newsletter 4th q for shops
TRANSCRIPT
Machine and Fitting Shop Newsletter 2014
2014 has been a tedious year. But
in the middle of the entire plant
hustle Machine and fitting shop
team has surpassed expectations.
With improvements ranging from
Machines Shop CM o LFC target
achievement & enhancing JQP
quality of Shop Machinists, team
has done it. All this yet safe & injury
free. With such high performance
bar is set even higher in 2015, so
team stay motivated, stay energetic
& Wish Us Best of Luck for 2015!
ttaullah Shah Bokhari
htsham hmad
People Development & Training
Machine Shop Achievements
Machine shop has been the most loaded area of shop this
year with jobs lined up one after the other. Following are
some of the major functional achievements this year,
Shop Machinist JQPs re-appraised and questions were
increased by 100%
AMM-II Syn. Compressor parts accurate Machining
TP-1403 GB – being the biggest site GB was refurbished
1st
time
NGBC - Pneumatic pump off-eccentric casing machining
and accurate drilling
PHT-2503 Train shaft and all other parts refurbishment
& machining in the crunch time of Plant-I
10 ea. Offsite Deep Well Turbines Extensive machining
and reclamation
Measuring Tools cannibalization and reclamation
observed the saving of 1.1 Million
EPQL Cooling Tower GB machining for casing alignment
with gears and cover
Zero injury
TRIR is 0.00
D-Level committee # 25 shown
continuous improvement
Measuring Tools Cannibalization
A pure process improvement project
aimed at streamlining Tools
Cannibalization and reclamation. As a
result of the activity over 72% of the
damaged measuring tools were
recovered having a realized fixed cost
saving of 1.1 M.
6 sigma
Universal Balancing connectorsA pure process improvement project
aimed at saving 700 Man-hrs. Per year.
Universal Type Mandrels and Couplers
were designed and in-house
fabricated. As a result of the activity
over 700 Man-hrs/year material
saving is expected in future along with
huge machining Man-hrs. Saving.
Year Round Appreciations
MACHINE SHOP TASK TEAMEnsured 100% closure of 2014 recommendations
1. Machines Taper was removed from 02 machines 1st
time
2. Short term CM Plan execution for Machine shop Machines
3. 50% of Machines Civil related problem were addressed
4. Machining time was reduced by introducing some new
bars
Fabrication Shop
In-house LFC PO Closure
This year, machine and fitting shop has brought up
about a saving of Rs. 21.2 M through in-house
replenishment and refurbishment orders for LFC.
100% increase in replenishment orders from
Machine Sho
Highlights 2014
Shop Machinists was trained to operate Boring Mill
Shop Machinist JQPs Quality Enhancement
Training of Personnel on SAP
Offsite Pumps Overhauling
Through Technical Talk Program
HSE
SPOT AWARDS Level 2 – Governor Calibration Bench
Level 2 – PSVs calibration Record per day
While TEAM received appreciation at
TP-1403 GB Refurbishment
CPI Exercise of Plant-II PSV spares
P-2503 Shafts and other Parts before time
Machining
NGBC Pneumatic Pump Machining
Syn. Compressor machining
Measuring Tools reclamation
Offsite pumps Refurbishment
The TEAM
Governor Calibration Bench
Universal Balancin Connectors
Excellent Su ort in Both Plant outa es
TP-1403 GB Refurbishment
Short Term Machine CM Plan Execution
LFC In-house PO closure increase d b 100%
Saving of 16M through Replenishment
CPI Exercise of Plant-II PSV S ares
Measuring Tools Cannibalization
Syn. Compressor, NGBC & P-2503 Machining
33 PSVs calibration per day Record. In 2014.More than 500 PSV’s were calibrated
OUR GREATEST PLEASEURE IS DOING WHAT OTHERS CAN’T
TEAM discovered and executed an
idea of in-house PGPL Governor
Calibration. This facility will be
commissioned in 2015 and will eventually
result in saving of Man-hrs. for sending
PGPL Governor to OEM shop as well as cost.