Northern Powergrid (Yorkshire) plc, Registered Office: Lloyds Court, 78 Grey Street, Newcastle Upon Tyne NE1 6SFRegistered In England And Wales No. 4112320
Statement of Use of System Charging
Northern Powergrid (Yorkshire) plc
Final Notice
Effective from 1st April 2014
Version 1.0
-
8/9/2019 Northern Power - Yorkshire 2014
2/48
Version Control Version Date Description of version and any changes made
1.0 1 April 2014 This statement is based on version 7.8 of the common
template developed during 2013.
A change-marked version of this statement can be provided upon request.
-
8/9/2019 Northern Power - Yorkshire 2014
3/48
PAGE 3 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Contents
1. Introduction 42. Charge Application and Definitions 6
Supercustomer Billing and Payment 6Supercustomer Charges 6Site-Specific Billing and Payment 7Site-Specific Billed Charges 7Time periods for half-hourly metered properties 8Time periods for half-hourly unmetered properties 9Application of Capacity Charges 9Chargeable Capacity 9Exceeded capacity 9Demand exceeded capacity 9Generation exceeded capacity 10
Standby Capacity for Additional Security on Site 10Minimum Capacity Levels 10Application of charges for excess reactive power 10Demand chargeable reactive power 11Generation chargeable reactive power 11Generation charges for pre-2005 Designated EHV Properties 12Provision of billing data 12Use of System Charges Out of Area 13Licensed Distributor Network Operator (LDNO) charges 13Third party access from exempt distribution networks 13
3. Schedule of Charges for use of the Distribution System 154. Schedule of Line Loss Factors 16
Role of Line Loss Factors in the Supply of Electricity 16Calculation of Line Loss Factors 16Line Loss Factor time periods 16Line Loss Factor tables 16
5. Notes for Designated EHV Properties 18EDCM nodal costs 18Charges for New Designated EHV Properties 18Charges for amended Designated EHV Properties 18Demand Side Management 18
6. Electricity Distribution Rebates 197. Accounting and Administration Services 20
Administration Charge 208. Charges for electrical plant provided ancillary to the grant of Use of System 209. Glossary of Terms 21
Annex 1 - Schedule of charges for use of the distribution system by LV and HV DesignatedProperties 26Annex 2 - Schedule of charges for use of the distribution system by Designated EHV Properties(including LDNOs with Designated EHV Properties/end-users) 27Annex 3 - Schedule of charges for use of the distribution system by preserved/additional LLFclasses 41Annex 4 - Charges applied to LDNOs with LV and HV end-users 42Annex 5 - Schedule of line loss factors 45Annex 6 - Addendum to charging statement detailing charges for new Designated EHV Properties 48
-
8/9/2019 Northern Power - Yorkshire 2014
4/48
PAGE 4 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
1. Introduction
1.1. This statement has been prepared in order to discharge Northern Powergrid’s
obligation under Standard Licence Condition 14 of our Electricity Distribution Licence.
It contains information on our charges 1 and charging principles for use of our
Distribution System. It also contains information on our Line Loss Factors.
1.2. The charges in this statement are calculated using the Common Distribution Charging
Methodology (CDCM) for Low-Voltage and High-Voltage (LV and HV) Designated
Properties and the Extra-High Voltage Distribution Charging Methodology (EDCM) for
Designated Extra-High Voltage (EHV) Properties (for Metering Point Administration
Numbers/Metering System Identifiers (MPANs/MSIDs) connected to our designated
distribution services area). The application of charges to a premise can usually be
referenced using the Line Loss Factor Class (LLFC) contained in the charge tables.
1.3. All charges in this statement are shown exclusive of VAT.
1.4. The annexes that form part of this statement are also provided for additional
convenience in spreadsheet format. This spreadsheet also contains supplementary
information used for charging purposes but which is not required to be provided in
accordance with Standard Licence Condition 14. This spreadsheet can be downloaded
from:
http://www.northernpowergrid.com/downloads/system.cfm
1.5. If you have any questions about this statement please contact us at the address
shown below:
Charges Manager
Northern Powergrid
98 Aketon Road
Castleford
WF10 5DS
e-mail:- [email protected]
1 Charges can be positive or negative.
http://www.northernpowergrid.com/downloads/system.cfmmailto:[email protected]:[email protected]:[email protected]:[email protected]://www.northernpowergrid.com/downloads/system.cfm
-
8/9/2019 Northern Power - Yorkshire 2014
5/48
-
8/9/2019 Northern Power - Yorkshire 2014
6/48
PAGE 6 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
2. Charge Application and Definitions
Supercustomer Billing and Payment
2.1.Supercustomer billing and payment applies to Metering Points registered as Non-Half
Hourly (NHH) metered or NHH unmetered. The Supercustomer approach makes use of
aggregated data obtained from the ‘Supercustomer Distribution Use of System (DUoS)
Report’.
2.2. Invoices are calculated on a periodic basis and sent to each user, for whom Northern
Powergrid is transporting electricity through its distribution system. Invoices are
reconciled, over a period of approximately 14 months, to ensure the cash positions of
users and Northern Powergrid are adjusted to reflect later and more accurate
consumption figures.
2.3. The charges are applied on the basis of the LLFC assigned to the Metering Point
Administration Number (MPAN), and the units consumed within the time periods
specified in this statement. All LLFCs are assigned at the sole discretion of Northern
Powergrid. Invoices take account of previous settlement runs and include VAT.
Supercustomer Charges
2.4. Supercustomer charges are generally billed through the following components:
a fixed charge - pence/MPAN/day, there will only be one fixed charge applied to
each MPAN; and
unit charges - pence/kilowatt-hour (kWh), more than one kWh charge may be
applied.
2.5. Users who wish to supply electricity to customers whose metering system is
measurement class A and settled on profile classes (PC) 1 through to 8 will be
allocated the relevant charge structure set out in Annex 1.
2.6. Measurement class A charges apply to exit/entry points where NHH metering is used
for settlement.
2.7. Measurement class B charges apply to exit points deemed to be suitable as unmetered
supplies as permitted in the Electricity (Unmetered Supply) Regulations 2001 2 and
where operated in accordance with BSCP520 3.
2.8. Identification of the appropriate charge can be made by cross reference to the LLFC.
2 The Electricity (Unmetered Supply) Regulations 2001 available fromhttp://www.legislation.gov.uk/uksi/2001/3263/made 3 Balancing and Settlement Code Procedures on unmetered supplies are available fromhttp://www.elexon.co.uk/pages/bscps.aspx
http://www.legislation.gov.uk/uksi/2001/3263/madehttp://www.legislation.gov.uk/uksi/2001/3263/madehttp://www.elexon.co.uk/pages/bscps.aspxhttp://www.elexon.co.uk/pages/bscps.aspxhttp://www.elexon.co.uk/pages/bscps.aspxhttp://www.legislation.gov.uk/uksi/2001/3263/made
-
8/9/2019 Northern Power - Yorkshire 2014
7/48
PAGE 7 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
2.9. Valid settlement profile class/standard settlement configuration/meter timeswitch
code (PC/SSC/MTC) combinations for these LLFCs are detailed in Market Domain Data
(MDD).
2.10. Where an MPAN has an invalid settlement combination, the ‘Domestic Unrestricted’fixed and unit charge will be applied as default until the invalid combination is
corrected. Where there are multiple SSC - time pattern regime (TPR) combinations,
the default ‘Domestic Unrestricted’ fixed and unit charge will be applied for each
invalid TPR combination.
2.11. The time periods for the charge rates are as specified by the SSC. To determine the
appropriate charge rate for each SSC/TPR a look-up table is provided in the ENA
spreadsheet that accompanies this statement 4.
2.12. The ‘Domestic Off -Peak’ and ‘Small Non -Domestic Off- Peak’ charges are
supplementary to either an unrestricted or a two-rate charge.
Site-Specific Billing and Payment
2.13. Site-specific billing and payment applies to metering points settled as Half Hourly
(HH) metered. The site-specific billing and payment approach to Use of System (UoS)
billing makes use of HH metering data received through settlement.
2.14. Invoices are calculated on a periodic basis and sent to each user, for whom Northern
Powergrid is transporting electricity through its distribution system. Where anaccount is based on estimated data, the account shall be subject to any adjustment
which may be necessary following the receipt of actual data from the user.
2.15. The charges are applied on the basis of the LLFC assigned to the MPAN (or the MSID
for Central Volume Allocation (CVA) sites), and the units consumed within the time
periods specified in this statement.
2.16. All LLFCs are assigned at the sole discretion of Northern Powergrid. Where an
incorrectly applied LLFC is identified, Northern Powergrid, may at its sole discretion
apply the correct LLFC and/or charges. Where MPANs have not been associated, forexample when multiple connections are fed from different sources, the relevant
number of fixed charges will be applied.
Site-Specific Billed Charges
2.17. Site-specific billed charges may include the following components:
a fixed charge pence/MPAN/day or pence/MSID/day;
4 Northern Powergrid Yorkshire - Schedule of charges and other tables – Version 10.7.xlsx
-
8/9/2019 Northern Power - Yorkshire 2014
8/48
PAGE 8 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
a capacity charge, pence/kVA/day, for Maximum Import Capacity (MIC) and/orMaximum Export Capacity (MEC);
an excess capacity charge, pence/kVA/day, if a site exceeds its MIC and/or MEC;
unit charges, pence/kWh, more than one unit charge may be applied; and
an excess reactive power charge, pence/kVArh, for each unit in excess of thereactive charge threshold.
2.18. Users who wish to supply electricity to customers whose metering system is
measurement class C, D or E or CVA will be allocated the relevant charge structure
dependent upon the voltage and location of the metering point.
2.19. Measurement class C, E or CVA charges apply to exit/entry points where HH metering,
or an equivalent meter, is used for settlement purposes.
2.20. Measurement class D charges apply to exit points deemed to be suitable asunmetered supplies as permitted in the Electricity (Unmetered Supply) Regulations
2001 and where operated in accordance with BSCP520.
2.21. Fixed charges are generally levied on a pence per MPAN basis. Where two or more HH
MPANs are located at the same point of connection (as identified in the connection
agreement), with the same LLFC, and registered to the same supplier, only one daily
fixed charge will be applied.
2.22. LV & HV Designated Properties will be charged in accordance with the CDCM and
allocated the relevant charge structure set out in Annex 1.
2.23. Designated EHV Properties will be charged in accordance with the EDCM and allocated
the relevant charge structure set out in Annex 2.
2.24. Where LV and HV Designated Properties or Designated EHV Properties have more than
one point of connection (as identified in the connection agreement) then separate
charges will be applied to each point of connection.
Time periods for half-hourly metered properties
2.25. The time periods for the application of unit charges to LV and HV DesignatedProperties that are HH metered are detailed in Annex 1. Northern Powergrid has not
issued a notice to change the time bands.
2.26. The time periods for the application of unit charges to Designated EHV Properties are
detailed in Annex 2. Northern Powergrid has not issued a notice to change the time
bands.
-
8/9/2019 Northern Power - Yorkshire 2014
9/48
PAGE 9 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Time periods for half-hourly unmetered properties
2.27. The time periods for the application of unit charges to connections that are pseudo
HH metered are detailed in Annex 1. Northern Powergrid has not issued a notice to
change the time bands.
Application of Capacity Charges
2.28. The following sections explain the application of capacity charges and exceeded
capacity charges.
Chargeable Capacity
2.29. The chargeable capacity is, for each billing period, the MIC/MEC, as detailed below.
2.30. The MIC/MEC will be agreed with Northern Powergrid at the time of connection or
pursuant to a later change in requirements. Following such an agreement (be it at
the time of connection or later) no reduction in MIC/MEC will be allowed for a period
of one year. In the absence of an agreement the chargeable capacity, save for error
or omission, will be based on the last MIC and/or MEC previously agreed by the
distributor for the relevant premises’ connection. A customer can seek to agree or
vary the MIC and/or MEC by contacting Northern Powergrid using the contact details
in paragraph 1.6.
2.31. Reductions to the MIC/MEC may only be permitted once in a 12 month period and no
retrospective changes will be allowed. Where MIC/MEC is reduced the new lower
level will be agreed with reference to the level of the customer’s maximum demand.
It should be noted that, where a new lower level is agreed, the original capacity may
not be available in the future without the need for network reinforcement and
associated charges.
Exceeded capacity
2.32. Where a customer takes additional unauthorised capacity over and above the
MIC/MEC, the excess will be classed as exceeded capacity. The exceeded portion of
the capacity will be charged at the excess capacity charge p/kVA/day rate, based on
the difference between the MIC/MEC and the actual capacity used. This will be
charged for the full duration of the month in which the breach occurs.
Demand exceeded capacity
),),max(max(2capacityexceededDemand 2 02 MIC RE RI AI
Where:
AI = Active Import (kWh)
RI = Reactive import (kVArh)
-
8/9/2019 Northern Power - Yorkshire 2014
10/48
PAGE 10 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
RE = Reactive export (kVArh)
MIC = Maximum import capacity (kVA)
2.33. Only RI and RE values occurring at times of AI are used in the calculation. Where data
for two or more MPANs is aggregated for billing purposes the HH consumption values
are summated prior to the calculation above.
2.34. This calculation is completed for every half hour and the maximum value from the
billing period is applied.
Generation exceeded capacity
),),max(max(2capacityexceededGeneration 02 MEC RE RI AE 2
Where:
AE = Active Export (kWh)
RI = Reactive import (kVArh)
RE = Reactive export (kVArh)
MEC = Maximum export capacity (kVA)
2.35. Only RI and RE values occurring at times of AE are used in the calculation. Where
data for two or more MPANs is aggregated for billing purposes the HH consumption
values occurring at times of kWh export are summated prior to the calculation
above.
2.36. This calculation is completed for every half hour and the maximum value from the
billing period is applied.
Standby Capacity for Additional Security on Site
2.37. Where standby capacity charges are applied, the charge will be set at the same rate
as that applied to normal MIC.
Minimum Capacity Levels
2.38. There is no minimum capacity threshold.
Application of charges for excess reactive power
2.39. When an individual HH metered MPAN’s reactive power (measured in kVArh) at LV and
HV Designated Properties exceeds 33% of total active power (measured in kWh),
excess reactive power charges will apply. This threshold is equivalent to an average
power factor of 0.95 during the period. Any reactive units in excess of the 33%
threshold are charged at the rate appropriate to the particular charge.
2.40. Power Factor is calculated as follows:
-
8/9/2019 Northern Power - Yorkshire 2014
11/48
PAGE 11 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Cos θ = Power Factor
2.41. The chargeable reactive power is calculated as follows:
Demand chargeable reactive power
Where:
AI = Active Import in (kWh)
RI = Reactive Import in (kVArh)
RE = Reactive Export in (kVArh)
2.42. Only RI and RE values occurring at times of AI are used in the calculation. Where
data for two or more MPANs is aggregated for billing purposes the HH consumption
values are summated prior to the calculation above.
2.43. The square root calculation will be to two decimal places.
2.44. This calculation is completed for every half hour and the values summated over the
billing period.
Generation chargeable reactive power
Where:
AE = Active Export in (kWh)
RI = Reactive Import in (kVArh)
RE = Reactive Export in (kVArh)
kWh
kVArh
θ
0,195.0
1RERI,maxmaxkVArhChargeable Demand 2 AI
0, AE1
95.0
1RERI,maxmaxkVArhChargeableGeneration
2
-
8/9/2019 Northern Power - Yorkshire 2014
12/48
PAGE 12 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
2.45. Only RI and RE values occurring at times of AE are used in the calculation. Where
data for two or more MPANs is aggregated for billing purposes the HH consumption
values are summated prior to the calculation above.
2.46. The square root calculation will be to two decimal places.
2.47. This calculation is completed for every half hour and the values summated over the
billing period.
Generation charges for pre-2005 Designated EHV Properties
2.48. Designated EHV Properties that were connected to the distribution system under a
pre-2005 connection charging policy are eligible for exemption from generation UoS
charges unless one of the following criteria has been met:
25 years have passed since their first energisation/connection date (i.e.Designated EHV Properties with energisation/connection agreements dated prior
to 1st April 2005, and for which 25 years has passed since their first
energisation/connection date will receive generation UoS charges from the next
charging year following the expiry of their 25 years exemption, (starting 1st
April), or
the person responsible for the Designated EHV Property has provided notice to
Northern Powergrid that they wish to opt in to generation UoS charges.
If a notice to opt in has been provided there will be no further opportunity to opt out.
2.49. Furthermore, if an exempt customer makes an alteration to its export requirement
then the customer may be eligible to be charged for the additional capacity required
or energy imported or exported. For example, where a generator increases its export
capacity the incremental increase in export capacity will attract UoS charges as other
non-exempt generators.
Provision of billing data
2.50. Where HH metering data is required for UoS charging and this is not provided through
settlement processes, such metering data shall be provided by the user of the system
to Northern Powergrid in respect of each calendar month within 5 working days of the
end of that calendar month. The metering data shall identify the amount consumed
and/or produced in each half hour of each day and shall separately identify active
and reactive import and export. Metering data provided to Northern Powergrid shall
be consistent with that received through the metering equipment installed. Metering
data shall be provided in an electronic format specified by Northern Powergrid from
time to time, and in the absence of such specification, metering data shall be
-
8/9/2019 Northern Power - Yorkshire 2014
13/48
PAGE 13 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
provided in a comma-separated text file in the format of D0275 MRA data flow (as
agreed with Northern Powergrid). The data shall be e-mailed to:
2.51. Northern Powergrid requires details of reactive power imported or exported to be
provided for all measurement class C (mandatory HH metered) sites and for
measurement class E (elective HH metered sites). It is also required for CVA sites and
exempt distribution network boundaries with difference metering. Northern
Powergrid reserves the right to levy a charge on users who fail to provide such
reactive data.
Use of System Charges Out of Area
2.52. Northern Powergrid does not operate networks outside its distribution service area.
Licensed Distributor Network Operator (LDNO) charges
2.53. Licenced distribution network operator (LDNO) charges are applied to LDNOs who
operate embedded networks within Northern Powergrid’s distribution services area.
2.54. The charge structure for LV and HV Designated Properties embedded in networks
operated by LDNOs will mirror the structure of the ‘all -the- way’ charge and is
dependent upon the voltage of connection of each embedded network to the host
DNO’s network. The same charge elements will apply as those that match the LDNO’s
end customer charges. The relevant charge structures are set out in Annex 4.
2.55. Where an M PAN has an invalid settlement combination, the ‘LDNO HV: Domestic
Unrestricted’ fixed and unit charge will be applied as default until the invalid
combination is corrected. Where there are multiple SSC-TPR combinations, the
default ‘LDNO HV: Domestic Unrestricted’ fixed and unit charge will be applied for
each invalid TPR combination.
2.56. The charge structure for Designated EHV Properties embedded in networks operated
by LDNOs will be calculated individually using the EDCM. The relevant charge
structures are set out in Annex 2.
2.57. For nested networks the relevant charging principles set out in DCUSA Schedule 21
will apply.
Third party access from exempt distribution networks
2.58. Where one of our MPANs (prefix 23) is embedded within an exempt distribution
network connected to one of Northern Powergrid’s distribution systems, and a
dispensation for difference metering is in place for settlement purposes, we will
continue to charge the supplier of the boundary MPAN of the connection, based on
mailto:[email protected]:[email protected]:[email protected]
-
8/9/2019 Northern Power - Yorkshire 2014
14/48
PAGE 14 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
gross measurement for UoS. No charges will be levied directly to the customer or
supplier of the embedded MPAN(s) connected within the exempt distribution network.
2.59. Northern Powergrid requires that gross metered data for the boundary of the
connection is provided to them. Until a new flow is introduced for the sending ofsuch gross data, gross metered data shall:
be sent using the D0036 or D0275 MRA data flow; and
the D0036 or D0275 shall contain the metering reference specified by NorthernPowergrid in place of the boundary settlements MPAN.
2.60. For the avoidance of doubt the reduced difference metered measurement data for
the boundary connection that is to enter settlements should continue to be sent using
the settlements MPAN.
2.61. Where the data collector is unable to send the D0036 or D0275 MRA data flow due to
system constraints, gross metered data shall;
be provided in a text file in the format of the D0036 or D0275 MRA data flow;
the text file shall contain the metering reference specified by Northern Powergridin place of the settlements MPAN;
the text file shall be emailed to [email protected];
the text filename shall be formed of the metering reference specified byNorthern Powergrid followed by a hyphen and followed by a timestamp in theformat YYYYMMDDHHMMSS and followed by “.txt”;
and the title of the email should contain the phrase “gross data for differencemetered private network”.
mailto:[email protected]:[email protected]:[email protected]
-
8/9/2019 Northern Power - Yorkshire 2014
15/48
PAGE 15 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
3. Schedule of Charges for use of the Distribution System
3.1. Tables listing the charges for the distribution of electricity for UoS are published in
annexes to this document.
3.2. These charges are also listed in a spreadsheet which is published with this statement
and can be downloaded from:
http://www.northernpowergrid.com/downloads/system.cfm
3.3. Annex 1 contains charges to LV and HV Designated Properties.
3.4. Annex 2 contains the charges to Designated EHV Properties and charges applied to
LDNOs with Designated EHV Properties/end-users embedded in networks within
Northern Powergrid’s area.
3.5. Annex 3 contains details of any preserved and additional charges that are valid at this
time. Preserved charges are mapped to an appropriate charge and are closed to new
customers.
3.6. Annex 4 contains the charges applied to LDNOs with LV and HV Designated Properties
emb edded in networks within Northern Powergrid’s distribution services area.
http://www.northernpowergrid.com/downloads/system.cfmhttp://www.northernpowergrid.com/downloads/system.cfm
-
8/9/2019 Northern Power - Yorkshire 2014
16/48
PAGE 16 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
4. Schedule of Line Loss Factors
Role of Line Loss Factors in the Supply of Electricity
4.1. Electricity entering or exiting the DNOs’ networks is adjusted to take account of
energy that is lost5 as it is distributed through the network.
4.2. This adjustment is made to ensure that energy bought or sold by a user, from/to a
customer, accounts for energy lost as part of distributing energy to and from the
customer’s premises.
4.3. DNOs are responsible for calculating the Line Loss Factors (LLFs) and providing these
factors to Elexon. Elexon manage the Balancing and Settlement Code (BSC). The code
covers the governance and rules for the balancing and settlement arrangements.
4.4. Annex 5 provides the LLFs which must be used to adjust the metering system volumes
to take account of losses on the distribution network.
Calculation of Line Loss Factors
4.5. LLFs are calculated in accordance with BSC Procedure (BSCP) 128, which determines
the principles that DNOs must comply with when calculating LLFs.
4.6. LLFs are either calculated using a generic method or a site-specific method. The
generic method is used for sites connected at LV or HV and the site -specific method is
used for sites connected at EHV or where a request for site-specific LLFs has been
agreed. Generic LLFs will be applied to all new EHV sites until sufficient data isavailable for a site-specific calculation.
4.7. The Elexon website:
(http://www.elexon.co.uk/reference/technicaloperations/losses/ ) contains more
information on LLFs. This page also has links to BSC Procedure (BSCP) 128 and to our
LLF methodology.
Line Loss Factor time periods
4.8. LLFs are calculated for a set number of time periods during the year and are detailedin Annex 5.
Line Loss Factor tables
4.9. When using the LLF tables in Annex 5 reference should be made to the LLFC allocated
to the MPAN to find the appropriate LLF.
5Energy can be lost for technical and non-technical reasons and losses normally occur by heat dissipation through power
flowing in conductors and transformers. Losses can also reduce if a customer’s action reduces power flowing in thedistribution network. This might happen when a customer generates electricity and the produced energy is consumedlocally.
http://www.elexon.co.uk/reference/technicaloperations/losses/http://www.elexon.co.uk/reference/technicaloperations/losses/http://www.elexon.co.uk/reference/technicaloperations/losses/http://www.elexon.co.uk/reference/technicaloperations/losses/
-
8/9/2019 Northern Power - Yorkshire 2014
17/48
PAGE 17 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
4.10. The Elexon portal website, https://www.elexonportal.co.uk , contains the LLFs in
standard industry data format (D0265). A user guide with details on registering and
using the portal can be downloaded from: www.elexonportal.co.uk/userguide
https://www.bsccentralservices.com/https://www.bsccentralservices.com/https://www.bsccentralservices.com/
-
8/9/2019 Northern Power - Yorkshire 2014
18/48
PAGE 18 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
5. Notes for Designated EHV Properties
EDCM nodal costs
5.1. A table is provided in the accompanying spreadsheet which shows the unscaled LRIC
nodal costs used to calculate the current EDCM charges. This spreadsheet NorthernPowergrid Yorkshire - Schedule of charges and other tables – Version10.7.xlsx is
available to download from Northern Powergrid’s website.
5.2. These are illustrative of the modelled costs at the time that this statement was
published. A new connection will result in changes to current network utilisations
which will then form the basis of future prices, the charge determined in this
statement will not necessarily be the charge in subsequent years because of the
interaction between new and existing network connections and any other changes
made to Northern Powergrid’s distribution system which may affect charges.
Charges for New Designated EHV Properties
5.3. Charges for any new Designated EHV Properties calculated after publication of the
current statement will be published in an addendum to that statement as and when
necessary.
5.4. The form of the addendum is detailed in Annex 6 of this statement.
5.5. The addendum will be sent to relevant DCUSA parties and published as a revised
“Schedule of Charges and other tables” spreadsheet on our website. The addendum
will include charge information that under enduring circumstances would be found in
Annex 2 and line loss factors that would normally be found in Annex 5.
5.6. The new Designated EHV Properties charges will be added to Annex 2 in the next full
statement released.
Charges for amended Designated EHV Properties
5.7. Where an existing Designated EHV Property is modified and energised in the charging
year, Northern Powergrid may revise its EDCM charges for the modified Designated
EHV Property. If revised charges are appropriate, an addendum will be sent torelevant DCUSA parties and published as a revised 'Schedule of charges and other
table' spreadsheet on http://www.northernpowergrid.com/downloads/system.cfm.
The modified Designated EHV property charges will be added to Annex 2 in the next
full statement released.
Demand Side Management
5.8. For those premises where use of system is charged under the EDCM, some customers
may be able to benefit from entering into a Demand Side Management (DSM)
agreement with Northern Powergrid.
http://www.northernpowergrid.com/downloads/system.cfm.Thttp://www.northernpowergrid.com/downloads/system.cfm.Thttp://www.northernpowergrid.com/downloads/system.cfm.T
-
8/9/2019 Northern Power - Yorkshire 2014
19/48
PAGE 19 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
5.9. DSM arrangements are based on a formal commitment by the customer to materially
reduce their MIC in certain time periods, as determined by Northern Powergrid, for
active network management purposes other than normal planned or unplanned
outages.
5.10. For new connections the customer must make an express statement in their
application that they have an interest in some, or all, of the import capacity for their
intended connection or modified connection being interruptible for active network
management purposes.
5.11. Where the customer enters into a DSM agreement by agreeing to reduce their MIC to
meet the defined parameters in the agreement, reduced use of system charges will
apply. The chargeable capacity will be equal to the MIC minus the capacity that is
subject to restrictions under the DSM agreement. The scale of the reduction will varyby site and is linked to the LRIC element of the charge in line with the approved
charging methodology.
5.12. Any reduction in use of system charges applicable to the customer will be assessed on
a site-specific basis by Northern Powergrid. Any customers who wish to enquire
whether they can take advantage of DSM should in the first instance contact:
Connection Record Maintenance
Manor House
Station Road
New Penshaw
Houghton-le-Spring
DH4 7LA
e-mail:- [email protected]
6. Electricity Distribution Rebates6.1. Northern Powergrid (Yorkshire) plc issued a use of system rebate to energy suppliers
in December 2013. Its intention was to facilitate the Department for Energy and
Climate Change’s announcement early that month that network operators were
willing to take voluntary action to reduce network costs. The rebates amounted to
£6.10 per domestic unrestricted customer and £8.67 per domestic restricted
customer and were based on the number of traded MPANs (excluding related MTCs).
6.2. Northern Powergrid (Yorkshire) plc is not proposing to make further rebates in the
2014/15 charging year.
mailto:[email protected]:[email protected]:[email protected]:[email protected]
-
8/9/2019 Northern Power - Yorkshire 2014
20/48
PAGE 20 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
6.3. The tariffs within this statement do not attempt to recover any of the revenue
associated with the rebate and are identical to those tariffs that would have been
published had the rebate not been issued.
7. Accounting and Administration ServicesAdministration Charge
7.1. Where a user has failed to settle a DUoS invoice or notify Northern Powergrid of a
bona fide dispute, in accordance with the Use of System agreement an account
review charge of £75.00 may be made to cover the associated credit control,
administration, invoicing and collection costs. This is in addition to the interest
charge that will be made in accordance with clause 23.3 of the Distribution
Connection and Use of System Agreement (DCUSA).
8. Charges for electrical plant provided ancillary to the grant of Use ofSystem
8.1. Northern Powergrid has no charges applicable to this section.
-
8/9/2019 Northern Power - Yorkshire 2014
21/48
PAGE 21 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
9. Glossary of Terms
9.1. The following definitions, which can extend to grammatical variations and cognate
expressions, are included to aid understanding:
Term Definition
All-the-way charge A tariff applicable to an end user rather than an LDNO.
Balancing and Settlement Code(BSC)
The BSC contains the governance arrangements forelectricity balancing and settlement in Great Britain. Anoverview document is available fromwww.elexon.co.uk/ELEXONDocuments/trading_arrangements.pdf .
CDCM
The common distribution charging methodology used forcalculating charges to Designated Properties as requiredby standard licence condition 13A of the electricitydistribution licence.
Central volume allocation (CVA) As defined in the BSC.
Customer
A person to whom a user proposers to supply, or for thetime being supplies, electricity through an exit point, orfrom who, a user or any relevant exempt supplier, isentitled to recover charges, compensation or an accountof profits in respect of electricity supplied though an exitpoint;
Or
A person from whom a user purchases, or proposes topurchase, electricity, at an entry point (who may fromtime to time be supplied with electricity as a customer ofthat user (or another electricity supplier) through an exitpoint).
Designated Properties As defined in standard condition 13A of the electricitydistribution licence.
Distributed generator A generator directly connected or embedded within thedistribution system.
Distribution Connection and Useof System Agreement (DCUSA)
The DCUSA is a multi-party contract between the licensedelectricity distributors, suppliers, generators and OffshoreTransmission Owners (OFTOs) of Great Britain.It is a requirement that all licensed electricity distributorsand suppliers become parties to the DCUSA.
Distribution network operator(DNO)
An electricity distributor who operates one of the 14distribution services areas and in whose electricitydistribution licence the requirements of Section B of thestandard conditions of that licence have effect.
http://elinkfp01/data1/Governance%20Services/DCMF/Administration/Meetings/LC14%20Review%20Group/www.elexon.co.uk/ELEXON%20Documents/trading_arrangements.pdfhttp://elinkfp01/data1/Governance%20Services/DCMF/Administration/Meetings/LC14%20Review%20Group/www.elexon.co.uk/ELEXON%20Documents/trading_arrangements.pdfhttp://elinkfp01/data1/Governance%20Services/DCMF/Administration/Meetings/LC14%20Review%20Group/www.elexon.co.uk/ELEXON%20Documents/trading_arrangements.pdfhttp://elinkfp01/data1/Governance%20Services/DCMF/Administration/Meetings/LC14%20Review%20Group/www.elexon.co.uk/ELEXON%20Documents/trading_arrangements.pdfhttp://elinkfp01/data1/Governance%20Services/DCMF/Administration/Meetings/LC14%20Review%20Group/www.elexon.co.uk/ELEXON%20Documents/trading_arrangements.pdf
-
8/9/2019 Northern Power - Yorkshire 2014
22/48
PAGE 22 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Term Definition
Distribution services area The area specified by the authority within which each DNOmust provide specified distribution services.
Distribution system
The system consisting (wholly or mainly) of:
electric lines owned or operated by an authoriseddistributor that is used for the distribution ofelectricity from grid supply points or generationsets or other entry points to the points of deliveryto customers or users; or
any transmission licensee in its capacity asoperator of that licensee’s transmission system orthe Great Britain (GB) transmission system
and includes any remote transmission assets (owned by atransmission licensee within England and Wales) that areoperated by that authorised distributor and any electricalplant, electricity meters, and metering equipment ownedor operated by it in connection with the distribution ofelectricity, but does not include any part of the GBtransmission system.
Designated EHV Properties As defined in standard condition 13B of the electricitydistribution licence.
EDCM
The EHV distribution charging methodology used forcalculating charges to Designated EHV Properties asrequired by standard licence condition 13B of theelectricity distribution licence.
Electricity distribution licenceThe electricity distribution licence granted or treated asgranted pursuant to section 6(1) of the Electricity Act1989.
Electricity distributor Any person who is authorised by an electricity distributionlicence to distribute electricity.
Embedded LDNO This refers to an LDNO operating a distribution networkwhich is embedded within another distribution network.
Embedded network An electricity distribution system operated by an LDNOand embedded within another distribution network.
Entry point
A boundary point at which electricity is exported onto adistribution system from a connected installation or fromanother distribution system, not forming part of the totalsystem (boundary point and total system having themeaning given to those terms in the BSC).
Exit point
A point of connection at which a supply of electricity mayflow from the distribution system to the customer’sinstallation or user’s installation or the distribution systemof another person.
Extra-high voltage (EHV) Nominal voltages of 22kV and above.
-
8/9/2019 Northern Power - Yorkshire 2014
23/48
PAGE 23 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Term Definition
Gas and Electricity MarketsAuthority (GEMA) (the
Authority)
As established by the Utilities Act 2000.
Grid supply point (GSP)
A metered connection between the National GridElectricity Transmission (NGET) system and the licensee’sdistribution system at which electricity flows to or fromthe distribution system.
GSP groupA distinct electrical system that is supplied from one ormore GSPs for which total supply into the GSP group canbe determined for each half hour.
High voltage (HV) Nominal voltages of at least 1kV and less than 22kV.
Host DNOA distribution network operator that is responsible for adistribution services area as defined in standard conditionsof the electricity distribution licence.
Intermediate LDNOAn embedded licenced distribution network operator thatis responsible for a distribution system between a hostDNO and another embedded distribution system.
Invalid settlement combinationA settlement combination that is not recognised as a validcombination in market domain data - seehttps://www.elexonportal.co.uk/MDDVIEWER.
kVA Kilovolt amperes.
kVArh Kilovolt ampere reactive hour.
kW Kilowatt.
kWh Kilowatt hour (equivalent to one “unit” of electricity).
Licensed distribution networkoperator (LDNO)
The holder of a licence in respect of distribution activitiesin Great Britain.
Line loss factor (LLF)The factor that is used in settlement to adjust themetering system volumes to take account of losses on the
distribution system.
Line loss factor class (LLFC) An identifier assigned to an SVA metering system which isused to assign the LLF and use of system charges.
Low voltage (LV) Nominal voltages below 1kV.
Market domain data (MDD)Market domain data is a central repository of referencedata used by all users involved in settlement. It isessential to the operation of SVA trading arrangements.
https://www.elexonportal.co.uk/MDDVIEWERhttps://www.elexonportal.co.uk/MDDVIEWER
-
8/9/2019 Northern Power - Yorkshire 2014
24/48
PAGE 24 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Term Definition
Maximum export capacity (MEC)
The maximum export capacity of apparent powerexpressed in kVA that has been agreed can flow through
the entry point to the distribution system from thecustomer’s installation as specified in the connectionagreement.
Maximum import capacity (MIC)
The maximum import capacity of apparent powerexpressed in kVA that has been agreed can flow throughthe exit point from the distribution system to thecustomer’s installation as specified in the connectionagreement.
Measurement class
A classification of metering systems which indicates howconsumption is measured, i.e.:
non-half-hourly metering equipment (equivalentto measurement class A);
non-half-hourly unmetered supplies (equivalent tomeasurement class B);
half-hourly metering equipment at or above100kW premises (equivalent to measurement classC);
half-hourly unmetered supplies (equivalent tomeasurement class D); and
half-hourly metering equipment below 100kwpremises (equivalent to measurement class E).
Metering point
The point at which electricity that is exported to or
imported from the licensee’s distribution system ismeasured, is deemed to be measured, or is intended to bemeasured and which is registered pursuant to theprovisions of the MRA. For the purposes of this statement,GSPs are not ‘metering points’.
Metering systemParticular commissioned metering equipment installed forthe purposes of measuring the quantities of exportsand/or imports at the exit point or entry point.
Metering point administrationnumber (MPAN)
A number relating to a metering point under the MRA.
MRA The Master Registration Agreement.
Meter timeswitch code (MTC)
MTCs are three digit codes allowing suppliers to identifythe metering installed in customers’ premises. Theyindicate whether the meter is single or multi-rate, pre-payment or credit, or whether it is ‘related’ to anothermeter.
Nested LDNO A distribution system operator that is responsible for anested network.
-
8/9/2019 Northern Power - Yorkshire 2014
25/48
PAGE 25 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014– V1.0
Term Definition
Nested networks
This refers to a situation where there is more than onelevel of embedded network and therefore nested
distribution systems between LDNOs (e.g. hostDNO intermediate LDNO nested LDNO customer).
OfgemOffice of Gas and Electricity Markets – Ofgem is governedby GEMA and is responsible for the regulation of thedistribution companies.
Profile class (PC)
A categorisation applied to NHH MPANs and used insettlement to group customers with similar consumptionpatterns to enable the calculation of consumptionprofiles.
Settlement
The determination and settlement of amounts payable in
respect of charges (including reconciling charges) inaccordance with the BSC.
Settlement class (SC)
The combination of profile class, line loss factor class,time pattern regime and standard settlementconfiguration, by supplier within a GSP group and used forsettlement.
Standard settlementconfiguration (SSC)
A standard metering configuration relating to a specificcombination of TPRs.
SupercustomerThe method of billing users for use of system on anaggregated basis, grouping together consumption andstanding charges for all similar NHH metered customers.
Supercustomer DUoS Report A report of profiled data by settlement class providingcounts of MPANs and units consumed.
SupplierAn organisation with a supply license which can registeritself as being responsible for electricity supplied toand/or exported from a metering point.
Supplier volume allocation (SVA) As defined in the BSC.
Time pattern regime (TPR) The pattern of switching behaviour through time that one
or more meter registers follow.
Use of system chargesCharges applicable to demand and generation connectionswhich are connected to and utilise the distributionnetwork.
User Someone that has a use of system agreement with theDNO e.g. a supplier, generator or other DNO.
Unmetered Supplies
Exit points deemed to be suitable as unmetered suppliesas permitted in the Electricity (Unmetered Supply)Regulations 2001 and where operated in accordance withBSCP520.
-
8/9/2019 Northern Power - Yorkshire 2014
26/48
Annex 1 - Schedule of Charges for use of the Distribution System by LV and HV Designated Properties
Time periodsRed Time
BandGreen Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday(Including Bank Holidays)All Year
16:00 to 19:3000:00 to 08:0022:00 to 24:00
16:00 to 19:3008:00 to 16:0019:30 to 22:00
00:00 to 08:0022:00 to 24:00
Saturday and SundayAll Year
00:00 to 24:00 08:00 to 22:00 00:00 to 08:0022:00 to 24:00
Notes 00:00 to 24:00
DNOs paste value cells A15:I42 from CDCM 3701 into cells A14:J41
O pe n L LF Cs P CsUnit rate 1
p/kWh(red/black)
Unit rate 2p/kWh
(amber/yellow)
Unit rate 3p/kWh(green)
Fixed chargep/MPAN/day
Capacity chargep/kVA/day
Reactive powercharge
p/kVArh
Excess capacitycharge
p/kVA/dayClosed LLFCs
Domestic Unrestricted 100 1 2.263 4.71 101, 400, 401, 999
Domestic Two Rate 120 2 2.829 0.101 4.71 121, 123, 402, 403, 413
Domestic Off Peak (related MPAN) 111 2 0.390 130, 131, 414, 415, 416
Small Non Domestic Unrestricted 240 3 2.254 4.32 241, 404, 405
Small Non Domestic Two Rate 246 4 2.946 0.185 4.32 249, 250, 275, 406, 407, 417, 418
Small Non Domestic Off Peak (related MPAN) 214 4 0.503 268, 419, 420
LV Medium Non-Domestic 290 5-8 2.236 0.063 30.40 280, 287, 408, 409, 421
LV Sub Medium Non-Domestic - 5-8 1.504 0.041 43.66 -
HV Medium Non-Domestic 580 5-8 1.764 0.036 210.59 410
LV HH Metered 281 0 9.377 0.963 0.051 13.06 1.46 0.329 1.46 244, 248, 257, 291, 297
LV Sub HH Metered 471 0 8.256 0.786 0.040 43.66 1.93 0.269 1.93 472
HV HH Metered 581 0 6.522 0.573 0.027 111.03 1.81 0.198 1.81 500, 501, 502, 741, 742, 743, 744
HV Sub HH Metered
NHH UMS category A 814 8 1.107 -
NHH UMS category B 815 1 1.498 -
NHH UMS category C 816 1 2.806 -
NHH UMS category D 817 1 0.855 -
LV UMS (Pseudo HH Metered) 813 & 913 0 21.989 0.847 0.046 -
LV Generation NHH 20 8 ( 0.574) 17, 18, 21, 411, 412
LV Sub Generation NHH 30 8 ( 0.504) -
LV Generation Intermittent 22 0 ( 0.574) 0.134 12, 40
LV Generation Non-Intermittent 24 0 ( 3.423) ( 0.621) ( 0.039) 0.134 -
LV Sub Generation Intermittent 23 0 ( 0.504) 0.128 14
LV Sub Generation Non-Intermittent 25 0 ( 3.007) ( 0.545) ( 0.034) 0.128 -
HV Generation Intermittent 26 0 ( 0.357) 117.36 0.098 15, 41
HV Generation Non-Intermittent 28 0 ( 2.139) ( 0.384) ( 0.024) 117.36 0.098 -
HV Sub Generation Intermittent
HV Sub Generation Non-Intermittent
08:00 to 16:0019:30 to 22:00
Monday to Friday(Including Bank Holidays)November to February Inclusive
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final LV and HV charges
Time Bands for Half Hourly Metered Properties Time Bands for Half Hourly Unmetered PropertiesAmber Time Band Time periods
All the above times are in UK Clock time
Monday to Friday(Including Bank Holidays)April to October and MarchInclusive
All the above times are in UK Clock time Saturday and Sunday
All other times
NORTHERN POWERGRID (YORKSHIRE) PLC 26 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
27/48
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
3 4 5 6 6 7 8 9
ImportUnique
Identifier LLFC Import
MPANs/MSIDsExport Unique
Identifier LLFC Export
MPANs/MSIDsName
ImportSuper Red
unit rate
(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded capacity rate
(p/kVA/day)
ExportSuper Red
unit rate
(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded capacity rate
(p/kVA/day)
750 23000005996572336541294017 EHV Site Specific 0.498 9.43 9.43
751
230000070251723000007025262300000702535237655500201023765550020292376555002038
EHV Site Specific 0.074 5,812.23 1.83 1.83
753 2356555555010 90 2394000039650 EHV Site Specific 0.781 6,271.33 2.28 2.28 104.52 0.13 0.13754 2356555554017 82 2394000039660 EHV Site Specific 0.487 9,377.56 1.48 1.48 468.88 0.13 0.13755 2316521850010 76 2394000039641 EHV Site Specific 0.058 4,347.17 2.31 2.31 434.72 0.13 0.13756 2346540436013 75 2394000039679 EHV Site Specific 0.017 5,931.03 1.49 1.49 444.83 0.13 0.13757 2336566756217 95 2394000060226 EHV Site Specific 796.98 2.44 2.44 ( 0.146) 796.98 0.13 0.13758 2366591411116 EHV Site Specific 0.104 7,952.88 0.84 0.84759 MSID 0645 EHV Site Specific 16,521.44 2.59 2.59
760 23000008809662376509001013 6023000002337362300000880975 EHV Site Specific - Generation Exempt
1,810.30 1.24 1.24
761 23000005266862336518071011 EHV Site Specific 0.002 552.57 0.87 0.87
762 2300000457400 62 2300000457410 EHV Site Specific - Generation Exempt 0.062 120.35 1.34 1.34
763 23000007758532376509000010 8023000009489042300000948913 EHV Site Specific - Generation Exempt
0.015 829.91 0.76 0.76
764230000023395923000002339682300000233977
EHV Site Specific 0.017 4,837.36 0.66 0.66
765230000045708423900000108402390000010859
EHV Site Specific 0.544 3,350.71 2.07 2.07
766 23765080300132376508030022 6623000002339122300000996990 EHV Site Specific - Generation Exempt
215.85 1.18 1.18
767 MSID 7020MSID 7021 67MSID 7020MSID 7021 EHV Site Specific - Generation Exempt
170.52 1.39 1.39
769 2346526241119 EHV Site Specific 0.083 7,952.88 1.99 1.99
770 2366591365115 EHV Site Specific 0.115 7,952.88 1.90 1.90771 2366591376117 92 2394000019176 EHV Site Specific 0.043 1,988.22 0.84 0.84 ( 0.043) 5,964.66 0.13 0.13772 2366591373116 EHV Site Specific 0.058 7,952.88 1.98 1.98773 2366591486111 EHV Site Specific 0.136 7,952.88 2.05 2.05
774 23265229100112326522910020 7423940000029252394100008408 EHV Site Specific - Generation Exempt
2.636 230.24 1.21 1.21
775 2380000531989 87 2394000024440 EHV Site Specific 0.051 352.88 0.88 0.88 ( 0.223) 1,347.35 0.13 0.13777 2300000233596 77 2300000233610 EHV Site Specific - Generation Exempt 0.612 9.21 1.04 1.04778 2300000443816 78 2300000443825 EHV Sit e Specif ic - Generation Part Exempt 6 .38 2.30 2.30 414.54 0.13 0.13780 2380000825051 EHV Site Specific 0.011 1,062.64 0.55 0.55781 2300000790540 81 2300000790550 EHV Site Specific - Generation Exempt 147.48 1.05 1.05
782 23000010162882300001016297 EHV Site Specific 0.139 552.57 1.91 1.91
783 2300000974268 83 2300000974408 EHV Site Specific - Generation Exempt 0.137 10.23 1.77 1.77784 2300001007247 84 2300001007256 EHV Site Specific - Generation Exempt 0.028 1.37 2.21 2.21785 2380000151720 85 2394000011646 EHV Site Specific - Generation Exempt 0.068 4.08 0.80 0.80
786 2380000148115 86 23911000137042394000011502 EHV Site Specific - Generation Exempt 2.74 0.76 0.76
787 23800001234212380000123430 EHV Site Specific 637.59 2.23 2.23
788 2380000654644 88 2394000027673 EHV Site Specific 0.094 0.71 1.47 1.47 ( 0.313) 1,593.26 0.13 0.13789 2380001118812 89 2394000043364 EHV Site Specific 38.88 1.35 1.35 ( 0.103) 1,555.09 0.13 0.13
Monday to Friday(Including Bank Holidays)November to February Inclusive
16:00 to 19:30
Notes All the above times are in UK Clock time
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final EDCM charges
Time Periods for Designated EHV Properties
Time periods Super Red Time Band
NORTHERN POWERGRID (YORKSHIRE) PLC 27 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
28/48
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Export UniqueIdentifier LLFC
ExportMPANs/MSIDs Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded capacity rate
(p/kVA/day)
ExportSuper Red
unit rate(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded capacity rate
(p/kVA/day)
790 2380001476585 94 2394000056790 EHV Site Specific 0.067 12.15 1.28 1.28 816.71 0.13 0.13791 2380001494334 93 2394000058333 EHV Site Specific 0.148 5.38 1.33 1.33 ( 0.338) 270.91 0.13 0.13
793238000125282923800012528382380001767827
91239400004758123940000475902394000047606
EHV Site Specific 0.323 73.36 1.24 1.24 1,796.90 0.13 0.13
794 2380001458911 97 2394000055174 EHV Site Specific 1.519 324.14 1.51 1.51 9,724.21 0.13 0.13
795 23800015321672380001532176 EHV Site Specific 0.079 1,908.51 1.01 1.01
796 2380001635401 98 2394000072198 EHV Site Specific 52.96 0.51 0.51 5,211.58 0.13 0.13
831 23165303051102316530305129 EHV Site Specific 3.726 191.28 5.54 5.54
832 2316541311014 73 2300000233587 EHV Site Specific 1.888 84.32 2.78 2.78 ( 1.864) 11.32 0.13 0.13
83323265110150142326511015023 EHV Site Specific 5.522 191.28 4.24 4.24
834230000045690323000005166052326531140128
EHV Site Specific 1.623 286.91 3.91 3.91
835 23000004736252336505790019 EHV Site Specific 0.837 191.28 5.93 5.93
836 23000004736162336506255013 EHV Site Specific 0.748 191.28 6.65 6.65
837 23000004736342336526022010 EHV Site Specific 0.238 191.28 3.97 3.97
838 23000005849252336559992019 EHV Site Specific 0.317 191.28 1.52 1.52
839 23000002338332336566356211 68 2300000233898 EHV Si t e Speci f ic 0.168 151.01 2.23 2.23 ( 0.168) 40.27 0.13 0.13
840 2336566566018 EHV Site Specific 0.878 95.64 2.86 2.86
841
2300000539365230000053937423365906600282336590660037
EHV Site Specific 0.244 382.55 4.95 4.95
842 23000005393562336593810110 EHV Site Specific 0.112 191.28 3.82 3.82
843 23000005414342336593980114 EHV Site Specific 0.796 95.64 1.84 1.84
844 23565303300142356530330023 EHV Site Specific 0.715 191.28 5.07 5.07
845 2356562495011 EHV Site Specific 1.194 95.64 4.33 4.33
846230000044496223000006013212366531830013
EHV Site Specific 1.622 286.91 3.93 3.93
847 2366560261014 EHV Site Specific 0.963 95.64 1.07 1.07
848 23000004573772366560264112 EHV Site Specific 0.963 191.28 8.88 8.88
849 23000006522922376503256010 EHV Site Specific 0.008 191.28 2.92 2.92
850
2300000647051230000064706023765529200132376552920022
EHV Site Specific 2.046 382.55 3.12 3.12
851237655082501323800000005432380000004097
EHV Site Specific 0.686 286.91 4.73 4.73
852 2380000257932 71 2394000016040 EHV Site Specific - Generation Exempt 0.208 5.63 1.18 1.18
853 23800004288372380000428846 EHV Site Specific 0.007 191.28 4.14 4.14
854 2380000476088 72 2394000022132 EHV Site Specific - Generation Exempt 0.208 2.33 1.18 1.18
855
238000072419523800010789772380001078986238000107899523800010790012380001079321
EHV Site Specific 573.83 1.41 1.41
856
2380001519750238000151976023800015197792380001519788
EHV Site Specific 0.299 382.55 1.08 1.08
857 2300000526046 EHV Site Specific 2.239 95.64 3.81 3.81
858230000083936423265262900162326526290025
EHV Site Specific 2.105 286.91 3.65 3.65
NORTHERN POWERGRID (YORKSHIRE) PLC 28 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
29/48
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Export UniqueIdentifier LLFC
ExportMPANs/MSIDs Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded capacity rate
(p/kVA/day)
ExportSuper Red
unit rate(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded capacity rate
(p/kVA/day)
859 23365257110112336525711020 EHV Site Specific 0.030 191.28 2.08 2.08
860233652633201723365263320262300000457057
EHV Site Specific 0.241 382.55 3.30 3.30
861
2300000493180230000055212523365521150172336552115026
EHV Site Specific 0.113 382.55 3.31 3.31
862
2300000234163230000023417223365907700132336590770022
EHV Site Specific 1.125 382.55 3.25 3.25
863
2300000234066230000023407523000002340842336590810010
EHV Site Specific 0.603 382.55 4.56 4.56
864 2300000478970 EHV Site Specific 0.216 95.64 1.62 1.62
865 23465300350172346530035026 EHV Site Specific 0.767 191.28 2.21 2.21
867 23465344330192346534433028 EHV Site Specific 0.239 191.28 3.84 3.84
868 23565300300152356530030024 EHV Site Specific 0.019 191.28 2.55 2.55
869 23565303210102356530321029 EHV Site Specific 0.715 191.28 5.03 5.03
870 23565306202102356530620229 EHV Site Specific 1.431 191.28 3.13 3.13
871 23665400610172366540061026 EHV Site Specific 1.501 191.28 4.01 4.01
872
2300000674055230000067406423000006740732366540100010
EHV Site Specific 0.250 191.28 3.64 3.64
873 23000007775302366540110116 EHV Site Specific 0.181 191.28 1.59 1.59
874 2300000542828 EHV Site Specific 95.64 2.67 2.67875 2366560263119 EHV Site Specific 0.963 191.28 2.77 2.77
876 23000006995652366591250015 EHV Site Specific 0.318 191.28 4.17 4.17
877 2366591617013 EHV Site Specific 3.220 191.28 6.65 6.65878 2376501360010 EHV Site Specific 0.495 191.28 3.49 3.49
879 23765021950112390000003986 EHV Site Specific 0.017 191.28 2.16 2.16
880 2300000792050 EHV Site Specific 0.276 191.28 2.05 2.05
881 23000006344152376552766015 EHV Site Specific 0.276 191.28 2.82 2.82
882 2300000826383 69 2300000930377 EHV Site Specific 5.359 11.27 0.74 0.74 ( 5.359) 84.37 0.13 0.13
8832376503230011237650801001723900000024402390000002459
EHV Site Specific 0.275 191.28 2.64 2.64
884 2300000233754 EHV Site Specific 0.016 95.64 2.28 2.28886 2380001187667 EHV Site Specific 0.317 95.64 1.91 1.91887 2380001432843 EHV Site Specific 0.259 95.64 2.19 2.19
888
23800014486112380001448620238000144863023800014486492380001448658
EHV Site Specific 0.110 478.19 1.73 1.73
889 2380001564275 70 2394000039590 EHV Site Specific 0.165 2.42 1.59 1.59 ( 0.165) 93.22 0.13 0.13797 2390000079381 99 2394000079398 EHV Site Specific - Generation Exempt 0.470 2.20 1.78 1.78798 2380001746400 61 2394000083311 EHV Site Specific 33.67 1.21 1.21 2,721.33 0.13 0.13799 2380001812550 51 2394000089457 EHV Site Specific 0.282 32.81 1.18 1.18 ( 0.282) 3,281.15 0.13 0.13821 2380001851381 52 2394000093027 EHV Site Specific 0 .286 4.08 3.60 3.60 272.20 0.13 0.13
822 23800018830362380001883045 5323940000958312394000095840 EHV Site Specific
0.286 10.27 3.60 3.60 266.02 0.13 0.13
823 2380001877557 54 2394000097068 EHV Site Specific 0.122 17.40 5.41 5.41 3,754.98 0.13 0.13824 MSID 7275 55 MSID 7275 EHV Site Specific 15.61 2.16 2.16 538.45 0.13 0.13826 2380001874087 57 2394000094590 EHV Site Specific 0.268 28.63 3.79 3.79 3,435.58 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 29 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
30/48
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Export UniqueIdentifier LLFC
ExportMPANs/MSIDs Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded capacity rate
(p/kVA/day)
ExportSuper Red
unit rate(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded capacity rate
(p/kVA/day)
866 23465344000132346534400022 EHV Site Specific 0.801 95.64 2.03 2.03
827 2380001838371 58 2394000091952 EHV Site Specific 0.002 2.28 1.19 1.19 ( 0.074) 274.00 0.13 0.13768 2380001882798 59 2394000095804 EHV Site Specific 0 .016 4.26 2.95 2.95 272.03 0.13 0.13801 2380001905070 105 2394000098805 EHV Site Specific 1 .188 2.50 3.21 3.21 316.29 0.13 0.13792 2380001951360 96 2394000102693 EHV Site Specific 19.18 1.26 1.26 1,574.78 0.13 0.13806 TBC 109 TBC EHV Site Specific 0.073 45.72 2.52 2.52 1,973.30 0.13 0.13803 2380001909066 107 2394000099074 EHV Site Specific 14.15 2.08 2.08 1,771.09 0.13 0.13805 TBC 108 TBC EHV Site Specific 0.189 32.93 3.87 3.87 4,621.45 0.13 0.13825 2380002022460 56 2394000110630 EHV Site Specific 0 .087 4.10 2.58 2.58 393.12 0.13 0.13
802 23800019090752380001909084 10623940000990562394000099065 EHV Site Specific
0.162 263.74 1.81 1.81 ( 0.187) 1,776.54 0.13 0.13
807 2380002032360 63 2394000111660 EHV Site Specific 195.18 1.94 1.94 1,717.58 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 30 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
31/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
Super Red Time Band
16:00 to 19:30
All the above times are in UK Clock time
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
75023000005996572336541294017
EHV Site Specific 0.498 9.43 9.43
751
230000070251723000007025262300000702535237655500201023765550020292376555002038
EHV Site Specific 0.074 5,812.23 1.83 1.83
753 2356555555010 EHV Site Specific 0.781 6,271.33 2.28 2.28754 2356555554017 EHV Site Specific 0.487 9,377.56 1.48 1.48755 2316521850010 EHV Site Specific 0.058 4,347.17 2.31 2.31756 2346540436013 EHV Site Specific 0.017 5,931.03 1.49 1.49757 2336566756217 EHV Site Specific 796.98 2.44 2.44758 2366591411116 EHV Site Specific 0.104 7,952.88 0.84 0.84759 MSID 0645 EHV Site Specific 16,521.44 2.59 2.59
76023000008809662376509001013
EHV Site Specific - Generation Exempt 1,810.30 1.24 1.24
76123000005266862336518071011
EHV Site Specific 0.002 552.57 0.87 0.87
762 2300000457400 EHV Site Specific - Generation Exempt 0.062 120.35 1.34 1.34
76323000007758532376509000010
EHV Site Specific - Generation Exempt 0.015 829.91 0.76 0.76
Notes
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final EDCM import charges
Time Periods for Designated EHV Properties
Time periods
Monday to Friday(Including Bank Holidays)November to February Inclusive
NORTHERN POWERGRID (YORKSHIRE) PLC 31 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
32/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
764230000023395923000002339682300000233977
EHV Site Specific 0.017 4,837.36 0.66 0.66
765230000045708423900000108402390000010859
EHV Site Specific 0.544 3,350.71 2.07 2.07
76623765080300132376508030022
EHV Site Specific - Generation Exempt 215.85 1.18 1.18
767MSID 7020MSID 7021
EHV Site Specific - Generation Exempt 170.52 1.39 1.39
769 2346526241119 EHV Site Specific 0.083 7,952.88 1.99 1.99770 2366591365115 EHV Site Specific 0.115 7,952.88 1.90 1.90771 2366591376117 EHV Site Specific 0.043 1,988.22 0.84 0.84772 2366591373116 EHV Site Specific 0.058 7,952.88 1.98 1.98773 2366591486111 EHV Site Specific 0.136 7,952.88 2.05 2.05
77423265229100112326522910020
EHV Site Specific - Generation Exempt 2.636 230.24 1.21 1.21
775 2380000531989 EHV Site Specific 0.051 352.88 0.88 0.88777 2300000233596 EHV Site Specific - Generation Exempt 0.612 9.21 1.04 1.047 78 2 300 0004 438 16 EHV Site Speci fic - Genera tion Part Exem pt 6.38 2.30 2.30780 2380000825051 EHV Site Specific 0.011 1,062.64 0.55 0.55781 2300000790540 EHV Site Specific - Generation Exempt 147.48 1.05 1.05
78223000010162882300001016297
EHV Site Specific 0.139 552.57 1.91 1.91
783 2300000974268 EHV Site Specific - Generation Exempt 0 .137 10.23 1.77 1.77784 2300001007247 EHV Site Specific - Generation Exempt 0.028 1.37 2.21 2.21785 2380000151720 EHV Site Specific - Generation Exempt 0.068 4.08 0.80 0.80786 2380000148115 EHV Site Specific - Generation Exempt 2.74 0.76 0.76
78723800001234212380000123430
EHV Site Specific 637.59 2.23 2.23
788 2380000654644 EHV Site Specific 0.094 0.71 1.47 1.47789 2380001118812 EHV Site Specific 38.88 1.35 1.35790 2380001476585 EHV Site Specific 0 .067 12.15 1.28 1.28791 2380001494334 EHV Site Specific 0.148 5.38 1.33 1.33
NORTHERN POWERGRID (YORKSHIRE) PLC 32 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
33/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
793238000125282923800012528382380001767827
EHV Site Specific 0 .323 73.36 1.24 1.24
794 2380001458911 EHV Site Specific 1.519 324.14 1.51 1.51
7952380001532167
2380001532176EHV Site Specific 0.079 1,908.51 1.01 1.01
796 2380001635401 EHV Site Specific 52.96 0.51 0.51
83123165303051102316530305129
EHV Site Specific 3.726 191.28 5.54 5.54
832 2316541311014 EHV Site Specific 1 .888 84.32 2.78 2.78
83323265110150142326511015023
EHV Site Specific 5.522 191.28 4.24 4.24
834230000045690323000005166052326531140128
EHV Site Specific 1.623 286.91 3.91 3.91
83523000004736252336505790019
EHV Site Specific 0.837 191.28 5.93 5.93
83623000004736162336506255013
EHV Site Specific 0.748 191.28 6.65 6.65
83723000004736342336526022010
EHV Site Specific 0.238 191.28 3.97 3.97
83823000005849252336559992019
EHV Site Specific 0.317 191.28 1.52 1.52
83923000002338332336566356211
EHV Site Specific 0.168 151.01 2.23 2.23
840 2336566566018 EHV Site Specific 0 .878 95.64 2.86 2.86
841
2300000539365230000053937423365906600282336590660037
EHV Site Specific 0.244 382.55 4.95 4.95
84223000005393562336593810110
EHV Site Specific 0.112 191.28 3.82 3.82
84323000005414342336593980114
EHV Site Specific 0 .796 95.64 1.84 1.84
84423565303300142356530330023
EHV Site Specific 0.715 191.28 5.07 5.07
845 2356562495011 EHV Site Specific 1 .194 95.64 4.33 4.33
NORTHERN POWERGRID (YORKSHIRE) PLC 33 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
34/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
846230000044496223000006013212366531830013
EHV Site Specific 1.622 286.91 3.93 3.93
847 2366560261014 EHV Site Specific 0 .963 95.64 1.07 1.07
8482300000457377
2366560264112EHV Site Specific 0.963 191.28 8.88 8.88
84923000006522922376503256010
EHV Site Specific 0.008 191.28 2.92 2.92
850
2300000647051230000064706023765529200132376552920022
EHV Site Specific 2.046 382.55 3.12 3.12
851237655082501323800000005432380000004097
EHV Site Specific 0.686 286.91 4.73 4.73
852 2380000257932 EHV Site Specific - Generation Exempt 0.208 5.63 1.18 1.18
85323800004288372380000428846
EHV Site Specific 0.007 191.28 4.14 4.14
854 2380000476088 EHV Site Specific - Generation Exempt 0.208 2.33 1.18 1.18
855
238000072419523800010789772380001078986238000107899523800010790012380001079321
EHV Site Specific 573.83 1.41 1.41
856
2380001519750238000151976023800015197792380001519788
EHV Site Specific 0.299 382.55 1.08 1.08
857 2300000526046 EHV Site Specific 2 .239 95.64 3.81 3.81
858230000083936423265262900162326526290025
EHV Site Specific 2.105 286.91 3.65 3.65
85923365257110112336525711020
EHV Site Specific 0.030 191.28 2.08 2.08
860233652633201723365263320262300000457057
EHV Site Specific 0.241 382.55 3.30 3.30
NORTHERN POWERGRID (YORKSHIRE) PLC 34 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
35/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
861
2300000493180230000055212523365521150172336552115026
EHV Site Specific 0.113 382.55 3.31 3.31
862
2300000234163230000023417223365907700132336590770022
EHV Site Specific 1.125 382.55 3.25 3.25
863
2300000234066230000023407523000002340842336590810010
EHV Site Specific 0.603 382.55 4.56 4.56
864 2300000478970 EHV Site Specific 0 .216 95.64 1.62 1.62
86523465300350172346530035026
EHV Site Specific 0.767 191.28 2.21 2.21
86723465344330192346534433028
EHV Site Specific 0.239 191.28 3.84 3.84
86823565300300152356530030024
EHV Site Specific 0.019 191.28 2.55 2.55
86923565303210102356530321029
EHV Site Specific 0.715 191.28 5.03 5.03
87023565306202102356530620229
EHV Site Specific 1.431 191.28 3.13 3.13
87123665400610172366540061026
EHV Site Specific 1.501 191.28 4.01 4.01
8722300000674055230000067406423000006740732366540100010
EHV Site Specific 0.250 191.28 3.64 3.64
87323000007775302366540110116
EHV Site Specific 0.181 191.28 1.59 1.59
874 2300000542828 EHV Site Specific 95.64 2.67 2.67875 2366560263119 EHV Site Specific 0.963 191.28 2.77 2.77
87623000006995652366591250015
EHV Site Specific 0.318 191.28 4.17 4.17
877 2366591617013 EHV Site Specific 3.220 191.28 6.65 6.65878 2376501360010 EHV Site Specific 0.495 191.28 3.49 3.49
NORTHERN POWERGRID (YORKSHIRE) PLC 35 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
36/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
87923765021950112390000003986
EHV Site Specific 0.017 191.28 2.16 2.16
880 2300000792050 EHV Site Specific 0.276 191.28 2.05 2.05
88123000006344152376552766015
EHV Site Specific 0.276 191.28 2.82 2.82
882 2300000826383 EHV Site Specific 5 .359 11.27 0.74 0.74
883
2376503230011237650801001723900000024402390000002459
EHV Site Specific 0.275 191.28 2.64 2.64
884 2300000233754 EHV Site Specific 0 .016 95.64 2.28 2.28886 2380001187667 EHV Site Specific 0 .317 95.64 1.91 1.91887 2380001432843 EHV Site Specific 0 .259 95.64 2.19 2.19
888
23800014486112380001448620238000144863023800014486492380001448658
EHV Site Specific 0.110 478.19 1.73 1.73
889 2380001564275 EHV Site Specific 0.165 2.42 1.59 1.59797 2390000079381 EHV Site Specific - Generation Exempt 0.470 2.20 1.78 1.78798 2380001746400 EHV Site Specific 33.67 1.21 1.21799 2380001812550 EHV Site Specific 0 .282 32.81 1.18 1.18821 2380001851381 EHV Site Specific 0.286 4.08 3.60 3.60
82223800018830362380001883045 EHV Site Specific 0 .286 10.27 3.60 3.60
823 2380001877557 EHV Site Specific 0 .122 17.40 5.41 5.41824 MSID 7275 EHV Site Specific 15.61 2.16 2.16826 2380001874087 EHV Site Specific 0 .268 28.63 3.79 3.79
86623465344000132346534400022
EHV Site Specific 0 .801 95.64 2.03 2.03
827 2380001838371 EHV Site Specific 0.002 2.28 1.19 1.19768 2380001882798 EHV Site Specific 0.016 4.26 2.95 2.95801 2380001905070 EHV Site Specific 1.188 2.50 3.21 3.21792 2380001951360 EHV Site Specific 19.18 1.26 1.26806 TBC EHV Site Specific 0 .073 45.72 2.52 2.52803 2380001909066 EHV Site Specific 14.15 2.08 2.08
NORTHERN POWERGRID (YORKSHIRE) PLC 36 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
37/48
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ImportUnique
Identifier LLFC
ImportMPANs/MSIDs
Name
ImportSuper Red
unit rate(p/kWh)
Importfixed charge
(p/day)
Importcapacity rate(p/kVA/day)
Importexceeded
capacity rate(p/kVA/day)
805 TBC EHV Site Specific 0.189 32.93 3.87 3.87
825 2380002022460 EHV Site Specific 0.087 4.10 2.58 2.58
80223800019090752380001909084
EHV Site Specific 0.162 263.74 1.81 1.81
807 2380002032360 EHV Site Specific 195.18 1.94 1.94
NORTHERN POWERGRID (YORKSHIRE) PLC 37 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
38/48
Annex 2b - Schedule of Export Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
Super Red Time Band
16:00 to 19:30
All the above times are in UK Clock time
ExportUnique
Identifier LLFC
ExportMPANs/MSIDs
Name
ExportSuper Red
unit rate(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded
capacity rate(p/kVA/day)
90 2394000039650 EHV Site Specific 104.52 0.13 0.1382 2394000039660 EHV Site Specific 468.88 0.13 0.1376 2394000039641 EHV Site Specific 434.72 0.13 0.1375 2394000039679 EHV Site Specific 444.83 0.13 0.1395 2394000060226 EHV Site Specific ( 0.146) 796.98 0.13 0.13
6023000002337362300000880975
EHV Site Specific - Generation Exempt
62 2300000457410 EHV Site Specific - Generation Exempt
8023000009489042300000948913
EHV Site Specific - Generation Exempt
66 23000002339122300000996990
EHV Site Specific - Generation Exempt
67MSID 7020MSID 7021
EHV Site Specific - Generation Exempt
92 2394000019176 EHV Site Specific ( 0.043) 5,964.66 0.13 0.13
7423940000029252394100008408
EHV Site Specific - Generation Exempt
87 2394000024440 EHV Site Specific ( 0.223) 1,347.35 0.13 0.1377 2300000233610 EHV Site Specific - Generation Exempt78 2 300 0004 438 25 EHV Site Speci fic - Genera tion Part Exem pt 414.54 0.13 0.1381 2300000790550 EHV Site Specific - Generation Exempt83 2300000974408 EHV Site Specific - Generation Exempt84 2300001007256 EHV Site Specific - Generation Exempt
Notes
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final EDCM export charges
Time Periods for Designated EHV Properties
Time periods
Monday to Friday(Including Bank Holidays)November to February Inclusive
NORTHERN POWERGRID (YORKSHIRE) PLC 38 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
39/48
Annex 2b - Schedule of Export Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ExportUnique
Identifier LLFC
ExportMPANs/MSIDs
Name
ExportSuper Red
unit rate(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded
capacity rate(p/kVA/day)
85 2394000011646 EHV Site Specific - Generation Exempt
8623911000137042394000011502
EHV Site Specific - Generation Exempt
88 2394000027673 EHV Site Specific ( 0.313) 1,593.26 0.13 0.1389 2394000043364 EHV Site Specific ( 0.103) 1,555.09 0.13 0.13
94 2394000056790 EHV Site Specific 816.71 0.13 0.1393 2394000058333 EHV Site Specific ( 0.338) 270.91 0.13 0.13
91239400004758123940000475902394000047606
EHV Site Specific 1,796.90 0.13 0.13
97 2394000055174 EHV Site Specific 9,724.21 0.13 0.1398 2394000072198 EHV Site Specific 5,211.58 0.13 0.1373 2300000233587 EHV Site Specific ( 1.864) 11.32 0.13 0.1368 2300000233898 EHV Site Specific ( 0.168) 40.27 0.13 0.1371 2394000016040 EHV Site Specific - Generation Exempt72 2394000022132 EHV Site Specific - Generation Exempt69 2300000930377 EHV Site Specific ( 5.359) 84.37 0.13 0.1370 2394000039590 EHV Site Specific ( 0.165) 93.22 0.13 0.1399 2394000079398 EHV Site Specific - Generation Exempt61 2394000083311 EHV Site Specific 2,721.33 0.13 0.1351 2394000089457 EHV Site Specific ( 0.282) 3,281.15 0.13 0.1352 2394000093027 EHV Site Specific 272.20 0.13 0.13
5323940000958312394000095840 EHV Site Specific 266.02 0.13 0.13
54 2394000097068 EHV Site Specific 3,754.98 0.13 0.1355 MSID 7275 EHV Site Specific 538.45 0.13 0.1357 2394000094590 EHV Site Specific 3,435.58 0.13 0.1358 2394000091952 EHV Site Specific ( 0.074) 274.00 0.13 0.1359 2394000095804 EHV Site Specific 272.03 0.13 0.13
105 2394000098805 EHV Site Specific 316.29 0.13 0.1396 2394000102693 EHV Site Specific 1,574.78 0.13 0.13
109 TBC EHV Site Specific 1,973.30 0.13 0.13107 2394000099074 EHV Site Specific 1,771.09 0.13 0.13108 TBC EHV Site Specific 4,621.45 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 39 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
40/48
Annex 2b - Schedule of Export Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
ExportUnique
Identifier LLFC
ExportMPANs/MSIDs
Name
ExportSuper Red
unit rate(p/kWh)
Exportfixed charge
(p/day)
Exportcapacity rate(p/kVA/day)
Exportexceeded
capacity rate(p/kVA/day)
56 2394000110630 EHV Site Specific 393.12 0.13 0.13
10623940000990562394000099065
EHV Site Specific ( 0.187) 1,776.54 0.13 0.13
63 2394000111660 EHV Site Specific 1,717.58 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 40 of 48 FEBRUARY 2014 - V1.0
-
8/9/2019 Northern Power - Yorkshire 2014
41/48
Annex 3 - Schedule of Charges for use of the Distribution System to Preserved/Additional LLFC Classes
Closed LLFCs PCs Unit rate 1 p/kWh Unit rate 2 p/kWh Unit rate 3 p/kWhFixed chargep/MPAN/day
Domestic U nrestricted 101, 400, 401, 999 1 2.263 4.71
Domestic Two Rate 121, 123, 402, 403, 413 2 2.829 0.101 4.71
Domestic Off Peak (related MPAN) 130, 131, 414, 415, 416 2 0.390
Small Non D omestic Unrestricted 241, 404, 405 3 2.254 4.32
Small Non Domestic Two Rate 249, 250, 275, 406, 407, 417, 418 4 2.946 0.185 4.32
Small Non Domestic Off Peak (relatedMPAN) 268, 419, 420 4 0.503
LV Medium Non-Domestic 280, 287, 408, 409, 421 5-8 2.236 0.063 30.40
HV Medium Non-Domestic 410 5-8 1.764 0.036 210.59
LV Generation NHH 17, 18, 21, 411, 412 8 ( 0.574)
Closed LLFCs PCsUnit rate 1
p/kWh(red/black)
Unit rate 2p/kWh
(amber/yellow)
Unit rate 3p/kWh(green)
Fixed chargep/MPAN/day
Capacity chargep/kVA/day
Reactive powercharge
p/kVArh
Excess Capacitychargep/kVA
LV HH Metered 244, 248, 257, 291, 297 0 9.377 0.963 0.051 13.06 1.46 0.329 1.46
LV Sub HH Metered 472 0 8.256 0.786 0.040 43.66 1.93 0.269 1.93
HV HH Metered 500, 501, 502, 741, 742, 743, 744 0 6.522 0.573 0.027 111.03 1.81 0.198 1.81
LV Generation Intermittent 12, 40 0 ( 0.574) 0.134
LV Sub Generation Intermittent 14 0 ( 0.504) 0.128
HV Generation Intermittent 15, 41 0 ( 0.357) 117.36 0.098