Page 1: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

NJAWWA Webinar SeriesAugust 4, 2020

Investigation of Alternatives to Reduce DBPs at New Jersey American Water Company Jumping Brook WTP

Page 2: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

2

Jumping Brook WTP

Page 3: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

3

Jumping Brook PFD

Page 4: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

4

NJAWC Jumping Brook WTP

Solids Contact Clarifier

Purification Units

FiltersClearwells

Thickeners

WashwaterClarifiers

Filter Press

Page 5: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

5

Problem Statement

• Compliance with Stage 2 D/DBP Regulation

• A change in raw water quality resulted in an exceedance of TTHMs Operational Evaluation Level (OEL) at some sites in 2018

• Short term and Long term solutions needed

Page 6: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

6

Flow

0

5

10

15

20

25

30

35

Flo

w (

mgd

)

NJSB-21 Well 6 NJSB-72 Well 7 Shark River Withdrawal Glendola Reservoir

Page 7: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

7

Raw TOC

0

1

2

3

4

5

6

7

Org

anic

Car

bo

n (

mg/

L)

PU TOC (mg/L) PU DOC (mg/L) SCC TOC (mg/L) SCC DOC (mg/L)

Page 8: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

8

DBP – Jumping Brook Effluent

• TTHMs • HAAs

0

20

40

60

80

100

120

2/9

/20

15

5/1

1/2

01

5

8/1

0/2

01

5

11

/9/2

01

5

2/8

/20

16

5/9

/20

16

8/8

/20

16

11

/7/2

01

6

2/6

/20

17

5/8

/20

17

8/7

/20

17

11

/6/2

01

7

2/5

/20

18

5/8

/20

18

8/6

/20

18

11

/6/2

01

8

Tota

l TH

Ms

(ug/

L)

Sampling Date

0

5

10

15

20

25

30

35

2/9

/20

15

5/1

1/2

01

5

8/1

0/2

01

5

11

/9/2

01

5

2/8

/20

16

5/9

/20

16

8/8

/20

16

11

/7/2

01

6

2/6

/20

17

5/8

/20

17

8/7

/20

17

11

/6/2

01

7

2/5

/20

18

5/8

/20

18

8/6

/20

18

11

/6/2

01

8

Tota

l HA

As

(ug/

L)

Sampling Date

Page 9: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

9

Project Goals

• Identify an immediate term (2 months) approach to comply with OEL

• Assess short and long term options for ongoing compliance

• Identify option for Stage 2 D/DBP compliance while maintaining primary disinfection

Page 10: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

10

Project Goals

• Assess a wide range of alternatives

• Select alternative that provides the greatest value for the investment based on the project-specific goals.

• Constraints

ꟷMaintain primary disinfection ahead of filters

ꟷChloramine disinfection in distribution

ꟷOxidant needed for Mn

A defensible, comprehensive decision model was used to evaluate and rank the options

Page 11: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

11

Project Approach• Frame the Project

• Identify Treatment Alternatives (22)

• Rate performance against goals

• Rank treatment alternatives with Weighted Criteria

• Develop Conceptual Designs and Costs (10)

• Prepare Cost/Benefit Analysis

Project executed in 7 months, with short term

alternatives identified in month 3

Page 12: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

12

Developing Alternatives

Short Term Operational Changes

1 - Eliminate pre-chlorination. Provide alternate method for primary disinfection.

Permanganate or alternate oxidant.

2 - Provide additional TOC removal andmaintain current chlorine application as oxidant and disinfectant

4 - Major physical plant/process changes

5 – Shark River treatment

Page 13: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

13

Short Term Operations• Application of PAC to raw water at Glendola Reservoir location is ongoing

• Install GAC in dual media filters for THM adsorption

• Limit use of Shark River - install on-line TOC monitoring and analyze rainfall data could enable a more selective use of this source

Page 14: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

14

22 Options Rated

Treatment Change Alternative Treatment DescriptionShort-Term /

Long-Term

Alternative1A Chlorine dioxide at reservoir with pipeline contactor for

oxidation/disinfection1 Short-Term/Long-Term

1B Ozone at reservoir with pipeline contactor Long-Term

1Ca Pre-UV at reservoir with permanganate addition on plant raw

water for oxidation. Chlorine applied to clearwell. Long-Term

1Cb Post-UV downstream of clearwells with permanganate

addition on plant raw water for oxidation. Chlorine applied to

clearwell. Long-Term

1D Permanganate at intake for oxidation. Chlorine after filters.

New clearwell across the street from the plant, maintain

chlorine for disinfection Long-Term

2A Permanganate at intake for oxidation. Ferric chloride as

alternate coagulant1 Short-Term

2B PAC addition at reservoir seasonally1 Short-Term

2C MIEX at reservoir Long-Term

2D MF/UF and NF/RO at reservoir Long-Term

2E Anion Exchange at reservoir Long-Term

3A Change GAC filter media annually1 Short-Term

3B Discontinue Shark River use Short-Term

4Aa

New clarification process (e.g., DAF)/Ozone/Additional filters Long-Term

4Ab New clarification process (e.g., DAF)/Chlorine

Dioxide/Additional filters Long-Term

4Ac Permanganate/New clarification process (e.g.,

DAF)/Intermediate Chlorine/Additional filters Long-Term

4B Permanganate/New clarification process (e.g.,

DAF)/MF/UF/Chlorine Long-Term

4C NF/RO downstream of existing clarification - partial stream

treatment for DBP removal Long-Term

4D GAC adsorbers post-filtration - partial stream treatment for

DBP removal Long-Term

5A GAC with solids removal pretreatment (MF) Long-Term

5B Ozone on Shark River to plant Long-Term

5C MF/UF and NF/RO on Shark River to Glendora reservoir Long-Term

5D MIEX on Shark River to Glendora reservoir Long-Term

2 - Provide additional TOC removal and

maintain current chlorine application as

oxidant and disinfectant

5 - Provide treatment for Shark River only

including feed to Glendola Reservoir2

1 - Eliminate pre-chlorination. Provide

alternate method for primary

disinfection. Permanganate or alternate

oxidant.

4 - Major physical plant/process changes

3. Plant operation changes

UV, ClO2, ozone, new clearwell

PAC, MIEX, membranes

DAF + ozone or ClO2,Membranes, GAC adsorbers

Ozone, membranes, MIEX

Page 15: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

15

Assessment Criteria and Weighting Values

Stage 2 D/DBP Compliance Compliance

10

Ease of Operation 7

Flexibility for Future Regulatory 7

Limit Residuals Production 7

Footprint 6

Hydraulic Impacts 5

Ability to Address Manganese 5

Page 16: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

16

Top Ranked Alternatives by Treatment CategoryWeighting 10 7 7 7 6 5 5

Treatment Change Alternative Treatment DescriptionStage 2 D/DBP

Compliance

Ease of Operation

Flexibility for Future

Regulations

Limit Residuals

ProductionFootprint

Hydraulic Impacts

Ability to Address

Manganese

% of Total Points

1 - Eliminate pre-chlorination. Provide alternate method for primary disinfection. Permanganate or alternate oxidant.

1B Ozone at reservoir with pipeline contactor 5 1 3 5 5 5 35 77.9%

1CaPre-UV at reservoir with permanganate addition on plant raw water for oxidation. Chlorine applied to clearwell.

3 1 3 5 5 3 3 65.1%

1DPermanganate at intake for oxidation. Chlorine after filters. New clearwell across the street from the plant, maintain chlorine for disinfection

1 3 1 5 1 1 3 42.1%

2 - Provide additional TOC removal and maintain current chlorine application as oxidant and disinfectant

2C MIEX at reservoir1 4 1 1 31 5 3 1 53.2%

2D MF/UF and NF/RO at reservoir 44 1 34 1 5 1 4 55.3%

4 - Major physical plant/process changes

4Aa New clarification process (e.g., DAF)/Ozone/Additional filters 5 1 3 3 3 3 5 66.8%

4B Permanganate/New clarification process (e.g., DAF)/MF/UF/Chlorine 5 1 3 3 3 3 4 64.7%

5 – Shark River treatment

5B Ozone on Shark River to plant 23 1 3 5 5 3 3 60.9%

5C MF/UF and NF/RO on Shark River to Glendora reservoir 3 1 3 12 5 1 3 48.9%

5D MIEX on Shark River to Glendora reservoir 3 1 1 3 5 3 1 48.9%

Ranking is completed on merits – cost comes in later

Page 17: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

17

Alternative 1B: Ozone at Reservoir, Eliminate Pre-Chlorine

Glendola Reservoir

Distribution

Filter Press

Solids Contact Clarifiers

Filters

Purification Units

Clearwell 2

Clearwell 1

Washwater Clarifiers

Thickeners

OZO

NE

Shark River

Intake PSP

AC

L

CH

LOR

INE

PO

LYM

ER

CA

US

TIC

PA

CL

CH

LOR

INE

PO

LYM

ER

CA

US

TIC

FLU

OR

IDE

CA

US

TIC

PH

OS

PH

OR

IC

AC

ID

CH

LOR

INE

(U

SE

E

XIS

TIN

G)

CH

LOR

INE

AM

MO

NIA

FLU

OR

IDE

CA

US

TIC

PH

OS

PH

OR

IC

AC

ID

CH

LOR

INE

(N

OT

US

ED

)

CH

LOR

INE

AM

MO

NIA

PE

RM

AN

GA

NA

TE

Page 18: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

18

Alternative 1B: Ozone at Reservoir, Eliminate Pre-Chlorine Layout

Page 19: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

19

Alternative 1Ca: UV at Reservoir, Eliminate Pre-Chlorine

Glendola Reservoir

Distribution

Filter Press

Solids Contact Clarifiers

Filters

Purification Units

Clearwell 2

Clearwell 1

Washwater Clarifiers

Thickeners

CH

LOR

INE

(U

SE

E

XIS

TIN

G)

PE

RM

AN

GA

NA

TE

Shark River

UV

Intake PSP

AC

L

PO

LYM

ER

CA

US

TIC

PA

CL

PO

LYM

ER

CA

US

TIC

FLU

OR

IDE

CA

US

TIC

PH

OS

PH

OR

IC

AC

ID

CH

LOR

INE

CH

LOR

INE

AM

MO

NIA

FLU

OR

IDE

CA

US

TIC

PH

OS

PH

OR

IC

AC

ID

CH

LOR

INE

AM

MO

NIA

CH

LOR

INE

CH

LOR

INE

Page 20: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

20

Alternative 1Ca: UV at Reservoir, Eliminate Pre-Chlorine Layout

Page 21: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

21

Alternative 5B: Ozone at Shark River

Glendola Reservoir

Distribution

Filter Press

Solids Contact Clarifiers

Filters

Purification Units

Clearwell 2

Clearwell 1

Washwater Clarifiers

Thickeners

Shark River

Intake PS

PA

CL

CH

LOR

INE

PO

LYM

ER

CA

US

TIC

PA

CL

CH

LOR

INE

PO

LYM

ER

CA

US

TIC

FLU

OR

IDE

CA

US

TIC

PH

OS

PH

OR

IC

AC

ID

CH

LOR

INE

(N

OT

US

ED

)

CH

LOR

INE

AM

MO

NIA

FLU

OR

IDE

CA

US

TIC

PH

OS

PH

OR

IC

AC

ID

CH

LOR

INE

(N

OT

US

ED

)

CH

LOR

INE

AM

MO

NIA

OZO

NE

Page 22: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

22

Alternative 5B: Ozone at Shark River Layout

Page 23: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

23

Comparative Cost Estimate

Treatment Change Alternative Treatment Description % of Total Points Capital Cost O&M CostNet Present

Value*Benefit/Cost (Benefit/$M)

1 - Eliminate pre-chlorination. Provide alternate method for primary disinfection. Permanganate or alternate oxidant.

1BOzone at reservoir with pipeline contactor with permanganate addition.

77.9% $ 22,661,847 $ 418,000 $ 30,855,000 2.5

1CaPre-UV at reservoir with permanganate addition on plant raw water for oxidation. Chlorine applied to clearwell.

65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1

1DPermanganate at intake for oxidation. Chlorine after filters. New clearwell across the street from the plant, maintain chlorine for disinfection

42.1% $ 17,984,031 $ 221,000 $ 22,316,000 1.9

2 - Provide additional TOC removal and maintain current chlorine application as oxidant and disinfectant

2C MIEX at reservoir 53.2% $ 41,506,569 $ 1,439,000 $ 69,712,000 0.8

2D MF/UF and NF/RO at reservoir 55.3% $ 95,103,528 $ 5,144,000 $ 195,928,000 0.3

4 - Major physical plant/process changes

4AaNew clarification process (e.g., DAF)/Ozone/Additional filters

66.8% $ 71,759,688 $ 763,000 $ 86,715,000 0.8

4BPermanganate/New clarification process (e.g., DAF)/MF/UF/Chlorine

64.7% $ 83,991,453 $ 2,715,000 $ 137,207,000 0.5

5 – Shark River treatment5B Ozone on Shark River to plant 60.9% $ 17,391,387 $ 253,000 $ 22,350,000 2.7

5D MIEX on Shark River to Glendora reservoir 48.9% $ 20,318,415 $ 473,000 $ 29,589,000 1.7

Page 24: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

24

Benefit/Cost Analysis

$M

$20M

$40M

$60M

$80M

$100M

$120M

$140M

$160M

$180M

$200M

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

Ozo

ne

at

rese

rvo

ir

Pre

-UV

at

rese

rvo

irw

ith

per

man

gan

ate

Ne

w c

lear

we

ll

MIE

X a

t re

serv

oir

MF/

UF

and

NF/

RO

at

rese

rvo

ir

DA

F/O

zon

e/

Ad

dit

ion

al f

ilte

rs

Per

man

gan

ate

/DA

F/M

F/U

F/C

hlo

rin

e

Ozo

ne

on

Sh

ark

Riv

er

MIE

X a

t Sh

ark

Riv

er

1B 1Ca 1D 2C 2D 4Aa 4B 5B 5D

Ne

t P

rese

nt

Val

ue

($

M)

Be

ne

fit

Co

st (

Be

ne

fit/

$M

)

Page 25: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

25

Next Steps• TOC analyzer is in place on Shark River

• PAC continues to be fed at the source

• The findings for long-term treatment options are being used by NJAW in long term master planning for their Coastal North Water System.

Page 26: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

26

Questions

Page 28: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

28

DisclaimerImportant

The material in this presentation has been prepared by Jacobs®.

Copyright and other intellectual property rights in this presentation vest exclusively withJacobs. Apart from any use permitted under applicable copyright legislation, no part of this work may in any form or by any means (electronic, graphic, mechanical, photocopying, recording or otherwise) be reproduced, copied, stored in a retrieval system or transmitted without prior written permission.

Jacobs is a trademark of Jacobs Engineering Group Inc.

Copyright

July 28, 2020

Jacobs Engineering Group Inc. All rights reserved.

©

Page 29: New Jersey American Water Company DBP Reduction Plan for Jumping Brook WTP · 2020. 7. 30. · 65.1% $ 13,266,630 $ 143,000 $ 16,069,000 4.1 1D Permanganate at intake for oxidation

29

Forward-Looking Statement DisclaimerStatements included in this presentation that are not based on historical facts are forward-looking statements. Although such statements are based on management’s current estimates and expectations, and currently available competitive, financial and economic data, forward-looking statements are inherently uncertain and you should not place undue reliance on such statements as actual results may differ materially. We caution the reader that there are a variety of risks, uncertainties and other factors that could cause actual results to differ materially from what is contained, projected or implied by our forward-looking statements. For a description of some of the risks, uncertainties and other factors that may occur that could cause actual results to differ from our forward-looking statements see our Annual Report on Form 10-K for the period ended September 26, 2014, and in particular the discussions contained in Item 1 – Business, Item 1A - Risk Factors, Item 3 – Legal Proceedings, and Item 7 –Management’s Discussion and Analysis of Financial Condition and Results of Operations, as well as the Company’s other filings with the Securities and Exchange Commission. We also caution the readers of this presentation that we do not undertake to update any forward-looking statements made herein.