north carolina department of transportation …

39
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS TENTATIVE LETTING: Tuesday, March 16, 2021 Tuesday, December 8, 2020 PLANS DUE: REVIEW DATE: LENGTH TYPE OF WORK DESCRIPTION PROJECT Tuesday, January 26, 2021 PAGE 1 of 2 BR-0042 0.338 C204392 ROCKINGHAM DRAINAGE, GRADING, PAVING, STRUCTURE BRIDGE 116 ON SR 2600 OVER US 29 REPLACE BRIDGE LATEST PRELIMINARY ESTIMATE: $4,800,000 STIP ESTIMATE $0 RALEIGH LETTING (LET) NO PERMITS REQUIRED CONSTRUCTION CONSULTATION (IN) ROW CERTIFICATION (IN) KEVIN FISCHER, N/A, N/A, ERIN CHEELY, N/A, N/A DIVISION 49076.3.1 MI (STATE BRIDGE PROGRAM) EXEMPT BRIDGE 109 OVER GRINDLE CREEK ON SR 1514 (STATON MILL ROAD). BR-0119 0.119 MI DRAINAGE, GRADING, PAVING, 48828.3.1 STRUCTURE FA #: 2020001 C204521 PITT STIP ESTIMATE $1,450,000 LATEST PRELIMINARY ESTIMATE: $1,200,000 RALEIGH LETTING (LET) BUILD GRANT PROJECT 404/401 PERMITS (IN) RIPARIAN BUFFER AUTHORIZATION CONSTRUCTION CONSULTATION (IN) FEMA-NFIP (IN) KEVIN FISCHER, N/A, N/A, DEANNA R. RIFFEY, N/A, KYLE PLEASANT DELAYED FROM: 1/19/2021 TO: 3/16/2021 DESIGN ISSUES I-5711 0.605 DRAINAGE, GRADING, PAVING, SIGNALS, STRUCTURE INTERCHANGE IMPROVEMENTS AT I-40/I-85 AND SR 1007 (MEBANE OAKS ROAD) IN MEBANE 50401.3.GV1 FA #: NHPP-040-4(161)220 C204603 ALAMANCE STIP ESTIMATE $13,824,000 LATEST PRELIMINARY ESTIMATE: $12,000,000 RALEIGH LETTING (LET) NO PERMITS REQUIRED CONSTRUCTION CONSULTATION (IN) ROW & UTILITY CERTIFICATIONS (IN) MUNICIPAL AGREEMENT (IN) UTILITY AGREEMENT (IN) LAURA SUTTON, N/A, N/A, MICHAEL A. TURCHY, MIKE H. STEELMAN, C. DAYTON MARTIN STATEWIDE MI

Upload: others

Post on 28-Mar-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

DIVISION OF HIGHWAYS
Tuesday, December 8, 2020PLANS DUE:
REVIEW DATE:
Tuesday, January 26, 2021 PAGE 1 of 2
BR-0042 0.338
BRIDGE
RALEIGH LETTING (LET)
ROW CERTIFICATION (IN)
DIVISION
49076.3.1
MI
(STATON MILL ROAD).
48828.3.1 STRUCTURE
FA #: 2020001
RALEIGH LETTING (LET)
BUILD GRANT PROJECT
CONSTRUCTION CONSULTATION (IN)
KEVIN FISCHER, N/A, N/A, DEANNA R. RIFFEY, N/A, KYLE PLEASANT
DELAYED FROM: 1/19/2021 TO: 3/16/2021 DESIGN ISSUES
I-5711 0.605 DRAINAGE, GRADING, PAVING,
SIGNALS, STRUCTURE
SR 1007 (MEBANE OAKS ROAD) IN MEBANE50401.3.GV1
FA #: NHPP-040-4(161)220
RALEIGH LETTING (LET)
ROW & UTILITY CERTIFICATIONS (IN)
MUNICIPAL AGREEMENT (IN) UTILITY AGREEMENT (IN)
LAURA SUTTON, N/A, N/A, MICHAEL A. TURCHY, MIKE H. STEELMAN, C. DAYTON MARTIN
STATEWIDE
MI
DIVISION OF HIGHWAYS
Tuesday, December 8, 2020PLANS DUE:
REVIEW DATE:
Tuesday, January 26, 2021 PAGE 2 of 2
W-5600 0.000
CONVERT TO FREEWAY WITH INTERCHANGES
AT SR 1501 (SWIFT CREEK ROAD) AND SR 1919
(WILSON'S MILLS ROAD)
STIP ESTIMATE $77,000,000
50056.3.1
STRUCTURE NOS. 440112 AND 440108
LATEST PRELIMINARY ESTIMATE: $17,500,000
STIP ESTIMATE $0
15BPR.20
MI
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
RESURFACING AND ADD-ON PROJECTS LETTING DATE: March 16, 2021 PLAN TURN-IN DATE: January 19, 2021 UPDATED 1/26/2021
PROJECT LENGTH TYPE DESCRIPTION
27.77 mi. Milling, Resurfacing, and Shoulder Grading
19 sections of secondary roads
2021CPT.08.09.20191 Div. 8 Chatham County
26.475 mi. Milling, Resurfacing, and Shoulder Grading
64 sections of secondary roads
2021CPT.05.26.20931.1 2021CPT.05.26.20911.1 Div. 5 Warren and Vance Counties
23.646 mi. Milling, Resurfacing, and Shoulder Grading
22 sections of secondary roads
2021CPT.08.10.10761 2021CPT.08.10.20761 Div. 8 Randolph County
11.76 mi. Milling, Resurfacing, and Shoulder Grading
3 sections of US 64 3 sections of secondary roads
2021CPT.10.12.20901 Div. 10 Union County
7.04 mi. Milling, Resurfacing, and Shoulder Grading
12 sections of secondary roads
2021CPT.10.13.10901 2021CPT.10.13.20901 2021CPT.10.13.20902 Div. 10 Union County
19.75 mi. Milling, Resurfacing, and Shoulder Grading
2 sections of NC 207 19 sections of secondary roads
2021CPT.09.05.10341 2021CPT.09.06.20341 Div. 9 Forsyth County
19.567 mi. Milling, Resurfacing, and Shoulder Grading
2 sections of US 311 6 sections of secondary roads
2021CPT.05.14.10911.1 2021CPT.05.14.20911.1 2021CPT.05.14.20912.1 Div. 5 Vance County
26.915 mi. Milling, Resurfacing, and Shoulder Grading
2 sections of US 158 40 sections of secondary roads
2021CPT.05.16.20731.1 Div. 5 Person County
27.032 mi. Milling, Resurfacing, and Shoulder Grading
11 sections of secondary roads
2022CPT.14.01.10561 Div. 14 Macon County
8.63 mi. Milling and Resurfacing 1 section of US 23/441
BR-0119 48828.3.1 Pitt County
Bridge 109 on SR 1514 over Grindle Creek
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
Tuesday, January 12, 2021PLANS DUE:
REVIEW DATE:
Tuesday, March 2, 2021 PAGE 1 of 3
B-4414 0.189
LATEST PRELIMINARY ESTIMATE: $2,750,000STIP ESTIMATE $0
RALEIGH LETTING (LET)
FEMA-NFIP (IN)
KEVIN FISCHER, KRISTY ALFORD, N/A, JASON L. DILDAY, SPENCER JENNINGS, KYLE PLEASANT
38358.3.1
MI
RAILROAD ON US 17 BUS.; PRESERVATION OF
BRIDGE NO. 25 ON US 17 BUS. OVER PAMLICO
RIVER (COMB W/15BPR.42)
46016.3.1
MI
ROW CERTIFICATION (IN)
RAILROAD AGREEMENT (IN)
DELAYED FROM: 3/16/2021 TO:4/20/2021 UTILITY ISSUES
COMBINED PROJECT: B-5302, 15BPR.42 UNDER ONE CONTRACT, WBS: 46016.3.1 / 15BPR.42
REGIONAL
SUBSTRUCTURE REPAIRS BEAUFORT COUNTY,
STR 60025. (COMB W/B-5302)
LATEST PRELIMINARY ESTIMATE: $2,700,000
STIP ESTIMATE $0
RAILROAD AGREEMENT (IN)
RALEIGH LETTING (LET)
COMBINED PROJECT: B-5302, 15BPR.42 UNDER ONE CONTRACT, WBS: 46016.3.1 / 15BPR.42
DELAYED FROM: 3/16/2021 TO: 4/20/2021 UTILITY ISSUES
BR-0011 0.224
DRAINAGE, GRADING, PAVING,
LATEST PRELIMINARY ESTIMATE: $2,350,000
STIP ESTIMATE $0
DIVISION OF HIGHWAYS
Tuesday, January 12, 2021PLANS DUE:
REVIEW DATE:
Tuesday, March 2, 2021 PAGE 2 of 3
BR-0014 0.273
DRAINAGE, GRADING, PAVING,
CREEK. REPLACE BRIDGE.
STIP ESTIMATE $0
STATEWIDE
(BROOKSHIRE BOULEVARD) TO I-77
LATEST PRELIMINARY ESTIMATE: $21,000,000
STIP ESTIMATE $20,000,000
45888.3.1
CERTIFICATION UTILITY CERTIFICATION (IN) ROW CERTIFICATION (REQUIRED)
REGIONAL
INTERCHANGE IMPROVEMENTS IN
LATEST PRELIMINARY ESTIMATE: $51,700,000
STIP ESTIMATE $51,700,000
RALEIGH LETTING (LET)
DIVISION
BOULEVARD) FROM SR 1437 (VIRGIL AVENUE)
TO US 74/76
STIP ESTIMATE $0
41499.3.3
MI
DIVISION OF HIGHWAYS
Tuesday, January 12, 2021PLANS DUE:
REVIEW DATE:
Tuesday, March 2, 2021 PAGE 3 of 3
R-5797 0.892
REGIONAL
LATEST PRELIMINARY ESTIMATE: $27,500,000
STIP ESTIMATE $27,500,000
44997.3.1
MI
(IN)
EXEMPT
BELTWAY, EASTERN SECTION US 421/ NC 150/
BUSINESS 40 TO US 158. STREAM RELOCATION.
LATEST PRELIMINARY ESTIMATE: $10,000,000
STIP ESTIMATE $0
34839.3.12
REGIONAL
LATEST PRELIMINARY ESTIMATE: $2,600,000
JASON P. GALLOWAY, N/A, N/A, DEANNA R. RIFFEY, N/A, N/A
STIP ESTIMATE $2,600,000
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, February 9, 2021PLANS DUE:
REVIEW DATE:
Tuesday, March 30, 2021 PAGE 1 of 2
B-4407 0.647
DRAINAGE, GRADING, PAVING,
LATEST PRELIMINARY ESTIMATE: $7,000,000
KEVIN FISCHER, N/A, N/A, ERIN CHEELY, ROGER M. GARRETT, AGDUPREEYORK
STIP ESTIMATE $0
STRUCTURE
CONSTRUCTION CONSULTATION (REQUIRED) FEMA-NFIP (IN)
KEVIN FISCHER, KRISTY ALFORD, N/A, JASON L. DILDAY, SPENCER JENNINGS, KYLE PLEASANT
40134.3.1
MI
(STATE BRIDGE PROGRAM)
RALEIGH LETTING (LET)
CONSULTATION (REQUIRED)
REPLACE BRIDGE 152 OVER NEUSE RIVER
OVERFLOW ON SR 1389 (HARDY BRIDGE ROAD)
LATEST PRELIMINARY ESTIMATE: $7,100,000
KEVIN FISCHER, N/A, N/A, DEANNA R. RIFFEY, N/A, KYLE PLEASANT
STIP ESTIMATE $7,100,000
B-5626 0.180
DRAINAGE, GRADING, PAVING,
LATEST PRELIMINARY ESTIMATE: $2,100,000
KEVIN FISCHER, KRISTY ALFORD, N/A, DEANNA R. RIFFEY, N/A, KYLE PLEASANT
STIP ESTIMATE $0
DIVISION OF HIGHWAYS
Tuesday, February 9, 2021PLANS DUE:
REVIEW DATE:
Tuesday, March 30, 2021 PAGE 2 of 2
B-5666 0.290
DRAINAGE, GRADING, PAVING,
LINE RAILROAD ON US 117
LATEST PRELIMINARY ESTIMATE: $3,400,000
KEVIN FISCHER, KRISTY ALFORD, N/A, DEANNA R. RIFFEY, SPENCER JENNINGS, KYLE PLEASANT
STIP ESTIMATE $3,400,000
RAILROAD AGREEMENT (PENDING)
RALEIGH LETTING (LET)
DRAINAGE, GRADING, PAVING,
ON NC 109
KEVIN FISCHER, N/A, N/A, ERIN CHEELY, ROGER M. GARRETT, AGDUPREEYORK
STIP ESTIMATE $0
BR-0017 0.152
DRAINAGE, GRADING, PAVING,
ROCKFISH CREEK
STIP ESTIMATE $0
RALEIGH LETTING (LET)
WILDCAT SWAMP IN NORTHAMPTON COUNTY
LATEST PRELIMINARY ESTIMATE: $800,000
STIP ESTIMATE $0
DIVISION OF HIGHWAYS
Tuesday, April 27, 2021
REVIEW DATE:
PAGE 1 of 2
DRAINAGE, GRADING, PAVING,
NC 73
STIP ESTIMATE $4,300,000
STATEWIDE
(HALIFAX ROAD) (COMB W/BR-0036 & BR-0039).
LATEST PRELIMINARY ESTIMATE: $15,600,000
STIP ESTIMATE $15,600,000
UTILITY AGREEMENT (IN)
47617.3.1
COMBINED PROJECT: B-5980, BR-0036, BR-0039 UNDER ONE CONTRACT, WBS: 47617.3.1 / 67036.3.2 / 67039.3.2 (EACH PROJECT USES ITS OWN WBS)
BR-0036 0.250
REGIONAL
BRIDGE (COM B W/B-5980 & BR-0039).
LATEST PRELIMINARY ESTIMATE: $4,700,000
STIP ESTIMATE $4,700,000
RALEIGH LETTING (LET)
COMBINED PROJECT: B-5980, BR-0036, BR-0039 UNDER ONE CONTRACT, WBS: 47617.3.1 / 67036.3.2 / 67039.3.2 (EACH PROJECT USES
ITS OWN WBS)
DIVISION
BRIDGE. (COMB W/B-5980 & BR-0036)
LATEST PRELIMINARY ESTIMATE: $5,200,000
STIP ESTIMATE $5,200,000
RALEIGH LETTING (LET)
COMBINED PROJECT: B-5980, BR-0036, BR-0039 UNDER ONE CONTRACT, WBS: 47617.3.1 / 67036.3.2 / 67039.3.2 (EACH PROJECT USES
ITS OWN WBS)
DIVISION OF HIGHWAYS
Tuesday, April 27, 2021
REVIEW DATE:
PAGE 2 of 2
REPLACE BRIDGE.
STIP ESTIMATE $0
LATEST PRELIMINARY ESTIMATE: $25,900,000
STIP ESTIMATE $25,900,000
34466.1.5
CONSULTATION (REQUIRED)
TO US 158 (CROATAN HIGHWAY) IN KILL DEVL
HILLS, OPERATIONAL-SAFETY IMPROVEMENTS
LATEST PRELIMINARY ESTIMATE: $16,100,000
JENNIFER A. EVANS, KRISTY ALFORD, N/A, JASON L. DILDAY, SPENCER JENNINGS, VACANT
STIP ESTIMATE $16,100,000
UTILITY AGREEMENT (IN)
RALEIGH LETTING (LET)
N/A 0.113
DRAINAGE, GRADING, PAVING,
1418 (STATON HOUSE ROAD).
LATEST PRELIMINARY ESTIMATE: $625,000
STIP ESTIMATE $0
DIVISION OF HIGHWAYS
Tuesday, April 13, 2021PLANS DUE:
REVIEW DATE:
Tuesday, June 1, 2021 PAGE 1 of 4
B-4863 0.701
CONSULTATION (REQUIRED)
HARKERS ISLAND ON SR 1335 (ISLAND ROAD).
LATEST PRELIMINARY ESTIMATE: $39,900,000
DIVISION DESIGN RALEIGH LET (DDRL)
40212.3.1 (FED), 40212.3.2 (STATE) FA #: BRSTP-1335(4)
C204372
CARTERET
(INCLUDES BUILD NC BONDS)
CONSULTATION (REQUIRED)
RAILROAD ON NC 33
LATEST PRELIMINARY ESTIMATE: $6,900,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION
2555
LATEST PRELIMINARY ESTIMATE: $4,900,000
KEVIN FISCHER, KRISTY ALFORD, N/A, JASON L. DILDAY, MIKE H. STEELMAN, C. DAYTON MARTIN
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DRAINAGE, GRADING, PAVING,
LATEST PRELIMINARY ESTIMATE: $1,200,000
KEVIN FISCHER, KRISTY ALFORD, N/A, GORDON CASHIN, N/A, KYLE PLEASANT
STIP ESTIMATE $0
DIVISION OF HIGHWAYS
Tuesday, April 13, 2021PLANS DUE:
REVIEW DATE:
Tuesday, June 1, 2021 PAGE 2 of 4
BR-0107 0.092
DRAINAGE, GRADING, PAVING,
TO SNOW CREEK.
STIP ESTIMATE $800,000
RALEIGH LETTING (LET)
LITTLE HUNTING CREEK.
STIP ESTIMATE $1,200,000
DIVISION OF HIGHWAYS
Tuesday, April 13, 2021PLANS DUE:
REVIEW DATE:
Tuesday, June 1, 2021 PAGE 3 of 4
I-5986B 3.456
EXIT 77) TO I-40 (EXIT 81). WIDEN TO EIGHT
LANES HARNETT/JONSTON COUNTIES. (COMB
STIP ESTIMATE $70,800,000
47532.3.3
MI
COMBINED PROJECT: I-5986B, I-5883, I-5878 UNDER ONE CONTRACT, WBS: 47532.3.3
I-5878 2.216
I-95 AT US 421 (EXIT 73) AND SR 1793 (POPE
ROAD) (EXIT 72).IMPROVE INTERCHANGES.
5986B).
STIP ESTIMATE $60,100,000
53078.3.1
MI
COMBINED PROJECT: I-5986B, I-5883, I-5878 UNDER ONE CONTRACT, WBS: 47532.3.3
I-5883 3.201
NORTH OF SR 1709 (HODGES CHAPEL ROAD)
(EXIT 77). IMPROVE INTERCHANGES. WIDEN TO
EIGHT LANES. (COMB W/I-5878 & I-5986B).
LATEST PRELIMINARY ESTIMATE: $78,200,000
STIP ESTIMATE $78,200,000
53083.3.1
MI
COMBINED PROJECT: I-5986B, I-5883, I-5878 UNDER ONE CONTRACT, WBS: 47532.3.3
N/A 0.165
640021.
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, April 13, 2021PLANS DUE:
REVIEW DATE:
Tuesday, June 1, 2021 PAGE 4 of 4
N/A 0.057
DRAINAGE, GRADING, PAVING,
IN WILKES COUNTY.
STIP ESTIMATE $0
17BP.11.R.153
MI
DIVISION OF HIGHWAYS
Tuesday, May 11, 2021PLANS DUE:
REVIEW DATE:
Tuesday, June 29, 2021 PAGE 1 of 1
B-5703 0.176
401
LATEST PRELIMINARY ESTIMATE: $2,150,000
KEVIN FISCHER, KRISTY ALFORD, N/A, JASON L. DILDAY, N/A, KYLE PLEASANT
STIP ESTIMATE $0
ROAD).
KEVIN FISCHER, A. K. PASCHAL, N/A, ERIN CHEELY, N/A, N/A
STIP ESTIMATE $0
RAILROAD AGREEMENT (PENDING)
RALEIGH LETTING (LET)
LATEST PRELIMINARY ESTIMATE: $5,500,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
SECOND PLATFORM, PEDESTRIAN BRIDGE,
SITEWORK, RETAINING WALL, SIGNALLING
STIP ESTIMATE $10,100,000
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, June 15, 2021PLANS DUE:
REVIEW DATE:
Tuesday, August 3, 2021 PAGE 1 of 2
B-5624 0.266
LATEST PRELIMINARY ESTIMATE: $3,150,000
KEVIN FISCHER, KRISTY ALFORD, N/A, GORDON CASHIN, SPENCER JENNINGS, KYLE PLEASANT
STIP ESTIMATE $0
RALEIGH LETTING (LET)
RIVER REPLACE BRIDGE.
STIP ESTIMATE $0
MILEMARKER 167.
STIP ESTIMATE $9,000,000
45873.3.2
ROAD) OVER NS/NCRRRAILROAD AND CLOSURE
AT GRADE CROSSING (NO. 724408Y) IN
KANNAPOLIS AT MILEPOST 350.73
LATEST PRELIMINARY ESTIMATE: $12,450,000
STIP ESTIMATE $12,450,000
RAILROAD AGREEMENT (IN) MUNICIPAL RAIL AGREEMENT (IN) UTILITY AGREEMENT (IN)
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, June 15, 2021PLANS DUE:
REVIEW DATE:
Tuesday, August 3, 2021 PAGE 2 of 2
N/A 0.000
LATEST PRELIMINARY ESTIMATE: $2,482,000
STIP ESTIMATE $0
14SP.20441.2
MI
N/A 0.000
LATEST PRELIMINARY ESTIMATE: $2,328,475
STIP ESTIMATE $0
14SP.20441.1
MI
N/A 0.129
NO. 420052; US 401OVER CAPE FEAR RIVER -
STRUCTURES NO. 420045 AND 420046
LATEST PRELIMINARY ESTIMATE: $2,500,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
RAMP, IRWIN CREEK, CITY STREET -
STRUCTURE NO. 590345.
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, July 13, 2021PLANS DUE:
REVIEW DATE:
Tuesday, August 31, 2021 PAGE 1 of 1
B-4626 1.136 DRAINAGE, GRADING, PAVING,
STRUCTURE
SALEM SOUTHBOUND RAILROAD ON NC 49
(EASTBOUND LANE)
RALEIGH LETTING (LET)
RAILROAD AGREEMENT (PENDING)
KEVIN FISCHER, N/A, N/A, JEFFREY L. HEMPHILL, JUSTIN D. BEAVER, C. DAYTON MARTIN
STATEWIDE
38443.3.3
MI
GREENSBORO ROAD). CONVERT AT-GRADE
STIP ESTIMATE $27,500,000
50195.3.1
MI
REGIONAL
(RAEFORD ROAD) FROM OLD RAEFORD ROAD
TO EAST OF BUNCE ROAD
LATEST PRELIMINARY ESTIMATE: $27,300,000
STIP ESTIMATE $27,300,000
RALEIGH LETTING (LET)
STRUCTURE NO. 780132.
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, August 10, 2021PLANS DUE:
REVIEW DATE:
Tuesday, September 28, 2021 PAGE 1 of 3
B-5318 0.352
SR 2044 (LIGON MILLROAD) IN WAKE FOREST
LATEST PRELIMINARY ESTIMATE: $5,100,000
STIP ESTIMATE $0
46032.3.1
MI
LATEST PRELIMINARY ESTIMATE: $6,200,000
KEVIN FISCHER, KRISTY ALFORD, N/A, WILLIAM A. BARRETT, N/A, C. DAYTON MARTIN
STIP ESTIMATE $0
RALEIGH LETTING (LET)
(HURLEY SCHOOL ROAD)
LATEST PRELIMINARY ESTIMATE: $1,950,000
KEVIN FISCHER, A. K. PASCHAL, N/A, ERIN CHEELY, N/A, C. DAYTON MARTIN
STIP ESTIMATE $1,950,000
RALEIGH LETTING (LET)
EAST OF I-77. BRIDGE REHABILITATION.
LATEST PRELIMINARY ESTIMATE: $8,000,000
STIP ESTIMATE $8,000,000
48234.3.1
DIVISION OF HIGHWAYS
Tuesday, August 10, 2021PLANS DUE:
REVIEW DATE:
Tuesday, September 28, 2021 PAGE 2 of 3
P-5726 0.000
SECOND PLATFORM, PEDESTRIAN UNDERPASS,
SITEWORK, RETAINING WALL, SIGNALLING
STIP ESTIMATE $6,431,000
RALEIGH LETTING (LET)
NC 211 FROM SR 1500 (MIDWAY ROAD) TO NC 87
LATEST PRELIMINARY ESTIMATE: $102,300,000
STIP ESTIMATE $102,300,000
DIVISION DESIGN RALEIGH LET (DDRL) (8 WEEK ADVERTISEMENT)
41582.3.1
ADVANCED FROM: 1/18/2022 TO: 11/16/2021 STRATEGIC LETTING
U-5302 1.153
ROAD) TO SOUTH OF SR 2538 (MECHANICAL
BOULEVARD) IN GARNER. CONVERT TO
SUPERSTREET.
J. HOPKINS, JOHN W. BRAXTON JR, N/A, N/A, N/A, N/A
STIP ESTIMATE $15,700,000
48000.3.1
MI
REGIONAL
FROM I-40/BUSINESS 85 TO SOUTH OF FLORIDA
STREET IN GREENSBORO
LAURA SUTTON, N/A, VACANT, ERIN CHEELY, N/A, C. DAYTON MARTIN
STIP ESTIMATE $3,950,000
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, August 10, 2021PLANS DUE:
REVIEW DATE:
Tuesday, September 28, 2021 PAGE 3 of 3
U-5826 1.207
SR 2006 (DURANTROAD). ADD LANES.
LATEST PRELIMINARY ESTIMATE: $6,500,000
J. HOPKINS, JOHN W. BRAXTON JR, N/A, N/A, N/A, N/A
STIP ESTIMATE $6,500,000
44398.3.1
MI
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
Tuesday, September 14, 2021PLANS DUE:
REVIEW DATE:
Tuesday, November 2, 2021 PAGE 1 of 2
B-5737 0.152
IN EDEN ON NC 700
LATEST PRELIMINARY ESTIMATE: $4,100,000
KEVIN FISCHER, KRISTY ALFORD, N/A, WILLIAM A. BARRETT, N/A, N/A
STIP ESTIMATE $0
UTILITY AGREEMENT (PENDING)
RALEIGH LETTING (LET)
RAILROAD IN RALEIGH
STIP ESTIMATE $15,100,000
RALEIGH LETTING (LET)
ROAD)
BEVERLY G. ROBINSON, DAVID STUTTS, N/A, JEFFREY L. HEMPHILL, VACANT, AGDUPREEYORK
STIP ESTIMATE $104,600,000
RALEIGH LETTING (LET) (8 WEEK ADVERTISEMENT)
34400.3.4
MI
171 TO MULTI-LANES SOUTH OF WILLIAMSTON
LATEST PRELIMINARY ESTIMATE: $65,600,000
STIP ESTIMATE $65,600,000
35494.3.1
MI
DIVISION OF HIGHWAYS
Tuesday, September 14, 2021PLANS DUE:
REVIEW DATE:
Tuesday, November 2, 2021 PAGE 2 of 2
U-2579AB 2.727
(PENDING)
REGIONAL
40 BUSINESS/US 421 * SEE R-2247 FOR
PLANNING DOCUMENT *
LATEST PRELIMINARY ESTIMATE: $211,900,000
PAM R. WILLIAMS, A. K. PASCHAL, N/A, WILLIAM A. BARRETT, N/A, C. DAYTON MARTIN
STIP ESTIMATE $211,900,000
RALEIGH LETTING (LET) (8 WEEK ADVERTISEMENT)
34839.3.GV5
1308 (GUM BRANCH ROAD) FROM WEST OF SR
1313 (MILLS FIELDS ROAD) TO EAST OF SR 1324
(RAMSEY ROAD) IN ONSLOW COUNTY
LATEST PRELIMINARY ESTIMATE: $11,500,000
STIP ESTIMATE $11,500,000
40255.3.3
NO. 270012
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, October 12, 2021PLANS DUE:
REVIEW DATE:
Tuesday, November 30, 2021 PAGE 1 of 2
B-3186 0.000
CREEK ON US 23-74 NBL
LATEST PRELIMINARY ESTIMATE: $6,100,000
STIP ESTIMATE $6,100,000
38332.3.1
COMBINED STRATEGIC LETTING
REPLACE BRIDGE 168 OVER US 19 AND US 23 ON
US 23/US 74
STIP ESTIMATE $3,100,000
48030.3.1
COMBINED STRATEGIC LETTING
LATEST PRELIMINARY ESTIMATE: $6,000,000
STIP ESTIMATE $6,000,000
44990.3.1
MI
(INCLUDES BUILD NC BONDS)
NC 210 TO NORTH OF SR 1563 (SLOOP POINT
LOOP ROAD).
STIP ESTIMATE $116,700,000
40237.3.3
MI
DIVISION OF HIGHWAYS
Tuesday, October 12, 2021PLANS DUE:
REVIEW DATE:
Tuesday, November 30, 2021 PAGE 2 of 2
U-5996 1.185
NORTH OF SR 1770 (EASTERN AVE./SUNSET
AVE.) TO SR 1601 (REGES STORE RD)/ SR 1609
(GREEN HILLS RD.).
STIP ESTIMATE $23,940,000
47133.3.1
MI
NO. 640048 AND 640049
LATEST PRELIMINARY ESTIMATE: $3,500,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, November 9, 2021PLANS DUE:
REVIEW DATE:
Tuesday, December 28, 2021 PAGE 1 of 3
B-5353 0.000
404/401 PERMITS (REQUIRED) CONSTRUCTION CONSULTATION (REQUIRED)
STRUCTURE, RETAINING WALLS BRIDGE 147 OVER US 311 ON US 29/70 AND I-85
BUSINESS (COMB W/U-5896)
LATEST PRELIMINARY ESTIMATE: $3,450,000
LAURA SUTTON, DAVID STUTTS, N/A, JEFFREY L. HEMPHILL, JUSTIN D. BEAVER, C. DAYTON MARTIN
STIP ESTIMATE $0
RALEIGH LETTING (LET)
COMBINED PROJECT: B-5353, U-5896 UNDER ONE CONTRACT, WBS: 46067.3.1 / 44674.3.1 (EACH PROJECT USES ITS OWN WBS)
U-5896 2.072
DIVISION
MAIN STREET) IN HIGH POINT. (COMB W/B-5353).
RECONSTRUCT INTERCHANGE.
STIP ESTIMATE $12,400,000
RALEIGH LETTING (LET)
COMBINED PROJECT: B-5353, U-5896 UNDER ONE CONTRACT, WBS: 46067.3.1 / 44674.3.1 (EACH PROJECT USES ITS OWN WBS)
(INCLUDES BUILD NC BONDS)
LATEST PRELIMINARY ESTIMATE: $1,800,000
STIP ESTIMATE $0
LATEST PRELIMINARY ESTIMATE: $4,000,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
Tuesday, November 9, 2021PLANS DUE:
REVIEW DATE:
Tuesday, December 28, 2021 PAGE 2 of 3
HL-0003 0.000
ROADWAY (INCLUDINGRESURFACING AND
LATEST PRELIMINARY ESTIMATE: $7,724,000
M. T. GIBBS, MCCRAY H. COATES, N/A, N/A, N/A, N/A
STIP ESTIMATE $7,724,000
49467.3.1
MI
ALEXANDER BOULEVARD) TO SR 2667 (SUMMIT
PARK DRIVE) IN SALISBURY WIDEN TO MULTI-
LANES
STIP ESTIMATE $13,000,000
50163.3.1
MI
SR 1406 (PINEY GREENROAD). CONSTRUCT
ROADWAY ON NEW LOCATION
LATEST PRELIMINARY ESTIMATE: $3,250,000
STIP ESTIMATE $3,250,000
44694.3.1
MI
DIVISION OF HIGHWAYS
Tuesday, November 9, 2021PLANS DUE:
REVIEW DATE:
Tuesday, December 28, 2021 PAGE 3 of 3
N/A 0.166
BRIDGE PRESERVATION NC 731 OVER PEE DEE RIVER - STRUCTURE NO.
610006 (COMB W/15BPR.38).
STIP ESTIMATE $0
RALEIGH LETTING (LET)
N/A 0.603
030078 AND 030081 (COMB W/15BPR.21).
LATEST PRELIMINARY ESTIMATE: $2,500,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
N/A 0.047
BRIDGE PRESERVATION US 401 (SKIBO ROAD) OVER SR 1007 (ALL
AMERICAN FREEWAY) - STRUCTURE NO. 250053
LATEST PRELIMINARY ESTIMATE: $1,050,000
STIP ESTIMATE $0
RALEIGH LETTING (LET)
060028; NC 99 OVER PANTEGO CREEK -
STRUCTURE NO. 060077; AND US 17 OVER US
17B AND TAR RIVER - STR 060353 IN BEAUFORT
CO. SR 1565 OVER TAR RIVER - STRUCTURE NO.
730127 S
STIP ESTIMATE $0
RALEIGH LETTING (LET)
BRIDGE PRESERVATION NC 194 OVER NORTH FORK NEW RIVER - STR
040008; SR 1644 OVER NOTH FORK NEW RIVER -
STR 040507; NC 194 OVER BIG HORSE CREEK -
STR 040019; SR 1514 OVER NORTH FORK NEW
RIVER - STR040478
STIP ESTIMATE $0
RALEIGH LETTING (LET)
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
PAGE 1 of 2
STATEWIDE
DRAINAGE, GRADING, PAVING US 74 FROM I-40 IN ASHEVILLE TO I-77 AT I-485
(SOUTH) IN CHARLOTTE. INSTALL
BROADBAND.(COMB W/HO-0002B, HO-0002C, I-
STIP ESTIMATE $18,436,000
WBS) (EACH PROJECT USES ITS OWN FA#)
ADDED TO: 3/26/2021 AND COMBINED STRATEGIC LETTING
HO-0002B 0.000
STATEWIDE
DRAINAGE, GRADING, PAVING US 74 FROM EASTERN END OF MONROE BYPASS
TO I-95 IN LUMBERTON. INSTALL BROADBAND
AND ITS COMPONENTS INCLUDING
CCTV. (COMB W/HO-0002A, HO-0002C, I-5986C &
R-5777D).
STIP ESTIMATE $14,216,000
ADDED TO: 3/26/2021 AND COMBINED STRATEGIC LETTING
HO-0002C 0.000
STATEWIDE
DRAINAGE, GRADING, PAVING US 74 FROM I-95 IN LUMBERTON TO I-40 IN
WILMINGTON. INSTALLBROADBAND. (COMB
STIP ESTIMATE $10,456,000
WBS) (EACH PROJECT USES ITS FA#)
ADDED TO: 3/26/2021 AND COMBINED STRATEGIC LETTING
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
PAGE 2 of 2
CAROLINA STATE LINETO VIRGINIA STATE LINE
(COMB W/HO-0002A, HO-0002B, HO-0002C& R-
5777D).
STIP ESTIMATE $27,667,000
R-5777D 0.000
STATEWIDE
DRAINAGE, GRADING, PAVING US 70 (FUTURE I-42) INSTALL BROADBAND FIBER
FROM I-40 TO MOREHEAD CITY PORT (COMB
W/HO-0002A, HO-0002B, HO-002C & I- 5986C).
LATEST PRELIMINARY ESTIMATE: $19,000,000
STIP ESTIMATE $19,000,000
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
LENGTH DESCRIPTIONPROJECT
N/A 0.000
DRAINAGE, GRADING, PAVING EXPRESS DESIGN BUILD YEAR 8 GROUP A
LATEST PRELIMINARY ESTIMATE: $3,500,000
STIP ESTIMATE $0
17BP.11.R.196
MI
BUILD GRANT STATE MATCH
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
LENGTH DESCRIPTIONPROJECT
B-6015 0.057
(SUGAR LOAF ROAD) (COMB W/B-6018).
LATEST PRELIMINARY ESTIMATE: $700,000
STIP ESTIMATE $700,000
B-6018 0.057
1296 (BROOKS BRANCH ROAD) (COMB W/B-6015).
LATEST PRELIMINARY ESTIMATE: $700,000
STIP ESTIMATE $700,000
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
PAGE 1 of 2
CARTHAGE ROAD) (EXIT 19). IMPROVE
INTERCHANGE. (COMB W/I-6064A, I-6064B & I-
6064C).
STIP ESTIMATE $16,500,000
MI
COMBINED PROJECT: I-6064A, I-6064B, I-6064C, I-5879 UNDER ONE CONTRACT, WBS: USE 49067.3.1 FOR I-6064A; 49067.3.2 FOR I- 6064B; 49067.3.3 FOR I-6064C & I-5879 USE FA# 0095077 FOR I-6064A, I-6064C & I-5879
BUILD GRANT PROJECT
ROAD(EXIT 19). WIDEN ROADWAY. (COMB W/I-
5879, I-6064B, I-6064C).
STIP ESTIMATE $183,700,000
MI
COMBINED PROJECT: I-6064A, I-6064B, I-6064C, I-5879 UNDER ONE CONTRACT, WBS: USE 49067.3.1 FOR I-6064A; 49067.3.2 FOR I-
6064B; 49067.3.3 FOR I-6064C & I-5879 USE FA# 0095077 FOR I-6064A, I-6064C & I-5879
BUILD GRANT PROJECT
STATEWIDE
DRAINAGE, GRADING, PAVING I-95 FROM CARTHAGE ROAD (EXIT 19) TO US
301(FAYETTEVILLE ROAD, EXIT 22). WIDEN
ROADWAY. (COMB W/I-5879, I-6064A, I-6064C).
LATEST PRELIMINARY ESTIMATE: $72,300,000
STIP ESTIMATE $72,300,000
49067.3.2
MI
COMBINED PROJECT: I-6064A, I-6064B, I-6064C, I-5879 UNDER ONE CONTRACT, WBS: USE 49067.3.1 FOR I-6064A; 49067.3.2 FOR I- 6064B; 49067.3.3 FOR I-6064C & I-5879 USE FA# 0095077 FOR I-6064A, I-6064C & I-5879
BUILD GRANT STATE MATCH
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
LENGTH DESCRIPTIONPROJECT
I-6064C 0.000
TYPE OF WORK
PAVEMENT REHABILITATION I-95 FROM MILE MARKER 13 TO MILE MARKER 22.
PAVEMENT REHABILITATION. (COMB W/I-5879, I-
6064A, I-6064B).
STIP ESTIMATE $146,100,000
MI
COMBINED PROJECT: I-6064A, I-6064B, I-6064C, I-5879 UNDER ONE CONTRACT, WBS: USE 49067.3.1 FOR I-6064A; 49067.3.2 FOR I- 6064B; 49067.3.3 FOR I-6064C & I-5879 USE FA# 0095077 FOR I-6064A, I-6064C & I-5879
BUILD GRANT PROJECT
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
LENGTH DESCRIPTIONPROJECT
I-3306A 11.400
INTERCHANGE IMPROVEMENTS
LATEST PRELIMINARY ESTIMATE: $175,600,000
TERESA M. BRUTON, N/A, N/A, MICHAEL A. TURCHY, JUSTIN D. BEAVER, KYLE PLEASANT
STIP ESTIMATE $175,600,000
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
PAGE 1 of 1
STRUCTURE
SERVICE ROAD/COLD SPRINGS CREEK AT
HARMON'S DEN.
STARK, N/A, N/A, N/A, N/A, N/A
STATEWIDE
MI
DIVISION OF HIGHWAYS
TENTATIVE LETTING: Tuesday, October 19, 2021
PAGE 1 of 1
B-6054B 0.000 DRAINAGE, GRADING, PAVING I-40 REPLACE BRIDGE 159 OVER SR 1338 (WHITE
OADK ROAD).
N/A, N/A, N/A, N/A, N/A, N/A
STATEWIDE
MI
B-6054C 0.000 DRAINAGE, GRADING, PAVING I-40 REPLACE BRIDGE 171 OVER SR 1338 (WHITE
OADK ROAD) AND JONATHAN CREEK.
LATEST PRELIMINARY ESTIMATE: $25,000,000
FEMA-NFIP (REQUIRED)
STATEWIDE
MI
DIVISION
COROLLA NCTA PROJECT
STIP ESTIMATE $383,256,000
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
PAGE 1 of 2
1781 (COMB W/B-6011, B-6013 & B-6016).
LATEST PRELIMINARY ESTIMATE: $1,000,000
STIP ESTIMATE $1,000,000
COMBINED PROJECT: B-6011, B-6013, B-6014, B-6016 UNDER ONE CONTRACT, WBS: 48209.3.1 BRZ-1781(001)
B-6011 0.070
(COMB W/B-6014, B-6013 & B-6016).
LATEST PRELIMINARY ESTIMATE: $650,000
STIP ESTIMATE $725,000
COMBINED PROJECT: B-6011, B-6013, B-6014, B-6016 UNDER ONE CONTRACT, WBS: 48209.3.1 BRZ-1781(001)
B-6013 0.067
(COMB W/B-6011, B-6014 & B-6016).
LATEST PRELIMINARY ESTIMATE: $800,000
STIP ESTIMATE $800,000
COMBINED PROJECT: B-6011, B-6013, B-6014, B-6016 UNDER ONE CONTRACT, WBS: 48209.3.1 BRZ-1781(001)
B-6016 0.066
(COMB W/B-6011, B-6013 & B-6014).
LATEST PRELIMINARY ESTIMATE: $500,000
STIP ESTIMATE $700,000
COMBINED PROJECT: B-6011, B-6013, B-6014, B-6016 UNDER ONE CONTRACT, WBS: 48209.3.1 BRZ-1781(001)
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
DESIGN-BUILD PROJECTS
PAGE 2 of 2
BRIDGE REPLACEMENT BRIDGE 020005 ON SR 1133 OVER LITTLE RIVER
IN ALLEGHANY COUNTY.
STIP ESTIMATE $0
17BP.11.R.152
MI
17BP.11.R.161
404/401 PERMITS (REQUIRED)
BRIDGE REPLACEMENT BRIDGE 040029 ON US 221 OVER DOG CREEK IN
ASHE COUNTY.
STIP ESTIMATE $0
17BP.11.R.160
MI
N/A 0.000
BEAVER CREEK IN ASHE COUNTY.
LATEST PRELIMINARY ESTIMATE: $450,000
STIP ESTIMATE $0
17BP.11.R.161
MI
17BP.11.R.161
CREEK IN WILKES COUNTY.
LATEST PRELIMINARY ESTIMATE: $725,000
STIP ESTIMATE $0
17BP.11.R.163
MI
N/A 0.000
BRIDGE REPLACEMENT BRIDGE 960436 ON SR 1943 OVER EAST PRONG
ROARING RIVER IN WILKES COUNTY.
LATEST PRELIMINARY ESTIMATE: $1,340,000
STIP ESTIMATE $0
17BP.11.R.155
MI