.11 Hz 49.61 Hz 50.53 Hz 49.31 Hz 50.77 Hz September 2013 50.02 Hz 49.61 Hz 50.32 Hz 49.21 Hz 50.62 Hz

[Committee may like to note] 2.2 Operational Matters

2.2.1 Operational Discipline : System operated in terms of frequency profile for the months August

2013 and September 2013 is as given below for discussion by the committee : Month % of time

Frequency Below 49.7 Hz

% of time Frequency above

50. 2 Hz

% of time frequency within the permissible range of 49.7-50.2 Hz

Average monthly

frequency

No. of times frequency dipped

below 48.8 Hz August 2013 0.60 % 24.11% 75.17% 50.11 Hz 0 September 2013 1.51 % 9.25% 89.24% 50.02 Hz 0

[Committee may like to note.]

2.2.2 Messages for drawal curtailment : The total number of messages of significant violation of IEGC by the DISCOMs by overdrawing at frequency below 49.7 Hz is as given hereunder: MONTH East Discom Central Discom West Discom Total

August 2013 0 0 0 0 September 2013 0 0 0 0

[Committee may please note & discuss.]

36th OCC Agenda of MP 1

Page 4: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

2.3.1 Voltage Profile : Date wise voltage profile at some of the important 400 KV and 220 KV substations during the months August 2013 and September 2013 is enclosed at Annexure -2.3.1.

During the months August 2013 and September 2013, the deviation of voltage from the accepted limit on either side was recorded at following important 400 KV s/s in MP Grid.

SrNo

Name of 400 KV Substation

August 2013 September 2013

Max. Voltage observed Min.

Voltage observed

Max. Voltage observed

Min. Voltage observed

Voltage Date Voltage

Date Voltage Date Voltage Date

1 Indore 425 28.08.13 --- --- 427 29.09.13 --- --- 2 Itarsi 429 20.08.13 --- --- 427 03.09.13 --- --- 3 Bina 428 15.08.13 --- --- 426 21.09.13 --- --- 4 Gwalior 422 15.08.13 --- --- 421 22.09.13 --- --- 5 Nagda 427 20.08.13 --- --- 428 25.09.13 --- ---

6 Khandwa 431 30.08.13 --- --- 432 17.09.13 --- ---

6 Satpura 427 12.08.13 --- --- 427 04.09.13 --- --- 7 Birsingpur 429 05.08.13 --- --- 432 30.09.13 --- --- 8 ISP 427 28.08.13 --- --- 431 20.09.13 --- --- 9 Bina 765kv 800 15.08.2013 --- --- 802 29.09.13 --- --- 10 Seoni 765 KV 800 13.08.2013 --- --- 801 16.09.13 --- ---

[Committee may please note & discuss] 2.3.2 Status of Capacitor Banks in sub-transmission system : The updated information of the

status of capacitor banks in sub-transmission system as on 30th September 2013 as submitted by DISCOMs is detailed below :

DISCOMs have also furnished the updated additional information as detailed below.:

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600

KVAR

1200

KVAR

1500

KVAR

600

KVAR

1200

KVAR

1500

KVAR

No of 100 KVAR

Units required 600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

WZ 794 564 -- 28 96 -- 225 38 46 -- -- --- 325

CZ 8 721 255 3 34 -

24 3 16 0 588 0 178

EZ 359 153 -- 40 06 - 94 0 0 -- -- -- --

36th OCC Agenda of MP 2

Page 5: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Figures are in MVAR SN Particularas WZ CZ EZ 1 MVAR capacity of connected capacitors in good condition 1153.2 1252.5

399

2 MVAR capacity of connected capacitors in partially good condition 109.5 42.6 14

3 MVAR capacity of connected capacitors in good condition including partially good condition.

1262.7 1295.1

413

4 MVAR capacity of connected capacitors covered under ADV T-V Scheme.

0.0 267 Nil

5 Grand total MVAR of capacitors including that are proposed in ADB T-V scheme

1262.7 1562.1 Nil [Committee may please note & discuss]

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation : The updated information of the status of Installed capacitor banks(in MVAR) in EHV transmission system as on 30th September 2013 as submitted by MPPTCL is given below :

[Committee may like to note ] Status of completion of on going Transmission Schemes being executed by MPPTCL : The various ongoing Transmission Schemes for the current financial year i.e. Year 2013-2014 and latest status of completion of various ongoing Transmission Schemes for the current financial year i.e. Year 2013-2014 upto 30.09.2013 as submitted by MPPTCL is enclosed as annexure 2.4.1.

[Action : MPPTCL] 2.4.1 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Frequency did not touch 48.80 Hz or below during August 2013

to September 2013. [Committee may like to note]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that there are no defective u/f and df/dt

relays. (iii) Review of Under Frequency Relay Plan: The 2nd National Power Committee meeting was held on 16th July 2013 at New Delhi. It was decided in the meeting that 4 (four) stages of U/F relay operation starting from 49.2 Hz are to be implemented. The stages of AUFLS are 49.2 Hz, 49.0 Hz, 48.8 Hz & 48.6 Hz. The calculated apportion of quantum of load shed with respect to Western Region and States is as per Zalte Committee report/recommendations and is given as follows-

Voltage Class

Capacitor bank installed in good condition (No/Mvar)

Capacitor bank installed but

defective & are repairable (No/Mvar)

Requirement of repair

against each unit (No/Mvar)

Requirement against non-

repairable capacitor

banks

Capacitor banks

already covered under

ADB T-V

Balance capacitor

banks to be covered in

other schemes

220 KV 2 No / 62 MVAR All in Service --- --- ---

132 KV 36 Nos / 1182.34 MVAR

--- --- ---

33 KV 366 Nos / 3319 MVAR --- --- --- -

Total 404 nos / 4563.34 MVAR

--- --- ---

36th OCC Agenda of MP 3

Page 6: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Frequency (Hz) WR (MW) MP (MW)

49.2 2060 460 49.0 2070 460 48.8 2080 460 48.6 2100 465

The detailed plan for district group to be operated under AUFLS has been prepared by the SLDC based on the data furnished by CE(Plng&Desg) and furnished to all Discoms for their comments. After incorporating the comments received from DISCOMs the revised plan for AUFLS has been finalized in the special meeting held on 27.09.2013. In the revised plan, the nexal-hit area feeders are to be operated under AUFLS on the schedule days from 06.00 hrs to 18.00 hrs only and rest of the feeders shall be operated for the period 00.00 hrs to 24.00 hrs.

The Chief Engineer(T&C) intimated that the under frequency 49.2 Hz and 49.0 Hz have been

implemented at all the EHV substations of MPPTCL w.e.f. 08.10.2013 and the work of implementation of

under frequency settings for the frequency 48.8 Hz and 48.6 Hz is under progress. The matter of early

implementation of revised AUFLS has been discussed in various forums at regional level. The National

Power Committee and the Central Electricity Authority are also closely monitoring the progress of

implementation of AUFLS plan at state level.

The schedule for implementation of AUFLS plan for remaining two stages i.e. 48.8 Hz and 48.6 Hz may please be submitted to this office for onward submission to Central Electricity Authority through WRPC. Further, circle-wise progress of implementation of these two under frequency settings may also be sent to this office [Action : CE (T&C)] 2.5 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to

33 KV feeders :

(i) Details of DISCOM wise Power supply given to various domestic categories during the period August 2013 and September 2013 is enclosed at Annexure 2.5(i).

[Committee may like to note]

(ii) Group Allocation to Newly Commissioned existing EHV substations :- As per information submitted by CE (Plng. & Design), the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.5 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below :

36th OCC Agenda of MP 4

Page 7: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01

EAST

Jabalpur 02 02 Sagar 00 03 Rewa 03 04 Total 05 05

WEST Indore 04

06 Ujjain 10 07 Total 14 08

CENTRAL Bhopal 00

09 Gwalior 01 10 Total 01

TOTAL Grand Total 20 Discoms are requested to furnish the details as per list enclosed at annexure-2.5(ii)

[ACTION : DISCOMs] ITEM NO. 3 : OPERATIONAL PLANNNING 3.1 Anticipated availability for the Month of November 2013 to March 2014.: The Discom wise

average hourly anticipated availability, demand and shortage/ surplus has been prepared and given in Annexure-3.1

[Committee may like to note] 3.2 Generating Units under planned outage and proposed maintenance programme : There is

planned outages of MPPGCL thermal units during October 13 to March 2014 [Committee May like to note]

3.3 Proposed shutdown programme of Transmission lines / Transformers : The proposed shutdown of transmission elements for the period 01.11.2013 to 30.11.2013 submitted by MPPTCL is enclosed at Annexure-3.3 [Committee May like to discuss]

3.4 Long Outages of transmission elements and protections : The transmission elements as

detailed below are under long outages :

SN

Line/Transformer/Breaker/ Reactor etc under long outage

Outage date Reason Response from Utility

1 63MVAR Bus-I Reactor at Satpura TPS

24.05.2005 Damage of all three limbs along with reactor tank

Installation and Commissioning in bay no.17 is under progress. For work contract estimate prepared & submitted for approval. Expected by March’14

2 Bus bar Differential protection scheme at Amarkantak TPS

Since installation

Not commissioned

Order has been placed to M/s. ABB. Work is under progress. However the same is also included in R&U scheme of WRPC.

3 220 KV Bus bar protection scheme at SGTPS Birsinghpur

Since commissioning of 220 KV switch yard

The scheme not available

One offer is received. Case file under process for placement of order. However the same is also included in R&U scheme of WRPC.

4 220 KV Bus bar differential protection at TONS HPS

Since commissioning

Not mentioned New scheme with digital relays is required to be procured & commission. Case is under

36th OCC Agenda of MP 5

Page 8: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

progress. However the same is also included in R&U scheme of WRPC.

5 400KV Main Bkr of Satpura-ISP Line

04.08.2012 Not mentioned Letter of Award for Erection, Commissioning & Testing of Breaker has been issued to M/s Crompton Greaves Ltd. Nasik. Work delayed due to rain and expected to be taken into service upto 15th Oct’13

6 132 / 33 KV 40 MVA ECE Transformer at Chhegaon S/s

15.04.2013 For Reconditioning work

The Transformer was charged on 07-09-2013

7 400 KV main breaker of Birsingpur-Katni-I at katni End

14.02.2013 Not available The information of Breaker outage was not given to SLDC

The utilities may submit the latest status. [Action : MPPGCL/MPPTCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF August 2013 and September 2013: The details of actual generation, Schedule from Central Sector demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL& NHDC Hydel Units.

Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. [Committee may like to note]

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING AUGUST 2013 AND SEPTEMBER 2013 : There was no major grid disturbance in MP during August 2013 and September 2013. However the Grid Disturbances and Grid Incidents in MP during are given in Annexure 5.0. [Committee may like to note]

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES 6.1 Absorption of reactive power by generators: -. During the monsoon season the voltage profile has been high due to less system demand and low line loadings. The problem of high voltages becomes severe during night/off peak hours. It is observed that during these hours MVAR absorption at generating units is not significant. The power factor at many generating plants is been more than 0.95 leading which is non-conformity with CEA Technical Standards.

The SLDC has started issuing the code for absorption of reactive power by the generator wef 01.09.2013. MPPGCL/NHDC/IPPS are requested to complies the instruction of SLDC to absorb reactive power from grid with their capability curve to maintain voltages within operational limit. [ACTION: MPPGCL, NHDC, IPPs] 6.2 ISSUING CODE FOR SYNCHRONISATION / STOPPING OF GENERATORS IN THE STATE GRID: - The code is being issued by SLDC for Synchronisation / stopping of thermal / hydel generating units wef 01.09.2013. All the generators are requested to take necessary code from SLDC before synchronizing /stopping of their units. [Action : MPPGCL/ NHDC/JP Bina/BLA]

36th OCC Agenda of MP 6

Page 9: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

6.3 Change of CT ratio of all feeders at Omkareshwar Hydel Power Station : The CT of 220 KV Nimrani and 220 KV Barwaha line at Omkareshwar has been changed to 800/1 Amp. The matter was discussed in last meetings of OCC In the last OCC meeting chairman OCC requested OSP authorities to submit the plan for replacement of CT in the remaining three feeder. The same is not received by SLDC so far. OSP are requested to submit the plan in the OCC meeting.The updated status of replacement of CTs in remaining three feeders may be submitted in the meeting. [Action : NHDC] 6.4 Bus Bar Protection Scheme :- It has been noticed that bus bar protection scheme is not in place at some of the EHV sub stations / Generating stations. Action shall be taken for upgradation of protection system and bus bar protection system should be kept in service all the time and problem if any should be rectified on priority. The matter was discussed in 34th & 35th OCC meeting and it was decided that all the entities should submit their action plan for installation and commissioning of bus-bar protection scheme at their power stations/ sub-station to SLDC, if not already commissioned. The action taken in the matter may submitted to SLDC. All the entities has not submitted the plan to SLDC. It is again requested to submit action plan for installation and commissioning of bus-bar protection scheme at their power stations/ sub-station to SLDC, if not already commissioned. The implementation of Bus-Bar protection at all the 220 KV /400 KV substation has been raised at various forums at regional level. The WRLDC and WRPC are continuously insisting for early implementation of Bus-Bar Protection. The entities of state grid are requested to submit the details of substation /power stations where the bus bar protection is in service and schedule for installation and commissioning of bus-bar protection scheme at remaining substations/ power stations. [Action : MPPTCL/MPPGCL/NHDC/IPPs]

6.5 Contingency plan to Manage increased demand during ensuing rabi season :- A meeting has been arranged on 24.09.2013 at SLDC, Jabalpur to discuss and finalise contingency plan to manage increased demand during rabi season. All three Discoms have confirmed that they would not face any problem in Discom network for meeting the projected demand as furnished for October 2013 to December 2013. The Central Discom has submitted their contingency plan in the meeting. East Discom and west Discom informed that they have prepared the contingency plan and in pending for approval. After approval the same shall be furnished to SLDC. Now East Discom and West Discom have also submitted the contingency plan to SLDC. The contingency plan of all the three Discom is annexed as Annexure 6.5. [Committee may like to discuss]

6.6 RGMO status of generating units in WR :- The RGMO feature is not available in any of the eligible units of MPPGCL Thermal and Hydel Stations except SGTPS # 5. The RGMO in both units of Jaypee Bina TPS is also not implemented Thus primary response from these machines is not available. MPPGCL and JP Bina are requested to submit the latest status for implementation of RGMO in their units. [Action MPPGCL, JP Bina] 6.7 High Voltage problem at Indira Sagar HPS and installation of Reactors :- The issue of high voltage at ISP was discussed in the 36th Standing Committee on Power System Planning for Western Region held at NRPC New Delhi on 29th August, 2013. The provision of following reactive compensation was agreed in the meeting-

(i) 125 MVAR, 400KV Bus reactor at Indira Sagar HEP (to be provided by NHDC/NVDA).

36th OCC Agenda of MP 7

Page 10: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

(ii) 50 MVAR Line reactor for Indira Sagar-Satpura 400 KV S/C line at Satpura 400 KV sub-station (to

be provided by MPPGCL). (iii) 50 MVAR Line reactor for Indira Sagar-Nagda 400 KV line at Nagda 400 KV sub-station (to be

provided by MPPTCL). The action taken may please be initiated for installation of reactors as detailed above before onset of next monsoon season for safe, secure & reliable operation of the state grid. [Action : MPPTCL/MPPGCL/NHDC] 6.8 SENDING DISTURBANCE RECORDER(DR)/SEQUENTIAL EVENT LOGGER (SERS) OUTPUT TO WRLDC: With Reference to section 5.9.6(c) of the IEGC and section 9.5.3 of the Operating Procedure of WR-2013, the DR/SER details for all grid incidents/disturbances need to be sent by the concerned agency to RLDC through SLDC, within 24 hrs of the incident. It is observed that in many grid incidents/disturbances DR’s and SERs output are not being submitted to SLDC with the final report submitted by the entities to SLDC. The RLDC has viewed it seriously and requested to take up the matter with State Utilities. All the entities are requested to submit the DRs and SERs output alongwith tripping report within 24 hrs of the incident to SLDC so that the compiled information could be furnished to RLDC.

[Action: MPPTCL/MPPGCL/NHDC/IPPs] 6.9 Outage of Main Breaker of 400KV Satpura-ISP line at Satpura End :- The 400 KV Main Circuit Breaker of 400 KV Satpura-ISP line was failed on 04.08.2012 at Satpura end due to lock out cable broken. The tie-breaker of 400 KV switchyard of Satpura is permanently engaged in 400 KV Satpura-ISP line. The matter of installation & commissioning of circuit breaker was also discussed in the 35th Operation & Coordination Committee meeting of MP. The Chairman, OCCM has requested MPPGCL to complete the work before 30th September, 2013 to avoid any transmission constraint during the ensuing rabi season. :However, till date the restoration is not done. PGCIL is planning to replace the existing Main Breaker of 400 KV Satpura-Koradi and 400 KV Satpura –Itrasi lines and during the replacement period, Koradi & Itarsi circuits would be charged through the tie-breaker. PGCIL had proposed outage programmes in the 449th & 452nd OCCM of WRPC. The outages of main breaker of these lines have been approved during the month of November 2013. If the outage is not given, PGCIL may approach the commission. The MPPGCL should complete the installation & commissioning of 400 KV Main Breaker of 400KV Satpura-ISP line by the end of October, 2013. [Action: MPPTCL/MPPGCL/NHDC/IPPs] 6.10 Status of Tertiary Reactors in WR :- The tertiary winding reactors of 400/220/33 kV ICTs can be utilized for voltage improvement on HV side. The list of 25 MVAR tertiary reactors available with WRPC in MP grid is given below :-

36th OCC Agenda of MP 8

Page 11: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Sl NO Substation Reactor details

(MVAR) Rated

Voltage Net MVAR capacity

1 Bina 2x25 33 50 2 Nagda 2x25 33 50 3 Indore 2x25 33 50 4 Bhopal 2x25 33 50 5 Satpura 2x25 33 50 The matter was discussed in the 452nd OCC meeting of WR and it was requested by

WRPC to submit the updated status of such reactors. The respective utility may kindly submit the updated status of switching on these tertiary

reactors at 400 KV SUBSTATIONS/POWER STATIONS to curtail high voltage on 400 kV side. [Action : MPPGCL/MPPTCL]

6.11 NGR bypass scheme for using LR as BR: The LRs on the EHV lines that kept out on voltage regulation can be used as bus reactors for voltage control by providing NGR bypass scheme. The list of lines where such changeover of LR to BR can be done with NGR bypass scheme is provided is given below :-

400 KV Line Equipment Owner

Line Reactor at End 1

Line Reactor at end 2

Damoh –Bhopal 1 MPPTCL 50

Damoh –Bhopal 2 MPPTCL 50

Nagda-Ragarh -1 MPPTCL 50

Nagda-Ragarh -2 MPPTCL 50 The updated status may be submitted to SLDC [Action : /MPPTCL]

6.12 Line outages planned vs. implemented : The outage programme of 400KV transmission elements and interstate/ inter regional transmission lines for the next month is to be submitted to WRPC for approval in the Operation & Coordination Committee Meeting to be held in the current month. The outages approved in the OCCM are required to be availed on the stipulated dates only as these outages are given considering the availability of transmission elements of other states and PGCIL. The matter of non-availing approved outages has been raised in several OCCMs of WRPC. It was reported by the WRLDC that constituents of WR do not avail most of the outages of transmission elements approved in OCCM. This is viewed seriously by the WRLDC and WRPC. The report of approved outages versus actually availed outages during the month is to be submitted to the WRPC for onward submission to the Central Electricity Authority. If any approved outage of transmission element is not availed on the scheduled date, reason for not availing the shutdown is also to be intimated to WRLDC/WRPC. SE (Opn), WRPC in 452nd OCC meeting of WRPC has informed that out of 21 approved shut down MP has not availed 18 shutdown. The list of shut down not availed by the constituents is enclosed at Annexure 6.12. [Action : MPPGCL/MPPTCL/NHDC/IPPs]

36th OCC Agenda of MP 9

Page 12: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

6.13 TRIAL OPERATION OF TRANSMISSION ELEMENTS: (Petition No: 96/TT/2011 dated 27.09.2013) : In the matter of Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for transmission tariff for LILO of Nalagarh –Kaithal line at Patiala along with associated bays and 125 MVAR Bus Reactor at Patiala and 400/220 kV 500 MVA ICTs both at Patiala and Malerkotla S/S along with bays under Northern Region Strengthening Scheme –XIV (NRSS-XIV) in Northern Region from revised anticipated date of commercial operation i.e. 1.7.2011 to 31.3.2014, Hon’ble CERC pointed out that the 2009 Tariff Regulations do not define the trial operation in case of transmission elements and the successful test charging is considered as trial operation accordingly, successful test charging by the petitioner is considered as completion of trial operation.

Further Hon’ble CERC directed RPCs to discuss the issue of trial operation of transmission elements and submit the proposals to CEA who in turn shall submit a consolidated proposal regarding trial operation of transmission elements to the Commission. The staff of the Commission shall study the proposal made by CEA and make suitable changes to the existing Regulations to deal with all such cases in future.

In the meeting it was decided that the proposal may be sent by WRPC to CEA for considering commercial operation of a line on following ground :-

1. At the timing of line charging from both end , all the transmission elements, reactors, telemetry and protection should be in service.

2. After charging of line from both end, no planned shut down shall be availed for a month by the owner of the line.

[Committee May like to discuss] 6.14 Ensuing technical minimum generation levels in coal fired ISGS: In 24th WRPC board meeting WREB the final decision on reserve shut down was kept pending and a separate meeting will arrange by WRPC to finalise the same. Till such time all beneficiaries have agreed to absorb technical minimum of all NTPC units. Technical minimum was indicated 60% in case of 500MW and 70% in case of 200 MW. In 452nd OCC Meeting, Member secretary, WRPC insisted all the constituents to submit their requisition as per technical minimum of the plant as decided in the 24th WRPC meeting. Representative of SLDC MP and Gujarat opposed the same and inform that they shall submit their requisition as per present practice i.e as per merit order dispatch principal. [Committee May like to discuss]

ITEM NO. 7 : BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : 7.1 Black Start mock drill of Indira Sagar, Bargi, Pench and Gandhisagar : As mandated by sec 5.8(b) of IEGC all the units need to conduct black start exercise once in every six month. As per the IEGC the Black Start mock drill of Indira Sagar, Bargi, Pench and Gandhisagar has to be carried out, as the first black start mock drill of these stations has already completed six months and above. The plan for

36th OCC Agenda of MP 10

Page 13: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

black start drill of above power stations shall be finalized in the OCC meeting. The proposed date for black start mock drill is given below :-

Sr. No. Name of Power Station Proposed date for Black Start mock drill

1 Bargi 10.01.2014 2 Pench 30.01.2014 3 Gandhisagar 18.02.2014 4 Indira Sagar 2nd week of May 2014

[Action MPPGCL/NHDC]

7.2 Black Start mock drill of Tons, Madikeda, Rajghat and Birsingpur HPS: The Black Start Mock Drill of Tons, Madikheda, Rajghat and Birsingpur could not be performed due to some technical problem. The matter was discussed in the 34th & 35th OCC meeting and MPPGCL had agreed to rectify all the short comings by end of September 2013. The mock drill of all the remaining hydel Hydel power Stations is to be carried out during the period November 2013 to March 2104. MPPGCL may intimate the plan to conduct the black start mock drill. The proposed date for black start mock drill is given below :-

Sr. No. Name of Power Station Proposed date for Black Start mock drill

1 Rajghat 28.11.2013 2 Madikheda 29.11.2013 3 Tons 17.12.2013 4 Birsingpur 30.12.2013

[Action MPPGCL]

ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION: 8.1 Quarterly Review of Crisis Management Plan: The NHDC & SLDC have submitting the quarterly crisis management report to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai. All the other entities are requested to submit the CMP report in prescribed format for the first quarter (April 2013 to June 2013) for the year 2013-14.

[ACTION: MPPTCL,MPPGCL, NHDC& IPPs]

8.2 Status of Physical & Cyber Security in Power Sector regarding : Status of physical & cyber security in Power Sector for the first quarter (April 2013 to June 2013) have not been received from any of the constituents. All the entities may like to furnish the Status of physical & cyber security in Power Sector for first quarter (April 2013 to June 2013) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

[ACTION: MPPGCL, MPPTCL, NHDC & IPPs]

8.3 Data regarding 33/11 substations for inter connection with National optical Fibre Network: In the 34th and 35th OCC OCC meeting SLDC intimated that, WRPC has requested SLDC to furnish information/data pertaining to MP system in prescribed format. Accordingly DISCOMs was requested to furnish the information at the earliest to SLDC in the prescribed format given below, so that consolidated

36th OCC Agenda of MP 11

Page 14: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

information could be furnished by SLDC to CEA. The DISCOMs have not submitted the required information to SLDC so far. DISCOMs are requested to submit the information in the 36th OCC meeting. State: Madhya Pradesh - Name of the Discom:______________ Name of the 33/11 KV (or 66/11 KV) Substation

Name of the district/block

Capacity MVA

Distance from nearest panchayat/block/district HQ

Whether S/s is already connected with optical fiber cable

Mention the GIS coordinates of S/s, if available.

[ACTION: DISCOMs]

ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Replacement of faulty ABT meters and providing new ABT meters at Sub-stations : The substation wise list of around 10 Nos. faulty ABT meters and the requirement of around 15 Nos. ABT compliant meters to be installed in place of Non ABT meters at various sub-stations are enclosed herewith as Annexure – 9.1. The list has also been furnished to T&C. The present status along with plan for replacement / installation of ABT meters may be discussed. [Action : MPPTCL] 9.2 Replacement of faulty ABT meters and providing new ABT meter at Power stations : The ABT meter installed at 33kV Chanderi feeder, Rajghat HPS is faulty since long and ABT meter is not installed at 0.4kV Mangthar feeder, SGTPS. The plan for replacement / installation may be discussed. [Action : MPPGCL] 9.3 Providing Meter Master Details along with ABT Meter Data : MPPGCL / SE(T&C), Jabalpur, Sagar & Satna are not furnishing the meter master details i.e. replacement of faulty ABT meters, changes in CT / PT ratio along with ABT meter data. MPPGCL / MPPTCL to take up the matter with concerned site officials for furnishing the same along with ABT meter data on fortnightly basis.

[Action : MPPGCL/MPPTCL] 9.4 Providing AMR facility for the ABT meters installed at MPPGCL / IIP’s / NHDC : In compliance to state commission directives for computation of weekly transmission losses and UI charges, SLDC has requested the Intra State entities for providing the AMR facility by installation of modem and SIM at the interface point and arrangement of Application Protocol Interface (API) (where ever M/s Secure make meters are not installed ) for data communication with AMR System of M/s Secure Meters Ltd. installed at SLDC. MPPGCL / IIP’s / NHDC are requested to submit the status of the same.

[Action : MPPGCL / IIP’s / NHDC]

9.5 Renewable Regulatory Fund (RRF) Mechanism: The CERC vide order No. L-1/18/2010-CERC dated 09.07.2013 has implemented the RRF mechansim w.e.f 15.07.2013 and approved the detailed procedure for RRF. Presently wind farms and solar power plants qualified for RRF mechanism are listed in enclosed Annexure –I. The weekly schedule and actual generation data of these identified wind farms / solar generators is being sent by SLDC to WRLDC/ NLDC/ WRPC for preparation of RRF bills. MPPTCL / MPPMCL / Discoms are requested to identify the additional newly commissioned / wind farms and solar power plants coming under the RRF mechanism in accordance with CERC approved detailed procedure dated 09.07.2013. Details of installation of new wind farms / solar power plant in progress may be discussed. [Action : MPPTCL / MPPMCL / Discoms]

36th OCC Agenda of MP 12

Page 15: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ITEM NO 10: SCADA/EMS RELATED ISSUES: 10.1 ARRANGEMENT OF INFRASTRUCTURE FOR REPORTING OF RTUS TO DUAL CONTROL

CENTERS, AS PER REQUIREMENT OF MAIN SLDC AT JABALPUR AND BACKUP SLDC AT BHOPAL.

The formation of backup SLDC is in advance stage and all RTU reporting to SLDC Jabalpur and Sub-LDC Bhopal area are required to facilitate dual control centre reporting i.e. one channel from these RTU shall report to SLDC Jabalpur and another channel shall report to backup SLDC Bhopal. The material required for achieving the task of reporting of RTU to two different control centre ( Main and backup SLDC) has already been finalised and forwarded to CE(Procurement) and ED(O&M:GEN). Now action for procurement of material is required to be initiated by MPPGCL& MPPTCL so that communication channels and modification in RTU configuration required for achieving dual control centre reporting may be achieved as per the commissioning schedule of backup SLDC i.e. by June 2014.

The present status along with further action plan may be intimated by MPPGCL/MPPTCL.

Action: - CE (T&C)/CE (T&P), MPPTCL, ED (O&M: GEN: MMPPGCL)

10.2 REPLACEMENT OF ABB MAKE RTUS:-

Due to non availability of spares, problems in upgradation required for dual control centre reporting, it has already been decided earlier to replace all ABB make old RTUs with new one (two Number in MPPGCL and three in MPPTCL) . The copy of RTU tender document (soft copy) along with BOQ required for procurement was also provided by SLDC to MPPGCL. The present status of procurement of new RTUs required for replacement of old RTUs may please be provided by MPPGCL/MPPTCL.

Action: - CE (T&C)/CE (T&P), MPPTCL, ED (O&M: GEN: MMPPGCL) 10.3 ARRANGEMENT OF RTUS FOR UPCOMING 220KV CHICHLI S/S & 400KV JULWANIYA S/S:-

The RTUs for 220KV Chichli S/s and 400KV Julwaniya S/s was included in the order placed to M/s Chemtrol Ltd. Mumbai. Subsequently these RTUs were diverted to other sub stations for upgradation of telemetry and it was decided that the RTU for these S/ss shall be procured separately. As commissioning of these S/s are now in advance stage, the telemetry equipments for these S/s are required to be arranged before commissioning of S/s. The present status may please be provided.

Action: - CE (T&C)/CE (procurement), MPPTCL, 10.4 PROGRESS OF INSTALLATION OF NEW RTUS ALONG WITH PLCC DATA LINKS AT EHV S/S With reference to installation and commissioning of new RTU delivered by M/s Chemtrol , the Status with regard to following is required to be provided:-

(1) The commissioning schedule of RTU for 220KV Damoh, 220KV Pithampur and 220KV Rewa is required to be provided. These RTU are to be commissioned with minimum possible outage to existing RTUs.

(2) Arrangement of Training under RTU Order. (3) Arrangement of wiring details and configuration Software of RTU commissioned. (4) Completion of balance process connections specially SOE connections.

36th OCC Agenda of MP 13

Page 16: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

(5) Maintenance/upgradation plan for these RTUs as well as elimination of discripiency in these new RTUs. The issue regarding arranging training and wiring details is perused by SLDC in last three meetings. Now it is high time to attend these issues.

Action: - CE(T&C)/CE(T&P), MPPTCL 10.5 MAINTENANCE OF RTU’S AND AVAILABILITY OF SPARES:- The present status of available spares for various D20 RTUs, along with status of procurement of spares, repairing of spares may please be intimated. SLDC has already provided spares details (items and their minimum required quantity) to MPPGCL along six months back ACTION: T&C, MPPTCL & MPPGCL 10.6 STATUS OF TELEMETRY ARRANGEMENTS FOR SINGAJI TPS & SATPURA TPS:- The commissioning of telemetry of SSTPP stage-1 is in progress. It is observed that only EX-bus generation is available and actual generation (HV side) is not available. Further, there is also problem in configuration of IEC gateway at SSTPP due to which SOE timing is not received correctly. These two problems need to be rectified at the earliest. Similarly the telemetry of Satpura extention plant is commissioned recently. However, from Satpura Extention plant that only EX-bus generation is available and actual generation (HV side) is not available.

ACTION: ED (O&M: GEN), MPPGCL & CE (T&C)

10.7 THE ARRANGEMENT OF DATA CHANNEL FOR REMOTE VDU INSTALLED AT GCC, DCC During the last OCCM meeting, it was informed by SLDC that BSNL have laid the OFC cable upto SLDC for SLDC’s requirement under FTTH scheme. Therefore utilities may also approach BSNL for data channel on OFC network so that fast and reliable communication channels are available. Present status may please be provided by East DISCOM, MPPGCL.

ACTION: DCC, GCC, T&C, MPPTCL 10.8 DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & UPGRADATION OF EXISTING RTUS The matter is discussed in several OCCM meetings and also perused vigorously by SLDC in various forums. However, the desired progress in the matter has not been achieved. The present status of telemetry discipiency is enclosed herewith as annexure-10.8. As may be seen from the annexure, the progress in the matter is not encouraging. The material required for attending telemetry discripiency has not been arranged by any of the T&C circle. Now suitable instructions need to be issued to the field officers to complete the work on priority basis. In this reference it is to mention that in the matter of establishment and maintenance of telemetry and communication, CERC has filed an Suo Motu petition No. 56/SM/2013 and directed WRLDC and NLDC to closely monitor the telemetry functioning ( non availability/wrong values/intermittent functioning etc) and monthly progress report in the matter is required to be submitted to Honorable CERC. The Actual Generation of SSTPS extention unit & SSTPP is not available and only Ex-Bus generation is available. The same is required to be arranged.

36th OCC Agenda of MP 14

Page 17: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Further, in Most of the Power Stations including Tons & Pench Hydel power stations, process connection for SOE has not yet done. Manual copies of all power stations issued to CE(O&M:HYDEL) office, in the month of February. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discripiency and upgradation of RTU’s.

ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL

10.9 PROVIDING EXPRESS VOICE CHANNELS FOR RTU STATIONS:- Further, the Express Voice Channels, up to SLDC are also not available for many of the stations. In this reference, it is to mention that:-

(1) Recently commissioned voice channel link for Madikheda HPS, Gandhi Sagar HPS, ATPS, and STPS is functioning one way i.e. SLDC can contact but PS can not contact due to old exchanges.

(2) The Pench HPS voice link is not working because of faulty Power Supply module of carrier equipments at Pench HPS end.

(3) For alternate data channel of TONS HPS through Kotar, outdoor equipment is required to be arranged by MPPGCL.

(4) Bargi HPS regular PLCC voice channel has not been working since last one year due to faulty exchange at Bargi HPS.

The action for restoration of alternate data channels, express voice channels as well as improving

reliability of telemetry data channels need to be taken.

ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL

10.10 TELEMETRY DISCRIPIENCY OF JP BINA THERMAL POWER STATION Following telemetry discripiency is observed with reference to JP Bina Thermal Power Station:-

(1) When wideband /PLCC channel is in operation, the HV side generation of both generators becomes Non-Current. (2) When GPRS channel is in operation , all circuit breakers received as faulty. The above problems are persisting since long. Please do the needful for rectification of above at the earliest ACTION :- JP BINA THERMAL POWER STATION ITEM No 11 : DATE AND VENUE OF NEXT OCC MEETING : It is proposed to hold 37th OCC meeting of Operation and Coordination Committee of MP on 21st December 2013.The venue of the same shall be decided in the meeting.

***********

36th OCC Agenda of MP 15

Page 18: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

S. No. Particulars

1

1.1 Maximum Frequency 50.53 HzBetween 08.00 hrs & 09.00 Hrs on 15.08.13

50.32 HzBetween 20.00 hrs & 21.00 Hrs on 15.09.13

1.2 Minimum Frequency 49.61 HzBetween 19.00 hrs & 20.00 Hrs on 23.08.13

49.61 HzBetween 19.00 hrs & 20.00 Hrs on 07.09.13

1.3 Average Frequency 50.11 Hz 50.02 Hz

2

2.1 Maximum Frequency 50.77 Hz AT 08.03 HRS ON 15.08.13 50.62 Hz AT 13.04 HRS ON

21.09.13

2.2 Minimum Frequency 49.31 Hz AT 20.42 HRS ON 08.08.13 49.21 Hz AT 19.19 HRS ON

04.09.133 Percentage of time when frequency was :-

%age of time when frequency was अगस्त-13 िसतम्बर-13

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.12 0.16

3.5 Between 49.50 Hz and 49.7 Hz 0.60 1.35

3.6 Between 49.70 Hz and 50.2 Hz 75.17 89.24

3.7 Between 50.20 Hz and 51.0 Hz 24.11 9.25

3.8 Between 51.0 Hz AND 51.5 Hz 0.00 0

3.9 Above 51.5 Hz 0.00 0

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

अगस्त-13 िसतम्बर-13

36th OCC Agenda of MP 16

Page 19: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 424 411 427 411 422 406 419 398 425 411 426 415 425 410 425 4182 424 411 427 411 415 403 414 399 425 411 423 415 422 408 424 4173 423 410 422 407 414 398 412 392 424 409 424 412 423 408 425 4174 424 410 424 407 418 399 417 394 426 410 426 415 423 408 425 4175 423 411 424 411 418 406 415 401 425 411 429 418 426 412 426 4176 423 410 425 411 424 406 418 405 426 411 427 419 423 412 422 4177 421 409 423 409 420 407 420 400 422 409 427 418 425 411 424 4168 424 413 427 409 423 406 420 398 424 411 428 417 424 410 424 4199 424 411 426 411 426 411 422 404 424 411 429 419 426 414 425 419

10 424 413 427 414 424 409 421 404 424 412 427 418 423 411 423 41611 424 410 425 409 419 400 418 399 426 410 427 416 425 410 423 41612 423 409 427 408 421 409 417 402 424 408 427 418 427 410 424 41513 424 411 429 415 424 409 417 403 425 410 427 417 426 415 423 41614 424 409 428 411 425 407 417 405 426 408 429 416 425 413 424 41615 425 407 427 404 428 404 422 403 427 407 429 416 424 400 423 40016 423 408 422 406 420 407 418 404 425 403 427 417 423 407 423 41317 423 405 423 405 424 403 421 395 424 403 427 416 423 411 421 41418 421 410 425 412 416 401 418 401 421 408 429 417 425 413 423 41519 424 410 428 413 419 402 417 404 424 408 429 417 426 413 424 41520 424 414 429 411 417 400 417 402 427 414 429 419 425 411 424 41921 425 410 426 410 416 404 415 402 426 409 429 420 422 411 423 41622 425 410 426 410 416 404 419 404 426 409 428 419 423 410 424 41623 424 411 426 409 423 420 414 397 424 409 426 414 424 409 425 41724 424 411 426 410 417 404 413 397 424 409 425 416 424 413 424 41825 424 411 427 413 420 406 417 398 424 410 425 417 426 414 424 41726 424 412 425 410 414 405 409 398 424 410 424 416 421 400 423 40027 423 412 424 412 421 409 415 400 423 412 426 418 423 413 426 41628 425 410 426 410 423 407 416 399 426 409 424 416 425 411 427 41829 424 411 424 409 417 408 415 400 425 410 427 416 425 413 426 41930 424 411 425 411 426 414 419 406 426 411 426 416 423 414 425 41831 423 411 426 411 427 412 415 407 423 409 426 416 425 413 426 417

Max / Min 425 405 429 404 428 398 422 392 427 403 429 412 427 400 427 400

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 424 414 426 411 424 401 418 405 423 413 426 416 425 414 426 4212 421 409 423 409 422 406 418 399 421 406 423 413 424 412 425 4183 422 406 427 410 424 406 411 399 421 406 425 416 426 413 425 4164 423 411 426 414 421 408 411 400 423 409 426 416 427 416 426 4195 424 413 426 414 424 412 413 401 424 413 423 414 426 417 426 4216 423 411 425 411 420 409 416 401 423 410 423 413 424 413 424 4177 421 409 423 410 418 406 411 400 421 409 420 415 422 410 424 4168 420 409 420 410 412 405 408 398 420 409 421 413 421 400 424 4009 420 407 422 407 415 406 409 399 422 406 420 412 423 409 424 416

10 421 407 423 409 417 405 413 400 422 406 421 412 421 410 424 41611 420 406 419 395 418 407 412 401 420 406 418 412 420 410 427 41612 420 408 419 406 413 406 413 400 421 407 417 411 419 407 426 41713 422 409 421 406 412 403 410 400 423 410 416 410 420 407 427 41714 422 410 419 406 412 403 412 395 424 411 415 410 420 408 428 41715 423 411 423 410 418 405 417 402 426 413 421 412 421 411 430 42016 423 404 419 402 418 405 417 402 424 403 417 409 421 407 428 41217 424 410 421 407 417 405 417 403 424 410 418 410 420 410 426 41618 422 408 419 405 416 403 412 387 423 407 415 408 419 410 426 41619 418 397 416 396 414 399 411 397 420 399 421 410 418 403 423 40620 423 400 422 407 421 405 417 402 424 400 426 416 423 411 431 41721 426 410 424 410 426 407 418 407 424 409 425 415 424 416 430 41822 424 414 424 413 418 401 421 399 424 414 427 418 426 417 426 42023 424 413 424 410 418 405 414 399 424 412 427 418 426 415 428 42024 426 414 424 413 418 410 415 403 426 412 426 418 427 417 430 42025 427 416 425 413 417 406 413 401 428 416 426 417 427 418 429 42126 426 409 425 407 418 403 419 404 426 408 425 416 427 413 431 41827 426 409 424 407 420 406 416 400 425 408 424 416 425 411 428 41828 425 409 423 406 415 400 418 399 424 408 425 415 425 400 426 40029 427 413 423 411 421 408 417 407 425 412 425 419 425 416 431 40030 424 409 423 411 419 407 418 399 425 411 432 417 424 415 429 42031

Max 427 397 427 395 426 399 421 387 428 399 432 408 427 400 431 400

NagdaGwalior Birsingpur ISPVoltage Profile During the Month of Aug- 2013

DateIndore Itarsi Bina Gwalior Nagda ISP

Satpura

Birsingpur SatpuraVoltage Profile During the Month of SEPT - 2013

Indore Itarsi BinaDate

36th OCC Agenda of MP 17

Page 20: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMMEA. 400 KV TRANSMISSION LINES

1 400KV DCDS Indore (PGCIL) - Pithampur line (2x64) DCDS 64 128 Dec-13

2 400KV DCDS Malwa TPH - Pithampur line (2x135.85) DCDS 135.85 271.7 Sep-13

3 400KV DCDS Chhegaon - Julwania line (2x114) DCDS 114 228 Mar-14

Sub Total (A) 313.85 627.7B. 220 KV TRANSMISSION LINES

1 Ashta (400) - Indore - II (Jaitpura) (2x100) DCDS 100 200 Mar-14

2 Ratlam - Daloda DCSS Line (1x72.541km) DCSS 72.541 72.541 Jan-14

3 LILO of Itarsi - Narsinghpur 220 DCDS line at Chichali S/S. (DCDS) (2x2.06) DCSS 2.06 4.12 Sep-13

4 220KV line from Gwalior (400kv) (PGCIL) to Gwalior (220kv) (II) (2x0.76) DCDS 0.76 1.52 Dec-13

5 220KV Berchha -Shajapur DCDS line (2x20) DCDS 20 40 Mar-14

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

6LILO of Jabalpur(Sukha) - Birsinghpur/Amarkantak DCDS line at 220kv S/S Panagar. (DCDS)

DCSS 3.541 8 Mar-14

7 2nd Ckt of 220kv Damoh - Tikamgarh line (152) 2nd ckt 152 152 Sep-15

Sub Total (B) 350.902 478.181C. 132 KV TRANSMISSION LINES

1 2nd Ckt of Satna - Pawai section for Nagod 132kv S/s (19.50) 2nd ckt 19.5 19.5 Mar-14

2 Shivpuri - Mohna DCSS (1x63km) DCSS 63 63 Sep-13

3132KV DCSS Line between 220kv Pipariya s/s & 132kv Semari Harchanchad (Sohagpur ) s/s. (1x39.41km)

DCSS 39.41 39.41 Sep-13

4 Mandsaur - Neemuch DCDS line (2x50.508 Kms) DCDS 50.508 101.02 Mar-14

5 Chhatarpur - Nowgaon DCSS line (34Kms) DCSS 33 33 Dec-13

6

132kv DCDS line for Diversion of 132 kv Handiya-Nasrullaganj tap line & second circuiting of 132 kv Handiya-Nasrullaganj line and * 132 kv DCSS Tap line for proposed 132kv S/s GOPALPUR (2x8.5+1x3.35) (GoMP)

DCDS 11.85 20.35 Apr-13

7 132kv Birsinghpur -Shahdol DCSS line (1x48) DCSS 48 48 Mar-14

8 132kvA lot- Sitamau DCSS line (1x39.336+4x3.364) DCDS 42.7 52.792 Mar-14

9 132kv Badod -A lot-DCSS line (1x28) DCSS 28 28 Mar-14

10 132kv Ichhawar -Sehore DCSS line (1x35.298) DCSS 35.298 35.298 Mar-14

11 132kv Handiya(220kv)-Satwas DCSS line (1x34.77) DCSS 34.77 34.77 Sep-13

36th OCC Agenda of MP 18

Page 21: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMME

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

12 132kv Tikamgarh (220kv)- Digoda line (1x20) DCSS 20 20 Oct-13

13 132kv Chhatarpur (220kv)- Laundi line (1x43) DCSS 43 43 Mar-14

14 Lilo of Balaghat -Birsa 132kv line at Baihar (DC) (2x10) DCSS 10 20 Sep-13

15Lilo of one ckt of 132kv Rewa(PH-II) -PH-IV/Beohari line at Proposed 132kv s/s at Rampur Naikin (DCDS) (1x1.0)

DCDS 1 1 Sep-13

16 LILO of 132 kv Indore - Barwaha line for Simrol KV S/s (2x2x5) DCDS 5 20 Jun-13

17LILO of 132 kv Indore(SZ) -Indore(Chambal) for proposed 132 KV S/s at Indore Electronic complex (2x0.4)

DCDS 0.4 0.8 Sep-13

18 LILO of 132 kv S/C Jabalpur - Damoh line at proposed 132 KV S/s at Tejgarh (2x2.5) DCDS 2.5 5 Sep-13

19 LILO of 132 kv D/C Betul-Multai line at AMLA (2x21.0) DCDS 21 42 Mar-14

20 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35 42) DCDS 35.42 70.84 Mar-14line (2x35.42)

21 132 kv DCSS Dewas-Barotha line (1x16.7) DCSS 16.7 16.7 Dec-13

22 132 kv DCDS Dewas(220KV) TO Shankargarh( Dewas bypass) line (2x4.74) DCDS 4.74 4.74 Jun-14

23 132 kv DCSS Ghatabillod-Betama line (1x16.147) DCSS 16.147 16.147 Dec-13

24 132 kv DCSS Tikamgarh (220kv)-Budhera line (1x32) DCSS 32 32 Dec-13

25 132kv Jeerapur -Susner DCSS line (1x32) DCSS 32 32 Mar-14

26 132kv DCSS Gautampur -Depalpur line (1x19) DCSS 19 19 Dec-14

27 132kv Katra -Mauganj DCSS line (1x42.21) DCSS 42.21 42.21 Mar-14

28 132kv Bina-220kv Khurai DCSS line (1x17.61) DCSS 17.61 17.61 Dec-13

29 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x44.6) DCSS 44.16 44.16 Mar-14

30 132kv Julwaniya- Anjad DCSS line (1x23) DCSS 23 23 Dec-14

31 132kv Sajapur (220kv) -Berchha DCDS line (2x35) DCDS 35 70 Jun-14

32 132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x31.9) DCSS 31.9 31.9 Mar-15

33 132kv DCSS Chhindwara( 220kv) -Bichhua DCSS line (1x26.9) DCSS 26.9 26.9 Mar-14

34 132kv DCDS Shajapur( 220kv) -Moman Badodiya line (1x24) DCSS 24 48 Jun-14

35 2nd Ckt of 132kv Neemuch - Ratangarh 132kv line (44.0) 2nd ckt 44 44 Mar-15

36th OCC Agenda of MP 19

Page 22: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMME

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

36 132kv From 220kv Hosangabad -M/S Security Paper mill (SPM ) ITARSI DCSS line (1x1.350) DCSS 1.35 1.35 2013-14

37 132kv Gudgaon-M/s Betul wind near kurku (DIST.-BETUL) DCSS line (1x24.976) DCSS 24.976 24.976 Mar-14

38132kvDCSS line Supply from 132 kv s/s Khilchipur for 25MW ACME Power (DIST.-Rajgarh) DCSS line (1x7.964)

DCSS 7.964 7.964 Mar-14

39 220kv S/s Maihar -M/s KJS Cement ltd. Amiliya (DIST.-Satna) DCDS line (2x5.60) DCDS 5.6 11.2 Mar-14

40 220kv S/s Anooppur -M/s MB Power ltd. Jaitahri (DIST.-Anooppur) DCSS line (1x20.10) DCSS 20.1 20.1 Mar-14

41M/s Orient Green power Plant to 132kv S/s Gadarwara (DIST.-Narsinghpur) DCSS line (1x5.116)

DCSS 5.116 5.116 Mar-14

42 220kv S/s MandiDeep -M/s Proctor & Gamble MandiDeep (DIST.-Bhpoal) DCSS line (1x9.0) DCSS 9 9 Mar-14

43 220kv S/s Maihar -M/sReliance Cementation maihar (DIST.-Satna) DCSS line (1x11.535) DCSS 11.535 11.535 Mar-14

44Modification / Shifting of 220kv Jabalpur-Amarkantak DCDS Line due to proposed Bilgaon Medium Irrigation tank Project (2x8.04)

DCDS 8.04 16.08 Mar-14

45

Modification / Shifting of 220kv Sukha-Birsinghpur/Amarkantak DCDS Line due to proposed Bilgaon Medium Irrigation tank Project (2x6.56)

DCDS 6.56 13.12 Mar-14

46 132kv DCSS line from132kv s/s Kukshi to M/s Alfa Infra prop 20MW Solar Power .(1x20.283) DCSS 20.283 20.283 Mar-14

47132kv DCSS line for interconnection of 12MW Biomass based Power plant of M/s Salivahana Green Energy with 132 kv s/s Umariya(1x3.932)

DCSS 3.932 3.932 Dec-13

48132kv DCDS line Line from 220kv s/s Rajgarh to 50MW Photo Voltic Power Generating Plant of M/s.NTPC(2x5)

DCDS 5 10 Mar-14

Grand Total 132kv lines 1083.18 1320.80Grand Total (A+B+C) 1747.93 2426.68

S.No. NAME OF THE SUBSTATION VOLTAGE

RATIO (KV)

No.OF X-mer Cap.

(MVA)

EFFECTIVE CAPACITY MVA

COMPLETION PROGRAMME

A. 400 KV SUBSTATIONS

1 Ashta (New S/s) (Distt. Sehore) 400/220 2x315 630 Sep-13

2 Julwania (New S/s) (Distt. Badwani) 400/220 2x315 630 Mar-143 Nagda (ADDL.) (Distt. Ujjain) 400/220 1x315 315 Mar-14

Sub Total (A) (400 kv) 1575B. 220 KV SUBSTATIONS

36th OCC Agenda of MP 20

Page 23: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMME

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

1 Chichli (New S/s) (Distt. Narsinghpur) 220/132 1x160 160 Oct-132 Jabalpur (ADDL) (Distt. Jabalpur) 220/132 1x160 160 Nov-133 Vidisha (ADDL) (Distt. Vidisha) 220/132 1x160 160 Jul-13

4 Gwalior II (New S/s) (Distt. Gwalior) (2x160+40 MVA) 220/132 2x160 320 Mar-14

5 Datiya (New S/s) (Distt. Datiya) (1x160+40 MVA) 220/132 1x160 160 Apr-14

6 Dhar (New S/s) (Distt. Dhar) (1x160+40 MVA) 220/132 1x160 160 Apr-14

7 Julwaniya 220/132kv S/sat 400kv s/s (Distt. Badwani) (2x160+40 MVA) 220/132 2x160 320 May-14

8 Shajapur 220kv S/s (Distt. Shajapur) (2x160+40 MVA) 220/132 2x160 320 May-14

9 Rajgarh(Biora) (ADDL) (Distt. Rajgarh) 220/132 1x160 160 Sep-13

10 Panagar 220kv new s/s (Distt. Jabalpur) (1x160+40 MVA) 220/132 1x160 160 Apr-14

11 Sagar (ADDL) (Distt. Sagar) 220/132 1x160 160 Aug-1312 Badod (ADDL) (Distt. Shajapur) 220/132 1x160 160 Jul-1313 Ratlam(ADDL) (Distt. Ratlam) 220/132 1x160 160 Jul-1314 Ujjain (ADDL) (Distt. Ujjain ) 220/132 1x160 160 Aug-13

Sub Total (B) (220kv) 2720C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Nowgong (Distt. Chhatarpur) 132/33 1x40 40 Sep-132 Simrol (Distt. Indore) 132/33 1x63 63 Jul-133 Amla (Distt. Betul) 132/33 1x40 40 Sep-134 Khirkiya (Distt. Harda) 132/33 1x40 40 Jan-145 Runaha(Distt. Bhopal) 132/33 1x63 63 Jul-136 Satwas(Distt. Dewas) 132/33 1x40 40 Feb-14

7 Hastinapur (New S/s) (Distt.Gwalior) (40 MVA) 132/33 1x40 40 Apr-14

8 Baroda (Distt.Sheopur) 132/33 1x40 40 Feb-14

9 Indore Electronic Complex s/s (Distt.Indore) 132/33 1x40 40 Jan-14

10 Sitamau 132kv s/s (Distt.Mandsaur) 132/33 1x40 40 Sep-1311 Raukhedi 132kv s/s (Distt.Dhar) 132/33 1x63 63 Oct-1312 Anjad 132kv s/s (Distt.Barwani) 132/33 1x40 40 Oct-1313 Baihar132kv s/s (Distt.Balaghat) 132/33 1x40 40 May-1314 Bichhua132kv s/s (Distt.Chhinwara) 132/33 1x40 40 Sep-1315 Tejgarh132kv s/s (Distt.Damoh) 132/33 1x40 40 Sep-1316 Khurai132kv s/s (Distt.Sagar) 132/33 1x40 40 Sep-1317 Budhera132kv s/s (Distt.Sheopur) 132/33 1x40 40 Feb-1418 Laundi132kv s/s (Distt.Chhatarpur) 132/33 1x40 40 Dec-1319 Rampur naikin 132kv s/s (Distt.Sidhi) 132/33 1x40 40 Sep-1320 Shankargarh 132kv s/s (Distt.Dewas) 132/33 1x40 40 Dec-1321 Chandrwatiganj 132kv s/s (Distt.Indore) 132/33 1x40 40 Sep-1322 Barotha (Dewas)132kv s/s (Distt.Dewas) 132/33 1x40 40 Jan-14

23 Barwaha 132kv s/s (Distt.Khargone) 132/33 1x40 40 Jan-14SUB-Total (C.a) 989

(b) ADDITIONAL / AUG. WORKS1 132kv Gairatganj (20-40)MVA Aug. 132/33 20 Aug-132 132kv Petalawad 20MVA Addl. 132/33 1x20 20 Aug-133 132kv Barwaha 20MVA Addl. 132/33 1x20 20 Aug-13

36th OCC Agenda of MP 21

Page 24: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMME

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

4 132kv Ashoknagar 40MVA Addl. 132/33 1x40 40 Aug-135 Rajgarh(Dhar) (ADDL) (Distt.Dhar) 132/33 1x63 63 Aug-136 Ghatabillod (ADDL) (Distt.Indore) 132/33 1x63 63 Sep-13

7 Indore north zone (ADDL) (Distt.Indore) 132/33 1x63 63 Jun-13

8 Balaghat132kv s/s(Addl.) (Distt.Balaghat) 132/33 1x63 63 Aug-13

9 Khajuraho132kv s/s(Addl.) (Distt.Chhatarpur) 132/33 1x63 63 Jul-13

10 132kvkatangi (Balaghat) 20MVA Addl. 132/33 1x20 20 Aug-13SUB-Total (C.b) 435

(c) ADDITIONAL BAY WORKS

1 2Nos.220KV Bays at ASHTA for Shajapur 22okv

220KV Mar-14

2 2Nos.220KV Bays at Pipariya 220kv for Narsinghpur & Itarsi 220KV Sep-13

3 2Nos. Bays at 220kv Bairagarh for Runaha 132kv S/s 132KV Jul-13

4 1No. Bays at Pachhore 132kv for 220kv S/s Shujalpur 132KV Sep-13

5 1No.132kv Bays at Harda 132kv for Khirkiya 132KV Feb-14

6 1No.132kv Bays at Pipariya 220kv Semariharchand(Sohagpur) 132KV Sep-13

7 1No132kv. Bays at Jirapur 132kv for Susner 132KV Sep-13

8 1No132kv. Bays at Sehore 132kv for mugaliyachhaap 220kv 132KV Apr-14

9 1No.132kv Bays at Pipariya 220kv for Bareli 132KV Sep-13

10 1No.132kv Bays at Bareli 132kv for Pipariya 220kv 132KV Sep-13

11 1No132kv. Bays at Ichhawar 132kv for Sehore 132KV Sep-13

12 1No132kv. Bays at Sehore 132kv for Ichhawar 132KV Sep-13

13 1No.132kv Bays at Itarsi 220kv for Nasrullaganj 132KV Mar-14

14 1No.132kv Bays at Nasrullaganj 132kv for 220kv Itarsi 132KV Mar-14

15 1No.132kv Bays at Hosangabad 220kv for Shahganj 132KV May-13

16 1No132kv. Bays at 132kv Khilchipur for Jirapur 132KV Aug-13

17 1No132kv. Bays at Jirapur 132kv for Khilchipur 132KV Aug-13

18 2No.132kv Bays at Datiya (for 132kv interconnector I & II) 132KV Mar-14

19 1No.132kv Bays at Julwaniya 400kv s/s for Anjad 132KV Apr-14

20 1No.132kv Bays at Gautampura 132kv s/s for Depalpur 132KV Nov-13

21 1No.132kv Bays at Depalpur 132kv s/s for Gautampura 132KV Nov-13

22 1No.132kv Bays at Ghatabillod 132kv s/s for Betama 132KV May-14

36th OCC Agenda of MP 22

Page 25: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMME

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

23 1No.132kv Bays at Betama 132kv s/s for Ghatabillod 132KV May-14

24 1No.132kv Bays at Pithampur 220kv s/s for Jamli 132KV Jun-13

25 1No.132kv Bays at Jamli 220kv s/s for Pithampur 132KV Jun-13

26 1No.132kv Bays at Gautampura 132kv s/s forBADNAGAR 132KV Jun-13

27 1No.132kv Bays at Pithampur 220kv s/s for Betama 132KV Jun-13

28 1No.132kv Bays at Betama 220kv s/s for Pithampur 132KV Jun-13

29 1No.132kv Bays at Pithampur 220kv s/s for Bagdi 132KV Jun-13

30 1No.132kv Bays at Bagdi 220kv s/s for Pithampur 132KV Jun-13

31 1No.132kv Bays at Chhindwara 220kv s/s for Bichhua 132KV Sep-13

32 1Nos.220KV Bays at Damoh 22okvs/s for Tikamgarh 220KV Apr-14

33 1Nos.220KV Bays at Tikamgarh 22okvs/s for 220KV A 1433 y gDamoh 220KV Apr-14

34 1No.220kv Bays at CHHATARPUR 220kv s/s for Satna 220kv May-14

35 1No.132kv Bays at Sagar 220kv s/s for Rahatgarh 132KV Sep-13

36 1No.132kv Bays at Bina 220kv s/s for Khurai 132KV Sep-13

37 1No.132kv Bays at Tikamgarh 220kv s/s for Budhera 132KV Dec-13

38 1No.132kv Bays atChhatarpur 220kv s/s for Laundi 132KV Dec-13

39 1No.132kv Bays at Tikamgarh 220kv s/s for Degoda 132KV Sep-13

40 1No.132kv Bays at Damoh 220kv s/s for Batiyagarh 132KV Sep-13

41 1No.132kv Bays at Sagar 220kv s/s for Gaurjhamar 132KV Jun-13

42 1No.132kv Bays at Gaurjhamar 132kv s/s for Sagar 132KV Jun-13

43 1No.132kv Bays at Rampur baghelaan 132kv s/s for Kotar 132KV Oct-13

44 1No.132kv Bays at Mauganj 132kv s/s for Katra 132KV May-14

45 1No.132kv Bays at Rewa 220kv s/s for Mangawan 132KV Jun-13

46 1No.132kv Bays at Mangawan 132kv s/s for Rewa 132KV Jun-13

47 1No.132kv Bays at Momanbarodiya 132kv s/s for Shajapur 132KV Jan-14

48 2No.132kv Bays at Dewas 220kv s/s for Shankargarh 132KV Sep-13

49 2No.132kv Bays atUjjain 220kv s/s for Chandrawatiganj 132KV Sep-13

36th OCC Agenda of MP 23

Page 26: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

ANNEXURE-2.4.1

(Rs.in Lakhs)S.

No.NAME OF THE TRANSMISSION LINE TYPE OF

CIRCUITSROUTE

LENGTHCKT.KMS. COMPLETION

PROGRAMME

EHV TRANSMISSION LINES FOR THE YEAR 2013-14 (AS ON 30.09.2013)

50 1No.132kv Bays at Shujalpur 220kv s/s for Pachhore 132KV Sep-13

51 1No.132kv Bays atAlot s/s for Sitamau 132KV Sep-13

52 1No.132kv Bays atDewas 220kv s/s for Barotha 132KV Oct-13

53 1No.132kv Bays at Susner 1320kv s/s for Jeerapur 132KV Dec-13

54 1No.132kv Bays at Badod 220kv s/s for Alot 132KV Jan-14

55 1No.132kv Bays at Alot s/s for Badod 132KV Dec-13

56 1No.132kv Bays at Jaora 132 s/s for Khachrod 132KV Apr-14

57 1No.132kv Bays at Neemuch 220kv s/s for Ratangarh 132KV May-13

58 1No.132kv Bays at Ratangarh 132kv s/s for Neemuch 132KV May-13

59 1No.132kv Bays at Badnagar 132kv s/s for Gautampura 132KV Jun-13

60 1No.132kv Bays at Dewas 220kv s/s for Chaapda 132KV Jun-13

61 1No.132kv Bays at Chaapda 132kv s/s for Dewas 132KV Jun-13

36th OCC Agenda of MP 24

Page 27: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

अगस्त-13 �सतम्बर-13 अगस्त-13 �सतम्बर-13

Commissinary HQ 23:48 23:45 23:33 23:33

District HQ 23:50 23:52 23:39 23:33

Tehsil HQ 23:48 23:47 23:22 23:18

Rural -Mixed 23:36 23:37 22:44 22:21

Rural -DLF 23:38 23:39 23:01 22:53

Rural -Irrigation 11:56 11:57 9:39 9:35

अगस्त-13 �सतम्बर-13 अगस्त-13 �सतम्बर-13

Commissinary HQ 23:48 23:46 23:42 23:40

District HQ 23:54 23:39 23:47 23:41

Tehsil HQ 23:25 23:16 23:33 23:29

Rural -3Phase 22:45 22:36 23:06 22:55

Rural -1Phase 23:11 22:59 23:19 23:13

Total Rural 9:32 9:26 10:32 10:29

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

36th OCC Agenda of MP 25

Page 28: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-2.5(ii)

Name of EHV Substation Name of 33kV feeder Date of charging of feeder

132kV Amarwara 33kV Chuimuai 17.04.2013132kV Bankhedi 33kV Panagar 02.03.2011

132kV Rajmilan 33kV Khutar 07.09.2012

33kV Shahdol-I 01.11.201233kV Shahdol-II 03.01.2013

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR(For which group to be allocated)

JABALPUR REGION

132KV

REWA REGION132KV

220KV

LIST OF 33KV FEEDERS UNDER MPMKVVCL, BHOPAL

220kV Anuppur

GWALIOR REGION

220KV Mehgaon 33KV Gangrakhi 20.12.2012

Name of EHV Substation Name of 33KV feeder Date of Charging of feeder

132KV Rajgarh 33KV Amody --132KV Kasrawad 33KV Kasraoal --

220KV Pithampur 33KV Kunvars ---33KV Mital Corp ---

132KV Ujjain 33KV Jyoti Nagar 15.05.2013132KV Makdon132KV Makdon 33KV Banco (Solar Gen Plant) 16.05.2013

33KV Gata 26.05.2013132KV Susner 33KV Friends Salt (Solar Gen Plant) 09.04.2013

132KV Khachrod 33KV Grasim ---132KV MSP (Dewas) 33KV Singawada ---

33KV John Deere-I 21.01.201333KV John Deere-II 21.01.2013

33KV Dewas (VP) --220KV Badod 33KV M&B No.I 30.03.2013

220KV Dewas

INDORE REGION

132KV

132KV

220KV

220 KV

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE

UJJAIN REGION

220KV

36th OCC Agenda of MP 26

Page 29: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-3.3

36th OCC Agenda of MP 27

Page 30: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

36th OCC Agenda of MP 28

Page 31: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

A. ThermalStn. Name UNIT No. Capacity

MW Aug-13 Sep-133 120 47.03 50.694 120 17.23 41.29

PH II 240 64.26 91.985 210 150.69 144.25

PH III 210 150.69 144.25TOT 450 214.95 236.23

1 62.5 23.80 26.232 62.5 26.31 26.504 62.5 19.25 26.41

PH I 187.5 69.37 79.136 200 17.04 0.007 210 93.73 95.90

PH II 410 110.77 95.908 210 0 73.669 210 62.55 82.47

PH III 420 62.55 156.1310 250 32.88 64.91

PH IV 250 32.88 64.91TOT 1267.5 275.57 396.06

1 210 70.109 94.582 210 62.03 105.46

PH I 420 132.13 200.053 210 0.00 64.264 210 117.11 70.14

PH II 420 117.11 134.405 500 286.47 316.43

PH III 500 286.47 316.43TOT 1340 535.71 650.88

3057.5 1026.22 1283.16AMARKANTAK POWER HOUSE-I RETIRED FROM SERVICE WEF 01.04.2009

B. HydelCapacity

MW Aug-13 Sep-13115.0 68.79 29.96172.0 120.27 29.6399.0 58.13 20.42

386.0 247.19 80.01193.0 123.60 40.00160.0 44.74 64.45107.0 29.83 42.9790.0 63.28 40.29

315.0 169.41 171.6620.0 15.00 8.3160.0 44.04 34.5830.0 2.20 15.7745.0 10.17 2.8922.5 5.08 1.4420.0 2.93 15.0360.0 43.70 10.52

1186.0 642.67 443.49915.0 464.27 393.45917.5 499.07 380.56

CapacityMW Aug-13 Sep-13

Indira Sagar Hydel Project 1000 703.498 470.163Omkareshwar Hydel Project 520 187.658 189.807

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

M.P.CHAMBALPENCHM.P.PENCHBARGITONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

36th OCC Agenda of MP 29

Page 32: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Ann 4.2

S.No. Particulars अगस्त-13 िसतम्बर-13

1 MPSEB Thermal Availability 892.07 1139.37

2 MPSEB Hydel Availability 491.28 379.12

3 Indira Sagar 692.96 467.90

4 Omkareshwar 187.66 189.81

5 Schedule / Drawal From Central Sector 1225.66 1419.70

6 Schedule of DVC 189.03 247.91

7 Schedule of Sujen 23.83 22.74

8 Lanco AMK + Essar 146.68 170.70

9 Sasan 22.85 60.94

10 Sardar Sarovar 505.37 450.37

11 Additional Power Purchase 0.69 0.80

12 Sale of Power -231.93 -160.17

13 Banking of Power -869.14 -567.44

14 Energy Exchange 0.00 0.00

15 Unschedule Interchange -9.41 -5.02

16 Medium Term Power Purchase from CSPDCL & Balco 0.00 70.95

17 Other Imp / Exp 144.95 262.65

18 Total MPSEB Supply excl. Aux. Cons. 3412.55 4150.33

19 Average Supply per Day 110.08 138.34

20 Maximum Daily M.P. Supply 113.51 154.79

21 Minimum Daily M.P. Supply 96.03 113.68

22 Registered Demand : MW 5787 7395

23 Unrestricted Demand : MW 5816 7623

MP SUPPLY EXCLUDING AUXILIARY CONS. in Million Units

36th OCC Agenda of MP 30

Page 33: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-4.3(i)

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injectio

n

Total CSS DVC ER Sugen Lanco Sasan SSP SEZ Banking Sale Pur

Total

MTOAat MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH TOTAL

1:00 50.13 1352 1231 642 953 257 50 9 3142 1523 232 31 176 30 686 12 -1172 -327 0 0 91 12 1294 4230 1382 88 8 4532 0 0 0 4514 4514

2:00 50.17 1366 1243 612 946 254 50 8 3114 1539 241 31 173 28 684 12 -1172 -282 0 0 93 12 1359 4271 1343 -16 8 4465 0 0 0 4442 4442

3:00 50.23 1358 1236 587 941 254 50 8 3076 1510 256 31 170 29 684 12 -1172 -261 0 0 94 12 1365 4241 1345 -20 8 4429 0 0 0 4397 4397

4:00 50.25 1360 1238 585 942 253 50 8 3076 1480 260 31 170 31 679 12 -1172 -251 0 0 94 12 1346 4221 1325 -21 8 4409 0 0 0 4376 4376

5:00 50.11 1363 1240 579 941 253 50 9 3072 1368 260 31 170 27 677 12 -1172 -130 0 0 97 12 1352 4227 1315 -37 8 4395 0 0 0 4380 4380

6:00 50.17 1372 1249 627 945 255 46 10 3131 1346 260 31 170 28 679 12 -1172 -107 0 0 98 12 1359 4291 1384 25 8 4522 0 0 0 4499 4499

7:00 50.19 1381 1257 653 953 263 46 10 3182 1358 259 31 170 31 678 12 -1224 -50 0 0 96 12 1375 4355 1482 108 8 4672 0 0 0 4646 4646

8:00 50.22 1380 1256 626 957 260 45 13 3158 1423 259 31 170 32 676 12 -1224 -56 0 0 95 12 1430 4385 1498 68 8 4664 0 0 0 4632 4632

9:00 50.16 1378 1254 624 953 259 47 17 3153 1497 260 31 176 33 680 12 -1224 -145 0 0 91 12 1423 4366 1405 -19 8 4565 0 0 0 4543 4543

10:00 50.14 1378 1254 622 957 259 50 20 3161 1526 232 31 186 35 679 12 -1224 -303 0 0 87 12 1274 4214 1266 -8 8 4435 0 0 0 4416 4416

11:00 50.12 1373 1249 600 942 260 50 21 3122 1584 229 31 186 35 682 12 -1224 -429 0 0 82 12 1201 4102 1131 -70 8 4261 0 0 0 4245 4245

12:00 50.18 1371 1247 578 942 261 50 21 3101 1590 228 31 189 36 683 12 -1224 -460 0 0 81 12 1177 4053 1018 -159 8 4127 0 0 0 4105 4105

13:00 50.24 1370 1246 585 941 257 46 25 3100 1459 225 31 180 31 683 12 -1224 -467 0 0 81 12 1023 3912 931 -92 8 4039 0 0 0 4009 4009

14:00 50.12 1354 1232 571 941 255 46 24 3070 1445 225 31 168 31 683 12 -1224 -456 0 0 82 12 1010 3881 915 -96 8 3992 0 0 0 3978 3978

15:00 50.09 1361 1239 585 946 253 46 22 3091 1435 225 31 168 31 683 12 -1224 -509 0 0 80 12 945 3837 908 -37 8 4006 0 0 0 3996 3996

16:00 50.14 1341 1220 586 948 252 45 18 3069 1421 225 31 168 25 680 12 -1224 -455 0 0 83 12 979 3855 994 15 8 4071 0 0 0 4053 4053

17:00 50.23 1352 1230 561 941 249 45 14 3041 1408 225 31 171 25 677 12 -1224 -294 0 0 87 12 1131 3975 1191 60 8 4240 0 0 0 4210 4210

18:00 50.14 1359 1237 587 947 253 45 12 3080 1516 225 31 171 26 674 12 -1261 -144 0 0 88 12 1350 4233 1406 56 8 4495 0 0 0 4475 4475

19:00 49.98 1381 1256 634 950 253 46 10 3150 1871 272 31 255 26 681 12 -984 -464 0 0 84 12 1798 4667 1917 119 8 5075 0 0 0 5077 5077

20:00 50.04 1431 1302 668 955 252 47 11 3235 2104 318 31 255 26 688 12 -984 -434 0 0 71 12 2099 5053 2146 47 8 5389 0 0 0 5382 5382

21:00 50.02 1438 1309 639 951 251 46 9 3205 2103 306 31 255 27 688 12 -984 -389 0 0 77 12 2140 5063 2053 -86 8 5266 0 0 0 5262 5262

22:00 50.06 1425 1297 616 942 249 46 9 3159 2084 305 31 252 27 688 12 -984 -407 0 0 79 12 2099 4979 1912 -188 8 5079 0 0 0 5070 5070

23:00 50.07 1399 1273 624 947 250 46 9 3149 1990 246 31 258 30 687 12 -1172 -366 0 0 59 12 1789 4650 1735 -54 8 4892 0 0 0 4881 4881

24:00 50.15 1362 1240 638 950 257 46 9 3140 1850 238 31 198 32 687 12 -1172 -361 0 0 83 12 1610 4520 1551 -59 8 4699 0 0 0 4677 4677

Avg. 50.14 1375 1251 610 947 255 47 14 3124 1601 250 31 192 30 682 12 -1168 -315 0 0 86 12 1402 4316 1398 -16 8 4530 0 0 0 4511 4511

00 TO 06 HRS. 50.18 1362 1239 605 945 254 49 9 3102 1461 251 31 172 29 681 12 -1172 -226 0 0 94 12 1346 4247 1349 3 8 4459 0 0 0 4435 4435

06 TO 12 HRS. 50.17 1377 1253 617 951 260 48 17 3146 1496 245 31 180 34 680 12 -1224 -241 0 0 88 12 1313 4246 1300 -13 8 4454 0 0 0 4431 4431

12 TO 18 HRS. 50.16 1356 1234 579 944 253 45 19 3075 1447 225 31 171 28 680 12 -1230 -388 0 0 83 12 1073 3949 1057 -15 8 4141 0 0 0 4120 4120

06TO 18 HRS. 50.17 1366 1243 598 947 257 47 18 3111 1472 235 31 175 31 680 12 -1227 -314 0 0 86 12 1193 4097 1179 -14 8 4297 0 0 0 4276 4276

18 TO 24 HRS. 50.05 1406 1280 636 949 252 46 10 3173 2001 281 31 246 28 687 12 -1047 -404 0 0 76 12 1923 4822 1886 -37 8 5067 0 0 0 5058 5058

UI

Intra State STO

A

DEMAND MET

Load Shedding

REST.

DEMAND

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- अगस्त 2013

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

36th OCC Agenda of MP 31

Page 34: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-4.3(ii)

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injectio

n

Total CSS DVC ER Sugen Lanco Sasan Essar SSP SE

Z Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 50.03 1788 1627 538 735 303 221 3 3427 1944 332 31 238 84 5 604 14 -962 -187 0 100 20 15 2237 5338 2191 -42 8 5626 0 0 0 5622 5622

2:00 50.05 1784 1623 520 671 282 222 3 3321 1942 336 30 238 85 5 604 14 -962 -157 0 100 21 15 2271 5264 2167 -99 8 5496 0 0 0 5487 5487

3:00 50.06 1781 1621 501 613 267 218 3 3223 1938 340 30 235 81 5 604 14 -962 -136 0 100 23 15 2287 5190 2221 -62 8 5451 0 0 0 5442 5442

4:00 50.11 1776 1616 490 602 260 218 3 3190 1900 341 30 235 78 5 604 14 -962 -107 0 100 25 15 2278 5150 2223 -51 8 5421 0 0 0 5403 5403

5:00 50.05 1788 1627 498 619 265 220 4 3233 1907 341 30 235 81 5 604 14 -969 -109 0 100 27 15 2282 5194 2213 -65 8 5453 0 0 0 5445 5445

6:00 50.13 1781 1620 525 682 283 224 3 3336 1899 341 30 235 82 5 604 14 -962 -119 0 100 28 15 2272 5287 2311 43 8 5656 0 0 0 5634 5634

7:00 50.11 1784 1624 534 696 282 217 8 3361 1888 340 30 231 84 5 604 14 -711 -134 0 100 31 15 2498 5539 2457 -36 8 5826 0 0 0 5808 5808

8:00 50.13 1777 1617 527 713 283 217 20 3376 1876 332 30 228 86 5 605 14 -685 -130 0 100 35 15 2510 5567 2406 -99 8 5790 0 0 0 5768 5768

9:00 50.05 1760 1601 534 701 277 217 34 3364 1861 326 30 223 81 5 605 14 -686 -252 0 100 25 15 2348 5403 2264 -79 8 5636 0 0 0 5628 5628

10:00 50.14 1755 1597 525 656 261 216 44 3299 1839 325 30 223 80 5 641 14 -688 -308 0 93 21 15 2291 5283 2157 -130 8 5464 0 0 0 5442 5442

11:00 50.05 1749 1591 493 569 224 217 56 3150 1822 318 30 219 81 5 667 14 -688 -340 0 95 19 15 2257 5102 2111 -141 8 5269 0 0 0 5263 5263

12:00 50.09 1735 1579 471 516 216 218 59 3059 1797 313 31 219 79 5 670 14 -688 -329 0 93 20 15 2238 4994 2016 -218 8 5083 0 0 0 5069 5069

13:00 50.16 1727 1571 451 475 200 213 57 2967 1777 292 31 204 75 5 671 14 -690 -333 0 93 22 15 2176 4859 2071 -101 8 5046 0 0 0 5023 5023

14:00 50.03 1725 1570 437 448 190 214 52 2912 1764 293 31 201 76 5 671 14 -690 -326 0 93 22 15 2168 4798 2088 -75 8 5008 0 0 0 5005 5005

15:00 50.08 1738 1581 466 460 192 209 46 2955 1774 293 31 192 79 5 670 14 -689 -352 0 93 18 15 2142 4821 2094 -44 8 5056 0 0 0 5044 5044

16:00 50.11 1726 1570 469 492 200 214 32 2977 1790 299 31 192 81 5 663 14 -689 -343 0 93 19 15 2170 4870 2114 -51 8 5099 0 0 0 5082 5082

17:00 50.11 1725 1570 491 504 209 214 18 3006 1822 301 31 195 85 5 663 14 -689 -299 0 93 23 15 2260 4981 2188 -68 8 5201 0 0 0 5185 5185

18:00 50.06 1746 1589 536 663 270 217 6 3281 1869 299 31 199 83 5 663 14 -723 -245 0 93 31 15 2333 5327 2267 -61 8 5556 0 0 0 5547 5547

19:00 49.92 1795 1633 624 873 333 220 3 3687 2057 391 31 237 85 5 674 14 -716 -219 7 104 26 15 2710 6071 2722 17 8 6417 0 0 0 6434 6434

20:00 50.14 1823 1659 621 879 346 221 4 3728 2123 407 31 237 85 5 702 14 -714 -212 4 104 -2 15 2799 6201 2790 -5 8 6526 0 8 8 6508 6508

21:00 50.05 1834 1669 606 819 331 221 4 3648 2112 398 31 234 84 5 717 14 -748 -183 7 104 0 15 2787 6113 2695 -87 8 6351 0 7 7 6349 6349

22:00 50.12 1837 1672 568 794 315 221 4 3574 2104 392 31 240 84 5 703 14 -742 -201 7 104 1 15 2757 6003 2591 -161 8 6173 0 0 0 6151 6151

23:00 50.06 1835 1670 549 826 329 222 3 3599 2099 384 31 248 83 5 649 14 -938 -161 0 102 -5 15 2527 5789 2428 -94 8 6034 0 0 0 6025 6025

24:00 50.09 1829 1664 529 800 326 224 3 3545 2037 353 31 248 82 5 619 14 -969 -170 0 100 8 15 2374 5584 2267 -102 8 5820 0 0 0 5804 5804

Avg. 50.08 1775 1615 521 659 268 218 20 3301 1914 337 31 224 82 5 645 14 -788 -223 1 98 19 15 2359 5364 2294 -75 8 5602 0 1 1 5590 5590

00 TO 06 HRS.

50.07 1783 1622 512 654 277 220 3 3288 1922 339 30 236 82 5 604 14 -963 -136 0 100 24 15 2271 5237 2221 -46 8 5517 0 0 0 5506 5506

06 TO 12 HRS.

50.09 1760 1602 514 642 257 217 37 3268 1847 326 30 224 82 5 632 14 -691 -249 0 97 25 15 2357 5315 2235 -117 8 5511 0 0 0 5496 5496

12 TO 18 HRS.

50.09 1731 1575 475 507 210 214 35 3016 1799 296 31 197 80 5 667 14 -695 -317 0 93 22 15 2208 4943 2137 -66 8 5161 0 0 0 5148 5148

06TO 18 HRS.

50.09 1746 1588 495 574 234 215 36 3142 1823 311 31 211 81 5 649 14 -693 -283 0 95 24 15 2283 5129 2186 -92 8 5336 0 0 0 5322 5322

18 TO 24 HRS.

50.06 1825 1661 583 832 330 221 3 3630 2089 388 31 241 84 5 677 14 -804 -191 4 103 5 15 2659 5960 2582 -72 8 6220 0 2 2 6212 6212

UI

Intra State STO

A

DEMAND MET

Load Shedding

REST.

DEMAND

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- �सतम्बर 2013

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

36th OCC Agenda of MP 32

Page 35: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-4.4(i)

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 50.13 1346 1571 225 0 0 1565 1565 1367 1546 179 0 0 1540 1540 1793 1415 -378 0 0 1409 1409

2:00 50.17 1359 1556 197 0 0 1548 1548 1378 1518 140 0 0 1511 1511 1803 1391 -413 0 0 1384 1384

3:00 50.23 1344 1548 204 0 0 1537 1537 1363 1502 139 0 0 1491 1491 1784 1379 -405 0 0 1369 1369

4:00 50.25 1337 1540 203 0 0 1528 1528 1357 1483 126 0 0 1472 1472 1777 1386 -391 0 0 1376 1376

5:00 50.11 1327 1513 186 0 0 1508 1508 1356 1485 128 0 0 1480 1480 1776 1397 -379 0 0 1392 1392

6:00 50.17 1346 1498 152 0 0 1490 1490 1382 1549 167 0 0 1541 1541 1807 1476 -332 0 0 1468 1468

7:00 50.19 1363 1491 128 0 0 1482 1482 1400 1625 225 0 0 1616 1616 1829 1557 -272 0 0 1548 1548

8:00 50.22 1379 1455 77 0 0 1446 1446 1411 1612 201 0 0 1601 1601 1841 1596 -245 0 0 1586 1586

9:00 50.16 1377 1413 37 0 0 1407 1407 1403 1568 165 0 0 1561 1561 1832 1584 -249 0 0 1576 1576

10:00 50.14 1335 1383 48 0 0 1377 1377 1358 1509 150 0 0 1502 1502 1778 1543 -236 0 0 1536 1536

11:00 50.12 1303 1353 50 0 0 1348 1348 1319 1433 114 0 0 1427 1427 1729 1475 -254 0 0 1470 1470

12:00 50.18 1290 1329 39 0 0 1322 1322 1302 1372 71 0 0 1365 1365 1710 1425 -285 0 0 1418 1418

13:00 50.24 1229 1297 68 0 0 1287 1287 1250 1349 98 0 0 1339 1339 1646 1393 -253 0 0 1383 1383

14:00 50.12 1215 1265 49 0 0 1260 1260 1236 1345 110 0 0 1340 1340 1632 1383 -250 0 0 1378 1378

15:00 50.09 1203 1280 76 0 0 1276 1276 1225 1343 117 0 0 1339 1339 1619 1384 -235 0 0 1381 1381

16:00 50.14 1218 1279 60 0 0 1273 1273 1239 1386 147 0 0 1380 1380 1639 1406 -233 0 0 1400 1400

17:00 50.23 1253 1313 60 0 0 1304 1304 1277 1455 179 0 0 1445 1445 1680 1471 -209 0 0 1461 1461

18:00 50.14 1336 1407 71 0 0 1401 1401 1360 1543 182 0 0 1536 1536 1781 1545 -236 0 0 1538 1538

19:00 49.98 1509 1695 187 0 0 1696 1696 1516 1702 187 0 0 1703 1703 1963 1677 -286 0 0 1678 1678

20:00 50.04 1631 1830 199 0 0 1828 1828 1631 1812 181 0 0 1810 1810 2095 1747 -348 0 0 1745 1745

21:00 50.02 1643 1811 168 0 0 1809 1809 1643 1771 129 0 0 1770 1770 2107 1684 -423 0 0 1683 1683

22:00 50.06 1622 1745 123 0 0 1742 1742 1617 1717 99 0 0 1714 1714 2078 1617 -461 0 0 1615 1615

23:00 50.07 1516 1686 170 0 0 1682 1682 1515 1649 134 0 0 1645 1645 1960 1557 -403 0 0 1553 1553

24:00 50.15 1449 1624 176 0 0 1617 1617 1452 1589 137 0 0 1581 1581 1892 1486 -406 0 0 1479 1479

Avg. 50.14 1372 1495 123 0 0 1489 1489 1390 1536 146 0 0 1530 1530 1815 1499 -316 0 0 1493 1493

00 TO 06 HRS. 50.18 1343 1538 194 0 0 1529 1529 1367 1514 147 0 0 1506 1506 1790 1407 -383 0 0 1400 1400

06 TO 12 HRS. 50.17 1341 1404 63 0 0 1397 1397 1366 1520 154 0 0 1512 1512 1787 1530 -257 0 0 1522 1522

12 TO 18 HRS. 50.16 1242 1307 64 0 0 1300 1300 1265 1403 139 0 0 1397 1397 1666 1430 -236 0 0 1423 1423

06TO 18 HRS. 50.17 1292 1355 64 0 0 1349 1349 1315 1462 147 0 0 1454 1454 1726 1480 -246 0 0 1473 1473

18 TO 24 HRS. 50.05 1562 1732 170 0 0 1729 1729 1562 1707 144 0 0 1704 1704 2016 1628 -388 0 0 1625 1625

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- अगस्त 2013

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE

36th OCC Agenda of MP 33

Page 36: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-4.4(ii)

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 50.03 1745 1846 100 0 0 1844 1844 1782 2014 233 0 0 2013 2013 2165 1766 -399 0 0 1765 1765

2:00 50.05 1733 1817 84 0 0 1815 1815 1767 1983 216 0 0 1980 1980 2135 1695 -439 0 0 1693 1693

3:00 50.06 1718 1815 98 0 0 1812 1812 1747 1955 208 0 0 1951 1951 2096 1681 -415 0 0 1679 1679

4:00 50.11 1703 1795 92 0 0 1789 1789 1735 1946 211 0 0 1939 1939 2079 1680 -399 0 0 1675 1675

5:00 50.05 1712 1793 81 0 0 1790 1790 1745 1955 210 0 0 1952 1952 2098 1706 -392 0 0 1703 1703

6:00 50.13 1731 1795 64 0 0 1788 1788 1770 2049 279 0 0 2041 2041 2143 1812 -332 0 0 1805 1805

7:00 50.11 1800 1773 -28 0 0 1767 1767 1844 2121 277 0 0 2114 2114 2236 1932 -304 0 0 1927 1927

8:00 50.13 1804 1720 -84 0 0 1713 1713 1848 2084 236 0 0 2075 2075 2247 1987 -260 0 0 1979 1979

9:00 50.05 1750 1671 -79 0 0 1668 1668 1791 2000 209 0 0 1997 1997 2178 1965 -213 0 0 1962 1962

10:00 50.14 1714 1629 -86 0 0 1622 1622 1752 1917 165 0 0 1909 1909 2121 1918 -203 0 0 1911 1911

11:00 50.05 1659 1587 -72 0 0 1585 1585 1693 1848 155 0 0 1846 1846 2027 1833 -194 0 0 1832 1832

12:00 50.09 1629 1559 -69 0 0 1555 1555 1661 1797 136 0 0 1792 1792 1979 1727 -252 0 0 1722 1722

13:00 50.16 1589 1527 -62 0 0 1520 1520 1620 1773 154 0 0 1765 1765 1917 1746 -171 0 0 1738 1738

14:00 50.03 1571 1485 -85 0 0 1484 1484 1602 1779 177 0 0 1778 1778 1888 1744 -144 0 0 1743 1743

15:00 50.08 1577 1505 -71 0 0 1502 1502 1610 1785 175 0 0 1781 1781 1899 1766 -133 0 0 1762 1762

16:00 50.11 1593 1505 -89 0 0 1500 1500 1625 1812 187 0 0 1806 1806 1928 1782 -145 0 0 1777 1777

17:00 50.11 1638 1515 -123 0 0 1511 1511 1670 1861 191 0 0 1855 1855 1987 1825 -162 0 0 1820 1820

18:00 50.06 1729 1661 -69 0 0 1658 1658 1765 1979 214 0 0 1976 1976 2145 1916 -228 0 0 1913 1913

19:00 49.92 1957 2063 106 0 0 2069 2069 1992 2253 261 0 0 2259 2259 2472 2101 -371 0 0 2106 2106

20:00 50.14 2002 2147 146 0 2 2141 2141 2032 2300 268 0 6 2296 2296 2522 2079 -443 0 0 2071 2071

21:00 50.05 1984 2096 111 0 2 2095 2095 2013 2245 231 0 4 2246 2246 2484 2011 -473 0 0 2008 2008

22:00 50.12 1953 2045 92 0 0 2037 2037 1981 2210 229 0 0 2202 2202 2436 1919 -517 0 0 1912 1912

23:00 50.06 1878 1981 103 0 0 1977 1977 1909 2153 244 0 0 2149 2149 2355 1901 -454 0 0 1898 1898

24:00 50.09 1811 1902 91 0 0 1897 1897 1843 2068 225 0 0 2062 2062 2251 1850 -401 0 0 1845 1845

Avg. 50.08 1749 1760 10 0 0 1756 1756 1783 1995 212 0 0 1991 1991 2158 1848 -310 0 0 1844 1844

00 TO 06 HRS. 50.07 1724 1810 86 0 0 1806 1806 1758 1984 226 0 0 1979 1979 2119 1723 -396 0 0 1720 1720

06 TO 12 HRS. 50.09 1726 1656 -70 0 0 1652 1652 1765 1961 196 0 0 1956 1956 2131 1894 -238 0 0 1889 1889

12 TO 18 HRS. 50.09 1616 1533 -83 0 0 1529 1529 1649 1832 183 0 0 1827 1827 1961 1797 -164 0 0 1792 1792

06TO 18 HRS. 50.09 1671 1595 -76 0 0 1590 1590 1707 1896 190 0 0 1891 1891 2046 1845 -201 0 0 1840 1840

18 TO 24 HRS. 50.06 1931 2039 108 0 1 2036 2036 1962 2205 243 0 2 2202 2202 2420 1977 -443 0 0 1973 1973

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- �सतम्बर 2013

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE

36th OCC Agenda of MP 34

Page 37: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-5.0

SYSTEM DISTURBANCE August & September-2013

System Disturbance / System Incidence : 1. System Disturbance on 03.08.13 at 220KV S/s Malanpur : On dated 03.08.13 at around

22:18Hrs MP system was running normal at frequency 49.82 Hz with N-E-W grid. At around 22:20 Hrs. there was a transient fault on 132KV Malanpur-Ambah Ckt. (Radial Feeder) but the breaker of the same Ckt. did not trip (due to mechanical problem) and the fault was carried to 132KV Bus at 220KV S/s Malanpur, resulting 220/132KV, 160 MVA BHEL X’mer & 160 MVA CGL X’mer tripped at 220KV S/s Malanpur and 132KV Malanpur-Mehgaon Ckt. tripped from 220KV S/s Mehgaon end. Hence 132KV Supply failed at 220KV S/s Malanpur, 132KV S/s Ambah, 132KV S/s Morar, 132KV S/s Banmore, 132KV S/s Morena (Radially fed from 132KV S/s Banmore). There was consumer load loss due to this tripping of about 118.36 MWH for approx. 01 Hour 40 Minutes. System was normalized in due course of time.

2. System Disturbance on 05.08.13 at 220KV S/s Shujalpur : On dated 05.08.13 at around 16:25 Hrs MP system was running normal at frequency 50.07Hz with N-E-W grid. At 16:28 Hrs, Earth Wire of 132KV Shujalpur-Pachore Ckt broke and fault was carried to 220/132KV, 160 MVA X’mer-I,II&III and hence tripped these X’mer’s & 132KV Shujalpur-Pachore Ckt. tripped on Backup protection. Also 220KV Shujalpur-Shujalpur PGCIL Ckt-I&II tripped from 400KV S/s Shujalpur PGCIL end & 220KV S/s Shujalpur end respectively. Consequently interruption occurred at 132KV S/s Pachore. There was consumer load loss due to this tripping of about 7.4 MWH for approx. 37 Minutes. System was normalized in due course of time.

3. System Disturbance on 16.08.13 at 220KV S/s Shivpuri : On dated 16.08.13 at around 17:55 Hrs MP system was running normal at frequency 49.87 Hz with N-E-W grid. At around 17:58 Hrs. there was flash over on the Auxiliary Bus side isolator of 132KV Shivpuri-Kolaras Ckt. (Radial Feeder) and Breaker of the same feeder did not trip which in turn created the 132KV & 220KV Bus Fault at 220KV S/s Shivpuri. Consequently 132KV Interconnector–I&II, 220KV Shivpuri-Bina (PGCIL) Ckt., 220KV Shivpuri-Bina (MPPTCL) Ckt., 220KV Shivpuri-Sabalgarh Ckt.-I&II tripped and hence interruption occurred at 220KV S/s Shivpuri and 132KV S/s Kolaras. There was consumer load loss due to this tripping of about 14.72 Mwh for approx. 30 Minutes. System was normalized in due course of time.

4. System Disturbance on 22.08.13 at ATPS Chachai : On dated 22.08.13 at around 12:35Hrs MP system was running normal at frequency 50.15Hz with N-E-W grid. At around 12:40Hrs., 220KV side ‘B’–Phase bushing of 220/132KV, 63MVA New Auto-X’mer burst and also damaged the ‘R’ and ‘Y’ phase bushings consequently 220/132KV, 63MVA New Auto-X’mer at ATPS, 132KV ATPS–Anuppur Ckt.–I&II, 220/132KV 160MVA X’mer at 220KV S/s Anuppur and 132/33KV, 40MVA X’mer at 220KV S/s Anuppur tripped and hence 132KV supply failed at ATPS, 132KV Bus at 220KV S/s Anuppur, 132KV S/s Shahdol, 132KV S/s Kotma & 132KV S/s Dindori. There was consumer load loss due to this tripping of about 73.05 MWH for approx. 40Minutes. System was normalized in due course of time.

5. System Disturbance on 02.09.13 at OSP HPS : On dated 02.09.13 at around 14:05Hrs MP system was running normal at frequency 49.83Hz with N-E-W grid. At Omkareshwar HPS, 220KV Omkareshwar-Julwania Ckt. and 220KV Omkareshwar-Khandwa Ckt was open (due to over voltage). At 13:49 Hrs. 220KV Omkareshwar-Barwaha Ckt. tripped from Omkareshwar end on O/C with TOC-STL1, General Trip R-Phase Trip indication and 220KV Omkareshwar-Chhegaon & 220KV Omkareshwar-Nimrani Ckt tripped at 14:05Hrs & 14:08Hrs respectively resulting in all the running M/C at Omkareshwar (i.e. Unit No: 1, 2, 3, 4, 5, 6, 7 & 8) tripped on over frequency due to non-evacuation of power from OSP. There was no consumer load loss due to this tripping, where as generation Loss was about 370MW, 0.209MUs. System was normalized in due course of time.

6. System Disturbance on 21.09.13 at OSP HPS : On dated 21.09.13 at around 13:00Hrs MP system was running normal at frequency 50.28Hz with N-E-W grid. Prior to the fault Unit No.-4 & 6 was running at OSP and 220KV OSP-Julwania Ckt was open. At 13:02Hrs. 220KV OSP-Nimrani Ckt tripped on over voltage and simultaneously at 13:05Hrs 220KV Omkareshwar-Barwaha Ckt, 220KV Omkareshwar-Chhegaon and 220KV Omkareshwar-Khandwa Ckt also tripped on over voltage, resulting in running Unit No- 4 & 6 to tripped on over frequency due to non evacuation of

36th OCC Agenda of MP 35

Page 38: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

power. There was no consumer load loss due to this tripping, where as generation Loss was about 99MW, 0.0165MUs. System was normalized in due course of time.

7. System Disturbance on 30.09.13 at 400KV S/s Indore (M.P) : On dated 30.09.13 at around 18:30Hrs MP System was running normal at frequency 49.99Hz with N-E-W grid. At 18:32Hrs while taking Bus Bar protection in service, bus bar protection relay operated due to missing of contact during switchover for CT selection connected to 400KV Bus-II and resulted in tripping of 400/220KV, 315MVA X’mer-II & IV at 400KV S/s Indore, 400KV Bus Coupler, 400KV Indore-Itarsi Ckt-II & 400KV Indore-Asoj Ckt-II connected to 400 KV Bus-II (400KV ISP-Indore Ckt-I and 400KV Indore-Indore (PGCIL) Ckt-II though connected to Main Bus-II but did not trip due to their Bus Bar Protection link out, hence 400KV Bus-II was still charged). There was no consumer load loss due to this tripping. System was normalized in due course of time.

36th OCC Agenda of MP 36

Page 39: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

36th OCC Agenda of MP 37

Page 40: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

36th OCC Agenda of MP 38

Page 41: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

36th OCC Agenda of MP 39

Page 42: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

NOS. LOAD NOS. LOAD NOS. LOAD NOS. LOAD NOS. LOAD NOS. LOAD

1 JABALPUR  ED‐1 115 24 73 64 46 40 29 19 85 26 348 1732 KATNI ED‐2 30 9 3 4 7 8 15 12 77 43 132 763 NARSINGHPUR ED‐3 35 13 0 0 3 1 2 1 185 57 225 714 CHHINDWARA ED‐4 68 22 101 30 69 25 50 10 22 6 310 925 SEONI ED‐5 11 7 18 3 10 2 56 21 36 11 131 456 BALAGHAT ED‐6 82 39 18 11 0 0 28 13 0 0 128 637 MANDLA ED‐7 10 5 14 5 27 14 56 24 14 5 121 528 DINDORI ED 8 1 1 1 0 19 4 17 5 0 0 38 10

GROUP E TOTAL

Contingency plan of M.P.P.K.V.V.CO. LTD., JABALPURAnnexure- 6.5

DISTT. CODE

District‐wise,Categary mangement group wise no. of 11 KV feeder with MW load:‐ STATEMENT‐"I"

SL.NO NAME OF DISTRICTGROUP A GROUP B GROUP C GROUP D

8 DINDORI ED‐8 1 1 1 0 19 4 17 5 0 0 38 109 SAGAR ED‐9 55 42 86 7 2 1 225 65 0 0 368 11410 DAMOH ED‐10 7 7 12 11 10 3 121 48 0 0 150 6911 TIKAMGARAH ED‐11 0 0 0 0 3 2 2 1 180 73 185 7512 CHHATARPUR ED‐12 0 0 1 0 106 61 22 15 12 16 141 9213 PANNA ED‐13 9 7 0 0 20 9 13 4 50 20 92 4114 REWA ED‐14 27 15 27 15 70 39 83 26 19 6 226 10115  SATNA ED‐15 43 25 52 30 42 16 65 24 58 12 260 10816 SIDHI ED‐16 15 7 20 6 6 21 6 3 46 26 93 6317 SINGRAULI ED‐17 9 4 8 6 9 5 0 0 39 22 65 3718 SHAHDOL ED‐18 7 6 11 5 11 5 25 11 24 8 78 3519 ANOOPPUR ED‐19 0 0 0 0 1 1 9 4 0 0 10 520 UMARIA ED‐20 10 4 12 5 6 5 24 8 20 13 72 35

Total 534 236 457 202 467 262 848 313 867 343 3173 1356L:\36TH OCC\Information\Contingency plan_EZ

36th OCC Agenda of MP 40

Page 43: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

NOS. LOAD NOS. LOAD NOS. LOAD NOS. LOAD NOS. LOAD

1 JABALPUR  ED‐1 7 12 9 35 1 1 35 127 52 176

2 KATNI ED‐2 2 6 10 37 6 23 0 0 18 65

3 NARSINGHPUR ED‐3 22 55 4 12 3 4 0 0 29 71

4 CHHINDWARA ED‐4 15 50 7 17 3 8 0 0 25 75

5 SEONI ED‐5 4 6 8 31 1 4 0 0 13 40

6 BALAGHAT ED‐6 5 12 6 27 1 6 0 0 12 45

7 MANDLA ED‐7 4 10 9 29 1 11 0 0 14 50

8 DINDORI ED‐8 2 4 1 4 1 2 0 0 4 10

9 SAGAR ED‐9 8 25 13 51 1 7 11 30 33 112

NAME OF DISTRICT

DISTT. CODE

Contingency plan of M.P.P.K.V.V.CO. LTD., JABALPUR

SL. NO

District‐wise,Group wise no. of 33 KV feeder with MW load:‐ STATEMENT ‐ "II"TOTALGROUP I‐IV GROUP V‐VI(A) GROUP VII GROUP VIII

9 SAGAR ED 9 8 25 13 51 1 7 11 30 33 112

10 DAMOH ED‐10 8 17 6 37 1 13 0 0 15 67

11 TIKAMGARAH ED‐11 12 34 6 34 2 2 0 0 20 69

12 CHHATARPUR ED‐12 5 20 9 39 7 33 0 0 21 92

13 PANNA ED‐13 0 0 5 35 2 5 0 0 7 40

14 REWA ED‐14 6 21 12 38 0 0 10 49 28 108

15  SATNA ED‐15 17 44 17 46 6 32 0 0 40 122

16 SIDHI ED‐16 2 4 6 34 2 8 0 0 10 46

17 SINGRAULI ED‐17 4 16 1 10 2 11 0 0 7 38

18 SHAHDOL ED‐18 3 2 4 13 5 13 0 0 12 28

19 ANOOPPUR ED‐19 0 0 0 0 2 2 0 0 2 2

20 UMARIA ED‐20 0 0 2 16 2 1 0 0 4 17

126 336 135 543 49 185 56 206 366 1270Total

L:\36TH OCC\Information\Contingency plan_EZ

36th OCC Agenda of MP 41

Page 44: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

No. of 11 KV

feeder

Load in MW

No. of 11 KV feeder

Load in MW

No. of 11 KV feeder

Load in MW

No. of 11 KV feeder

Load in MW

No. of 11 KV feeder

Load in MW

1 Bhopal (o & m) 7 8.02 56 98.37 154 431.93 135 215 70 124

2 Bhopal (CC) 0 0 17 7.27 109 114.74 90 125.33 25 31.41

3 Hoshangabad 22 19.1 3 6.39 4 3.32 49 75.03 220 376.63

4 Betul 67 107.5 69 115.88 71 127.17 8 16.17 0 0

5 Rajgarh 0 0 0 0 2 2.57 80 132.10 187 379.88

"B" Category "C" Category "D" Category "E" Category

Annexure-6.5

BHOPAL REGION

Phase‐ICategory wise Abstract Feeder Master of CZ on 11 kV

Sr. no. Name of Circle

"A" Category

6 Sehore 13 17.23 29 52.20 69 174.09 81 150.34 2 5.31

7 Vidisha 5 3.50 39 50.10 116 180.65 27 26.32 0 0114 155.35 213 330.21 525 1034.47 470 740.29 504 917.23

1 Gwalior (CC) 28 26.38 4 5.63 61 63.64 57 85.36 11 10.57

2 Gwalior (o & m) 5 6.02 15 16.84 0 0 18 35.35 211 260.14

3 Sheopur 3 9.75 15 23.09 0 0 0 0 76 110.12

4 Guna 92 167.09 58 113.90 0 0 125 186.96 126 189.26

5 Morena 5 8.58 2 3.62 4 13.34 32 71.55 111 151.64

6 Shivpuri 1 0.32 12 34.57 53 77.34 93 178.21 0 0

7 Bhind 5 6.87 9 15.45 1 0.16 23 59.93 104 204.76

139 225.01 115 213.1 119 154.48 348 617.36 639 926.49

253 380.36 328 543.31 644 1188.95 818 1357.65 1143 1843.72

Total (BR)

GWALIOR REGION

Total (GR)Total (CZ)

36th OCC Agenda of MP 42

Page 45: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Q‐1 Q‐2 Q‐3 Q‐4Rural (I TO IV) 12 108.15 77.68 221.05 162.70THQ (V TO VI‐A) 28 26.10 22.46 41.28 35.94Rural (I TO IV) 6 53.10 34.11 78.13 75.56THQ (V TO VI‐A) 22 25.66 16.13 38.04 29.81Rural (I TO IV) 16 20.54 12.79 59.90 44.10THQ (V TO VI‐A) 32 4.68 4.17 9.60 5.19Rural (I TO IV) 10 23.02 25.41 56.62 51.90THQ (V TO VI‐A) 26 63.29 47.15 93.52 87.41Rural (I TO IV) 5 82.98 98.89 191.66 134.15THQ (V TO VI‐A) 21 32.72 29.24 50.38 41.10Rural (I TO IV) 11 16.96 10.64 14.95 14.04THQ (V TO VI‐A) 27 42.56 26.39 52.56 50.07Rural (I TO IV) 15 66.68 59.61 101.53 88.38THQ (V TO VI‐A) 31 39.71 29.52 54.41 47.18Rural (I TO IV) 9 32.03 25.79 67.80 77.19THQ (V TO VI‐A) 25 42.61 46.64 71.70 64.69Rural (I TO IV) 14 33.36 24.47 90.37 71.68THQ (V TO VI A) 30 14 86 13 08 39 46 36 03

Distt. Code

Name of Distt. Descipline CMG No.

D4

CONTINGENCY MANAGEMENT GROUPS OF CZ ON 33 KV

AVERAGE QUARTERLY LOAD

Harda

Hoshangabad

Raisen

AshoknagarD9

D1

D2

D3

D5

Phase‐II

Sehore

Betul

Bhopal

Vidisha

Rajgarh

D6

D7

D8

THQ (V TO VI‐A) 30 14.86 13.08 39.46 36.03Rural (I TO IV) 13 76.71 62.55 178.07 164.37THQ (V TO VI‐A) 29 45.27 42.85 94.31 76.79Rural (I TO IV) 8 50.96 54.64 97.46 91.82THQ (V TO VI‐A) 24 41.32 37.16 61.47 54.90Rural (I TO IV) 7 19.33 35.22 43.17 32.19THQ (V TO VI‐A) 23 14.01 16.88 26.71 23.41Rural (I TO IV) 4 23.13 12.96 33.81 25.16THQ (V TO VI‐A) 20 23.84 23.24 33.29 32.77Rural (I TO IV) 3 56.39 49.59 64.28 66.08THQ (V TO VI‐A) 19 40.68 45.98 51.12 46.83Rural (I TO IV) 1 40.31 33.43 95.00 87.47THQ (V TO VI‐A) 17 33.43 27.18 61.77 52.65Rural (I TO IV) 2 64.16 38.55 123.22 125.22THQ (V TO VI‐A) 18 32.38 25.72 39.18 37.13

1290.89 1110.07 2335.78 2033.91

Sheopur

Datia

Gwalior

Bhind

D12

D13

D14

D15

Morena

Guna

Shivpuri

D10

D11

D16

36th OCC Agenda of MP 43

Page 46: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

No. of 11KV Feeders

Load in MWNo. of 11KV Feeders

Load in MWNo. of 11KV Feeders

Load in MWNo. of 11KV Feeders

Load in MWNo. of 11KV Feeders

Load in MW

1 INDORE CITY 117 99.5 142 123.9 39 40.4 0 0 0 02 INDORE O&M 5 2.8 1 0.2 56 37.5 113 62.5 279 88.13 KHANDWA 43 7.4 0 0.0 0 0.0 92 24.1 100 21.44 BURHANPUR 54 34.2 0 0.0 19 4.9 31 6.6 26 4.05 KHARGONE 46 25.6 98 23.1 96 23.2 62 12.1 42 13.36 BARWANI 7 2.8 0 0.0 14 10.7 169 54.3 2 0.87 DHAR 44 10.9 3 0.6 7 5.7 72 26.4 266 69.08 JHABUA 3 1.3 3 1.3 5 7.6 127 29.1 14 2.8

319 185 247 149 236 130 666 215 729 199

INDORE REGION

TOTAL (IR)

Annexure- 6.5Contingency plan of West Discom  : Category wise abstract Feeder Master of WZ on 11KV

S.NO Name of Circle'A'' Category 'B'' Category 'C'' Category 'D'' Category 'E'' Category

1 UJJAIN 215 92.3 3 0.7 5 2.1 51 8.9 309 78.92 DEWAS 38 34.1 21 9.5 8 2.3 307 76.6 1 0.23 SHAJAPUR 0 0.0 0 0.0 0 0.0 18 7.7 340 89.84 RATLAM 14 4.2 32 15.5 60 9.3 145 27.7 100 12.95 MANDSAUR 13 3.7 67 21.9 69 18.1 207 32.2 4 0.76 NEEMUCH 14 12.7 42 12.1 134 27.9 34 7.3 0 0.0

294 147 165 60 276 60 762 160 754 183613 332 412 209 512 190 1428 376 1483 382

UJJAIN REGION

TOTAL (UR)TOTAL (WZ)

36th OCC Agenda of MP 44

Page 47: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Q‐1 Q‐2 Q‐3 Q‐4Rural (I TO IV) 14 83 59 163 127THQ (V TO VI‐A) 27 33 21 42 39Rural (I TO IV) 5 42 36 68 63THQ (V TO VI‐A) 16 21 10 29 29Rural (I TO IV) 13 30 15 29 25THQ (V TO VI‐A) 28 28 13 31 19Rural (I TO IV) 6 80 59 111 107THQ (V TO VI‐A) 17 73 44 96 82Rural (I TO IV) 7 33 22 39 36THQ (V TO VI‐A) 18 59 30 68 67Rural (I TO IV) 3 118 74 203 153THQ (V TO VI‐A) 15 13 8 20 18Rural (I TO IV) 8 11 12 29 21THQ (V TO VI‐A) 24 13 9 23 18THQ (V TO VI‐A) 25 12 6 21 19Rural (I TO IV) 10 101 78 220 165THQ (V TO VI‐A) 26 28 21 38 32Rural (I TO IV) 12 66 47 122 98THQ (V TO VI‐A) 29 49 32 70 73

l ( )

D10 DEWAS

D7 JHABUA

D8 ALIRAJPUR

D9 UJJAIN

D4 KHARGONE

D5 BARWANI

D6 DHAR

D1 INDORE O&M

D2 KHANDWA

D3 BURHANPUR

CONTINGENCY MANAGEMENT GROUPS OF WZ ON 33 KVDistt. Code

Name of Distt. Descipline CMG No.AVERAGE QUARTERLY LOAD

Rural (I TO IV) 1 59 46 118 96THQ (V TO VI‐A) 23 28 19 54 46Rural (I TO IV) 11 52 38 103 90THQ (V TO VI‐A) 20 27 13 49 46Rural (I TO IV) 4 54 42 99 71THQ (V TO VI‐A) 21 23 15 36 29Rural (I TO IV) 15 31 22 42 40THQ (V TO VI‐A) 22 32 17 41 38Rural (I TO IV) 2 12 7 25 19THQ (V TO VI‐A) 19 13 8 22 17

1223 822 2012 1685

D13 MANDSAUR

D14 NEEMUCH

D15 AGAR

D11 SHAJAPUR

D12 RATLAM

36th OCC Agenda of MP 45

Page 48: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure -9.1

I. Interface points where ABT meters has not been provided –

Sr. No. Name of Sub Station Description of Interface Point

1. 132 KV S/s, Ingoria 132/33 kV Xmer, 20 MVA BHEL. 2. 132 KV S/s, Satya Sai 132/33 kV Xmer, 20 MVA NGEF 3. 132 KV S/s, Aron 132/33 kV Xmer, 40MVA EMCO 4. 132 KV S/s, Chhegaon 132/33 kV Xmer, 20 MVA TELK 5. 132 KV S/s, Suwasara 132 kV Suwasara Rly. Traction. 6. 132 KV S/s, Mullapura 132 kV Naikheri Rly, Traction. 7. 132 KV S/s, Panwadi 33 KV Sarangpur feeder. 8. 220 KV S/s, Nepanagar 132 KV Chegaon I (For 132KV Rly.

Tract. Dongargaon-II). 9. 132 KV S/s, Bhonra 132/33 kV Xmer, 20MVA NGEF. 10. 220 KV Nagda 100 MVA LV-I 11. 132 KV S/s ,Alirajpur 132/33 KV Xmer , 63 MVA BBL 12. 132KV S/s ,Marhotal 132/33 KV Xmer , 63MVA Xmer-II 13. 220KV S/s Damoh 132/33 KV Xmer , 20MVA Xmer BBL

14. 132KV S/s Joura 132/33 KV Xmer , 63MVA Vijay Electrical

15. 220KV S/s Nagda 132/33 KV Xmer , 40MVA Xmer BHEL

II. Interface Points where ABT meters are faulty -

Sr. No. Name of Sub Station Description of Interface Point 1. 132 KV S/s, Rewa 132/33 kV Xmer, 40 MVA BHEL. 2. 220 KV S/s, Rewa 132/33 kV Xmer, 40 MVA NGEF. 3. 132 KV S/s, Rewa 132/33 kV Xmer, 40 MVA NGEF. 4. 220 KV S/s, Nagda 132kV Rly. Traction, DRM, Nagda. 5. 132 KV S/s Meghnagar 132kV Rly. Traction, Bamniya. 6. 132KV S/S Morwa 132/33 KV Xmer, 10MVA-II (EMCO)

7. 132KV S/S Neemach 132/33 KV Xmer, 20MVA BBL

8. 132 KV S/s, Jhabua 132/33 kV Xmer, 40MVA EMCO

9. 220 KV S/s, Anuppur 132/33 kV Xmer, 40MVA BBL

10. 220KV S/s Damoh Diamond Cement, Imlai

…..

36th OCC Agenda of MP 46

Page 49: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

Annexure-10.8 TELEMETRY DISCRIPIENCY LIST FOR INDORE T&C CIRCLE Sr.No DESCRIPTION Status telemetry value at

SLDC actual value at site

Burwaha 220 KV S/S 1 220/132KV 160 MVA XMER OLTC 17 3 2 63 MVA XMER OLTC 17 4

Nepanagar 220 KV S/S

1 160 MVA XMER OLTC N/C 2 3X40 MVA XMER OLTC 1 9 3 12.5 MVA XMER OLTC 17 5 4 132/33 XMER (20 MVA) NEW CB,MW,MVAR,SOE

Telemetry Not available

5 132 KV NAPA-BADGAON 6 220/132 KV 3*40 MVA TXMER 220SIDE CB FAULTY CLOSE 7 132 KV BUS COUPLER CB FAULTY CLOSE 8 220KV BUS COUPLER CB FAULTY CLOSE 9 220KV KHANDWA-2 CB FAULTY CLOSE

SOE’S OF ALL THE FEEDERS ARE NOT COMING PITHAMPUR 220 KV S/S

1 220KV BUS XFER CB FAULTY OPEN 2 220KV PITHAMPUR - RAJGARH I CB NC CLOSE 3 220KV PITHAMPUR- RAJGARH II CB NC CLOSE 4 220KV BUS COUPLER CB FAULTY CLOSE 5 PITAMPUR 132 KV-HML CB FAULTY OPEN 6 132 KV TRB CB FAULTY OPEN 7 132 KV BUS COUPLE CB FAULTY CLOSE 8 132 KV IC-2 CB OPEN CLOSE 9 132KV HML MW,MVAR

NOT AVAILABLE,UPGRADATION OF RTU REQUIRED

10 132KV PARASRAMPURIYA MW,MVAR 11 132KV JAMLI MW,MVAR,CB 12 132/33 KV 20MVA TRANSFORMER 2 MW,MVAR,CB,OLTC 13 132/33 KV 40 MVA TRANSFORMER 3 MW,MVAR,CB,OLTC 14 132/33 KV TRANSFORMER 2 OLTC N/C 8 15 220/132 XMER2 OLTC N/C 11

SOE’S OF ALL THE FEEDERS ARE NOT COMING INDORE NZ 220KV S/s

1 220KV BUS COUPLER CB Faulty Close 2 132KV NZ- SANWER MW,MVAR

CB,SOE Telemetry Not Available, Upgradation

required 3 132KV NZ- UJJAIN 4 132KV TRACTION 5 220KV BUS TIE CB FAULTY CLOSE 6 132KV IND NZ-1 CB FAULTY CLOSE 7 220/132 KV 160MVA X-MER 2 OLTC Telemetry Not available

RAJGARH DHAR 220 KV S/s 1 132 KV Bus VOLTAGE NOT COMING 2 132 KV Bus FREQUENCY NOT COMING 3 133/33 KV XMER-1 CB FAULTY CLOSE 4 132 KV BUSCPLR CB FAULTY CLOSE 5 132 KV PETLAWAR CB FAULTY CLOSE 6 220/132 KV X-MER 2 CB FAULTY CLOSE 7 220KV BUS TIE CB FAULTY CLOSE 8 220KV BUS COUPLER CB FAULTY CLOSE

36th OCC Agenda of MP 47

Page 50: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

9 220 KV RAJGRAH (PG)_ 2 CB FAULTY CLOSE Annexure-1 TELEMETRY DISCRIPIENCY LIST FOR NAGDA T&C CIRCLE

Sr.No

DESCRIPTION

status

telemetry value at SLDC

actual value at site

NAGDA 400 KV S/S 1 400Kv SUJALPUR-2 & DEHGAON-2 TIE

BREAKER CB FAULTY CLOSE

2 400/220 KV ICT OLTC N/C 7 NAGDA 220 KV S/S

1 132KV BUSCOUPLER CB FAULTY CLOSE 2 220KV BUS COUPLER CB FAULTY CLOSE

NEEMUCH 220 KV S/S NOTE:-SOE DATA NOT RECEIVED.CONNECTIONS FOR ALL FEEDERS HAVE TO BE VERIFIED

TELEMETRY DISCRIPIENCY LIST FOR UJJAIN T&C CIRCLE

Sr.No DESCRIPTION status telemetry value at SLDC

actual value at site

DEWAS 220 KV S/S

1 132 /33 KV TRANSFORMER 1 ,2 & 3 OLTC N/C 8 2 132 /33 KV TRANSFORMER 3 CB FAULTY CLOSE

BADOD 220KV S/S 1 132 /33 KV TRANSFORMER 1 OLTC N/C | 9

BADNAGAR 220KV S/S

1 220 kv BUS VOLTAGE KV N/C 2 TR 1 160 MVA MW /MVAR N/C 3 TR 2 160 MVA MW /MVAR N/C 4 TR 3 OLTC N/C 5 132 KV RATLAM MW /MVAR N/C 6 132 DEPALPUR MW /MVAR N/C 7 132 KV KANWAN MW /MVAR N/C 8 132/33 KV TR 4 MW /MVAR /

OLTC N/C

9 132 KV BUS VOLTAGE &FREQUENCY V & F N/C Annexure-1

TELEMETRY DISCRIPIENCY LIST FOR SATNA T&C CIRCLE

Sr.No DESCRIPTION Status telemetry value at SLDC

actual value at site

Satna 220 KV S/S 1 220/132 KV TRANSFORMER 1 & 2 OLTC N/C 10

36th OCC Agenda of MP 48

Page 51: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

2 132/33 KV TRANSFORMER 1 & 2 OLTC N/C 7 3 132 SATNA-SATNA IC-1 & 2 CB,MW,MVAR N/C 4 132 KV MAJGAWAN MW, MVAR N/C 5 132 KV SATNA CEMENT MW, MVAR N/C 6 132 KV PANNA MW, MVAR N/C

7 132 KV PAWAI MW, MVAR N/C 8 132 KV PRISM CEMENT MW, MVAR N/C 9 220KV KOTAR CB FAULTY CLOSE

Morwa 132 KV S/S MORWA RTU FAILED TELEMETRY NOT COMING

KOTMA 132 KV S/S 1 132 KV ARYA ENERGY MW, MVAR 0 /0 | 7 /1

Annexure-1

TELEMETRY DISCRIPIENCY LIST FOR JABALPUR T&C CIRCLE

Sr.No DESCRIPTION Status telemetry value at SLDC

actual value at site

NARSINGPUR 220KV S/s 1 220/132 TRANSFORMER-2 CB FAULTY CLOSE 2 220/132 BHEL TR MW 148 0 3 220/132 BHEL TR MVAR 10 8 4 220/132 CGL TR MW 292 20 5 220/132 CGL TR MVAR 13 10 6 220/132 KV TRANSFORMER 1 OLTC N/C 7 7 220/132 KV TRANSFORMER 2 OLTC N/C 5 8 132/33 KV TRANSFORMER 1 OLTC N/C 6 9 132 BUS TRANSFER CB FAULTY CLOSE

10 220 KV PIPARIA CB FAULTY CLOSE 11 220 KV ITARSI CB FAULTY CLOSE 12 132 KV I / C II MW 90 5 13 132 Narsingpur-Barman-2 CB,SOE,MW,MVAR TELEMETRY NOT AVAILABLE 14 132/33 TRANSFORMER-2

SOE’S OF ALL THE FEEDERS ARE NOT COMING Jabalpur 220 KV S/S

1 220 KV NARSINGPUR 1 CB OPEN CLOSE 2 220KV B / C CB FAULTY CLOSE 3 132KV BARGI -I

MW,MVAR

TELEMETRY NOT AVAILABLE 4 132KV BARGI -II NOTE:- SOE OF ALL THE FEEDERS ARE NOT COMING KATNI 220 KV S/S

1 220 KV BUS COUPLER CB FAULTY CLOSE 2 220 KV TRB CB FAULTY OPEN 3 220/132 KV TRANSFORMER 2 MW,MVAR NOT AVAILABLE 4 220/132 KV TRANSFORMER 2 CB,OLTC NOT AVAILABLE 5 132/132 KV TRANSFORMER 1 MW,MVAR NOT AVAILABLE

36th OCC Agenda of MP 49

Page 52: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

6 220/132 KV TRANSFORMER 1 132 SIDE CB FAULTY CLOSE 7 132/33 KV TRANSFORMER 1& 2 MW,MVAR,OLTC NOT AVAILABLE 8 132/33 KV TRANSFORMER 1& 2 CB,SOE NOT AVAILABLE 9 132KV Interconnector 1 & 2 MW,MVAR

10 132/33 TR-1 CB FAULTY OPEN 11 132/33 IC-1 & CB FAULTY OPEN 12 132/33 KYMORE-1 & 2 CB FAULTY OPEN

SOE’S OF ALL THE FEEDERS ARE NOT COMING

CHINDWADA 220 KV S/S

1 132/33 TR (40 MVA) MW,MVAR,OLTC N/C 2 132KV SHALIWADA MW,MVAR N/C 3 INTCC 3 MW,MVAR N/C 4 132KV AMARWADA MW,MVAR N/C 5 220 KV PGCIL 1 MW,MVAR N/C 6 TR 160 MVA OLTC N/C

Annexure-1

TELEMETRY DISCRIPIENCY LIST FOR GWALIOR T&C CIRCLE Sr.No DESCRIPTION Status telemetry value

at SLDC actual value at site

GUNA 220 KV S/S 1 220/132KV XMER-1 OLTC NOT AVAILABLE 9 2 40MVA XMER 1 & 2 OLTC NOT AVAILABLE 5

SOE’S OF ALL THE FEEDERS ARE NOT COMING IN GUNA 220 S/S GWALIOR 220 KV S/S

1 132/33 TRF 1, 2 & 3 OLTC NC 8 2 220 / 132 KV TR 2 OLTC NC 7 3 132 KV BUS COUPLER CB FAULTY CLOSE

Annexure-1 TELEMETRY DISCRIPIENCY LIST FOR BHOPAL T&C CIRCLE Sr.No DESCRIPTION status telemetry value at

SLDC actual value at site

BHOPAL 400 KV S/S 1 132KV BHEL CB OPEN CLOSE 2 220 / 33 KV TR OLTC NOT

AVAILABLE

SARNI 220 KV S/S 1 220/132KV 100 MVA XMER-I OLTC N/C 2 220/132KV 100 MVA XMER-II CB, OLTC, MW,

MVAR N/C

3 132/33 TR1 OLTC N/C 4 132/33 TR2 OLTC N/C 5 220KV BUS TRF CB FAULTY CLOSE 6 220KV SARNI PH-I CB FAULTY OPEN 7 220KV SARNI PH-II

36th OCC Agenda of MP 50

Page 53: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

8 220KV PANDURNA CB,SOE,MW,MVAR Telemetry not available,Proces connection need to be done 9 220KV BETUL

BAIRAGARH 220 KV S/S

1 220 KV BUS 1 VOLTAGE 143 231 2 BAIRAGRAH 132KV-LALGHATI II CB FAULTY OPEN 3 220/132 XMER –I CB FAULTY CLOSE 4 220/132 XMER (160MVA) NEW II CB

TELEMETRY NOT AVAILABLE AND NEED TO BE PROVIDED BY

UPGRADATION OF RTU

5 220/132 XMER (160MVA) NEW II MW,MVAR 7 132/33 XMER (20 MVA) NEW IV CB,OLTC 8 132/33 XMER (20 MVA) NEW IV MW

9 132/33 XMER (20 MVA) NEW IV MVAR

10 132KV BHOPAL CB,MW,MVAR,SOE 11 132KV BUS COUPLER CB FAULTY CLOSE 12 220KV BUS TIE CB FAULTY CLOSE Sr.No DESCRIPTION status telemetry value at

SLDC actual value at site

HANDIA 220 KV S/S

1 220KV HANDIA –ITARSI –I CB FAULTY CLOSE 2 220KV HANDIA 220/132 TR-2 CB FAULTY CLOSE 3 132KV HANDIA 220/132 TR-2 132 SIDE CB FAULTY CLOSE 4 220KV BARWAHA CB FAULTY CLOSE 5 220/132 TR-2 OLTC N/C 6 220/132 TR-2 MW N/C

NOTE:-SOE DATA NOT RECEIVED EXCEPT NASRULLAGANJ FEEDER.CONNECTIONS FOR ALL FEEDERS HAVE TO BE VERIFIED

Telemetry Discripiency List of Sagar 132,Pipariya 132 not prepared because all two RTU’s are not functioning

ASTHA 132 KV S/S

1 132KV KANOD CB FAULTY CLOSE 2 132KV I/C II CB FAULTY CLOSE

Annexure-1

Bina 400 KV S/S

1 400/220 KV XMER III Primary side CB TRANSIT CLOSE 2 400/220 KV XMER III Secondary side CB TRANSIT CLOSE 3 400 KV BHOPAL-1 CB FAULTY OPEN

Bina 220 KV S/S 1 132KV SAGAR MW, MVAR N/C 2 132KV BINA – SIRONJ CB, FAULTY CLOSE

Tikamgarh 220KV S/S 1 132KV JATARA MW MVAR N / C 2 220 KV BUSCOUPLER CB FAULTY CLOSE 3 132/33 XMER-2 CB, MW, MVAR, SOE Telemetry not available

36th OCC Agenda of MP 51

Page 54: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

TELEMETRY DISCRIPIENCY LIST FOR SAGAR T&C CIRCLE Telemetry Discripiency at power stations

Sr No DESCRIPTION Status telemetry value at SLDC

actual value at site

SATPURA TPS 1 GT 6 MW 77 0 2 GT6 MVAR 1 1 3 GT7 MW 178 119 4 GT7 MVAR 1 1 5 400KV SATPURA-ISP CB OPEN CLOSE 6 GENERATOR-8 CB OPEN CLOSE AMARKANTAK THERMAL POWER STATION 1 132KV ANUPUR-1 CB FAULTY CLOSE 2 132KV ANUPUR-2 CB FAULTY CLOSE 3 132/33 KV TRNSFRMER 5 OLTC N/C 6 4 132KV BUS COUPLER CB N/C CLOSE 5 132KV HJIM CB,MW,MVAR Telemetry not available,ProcesS

connection need to be done

6 63 MVA 220/132 XMER 2 CB FAULTY OPEN BARGI HPS

1 132/33KV TR MW 0 5 2 132/33KV TR MVAR 0 2

TONS HPS 1 220/33 20 MVA XMER CB FAULTY OPEN 2 BUS COUPLER CB FAULTY OPEN

Note:- SOE CONNECTION NOT DONE FOR ANY FEEDER AT TONS HPS. The matter was taken up in various OCCM meetings as well as telephonically.

GANDHISAGAR HPS 1 GENERATOR 3 ,4 & 5 CB FAULTY OPEN

RAJGHAT HPS NOTE- ALL CB & SOE ARE N/C

Telemetry Discripiency at SGTPS

Sr No DESCRIPTION Status telemetry value at

SLDC actual value at site

1 400 KV KATNI-1 & 2 CB FAULTY | CLOSE NOTE:- SOE’S OF MOST OF THE FEEDERS ARE NOT COMING ,CONNECTIONS FOR ALL FEEDERS HAVE TO BE VERIFIED.

4 220/132KV XMER-II CB, MW, MVAR, SOE Process connection need to be done

SOE DATA NOT RECEIVED.CONNECTIONS FOR GWALIOR-2,GUNA-1 FEEDERS HAVE TO BE VERIFIED CHHATARPUR 220KV S/S

1 132 KV NAUGAON CB, FAULTY | CLOSE 2 132 KV LAUDI CB FAULTY CLOSE 3 132/33 XMER-(40 MVA) CB, FAULTY | CLOSE 4 TR 12.5 MVA OLTC N/C 5 220 KV SATNA 2 CB, FAULTY | CLOSE

36th OCC Agenda of MP 52

Page 55: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … th OCC_agenda.pdf · MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ... In the revised

BANSAGAR-III HPS

1 132/33 20 MVA TRANSFORMER

MW,MVAR,CB,SOE,OLTC Telemetry not available,ProcesS connection need to be done

NOTE- SOE CONNECTION NOT DONE FOR ANY FEEDER AT BANSAGAR-III HPS

MADIKHEDA HPS 1 132kv Madhikheda-Karera-II MW Telemetred value is coming half Note :-SOE’s of Generator 2& 3, Karera-1&2 feeders are not coming. PENCH HPS 1 132/33KV TRF OLTC NOT AVAILABLE Note:- SOE,S OF ALL FEEDERS ARE NOT COMING

Annexure-1

TELEMETRY DISCRIPIENCY LIST FOR INDORE 400 T&C CIRCLE

Annexure-1

TELEMETRY DISCRIPIENCY LIST FOR BHOPAL 400 T&C CIRCLE

INDORE 400 KV S/S Sr No DESCRIPTION Status telemetry value at

SLDC actual value at site

1 400/220 KV XMER-2 Secondary side CB FAULTY CLOSE 2 220 KV Bus Coupler CB FAULTY CLOSE

BHOPAL 400 KV S/S Sr No DESCRIPTION Status telemetry value at

SLDC actual value at site

1 400 KV DAMOH-2 CB FAULTY OPEN 2 400 KV DAMOH-1 & DAMOH-2 TIE BKR CB FAULTY CLOSE

400 KV ITARSI-2 & BINA-2 TIE BKR CB FAULTY CLOSE

36th OCC Agenda of MP 53