Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 2
EIA Forecasted Oil Price (October 2019)
33JJ Kringstad - North Dakota Pipeline Authority 3
44JJ Kringstad - North Dakota Pipeline Authority 4
North Dakota Oil Production Forecast Assumes Current Technology – Enhanced Oil Recovery Not Included
5
Statewide Gas Performance
JJ Kringstad - North Dakota Pipeline Authority 5Average BKN/TF Well Performance Statewide
~10% Improvement
Over 2018
6
Statewide Gas-Oil Ratio
JJ Kringstad - North Dakota Pipeline Authority 6Average BKN/TF Well Performance Statewide
NDPA North Dakota Gas Production ForecastAssumes Current Technology – Enhanced Oil Recovery Not Included
77JJ Kringstad - North Dakota Pipeline Authority 7
8
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 8
Simple Terms
Blue – Lack of pipelines
Orange – Challenges on existing
infrastructure
GREEN – % of gas captured and sold
Blue – % flared from zero sales wells
Orange – % flared from wells with at
least one mcf sold.
Aug 2019 Data – Non-Confidential WellsStatewide
Solving the Flaring Challenge
JJ Kringstad - North Dakota Pipeline Authority 9
10
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 10
Gas Processing Expansions
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 11
Recent Major Gas Processing Expansions
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 12
Planned Major Gas Processing Expansions
670 MMCFD
625 MMCFD
13JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 13
14JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Future OutlookAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 14
Historical
Historical
Expected
Expected
15JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 15
Historical Expected
9%
24%
16JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 16
Historical Expected
9%
17JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 17
18
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 18
19JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 19
Major Gas Pipeline and
Processing Infrastructure
WBI Transmission
Whiting
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 20
WBI Energy – North
Bakken Expansion Project
JJ Kringstad - North Dakota Pipeline Authority 21
Project Highlights
• 67 Miles - 20” Pipeline
• 20 Miles - 12” Pipeline
• $220+ Million
• At least 250,000 MCFD Capacity (expandable)
• Expandable to 375,000 MCFD
• End of 2021 Proposed Completion
• Residue Gas Service From North of Lake
Sakakawea to Northern Border Pipeline in
McKenzie County
JJ Kringstad - North Dakota Pipeline Authority 22
Northern Border Pipeline
*Data Source: Northern Border IPS
Northern Border BTU at Glen Ullin, ND
JJ Kringstad - North Dakota Pipeline Authority 23*Data Source: Northern Border IPS
JJ Kringstad - North Dakota Pipeline Authority 24
Northern Border Pipeline Market Share
NDPA Calculations Using Northern Border IPS
~1,150+ BTU
~1,035 BTU
JJ Kringstad - North Dakota Pipeline Authority 25
NB Pipeline Interconnects With Known BTU Limits
JJ Kringstad - North Dakota Pipeline Authority 26Map Source: TC Energy Website
JJ Kringstad - North Dakota Pipeline Authority 27Map Source: TC Energy Website
JJ Kringstad - North Dakota Pipeline Authority 28
Northern Border – BTU Calculations*
*Assumes Equivalent Net Replacement of 1,035 Canadian Gas
29JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 29
Bakken Natural Gas Infrastructure
3030JJ Kringstad - North Dakota Pipeline Authority 30
Northern Border Proposed Expansion Options
JJ Kringstad - North Dakota Pipeline Authority 31
Two Proposed Options:
Stateline/Watford City to Ventura
-580 Mdth Incremental (~525 MMCFD)
-Phase 1: Q3 2021
-Phase 2: Q4 2023
Stateline/Watford City to Cheyenne
-430 Mdth Incremental (~390 MMCFD)
-Phase 1: Q3 2021
-Phase 2: Q4 2022
Bakken & Three Forks
Natural Gas Liquids
Regional NGL Infrastructure
Kinder
JJ Kringstad - North Dakota Pipeline Authority 33
Ma
rath
on
Pe
tro
leu
m
North Dakota Captured* NGL’s
3434JJ Kringstad - North Dakota Pipeline Authority 34*Non-flared NGL’s & Assumes 10 GPM
NGL Pipeline Takeaway Options
35
3535JJ Kringstad - North Dakota Pipeline Authority 35
Justin J. Kringstad, DirectorNorth Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840
Phone: (701)220-6227Fax: (701)328-2820
E-mail: [email protected]
Websites: www.pipeline.nd.gov
www.northdakotapipelines.com
Contact Information