no r c p bl010: it&c primary ops facility r d p 30% … · 10/6/2016 5:59:17 pm...

41
U N I T E D S T A T E S A N T A R C T I C P R O G R A M N A T I O N A L S C I E N C E F O U N D A T I O N U N I T E D S T A T E S A N T A R C T I C P R O G R A M N A T I O N A L S C I E N C E F O U N D A T I O N PRELIMINARY DRAWING FOR REVIEW ONLY - NOT FOR CONSTRUCTION INCHES CENTIMETERS 1 2 3 4 5 6 D C B A 8 7 6 5 4 3 2 1 SHEET NUMBER: SHEET TITLE: DATE CHECKED: DRAWN BY: DESIGNED BY: FILE NAME: PROJECT NUMBER: W A S H I N G T O N , D . C . N S F C O N T R A C T O P P . 0 0 0 0 3 7 3 O F F I C E O F P O L A R P R O G R A M S FOUNDATION NATIONAL SCIENCE 7400 South Tucson Way Centennial, Colorado 80112 - 3938 USA 303 - 790 - 8606 800 - 688 - 8606 R E V I S I O N L O G R E V . D A T E D E S C R I P T I O N D F T G . A P P D . 1 2 MCMURDO STATION BL010: IT&C PRIMARY OPS FACILITY A 0 9 / 2 3 / 2 0 1 6 3 0 % D E S I G N S U B M I T T A L D F T G . A P P D . 160604MCM010 10/6/2016 5:59:17 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt G-001 PROJECT INFORMATION LOCATION MAP, TITLE SHEET, JC, RB JF 9/23/16 GENERAL 160604MCM010G-001-RA MCMURDO STATION BL010: IT&C PRIMARY OPS FACILITY 30% SUBMITTAL DESIGN CONSULTANT TEAM LOCATION MAP OFFICE OF POLAR PROGRAMS WASHINGTON, D.C. OWNER NATIONAL SCIENCE FOUNDATION PROJECT INFORMATION STANDARD CODE REFERENCES: 2015 ICC INTERNATIONAL BUILDING CODE ® (IBC) 2015 ICC INTERNATIONAL MECHANICAL CODE ® (IMC) 2014 NFPA 70 - NATIONAL ELECTRIC CODE ® (NEC 2011) 2015 NATIONAL ELECTRICAL SAFETY CODE ® (NESC) IEE C2-2015 2015 INTERNATIONAL FIRE CODE 2015 INTERNATIONAL PLUMBING CODE 2015 NFPA 101 - LIFE SAFETY CODE 2013 NFPA 72 - FIRE ALARM AND SIGNALING CODE APPROVALS NAMES SIGNATURES DATE STRUCTURAL ENGINEER MECHANICAL ENGINEER CRAIG FREDEEN, PE DENNIS BERRY, PE ARCHITECT ELECTRICAL ENGINEER JOSEPH FERRARO, FAIA FIRE PROTECTION ENGINEER --/--/---- EGINEERING MANAGER IT OPERATIONS KEVIN GIBBONS ---- ARCHITECT JAMES HILDEN PROJECT MANAGER APPROVALS NAMES SIGNATURES DATE ASC ENGINEERING REVIEW NATHAN HOOPLE PROJECT OPERATIONS JOE HARRIGAN --/--/---- --/--/---- --/--/---- --/--/---- --/--/---- --/--/---- --/--/---- --/--/---- --/--/---- PALMER STATION PRIME MERIDIAN ANTARCTIC CIRCLE McMURDO STATION SOUTH POLE STATION SOUTH ATLANTIC OCEAN SOUTH PACIFIC OCEAN INDIAN OCEAN 90°E 90°W ANTARCTICA VICINITY MAP PROJECT LOCATION ROBERT POSMA, PE DANNY RAUCHENSTEIN, PE IT ENGINEER --/--/---- LANCE MACKIE SHEET INDEX, SEE G-002

Upload: others

Post on 24-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

UN

ITED

STAT ES ANTARCT I CPRO

GRA

M

NAT

IONA L

SC I ENCE FOUNDAT

I ON

UN

ITED

STAT ES ANTARCT I CPRO

GRA

M

NAT

IONA L

SC I ENCE FOUNDAT

I ON

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:59:17 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

G-001

PROJECT INFORMATION

LOCATION MAP,

TITLE SHEET,

JC, RB

JF

9/23/16

GE

NE

RA

L

160604MCM010G-001-RA

MCMURDO STATIONBL010: IT&C PRIMARY OPS FACILITY

30% SUBMITTAL

DESIGN CONSULTANT TEAM

LOCATION MAP

OFFICE OF POLAR PROGRAMSWASHINGTON, D.C.

OWNER

NATIONAL SCIENCE FOUNDATION

PROJECT INFORMATION

STANDARD CODE REFERENCES:2015 ICC INTERNATIONAL BUILDING CODE ® (IBC)2015 ICC INTERNATIONAL MECHANICAL CODE ® (IMC)2014 NFPA 70 - NATIONAL ELECTRIC CODE ® (NEC 2011)2015 NATIONAL ELECTRICAL SAFETY CODE ® (NESC) IEE C2-20152015 INTERNATIONAL FIRE CODE2015 INTERNATIONAL PLUMBING CODE2015 NFPA 101 - LIFE SAFETY CODE2013 NFPA 72 - FIRE ALARM AND SIGNALING CODE

APPROVALS NAMES SIGNATURES DATE

STRUCTURAL ENGINEER

MECHANICAL ENGINEER CRAIG FREDEEN, PE

DENNIS BERRY, PE

ARCHITECT

ELECTRICAL ENGINEER

JOSEPH FERRARO, FAIA

FIRE PROTECTION ENGINEER

--/--/----

EGINEERING MANAGER

IT OPERATIONS KEVIN GIBBONS

----

ARCHITECT JAMES HILDEN

PROJECT MANAGER

APPROVALS NAMES SIGNATURES DATE

ASC ENGINEERING REVIEW

NATHAN HOOPLE

PROJECT OPERATIONS JOE HARRIGAN

--/--/----

--/--/----

--/--/----

--/--/----

--/--/----

--/--/----

--/--/----

--/--/----

--/--/----

PALMER STATION

PRIME MERIDIAN

ANTARCTIC CIRCLE

McMURDO STATION

SOUTHPOLESTATION

SOUTHATLANTIC

OCEAN

SOUTHPACIFICOCEAN

INDIANOCEAN

90°E90°W

ANTARCTICA

VICINITY MAP

PROJECT

LOCATION

ROBERT POSMA, PE

DANNY RAUCHENSTEIN, PE

IT ENGINEER --/--/----LANCE MACKIE

SHEET INDEX, SEE G-002

Page 2: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/7/2016 12:39:39 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

G-002

DRAWING INDEX

JC, RB

JF

9/23/16

GE

NE

RA

L

160604MCM010G-002-RA

DRAWING INDEX

SHEET NUMBER SHEET NAME

ELECTRICAL

E-001 LEGEND

E-002 LEGEND

E-003 LEGEND

E-004 GENERAL NOTES

E-005 ABBREVIATIONS

E-006 FIXTURE SCHEDULE

E-007 TRANSFORMER AND FEEDER / BRANCH CIRCUIT SCHEDULE

E-008 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

ED-121 LEVEL 1 - B010 - DEMOLITION - LIGHTING

ED-122 LEVEL 2 - B010 - DEMOLITION - LIGHTING

ED-131 LEVEL 1 - B010 - DEMOLITION - POWER

ED-132 LEVEL 2 - B010 - DEMOLITION - POWER

ED-141 MEZZANINE - B010 - DEMOLITION - ELECTRICAL

E-101 LEVEL 1 - ELECTRICAL OVERALL PLAN

E-102 LEVEL 2 - ELECTRICAL OVERALL PLAN

E-121 LEVEL 1 - DATA CENTER - LIGHTING

E-122 LEVEL 1 - B010 - RENOVATION - LIGHTING

E-123 LEVEL 2 - DATA CENTER - LIGHTING

E-124 LEVEL 2 - B010 - RENOVATION - LIGHTING

E-131 LEVEL 1 - DATA CENTER - POWER

E-132 LEVEL 1 - B010 - RENOVATION - POWER

E-133 LEVEL 2 - DATA CENTER - POWER

E-136 LEVEL 2 - B010 - RENOVATION - POWER

E-141 MEZZANINE - B010 - ELECTRICAL

E-401 ELECTRICAL LARGE SCALE PLANS - PHASE 1

E-402 ELECTRICAL LARGE SCALE PLANS - PHASE 1

E-403 ELECTRICAL LARGE SCALE PLANS - PHASE 1

E-404 ELECTRICAL LARGE SCALE PLANS - PHASE 1

E-405 ELECTRICAL LARGE SCALE PLANS - PHASE 2

E-501 DETAILS

E-601 BLD010 POWER SINGLE-LINE DIAGRAM - 480V SERVICE B

E-602 BLD010 POWER SINGLE-LINE DIAGRAM - 208V SERVICE A

TELECOMMUNICATION

T-000 LEGEND

T-001 GENERAL NOTES

T-002 ABBREVIATIONS

T-101 LEVEL 1 - TELECOM OVERALL PLAN

T-102 LEVEL 2 - TELECOM OVERALL PLAN

T-111 LEVEL 1 - TELECOM PLAN - AREA A & B

T-112 LEVEL 1 - TELECOM PLAN - AREA C

T-113 LEVEL 2 - TELECOM PLAN - AREA A & B

T-114 LEVEL 2 - TELECOM PLAN - AREA C

T-200 TELECOM RISER DIAGRAM

T-401 ENLARGED TELECOM PLANS

T-402 ENLARGED TELECOM PLANS

T-501 TELECOM DETAILS

T-502 TELECOM DETAILS

T-503 TELECOM DETAILS

T-504 TELECOM DETAILS

T-505 TELECOM DETAILS

T-506 TELECOM DETAILS'

DRAWING INDEX

SHEET NUMBER SHEET NAME

MECHANICAL

M-001 MECHANICAL SYMBOL LEGEND AND ABBREVIATIONS

MD-122 LEVEL 1 - B010 - DEMOLITION - HYDRONIC

MD-124 LEVEL 2 - B010 - DEMOLITION - HYDRONIC

MD-132 LEVEL 1 - B010 - DEMOLITION - VENTILATION

MD-134 LEVEL 2 - B010 - DEMOLITION - VENTILATION

MD-141 MEZZANINE - B010 - DEMOLITION - MECHANICAL

MD-401 LEVEL 1 - LARGE SCALE DEMOLATION MECHANICAL PLAN - MECH ROOM 115

M-101 LEVEL 1 - MECHANICAL OVERALL PLAN

M-102 LEVEL 2 - MECHANICAL OVERALL PLAN

M-121 LEVEL 1 - DATA CENTER - HYDRONIC

M-122 LEVEL 1 - B010 - RENOVATION - HYDRONIC

M-123 LEVEL 2 - DATA CENTER - HYDRONIC

M-124 LEVEL 2 - B010 - RENOVATION - HYDRONIC

M-131 LEVEL 1 - DATA CENTER - VENTILATION

M-132 LEVEL 1 - B010 - RENOVATION - VENTILATION

M-133 LEVEL 2 - DATA CENTER - VENTILATION

M-134 LEVEL 2 - B010 - RENOVATION - VENTILATION

M-141 MEZZANINE - B010 - MECHANICAL

M-401 LEVEL 1 - B010 - MECH ROOM 115 - RENOVATION

M-521 VENTILATION DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-611 HYDRONIC SYSTEM DIAGRAM - LCCA OPTION 1

M-612 HYDRONIC SYSTEM DIAGRAM - LCCA OPTION 2

M-613 HYDRONIC SYSTEM DIAGRAM - LCCA OPTION 3

M-614 HYDRONIC BOILER DIAGRAM

M-615 HYDRONIC DIAGRAMS

M-621 VENTILATION DIAGRAMS

M-631 MICROTURBINE DIAGRAMS

M-641 FUEL OIL SYSTEM DIAGRAM

PLUMBING

P-001 PLUMBING SYMBOL LEGEND AND ABBREVIATIONS

PD-111 LEVEL 1 - BL010 - DEMOLITION - PLUMBING

PD-112 LEVEL 2 - B010 - DEMOLITION - PLUMBING

PD-113 MEZZANINE - B010 - DEMOLITION - PLUMBING

P-102 LEVEL 1 - PLUMBING OVERALL PLAN

P-103 LEVEL 2 - PLUMBING OVERALL PLAN

P-112 LEVEL 1 - DATA CENTER - PLUMBING

P-113 LEVEL 1 - B010 - RENOVATION - PLUMBING

P-114 LEVEL 2 - DATA CENTER - PLUMBING

P-115 LEVEL 2 - B010 - RENOVATION - PLUMBING

P-601 PLUMBING SCHEDULES

P-611 WATER TREATMENT AND HUMIDIFCATION DIAGRAM

FIRE PROTECTION

F-001 FIRE PROTECTION SYMBOL LEGEND AND ABBREVIATIONS

F-601 FIRE PROTECTION DETAILS

DRAWING INDEX

SHEET NUMBER SHEET NAME

GENERAL

G-001 TITLE SHEET

G-002 DRAWING INDEX

G-003 ABBREVIATIONS & LEGENDS

G-004 BUILDING CODE

G-005 FIRE AND LIFE SAFETY

G-006 FIRE AND LIFE SAFETY

ARCHITECTURE

A-311 WALL SECTIONS

A-312 WALL SECTIONS

AD-111 FIRST FLOOR PLAN DEMO

AD-112 SECOND FLOOR PLAN DEMO

AD-121 FIRST FLOOR REFLECTED CEILING PLAN - DEMO

AD-122 SECOND FLOOR RELFECTED CEILING PLAN - DEMO

A-000 SITE PLAN

A-101 FIRST FLOOR PLAN, OVERALL

A-102 SECOND FLOOR PLAN, OVERALL

A-111 FIRST FLOOR PLAN - EXISTING BUILDING

A-112 FIRST FLOOR PLAN - DATA CENTER

A-113 SECOND FLOOR PLAN - EXISTING BUIDING

A-114 SECOND FLOOR PLAN - DATA CENTER

A-121 FIRST FLOOR REFLECTED CEILING PLAN - EXISTING BUILDING

A-122 FIRST FLOOR REFLECTED CEILING PLAN - DATA CENTER

A-123 SECOND FLOOR REFLECTED CEILING PLAN - EXISTING BUILDING

A-124 SECOND FLOOR REFLECTED CEILING PLAN - DATA CENTER

A-131 ROOF PLAN

A-201 EXTERIOR ELEVATIONS

A-202 EXTERIOR ELEVATIONS

A-203 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-302 BUILDING SECTIONS

A-601 DOOR SCHEDULE, DOOR TYPES

A-602 ROOM FINISH SCHEDULE, FINISH LEGEND

STRUCTURAL

S-001 GENERAL NOTES AND ABBREVIATIONS

SD-108 FOUNDATION PLAN EXISTING BUILDING DEMO

SD-109 FOUNDATION PLAN DATA CENTER DEMO

SD-110 1ST FLOOR FRAMING PLAN AREA A, B - DEMO

SD-111 1ST FLOOR FRAMING PLAN DATA CENTER DEMO

SD-112 2ND FLOOR FRAMING EXISTING BUILDING DEMO

SD-113 2ND FLOOR FRAMING PLAN DATA CENTER DEMO

SD-114 ROOF FRAMING PLAN EXISTING BUILDING DEMO

SD-115 ROOF FRAMING PLAN DATA CENTER - DEMO

S-108 FOUNDATION PLAN EXISTING BUILDING

S-109 FOUNDATION PLAN DATA CENTER

S-110 1ST FLOOR FRAMING PLAN AREA A, B

S-111 1ST FLOOR FRAMING PLAN DATA CENTER

S-112 2ND FLOOR FRAMING EXISTING BUILDING

S-113 2ND FLOOR FRAMING PLAN DATA CENTER

S-114 ROOF FRAMING PLAN EXISTING BUILDING

S-115 ROOF FRAMING PLAN DATA CENTER

S-201 BRACE ELEVATIONS

S-501 DETAILS

S-502 DETAILS

S-503 DETAILS

S-601 SCHEDULES

DRAWING INDEX

Page 3: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

GRATE

INSULATION

GYPSUM BOARD

PLAN INDICATIONS

ELEVATION INDICATIONS

TILE

CHECKER PLATE

GLASS

BRICK

FINISHES

ACOUSTICAL TILE

CARPET

BATT/LOOSE FILL

RIGID

WOOD

PLYWOOD

BLOCKING

ROUGH

STEEL

FINISH

MASONRY

METAL

ALUMINUM

SAND

BRICK OR CMU

EARTHWORKS

CONCRETE

MATERIAL LEGEND

CONCRETE

GRAVEL

EARTH

DETAILDTLDRAWINGDWG

FLR FLOOR

NA NOT APPLICABLE

FACE OF CONCRETE

FACE OF MASONRY

FIBERGLASS REINFORCEDPLASTIC - TYPE

HIGH PERFORMANCE COATING

CHEMICAL RESISTANT COATING

DIAMETER

DOWNSPOUT

DIMENSION

DRINKING FOUNTAINDATUM

DOWN

DOOR

DAT

DN

DS

DR

DIM

DFDIA

CARPET - TYPE

CENTER

CRASH RAIL - TYPE

COORDINATE

CERAMIC TILE - TYPE

CENTERLINE

CLEAN ROOM WALLSYSTEM - TYPE

CTR

CRC

CWS-(#)

CR-(#)

CPT-(#)COORD

CT-(#)

HPC

IN

HT

INTINSUL

HEIGHT

INTERIORINSULATION

INCH/INCHES

GYP

HB

HDBDHDWRHM

HORIZ

HC

GYPSUM

HOSE BIBBHOLLOW COREHARDBOARDHARDWAREHOLLOW METAL

HORIZONTAL

CORNER GUARD - TYPECG-(#)

COLUMN

CEILING

CHECKERED

CONTINUOUS

CONCRETE

CONTROL JOINTCAST-IN-PLACE

CONCRETE MASONRY UNIT

CHK

CONT

CONCCOLCMU

CJ

CLG

CIP

FT

GA

GB

GL-(#)

GRGPM

GALV

FOOT/FEET

GAUGE

GRAB BAR

GLASS - TYPE

GRILLEGALLONS PER MINUTE

GALVANIZED

FM

FOCFOFFOMFOPFOS

FRP-(#)

FACTORY MUTUAL

FACE OF FINISH

FACE OF PANELFACE OF STUDS / STEEL

PREFABRICATED

RESILIENT BASE - TYPEROOF DRAINREFERENCE

ROUGH OPENING

REQUIRED

PAPER TOWEL DISPENSER

RESILIENT FLOORING - TYPEREQDRF - (#)RMRO

ROOM

PRPREFAB

PTD

R

RDREF

RB-(#)

PAIR

RISER

W/O

W/

WT

WD

WC-(#)

VP

ON CENTER

OPPOSITE

PLYWOOD

OWNER FURNISHED,CONTRACTOR INSTALLED

PLASTIC LAMINATE - TYPE

NAPKIN DISPOSAL

NOT IN CONTRACT

NOT TO SCALENAPKIN VENDOR

OPP

PT - (#)

PLPLAM - (#)

PLYWDPNL

PAINT SYSTEM - COLOR

PLATE

PANEL

OC

OFCI

ND

NTSNV

NIC

UNO

V

VEST

VR

VDB-(#)

UL

THR

TRTSTYP

TOP OF STEEL

TEMP

FIRE EXTINGUISHER - TYPE

EXTERIOR INSULATION FINISHSYSTEM

FACTFE-(#)

FFU

FINFLG

FF

FINISH

FACTORY

FINISH FLOOR

FAN FILTER UNIT

FLASHING

ELEC

EQ

EXP

(E)

EXT

EJ-(#)

EMERG

EL/ELEVELECTRICELEVATION OR ELEVATOR

EQUAL

EXPOSED

EXISTING

EXTERIOR

EXPANSION JOINT - TYPE

EMERGENCY

ARCHITECTURAL ABBREVIATIONS

EAEIFS

EACH

SAT

KEC KITCHEN EQUIPMENT CONSULTANT

MATERIALMASONRY

LAMINATED

MECHANICALMEZZANINEMANUFACTURER

MISCELLANEOUSMASONRY OPENING

MOP SINK

MINMFR

MINIMUM; MINUTE

MISCMO

MS

MTL METAL

MIRRORMIR

MATLMAS

MECHMEZZ

LAM

SSSTCSTDSTLSTRUCTSUSP

SCD

SDSECT

SHTSIB

SIM

JOINTJT

SAC-(#)

WITHOUT

WITH

WEIGHT

WOOD

WALLCOVERING - TYPE

VENT PIPE

VENT

VESTIBULE

VAPOR RETARDER

THRESHOLD

TREADTUBE STEELTYPICAL

TEMPERED

STAINLESS STEEL

STANDARDSTEELSTRUCTURALSUSPENDED

SOAP DISPENSERSECTION

SHEET

SIMILAR

CLEARCLR

FO FACE OF

EM(#) ENTRANCE MAT - TYPE

TBD TO BE DETERMINED

TOC

OHC OVERHEAD COILING DOOR

CLF CHAIN LINK FENCE

DO DOOR OPENING

LOUVERED BLINDS / POUNDLB

MARKER BOARD - TYPEMB-(#)

S/H SEALER / HARDENER

PER CUBIC FOOTPCF

TOSTOP OF CONCRETE

WWP WOVEN WIRE PARTITION

FWP-(#) FABRIC WRAPPED PANEL - TYPE

GT-(#) GROUT - TYPE

MARKET TRAYMT

REDUCER STRIP - TYPERS - (#)

WF-(#) WINDOW FILM - TYPE

WP-(#)

WB-(#) WHITE BOARD - TYPE

RAPID ROLL-UP DOORRRD

PC-(#) POLYMER COMPOSITE

HR HOUR

LIFE SAFETY SYSTEMSLSS

S STAIN

S-INSUL STEEL INSULATED

WM WIRE MESH

DEMOUNTABLE WALL PARTITIONDWP

SOW SCOPE OF WORK

OFOI

ROUGH ORDER OF MAGNITUDEROM

SF SQUARE FEET

RETURN AIRRETURN AIR GRILLERAG

RA

HS HIGH STRENGTH

FG FINISH GRADE

DUMBWAITERDW

EQUIP EQUIPMENT

PKG PACKAGE

VERT VERTICALEOD EDGE OF DECK

LOW POINTLP

HIGH POINTHP

PASS THROUGHP / T

UA UNASSIGNED

TEMP. TEMPORARY

VIB VIBRATION

ICR INFORMAL CONFERENCE ROOM

CONFERENCECONF

IGU INSULATED GLASS UNIT

FMS FACILITIES MANAGEMENT SYSTEM

FOUP FRONT OPENING UNIFIED POD

PERSONAL GUIDED VEHICLEPGV

SCR

DESIGN REVISION BULLETINDRB

REMOTE OPERATIONS CENTERROC

INTERBAY AMHSDAC

CARD READERCR

FF&E FURNITURE, FIXTURES ANDEQUIPMENT

PLUMBINGPLBG

PROCESSPROC

BOARDBD

BLOCKINGBUILDING

BOTTOM OF

BEAMBLKG

B/

BM

BLDG

AMERICANS WITH DISABILITIES ACTADA

ACOUSTICAL WALL TREATMENT

AMERICAN SOCIETY FORTESTING AND MATERIALS

ARCHITECTURAL

AT@

AWT

ASTM

ARCHAPPROXIMATE

AMERICAN NATIONAL STANDARDSINSTITUTE

ALUMINUMABOVE FINISH FLOORACCESS FLOOR - TYPE

ANSI

ALUMAFF

APPROX

AF-(#)

ACOUSTICAL TILE - TYPEAC-(#)ACP ALUMINUM CHECKER PLATE

BOTTOM OF STEELBOS

NOT FIRE RATEDNR

ALTERNATE MATERIALS ANDMETHODS

AM&M

AMERICAN SOCIETY OF CIVILENGINEERS

ASCE

AMERICAN SOCIETY OFMECHANICAL ENGINEERS

ASME

CUBIC FEET PER MINUTECFMCUBIC FEETCF

CODE INTERPRETATIONCI

CONCRETE SEALERCS

DIAMETERø

DEGREE°

GB GYPSUM BOARD

IBC INTERNATIONAL BUILDING CODE

IECC INTERNATIONAL ENERGYCONSERVATION CODE

IFC INTERNATIONAL FIRE CODE

IMC INTERNATIONAL MECHANICAL CODE

IPC INTERNATIONAL PLUMBING CODEIWUIC INTERNATIONAL WILDLANDS

URBAN INTERFACE CODE

MAXIMUM ALLOWABLE QUANTITIESMAQ

MEMORANDUM OF UNDERSTANDINGMOU

NATIONAL ELECTRIC CODENECNATIONAL FIRE PROTECTIONASSOCIATION

NFPA

OWNER FURNISHED, OWNERINSTALLED

OCCUPATIONAL SAFETY ANDHEALTH ASSOCIATION

OSHA

POUNDS PER SQUARE INCHPSI

REVERSE OSMOSIS DE-IONIZED WATERRODI

SUSPENDED ACOUSTICALCEILING - TYPESUSPENDED ACOUSTICAL TILESEAT COVER DISPENSERSATELLITE COMMUNICATIONS ROOM

STRUCTURAL ISOLATION BREAK

SOUND TRANSMISSION COEFFICIENT

UNDERWRITERS LABORATORYUMC UNIFORM MECHANICAL CODE

UPC UNIFORM PLUMBING CODEUNLESS NOTED OTHERWISE

VISUAL DISPLAY BOARD - TYPE

DEMOUNTABLE PARTITION - TYPE

WWT WASTE WATER TREATMENT

AUTOMATED MATERIALHANDLING SYSTEM

AMHS

MAXIMUMMAX

TLA THREE LETTER ACRONYM

8X

ROOM NUMBER

BUILDING SECONDARY LEVEL (WHERE REQUIRED)BUILDING FLOOR LEVELBUILDING (WHERE REQUIRED)

ROOM TAG

BUILDING SECTOR (WHERE REQUIRED)

BUILDING (WHERE REQUIRED)BUILDING LEVEL (WHERE REQUIRED)

ROOM NUMBERDOOR NUMBER

DOOR TAG

SPECIAL CONDITION IF REQUIRED

PARTITION TYPE

GLAZING TAG

STUD OR CMU NOMINAL SIZE

PARTITION CONSTRUCTION CONDITION

SIZE/TYPE SEE WINDOW SCHEDULE

ROOM NUMBERROOM SQ FOOTAGE

OCCUPANT LOADOCCUPANT LOAD FACTOROCCUPANCY

ROOM OCCUPANCY TAG

BUILDING SECTOR (WHERE REQUIRED)

BLS01A

WALL TAG

TAGS

FIRE RESISTANCE RATING SEE WINDOW SCHEDULE

AE 2

2 D

Room name

## SQ FTOCC OLOLF

Room name

BLS201

X

0

1

DX3A-7600

______________________

1

DX3A-7600

______________________

1

DX3A-7600

______________________

DETAIL CALLOUT

COLUMN GRID BUBBLE

EXISTING COLUMN GRID BUBBLE

BUILDING SECTION CALLOUT

ELEVATION CALLOUT

REVISION TRIANGLE

KEYED NOTE

ELEVATION DATUM

INTERIOR ELEVATION CALLOUT

SIGNAGE CALLOUT

XX

X Ref

X

Ref

X Ref

X

Ref

Sign No.

SYMBOLS

1

DX3A-7600

______________________

WALL SECTION CALLOUT

1RFI-0000

?

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:59:19 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

G-003

SYMBOLS AND TAGS

MATERIAL LEGEND,

ABBREVIATIONS,

JC, RB

JF

9/23/16

GE

NE

RA

L

160604MCM010G-003-RA

Page 4: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

1 2 3 4 6 8 9 10 11 12 13 14

M

L

K

J

I

H

G

F

E

D

C

B

A

5 7

AA

VESTIBULE

101

LOBBY

102

259 SF

SERVICEBAR

106B 3100

WOMEN

103

73 SF

JAN.

104B 1300

MEN

105

567 SF

LAY-DOWN/MOCK-UP

108B 6100

CORRIDOR

107

1318 SF

SPAWARGENERALSTORAGE

110AB 13100

536 SF

LOADING

111B 6100

945 SF

PCELECTRONICS

112B 13100

315 SF

PCSTORAGE

112AS-1 2300

163 SF

BATTERYSTORAGE

114S-1 1300

353 SF

MECH.

115S-1 2300

799 SF

UPS

122S-1 3300

812 SF

RADIATOR

120S-1 4300

271 SF

ELECTRICAL

119S-1 1300

1832 SF

COLDSTORAGE

123S-1 7300

237 SF

PARTS/CONSUMABLES

STORAGE

109DB 5100

DIA

GO

NA

L = 1

90'-0

" X

1/3

= 6

3'-4

"

162'

-0" > 6

3'-4

"

30

167

30 52

19 49

TOTAL OCCUPANT LOAD: 89

181 SF

MICROTURBINE

123AS-1 1300

30

TRAVEL DISTANCE: 95'-0"

TR

AV

EL

DIS

TA

NC

E:

136'-0"

TR

AV

EL

DIS

TA

NC

E:

45'-0"

TRAVEL DISTANCE: 100'-0"

146 SF

TELECOMROOM

118S-1 1300

199 SF

COMMSNODE &

TELECOM

117S-1 1300

1907 SF

MECHANICAL

116S-1 7300

534 SF

GENERATOR

121S-1 2300

D.6

B.1

562 SF

WORKBENCHES

109EB 6100

1167 SF

COMMS

109B 12100

172 SF

LOCKERROOM

109AB 350

98 SF

OFFICE

109BB 1100

98 SF

OFFICE

109CB 1100

240 SF

SPAWAROFFICES

110B 3100

106 SF

SPAWARMANAGER

110BB 1100

666 SF

COMMS/ITCSTORAGE

113BS-1 3300

307 SF

COMMONAREA

113S-1 2300

249 SF

SPAWARSTORAGE

113AS-1 1300

TOTAL OCCUPANT LOAD: 19

AA.9

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:59:24 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

G-005

LEVEL 1

FIRE AND LIFE SAFETY

JC, RB

JF

9/23/16

GE

NE

RA

L

160604MCM010G-005-RA

- 3/32" = 1'-0"

1 FIRE AND SAFETY - LEVEL 1 OVERALL FLOOR PLAN

N

8 0 8

Scale: 3/32 INCH = 1 FOOT

16 24

Base Bid (new construction)

hooplena
Rectangle
hooplena
Rectangle
Page 5: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

188

166

701

108

142 & 85

2

3

167

182

107

1

1

A-2

02

2

A-2

02

1

A-2

01

1

A-2

03

PHASE 1 -NEW DATA CENTER BUILDING

STAIR TOWER TO ROOF

STEEL ROOF PLATFORM,

PHASE 2, COLD STORAGE ADDITION

PHASE 2 -EXISTING BUILDING RENOVATION

SEWERWATERWASTE HEAT SUPPLYWASTE HEAT RETURN

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:57:32 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-000

SITE PLAN

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-000-RA

- 1 : 400

1 SITE PLAN

N

Page 6: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

UP

1 2 3 4 6 8 9 10 11 12 13 14

M

L

K

J

I

H

G

F

E

D

C

B

A

20'-0" 20'-0" 20'-0" 14'-0" 12'-0" 14'-0" 20'-0" 28'-6"

2'-9"

10'-0"

1'-8"

8'-4"

10'-0"

6'-6"

3'-6"

10'-0"

10'-0"

10'-0"

20'-0"

20'-0"

20'-0"

20'-0"

20'-0"

5 7

LOBBY

102

SERVICEBAR

106

LAY-DOWN/MOCK-UP

108

SPAWARGENERALSTORAGE

110A

LOADING

111

PCELECTRONICS

112

2

A-301

______________________

4

A-302

______________________

UPS

122

ELECTRICAL

119

RADIATOR

120

COLDSTORAGE

123

MICROTURBINE

123A

D.6

B.1

MECHANICAL

116

GENERATOR

121

COMMS/ITCSTORAGE

113B

COMMONAREA

113

COMMS

109

WORKBENCHES

109E

1

A-301

______________________

PHASE 1 - DATA CENTER BUILDING

PHASE 2 - RENOVATION OF EXISTING BUILDING

PHASE 2 - ADDITIVE ALTERNATE #1 - COLD STORAGE ADDITION

PHASE 2 - ADDITIVE ALTERNATE #2 - MICROTURBINE

STAIR

003

STAIR

001

STAIR

002

27'-2" 27'-2" 27'-2" 9'-10"

2

A-111

1

A-111PHASE 2 - RENOVATION OF EXISTING BUILDING

1

A-112

CORRIDOR

123B

AA.9

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:57:35 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-101

OVERALL

FLOOR PLAN

LEVEL 1

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-101-RA

- 1/16" = 1'-0"

1 LEVEL 1 - FLOOR PLAN - OVERALL

N

16 0

Scale: 1/16 INCH = 1 FOOT

16 32

KEY PLAN

A

B C

Page 7: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

1 2 3 4 6 8 9 10 11 12 13 14

M

L

K

J

I

H

G

F

E

D

C

B

A

5 7

2'-9"

10'-0"

20'-0" 20'-0" 20'-0" 14'-0" 6'-0" 6'-0" 14'-0" 20'-0" 28'-6"

OPENBELOW

BREAK RM

204

OFFICECUBICLES

214

SCIENCEELECTRONICS

SHOP

205

OPERATIONS,RECEIVING,SHIPPING

205A

AFRTS

221

MUD RM

217

COPY

218

USAP/NSFDC

224B

USAP/NSFNOC

225

4

A-302

______________________

NOAA/NASA/JPSSDC

224C

COLO DC

224A

ASSIGNEDOFFICES

219

D.6

B.1

BACKUPMISSIONSCOMMS

216

CONFERENCE/MEETING

215

NOAA/NASA/JPSS

226

2" / 12"

1

A-301

______________________

PHASE 1 - DATA CENTER BUILDING

TELECOM

208A

PHASE 2 - RENOVATION OF EXISTING BUILDING

PHASE 2 - ADDITIVE ALTERNATE #1 - COLD STORAGE ADDITION

STAIR

003

STAIR

002

STAIR

001

27'-2" 27'-2" 27'-2" 9'-10"

10'-0"

10'-0"

10'-0"

20'-0"

20'-0"

20'-0"

20'-0"

20'-0"

10'-0"

1'-8"

8'-4"

6'-6"

3'-6"

1

A-114

1

A-113PHASE 2 - RENOVATION OF EXISTING BUILDING

2

A-113

AA.9

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/7/2016 10:08:58 AM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-102

OVERALL

FLOOR PLAN

LEVEL 2

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-102-RA

- 1/16" = 1'-0"

1 LEVEL 2 - FLOOR PLAN - OVERALL

N

16 0

Scale: 1/16 INCH = 1 FOOT

16 32

KEY PLAN

A

B C

Page 8: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

9 10 11 12 13 14

H

G

F

E

D

C

B

A

AA

2

A-302

______________________

1

A-302

______________________

1907 SF

MECHANICAL

116

799 SF

UPS

122

271 SF

ELECTRICAL

119

146 SF

TELECOMROOM

118

199 SF

COMMSNODE &

TELECOM

117

812 SF

RADIATOR

120

534 SF

GENERATOR

121

3'-0"

FOR VEHICLES

21'-6" CLEAR 1'-0"

REMOVABLEGUARDRAIL

D.6

B.1

28'-6" 27'-2" 27'-2" 27'-2" 9'-10"

7'-3"

2'-9"

10'-0"

1'-8"

8'-4"

10'-0"

6'-6"

3'-6"

10'-0"

10'-0"

10'-0"

ARCTIC HOODS

OSA INTAKE10'X20'

PER MECH.DRAWINGS

PER ELEC.DRAWINGS

PER MECH.DRAWINGS

GENERATOREXHAUST TO ROOF

2'-0"

PER ELEC.DRAWINGS

3

A-302

______________________

119A

122A

116A

120A

116B

117A118A

116C

121A

OPEN

OPEN

W1 W1

W1W1

MA

TC

H L

INE

1/A

-111

PHASE 1 - DATA

CENTER BUILDING

PHASE 2 -

RENOVATION OF

EXISTING BUILDING

STAIR

003

AA.9

EXISTING WALL

PARTITION, TYPICAL

EXISTING DOOR

NEW DOOR

FLOOR PLAN LEGEND

METAL CLAD STRUCTURAL INSULATED PANEL

PARTITION, 1 HR FIRE RATED

TRIPLE GLAZED WINDOW

PARTITION, 2 HR FIRE RATED

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:57:51 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-112

AREA C

FLOOR PLAN

LEVEL 1

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-112-RA

- 1/8" = 1'-0"

1 LEVEL 1 - FLOOR PLAN - AREA C

N

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

KEY PLAN

A

B C

Page 9: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

9 10 11 12 13 14

H

G

F

E

D

C

B

A

710 SF

USAP/NSFDC

224B

741 SF

ASSIGNEDOFFICES

219

150 SF

COPY

218

233 SF

MUD RM

217

304 SF

CONFERENCE/MEETING

220

390 SF

AFRTS

221

454 SF

CORRIDOR

222B

MA

TC

HLIN

E 1

/A-1

03

2

A-302

______________________1

A-302

______________________

10'-0"

1'-8"

8'-4"

10'-0"

6'-6"

3'-6"

10'-0"

10'-0"

10'-0"

28'-6" 27'-2" 27'-2" 27'-2" 9'-10"

747 SF

NOAA/NASA/JPSSDC

224C

465 SF

COLO DC

224A

115 SF

STORAGE

223A

159 SF

SPAWARNOC

223

CRACCRACCRAC

WK

BE

NC

H

133 SF

AFRTSEDITINGSUITE

221B

LOCKERS

54 SF

SOUNDBOOTH

221A

BENCH

D.6

B.1

535 SF

USAP/NSFNOC

225

678 SF

NOAA/NASA/JPSSNOC

226TOOLS

WORKBENCH

SH

ELV

ING

CRACCRAC

4'-0"4'-0"

CABINETS314 SF

STORAGE

225A

SHELVING

MUD ROOM

6X6LIFT

WK

BE

NC

H

6'-0"

179 SF

STORAGE

226A

GENERATOREXHAUST TO ROOF

WINDOW WALLWINDOW WALL

173 SF

CORRIDOR

222A

3

A-302

______________________

203B

201A218A

224A

221A

219A

217A

223B

221B

222B

W1 W1 W1W1 W1W1 W1 W1W1 W1 W1

225B

221C

217B224B

224C

225A 226A

226B

222A

W1

W1W1

PHASE 1 - DATA

CENTER BUILDING

PHASE 2 -

RENOVATION OF

EXISTING BUILDING

220A 223A

STAIR

003

4'-0"4'-0"4'-0"4'-0" 4'-0"

AA.9

2'-9"

2'-9"

10'-0"

1'-8"

8'-4"

10'-0"

6'-6"

3'-6"

10'-0"

10'-0"

10'-0"

EXISTING WALL

PARTITION, TYPICAL

EXISTING DOOR

NEW DOOR

FLOOR PLAN LEGEND

METAL CLAD STRUCTURAL INSULATED PANEL

PARTITION, 1 HR FIRE RATED

TRIPLE GLAZED WINDOW

PARTITION, 2 HR FIRE RATED

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:57:58 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-114

AREA C

FLOOR PLAN

LEVEL 2

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-114-RA

- 1/8" = 1'-0"

1 LEVEL 2 - FLOOR PLAN - AREA C

N

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

KEY PLAN

A

B C

Page 10: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

1 2 3 4 6 8 9 10 11 12 13 14

M

L

K

J

I

H

G

F

E

D

C

B

A

2" / 12"2" / 12"

2"

/ 12"

2"

/ 12"

2"

/ 12"

2"

/ 12"

2"

/ 12"

2" / 12"

4

A-302

______________________

D.6

B.1

2"

/ 12"

20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 28'-6"10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

20'-0"

20'-0"

20'-0"

20'-0"

20'-0"

3'-6"

2"

/ 12"

2" / 12"

EXISTINGMETAL ROOF

EXISTINGMETAL ROOF

METAL ROOF

METAL INSULATEDROOF PANELS

STEEL ROOF PLATFORM,SEE STRUCT. DRAWINGS

1

A-301

______________________

MICROTURBINEEXHAUST STACK

GENERATOREXHAUST STACK

2

A-131

20'-0"

20'-0"

10'-0"

20'-0"

TERASCAN DOME

27'-2" 27'-2" 27'-2" 9'-10"

1'-8"

MICROTURBINELOUVER AND HOOD

AA.9

2'-9"

13 14

D

C

D.6

B.1

8'-4"

10'-0"

6'-6"

EX

PO

SE

D T

OR

OO

F S

TR

UC

TU

RE

9'-10"

13 14

D

C

D.6

B.1

8'-4"

10'-0"

6'-6"

9'-10"

W1

301A

STAIR

003

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:58:15 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-131

ROOF PLAN

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-131-RA

- 1/16" = 1'-0"

1 ROOF PLAN

N

16 0

Scale: 1/16 INCH = 1 FOOT

16 32

- 1/8" = 1'-0"

3 STAIRWELL - REFLECTED CEILING PLAN

- 1/8" = 1'-0"

2 STAIRWELL

Page 11: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

LEVEL 1 F.F.0"

1 2 3 4 6 8 9 10

LEVEL 2 F.F.12'-10"

ROOF25'-0"

MEZZANINE22'-10"

GROUND LEVEL-7'-2"

5 7

20'-0" 20'-0" 20'-0" 14'-0" 6'-0" 6'-0" 14'-0" 20'-0" 28'-6"

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

OPENBREEZEWAY

MA

TC

H L

INE

2/A

-201

TERASCAN DOME

GENERATOR EXHAUST

LEVEL 1 F.F.0"

9 10 11 12 13 14

LEVEL 2 F.F.12'-10"

ROOF25'-0"

GROUND LEVEL-7'-2"

28'-6" 27'-2" 27'-2" 27'-2" 9'-10"

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

OPENBREEZEWAY

MA

TC

H L

INE

1/A

-201

METAL CLAD STRUCTURALINSULATED ROOF PANELS

PREFINISHED ARCHITECTURALCLADDING, TYP.

INSULATED SOFFIT, R-70

METAL ROOF PLATFORM,PER STRUCT. DRAWINGS

COLUMN PAD FOOTINGS,PER STRUCT. DRAWINGS

HIGH PERFORMANCEINSULATED WINDOWS, TYP.

PREFINISHEDARCHITECTURALCLADDING OVERARCTIC HOODS

GENERATOREXHAUST

TERASCAN DOME

CORRUGATED, PREFINISHEDARCHITECTURAL CLADDING, TYP.

BIRD SCREENBIRD SCREEN

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:58:28 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-201

EXTERIOR ELEVATIONS

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-201-RA

- 1/8" = 1'-0"

1 WEST ELEVATION

- 1/8" = 1'-0"

2 WEST ELEVATION - CONTINUED 8 0 8

Scale: 1/8 INCH = 1 FOOT

16

Page 12: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

LEVEL 1 F.F.0"

123468910

LEVEL 2 F.F.12'-10"

ROOF25'-0"

MEZZANINE22'-10"

GROUND LEVEL-7'-2"

57

20'-0"20'-0"20'-0"14'-0"6'-0"6'-0"14'-0"20'-0"28'-6"

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

OPENBREEZEWAY

MA

TC

H L

INE

2/A

203

PREFINISHEDARCHITECTURALCLADDING, TYP.

CORRUGATED,PREFINISHEDARCHITECTURALCLADDING, TYP.

HIGH PERFORMANCEINSULATED WINDOWS,TYP.

METAL CLADSTRUCTURAL INSULATEDROOF PANELS

METAL ROOF PLATFORM,PER STRUCT. DRAWINGS

TERASCAN DOME

LOUVER AND HOOD, REFERTO MECH. DRAWINGS

LEVEL 1 F.F.0"

91011121314

LEVEL 2 F.F.12'-10"

ROOF25'-0"

GROUND LEVEL-7'-2"

28'-6"27'-2"27'-2"27'-2"9'-10"

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

OPENBREEZEWAY

MA

TC

H L

INE

1/A

203

METAL CLADSTRUCTURAL INSULATEDROOF PANELS

HIGH PERFORMANCEINSULATED WINDOWS, TYP.

PREFINISHED ARCHITECTURALCLADDING, TYP.

CORRUGATED,PREFINISHEDARCHITECTURALCLADDING, TYP.

COLUMN PAD FOOTINGSPER STRUCT. DRAWINGS

INSULATED SOFFIT, R-70

TERASCAN DOME

METAL ROOF PLATFORM, PERSTRUCT. DRAWINGS

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:58:43 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-203

EXTERIOR ELEVATIONS

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-203-RA

- 1/8" = 1'-0"

1 EAST ELEVATION

- 1/8" = 1'-0"

2 EAST ELEVATION - CONTINUED8 0 8

Scale: 1/8 INCH = 1 FOOT

16

Page 13: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

LEVEL 1 F.F.0"

6 8 9 10 11 12 13 14

LEVEL 2 F.F.12'-10"

ROOF25'-0"

MEZZANINE22'-10"

GROUND LEVEL-7'-2"

7

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

CORRIDOR

222

MECHANICAL

116

UPS

122

MUD RM

217

6'-0" 14'-0" 20'-0" 28'-6" 27'-2" 27'-2" 27'-2" 9'-10"

MA

TC

HLIN

E 1

/A-3

01 ROOF ASSEMBLY:

METAL CLAD STRUCTURALINSULATED ROOF PANELS, R-70

VAPOR BARRIER

WALL ASSEMBLY:METAL CLAD STRUCTURAL

INSULATED PANELS, R-60VAPOR BARRIERMETAL STUDSGYPSUM BOARD

FLOOR ASSEMBLY:RAISED FLOOR SYSTEMSTEEL PLATEMETAL DECK

INSULATED SOFFIT, R-70

METAL ROOF PLATFORM,PER STRUCT. DRAWINGS

COLUMN PAD FOOTINGS,PER STRUCT. DRAWINGS

FLOOR ASSEMBLY:STEEL PLATEMETAL DECK

INSULATED SOFFIT, R-70

OPEN BREEZEWAY

TERASCAN DOME

LEVEL 1 F.F.0"

1 2 3 4 6

LEVEL 2 F.F.12'-10"

ROOF25'-0"

MEZZANINE22'-10"

GROUND LEVEL-7'-2"

5

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

CORRIDOR

202

LOADING

111

20'-0" 20'-0" 20'-0" 14'-0" 6'-0"

MA

TC

HLIN

E 2

/A-3

01

SPAWARGENERALSTORAGE

110A

SPAWAROFFICES

110

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:58:49 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-301

BUILDING SECTIONS

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-301-RA

- 1/8" = 1'-0"

2 BUILDING SECTION A - CONTINUED

- 1/8" = 1'-0"

1 BUILDING SECTION A

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

Page 14: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

LEVEL 1 F.F.0"

LEVEL 2 F.F.12'-10"

ROOF25'-0"

GFEDCBA

GROUND LEVEL-7'-2"

AA

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

D.6B.1

2'-6"

CONFERENCE/MEETING

220

ASSIGNEDOFFICES

219

7'-3" 2'-9" 10'-0" 1'-8" 8'-4" 10'-0" 6'-6" 3'-6" 10'-0" 10'-0"

14'-2"

AFRTS

221

6"

ROOF ASSEMBLY:METAL CLAD STRUCTURAL INSULATED ROOF PANELS, R-70VAPOR BARRIER

WALL ASSEMBLY:METAL CLAD STRUCTURAL INSULATED PANELS, R-60VAPOR BARRIERMETAL STUDSGYPSUM BOARD

FLOOR ASSEMBLY:RAISED FLOOR SYSTEMSTEEL PLATEMETAL DECK

INSULATED SOFFIT, R-70

METAL ROOF PLATFORM,PER STRUCT. DRAWINGS

COLUMN PAD FOOTINGS,PER STRUCT. DRAWINGS

TERASCAN DOME

AA.9

LEVEL 1 F.F.0"

LEVEL 2 F.F.12'-10"

ROOF25'-0"

G F E D C B A

GROUND LEVEL-7'-2"

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

2'-6"

D.6 B.1

10'-0" 10'-0" 3'-6" 6'-6" 10'-0" 8'-4" 1'-8" 10'-0" 2'-9"

ROOF ASSEMBLY:METAL CLAD STRUCTURAL INSULATED ROOF PANELS, R-70VAPOR BARRIER

WALL ASSEMBLY:METAL CLAD STRUCTURAL INSULATED PANELS, R-60VAPOR BARRIERMETAL STUDSGYPSUM BOARD

FLOOR ASSEMBLY:RAISED FLOOR SYSTEMSTEEL PLATEMETAL DECK

INSULATED SOFFIT, R-70

METAL ROOF PLATFORM,PER STRUCT. DRAWINGS

COLUMN PAD FOOTINGS,PER STRUCT. DRAWINGS

ARCTIC HOODS WITH METAL CLADDING

4'-0"

CLE

AR

RADIATOR

120

USAP/NSFNOC

225

CORRIDOR

222B

USAP/NSFDC

224B

MECHANICAL

116

MECHANICAL

116

BIRD SCREEN

6"

AA.9

LEVEL 1 F.F.0"

4 6 8 9

LEVEL 2 F.F.12'-10"

ROOF25'-0"

MEZZANINE22'-10"

GROUND LEVEL-7'-2"

5 7

COLDSTORAGE

123

CORRIDOR

107

SCIENCEELECTRONICS

SHOP

205

14'-0" 6'-0" 6'-0" 14'-0" 20'-0"

ROOF ASSEMBLY:METAL CLADSTRUCTURAL INSULATEDROOF PANELS, R-70

WALL ASSEMBLY:METAL CLAD STRUCTURALINSULATED PANELS, R-60

FLOOR ASSEMBLY:STEEL PLATEMETAL DECK

COLUMN PAD FOOTINGS,PER STRUCT. DRAWINGS

INSULATED SOFFIT, R-70

LEVEL 1 F.F.0"

LEVEL 2 F.F.12'-10"

ROOF25'-0"

G F E D C B A

GROUND LEVEL-7'-2"

ROOF PLATFORM31'-6"

STAIRWELL ROOF40'-0"

D.6 B.1

710 SF

USAP/NSFDC

224B

799 SF

UPS

122

1907 SF

MECHANICAL

116

159 SF

SPAWARNOC

223

115 SF

STORAGE

223A

741 SF

ASSIGNEDOFFICES

219

454 SF

CORRIDOR

222B

10'-0" 10'-0" 3'-6" 6'-6" 10'-0" 8'-4" 1'-8" 10'-0" 2'-9"

OUTSIDEAIR INTAKE

OUTSIDEAIR INTAKE

DAMPERS PERMECH. DRAWINGS

AA.9

PRELIMINARY DRAWINGFOR REVIEW ONLY - NOT FOR CONSTRUCTION

INCHES

CENTIMETERS

1 2 3 4 5 6

D

C

B

A

87654321

SHEET NUMBER:

SHEET TITLE:

DATE CHECKED:

DRAWN BY:

DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WA

SH

ING

TO

N, D

.C. N

SF

CO

NT

RA

CT

O

PP

. 0

0003

73

OF

FIC

E O

F P

OLA

R P

RO

GR

AM

S

FO

UN

DA

TIO

N

NA

TIO

NA

L S

CIE

NC

E

7400 S

outh

T

ucson W

ay

Cente

nnia

l, C

ol o

rado

80112 -

3938 U

SA

303 -

790 -

8606

800 -

688 -

8606

RE

VIS

ION

LO

G

RE

V.

DA

TE

DE

SC

RIP

TIO

ND

FT

G.

AP

PD

.

1 2

MC

MU

RD

O S

TA

TIO

N

BL010: IT

&C

PR

IMA

RY

OP

S F

AC

ILIT

Y

A09/2

3/2

016

30%

DE

SIG

N S

UB

MIT

TA

L

DF

TG

.A

PP

D.

160604MCM010

10/6/2016 5:58:56 PM F:\Projcur\Lockheed Martin-IT&C Primary Ops\CADD\CADD\Revit\USAP-160604-AR-DM2016-CENTRAL - Reece.rvt

A-302

BUILDING SECTIONS

JC, RB

JF

9/23/16

AR

CH

ITE

CT

UR

E

160604MCM010A-302-RA

- 1/8" = 1'-0"

1 CROSS SECTION - 1

- 1/8" = 1'-0"

2 CROSS SECTION - 2- 1/8" = 1'-0"

4 CROSS SECTION - 48 0 8

Scale: 1/8 INCH = 1 FOOT

16

- 1/8" = 1'-0"

3 CROSS SECTION - 3

Page 15: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

ACFM ACTUAL CUBIC FEET PERAFF ABOVE FINISHED FLOORAGT AVERAGE GLYCOL TEMPERATUREAHAP AS HIGH AS POSSIBLEAHU AIR HANDLING UNITAPPROX APPROXIMATEAS AIR SEPARATORAV ACID VENTAVTR ACID VENT THROUGH ROOFAW ACID WASTEBTU BRITISH THERMAL UNITCA COMPRESSED AIRCFM CUBIC FEET PER MINUTECIRC CIRCULATIONCH CHILLERCLNG CEILINGCO CARBON MONOXIDECO2 CARBON DIOXIDECONT CONTINUATION, CONTINUEDCP CIRCULATING PUMPCR CONDENSATE RETURNCRAC COMPUTER ROOM AIR

CONDITIONING UNITCU COPPERCW COLD WATERCWR CHILLED WATER RETURNCWS CHILLED WATER SUPPLYDDC DIRECT DIGITAL CONTROLSDIA DIAMETERDHWC DOMESTIC HOT WATER CIRCDN DOWNDWR DEMINERALIZED WATER RETURNDWS DEMINERALIZED WATER SUPPLYDX DIRECT EXPANSION(E) EXISTINGEA EXHAUST AIREBB ELECTRIC BASEBOARDEF EXHAUST FANEGT ENTERING GLYCOLTEMPERATUREENT ENTERINGET EXPANSION TANKEUH ELECTRIC UNIT HEATEREWT ENTERING WATER TEMPERATUREFCO FLOOR CLEANOUTFCU FAN COIL UNITFD FIRE DAMPERFD FLOOR DRAINFM FORCED MAINFT FEETFT FINNED TUBEFSD FIRE SMOKE DAMPERGAL GALLONSGALV GALVANIZEDGCR GLYCOL COOLING RETURNGCS GLYCOL COOLING SUPPLYGHR GLYCOL HEATING RETURNGHS GLYCOL HEATING SUPPLYGI GREASE INTERCEPTORGMT GLYCOL MAKE-UP TANKGPM GALLONS PER MINUTEHB HOSE BIBBHC HEATING COILHP HORSE POWERHRV HEAT RECOVERY VENTILATORHW HOT WATERHWC HOT WATER CIRCULATIONHWR HEATING WATER RETURNHWS HEATING WATER SUPPLYHX HEAT EXCHANGERHZ HERTZID INSIDE DIAMETERIN INCHESLAV LAVATORYLF LINEAL FEETLGT LEAVING GLYCOL TEMPLHWR LOW TEMP HEATING WATERRETURNLHWS LOW TEMP HEATING WATERSUPPLYLVG LEAVINGLW LAB WASTELWH LAB WATER HEATERLWT LEAVING WATER TEMPERATURE

MAX MAXIMUMMBH THOUSAND BTU's PER HOURMIN MINIMUMMBH THOUSAND BTU's PER HOURMIN MINIMUMMISC MISCELLANEOUSNC NORMALLY CLOSEDNO NORMALLY OPENNO. NUMBERNPCW NON POTABLE COLD WATER02 OXYGENOA OUTSIDE AIROC ON CENTERORD OVERFLOW ROOF DRAINORL OVERFLOW RAIN LEADEROSA OUTSIDE AIR SUPPLYP PUMPPCR PUMPED CONDENSATE RETURNPD PRESSURE DROPPDI PLUMBING & DRAINAGE

INSTITUTEPG PROPYLENE GLYCOLPH PHASEPHC PRE HEAT COILPOC POINT OF CONNECTIONPSIG POUNDS PER SQUARE INCH GAUGEPSI POUNDS PER SQUARE INCHPW PUMPED WASTERA RETURN AIRRCP RADIANT CEILING PANELRD ROOF DRAINRECIRC RECIRCULATIONRFL REFRIGERANT LIQUIDRFM RADIANT FLOOR MANIFOLDRFS REFRIGERANT SUCTIONRHC REHEAT HEATING COILRL RAINLEADERRPBP REDUCED PRESSURE ZONE

BACKFLOW PREVENTERRTU ROOF TOP UNITRV REFRIGERANT VAPORRWL RAIN WATER LEADERRZ RADIANT ZONESA SUPPLY AIRSCH SCHEDULESD STORM DRAINSF SQUARE FEETSF SUPPLY FANSH STEAM HUMIDIFIERSP SUMP PUMPSS STAINLESS STEELTA TRANSFER AIRTEMP TEMPERATURETDH TOTAL DEVELOPED HEADTP TRAP PRIMERTYP TYPICALUL UNDERWRITER'S LABORATORYUON UNLESS OTHERWISE NOTEDVAV VARIABLE AIR VOLUMEUH UNIT HEATERVTR VENT THROUGH ROOFVR VENT RISERW WASTEW/ WITHW.C. WATER COLUMNWCO WALL CLEANOUTWH WATER HEATERWHA WATER HAMMER ARRESTORWPD WATER PRESSURE DROPWRT WITH RESPECT TO

ABBREVIATIONS

3.

DETAIL IDENTIFICATION

DRAWING ON WHICHDETAIL IS SHOWNSECTIONIDENTIFICATION

DRAWING ON WHICHSECTION IS SHOWN

EQUIPMENTDESIGNATION

LINEAL FEET ORMBH OUTPUT

GPM

T-1

1

UH-1

83 7.0

1A101

AA101

(E)VAV-100

DETAIL SYMBOL

SECTION SYMBOL

ROOM NAME ANDNUMBER DESIGNATION

SHEET NOTE REFERENCE

GENERAL SHEET NOTE

PLUMBING FIXTUREDESIGNATION, SEEFIXTURE CONNECTIONSCHEDULE

EQUIPMENT DESIGNATION,SEE EQUIPMENTSCHEDULE

TERMINAL HEATINGUNIT DESIGNATION

POINT OF CONNECTION

VAV TAG

TO BE DEMOLISHEDOR RELOCATED

EXISTING TO REMAIN

NEW

GENERAL

P-1

HORIZONTAL VERTICAL

HORIZONTAL

SUPPLY

RETURN

AUTOMATIC AIR VENT W/ISOLATION VALVE

UNIT HEATER PLAN VIEW

CABINET UNIT HEATERPLAN VIEW

FINNED TUBE PLAN VIEW

HEATING & COOLING

ELBOW, TURNED DOWN

ELBOW, TURNED UP

TEE, OUTLET DOWN

TEE, OUTLET UP

FLOW DIRECTION

CONCENTRIC REDUCER

ISOLATION VALVE

BALL VALVE

PRESSURE REDUCING VALVE

CHECK VALVE

STRAINER

STRAINER W/ BLOWDOWN

PRESSURE TEMPERATURE TAP("PETE'S PLUG")

AUTOMATIC FLOW CONTROL VALVE

BALANCE VALVE

MOTORIZED 2-WAY CONTROL VALVE

MOTORIZED 3-WAY CONTROL VALVE

RELIEF OR SAFETY VALVE

DRAIN ISOLATION VALVE ANDHOSE ADAPTOR

DRAIN ISOLATION VALVE ANDCAP

UNION

FLANGE CONNECTION

PIPE ANCHOR

PIPE GUIDE

METER

TRIPLE-DUTY VALVE

2-WAY TEMPERING VALVE

3-WAY TEMPERING VALVE

THERMOMETER

PRESSURE GAUGE W/ISOLATION VALVE

PUMP - CIRC

PUMP - INLINE

M

PIPE FITTINGS & VALVES

(DN)(UP)

VD

(UP) (DN)

18"X12"

F

(UP) (DN)

SD FSD

DUCT (1ST FIGURE, SIDE SHOWN2ND FIGURE, SIDE NOT SHOWN)

DIRECTION OF FLOW

DUCT WITH INSULATION

DUCT WITH SOUND LINING

SUPPLY DUCT SECTION

RETURN DUCT SECTION

EXHAUST DUCT SECTION

SUPPLY REGISTER.GRILLE, OR DIFFUSER

RETURN REGISTER.GRILLE, OR DIFFUSER

EXHAUST REGISTER,GRILLE OR DIFFUSER

FLEXIBLE CONNECTIONS

VOLUME DAMPER

FIRE DAMPERSMOKE DAMPERCOMBINATION FIRE/SMOKE DAMPER

TURNING VANES

DUCT SMOKE DETECTOR

VAV BOX

CARBON MONOXIDE

CARBON DIOXIDE

PRESSURE SENSOR

TEMPERATURE SENSOR

HUMIDITY SENSOR

COCO2

P

SM

VENTILATION

T

H

COCO

MM

MOTORIZEDCONTROL DAMPER

CENTRIFUGAL FAN

PLENUM/PLUG FAN

AIRFLOW STATION

HEATING/PREHEATCOIL

COOLING COIL

SOUNDATTENUATOR

PARALLEL OPPOSED

VENTILATION SYMBOLS

HUMIDIFIER

LOUVER

CARBON FILTER

SUMMER/PRE-FILTER

FINAL FILTER

AIR BLENDER

BACKDRAFTDAMPER

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:25:27 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-001

MECHANICAL SYMBOLLEGEND AND

ABBREVIATIONS

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-001-RA

CD

FM

EB

Page 16: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

UP

1 2 3 4 5 6 7 8 9 10 11 12 13 14

M

L

K

J

I

H

G

F

E

D

C

B

A

AA

SERVICEBAR106WOMEN

103

MEN105

BATTERYSTORAGE

114

MECH.115

LOBBY102

VESTIBULE101

COMMONAREA

113

SPAWAROFFICES

110

LAY-DOWN/MOCK-UP

108

CORRIDOR123B

COLDSTORAGE

123

COMMS109

LOADING111

WORKBENCHES

109E

PARTS/CONSUMABLES

STORAGE109D

COMMS/ITCSTORAGE

113B

SPAWARGENERALSTORAGE

110A

CORRIDOR107

B.1

D.6

MICROTURBINE123A

PCSTORAGE

112A

PCELECTRONICS

112

LOCKERROOM109A

OFFICE109B

OFFICE109C

SPAWARMANAGER

110B

BREEZEWAY123

UPS122

MECHANICAL116

TELECOMROOM

118

COMMSNODE &

TELECOM117

ELECTRICAL119

RADIATOR120

GENERATOR121

SPAWARSTORAGE

113A

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:25:31 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-101

LEVEL 1 - MECHANICALOVERALL PLAN

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-101-RA

CD

FM

EB

- 3/32" = 1'-0"1 LEVEL 1 - MECHANICAL OVERALL PLAN

N

8 0 8

Scale: 3/32 INCH = 1 FOOT

16 24

KEY PLAN

A

B C

Page 17: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

1 2 3 4 5 6 7 8 9 10 11 12 13 14

M

L

K

J

I

H

G

F

E

D

C

B

A

AA

B.1

D.6

LOBBY102

VESTIBULE215

CORRIDOR222

CONFERENCE214C

OPERATIONS,RECEIVING,SHIPPING

205A

LANDING201

OFFICECUBICLES

214

SCIENCEELECTRONICS

SHOP205

CONFERENCE/MEETING

215

BACKUPMISSIONSCOMMS

216 NOAA/NASA/JPSSDC

224CCOLO DC

224A

USAP/NSFDC

224BCORRIDOR

202

MEN210

IT MGMT214A

IT MGMT214B

KITCHENETTE203BREAK RM

204

COPY211

COMMONSTORAGE

208

SPAWARNOC223

STORAGE223A

NOAA/NASA/JPSS226

DJBROADCAST

207A HAM RADIO206DJ PREP

207

TELECOM208A

EOC COMMS215A

EOCSTORAGE/MAP ROOM

212

OFFICE213

WOMEN209

JANITOR210A

AFRTSEDITINGSUITE221B

SOUNDBOOTH

221A AFRTS221

MUD RM217

COPY218

CONFERENCE/MEETING

220

ASSIGNEDOFFICES

219

USAP/NSFNOC-2

225STOR.225A

STOR.226A

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:25:34 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-102

LEVEL 2 - MECHANICALOVERALL PLAN

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-102-RA

CD

FM

EB

- 3/32" = 1'-0"1 LEVEL 2 - MECHANICAL OVERALL PLAN

N

8 0 8

Scale: 3/32 INCH = 1 FOOT

16 24

KEY PLAN

A

B C

Page 18: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

9 10 11 12 13 14

H

G

F

E

D

C

B

A

AA

B.1

D.6 GMT-1

ET-2

CP-3BCP-3A

CP-6B CP-6A

UH-1UH-1

T

UH-1

T

UH-2T

UH-2T

UH-1

T

UH-1T

UH-1 T

UH-2

T

CUH-1

HP-1

CP-4A

CP-4B

UPS122

MECHANICAL116

TELECOMROOM

118

COMMSNODE &

TELECOM117

ELECTRICAL119

RADIATOR120

GENERATOR121

BREEZEWAY123

R-4 R-3 R-2 R-1

GENERATOR

CRAC-6

CRAC-7

MATC

HLI N

E

S EE SHEET 1 /M

-12 2

1

3

2

3

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:25:36 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-121

LEVEL 1 - DATA CENTER -HYDRONIC

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-121-RA

CD

FM

EB

- 1/8" = 1'-0"1 LEVEL 1 - HYDRONIC PLAN - AREA C

N

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

KEY PLAN

A

B C

SHEET NOTESFOR PIPING DIAGRAM, SEE 1/M-6XX.

FOR UNIT HEATER PIPING DIAGRAM, SEE 1/M-615.

FOR CABINET UNIT HEATER PIPING DIAGRAM, SEE 2/M-615.

SHEET KEY NOTESELECTRICAL PANEL AND VFD LOCATION.

FIRE SUPPRESSION TANK LOCATION, SEE FIRE PROTECTION.

HUMIDIFICATION EQUIPMENT LOCATION, SEE PLUMBING.

1

1.

2.

3.

2

3

Page 19: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

9 10 11 12 13 14

H

G

F

E

D

C

B

A

AA

AFRTS221 COLO DC

224A

USAP/NSFDC

224B

NOAA/NASA/JPSSDC

224C

CORRIDOR222B

NOAA/NASA/JPSSNOC226

USAP/NSFNOC225

ASSIGNEDOFFICES

219

CONFERENCE/MEETING

220

CORRIDOR222A

MUD RM217

COPY218

B.1

D.6

T

T

T

T

T

FT-150'

FT-15'

FT-114'

FT-125'

CRAC-1 CRAC-2 CRAC-3 CRAC-4 CRAC-5

SOUNDBOOTH

221A

AFRTSEDITINGSUITE221B

SPAWARNOC223

STORAGE223A

STORAGE226A

STORAGE225A

FT-15'

FT-15'

T T

1

111 TTT

T

MATC

HLI N

E

S EE SHEET 1 /M

-12 4

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:25:41 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-123

LEVEL 2 - DATA CENTER -HYDRONIC

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-123-RA

CD

FM

EB

- 1/8" = 1'-0"1 LEVEL 2 - HYDRONIC PLAN - AREA C

N

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

KEY PLAN

A

B C

SHEET NOTESFOR FINNED TUBE PIPING DIAGRAM, SEE 3/M-615.

FOR CRAC PIPING DIAGRAM, SEE X/M-XXX.

SHEET KEY NOTESTEMP SENSOR LOCATED IN COLD DECK FOR MONITORINGPURPOSES ONLY.

1

1.

2.

Page 20: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

9 10 11 12 13 14

H

G

F

E

D

C

B

A

AA

B.1

D.6

HRV-1

R-4 R-3 R-2 R-1

UPS122

MECHANICAL116

TELECOMROOM

118

COMMSNODE &

TELECOM117

ELECTRICAL119

RADIATOR120

GENERATOR121

BREEZEWAY123

2 2

1

15

MOTORIZEDCONTROLDAMPER, TYP

GENERATOR

MATC

HLIN

E

SEE SHEET 1/M

-132

CRAC-7

CRAC-6

64 3

34

6 6 6

66

DISCONNECTAND VFDLOCATIONS

7

EF-2

VF-1

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:25:45 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-131

LEVEL 1 - DATA CENTER -VENTILATION

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-131-RA

CD

FM

EB

- 1/8" = 1'-0"1 LEVEL 1 - VENTILATION PLAN - AREA C

N

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

KEY PLAN

A

B C

SHEET NOTESFOR VENTILATION FAN DIAGRAM, SEE 3/M-621.

FOR HRV-1 SCHEMATIC, SEE 1/M-621.

FOR GENERATOR SCHEMATIC, SEE 4/M-621.

FOR RADIATOR SCHEMATIC, SEE 5/M-621.

SHEET KEY NOTESOUTSIDE AIR INTAKE.

EXHAUST THROUGH EXTERIOR SOFFIT.

CONTROL DAMPER FROM OA PLENUM TO RADIATOR ROOM.

CONTROLLED 1 HR RATED FIRE DAMPER FROM OA PLENUM TOGENERATOR ROOM.

GENERATOR RADIATOR EXHAUST AND RETURN AIR DAMPERS.

CONTROL DAMPER TO ALLOW HEATED AIR TO TEMPER ROOMTEMPERATURE.

HYDROGEN SENSOR IN UPS ROOM PER IMC FOR BATTERYSTORAGE.

1

1.

2.

3.

4.

2

3

4

5

6

7

Page 21: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

AUTO AIR VENT,TYP.

CR-4

T

2

T

T

T

3CR-2

2

CR-1

CR-3

T TTT

RAISED FLOOR

MECHANICAL ROOM

T

P

HP-1

6

4

T

T

T

T

T

T

MEC

HAN

ICAL

RO

OM

RAD

IATO

R R

OO

M

R-4

R-3

T

VFDVFD

1

CP-6BCP-6A

150 DEG F

130 DEG F

110/

50 D

EG F

120/

62 D

EG F

VFDVFD

1

CP-5BCP-5A

VFDVFD

1

CP-4BCP-4A

AS-3

150

DEG

F

130

DEG

F

T

TO BL-010TERMINAL UNITS

FROM BL-010TERMINAL UNITS

C

NO

NC

C

NC

NO

CR-5

150/130 DEG F

130/180 DEG F

4" HGS/HRGTO (E) BOILERROOM. FORCONTINUATION,SEE M-614.

T

TT

T

T

T

T

5NO

NC

C

TT

4" BYPASSUSED WHENHEAT FROM HP-1IS USED TO HEAT(E) BUILDING.

ISOLATION VALVE, TYP

BALANCE VALVE, TYP

TEMP SENSOR, TYP

STRAINER W/BLOWDOWN VALVE, TYP

DRAIN VALVE W/ ENDCAP, TYP

VARIABLE FREQUENCYDRIVE, TYP

THERMOMETER, TYP

PRESSURE GAUGE, TYP

EXPANSIONTANK DRAIN,TYP.

VFDVFD

1

ET-2GT-1

AIR VENT,INTEGRAL X" CGR

AS-2

CP-3BCP-3A

ROUTE TO GT-1

R-2

R-1

- No Scale1 HYDRONIC SYSTEM DIAGRAM - LCCA OPTION 2

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:26:01 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-612

HYDRONIC SYSTEMDIAGRAM - LCCA OPTION 2

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-612-RA

CD

FM

EB

WHEN THE OAT < 0 DEG F, CRAC UNITS OPERATE ON ECONOMIZERMODE (CHILLED GLYCOL COIL) AND LOOP TEMPERATURES ARE 50DEG F SUPPLY AND 62 DEG F RETURN.

WHEN OAT > 0 DEG F, CRAC UNIT INTEGRAL DX REFRIGERATIONCYCLE IS ENGAGED AND THE LOOP TEMPERATURES ARE 110 DEG FSUPPLY AND 120 DEG F RETURN.

4" HGS/HGR ROUTED TO THE BOILER ROOM SUPPLY AND RETURNHEADER TO SEND HEAT TO/FROM BOILER PLANT. (E) CENTRAL HEATPUMPS, CP-1 AND CP-2, ARE REPLACED WITH UNITS TO EXTRACTMORE HEATING CAPACITY FROM BOILERS FOR THE ADDITION. NEWBOILERS INSTALLED UNDER PHASE 1 OR (E) HX-1 (DISTRICT-WIDEWASTE HEAT SYSTEM) WILL BE USED TO MAKE-UP ANY REQUIREDADDITIONAL HEAT LOAD. FOR PHASE 2, MICRO-TURBINE CAN ALSOADD SUPPLEMENTARY HEAT.

SHEET NOTES

SHEET KEY NOTES1 VENTURI FLOW VALVE.

FLOW DIVERTED EITHER TO INTEGRAL FREE COOLING GLYCOLCOIL OR HEAT EXCHANGER AND REFRIGERATION SYSTEM.

THREE-WAY VALVE USED FOR MINIMUM FLOW BYPASS.

THREE-WAY VALVE TO DIVERT FLOW TO RADIATORS TOREMOVE EXCESS HEAT.

THREE-WAY VALVE TO CHANGE FLOW DIRECTION OF ADDINGHEAT FROM BOILER PLANT OR SENDING HEAT TO BOILERPLANT.

THREE-WAY VALVE TO DIVERT FLOW AROUND HEAT PUMP IFNO WASTE HEAT IS NEEDED IN BUILDING.

2

3

4

5

6

1.

2.

3.

Page 22: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

(E) 4" SUPPLY TOBUILDING HEATING LOOP

(E) 4" AIRSEPARATOR

(E) FLOW CONTROLVALVE, TYP

(E) HOSE THREAD DRAINW/CAP

(E) FLOAT TYPE LOWWATER CUT-OFF, TYP OF 2

(E) LARGE CAPACITY AUTOAIR VENT

(E) DRAIN TO GLYCOL TANK

(E) 3/4" GLYCOL FILL

(E) CP-3

(E) CP-4

(E) BOILERB-1

(E) BOILERB-2

(E) HX-1

W/HOUT

W/HIN

HOUSEOUT

HOUSEIN

(E) 4" WASTE HEAT MAIN'S FROMDISTRICT WASTE HEAT SYSTEM

(E) THERMOMETER, TYP

(E) SENSOR WELL, TYP

130°F/150°F

4" GHS/GHR

180°F/130°F

(E) BALANCE/SHUT-OFFVALVE

(E) 4" RETURN FROMPERIMETER HEAT LOOP

4" GHS

ISOLATIONVALVE, TYP

4" GHR

1

T

T

CP-1

CP-2

22

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:26:02 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-614

HYDRONIC BOILERDIAGRAM

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-614-RA

CD

FM

EB

- No Scale1 EXISTING BOILER ONE-LINE DIAGRAM

SHEET NOTES SHEET KEY NOTES1 3-WAY VALVE DIVERTS FLOW FROM SENDING HEAT TO DATA

CENTER OR FROM DATA CENTER.

BOILERS TO BE REPLACED. MORE INFORMATION TO BEPROVIDED AT THE NEXT MILESTONE.

2

Page 23: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

2-WAY 2-POSITION CONTROL VALVE

FLEXIBLE CONNECTION, TYP

UNION, TYP

UNIT HEATER HEATING COIL

VALVED HIGH POINT MANUALAIR VENT ON SUPPLY BRANCH

VALVED LOW POINT DRAINWITH CAPPED HOSE ADAPTOR

FLOW CONTROL VALVE

ISOLATION VALVE, TYP

SUPPLY FROM MAIN

RETURN TO MAIN

VALVE HIGH POINT AIR VENTON SUPPLY BRANCH

SUPPLY FROMMAINRETURN TOMAIN

WALL

FILTER

FLOW CONTROLVALVE

ISOLATION VALVE, TYP

2-WAY CONTROLVALVE

FAN

HEATING COIL

UNION, TYP

VALVED LOW POINTDRAIN WITH CAPPEDHOSE ADAPTOR

FLOOR

NOTE: ALL VALVES AND OTHERPIPING ACCESSORIES SHALL BECONTAINED WITHIN THE CABINETAND SHALL BE ACCESSIBLE ORPROVIDED WITH ACCESS PANELS.

FINNED TUBE HEATING ELEMENT

UNION, TYP.

2-WAY CONTROL VALVE

FLOW CONTROL VALVE

VALVED LOW POINT DRAINWITH CAPPED HOSE ADAPTOR

RETURN TO MAIN

SUPPLY FROM MAIN

VALVED HIGH POINT AIR VENTON SUPPLY BRANCH

ENCLOSURE

ACCESS PANEL, TYP.

ISOLATION VALVE, TYP.

NOTE: ALL VALVESAND OTHER PIPINGACCESSORIES SHALLBE CONTAINED WITHINTHE ENCLOSURE ANDSHALL BE ACCESSIBLEOR PROVIDED WITHACCESS PANELS.

RETURN UNDER ENCLOSURE

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:26:02 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-615

HYDRONIC DIAGRAMS

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-615-RA

CD

FM

EB

- No Scale1 UNIT HEATER PIPING DIAGRAM

- No Scale2 CABINET UNIT HEATER PIPING DIAGRAM

- No Scale3 FINNED TUBE DIAGRAM

Page 24: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

M

O/A

MERV 8 PRE-FILTER

INSULATED O/ADAMPER

SA

T

VFDT

T

DPSH L

CONTROL VALVE

HEATING COIL

M

RA DAMPER

RA

DPSH L

O/A

S/A

SUMMER FILTER

PREHEAT COIL

DIFFERENTIAL PRESSURE SENSOR, TYP

HEAT EXCHANGER

DPSH L

DPSH L

M

HEATING COIL

INSULATED O/A DAMPER

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE, TYP.

MERV 14 FINAL FILTER

EXHAUST FAN

INSULATED E/ADAMPER

M

SUPPLY FAN

FACE/BYPASS DAMPER

E/A

EA FILTER

DPS HL

E/A

T

TT

T

TEMP SENSOR, TYP

THERMOMETER, TYPWINTERFILTER

DIFFERENTIAL PRESSUREGUAGE, TYP

M

VFDVFDT

TDPSH L

O/A

S/A

SUMMER FILTER

PREHEAT COIL

DIFFERENTIAL PRESSURE SENSOR, TYP

HEAT EXCHANGER

DPSH L

M

HEATING COIL

INSULATED O/AINLET DAMPER

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE, TYP.

EXHAUST FAN

M

SUPPLY FAN

FACE/BYPASS DAMPER

E/A

EA FILTER

DPS HL

E/A

T

T

T

T

TEMP SENSOR, TYP

THERMOMETER, TYPWINTER FILTER

DIFFERENTIAL PRESSUREGUAGE, TYP

M

INSULATED E/A DAMPER

VFDVFDT

T

M

OSA

GENSET AND REMOTERADIATOR SKID

INSULATED MOTORIZEDCONTROL DAMPER, TYP

M

T

M M

ROOM TEMP SENSORROOM HEATINGRECIRC DAMPER

OA INTAKEFLOOR PLENUM

EXHAUST ROOFPENETRATION THIMBLE

GENSET SILENCER

FIRE RATEDEXHAUST CHASE

FLOOR

OUTSIDEGENERATOR ROOM

INSULATEDEXHAUST DAMPER

SECOND LEVEL OFFICES

DISCHARGE TO POINT NORTH

SOFFIT ON OUTSIDEOF BUILDING

4"X4" BIRDSCREEN

OUTSIDE WALL,FIRST FLOOR

OUTSIDE WALL,SECOND FLOOR

M

OSA

REMOTE RADIATOR, TYP.

INSULATED MOTORIZEDCONTROL DAMPER, TYP

M

T

M

ROOM TEMP SENSOR

ROOM HEATINGRECIRC DAMPER

OA INTAKEFLOOR PLENUM

FLOOR

OUTSIDERADIATOR ROOM

INSULATEDEXHAUST DAMPER

HOODM

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:26:03 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-621

VENTILATION DIAGRAMS

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-621-RA

CD

FM

EB

- No Scale3 AHU-1 DIAGRAM

- No Scale1 HRV-1 DIAGRAM

- No Scale2 HRV-2 DIAGRAM

- No Scale5 GENERATOR ROOM DIAGRAM

- No Scale4 RADIATOR ROOM DIAGRAM

Page 25: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

(E) 6" WGHS/WGHR TO STATIONWASTE HEAT. SEE 2/M-651

MT-1

T

DRAIN VALVE W/END CAP, TYP

CP-7A

T

STRAINER W/BLOWDOWN, TYP.

T

T

CNC

NO

BALANCEVALVE, TYP.

PRESSURE RELIEFVALVE, TYP.

MFLOW METER

M

BI-DIRECTIONAL FLOW METER,ONICON FB-3500 OR EQUAL

TT

P

PRESSURE SENSOR

TO/FROM (E)HX-1, SEE 1/M-614

(E) MODULATIINGCONTROL VALVEOPEN

M

CP-7B

(E)WASTE HEAT PUMPSCP-5 AND CP-6 W/ VFD

838 GPM

BL 1890-35 GPM0-307 MBH

BL 1550-233 GPM0-3061 MBH

BL 0100-190 GPM0-1665 MBH

(E)HX-1

BL 1650-80 GPM0-701 MBH

BL 0010-300 GPM0-2628 MBH

T

T

TTTTTTTT

(E) CVOPEN

MT-1

45 GPM400 MBH

T

T

MT-1

T

DRAIN VALVE W/END CAP, TYP

CP-7A

T

STRAINER W/BLOWDOWN, TYP.

(E) MODULATIINGCONTROL VALVECLOSED

PRESSURE RELIEFVALVE, TYP.

FLOW DIRECTION CHANGE

BALANCEVALVE, TYP.

(E) 6" WGHS/WGHR TO STATIONWASTE HEAT. SEE 4/M-651

T

T

C

NCNOM

FLOW METER, TYP.

M

BI-DIRECTIONAL FLOW METER,ONICON FB-3500 OR EQUAL

TT

P

PRESSURE SENSOR

M

TO/FROM (E)HX-1, SEE 1/M-614

CP-7B

BL 1890-35 GPM0-307 MBH

BL 1550 GPM0 MBH

BL 0100-190 GPM0-1665 MBH

(E)HX-1

BL 1650-80 GPM0-701 MBH

BL 0010-300 GPM0-2628 MBH

T

T

TTTTTTTT

(E) CVCLOSED

MT-1

45 GPM400 MBH

NOTES: FLOW DIRECTION DEPENDENT ON NEED.1

1

T

T

(E)WASTE HEAT PUMPSCP-5 AND CP-6 W/ VFD

1

ELBOW, TURNED DOWN

ELBOW, TURNED UP

TEE, OUTLET DOWN

TEE, OUTLET UP

FLOW DIRECTION

ISOLATION VALVE

M

PIPE FITTINGS & VALVESPOINT OF CONNECTION

CHECK VALVE

STRAINER W/ BLOWDOWN

BALANCE VALVE

MOTORIZED 2-WAY CONTROL VALVE

MOTORIZED 3-WAY CONTROL VALVE

RELIEF OR SAFETY VALVE

DRAIN ISOLATION VALVE ANDHOSE ADAPTOR

UNION

FLANGE CONNECTION

FLOW METER

THERMOMETER

TEMP SENSOR

PRESSURE GAUGE W/ISOLATION VALVE

PRESSURE SENSOR

PUMP - CIRC

P

T

CO CARBON MONOXIDE(D) DEMOLISHDEMO DEMOLISHDIA DIAMETERDT DAY TANK(E) EXISTINGEA EXHAUST AIREXIST EXISTINGFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFT FEETGHR GLYCOL HEATING RETURNGHS GLYCOL HEATING SUPPLYHX HEAT EXCHANGER

IN INCHESL LOUVERMISC MISCELLANEOUSMT MICRO-TURBINEOA OUTSIDE AIRP PUMPRA RETURN AIRSA SUPPLY AIRTYP TYPICALVF VENTILATION FANW/ WITHWGHR WASTE HEAT GLYCOL RETURNWGHS WASTE HEAT GLYCOL SUPPLY

ABBREVIATIONS

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:26:03 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-631

MICROTURBINE DIAGRAMS

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-631-RA

CD

FM

EB

- No Scale1 PIPING SCHEMATIC - HEAT SERVING BL010 SCENARIO

- No Scale2

STATION WASTE HEAT DIAGRAMHEAT SERVING BL010

- No Scale3 PIPING SCHEMATIC - WASTE HEAT INJECTION SCENARIO

- No Scale4

STATION WASTE HEAT DIAGRAMWASTE HEAT INJECTION

Page 26: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

F

FOSVMT-1

EXISTINGEXTERIOR FUELSTORAGE TANK

X" EMERGENCY VENT

X" VENT

TERMINATE VENTS MIN 12FT AFG AND 10 FT FROMBUILDING OPENINGS

DUPLEX SUPPLY PUMP, ENGAGEDBASED ON GENERATOR SUB-BASESTORAGE TANK CONTROLS

2" LIQUID TIGHT PAN UNDER UNITAND VALVES, TYP.

EXTERIOR WALL

(E) FOS/FOR PIPINGTO (E) BOILERS

MT ROOM WALL

M

FUSIBLELINK, TYP.

OIL SAFETYVALVE, TYP.

FUEL METER

FUEL FILTER, TYP.

ISOLATION VALVE, TYP.

3/4" FOS

TIGER LOOP DEARATOR

24" STAINLESSSTEEL BRAIDEDHOSE, TYP.

BOILER ROOM WALLGENERATOR ROOMWALL

GENERATOR SUB-BASE FUEL TANK

SIMPLEX SUPPLY PUMP, CIRCULATESFUEL BASED ON ACTIVATINO OF MT-1

PRESSURE RELIEF VALVE

HIGHLEVEL, NOSOLENOIDVALVE

FLEX

WELDED STEEL FOS/FOR PIPEOUTSIDE OF THE BUILDINGFLEX, TYP.

FOOT VALVE

ELBOW, TURNED DOWN

ELBOW, TURNED UP

TEE, OUTLET DOWN

TEE, OUTLET UP

FLOW DIRECTION

ISOLATION VALVE

M

PIPE FITTINGS & VALVESPOINT OF CONNECTION

CHECK VALVE

STRAINER W/ BLOWDOWN

BALANCE VALVE

MOTORIZED 2-WAY CONTROL VALVE

MOTORIZED 3-WAY CONTROL VALVE

RELIEF OR SAFETY VALVE

DRAIN ISOLATION VALVE ANDHOSE ADAPTOR

UNION

FLANGE CONNECTION

FLOW METER

THERMOMETER

TEMP SENSOR

PRESSURE GAUGE W/ISOLATION VALVE

PRESSURE SENSOR

PUMP - CIRC

P

T

CO CARBON MONOXIDE(D) DEMOLISHDEMO DEMOLISHDIA DIAMETERDT DAY TANK(E) EXISTINGEA EXHAUST AIREXIST EXISTINGFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFT FEETGHR GLYCOL HEATING RETURNGHS GLYCOL HEATING SUPPLYHX HEAT EXCHANGER

IN INCHESL LOUVERMISC MISCELLANEOUSMT MICRO-TURBINEOA OUTSIDE AIRP PUMPRA RETURN AIRSA SUPPLY AIRTYP TYPICALVF VENTILATION FANW/ WITHWGHR WASTE HEAT GLYCOL RETURNWGHS WASTE HEAT GLYCOL SUPPLY

ABBREVIATIONS FUEL OIL

FUEL OIL SUPPLY

FUEL OIL RETURN

FUSIBLE LINK

FILTER

OIL SAFETY VALVE

F

OSV

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 2:26:04 PM C:\Users\cyndibradley\Documents\USAP-160604-ME-DM2016_cyndibradley.rvt

M-641

FUEL OIL SYSTEMDIAGRAM

MEB

JEE/CDF

09/23/16

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

MEC

HAN

I CAL

160604MCM010M-641-RA

CD

FM

EB

- No Scale1 FUEL OIL SYSTEM DIAGRAM

Page 27: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

DUPLEX RECEPTACLE. UNLESS NOTED OTHERWISE,RECEPTACLES ARE FLUSH MTD, 20A,125V,1PH, 2P, 3W, NEMA5-20R, MH 1'-6" AFF TO CENTER. SEE RECEPTACLEDESIGNATIONS BELOW FOR NOTES AND OTHERREQUIREMENTS.

RECEPTACLE DESCRIPTIONSYMBOLS

3 CIRCUIT NUMBER (3 IN THIS EXAMPLE)

A DENOTES RECEPTACLE FOR WHICH LOCATION AND MOUNTINGARRANGEMENT IS SHOWN ON ARCHITECTURAL DRAWINGS.

L6-30R SPECIAL PURPOSE RECEPTACLE TYPE (TYPE L6-30R IN THISEXAMPLE). SEE SPECIAL PURPOSE RECEPTACLE SCHEDULE.

WP GFCI TYPE, WEATHERPROOF WITH HINGED COVER.

WP-WIN GFCI TYPE, WEATHERPROOF WITH WHILE-IN-USE COVER

L PAD LOCKABLE COVER

GF GFCI TYPE, WIRED FOR GFCI TRIP FOR DESIGNATEDRECEPTACLE ONLY.

G GFCI TYPE, WIRED FOR GFCI PROTECTION OF RCPT AND ALLRCPT'S ON SAME CIRCUIT, UNLESS NOTED OTHERWISERECEPTACLE ONLY.

H50 DENOTES MOUNTING HEIGHT IN INCHES ABOVE FINISHEDFLOOR TO CENTER; 50" AFF IN THIS EXAMPLE.

C6 DENOTES MOUNTING HEIGHT IN INCHES ABOVE COUNTER TOCENTER; 6" ACT IN THIS EXAMPLE. SEE ARCHITECTURALPLANS FOR COUNTER TOP LOCATION.

CW DENOTES RECEPTACLE LOCATED WITHIN CASEWORK.COORDINATE LOCATION WITH ARCHITECTURAL CASEWORKDETAILS AND VERIFY LOCATION WITH OWNER'SREPRESENTATIVE.

V VERIFY EXACT LOCATION AND HEIGHT WITH OWNER'SREPRESENTATIVE PRIOR TO INSTALLATION.

T TELECOMMUNICATION EQUIPMENT RECEPTACLE, MOUNTHEIGHT 8" AFF, UNLESS NOTED OTHERWISE.

* COORDINATE MOUNTING HEIGHT AND EXACT LOCATION WITHEQUIPMENT SERVED BY RECPT, AND ALL OTHER WORK INVICINITY OF RECPT. SEE PANEL SCHEDULE FOR EQPTDESIGNATION.

IG ISOLATED GROUND TYPE RECEPTACLE.SS TVSS TYPE RECEPTACLE.

TR TAMPER RESISTANT TYPE RECEPTACLE.TV TELEVISION RECEPTACLE TYPE RECEPTACLE; COORDINATE

MOUNTING HEIGHT AND EXACT LOCATION WITH OWNER'SREPRESENTATIVE PRIOR TO INSTALLATION.

RECEPTACLE DESIGNATIONDESIGNATION

NOTE: MULTIPLE RECEPTACLE DESIGNATIONS MAY BEADJACENT TO DEVICE OR SEPARATED BY COMMAS (EXAMPLE:A, L6-30R, 13).

TWO DUPLEX RECEPTACLE MOUNTED IN A TWO GANG BOX.UNLESS NOTED OTHERWISE, RECEPTACLES ARE FLUSHMTD, 20A,125V,1PH, 2P, 3W, NEMA 5-20R, MH 1'-6" AFF TOCENTER. SEE RECEPTACLE DESIGNATIONS BELOW FORNOTES AND OTHER REQUIREMENTS.SIMPLEX RECEPTACLE. UNLESS NOTED OTHERWISE,RECEPTACLES ARE FLUSH MTD, 20A,125V,1PH, 2P, 3W, NEMA5-20R, MH 1'-6" AFF TO CENTER. SEE RECEPTACLEDESIGNATIONS BELOW FOR NOTES AND OTHERREQUIREMENTS.

SIMPLEX RECEPTACLE ON UPS POWER. UNLESS NOTEDOTHERWISE, RECEPTACLES ARE FLUSH MTD, 20A,125V,1PH,2P, 3W, NEMA 5-20R, MH 1'-6" AFF TO CENTER. SEERECEPTACLE DESIGNATIONS BELOW FOR NOTES ANDOTHER REQUIREMENTS.

SIMPLEX RECEPTACLE ON STANDBY POWER. UNLESS NOTEDOTHERWISE, RECEPTACLES ARE FLUSH MTD, 20A,125V,1PH,2P, 3W, NEMA 5-20R, MH 1'-6" AFF TO CENTER. SEERECEPTACLE DESIGNATIONS BELOW FOR NOTES ANDOTHER REQUIREMENTS.

3 PHASE 250V SPECIAL PURPOSE RECEPTACLE. SEERECEPTACLE DESIGNATIONS BELOW FOR NOTES AND OTHERREQUIREMENTS.3 PHASE 480V SPECIAL PURPOSE RECEPTACLE. SEERECEPTACLE DESIGNATIONS BELOW FOR NOTES AND OTHERREQUIREMENTS.

ELECTRICAL DEVICE LEGEND

DENOTES SURFACE MOUNTED DEVICE.

DESCRIPTIONSYMBOLS

POWER DISTRIBUTION / EQUIPMENT LEGEND

DEVICE DESIGNATIONDESIGNATION

* MOUNTING HEIGHT AND/OR MOUNTING TO BE COORDINATEDWITH WORK AND EQUIPMENT AT JUNCTION BOX LOCATIONPROVIDED UNDER DIVISION 26 AND ALL OTHER DIVISIONS.

C MOUNTING ABOVE CEILING.

50EF-01

MOTOR EQUIPMENT IDENTIFICATION AND HORSEPOWER ASINDICATED. DISCONNECT AND/OR STARTER IS NOT FURNISHEDWITH MOTOR EQUIPMENT.

50KVA

EF-01

PACKAGED EQUIPMENT IDENTIFICATION AND KILOVOLT-AMPERE AS INDICATED. PACKAGED EQUIPMENT IS FURNISHEDWITH LOCAL DISCONNECT AND IS A SINGLE POINTCONNECTION.

FUSED DISCONNECT / SAFETY SWITCH. SEE SINGLE LINELEGEND FOR ADDITIONAL REQUIREMENTS AND SINGLE LINEDRAWINGS FOR SWITCH / FUSE RATINGS NOT SHOWN ON PLANS.

NON-FUSED DISCONNECT / SAFETY SWITCH. SEE SINGLE LINELEGEND FOR ADDITIONAL REQUIREMENTS AND SINGLE LINEDRAWINGS FOR SWITCH RATINGS NOT SHOWN ON PLANS.

COMBINATION STARTER DISCONNECT / SAFETY SWITCH. SEESINGLE LINE LEGEND FOR ADDITIONAL REQUIREMENTS ANDSINGLE LINE DRAWINGS FOR SWITCH / STARTER RATINGS NOTSHOWN ON PLANS.

STARTER. SEE SINGLE LINE LEGEND FOR ADDITIONALREQUIREMENTS AND SINGLE LINE DRAWINGS FOR SWITCH /STARTER RATINGS NOT SHOWN ON PLANS.

CIRCUIT BREAKER, LOCKABLE IN OPEN POSITION, INDIVIDUALLYMOUNTED, NEMA 1 ENCLOSURE. IN THIS EXAMPLE, 30 A/3PDENOTES 30 AMPERE, 3 POLE. SEE SINGLE LINE LEGEND FORRATINGS IF NOT INDICATED ON PLANS. VOLTAGE RATINGSSHALL BE NO LESS THAN APPLIED CIRCUIT VOLTAGE.

30A/3P

P CEILING MOUNTED PROJECTOR RECEPTACLE.

CTL CONTROL PANEL.

FLOOR OR SURFACE MOUNTED MAIN LUG ONLY PANELBOARD.

FLOOR OR SURFACE MOUNTED MAIN PROTECTIVE DEVICEPANELBOARD.

RECESSED MAIN LUG ONLY PANELBOARD.RECESSED MOUNTED MAIN PROTECTIVE DEVICE PANELBOARD.

DRY TYPE TRANSFORMER WITH NEMA 2 ENCLOSURE, UNLESSINDICATED OTHERWISE. SEE TRANSFORMER SCHEDULE FORADDITIONAL REQUIREMENTS.

WHERE CONCRETE PAD SHOWN, PROVIDE 4" THICK CONCRETEPAD, 4" OFFSET FROM ENCLOSURE FRONT AND SIDES, 6"OFFSET FROM ENCLOSURE BACK.

WHERE CONCRETE PAD SHOWN, PROVIDE 2" THICK CONCRETEPAD, 4" OFFSET FROM ENCLOSURE FRONT AND SIDES, 4"OFFSET FROM ENCLOSURE BACK.

J JUNCTION BOX. UNLESS NOTED OTHERWISE, JUNCTION BOXIS FLUSH MOUNTED WITH COVER PLATE, SIZE IAW NEC ANDEQPT MFR INSTRUCTIONS.

J JUNCTION BOX. UNLESS NOTED OTHERWISE, JUNCTION BOX ISSURFACE MOUNTED WITH COVER PLATE, SIZE IAW NEC ANDEQPT MFR INSTRUCTIONS.

PT FLUSH FLOOR TYPE POKE THRU. INSTALL PER MFRINSTRUCTION. ALPHANUMERIC DESIGNATION INDICATES TYPE,SEE POKE THRU SCHEDULE.

FB FLUSH FLOOR TYPE FLOOR BOX. INSTALL PER MFRINSTRUCTION. ALPHANUMERIC DESIGNATION INDICATES TYPE,SEE FLOOR BOX SCHEDULE.SMR

A

HORIZONTAL SURFACE MOUNTED SURFACE METAL RACEWAY(SMR), ALUMINUM TYPE WIREMOLD ALA4800 SERIES WITHDIVIDER & COVER. BOTTOM OF SMR MOUNTED 6" ABOVELABORATORY BENCH, UNLESS INDICATED OTHERWISE.

VERTICAL SURFACE MOUNTED SURFACE METAL RACEWAY,TYPE MATCHING HORIZONTAL, STUB-UP 6" ABOVE FINISHEDCEILING.

A

HARDWIRED EQUIPMENT CONNECTION, COORDINATE EXACTLOCATION WITH EQUIPMENT SERVED.

HW

P POWER POLE, LENGTH AS REQUIRED TO EXTEND ABOVECEILING; RECEPTACLE TYPES AS INDICATED PER RECEPTACLETYPE INDICATED ON ELECTRICAL DEVICE AND/ORTELECOMMUNICATIONS LEGEND. SHADED AREA DENOTESTELECOMMUNICATION RACEWAY. ALPHANUMERICDESIGNATION INDICATES TYPE.

A

DUPLEX RECEPTACLE ON UPS POWER. UNLESS NOTEDOTHERWISE, RECEPTACLES ARE FLUSH MTD, 20A,125V,1PH,2P, 3W, NEMA 5-20R, MH 1'-6" AFF TO CENTER. SEERECEPTACLE DESIGNATIONS BELOW FOR NOTES AND OTHERREQUIREMENTS.

DUPLEX RECEPTACLE ON STANDBY POWER. UNLESS NOTEDOTHERWISE, RECEPTACLES ARE FLUSH MTD, 20A,125V,1PH,2P, 3W, NEMA 5-20R, MH 1'-6" AFF TO CENTER. SEERECEPTACLE DESIGNATIONS BELOW FOR NOTES AND OTHERREQUIREMENTS.

SW SWITCHED RECEPTACLE CONTROLLED BY ROOM OCCUPANCYDEVICE

CATEGORYSERVICE ENTRANCELOCATIONS

SURGE PROTECTIVE DEVICE (SPD) SCHEDULE

APPLICATION

C

PER PHASE

MINIMUM SURGE CURRENT (ANSI/IEEE C62.41 LOCATION CATEGORY)

250 kA

PER MODE

125 kA

ELECTRICALSYSTEM

CONFIGURATIONWYE

DELTA

VOLTAGE PROTECTION MODES / RATINGS (UL 1449 3RD EDITION)

L-N / L-G / N-G700

< 300 VOLTS (L-L)

N/A

L-L12001200

L-N / L-G / N-G1200N/A

L-L2000

L-N / L-G / N-G1500N/A

L-L3000

< 500 VOLTS (L-L) < 601 VOLTS (L-L)

2000 3000HIGH EXPOSURE ROOFTOP LOCATIONSB 160 kA 80 kA

WYEDELTA

700N/A

12001200

1200N/A

2000 1500N/A

30002000 3000

BRANCH CIRCUITLOCATIONSA 120 kA 60 kA

WYEDELTA

700N/A

12001200

1200N/A

2000 1500N/A

30002000 3000

UL 1449 TYPE

1

2

2

ELECTRICAL AREA CLASSIFICATION LEGEND

CLASS 1, DIVISION 1

CLASS 1, DIVISION 2

CLASS 2, DIVISION 1

CLASS 2, DIVISION 2

CLASS 3, DIVISION 1

CLASS 3, DIVISION 2

DENOTES EQUIPMENT TEMPERATURE CLASS(T-CODE OR NEC LIMITING CONDITIONS)• T## - GENERAL NOTE 1.• O.L. - GENERAL NOTE 2.• N.O.L. - GENERAL NOTE 3.

DENOTES MAXIMUM SURFACETEMPERATURE OF ENERGIZEDEQUIPMENT, DEVICES, OR LUMINIARIESFOR THE HAZARDOUS AREAINDICATED.

SYMBOL DESCRIPTION

T1450°C842°F G

DENOTES MATERIAL GROUPCLASSIFICATION (GROUP A,B,C,D,E,F,G);'-' DENOTES NOT APPLICABLE.

A- L D 2 B 1(EXAMPLE)

ALPHANUMERIC CHARACTER DENOTING SEQUENCENUMBER (A,B,C,ETC).

WHERE APPLICABLE, SINGLE ALPHANUMERIC CHARACTERDENOTING PANELBOARD TYPE.

WHERE INDICATED, NUMERIC DESIGNATION DENOTESSECTION NUMBER.

ELECTRICAL EQUIPMENT NOMENCLATURE

SINGLE ALPHANUMERIC CHARACTER DENOTING FLOOROR BUILDING AS FOLLOWS:

1 - FIRST FLOOR.2 - SECOND FLOOR.3 - MEZZANINE.4 - ROOF.

D - DISTRIBUTION.M - MAIN DISTRIBUTION.P - POWER.

SINGLE OR DOUBLE ALPHANUMERIC CHARACTERDENOTING EQUIPMENT TYPE DESIGNATION, AS FOLLOWS:

E - EMERGENCY (LIFE SAFETY).L - LIGHTING.M - MECHANICAL.R - RECEPTACLE.P - POWER.S - STANDBY.U - UPS.

WHERE APPLICABLE, SINGLE TO TRIPLE ALPHANUMERICCHARACTER DENOTING EQUIPMENT TYPE MODIFIER, ASFOLLOWS:

A - AUTOMATIC TRANSFER SWITCH.MCC - MOTOR CONTROL CENTER.SS - SUBSTATIONT - TRANSFORMER

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:20 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-001

LEGEND

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-001-RA

RD

PJD

S

1. COMPLY WITH NFPA 70, NATIONAL ELECTRICAL CODE 2014EDITION; NECA 1, STANDARD FOR GOOD WORKMANSHIP INELECTRICAL CONSTRUCTION; AND NATIONAL ELECTRICALSAFETY CODE.

2. ELECTRICAL COMPONENTS, DEVICES, ASSEMBLIES, ANDACCESSORIES ARE REQUIRED TO BE LISTED AND LABELEDAS DEFINED IN NFPA 70, ARTICLE 100, BY A TESTING AGENCYACCEPTABLE TO AUTHORITIES HAVING JURISDICTION, ANDMARKED FOR INTENDED USE.

3. DRAWINGS SHOW THE GENERAL LOCATIONS OF THEELECTRICAL FEATURES ONLY, UNLESS OTHERWISEINDICATED. MAKE MINOR RELOCATIONS AS REQUIRED FORPROJECT CONDITIONS WHEN NECESSARY TO PRESENTSYMMETRICAL APPEARANCE OR TO AVOID INTERFERENCEWITH OTHER INSTALLATIONS.

4. NEUTRAL CONDUCTORS SHALL NOT BE SHARED BETWEENBRANCH CIRCUITS, UNLESS OTHERWISE INDICATED.

5. PROVIDE INSULATED EQUIPMENT GROUNDING CONDUCTORSWITH ALL FEEDERS AND BRANCH CIRCUITS. TERMINATEEACH END ON SUITABLE LUG, BUS OR BUSHING. SIZEEQUIPMENT GROUNDING CONDUCTORS IN ACCORDANCEWITH NEC, UNLESS OTHERWISE INDICATED, BUT NOTSMALLER THAN NO. 12 AWG.

6. MINIMUM CONDUCTOR SIZE FOR BRANCH CIRCUITS: NO. 12AWG.- USE NO. 10 AWG MINIMUM FOR 15 OR 20 AMPERE, 120 VOLTBRANCH CIRCUITS LONGER THAN 65 FEET, BUT NOTGREATER THAN 100 FEET.- USE NO. 8 AWG MINIMUM FOR 15 OR 20 AMPERE, 120 VOLTBRANCH CIRCUITS LONGER THAN 100 FEET UNLESSOTHERWISE INDICATED.- USE NO. 10 AWG MINIMUM FOR 15 OR 20 AMPERE, 277 VOLTBRANCH CIRCUITS LONGER THAN 150 FEET UNLESSOTHERWISE INDICATED.

7. PROVIDE ACOUSTICAL SEAL FOR THE OUTLET AND DEVICEBOXES[, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONALINFORMATION]. OUTLET AND DEVICE BOXES LOCATED BACKTO-BACK ON A COMMON WALL ARE REQUIRED TO BEMOUNTED IN SEPARATE STUD SPACES. THE REQUIREDDEVICE AND OUTLET BOXES INCLUDE BUT ARE NOT LIMITEDTO SWITCHES, RECEPTACLES, TELECOMMUNICATIONOUTLETS, AND HORN/STROBES.

8. OUTLET AND DEVICE BOXES FOR USE WITH EXPOSEDRACEWAY SYSTEMS SHALL BE THREADED HUB, CASTMETAL TYPE.

GENERAL NOTES

Page 28: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

SWITCHING DEVICE DESCRIPTIONSYMBOLS

SWITCHING DEVICE SUBSCRIPT DESIGNATIONDESIGNATION

NOTE: WHERE SUBSCRIPT DESIGNATIONS ARE INDICATEDADJACENT TO DEVICE, SEE SWITCHING DEVICE SUBSCRIPTDESIGNATIONS BELOW FOR ADDITIONAL REQUIREMENTS.

WHERE USED; LOWER CASE LETTER SUBSCRIPT DENOTESFIXTURES CONTROLLED BY SWITCH, IF NOT INDICATED BYWIRING ARRANGEMENT ON PLANS. WHERE USED AS ADISCONNECT SWITCH, COORDINATE LOCATION ANDMOUNTING WITH RELATED EQUIPMENT; COMPLY WITH NECAND EQUIPMENT MANUFACTURER'S WRITTEN INSTRUCTIONS.

SWITCHING DEVICE LEGEND

TOGGLE SWITCH, SINGLE POLE, 20A, 120-277V, UNLESSDENOTED OTHERWISE.

3 THREE WAY.4 FOUR WAY.

EP EXPLOSION PROOF FOR THE ELECTRICAL AREA OFCLASSIFICATION INSTALLED IN.

K KEY OPERATED WITH 2 KEYS. ALL SWITCHES KEYED ALIKE,UNLESS NOTED OTHERWISE.

MC 3 POSITION, MOMENTARY CONTACT WITH CENTER OFF.WP WEATHERPROOF.

M SURFACE MOUNTED MOTOR RATED WITH OVERLOADELEMENTS, CONTINOUS CURRENT RATING AND QUANTITY OFPOLES AS REQUIRED FOR EQUIPMENT SERVED.

T DIGITAL TIMER WITH FLASH AND BEEP WARNING,WATTSTOPPER TS-400 OR APPROVED EQUAL. PRESET TO 1HOUR.

D WALL DIMMER.

WHERE INDICATED, DENOTES SURFACE MOUNTEDDEVICE.

V VARIABLE SPEED CONTROL SWITCH FOR FAN, FURNISHEDWITH EQUIPMENT, UNLESS NOTED OTHERWISE.

LIGHTING LUMINAIRE DESCRIPTIONSYMBOLS

LIGHTING LEGEND

3 WHERE USED, DENOTES QUANTITY OF ETHERNET CABLES.(3 IN THIS EXAMPLE)

A DENOTES OUTLET FOR WHICH LOCATION AND MOUNTINGARRANGEMENT IS SHOWN ON ARCHITECTURAL DRAWINGS.

DEVICE DESIGNATIONDESIGNATION

WP WEATHERPROOF WITH HINGED COVER.

H50 DENOTES MOUNTING HEIGHT IN INCHES ABOVE FINISHEDFLOOR TO CENTER; 50" AFF IN THIS EXAMPLE.

C6 DENOTES MOUNTING HEIGHT IN INCHES ABOVE COUNTER TOCENTER; 6" AFF IN THIS EXAMPLE. SEE ARCHITECTURAL PLANSFOR COUNTER TOP LOCATION.

CW DENOTES OUTLET LOCATED WITHIN CASEWORK. COORDINATELOCATION WITH ARCHITECTURAL CASEWORK DETAILS ANDVERIFY LOCATION WITH OWNER'S REPRESENTATIVE.

V VERIFY EXACT LOCATION AND HEIGHT WITH OWNER'SREPRESENTATIVE PRIOR TO INSTALLATION.

* COORDINATE MOUNTING HEIGHT AND EXACT LOCATION WITHEQUIPMENT SERVED BY OUTLET, AND ALL OTHER WORK INVICINITY OF OUTLET.

TV TELEVISION OUTLET TYPE; COORDINATE MOUNTING HEIGHTAND EXACT LOCATION WITH OWNER'S REPRESENTATIVE PRIORTO INSTALLATION.

WIRING LEGEND

P CEILING MOUNTED PROJECTOR AUDIO/VISUAL COMMUNICATIONOUTLETS. SIZE JUNCTION BOX ACCORDINGLY.

OC OCCUPANCY SENSOR [WITH MANUAL OVERRIDE].

BRANCH CIRCUIT "HOMERUN", PANEL AND CIRCUITNUMBERS INDICATED. NUMBER OF ARROWS DENOTESNUMBER OF CIRCUITS.

LP-1,3

WIRING IN FLEXIBLE METAL CONDUIT, MINIMUM 3/4"UNLESS INDICATED OTHERWISE. REFER TOSPECIFICATIONS FOR TYPE. EXTEND TO EQUIPMENT ANDCONNECT PER MANUFACTURER'S INSTRUCTIONS.

ARC DENOTES WIRING CONCEALED IN WALL, BELOWRAISED FLOOR, OR ABOVE RAISED CEILING, 3/4" CONDUITMINIMUM WITH #12 AWG CONDUCTORS UNLESSNOTED/SPECIFIED/INDICATED OTHERWISE.

CHAMFER OR RIGHT ANGLE DENOTES WIRING EXPOSED,3/4" CONDUIT MINIMUM WITH #12 AWG CONDUCTORSUNLESS NOTED/SPECIFIED/INDICATED OTHERWISE.

CONDUIT RUN UP OR TOWARD OBSERVER.

CONDUIT RUN DOWN OR AWAY FROM OBSERVER.

CONDUIT CAPPED

IN THIS EXAMPLE, INDICATES SINGLE CONDUCTOR, 3PHASE, 30 AMPERE DELTA CONFIGURATION; REFER TOFEEDER/BRANCH CIRCUIT SCHEDULE ON DWG_______________.

30D

CHAMFER OR RIGHT ANGLE AND DASHED DENOTES WIRINGCONCEALED OR BELOW GRADE, 3/4" CONDUIT MINIMUMWITH #12 AWG CONDUCTORS UNLESSNOTED/SPECIFIED/INDICATED OTHERWISE.

DEVICE DESCRIPTIONSYMBOLS

DESCRIPTIONSYMBOLS

GROUNDING AND LIGHTNING PROTECTION LEGEND

MINIMUM 3/4"Ø X 10 FOOT LONG COPPER-CLAD GROUNDROD, UNLESS NOTED OR SPECIFIED OTHERWISE. SEEDETAIL 9/E-17080-111.

R

MGB

MINIMUM 3/4"Ø X 10 FOOT LONG COPPER-CLAD GROUNDROD IN TEST WELL, UNLESS NOTED OR SPECIFIEDOTHERWISE. SEE DETAIL 5/E-17080-111.

EXOTHERMIC WELD.FOOTER REBAR TO CABLE CONNECTION.

G GROUND CONNECTION TO BUILDING STEEL OREQUIPMENT / VESSEL.MAIN GROUND BAR.

P PARAPET TYPE AIR TERMINAL.

F FLAT ROOF TYPE AIR TERMINAL.

MAIN LIGHTNING PROTECTION CABLE, ALUMINUM 12GAUGE, 192 KCMIL.

CROSS RUN CONNECTOR OR "T" CONNECTION. CASTALUMINUM BOLTED.

LIGHTNING PROTECTION DOWN CONDUCTOR.

BGA BARREL GROUNDING BAR ASSEMBLY; MOUNTED 5'-0" AFF.

GROUNDING CONDUCTOR, #4/0 AWG BARE COPPER, 30INCHES BELOW GRADE

3G

WHERE INDICATED, DENOTES SURFACE MOUNTED DEVICE.

MULTI-GANG BOX WITH MULTIPLE TOGGLE SWITCHES, SINGLEPOLE, 20A, 120-277V, UNLESS DENOTED OTHERWISE. IN THISEXAMPLE, '3G' DENOTES THREE TOGGLE SWITCHING DEVICESMOUNTED IN A THREE GANG BOX.

3a,3b,cWHERE MULTIPLE SUBSCRIPT DESIGNATIONS ARE INDICATED,SEE SWITCHING DEVICE SUBSCRIPT DESIGNATIONS BELOWFOR ADDITIONAL REQUIREMENTS.

DP DOUBLE POLE.

3

a

A

A,B

2'X2' RECESSED, PENDANT, OR SURFACE MOUNTED LUMINAIRE.SEE LUMINAIRE ANCILLARIES BELOW FOR ADDITIONALREQUIREMENTS.

DENOTES WALL MOUNTED FIXTURE OR LUMINAIRE. MOUNTINGHEIGHT AS INDICATED.

DENOTES POLE MOUNTED SINGLE ARM LUMINAIRE. POLE HEIGHTAS INDICATED.DENOTES POLE MOUNTED TWIN CONFIGURATION SINGLE ARMLUMINAIRE. INDIVIDUAL LUMINAIRE TYPE AS INDICATED; POLEHEIGHT AS INDICATED.

DENOTES POLE MOUNTED TRIPLEX CONFIGURED SINGLE ARMLUMINAIRE. INDIVIDUAL TYPE AS INDICATED; POLE HEIGHT ASINDICATED.

DENOTES POLE MOUNTED QUADRAPLEX CONFIGURED SINGLEARM LUMINAIRE. INDIVIDUAL LUMINAIRE TYPE AS INDICATED;POLE HEIGHT AS INDICATED.

DUAL FACED ILLUMINATED EGRESS EXIT SIGN. WHERE USED,DIRECTIONAL ARROWS AS INDICATED. WHERE WALL MOUNTEDABOVE DOOR, MOUNT BOTTOM OF FIXTURE 6" ABOVE DOORFRAME.

SINGLE FACED ILLUMINATED EGRESS EXIT SIGN. WHERE USED,DIRECTIONAL ARROWS AS INDICATED. WHERE WALL MOUNTEDABOVE DOOR, MOUNT BOTTOM OF FIXTURE 6" ABOVE DOORFRAME.

2'X4' RECESSED, PENDANT, OR SURFACE MOUNTED LUMINAIRE.SEE LUMINAIRE ANCILLARIES BELOW FOR ADDITIONALREQUIREMENTS.

ROUND RECESSED, PENDANT, OR SURFACE MOUNTEDLUMINAIRE. SEE LUMINAIRE ANCILLARIES BELOW FORADDITIONAL REQUIREMENTS.

DENOTES HANDRAIL STANCHION MOUNTED LUMINAIRE.STANCHION HEIGHT AS INDICATED.

DENOTES CONCRETE BASE STANCHION MOUNTED LUMINAIRE.STANCHION HEIGHT AS INDICATED.

WALL MOUNTED EGRESS LIGHT. MOUNT 8'-0" ABOVE FINISHEDFLOOR, UNLESS INDICATED OTHERWISE. NUMBERS OF LAMPHEADS AS INDICATED IN LIGHTING FIXTURE SCHEDULE.

WALL MOUNTED REMOTE LAMP HEAD EMERGENCY LIGHT.MOUNT 8'-0" ABOVE FINISHED FLOOR, UNLESS INDICATEDOTHERWISE. NUMBERS OF LAMP HEADS AS INDICATED INLIGHTING FIXTURE SCHEDULE.

1'X4' RECESSED, PENDANT, OR SURFACE MOUNTEDLUMINAIRE. SEE LUMINAIRE ANCILLARIES BELOW FORADDITIONAL REQUIREMENTS.1'X8' RECESSED, PENDANT, OR SURFACE MOUNTEDLUMINAIRE. SEE LUMINAIRE ANCILLARIES BELOW FORADDITIONAL REQUIREMENTS.

LUMINAIRE ANCILLARIESSYMBOLS

WHERE INDICATED, SHADED REGION DENOTES LIFE SAFETYEGRESS.

SQUARE OR RECTANGLUAR RECESSED, PENDANT, OR SURFACEMOUNTED LUMINAIRE. SEE LUMINAIRE ANCILLARIES BELOW FORADDITIONAL REQUIREMENTS.

ONE OR TWO ALPHANUMERIC CHARACTER DENOTINGLUMINAIRE TYPE; SEE LIGHTING FIXTURE SCHEDULE.

LIGHTING PANEL CIRCUIT NUMBER (3 IN THIS EXAMPLE), SEELIGHTING PANEL SCHEDULE. WHERE DENOTED WITH AN 'R'PREFIX (R3 FOR EXAMPLE); DENOTES RELAY PANEL CIRCUITNUMBER, SEE RELAY LIGHTING PANEL SCHEDULE.

WHERE LOWERCASE ALPHANUMERIC CHARACTER ISINDICATED; DENOTES LUMINAIRE CONTROLLED BY THECORRESPONDING LIGHT SWITCH.

WHERE INDICATED, DENOTES LUMINAIRE WIRED TO THECORRESPONDING PHASE CONDUCTORS.

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:21 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-002

LEGEND

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-002-RA

RD

PJD

S

Page 29: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

DESCRIPTIONSYMBOLS

L LONG PICKUP AND TIME DELAY PROTECTION

PROTECTIONDESIGNATION

SINGLE LINE DIAGRAM LEGEND

S SHORT PICKUP AND TIME DELAY PROTECTIONI INSTANTANEOUS PICKUP PROTECTIONG GROUND (EARTH) PICKUP AND TIME DELAY PROTECTIONN NEUTRAL PROTECTION

LSIG250 AF225 AT

LOW VOLTAGE BOLT-ON OR PLUG-ON STATIONARY (FIXED)MOLDED CASE CIRCUIT BREAKER. IN THIS EXAMPLE: '250AF' DENOTES 250 AMP FRAME SIZE SET TO TRIP AT 225AMPS. WHERE INDICATED, 'LSIG' DENOTES ADJUSTABLEPROTECTION TYPE, SEE ADJUSTABLE PROTECTIONDESIGNATIONS THIS SHEET FOR DESCRIPTION.

LSIG250 AF225 AT

LOW VOLTAGE PLUG-ON TYPE STATIONARY (FIXED)MOLDED CASE CIRCUIT BREAKER. IN THIS EXAMPLE: '250AF' DENOTES 250 AMP FRAME SIZE SET TO TRIP AT 225AMPS. WHERE INDICATED, 'LSIG' DENOTES ADJUSTABLEPROTECTION TYPE, SEE ADJUSTABLE PROTECTIONDESIGNATIONS THIS SHEET FOR DESCRIPTION.LOW VOLTAGE PLUG-ON TYPE STATIONARY (FIXED) MOLDEDCASE MOTOR CIRCUIT PROTECTOR. IN THIS EXAMPLE: '50CAR' DENOTES 50 CONTINUOUS AMPERE RATING (CAR) WITHINSTANTANEOUS PICK-UP (IPS) SET APPROXIMATELY AT 300AMPERES.

KEY INTERLOCK

PROTECTION DEVICE FEATURES / ACCESSORIESDESIGNATION

NOTE: MULTIPLE DESIGNATIONS MAY BE ADJACENT TODEVICE.

K

ST SHUNT TRIP

ET ELECTRONIC TRIP

LSIG1200/5

3 SOLID STATE TRIP UNIT WITH CT INPUT OR MODULECAPABLE OF MONITORING AMPS, INSTANTANEOUS KW,PEAK KW AND KWH. IN THIS EXAMPLE, 'LSIG' DENOTESADJUSTABLE PROTECTION TYPE, SEE ADJUSTABLEPROTECTION DESIGNATIONS THIS SHEET FOR DESCRIPTION,1200/5 DENOTES CURRENT TRANSFORMER RATIO AND '3'DENOTES CURRENT TRANSFORMER QUANTITY.

LOW VOLTAGE GENERAL PURPOSE DRY-TYPETRANSFORMER. IN THIS EXAMPLE, 'T-PD2A', DENOTESTHE UNIQUE TRANSFORMER DESIGNATION. 'XC30Y'DENOTES THE TRANSFORMER TYPE, SEETRANSFORMER SCHEDULE FOR ADDITIONALREQUIREMENTS. '30KVA' DENOTES THE TRANSFORMERRATING, '480V - 208/120V' DENOTES THE TRANSFORMERPRIMARY AND SECONDARY VOLTAGES.

PHASE CURRENT TRANSFORMER, RATING AND QUANTITYAS INDICATED. IN THIS EXAMPLE, '1200/5' DENOTES 1200/5AMP CT RATIO, '3' DENOTES QUANTITY, 'MR' DENOTESMULTI-RATIO TYPE

100 VA

POTENTIAL TRANSFORMER, RATING AS INDICATED. IN THISEXAMPLE, '100 VA' DENOTES 100 VOLT-AMPS POTENTIALTRANSFORMER RATING.CONTROL POWER TRANSFORMER WITH PRIMARY VOLTAGE,SECONDARY VOLTAGE, KVA AND PHASE INDICATED.

F-200 AFUSE, RATING AS INDICATED. IN THIS EXAMPLE, 'F-200 A'DENOTES 200 AMP FUSE. UNLESS INDICATEDOTHERWISE, FUSES SHALL BE PROVIDED IN EACHPHASE, CURRENT LIMITING DUAL-ELEMENT TIME DELAY,200,000 AIC RATING, UL CLASS L, J OR RK1. COORDINATEFUSE RATINGS AND TYPES WITH MFR'S INSTRUCTIONSFOR EQUIPMENT PROTECTED BY FUSES.

MEDIUM VOLTAGE CABLE LUG TERMINATION. WHEREINDICATED, NUMERIC VALUE INDICATES QUANTITYPER PHASE.

ELECTRICAL CONNECTION. WHERE ALPHA-NUMERICCHARACTER(S) ARE INDICATED ADJACENT TO THEELECTRICAL CONNECTION; ALPHA-NUMERICCHARACTER(S) DENOTE THE LOCATION OF THEEQUIPMENT LOCATED WITHIN ELECTRICALEQUIPMENT. IN THIS EXAMPLE, 'S1A' DENOTESSECTION 1 ELEVATION A.

S1A

L ATSP S

TRANSFER SWITCH. 'ATS' DENOTES AUTOMATICTRANSFER TYPE, 'MTS' DENOTES MANUAL TRANSFERTYPE. 'P' DENOTES PRIMARY POWER SOURCE; 'S'DENOTES SECONDARY POWER SOURCE; 'L' DENOTESTRANSFER SWITCH LOAD SIDE CONNECTION POINT.

MCB

PNL L1A

PNL L1A

PANELBOARD WITH MAIN CIRCUIT BREAKER.DESIGNATION AS INDICATED (L1A, IN THIS EXAMPLE).

PANELBOARD WITH MAIN LUGS ONLY. DESIGNATION ASINDICATED (L1A, IN THIS EXAMPLE).

DESCRIPTIONSYMBOLS

SINGLE LINE DIAGRAM LEGEND

SURGE PROTECTIVE DEVICE, ALPHANUMERICDESIGNATION REPRESENTS SPD UL TYPE AND THECATEGORY PROTECTION TYPE; SEE SURGE PROTECTIVEDEVICE SCHEDULE.

NON-FUSED DISCONNECT / SAFETY SWITCH. UNLESSINDICATED OTHERWISE, DISCONNECT SWITCH IS: 30A,3P WITH GROUND BAR, NEMA 1 ENCLOSURE, VOLTAGERATING NO LESS THAN APPLIED CIRCUIT VOLTAGE(240VAC OR 600VAC).

NON-FUSED DISCONNECT SWITCHES SHALL HAVE AMINIMUM 10,000 AIC NON-SERIES RATING. LOCATIONAND SUPPORT OF DISCONNECT SWITCH SHALL BECOORDINATED WITH RELATED EQUIPMENT AND SHALLCOMPLY WITH NEC AND EQUIPMENT MFR'SINSTRUCTIONS. SWITCH SHALL BE LOCKABLE IN OPENPOSITION.

60A/3P

IN THIS EXAMPLE. DENOTES 60 AMPERES / 3 POLE.

DISCONNECT CHARACTERISTICSDESIGNATION

F-30A

IN THIS EXAMPLE, DENOTES FUSED WITH 30 AMPEREFUSES.

F-MFRDENOTES FUSE RATING IN ACCORDANCE WITHMANUFACTURER'S INSTRUCTIONS FOR THEUTILIZATION EQUIPMENT PROTECTED BY THEFUSES.

N3R IN THIS EXAMPLE, DENOTES NEMA 3RENCLOSURE.

SN DENOTES SOLID NEUTRAL.

N.C.30A/3P

N.C.30A/3P

F-30A

FUSED DISCONNECT / SAFETY SWITCH. UNLESSINDICATED OTHERWISE, DISCONNECT SWITCH IS: 30A,3P WITH GROUND BAR, NEMA 1 ENCLOSURE, VOLTAGERATING NO LESS THAN APPLIED CIRCUIT VOLTAGE(240VAC OR 600VAC), FUSED AT 30A.

DISCONNECT SWITCHES SHALL HAVE 200,000 AICRATING WHEN PROTECTED BY UL CLASS L, J, OR RK1FUSES DESCRIBED UNDER THE FUSE DESCRIPTION.LOCATION AND SUPPORT OF DISCONNECT SWITCHSHALL BE COORDINATED WITH RELATED EQUIPMENTAND SHALL COMPLY WITH NEC AND EQUIPMENT MFR'SINSTRUCTIONS. SWITCH SHALL BE LOCKABLE IN OPENPOSITION.

SH

MM

THERMOSTAT CONTROLLED SPACE HEATERFURNISHED BY EQUIPMENT MANUFACTURER; WIREDBY ELECTRICAL CONTRACTOR.PROVIDE AUXILIARY CONTACTS FOR MONITORINGTHE ABSENCE OF POWER AT DISCONNECT ANDHANDLE "OFF" POSITION. THE MONITOR MODULESHALL BE FURNISHED AND WIRED BY THE F.A.CONTRACTOR TO THE FIRE ALARM SYSTEM; E.C.SHALL WIRE FROM CONTACTS TO MONITOR MODULE.

MOTOR CONTROL CENTER MOTOR STARTER ORLOCAL CONTROLLER. IN THIS EXAMPLE, '1' DENOTESNEMA SIZE, 'FVNR' DENOTES FULL VOLTAGE NON-REVERSING, WHERE INDICATED, 'E' DENOTESELECTRONIC OR SOLID STATE OVERLOAD RELAY.UNLESS INDICATED OTHERWISE, LOCALCONTROLLER ENCLOSURES ARE RATED NEMA 1.

N.C. DENOTES NORMALLY CLOSED.

N.O. DENOTES NORMALLY OPEN.

T-PD2AXC30Y30KVA480 V- 208/120 V

DENOTES BRANCH CIRCUIT / FEEDER IN CABLETRAY.DENOTES BRANCH CIRCUIT / FEEDER INCONDUIT.DENOTES GROUNDING SYSTEM.

DESCRIPTIONSYMBOLS

SINGLE LINE DIAGRAM LEGEND

DESCRIPTIONSYMBOLS

DENOTES ELECTRICAL EQUIPMENT BUS.DENOTES DATA CIRCUITRY

E

FVNR1

E

FVR1

MOTOR CONTROL CENTER MOTOR STARTER ORLOCAL CONTROLLER. IN THIS EXAMPLE, '1' DENOTESNEMA SIZE, 'FVR' DENOTES FULL VOLTAGEREVERSING, WHERE INDICATED, 'E' DENOTESELECTRONIC OR SOLID STATE OVERLOAD RELAY.UNLESS INDICATED OTHERWISE, LOCALCONTROLLER ENCLOSURES ARE RATED NEMA 1.

VFD

MOTOR CONTROL CENTER MOTOR STARTER OR LOCALCONTROLLER. IN THIS EXAMPLE, 'VFD' DENOTESVARIABLE OR ADJUSTABLE FREQUENCY DRIVE. UNLESSINDICATED OTHERWISE, LOCAL CONTROLLERENCLOSURES ARE RATED NEMA 1.

3MR

1200/5

ZERO SEQUENCE CURRENT TRANSFORMER, RATINGAND QUANTITY AS INDICATED. IN THIS EXAMPLE, '50/5'DENOTES 50/5 AMP CT RATIO, '1' DENOTES QUANTITY.

150/5

T-PD2AAA/FA1500/2000 KVA13200 V- 480/277 V

CAST COIL POWER DRY-TYPE TRANSFORMER. IN THISEXAMPLE, 'T-PD2A', DENOTES THE UNIQUETRANSFORMER DESIGNATION. 'AA/FA' DENOTESAMBIENT AIR (AA) / FORCED AIR (FA); '1500/2000' KVADENOTES THE TRANSFORMER AA/FA RATING, '13200V -480/277V' DENOTES THE TRANSFORMER PRIMARY ANDSECONDARY VOLTAGES.

ADJUSTABLE PROTECTION DESIGNATIONS

THIS EXAMPLE INDICATES THREE SINGLE PHASECONDUCTORS SIZE 12 AWG AND A SINGLE GROUNDCONDUCTOR SIZE #12 AWG IN 3/4" CONDUIT.

3#12,#12G,3/4"C

THIS EXAMPLE INDICATES THREE SINGLE PHASECONDUCTORS SIZE #12 AWG AND A SINGLE GROUNDCONDUCTOR SIZE #12 AWG WITHIN A SINGLE OUTERJACKET IN 3/4" CONDUIT.

3/C#12 W/#12G,3/4"C

THIS EXAMPLE INDICATES TWO PARALLEL SETS OFTHREE SINGLE PHASE CONDUCTORS SIZE #1/0 AWGWITHIN A SINGLE OUTER JACKET ALONG WITH A SINGLESEPARATE SIZE #2 AWG GROUND CONDUCTOR IN 2"CONDUIT.

2[3/C#1/0,#2G, 2"C]

THIS EXAMPLE INDICATES THREE SINGLE PHASECONDUCTORS SIZE #12 AWG, ONE NEUTRAL CONDUCTORSIZE #12 AWG, AND ONE GROUND CONDUCTOR SIZE #12AWG IN 3/4" CONDUIT.

4#12,#12G,3/4"C

THIS EXAMPLE INDICATES TWO SINGLE PHASECONDUCTORS SIZE #12 AWG AND A SINGLE GROUNDCONDUCTOR SIZE #12 AWG WRAPPED IN METAL-CLADARMOR (MC CABLE).

2#12,#12G,MC

THIS EXAMPLE, INDICATES TWO PARALLEL SETS OFTHREE SINGLE PHASE CONDUCTORS SIZE #1/0 AWGWITHOUT GROUND CONDUCTOR WITHIN A SINGLE TYPE TCRATED OUTER JACKET, ROUTED IN CABLE TRAY. #4/0 CEGDENOTES A SINGLE COMMON EQUIPMENT GROUND (CEG)CONDUCTOR SIZE ROUTED ALONG THE ASSOCIATEDCABLE TRAY. REFER TO TYPICAL CEG ALONG CABLE TRAYDETAIL.

2[3/C#1/0],#4/0CEG,CT

THIS EXAMPLE, INDICATES A SET OF THREE SINGLE PHASECONDUCTORS SIZE 500KCMIL WITH #2 AWG GROUNDCONDUCTOR WITHIN A SINGLE OUTER JACKET, ROUTED INCABLE TRAY.

3/C#500 W/#2G,CT

DESCRIPTIONWIRE TYPEDESCRIPTIONSYMBOLS

N.O.30A/3P

BRANCH CIRCUIT / FEEDER LEGEND

50EF-01

MOTOR EQUIPMENT IDENTIFICATION AND HORSEPOWERAS INDICATED.

50KVA

EF-01

PACKAGED EQUIPMENT IDENTIFICATION AND KILOVOLT-AMPERE AS INDICATED. PACKAGED EQUIPMENT ISFURNISHED WITH LOCAL DISCONNECT AND IS A SINGLEPOINT CONNECTION UNLESS NOTED OTHERWISE.ELECTRONIC METERING MODULE: MICROPROCESSORBASED FOR METERING, ANALYZING, WAVEFORMCAPTURE AND CAPABLE OF PROVIDING MONITOREDDATA PARAMETERSLOCAL MONITORING UNIT FOR SWITCHGEAR ASSEMBLIESCAPABLE OF UP TO 40 SEPARATE DATA INPUTS FROMBREAKER LSIG'S, EMM'S AND MFR'S; CONFIGURABLEDISPLAY SCREEN; DATA OUTPUT PORTS

2

DENOTES FUTURE CIRCUIT / EQUIPMENT

DENOTES EQUIPMENT ENCLOSURE.

THIS EXAMPLE INDICATES TWO PARALLEL SETS OF THREESINGLE PHASE CONDUCTORS SIZE #1/0 AWG AND A SINGLEGROUND CONDUCTOR SIZE #2 AWG WITHIN A SINGLE TC-ER RATED OUTER JACKET ROUTED ALONG THEASSOCIATED CABLE TRAY.

2[3/C #1/0 W/#2G,CT]

THIS EXAMPLE INDICATES TWO PARALLEL SETS OFTHREE SINGLE PHASE CONDUCTORS SIZE #1/0 AWG ANDA SINGLE GROUND CONDUCTOR SIZE #2 AWG WITHIN ASINGLE TC-ER RATED OUTER JACKET IN 2" CONDUIT.

2[3/C #1/0 W/#2G,2"C]

THIS EXAMPLE INDICATES THREE SINGLE PHASECONDUCTORS SIZE #4/0 AWG AND THREE SINGLEGROUND CONDUCTORS SIZE#6G, SHIELDED, WITHIN A SINGLE TYPE TC-ER RATEDOUTER JACKET. WHERE DENOTED BY 'CT' CABLE SHALLBE ROUTED IN CABLE TRAY, WHERE DENOTED BY 'C'CABLE SHALL BE ROUTED IN CONDUIT. CONDUIT SIZEAS NOTED.

3/C #4/0 W/3-1/C #6G,CT OR CONDUIT

DESCRIPTION

BRANCH CIRCUIT / FEEDER LEGEND

WIRE TYPE

THIS EXAMPLE INDICATES THREE SINGLE PHASECONDUCTORS, SIZE #4/0 AWG AND ONE SINGLEGROUND CONDUCTOR, SIZE #3 AWG, 15KV SHIELDED,WITHIN A SINGLE OUTER JACKET, IN 4" CONDUIT.

3/C #4/0 (15KV SHLD.)W/#3G, 4"C

THIS EXAMPLE INDICATES TWO PARALLEL SETS OFTHREE SINGLE PHASE CONDUCTORS, SIZE 500 KCMIL,WITHOUT GROUND CONDUCTOR, SHIELDED, WITHIN ASINGLE TYPE TC RATED OUTER JACKET ROUTED INCABLE TRAY. '#4/0 CEG' DENOTES A SINGLE COMMONEQUIPMENT GROUND (CEG) CONDUCTOR SIZE ROUTEDALONG THE ASSOCIATED CABLE TRAY. REFER TOTYPICAL CEG ALONG CABLE TRAY DETAIL.

2[3/C 500 (15KVSHLD.)],#4/0CEG, CTCPT

480V10KVA,

1PH120/240V

PT

225D FEEDER / BRANCH CIRCUIT DESIGNATION. IN THISEXAMPLE, '225D' REFERS TO THE SYMBOL COLUMN OFTHE FEEDER/BRANCH CIRCUIT SCHEDULE. THEASSOCIATED SYMBOL DESIGNATION DENOTES THEFEEDER / BRANCH CIRCUIT REQUIREMENTS FOR THEITEM TAGGED.

DENOTES BRANCH CIRCUIT / FEEDER CONDUIT TOCABLE TRAY TRANSITION OR FROM CABLE TRAY TOCONDUIT TRANSITION. WHERE CONDUCTORS AREINSTALLED IN PARALLEL IN MULTIPLE CONDUITS, THEEQUIPMENT GROUNDING CONDUCTORS SHALL BEINSTALLED IN EACH CONDUIT AND SHALL BE TAPPEDFROM THE COMMON EQUIPMENT GROUND (CEG)CONDUCTOR ROUTED WITHIN THE CABLE TRAY.

OR

SPD2C

N.C.

600 A

LOAD INTERRUPTER SWITCH, AMPERE RATINGS ASINDICATED. WHERE ADDITIONAL ALPHANUMERIC ORNUMERIC DESIGNATIONS ARE INDICATED, REFER TODISCONNECT CHARACTERISTICS.

MEDIUM VOLTAGE CABLE PLUG TERMINATION. WHEREINDICATED, NUMERIC NUMBERS INDICATE QUANTITYPER PHASE.

2

MCP50 CAR300 IPS

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:21 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-003

LEGEND

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-003-RA

RD

PJD

S

Page 30: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:22 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-005

ABBREVIATIONS

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-005-RA

RD

PJD

S

E - KEY - ABBREVIATIONS

SWGR SWITCHGEARSYM SYMMETRICALSYNC SYNCHRONIZER

T, TX TRANSFORMERT&B TOP AND BOTTOMTB TERMINAL BLOCKTBD TO BE DETERMINEDTDR TIME DELAY RELAYTEL TELEPHONETEL CAB TELEPHONE CABINETTJB TERMINAL JUNCTION BOXT.O.C. TOP OF CONDUITTSTAT THERMOSTATTYP, (TYP) TYPICAL

UG, UGND UNDERGROUNDUH UNIT HEATERUL UNDERWRITERS’ LABORATORIESUNO, UON UNLESS NOTED OTHERWISE, UNLESS

OTHERISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLYUTP UNSHIELDED TWISTED PAIR

V VOLT, VOLTS, VOLTMETERVA VOLT-AMPEREVAC VOLTS ALTERNATING CURRENTVAR VOLT AMPERE REACTIVEVDC VOLTS DIRECT CURRENTVESDA VERY EARLY SMOKE DETECTIONVERT VERTICALVFD VARIABLE FREQUENCY DRIVEVM VOLT METERVPE VACUUM PRESSURE ENCAPSULATEDVPI VACUUM PRESSURE IMPREGNATEDVS VOLTMETER SWITCHVSD VARIABLE SPEED DRIVEVT VOLTAGE TRANSFORMER

W WATT(S), WIRE, WIDTHW/ WITHW/O WITHOUTWG WATER GAGEWHD WATTHOUR DEMAND METERWP WEATHERPROOFWPH WORK PLANE HEIGHT

X REACTANCE%X PERCENT REACTANCEXFMR TRANSFORMERXLP CROSS-LINK POLYETHYLENE INSULATION

Y WYE-CONNECTED

Z IMPEDANCE%Z PERCENT IMPEDANCE

1/C SINGLE CONDUCTOR CABLE3/C THREE CONDUCTOR CABLE

SPST SINGLE POLE-SINGLE THROWDPST DOUBLE POLE-SINGLE THROW3PST THREE POLE-SINGLE THROWSPDT SINGLE POLE-DOUBLE THROWDPDT DOUBLE POLE-DOUBLE THROW3PDT THREE POLE-DOUBLE THROW

2S1W TWO SPEED, ONE WINDING2S2W TWO SPEED, TWO WINDING

E - KEY - ABBREVIATIONS

N.C. NORMALLY CLOSEDNEC NATIONAL ELECTRICAL CODENEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATIONNFPA NATIONAL FIRE PROTECTION ASSOCIATIONNIC NOT IN CONTRACTN.O. NORMALLY OPENNO. NUMBERNOS NUMBERSN.O.L. NON-OVERLOADNPF NORMAL POWER FACTORNPT NATIONAL PIPE THREADNTE NOT TO EXCEEDNTS NOT TO SCALE

O.C. ON CENTEROFCI OWNER FURNISHED, CONTRACTOR

INSTALLEDOFE OWNER FURNISHED EQUIPMENT,

CONTRACTOR INSTALLEDOFOI OWNER FURNISHED, OWNER INSTALLEDO.L. OVERLOADOPT OPTIONAL

P POLE, POWERPB PRIVATE BRANCH EXCHANGEPBRD PANELBOARDPCC POINT OF COMMON COUPLINGPDP POWER DISTRIBUTION PANELPDU POWER DISTRIBUTION UNITPF POWER FACTORPH PHASEPLC PROGRAMMABLE LOGIC CONTROLLERPMCS POWER MONITORING AND CONTROL SYSTEMPNL PANELPT POTENTIAL TRANSFORMERPVC POLYVINYL CHLORIDE

QTY QUANITY

(R) RELOCATE%R PERCENT RESISTANCER RESISTANCE, RATE, RISER/I RECTIFIER/INVERTERRCR ROOM CAVITY RATIORCPT RECEPTACLERECP(S) RECEPTACLE(S)REQD REQUIREDREQMTS REQUIREMENTSRFI RADIO FREQUENCY INTERFERENCERGS RIGID GALVANIZED STEELRM ROOMRMS ROOT MEAN SQUARERQD REQUIREDRVAT REDUCED VOLTAGE AUTOTRANSFORMERRVNR REDUCED VOLTAGE NON-REVERSINGRVR REDUCED VOLTAGE REVERSING

S/MH SPACING TO MOUNTING HEIGHT RATIOS.C. SHORT CIRCUITSCHED SCHEDULESE SERVICE ENTRANCESEC SECONDSSECT SECTIONSES SERVICE ENTRANCE SUBSATATIONSHLD SHIELDED, SHIELDSKVA STARTING KILO-VOLT AMPERESSM SOLID NEUTRALSN SHARED NEUTRALSP SPARESPD SURGE PROTECTIVE DEVICESQ SQUARESS STAINLESS STEELSSBJ SUPPLY-SIDE BONDING JUMPERSSL SOLID STATE LIGHTSSM SOLID STATE METERINGSST SOLID STATE TRIPST SHUNT TRIPSTA STATIONSTD STANDARDSTP SHIELDED TWISTED PAIRSW SWITCHSWBD SWITCHBOARD

E - KEY - ABBREVIATIONS

IEC INTERNATIONAL ELECTROTECHNICALCOMMISSION

IEEE INSTITUTE OF ELECTRICAL ANDELECTRONICS ENGINEERS

IESCR INTEGRATED EQUIPMENT SHORT CIRCUITRATING

IESNA, IES ILLUMINATING ENGINEERING SOCIETY OFNORTH AMERICA

IG ISOLATED GROUNDIMC INTERMEDIATE METAL CONDUITINC, INCAND INCANDESCENTINST INSTRUCTIONS,

INSTRUMENT/INSTRUMENTATIONINTER INTERMEDIATE

J, JB JUNCTION BOX

*K DEGREES KELVINK KEY INTERLOCKKA KILO-AMPERESKCM, KCMIL 1000 CIRCULAR MILSKG KILO-GRAMKM KILO-METERKV KILO-VOLTSKVA KILO-VOLT AMPERESKVAC KILO-VOLT AMPERES CONNECTEDKVAD KILO-VOLT AMPERES DEMANDKVAR KILO-VOLT AMPERES REACTIVEKW KILOWATTKWD KILOWATT DEMAND

L LUMEN, LENGTHLA LIGHTNING ARRESTERLAN LOCAL AREA NETWORKLB(S) POUND(S)LED('S) LIGHT EMITTING DIODE(S)LPF LOW POWER FACTORLRG LOW RESISTANCE GROUNDLSGM LONG-TIME/SHORT-TIME TRIPLSI LONG-TIME/SHORT-TIME/INSTANTANEOUS

TRIPLSIG LONG-TIME/SHORT-TIME/INSTANTANEOUS/GR

OUND FAULT TRIPLSIGM LONG-TIME/SHORT-TIME/INSTANTANEOUS/GR

OUND FAULT TRIP AND METERINGLSIM LONG-TIME/SHORT-TIME/INSTANTANEOUS

TRIP AND METERINGLT LIQUID TIGHTLTG LIGHTINGLTS LIGHTSLV LOW VOLTAGELVR LOW VOLTAGE RELAY

m METERmm MILLIMETERMAX MAXIMUMMC METAL-CLAD CABLEMCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMCCB MOLDED CASE CIRCUIT BREAKERMECH MECHANICALMEZZ MEZZANINEMFR MANUFACTURERM/G MOTOR/GENERATORMH MOUNTING HEIGHT, MAN HOLEMHL METAL HALIDE LAMPMI MINERAL INSULATEDMIN MINIMUMMIP MEDICAL ISOLATION PANELMLO MAIN LUGS ONLYMO MECHANICALLY OPERATED, MOTOR

OPERATORMP MOTOR PROTECTORMS MASTER SUBSTATION, MOTOR STARTERMSP MOTOR STARTER PANELMT MOUNTMTD MOUNTEDMTG MOUNTINGMTTOE MOUNTED TO TOP OF EQUIPMENTMV MEDIUM VOLTAGE

(N) NEWN, NEUT NEUTRALN/A NOT APPLICABLE

E - KEY - ABBREVIATIONS

EC EMPTY CONDUITEF EACH FACEEGC EQUIPMENT GROUNDING CONDUCTOREL. ELEV ELEVATIONELEC ELECTRICAL/ELECTRICEM, EMER EMERGENCYEMER EMERGENCYEMH EXISTING MANHOLE, ELECTRICAL MANHOLEEMO EMERGENCY MANUAL OFFEMS ENERGY MANAGEMENT SYSTEMEMT ELECTRICAL METALLIC TUBINGENT ELECTRICAL NON-METALLIC TUBINGEO ELECTRICALLY OPERATEDEOL END-OF-LINE DEVICEEPP EXISTING POWER POLEEPR ETHYLENE-PROPYLENE RUBBEREQPT EQUIPMENTE.T. ELECTRONIC TRIPETC ETCETERAETL ELECTRICAL TESTING LABORATORIESES ENERGY SAVINGEW EACH WAYEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREX, EXST EXISTING, EXHAUST

(F) FUTUREF FAHRENHEITFA FORCED AIR, FIRE ALARMFACP FIRE ALARM CONTROL PANELFBO FURNISHED BY OTHERS, FURNISHED BY

OWNERFC FLEXIBLE CONDUITFDR FEEDERFFE FINISHED FLOOR ELEVATIONFIXT FIXTUREFL FOOT LAMBERTSFLR FLOORFLUOR FLUORESCENTFREQ FREQUENCYFRP FIBERGLASS-REINFORCED POLYESTERFT FOOTFU FUSEFUT FUTUREFVNR FULL VOLTAGE NON-REVERSINGFVR FULL VOLTAGE REVERSINGFWE FURNISHED WITH EQUIPMENT, INDICATES

ITEM IS FURNISHED WITH EQUIPMENTSUPPLIED UNDER OTHER DIVISIONS, BUTINSTALLED UNDER DIVISION 26.

g GRAMG, GND GROUNDGA GAUGEGALV GALVANIZEDGEC GROUNDING ELECTRODE CONDUCTORGEN GENERATORGFCI GROUND FAULT EQUIPMENT PROTECTIVE

DEVICEGFE DENOTES GOVERNMENT FURNISHED

EQUIPMENT, CONTRACTOR INSTALLEDGFEPD GROUND FAULT EQUIPMENT PROTECTIVE

DEVICEGFP GROUND FAULT PROTECTIONGFR GROUND FAULT RELAYGP GENERAL PURPOSE

H HEIGHT, HORNHALOG HALOGENHE HIGH EXPOSUREHH HANDHOLEHID HIGH INTENSITY DISCHARGEHORIZ HORIZONTALHP HORSEPOWERHPF HIGH POWER FACTORHPS HIGH PRESSURE SODIUMHRG HIGH RESISTANCE GROUNDHVAC HEATING, VENTILATING AND AIR

CONDITIONINGHZ HERTZ

IAW IN ACCORDANCE WITHICEA INSULATED CABLE ENGINEERS ASSOCIATIONIDS INTRUSION DETECTION SYSTEM

E - KEY - ABBREVIATIONS

A, AMP AMMETER, AMPEREAA AMBIENT AIRABBREV ABBREVIATIONABV ABOVEAC ALTERNATING CURRENTACT ABOVE COUNTER TOPAF AMP FRAME, CIRCUIT BREAKER FRAME AND

TRIP DEVICE SENSOR SIZE (AMPS)AFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAHU AIR HANDLING UNITAIC AMPERE INTERRUPTING CAPACITYAL ALUMINUMAM AMPERE METERANN ANNUNCIATORANSI AMERICAN NATIONAL STANDARDS INSTITUTEAS AMMETER SWITCHASYM ASYMMETRICALAT AMP TRIP, TRIP DEVICE RATING PLUG SIZE

(AMPS)ATC AIR TERMINAL CHAMBERATS AUTOMATIC TRANSFER SWITCH, TRIP DEVICE

LONG TIME PICKUP SETTING (AMPS)ATX AUTO TRANSFORMERAVG AVERAGEAWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEMBATT BATTERY, BATTERIESBC BARE COPPERBIAX BIAXIALBIL BASIC IMPULSE LEVELBKR BREAKERBLDG BUILDINGB.O.C. BOTTOM OF CONDUITB.O.D. BOTTOM OF DUCTB.O.P. BOTTOM OF PIPEB.O.T. BOTTOM OF TRAY

*C CELSIUSC CONDUIT, COILCAT. NO,CAT

CATALOG

CBM CERTIFIED BALLAST MANUFACTURERCCTV CLOSED CIRCUIT TELEVISION CAMERACEG COMMON EQUIPMENT GROUNDCFM CUBIC FEET PER MINUTECKT CIRCUITCLF CURRENT LIMITING FUSECLO CLOSETcm CENTIMETERCMS COMBINATION MOTOR STARTERCND CONDUITCOMPT COMPARTMENTCONT CONTINUOUS, CONTINUEDCPT CONTROL POWER TRANSFORMERCPU CENTRAL PROCESSING UNITCRAC COMPUTER ROOM AIR CONDITIONING UNITCRI COLOR RENDERING INDEXCS CONTROL SWITCHCSA CANADIAN STANDARDS ASSOCIATIONCSCCN CENTRAL SCIENTIFIC COMMUNICATIONS

NETWORKCT CURRENT TRANSFORMER, CABLE TRAYCU COPPER, COEFFICIENT OF UTILIZATIONCY CYCLE(S)

∆ DELTAD DEPTH, DEEPDB DUCT BANKDC DIRECT CURRENTDEPT DEPARTMENTDESIG DESIGNATIONDIA DIAMETERDISC DISCONNECTDIST,DISTRIB

DISTRIBUTION

DIV DIVISIONDS, DSW DISCONNECT SWITCHDWG(S) DRAWING(S)

(E), EX EXISTINGE EMPTY

Page 31: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

SYMBOL NO. OFSETS COND PHASE

(AWG)NEUTRAL

(AWG)EQPT GND

(AWG)MIN. CONDUIT

SIZE NOTES REMARKS

15D 1 3-1/C 12 -- 12 1/2 120D 1 3-1/C 12 -- 12 1/225D 1 3-1/C 10 -- 10 3/430D 1 3-1/C 10 -- 10 3/435D 1 3-1/C 8 -- 10 3/440D 1 3-1/C 8 -- 10 3/445D 1 3-1/C 8 -- 10 3/450D 1 3-1/C 8 -- 10 3/460D 1 3-1/C 6 -- 10 170D 1 3-1/C 6 -- 8 180D 1 3-1/C 4 -- 8 1 1/490D 1 3-1/C 4 -- 8 1 1/4100D 1 3-1/C 3 -- 8 1 1/4110D 1 3-1/C 2 -- 6 1 1/4125D 1 3-1/C 2 -- 6 1 1/4150D 1 3-1/C 1/0 -- 6 1 1/2 2-4175D 1 3-1/C 2/0 -- 6 2200D 1 3-1/C 3/0 -- 6 2225D 1 3-1/C 4/0 -- 4 2250D 1 3-1/C 4/0 -- 4 2300D 1 3-1/C 250 -- 4 2 1/2350D 1 3-1/C 350 -- 3 2 1/2400D 1 3-1/C 500 -- 3 3450D 1 3-1/C 600 -- 2 3 1/2500D 2 3-1/C 4/0 -- 2 2600D 2 3-1/C 300 -- 1 2 1/2700D 2 3-1/C 400 -- 1/0 3800D 2 3-1/C 500 -- 1/0 3900D 3 3-1/C 350 -- 2/0 31000D 3 3-1/C 400 -- 2/0 31200D 4 3-1/C 350 -- 3/0 31600D 5 3-1/C 400 -- 4/0 32000D 6 3-1/C 400 -- 250 32500D 6 3-1/C 600 -- 350 3 1/23000D 8 3-1/C 500 -- 400 3 1/24000D 11 3-1/C 500 -- 500 3 1/25000D 12 3-1/C 600 -- 600 4

3 PHASE, 3 WIRE + EG(PE) - FEEDER/BRANCH CIRCUIT SCHEDULE FOR CONDUIT

INDIVIDUAL-CONDUCTORS RATED AT 600 VOLT WITH 90C/75CTHHN/THWN/XHHW INSULATION, IN MAX. 40C/30C AMBIENT AREA

SCHEDULE NOTES:1. APPLICABLE FOR CONDUIT INSTALLATIONS ONLY.2. APPLICABLE FOR CONDUIT OR COMBINATION CONDUIT AND LADDER, VENTILATED, OR WIRE

MESH CABLE TRAY INSTALLATIONS.3. WHERE INSTALLED IN A PLENUM, ALL CONDUCTORS INSULATIONS SHALL BE PLENUM RATED.4. WHERE INSTALLED IN CABLE TRAY, ALL CONDUCTOR INSULATIONS SHALL BE TC-ER RATED.

Use #4 AWG GND for CT ApplicationsUse #4 AWG GND for CT ApplicationsUse #4 AWG GND for CT Applications

SYMBOL NO. OFSETS COND PHASE

(AWG)NEUTRAL

(AWG)EQPT GND

(AWG)MIN. CONDUIT

SIZE NOTES REMARKS

15Y 1 4-1/C 12 12 12 3/4 120Y 1 4-1/C 12 12 12 3/425Y 1 4-1/C 10 10 10 3/430Y 1 4-1/C 10 10 10 3/435Y 1 4-1/C 8 8 10 140Y 1 4-1/C 8 8 10 145Y 1 4-1/C 8 8 10 150Y 1 4-1/C 8 8 10 160Y 1 4-1/C 6 6 10 170Y 1 4-1/C 6 6 8 1 1/480Y 1 4-1/C 4 4 890Y 1 4-1/C 4 4 8100Y 1 4-1/C 3 3 8110Y 1 4-1/C 2 2 6 1 1/2125Y 1 4-1/C 2 2 6 1 1/2150Y 1 4-1/C 6 2 2-4175Y 1 4-1/C

1/0 1/06 2

200Y 1 4-1/C2/0 2/0

6 2225Y 1 4-1/C

3/0 3/04 2 1/2

250Y 1 4-1/C 4/0 4/0 4 2 1/2300Y 1 4-1/C 250 250 4 2 1/2350Y 1 4-1/C 350 350 3 3400Y 1 4-1/C 500 500 3 3 1/2450Y 1 4-1/C 600 600 2 4500Y 2 4-1/C 4/0 4/0 2 2 1/2600Y 2 4-1/C 300 300 1 3700Y 2 4-1/C 400 400 1/0 3800Y 2 4-1/C 500 500 1/0 3 1/2900Y 3 4-1/C 350 350 2/0 31000Y 3 4-1/C 400 400 2/0 3 1/21200Y 4 4-1/C 350 350 3/0 31600Y 5 4-1/C 400 400 4/0 3 1/22000Y 6 4-1/C 400 400 250 3 1/22500Y 6 4-1/C 600 600 350 43000Y 8 4-1/C 500 500 400 3 1/24000Y 11 4-1/C 500 500 500 45000Y 12 4-1/C 600 600 600 4

INDIVIDUAL-CONDUCTORS RATED AT 600 VOLT WITH 90C/75CTHHN/THWN/XHHW INSULATION, IN MAX. 40C/30C AMBIENT AREA

3 PHASE, 4 WIRE + EG(PE) - FEEDER/BRANCH CIRCUIT SCHEDULE FOR CONDUITNON-CURRENT CARRYING GROUNDED (NEUTRAL) CONDUCTOR

1 1/41 1/41 1/4

4/0 4/0

SCHEDULE NOTES:1. APPLICABLE FOR CONDUIT INSTALLATIONS ONLY.2. APPLICABLE FOR CONDUIT OR COMBINATION CONDUIT AND LADDER, VENTILATED, OR WIRE

MESH CABLE TRAY INSTALLATIONS.3. WHERE INSTALLED IN A PLENUM, ALL CONDUCTORS INSULATIONS SHALL BE PLENUM RATED.4. WHERE INSTALLED IN CABLE TRAY, ALL CONDUCTOR INSULATIONS SHALL BE TC-ER RATED.

Use #4 AWG GND for CT ApplicationsUse #4 AWG GND for CT ApplicationsUse #4 AWG GND for CT Applications

SYMBOL NO. OFSETS COND PHASE

(AWG)NEUTRAL

(AWG)EQPT GND

(AWG)MIN. CONDUIT

SIZE NOTES REMARKS

C15Y 1 4-1/C 12 12 12 3/4 1C20Y 1 4-1/C 12 12 12 3/4C25Y 1 4-1/C 10 10 10 3/4C30Y 1 4-1/C 10 10 10 3/4C35Y 1 4-1/C 8 8 10 1C40Y 1 4-1/C 8 8 10 1C45Y 1 4-1/C 8 8 10 1C50Y 1 4-1/C 6 6 10 1C60Y 1 4-1/C 6 6 10 1C70Y 1 4-1/C 4 4 8 1 1/4C80Y 1 4-1/C 3 3 8 1 1/4C90Y 1 4-1/C 3 3 8 1 1/4C100Y 1 4-1/C 2 2 8 1 1/2C110Y 1 4-1/C 1 1 6 1 1/2C125Y 1 4-1/C 1/0 1/0 6 2C150Y 1 4-1/C 2/0 2/0 6 2C175Y 1 4-1/C 3/0 3/0 6 2C200Y 1 4-1/C 4/0 4/0 6 2 1/2C225Y 1 4-1/C 250 250 4 2 1/2C250Y 1 4-1/C 350 350 4 3C300Y 1 4-1/C 400 400 4 3C350Y 1 4-1/C 600 600 3 4C400Y 2 4-1/C 4/0 4/0 3 2 1/2C450Y 2 4-1/C 250 250 2 3C500Y 2 4-1/C 350 350 2 3C600Y 2 4-1/C 400 400 1 3C700Y 2 4-1/C 600 600 1/0 4C800Y 3 4-1/C 350 350 1/0 3C900Y 3 4-1/C 500 500 2/0 3 1/2C1000Y 3 4-1/C 600 600 2/0 4C1200Y 4 4-1/C 500 500 3/0 3 1/2C1600Y 5 4-1/C 600 600 4/0 4C2000Y 6 4-1/C 600 600 250 4C2500Y 8 4-1/C 600 600 350 4C3000Y 10 4-1/C 500 500 400 3 1/2C4000Y 12 4-1/C 600 600 500 4C5000Y 15 4-1/C 600 600 600 4

3 PHASE, 4 WIRE + EG(PE) - FEEDER/BRANCH CIRCUIT SCHEDULE FOR CONDUIT

INDIVIDUAL-CONDUCTORS RATED AT 600 VOLT WITH 90C/75CTHHN/THWN/XHHW INSULATION, IN MAX. 40C/30C AMBIENT AREA

CURRENT CARRYING GROUNDED (NEUTRAL) CONDUCTOR

SCHEDULE NOTES:1. APPLICABLE FOR CONDUIT INSTALLATIONS ONLY.2. APPLICABLE FOR CONDUIT OR COMBINATION CONDUIT AND LADDER, VENTILATED, OR WIRE

MESH CABLE TRAY INSTALLATIONS.3. WHERE INSTALLED IN A PLENUM, ALL CONDUCTORS INSULATIONS SHALL BE PLENUM RATED.4. WHERE INSTALLED IN CABLE TRAY, ALL CONDUCTOR INSULATIONS SHALL BE TC-ER RATED.

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:24 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-007

TRANSFORMER ANDFEEDER / BRANCH CIRCUIT

SCHEDULE

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-007-RA

RD

PJD

S

Page 32: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:24 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-008

MECHANICAL EQUIPMENTCONNECTION SCHEDULE

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-008-RA

RD

PJD

S

A - EQUIPMENT LIST - ELECTRICAL

REV NO.

EXISTINGEQUIPMENT

NAME/NUMBER

NEW EQUIPMENTNAME/ NUMBER

EQUIPMENTDESCRIPTION

REFERENCE P&ID

NO.

INFOSTATUS

1 2 3

ELECTRICAL PROPERTIES

PKGE.UNIT (Y/N)

ELEC. ANDI&C

PROVIDEDEQUIPMENT

ELEC. ANDI&C

PROVIDEDEQUIPMENT

ELEC. ANDI&C

PROVIDEDEQUIPMENT

POWERSOURCE(S)

POWERSOURCE(S) POWER SOURCE(S) POWER SOURCE(S)

POWERSOURCE(S)

METERING/TELECOMOUTLET FIRE ALARM

SPECIALELECTRICAL /

CONTROLSINSTRUCTIONS

(ONE ONLY)

VOLTS PHASE HERTZDISCONNEC

T (Y/N)STARTER

(Y/N)CONTROLS

(Y/N)NORMAL

(Y/N)EMERGENCY(700) (Y/N)

LEGALLYREQUIRED

STANDBY (701)(Y/N)

OPTIONALSTANDBY (702)

(Y/N)C.O.P.S.

(708) (Y/N)FLA HP KW RLA

(E)OH DOOR 6. 3 HP 3 208 V(E)UH-1 1. 1/6 HP 0.16 115 V(E)CHU-1 12. 1/30 HP 0.3 115 V(E)EF-3 1. 1/6 HP 0.16 115 V(E)EF-4 1. 1/6 HP 0.16 115 V(E)LIFTSTATION

1. 1/6 HP 0.16 115 V

(E)CHU-1 12. 1/30 HP 0.3 115 V(E)UH-1 1. 1/6 HP 0.16 115 V(E)CHU-1 12. 1/30 HP 0.3 115 V(E)EF-2 1. 1/6 HP 0.16 115 V(E)UH-1 1. 1/6 HP 0.16 115 V(E)EF-8 1. 1/6 HP 0.16 115 V(E)OH DOOR 2. 3/4 HP 0.75 208 V(E)UH-1 1. 1/6 HP 0.16 115 V(E)AHU-1 5. 2 HP 2 208 V(E)MUA-2 5. 2 HP 2 208 V(E)UH-1 1. 1/6 HP 0.16 115 V(E)OH DOOR 4. 1/2 HP 0.5 115 V(E)CP-5 2. 1/4 HP 0.25 115 V(E)EF-1 4. 1/2 HP 0.5 115 V(E)OH DOOR 22. 1/3 HP 0.33 208 V(E)UH-3 1. 1/6 HP 0.16 115 V(E)UH-3 1. 1/6 HP 0.16 115 V(E)CP-6 2. 1/4 HP 0.25 115 V(E)CP-5 2. 1/4 HP 0.25 115 V(E)GP-1 4. 1/2 HP 0.5 115 V(E)CP-4 9. 3 HP 3 115 V(E)CP-1 9. 3 HP 3 115 V(E)CP-2 9. 3 HP 3 115 V(E)CP-3 9. 3 HP 3 115 V

CP-3A 1. 1/6 HP 0.16 115 VCP-3B 1. 1/6 HP 0.16 115 VCP-4A 1. 1/6 HP 0.16 115 VCP-4B 1. 1/6 HP 0.16 115 VCP-6A 1. 1/6 HP 0.16 115 VCP-6B 1. 1/6 HP 0.16 115 VDAMPER 2. 1/4 HP 0.25 115 VDAMPER 2. 1/4 HP 0.25 115 VDAMPER 2. 1/4 HP 0.25 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-1 1. 1/6 HP 0.16 115 VUH-2 1. 1/6 HP 0.16 115 VVF-X 1. 1/6 HP 0.16 115 VVF-X 1. 1/6 HP 0.16 115 V

Page 33: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

0.16

UH-1

0.16

UH-1

0.16

UH-1

0.16

CP-3B

0.16

CP-3A

0.16

CP-6B

0.16

CP-6A

0.16

CP-4A

0.16

CP-4B

0.16

VF-X

0.16

VF-X

H

G

F

E

D

C

B

A

AA

UPS122

GENERATOR121

RADIATOR120

MECHANICAL116

TELECOM ROOM118

COMMS NODE &TELECOM

117

ELECTRICAL119

UD1A

SD1B

1

E-402

2

E-402

2

E-401

1

E-401

9 10 11 12 13 14

UP1A

SP1B

SP1A

SD1C

M1A

SD1B

SL1A

SD1A

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:37 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-131

LEVEL 1 - DATA CENTER -POWER

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-131-RA

RD

PJD

S

- 1/8" = 1'-0"1 LEVEL 1 - POWER PLAN - AREA C

N

8 0 8

Scale: 1/8 INCH = 1 FOOT

16

1. 30% DESIGN. SEE BASIS OF DESIGN FOR GENERALPOWER REQUIREMENTS, RECEPTACLES, ETC.

2. TELECOMMUNICATION OUTLETS INDICATED ON POWERPLAN DRAWINGS TO SHOW TELECOMMUNICATION OUTLETLOCATIONS WITH RESPECT TO RECEPTACLE LOCATIONS,SEE SIGNALING PLAN DRAWINGS FOR ADDITIONALINFORMATION.

1. XXXX

SHEET NOTES

SHEET KEYNOTES 1

KEY PLAN

A

B C

Page 34: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

ELEL

CR

0.16

UH-1

0.16

UH-1

CR

ELEL

MM

0.25

DAMPER

0.25

DAMPER

0.25

DAMPER

0.16

UH-1

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

BATTCAB.

UD1A

T-UD1A

UPS122

MBS-UD1A

UPS-SD1C

UPS-SD1A

UPS-SD1B

FUTUREBATT.CAB.

FUTUREBATT.CAB.

FUTUREBATT.CAB.

GENERATOR

GENERATOR121

SD1A

BATTERYCHARGER

MOTORIZEDDAMPERPOWER, TYP.OF 3

MAINTAIN FRONTAND REAR ACCESS

OUTPUTBREAKERSECTION

ATS-SD1A

REAR

FRONT

CONTROLCABINETSECTION

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:50 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-402

ELECTRICAL LARGE SCALEPLANS - PHASE 1

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-402-RA

RD

PJD

S

- 3/8" = 1'-0"1 LARGE SCALE - UPS ROOM 117

- 3/8" = 1'-0"2 LARGE SCALE - GENERATOR ROOM 110

N

1. 30% DESIGN. SEE BASIS OF DESIGN FOR GENERALPOWER REQUIREMENTS, RECEPTACLES, ETC.

2. TELECOMMUNICATION OUTLETS INDICATED ON POWERPLAN DRAWINGS TO SHOW TELECOMMUNICATION OUTLETLOCATIONS WITH RESPECT TO RECEPTACLE LOCATIONS,SEE SIGNALING PLAN DRAWINGS FOR ADDITIONALINFORMATION.

3. RECEPTACLES IN XXX SHALL BE POSITIONED 48” ABOVEFINISHED FLOOR.

1. XXXX

SHEET NOTES

SHEET KEYNOTES 1

KEY PLAN

A

B C

KEY PLAN

A

B C2 0

Scale: 3/8 INCH = 1 FOOT

4 62

Page 35: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

(E) BLD010 208VSERVICE A XFMR.(T-PM1A)150 KVA4160 V- 208/120 V

T-PM1BAA750 KVA4160 V- 480/277 V

SEE E602 - BLD010SERVICE A SINGLE-LINEFOR CONTINUATION

INTERCEPT EXISTING BLD040 4160V SERVICEAHEAD OF 150KVA XFMR. PROVIDE 4POSITION SECTIONALIZER SWITCH ANDJUNCTION CABINET TO REFEED EXISTINGSERVICE A AND EXTEND NEW UNDERGROUNDCONDUCTORS TO SERVICE B.

TO EXISTING POLE #B14-1VIA FUSED CUT OUT. REMOVEEXISING 50A FUSE ANDPROVIDE 100A FUSE INEXISTING CUT OUT.225MV

225MV225MV

KWHXX/XX

3

LSI250 AF150 AT

LSI250 AF150 AT

LSI250 AF150 AT

LSI250 AF150 AT

LSIG1600 AF1600 AT

3P,4W,1600A, 480/277V, 60HZ, --kA RMS SYS

SWITCHGEAR M1A

250 AF0 AT

250 AF0 AT

LSIG1200 AF1000 AT

SPACE SPACE

LSI250 AF150 AT

0HP-01

0HP-02

0HP-03

0HP-04

0HP-05LATS-SD1A

PS1200A CLOSEDTRANSITIONBYPASSSWITCH

LSIG1200 AF1000 AT

0

PACKAGEGENSET500KW625KVA

480Y/277V

KWHXX/XX

3

LSI250 AF150 AT

LSIG250 AF175 AT

LSIG400 AF350 AT

LSIG400 AF350 AT

3P, 4W, 1000A, 480/277V, 60HZ, --kA RMS SYS

SWITCHGEAR SD1A

250 AF0 AT

LSI800 AF600 AT

SPACE

LSIG400 AF350 AT

1600Y

1000Y 150Y 150Y 150Y 150Y 150Y1000Y

1000Y

PNL SL1A

150Y

DISTRIBUTIONPANELBOARD SD1B

600Y

3P, 4W, 600A, 480/277V, 60HZ, --kA RMS SYS

KWHXX/XX

3

CONTINUESTO T-SD1C

UPS-SD1A

LSIG800 AF800 AT

200D 400Y

UPS-SD1B

400Y

UPS-SD1C

400Y 800Y

400Y 400Y 400Y

L MBS-UD1AP S

LSI800 AF800 AT

800A MAINTENANCEBYPASS SWITCH

CONTINUESTO T-UD1A

800D

150KW/30MIN. INITIAL CAPACITY,250KW/30MIN. TOTAL CAPACITY,INTERNAL BYPASS UPS UNITS,480Y/277V, TYPICAL OF 3

LSI250 AF125 AT

LSI250 AF125 AT

LSI250 AF125 AT

3P, 4W, 400A, 208/120V, 60HZ, --kA RMS SYS

DISTRIBUTIONPANELBOARD SD1C

SPACE

250 AF0 AT

T-SD1CK-TBD112.5KVA480 V- 208/120 V

400Y

CONTINUESTO SD1A

T-UD1AK-TBD450KVA480 V- 208/120 V

1000Y

CONTINUES TOMBS-UD1A

KWHXX/XX

3

LSI100 AF100 AT

LSIG1200 AF1000 AT

3P,4W,1000A, 208/120V, 60HZ, --kA RMS SYS

DISTRIBUTION PANEL UD1A

LSI100 AF100 AT

PNL SP01

125Y

PNL SP02

125Y

PNL SP2A

125Y

PNL UP2A

100Y

PNL UP1A

100Y

LSI400 AF400 AT

PNL UD2D

400Y

LSI400 AF400 AT

PNL UD2C

400Y

LSI400 AF400 AT

PNL UD2B

400Y

LSI400 AF400 AT

PNL UD2A

400Y

TYP. 6 EA.100/3 CB TOFEED BUS IN

DATACENTERS

TYP. 4 EA.100/3 CB TOFEED BUS IN

DATACENTERS

LSI100 AF100 AT

100Y

PHASE 2 WORK

SEE E-602 FORCONTINUATIONTO ATS-UD2A

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:57 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-601

BLD010 POWERSINGLE-LINE DIAGRAM –

480V SERVICE B

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-601-RA

RD

PJD

S

1. 30% DESIGN. SEE BASIS OF DESIGN FOR GENERALPOWER REQUIREMENTS.

2. SEE SCHEDULE ON E-007 FOR FEEDER DESIGNATIONS.

1. RE-ROUTE FEEDER TO NEW SERVICE LOCATION IN ROOM1XX.

SHEET NOTES

SHEET KEYNOTES 1

- NO SCALE1 BLD0010 POWER RISER - 480V DISTRIBUTION

Page 36: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

LSI200 AF200 AT

LSI200 AF200 AT

LSI200 AF200 AT

LSI225 AF225 AT

LSI50 AF50 AT

LSI200 AF200 AT

LSI200 AF200 AT

LSI200 AF200 AT

LSI600 AF600 AT

3P,4W,600A, 208/120V, 60HZ, --kA RMS SYS

(E) MDP

SEE E601 - BLD010SERVICE B SINGLE-LINE

FOR CONTINUATION

225Y 225Y 225Y 50Y 225Y225Y

600Y

(E) PANEL M (E) PANEL A (E) PANELHB

MCB

(E)PANEL B (E)PANEL C

7.5(E)ACU

25D

SPARE SPACE SPACE

LSI0 AF0 AT

LSI0 AF0 AT

SPARE

(E) T215KVA208 V-480 V

LSI200 AF200 AT

LSI200 AF200 AT

LSI200 AF200 AT

LSI225 AF225 AT

LSI50 AF50 AT

LSI200 AF200 AT

LSI100 AF100 AT

LSI600 AF600 AT

3P,4W,600A, 208/120V, 60HZ, --kA RMS SYS

(E) MDP

225Y 225Y 225Y 50Y 225Y225Y

600Y

(E) PANEL M (E) PANEL A (E) PANELHB

MCB

(E)PANEL B

(E)PANEL C7.5

(E)ACU

25D

65MT1A

125Y

300D

SEE E-601 FORCONTINUATION TOPANEL UD1A

L

ATS-UD2A

120/208VP S

200A 4PATS W/ BYPASS

PNL UP2B

65kWMICROTURBINE

NEW WORK

LSI200 AF200 AT

LSI200 AF200 AT

SPARESPARE

LSI800 AF800 AT

LSI300 AF300 AT

LSI600 AF600 AT

800Y

M1B DISTRIBUTIONPANELBOARD

NEW WORK

100Y

SPACE

LSI0 AF0 AT

3P,4W,800A, 208/120V, 60HZ, --kA RMS SYS

SEE E601 - BLD010SERVICE B SINGLE-LINE

FOR CONTINUATION

T-PD2A75KVA480 V- 208/120 V

(E) T215KVA208 V-480 V

2

1

100Y

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

A09

/23/

201 6

30%

DES

IGN

SUBM

ITT A

L

10/6/2016 1:50:58 PM C:\Users\brycemahn\Documents\USAP-160604-EL-DM2016_brycemahn.rvt

E-602

BLD010 POWERSINGLE-LINE DIAGRAM –

208V SERVICE A

JDS

BGJ

09/23/2016

160604MCM010

MC

MU

RD

O S

TATI

ON

BL01

0 -

IT P

RIM

ARY

OPE

RAT

ION

S F A

CIL

ITY

ELE C

TRIC

AL

160604MCM010E-602-RA

RD

PJD

S

- NO SCALE1 EXISTING BLDG 010 SERVICE A POWER SINGLE LINE

- NO SCALE2 NEW BLDG 010 SERVICE A POWER SINGLE LINE

1. 30% DESIGN. SEE BASIS OF DESIGN FOR GENERALPOWER REQUIREMENTS.

2. SEE SCHEDULE ON E-007 FOR FEEDER DESIGNATIONS.

1. RE-ROUTE FEEDER TO NEW SERVICE LOCATION IN ROOM 1XX2. RECONNECT FEEDER TO EXISTING MDP MAIN CIRCUIT

BREAKER.

SHEET NOTES

SHEET KEYNOTES 1

Page 37: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

CONDUIT AND CONDUCTORS BELOW GRADE OR SLAB

DESCRIPTIONSYMBOLS

CONDUIT AND CONDUCTORS ABOVE GRADE

COMMUNICATIONS SYMBOLS

TELECOMMUNICATIONS OUTLET, 8 PIN, RJ45 TYPE, VOICE.W DENOTES WALL MOUNTED 54" AFF WITH SINGLE

GANG FACEPLATE.

TELECOMMUNICATION PULL BOX

WIRELESS LAN ACCESS POINT

PB

CONDUIT DOWN

CONDUIT UP

CONDUIT, STUBBED AND CAPPED

TELECOMMUNICATIONS OUTLET, 8 PIN, RJ45 TYPE, DATA.BAS INDICATES BUILDING AUTOMATION SYSYEM.

J TELECOMMUNICATIONS JUNCTION BOX, MOUNT AT 18" AFFUNLESS OTHERWISE NOTED.

X-

______________________

AUDIOVISUAL SYMBOLSDESCRIPTIONSYMBOLS

TELECOMMUNICATIONS OUTLET, 8 PIN, RJ45 TYPE, FOUR (4)VOICE/DATA OUTLETS TO BE MOUNTED 18" AFF UNLESSOTHERWISE NOTED.

1

1

TELECOMMUNICATIONS OUTLET, 8 PIN, RJ45 TYPE, TWO (2)VOICE/DATA OUTLETS IN SINGLE-GANG FLOOR BOX, MOUNTEDFLUSH UNLESS OTHERWISE NOTED.

FREESTANDING 2 POST COMMUNICATIONS RACK

FREESTANDING 4 POST COMMUNICATIONS RACK

COMMUNICATIONS CABINET

KEYED NOTE

DETAIL OR ENLARGED PLAN CALLOUT.

EQUIPMENT REFERENCE NUMBER

CABLE TRAY, SIZE AS INDICATED ON PLANS. WELDED WIRE TYPEFOR DISTRIBUTION OF CABLING OUTSIDE TELECOMMUNICATIONROOM.

LADDER RACK, SIZE AS INDICATED ON PLANS. WELDED LADDERTYPE FOR DISTRIBUTION OF CABLING INSIDETELECOMMUNICATION ROOM.

TMGB OR TGB AS INDICATED ON PLANS

HOMERUN CONDUIT

REVISION NUMBER-

O-Z CABLE CALL-OUT INDICATING QUANTITY OF CABLES AND CABLETYPE

CONDUIT STUB-OUT

55" IPTV FLAT PANEL DISPLAY, MOUNTED 60" AFF ON CENTER,UNO

A/V FLOOR BOX PLATE

WALL MOUNTED LOUDSPEAKER, MOUNTED 9' AFF ON CENTER,UNO

AUDIO SYSTEM SOURCE SELECTION AND VOLUME WALLCONTROLLER, MOUNTED 48" AFF ON CENTER, UNO

32" PUBLIC AREA DISPLAY, MOUNTED 44" AFF ON CENTER, UNOPAD

CARD READER, WALL MOUNTED AT 42" AFF ON SINGLEGANG BACKBOX WITH SPACER

ELECTRONIC MORTISE LOCK. INCLUDES OPTION REQUESTTO EXIT SWITCH, DOOR POSITION SWITCH, AND LATCH BOLTMONITOR

DOOR POSITION SWITCH, OVERHEAD DOOR SURFACEMOUNTED. INSTALL WITH STEEL FLEXIBLE CONDUIT TONEAREST JUNCTION BOX

FIXED INTERIOR CCTV SECURITY CAMERA

DESCRIPTIONSYMBOLS

TELEPHONY SYMBOLS

TC IP TELEPHONE CONSOLE

IP TELEPHONE CONFERENCE STATIONTCS

DESCRIPTIONSYMBOLS

SECURITY SYMBOLS

CR

WAP

EL

DC

WC

FB

CELLULAR REPEATER JUNCTION BOX, MOUNTED ATCEILING DECK

CEL

LMR LMR REPEATER JUNCTION BOX, MOUNTED AT CEILINGDECK

S1

S1 CEILING SPEAKER

IC INTERCOM CALL FOR HELP STATION. FULL DUPLEX, HANDS-FREE VOIP, SIP-COMPLIANT, POE POWERED TELEPHONE.FLUSH-MOUNT SO THAT CONTROLS ARE LESS THAN 54" AFF.

CHAINLINK FENCE

CAM WALL MOUNTED VIDEO CONFERENCE CAMERA (MOUNTED 70"AFF ON CENTER)

CCC COMMAND & CONTROL CONSOLE

EOC DISPLAY (TYPE X, MOUNTED Z UNITS AFF ON CENTER)

FPD1+Z AFF IPTV DISPLAY (TYPE X, MOUNTED Z UNITS AFF ON CENTER)

FPD2+Z AFF

80" LED MONITOR (TYPE X, MOUNTED Z UNITS AFF ON CENTER)FPD3+Z AFF

PS WALL MOUNTED PAGING STATION, MOUNTED 48" AFF ONCENTER, UNO

PS DESK PAGING STATION2

1

CEILING MOUNTED MICROPHONEM

EXISTING CONDUIT AND/OR WIRE TO BE REMOVED

EXISTING CONDUIT AND/OR WIRE TO REMAIN (SHOWN LIGHT)

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

MC

MU

RD

O S

TATI

ON

BL 0

10: I

T&C

PR

IMAR

Y O

PS F

ACIL

ITY

9/22/2016 4:15:52 PM C:\Users\brad.twitchell\Documents\USAP-160604-TC-DM2016_brad.twitchell.rvt

T-000

LEGEND

BRT

LLM

9/23/16

160604MCM010

TELE

CO

M

160604MCM010T-000-RA

A09

/23/

2016

30%

DES

IGN

SU

BMIT

TAL

Page 38: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

GENERAL NOTES (CONT'D)DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK.1.

EXISTING EQUIPMENT TO REMAIN IS SHOWN LIGHT. NEW EQUIPMENT IS SHOWN HEAVY.2.

CONTRACTOR SHALL VISIT SITE PRIOR TO BID AND VERIFY THAT CONDITIONS ARE AS INDICATED.CONTRACTOR SHALL INCLUDE IN BID COSTS REQUIRED TO MAKE WORK MEET EXISTING CONDITIONS.

3.

THE OWNER RESERVES FIRST CHOICE TO KEEP EXISTING EQUIPMENT AND MATERIALS. COORDINATEWITH OWNER AND DELIVER DESIGNATED EQUIPMENT AND MATERIALS REMOVED UNDER THIS CONTRACTTO OWNERS DESIGNATED STORAGE AREA. REMAINING EQUIPMENT AND MATERIAL REMOVED SHALLBECOME PROPERTY OF THE CONTRACTOR.

4.

PROVIDE LOW VOLTAGE DEMOLITION AS REQUIRED. REFER TO ARCHITECTURAL DEMOLITION DRAWINGSFOR LOCATION AND EXTENT OF DEMOLITION REQUIRED. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDTO DETERMINE EXTENT OF WORK INVOLVED. PROVIDE LABOR AND MATERIALS AS REQUIRED TOMAINTAIN AND OR RESTORE CONTINUITY OF EXISTING LOW VOLTAGE SERVICES.

5.

CONTRACTOR SHALL PROVIDE ALL NECESSARY DEMOLITION TO REMOVE EXISTING UNUSED CONDUIT,WIRE, CABLE, JUNCTION BOXES, ETC; REUSE AS REQUIRED.

6.

LOW VOLTAGE SERVICE OUTAGES SHALL BE PERMITTED ONLY AT TIMES APPROVED BY IN WRITING.7.

LOW VOLTAGE SERVICE SHALL BE MAINTAINED TO EXISTING AREAS DURING CONSTRUCTION.CONTRACTOR SHALL PROVIDE CABLES AND TERMINATION ETC AS REQUIRED TO MAINTAIN CONTINUITYOF SERVICE.

8.

LOW VOLTAGE CABLING CONTRACTOR SHALL COORDINATE WITH THE FIRE ALARM VENDOR AND SERVICEREPRESENTATIVE FOR THE PROPERTY AND PROVIDE CABLING TO REESTABLISH FIRE ALARM BACKBONEINTERCONNECTION FOR THE CABLING THAT MIGHT BE DISRUPTED BY THE NEW CONSTRUCTION.

9.

PROVIDE RECORD DRAWINGS TO ARCHITECT. DRAWINGS SHALL INCLUDE PULLBOXES, BACKBONEINTERCEPTING, STUB UP LOCATIONS AND ROUTING, ETC.

10.

THE WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE APPLICABLE PROVISIONS OF THE 2015INTERNATIONAL BUILDING CODE, THE 2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC),THE2015 UNIFORM PLUMBING CODE, THE 2015 UNIFORM MECHANICAL CODE, THE 2014 NATIONAL ELECTRICCODE AND THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA REGULATIONS).

11.

CONDUIT INSTALLATION SHALL BE IN STRICT COMPLIANCE WITH TIA 569 STANDARD. CABLE INSTALLATIONSHALL BE IN STRICT COMPLIANCE WITH TIA 568 B.1, B.2 AND B.3.

12.

ALL CABLING, PATHWAY, GROUND BUSSES AND TERMINATION HARDWARE, RACKS AND CABINETS SHALLBE PROVIDED WITH IDENTIFICATION (LABELING) IN ACCORDANCE WITH TIA 606 STANDARD.

13.

ALL FIBER OPTIC CABLE ROUTED IN CONDUIT SHALL BE INSTALLED IN INNER DUCT.14.

EQUIPMENT LOCATION AND DUCT/PATHWAY ROUTING INDICATED ON DRAWINGS IS FOR GENERALREFERENCE ONLY. CONTRACTOR SHALL FIELD COORDINATE AND VERIFY EXACT ROUTING AS REQUIRED.

15.

CONTRACTOR SHALL MAINTAIN SEPARATION FROM ELECTRICAL FEEDERS, ELECTRONIC BALLASTS,TRANSFORMERS, ETC. TO MINIMIZE ELECTO-MAGNETIC INTERFERENCE ISSUES.

16.

ANY CONDUIT OR TRUNKING RUN INDICATED ON THE TELECOMMUNICATION DRAWINGS SHALL BEPROVIDED BY THE ELECTRICAL CONTRACTOR AND SIZED PER APPLICABLE REVISION OF THE NEC. BENDRADIUS OF CONDUIT LESS THAN 2" IS 6 TIMES INTERNAL CONDUIT DIAMETER, AND GREATER THAN 2" IS10 TIMES INTERNAL CONDUIT DIAMETER, AND CONDUIT SHALL HAVE NO MORE THAN 180 DEGREECUMULATIVE BEND BETWEEN PULL POINTS. PULL BOXES MAY NOT BE USES IN PLACE OF BENDS AND IFTHE RUN IS MORE THAN 30 METERS (98'-5"), A JUNCTION BOX IS REQUIRED. JUNCTION BOXES SHALL BESIZED PER REQUIREMENTS OF THE LOCAL AND STATE AUTHORITY HAVING JURISDICTION.

17.

VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK. COORDINATE ALL DEVICES WITHINTERIOR DESIGN AND ARCHITECTURAL DRAWINGS.

18.

ALL EMPTY RACEWAY SYSTEMS SHALL HAVE A 1/8" PULL-STRING WITH A TENSILE STRENGTH OF 200POUNDS AND SHALL BE INDENTIFIED AT ALL JUNCTION, PULL AND TERMINATION POINTS, USINGPERMANENT METALLIC TAGS. TAGS SHALL INDICATE INTENDED USE OF CONDUIT, ORIGINATION ANDTERMINATION POINT OF EACH INDIVDUAL CONDUIT. CAP OPEN ENDS NOT TERMINATED IN A JUNCTIONBOX.

19.

CONTRACTOR SHALL REVIEW ARCHITECTURAL, STRUCTURAL, MEP AND OTHER DRAWINGS IN RELATIONTO THIS SCOPE.

20.

PROVIDE PERMITS AND INSPECTIONS AS REQUIRED.21.

LOW LEVEL AUDIO CABLES, CONTROL CABLES, VIDEO CABLES AND HIGH LEVEL SPEAKER CABLES SHALLBE ROUTED IN SEPARATE GALVANIZED STEEL CONDUITS, EACH WITH A MINIMUM OF 6" SPACING. VERIFYIN WRITING THE COMBINING OF HOME RUN CABLES WITH THE AUDIOVISUAL DESIGN CONSULTANT PRIORTO INSTALLATION.

22.

ALL AUDIOVISUAL SYSTEMS CABLE RUNS MUST BE CONTINUOUS FROM SOURCE TO DESTINATIONWITHOUT SPLICES.

23.

THE CONTRACTOR SHALL PROVIDE LISTED CABLES NON-PLENUM CABLES SHALL BE USED ONLY WHENINSTALLED IN CONDUIT AS REQUIRED BY LOCAL AND NATIONAL CODES AND BY THE AUTHORITY HAVINGJURISDICTION.

24.

THE CONTRACTOR SHALL INSURE THAT ALL ELECTRONIC EQUIPMENT ROOMS BE CLEAN AND DUST FREEPRIOR TO INSTALLATION OF ANY ELECTRONIC EQUIPMENT AND SHALL INSURE THAT THE ROOMSMAINTAIN A CLEAN AND DUST FREE ENVIRONMENT UNTIL TURNED OVER AND ACCEPTED BY THE OWNER.

27.

THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 12" UNOBSTRUCTED ACCESS FROM THE TOP OF ALLAUDIOVISUAL SYSTEM RACKS OR CABINET ASSEMBLIES TO THE BOTTOM OF ALL OVERHEAD CABLE TRAYASSEMBLIES AND 12" FROM THE TOP OF ALL CABLE TRAY ASSEMBLIES TO THE FACILITY FINISHEDCEILING, UNLESS OTHERWISE NOTED.

28.

AUDIOVISUAL SYSTEM RACKS AND CABINETS SHALL HAVE A MINIMUM OF 36" UNOBSTRUCTED CLEARSPACE FOR ACCESS IN FRONT AND REAR. WALL MOUNTED AUDIOVISUAL SYSTEM RACK AND CABINETASSEMBLIES REQUIRE FRONT ACCESS ONLY, UNLESS OTHERWISE NOTED.

29.

THE CONTRACTOR SHALL PROVIDE A SERVICE LOOP NO LESS THAN 10'-0" AT ALL AUDIOVISUAL SYSTEMSRACK LOCATIONS AND NO LESS THAN 3'-0" AT ALL AUDIOVISUAL SYSTEMS PULL AND BREAKOUT BOXES,UNLESS OTHERWISE NOTED.

30.

ALL AUDIOVISUAL SYSTEMS MOUNTING HEIGHTS ARE BY THE INTERIOR DESIGNER OR ARCHITECT.HEIGHT VALUES SHOWN IN THIS DOCUMENT ARE MEANT FOR COORDINATION PURPOSES ONLY.

31.

ALL AUDIOVISUAL SYSTEM DEVICE PLATE FINISHES AND TYPES ARE TO BE VERIFIED IN WRITING BY THEAUDIOVISUAL CONTRACTOR WITH THE ARCHITECT AND/OR INTERIOR DESIGNER.

32.

J-HOOKS SHALL BE LOCATED AT A MAXIMUM OF 5'-0" INTERVALS TO SUPPORT CABLE WEIGHT, AND BEINSTALLED WITH AT LEAST 6" OF CLEAR VERTICAL SPACE ABOVE THE CEILING TO ENSUREACCESSIBILITY.

33.

HORIZONTAL PATHWAYS AND CABLES SHALL NEVER REST DIRECTLY ON OR BE SUPPORTED BYCOMPONENTS OF A SUSPENDED CEILING, AIR DUCTING, WATER OR ELECTRICAL PIPING, LIGHTING, ORANY OTHER BUILDING ELEMENT NOT SPECIFICALLY INTENDED FOR LOW VOLTAGE CABLING.

34.

GENERAL NOTES (CONT'D)

LOW VOLTAGE GROUNDING SYSTEM SHALL CONFROM THE THE TIA 607 STANDARD.35.

CONTRACTOR SHALL PROVIDE LISTED FIRESTOPPING FOR ALL TELECOM/LOW VOLTAGE CONDUITS ANDCABLES, REFER TO SPECIFICATION.

36.

ALL CABLING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS. EMT FITTINGS SHALL BE MALLEABLEIRON OR STEEL. CONNECTORS SHALL BE INSULATED THROAT TYPE.

37.

ALL TELEPHONE TERMINAL BACKBOARDS SHALL BE 3/4" x 8'-0" (H) VOID FREE FIRE RETARDANT ACPLYWOOD.

38.

CONDUIT/PATHWAY ROUTING INDICATED ON DRAWINGS IS FOR GENERAL REFERENCE ONLY.CONTRACTOR SHALL FIELD COORDINATE AND VERIFY EXACT ROUTING AS REQUIRED.

39.

TELECOMMUNICATIONS CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR TO ENSURECONDUIT ROUTING FOR TELEPHONE AND DATA DOES NOT RESULT IN CABLE LENGTHS IN EXCESS OF 295FEET.

40.

CONDUIT GREATER THAN 1-1/4" WILL REQUIRE A JUNCTION BOX SIZED PER THE NEC.41.

UNLESS SPECIFICALLY INDICATED OTHERWISE, CONDUIT SHALL NOT EXTEND FROM TR TO MORE THANTHREE OUTLET BOXES.

42.

INSTALLATION SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THEARCHITECT.

43.

CONTRACTOR SHALL REFER TO SPECIFICATION FOR ADDITIONAL PROJECT REQUIREMENTS.SPECIFICATIONS SUPERSEDE DRAWING INFORMATION.

44.

WORK, MATERIAL AND EQUIPMENT SHALL CONFORM TO THE LATEST EDITIONS OF LOCAL, STATE ANDNATIONAL CODES AND ORDINANCES.

45.

ALL LOW VOLTAGE SYSTEMS COMPONENTS SHALL BE LISTED OR LABELED BY UL OR OTHERRECOGNIZED TESTING FACILITY.

46.

ALL CABLING SHALL BE COMPLETE, OPERABLE, TESTED (END TO END) IN ACCORDANCE WITH THEAPPLICABLE TIA/EIA STANDARDS FOR THE SPECIFIC MEDIA INVOLVED.

47.

COORDINATE WITH ARCHITECT AND INTERIOR DESIGN FOR EXACT LOCATION, ELEVATION AND COLORREQUIREMENTS OF OUTLETS/FACEPLATES.

48.

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

MC

MU

RD

O S

TATI

ON

BL 0

10: I

T&C

PR

IMAR

Y O

PS F

ACIL

ITY

9/22/2016 4:15:54 PM C:\Users\brad.twitchell\Documents\USAP-160604-TC-DM2016_brad.twitchell.rvt

T-001

GENERAL NOTES

BRT

LLM

9/23/16

160604MCM010

TELE

CO

M

160604MCM010T-001-RA

A09

/23/

2016

30%

DES

IGN

SU

BMIT

TAL

Page 39: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

MC

MU

RD

O S

TATI

ON

BL 0

10: I

T&C

PR

IMAR

Y O

PS F

ACIL

ITY

9/22/2016 4:15:58 PM C:\Users\brad.twitchell\Documents\USAP-160604-TC-DM2016_brad.twitchell.rvt

T-002

ABBREVIATIONS

BRT

LLM

9/23/16

160604MCM010

TELE

CO

M

160604MCM010T-002-RA

ABBREVIATIONS - COMMUNICATIONS

UL UNDERWRITERS' LABORATORIES, INC.UNO UNLESS NOTED OTHERWISEUPS UNINTERRUPTABLE POWER SUPPLYUTP UNSHIELDED TWISTED PAIRUTP3 CATEGORY 3, 4 PR UTP NONPLENUM CABLE or CATEGORY 3, 4 PR

UTP CABLEUTP3P CATEGORY 3, 4 PR UTP PLENUM CABLEUTP5E CATEGORY 5, 4 PR ENHANCED UTP NONPLENUM CABLE or

CATEGORY 5E, 4 PR UTP CABLEUTP5EP CATEGORY 5, 4 PR ENHANCED UTP PLENUM CABLEUTP6 CATEGORY 6, 4 PR UTP NONPLENUM CABLE or CATEGORY 6, 4 PR

ENHANCED UTP CABLEUTP6P CATEGORY 6, 4 PR UTP PLENUM CABLE

VCT VINYL COMPOSITION TILEVGA VIDEO GRAPHICS ARRAYVP VAPORPROOF

W WALL PHONEWW WIDE/WIDTHW/ WITHW/O WITHOUTWA WORK AREAWAN WIDE AREA NETWORKWAP WIRELESS ACCESS POINTWLAN WIRELESS LOCAL AREA NETWORKWM WIRE MANAGERWP WEATHERPROOF (NEMA 3R)WT WEIGHT

8.3/250-OFNR

SINGLE-MODE, GEL-FILLED LOOSE TYPE, FIBER OPTIC CABLEFOR INDOOR AND OUTDOOR APPLICATIONS, OFNR RATED

8.3/900 SINGLE-MODE, TIGHT BUFFERED, FIBER OPTIC CABLE FORBUILDING INSTALLATION

50/250 MULTIMODE, GEL-FILLED LOOSE TUBE, FINBER OPTIC CABLE FORUNDERGROUND CONDUIT INSTALLATION

50/250-OFNR

MULTIMODE, GEL-FILLED LOOSE TUBE, FIBER OPTIC CABLE FORINDOOR AND OUTDOOR APPLICATIONS, OFNR RATED

50/900 MULTIMODE, TIGHT BUFFERED, FIBER OPTIC CABLE FORINDOOR/OUTDOOR INSTALLATION

50/900-OFNR

MULTIMODE, TIGHT BUFFERED, FIBER OPTIC CABLE, OFNRRATED

50/900P MULTIMODE, TIGHT BUFFERED PLENUM FIBER OPTIC CABLE FORINDOOR/OUTDOOR INSTALLATION

50/900-OFCR

MULTIMODE, TIGHT BUFFERED, FIBER OPTIC CABLE, WITH SPIRALWOUND INTERLOCKING ALUMINUM ARMOR - OFCR RATED

62.5/250 MULTIMODE, GEL-FILLED LOOSE TUBE, FIBER OPTIC CABLE FORUNDERGROUND CONDUIT INSTALLATION

62.5/900 MULTIMODE, TIGHT BUFFERED, FIBER OPTIC CABLE FORINDOOR/OUTDOOR INSTALLATION

62.5/900P MULTIMODE, TIGHT BUFFERED, PLENUM FIBER OPTIC CABLE FORINDOOR/OUTDOOR INSTALLATION

ABBREVIATIONS - COMMUNICATIONS

OFCI OWNER FURNISHED, CONTRACTOR INSTALLEDOFOI OWNER FURNISHED, OWNER INSTALLEDOIT OPERATOR INTERFACE TERMINALOM3 OPTICAL MULTIMODE FIBER GRADE 3OM4 OPTICAL MULTIMODE FIBER GRADE 4OS2 OPTICAL SINGLEMODE FIBER GRADE 2OSP OUTSIDE PLANTOTDR OPTICAL TIME DOMAIN REFLECTOMETER

PA PUBLIC ADDRESS SYSTEM, AUDIO POWER AMPLIFIERPABX PRIVATE AUTOMATIC BRANCH EXCHANGEP/N PART NUMBERPB PULL BOXPBX PRIVATE BRANCH EXCHANGEPGM PROGRAMPLC PROGRAMMABLE LOGIC CONTROLLERPOTS PLAIN OLD TELEPHONE SERVICEPM PROJECT MANAGERPNL PANELPOS POINT OF SALESPR PAIRPSI POUNDS PER SQUARE INCHPVC POLYVINYL CHLORIDE

QTY QUANTITY

R RISER(R) RELOCATERCPT RECEPTACLEREF REFERENCEREQD REQUIREDRF RADIO FREQUENCYRFI REQUEST FOR INFORMATIONRGBHV RED, GREEN, BLUE, HORIZONTAL, VERTICAL SIGNALRGS RIGID GALVANIZED STEELRH RELATIVE HUMIDITYRM ROOMRU RACK UNIT(S)

S SPEAKERSATV SATELLITE TELEVISIONSC TYPE OF FIBER OPTIC CONNECTORSCC SATELLITE COMMUNICATIONS CABINETSCH SCHEDULESCP SECURITY CONTROL PANELSCR SATELLITE COMMUNICATIONS ROOMSDC SERVICES DURING CONSTRUCTIONSDI SERIAL DIGITAL INTERFACESE STATION EQUIPMENTSECT SECTIONSEG SEGMENTSHT SHEETSIB STRUCTURAL ISOLATION BREAKSIM SIMILARSM SINGLE MODE OPTICAL FIBERSMATV SATELLITE MASTER ANTENNA TELEVISIONSMPTE SOCIETY OF MOTION PICTURE AND TELEVISION ENGINEERSSPEC SPECIFICATIONSRL SIGNAL RETURN LOSSSS STAINLESS STEELST TYPE OF FIBER OPTIC CONNECTORSTD STANDARDSTL STEELSTP SHIELDED TWISTED PAIRSTRUCT STRUCTURALSUR SURFACESW SWITCHSYM SYMMETRICAL

TB TERMINAL BLOCKTC TELECOMMUNICATIONS CLOSETTBD TO BE DETERMINEDTGB TELECOMMUNICATIONS GROUNDING BUSBARTIA TELECOMMUNICATIONS INDUSTRY ASSOCIATIONTMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBARTO TELECOMMUNICATIONS OUTLETTP TRANSITION POINTTR TELECOMMUNICATIONS ROOMTV TELEVISIONTYP TYPICAL

UHF ULTRA HIGH FREQUENCY

ABBREVIATIONS - COMMUNICATIONS

FMS FACILITY MANAGEMENT SYSTEMSFO FIBER OPTICFPD FLAT PANEL DISPLAYFT FOOT/FEET

G,GND GROUNDGALV GALVANIZEDGHZ GIGAHERTZ

H HORNHAC HOT AISLE CONTAINMENTHC HORIZONTAL CROSS-CONNECTHDMI HIGH DEFINITION MULTIMEDIA INTERFACEHDTV HIGH DEFINITION TELEVISIONHH HANDHOLEHORZ HORIZONTALHMI HUMAN MACHINE INTERFACEHT HEIGHTHV HIGH VOLTAGEHVAC HEATING, VENTILATING & AIR CONDITIONING

I/O INPUT/OUTPUTI&C INSTRUMENTATION AND CONTROLIAW IN ACCORDANCE WITHIC INTERMEDIATE CROSS-CONNECTICOM INTERCOMID INSIDE DIAMETERIDF INTERMEDIATE DISTRIBUTION FRAMEIEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERSIMC INTERMEDIATE METALLIC CONDUITIN INCH/INCHESISDN INTEGRATED SERVICES DIGITAL NETWORKISO INTERNATIONAL STANDARDS ORGANIZATIONIT INFORMATION TECHNOLOGIES

LAN LOCAL AREA NETWORKLED LIGHT EMITTING DIODELMC LIQUIDTIGHT FLEXIBLE METAL CONDUITLNC LIQUIDTIGHT FLEXIBLE NONMETALLIC CONDUITLV LOW VOLTAGELSS LIFE SAFETY SYSTEMS

MATL MATERIALMAU MULTISTATION ACCESS UNITMAX MAXIMUMMC MAIN CROSS-CONNECTMCR MAIN COMMUNICATIONS ROOMMECH MECHANICALMEZZ MEZZANINEMFR MANUFACTURERMH MAINTENANCE HOLEMHz MEGAHERTZMIC MICROPHONEMIN MINIMUMMISC MISCELLANEOUSMM MULTIMODE OPTICAL FIBERMON MONITORMPEG MOVING PICTURES EXPERT GROUP STANDARDMPO, MPT TYPE OF FIBER OPTIC CONNECTORMT, MTD MOUNT, MOUNTEDMTL METAL

(N) NEWNA NOT APPLICABLENC NO CONNECTIONNEC NATIONAL ELECTRIC CODENEMA NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATIONNEXT NEAR END CROSS TALKNFPA NATIONAL FIRE PROTECTION ASSOCIATIONNIC NOT IN CONTRACTNIP NOT IN PROJECTNP NAMEPLATENTS NOT TO SCALENTSC NATIONAL TELEVISION SYSTEMS COMMITTEE VIDEO STANDARD

OC ON CENTEROD OUTSIDE DIAMETEROFCI OWNER FURNISHED, CONTRACTOR INSTALLEDOFCP OPTIC FIBER CONDUCTIVE PLENUMOFCR OPTIC FIBER CONDUCTIVE RISEROFE OWNER FURNISHED EQUIPMENTOFNR OPTIC FIBER NONCONDUCTIVE RISER

ABBREVIATIONS - COMMUNICATIONS

ADA AMERICANS WITH DISABILITIES ACTAFC ABOVE FINISHED CEILINGAFF ABOVE FINISHED FLOORAIA AMERICAN INSTITUTE OF ARCHITECTSANMW GEL-FILLED UNDERGROUND CABLEANSI AMERICAN NATIONAL STANDARDS INSTITUTEAL ALUMINUMAP ACCESS POINTAPC ANGLED POLISHED CONNECTORARF ABOVE RAISED FLOORARMM AIR-FILLED UTP RISER CABLEASP ALUMINUM STEEL POLYETHYLENEASTM AMERICAN SOCIETY FOR TESTING AND MATERIALSAV AUDIO VISUALAWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEMBC BARE COPPERBCR BUILDING COMMUNICATIONS ROOMBICSI BUILDING INDUSTRY CONSULTING SERVICES INTERNATIONALBLDG BUILDINGBOC BOTTOM OF CONDUITBOM BILL OF MATERIALSBOT BOTTOM OF TRAYBOW BOTTOM OF WIREWAY

C CONDUITCATV COMMUNITY ANTENNA TELEVISIONCB CIRCUIT BREAKERCC CONTROL CABLECCTV CLOSED CIRCUIT TELEVISIONCFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLEDCFOI CONTRACTOR FURNISHED, OWNER INSTALLEDCIM COMMUNICATIONS INTERFACE MODULECKT CIRCUITCLG CEILINGCONC CONCRETECONT CONTINOUSCOORD COORDINATECMP COMMUNICATIONS PLENUMCMU CONCRETE MASONARY UNITCP CONSOLIDATION POINTCR COMPUTER ROOMCRS COATED RIGID STEEL CONDUIT

D DISPLAY BOARD (SIGN)DAS DISTRIBUTED ANTENNA SYSTEMdB DECIBELDBS DIGITAL BROADCAST SYSTEMDDC DIRECT DIGITAL CONTROLDIA DIAMETERDIM DIMENSIONDIV DIVISIONDN DOWNDTE DATA TERMINAL EQUIPMENTDTL DETAILDWG DRAWING

EA EACHEC ELECTRICAL CONTRACTOREF ENTRANCE FACILITYEL, ELEV ELEVATIONELEC ELECTRICEM EMERGENCYEMC ELECTROMAGNETIC COMPATIBILITYEMI ELECTROMAGNETIC INTERFERENCEEMT ELECTRICAL METALLIC TUBINGENET ETHERNET NETWORKENT ELECTRICAL NON-METALLIC TUBINGEPMS ELECTRICAL POWER MONITORING SYSTEMER EQUIPMENT ROOMEQ EQUAL(E), EX EXISTING

(F) FUTUREFA FIRE ALARMFBO FURNISHED BY OTHERSFCS FACILITY CONTROL SYSTEMFDR FEEDERFDU FIBER OPTIC DISTRIBUTION UNITFLEX FLEXIBLE NONMETALLIC CONDUITFLR FLOOR

FOR REFERENCE. NOT ALLABBREVIATIONS ARE USED.

A09

/23/

2016

30%

DES

IGN

SU

BMIT

TAL

Page 40: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

LEVEL 2

LEVEL 1

TR-208A

24 SM FIBERTO ROUTE FROM DATA CENTER

TO TR-118 THROUGH NODE 6

TR - 118 NODE 6

DATA CENTER

1728 SM FIBERFOR OSP NODE CABLING

24 SM FIBER

288 STRAND TO NODE 5 (POINT TO POINT)(2) 288 STRAND TO NODE 4 (LOOP 'A')144 STRAND TO NODE 3 (POINT TO POINT)

288 STRAND TO NODE 11 (LOOP 'B')144 STRAND TO NODE 9 (POINT TO POINT)

288 STRAND TO NODE 10 (LOOP 'B')

PHAS

E 2

PHAS

E 1

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

MC

MU

RD

O S

TATI

ON

BL 0

10: I

T&C

PR

IMAR

Y O

PS F

ACIL

ITY

9/22/2016 4:16:22 PM C:\Users\brad.twitchell\Documents\USAP-160604-TC-DM2016_brad.twitchell.rvt

T-200

TELECOM RISER DIAGRAM

BRT

LLM

9/23/16

160604MCM010

TELE

CO

M

160604MCM010T-200-RA

- NONE1 TELECOM RISER DIAGRAM

A09

/23/

2016

30%

DES

IGN

SU

BMIT

TAL

Page 41: NO R C P BL010: IT&C PRIMARY OPS FACILITY R D P 30% … · 10/6/2016 5:59:17 pm f:\projcur\lockheed martin-it&c primary ops\cadd\cadd\revit\usap-160604-ar-dm2016-central - reece.rvt

CREL

CREL

TCTC

ELCR

ELCR

WAPWAP

TC

TCTCEL

CR

S1

S1

S1

S1FPD2

FPD2

FPD2

FPD2

FPD2

FPD2

FPD2

FPD2

CCC

CCC

CCC

CCC

F

G

12 13

TELECOMMROOM

118WW

COMMSNODE &

TELECOM117

E

F

G

10 11 12 13

WWW

HOT AISLEHOT AISLEHOT AISLE

COLD AISLE20 CABINETS FOR USAP/NSF

HOT AISLEHOT AISLEHOT AISLE

COLD AISLE22 CABINETS FORNOAA/NASA/JPSS

COLD AISLE12 CABINETS FOR

SPAWAR

E

F

G

H

1 2

BACKUPMISSIONSCOMMS

216

INCHES

CENTIMETERS1 2 3 4 5 6

D

C

B

A

8

FOR REVIEW ONLY - NOT FOR CONSTRUCTION

7654321

PRELIMINARY DRAWING SHEET NUMBER:

SHEET TITLE:DATE CHECKED:DRAWN BY:DESIGNED BY:

FILE NAME:

PROJECT NUMBER:

WAS

HIN G

TON,

D.C

. NS

FC O

NTRA

C T O

PP.

0000

373

OFF

ICE

OF

PO

LAR

PRO

GRA

MS

FOU

ND

ATIO

NN

ATIO

NAL

SC

IEN

CE

740 0

Sou

th T

u cso

n W

ayC

ente

nnia

l, C

olor

ado

801 1

2 - 3

938

USA

303

- 790

- 86

0680

0 - 6

88 -

8606

REV

ISIO

N L

OG

REV.

DATE

DES C

RIPT

ION

DFTG

.AP

PD.

1 2

MC

MU

RD

O S

TATI

ON

BL 0

10: I

T&C

PR

IMAR

Y O

PS F

ACIL

ITY

9/22/2016 4:16:28 PM C:\Users\brad.twitchell\Documents\USAP-160604-TC-DM2016_brad.twitchell.rvt

T-401

ENLARGED TELECOMPLANS

BRT

LLM

9/23/16

160604MCM010

TELE

CO

M

160604MCM010T-401-RA

- 1/4" = 1'-0"1 LEVEL 1 - ENLARGED TELECOM & NODE PLANS

- 1/4" = 1'-0"3 LEVEL 2 - ENLARGED DATA CENTER PLAN

18" LADDERTRAY

PLYWOODBACKBOARD

2-POST RACK

19"X45" CABINET

BACKBONE COPPERTERMINATION

GROUNDINGBUSBAR (TGB)

VERTICAL WIREMANAGER (TYP)

18" LADDERTRAY

PLYWOODBACKBOARD

19"X45" CABINET

GROUNDING BUSBAR (TGB)

PLYWOODBACKBOARD

6" X 4" FIBER TRAY

GROUNDINGBUSBAR (TMGB)

CONTAINMENT DOOR/WALL10' X 3' CRAC UNIT (TYP)

24" X 2" LADDER TRAY

24" X 42" EQUIPMENT CABINETS (TYP)

- 1/4" = 1'-0"2 LEVEL 2 - ENLARGED BACKUP MISSION COMMS PLAN

PDC (TYP)

WORKBENCH

WORKBENCH

2 ROWS OF 4FLAT PANEL DISPLAYS

A09

/23/

2016

30%

DES

IGN

SU

BMIT

TAL

N

4 0 4 8

Scale: 1/4 INCH = 1 FOOT