national oilwell varco manufacturing facility gets roi using shuttle vlms

21
Please Use Forward Button To Advance Slides

Upload: david-brown-vss

Post on 19-Jun-2015

333 views

Category:

Documents


1 download

DESCRIPTION

- Get ROI Using KardexRemstar Shuttle VLMs - Increase Productivity and Accuracy Using Less Labor

TRANSCRIPT

Page 1: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

Please Use Forward Button To Advance Slides Please Use Forward Button To Advance Slides

Page 2: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

National Oilwell Varco is the leading

provider to the oil and gas industry and

is dedicated to providing the highest

quality oilfield products and

services.

National Oilwell Varco is the leading

provider to the oil and gas industry and

is dedicated to providing the highest

quality oilfield products and

services.

Page 3: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

For more than 140 years, National

Oilwell Varco has been providing

customers everything from spare parts to

comprehensive drilling systems;

For more than 140 years, National

Oilwell Varco has been providing

customers everything from spare parts to

comprehensive drilling systems;

Page 4: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

includingrig equipment,

integrated systems, downhole tools and

supply chain solutions.

includingrig equipment,

integrated systems, downhole tools and

supply chain solutions.

Page 5: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

Continually improving their customer’s

performance, National Oilwell Varco-SHP

Facility took a look at improving their

warehouse operations which supplies parts to the manufacturing floor.

As plant capacity increased, so did the

number of parts. Organizing and stocking

the right parts, was becoming a challenge.

Continually improving their customer’s

performance, National Oilwell Varco-SHP

Facility took a look at improving their

warehouse operations which supplies parts to the manufacturing floor.

As plant capacity increased, so did the

number of parts. Organizing and stocking

the right parts, was becoming a challenge.

Page 6: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

The warehouse was redesigned to include three Shuttle Vertical Lift Modules (VLMs)

from Remstar

The warehouse was redesigned to include three Shuttle Vertical Lift Modules (VLMs)

from Remstar

Page 7: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

With The Remstar VLMs, National Oilwell Varco-

SHP Facility is now picking orders 44%

faster using less labor while recovering 70% of

previously occupied shelving space.

With The Remstar VLMs, National Oilwell Varco-

SHP Facility is now picking orders 44%

faster using less labor while recovering 70% of

previously occupied shelving space.

Page 8: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

Before installing the VLMs, workers

averaged 4.72 minutes per pick. Now, about

half of the parts for an order are picked from the Shuttle VLMs and the other half from the shelving. The Shuttle VLMs averaged 1.85 minutes per pick,

Before installing the VLMs, workers

averaged 4.72 minutes per pick. Now, about

half of the parts for an order are picked from the Shuttle VLMs and the other half from the shelving. The Shuttle VLMs averaged 1.85 minutes per pick,

Page 9: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

and because parts were able to be relocated to

more accessible shelves, the shelving time was reduced to

3.43 minutes per pick. The overall average

picking time has been reduced to 2.64 minutes per pick. That’s a 44%

increase in productivity.

and because parts were able to be relocated to

more accessible shelves, the shelving time was reduced to

3.43 minutes per pick. The overall average

picking time has been reduced to 2.64 minutes per pick. That’s a 44%

increase in productivity.

Page 10: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

With the old system requiring eleven people,

SHP has cut their department labor to eight people while

remaining flexible to adjust labor to meet

order volume. That’s a 28% saving in labor cost.

With the old system requiring eleven people,

SHP has cut their department labor to eight people while

remaining flexible to adjust labor to meet

order volume. That’s a 28% saving in labor cost.

Page 11: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

On average, the new system required two

people. One to pick from shelving and one to pick

from the VLMs. When order volume is high

they have the flexibility to add an additional

person to the shelving area to keep up with the

VLM area.

On average, the new system required two

people. One to pick from shelving and one to pick

from the VLMs. When order volume is high

they have the flexibility to add an additional

person to the shelving area to keep up with the

VLM area.

Page 12: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

The warehouse is responsible for about

half of the 18,000 parts in National Oilwell Varco-

SHP Facility. With about 3,000 of those parts in

the Shuttle VLMs already, the goal is to get

all of the high usage parts (about 5,000 parts)

into the VLMs.

The warehouse is responsible for about

half of the 18,000 parts in National Oilwell Varco-

SHP Facility. With about 3,000 of those parts in

the Shuttle VLMs already, the goal is to get

all of the high usage parts (about 5,000 parts)

into the VLMs.

Page 13: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

As they move more parts into the VLMs and a greater percentage of

parts for orders are picked from the VLMs, they expect to see their productivity numbers increase even more.

As they move more parts into the VLMs and a greater percentage of

parts for orders are picked from the VLMs, they expect to see their productivity numbers increase even more.

Page 14: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

The parts that have been relocated to the

Shuttle VLMs occupied 2,654 square feet of

floor space when previously stored in

shelving.

The parts that have been relocated to the

Shuttle VLMs occupied 2,654 square feet of

floor space when previously stored in

shelving.

Page 15: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

The new Shuttle VLMs occupy only 797 square

feet, giving themback 70% of their

floor space,

The new Shuttle VLMs occupy only 797 square

feet, giving themback 70% of their

floor space,

Page 16: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

or 1,857 square feet of now empty

shelving space.

or 1,857 square feet of now empty

shelving space.

Page 17: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

Using the Shuttle VLMs, workers no longer need

to push carts, repetitively move,

climb stairs or reach under shelving into

dark corners.

Using the Shuttle VLMs, workers no longer need

to push carts, repetitively move,

climb stairs or reach under shelving into

dark corners.

Page 18: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

All parts are automatically brought directly to the operator

eliminating walking, climbing and stooping

to retrieve parts.

All parts are automatically brought directly to the operator

eliminating walking, climbing and stooping

to retrieve parts.

Page 19: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

Every part is presented to the VLM operator on a tray delivered at an ergonomic height to a

clean and fully lit workstation.

Every part is presented to the VLM operator on a tray delivered at an ergonomic height to a

clean and fully lit workstation.

Page 20: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

The VLMs are also equipped with

Transaction Information Center (TIC) lights that

direct the operator to the exact location of the part, displaying the

quantity to pick and part number, increasing pick

accuracy and productivity.

The VLMs are also equipped with

Transaction Information Center (TIC) lights that

direct the operator to the exact location of the part, displaying the

quantity to pick and part number, increasing pick

accuracy and productivity.

Page 21: NATIONAL OILWELL VARCO Manufacturing Facility gets ROI using Shuttle VLMs

For more information call or visit our websitehttp://www.verticalstoragesystems.com/