Northeast
Trail
November 8, 2018
@atlantabeltline
@atlantabeltline
@atlantabeltline
Vision:
To be the catalyst
for making
Atlanta a global
beacon for
equitable,
inclusive, and
sustainable
city life.
PROGRAM
ELEMENTS
We are here…
Infrastructure Updates
Eastside Trail:
Monroe Drive Plaza
Eastside Trail:
Memorial Drive
Southside Trail:
Interim Trail
Infrastructure Updates
Eastside Trail:
Monroe Drive Plaza
Eastside Trail:
Memorial Drive
Southside Trail:
Interim Trail
Infrastructure Updates
Eastside Trail:
Monroe Drive Plaza
Eastside Trail:
Memorial Drive
Southside Trail:
Interim Trail
Still Here!
Northeast Trail
Project Limits: • Monroe Drive to
MARTA Lindbergh
Scope:• Alternatives Analysis
• Concept Validation
• Locally Preferred Alt
• Engineering and Design
• Construction Documents
Schedule:• LPA by Spring 2019
• CD’s in 2022
Still Here!
Northeast Trail
Project Limits: • Monroe Drive to
MARTA Lindbergh
Scope:• Alternatives Analysis
• Concept Validation
• Locally Preferred Alt
• Engineering and Design
• Construction Documents
Schedule:• LPA by Spring 2019
• CD’s in 2022
Still Here!
Northeast Trail
The Band
https://www.moviemarket.com/the-blues-brothers-299618/
Northeast Trail
Public Challenge #1• Allow for the possibility
of alternative Northeast
Trail and Transit
alignments
Still Here!
Northeast Trail
Systems
Interactions…• Northeast Trail
• Northeast Transit
• Northside Trail
• Northside Transit
• MARTA Armour Station?
• Clifton Corridor LRT
These are all
“defined by
placeholders.”
Northeast Trail
Systems
Interactions…• Northeast Trail cannot
preclude any viable
alternatives along any
Northside BeltLine
Corridor
Northeast Trail
Public Challenge #2• Allow for the possibility
of alternative Northside
Trail and Transit
alignments
Northeast Trail
Network
Connections…• MARTA Red/Gold Lines
• PATH400
• Cheshire Farm Trail
• Confluence Trail
• Peachtree Hills Spur
Northeast Trail
Physical
Constraints…• I-85/Buford Hwy
• MARTA Red/Gold Line
• MARTA Armour Yard
• Norfolk Southern Rail
• CSX Rail
• Peachtree Creek
• Brookwood Hills
Conservation Easement
• Armour Drive
– Under Buford Hwy
– Under
MARTA/NSR
Northeast Trail
So How Do We
Move Forward?!
1. Alternatives Analysis
2. Performance Measures
3. Systems Analysis
– Do Not Preclude…
Northeast Trail
Engagement
Activities…• Performance Measures
• Share Ideas and
Opinions
• Mapping Alignment
Alternatives
Northeast Trail
Performance
Measures…
• Attractiveness
• Comfort
• Connectivity
• Directness
• Implementability
• Your Suggestions?
– Equal Weighting?
– Missing Metrics?
– Scoring System?
Northeast Trail
Thank you!
Beltline.org/engage // [email protected]