overview and guidelines for... soa/npac, internal and inter- carrier testing
TRANSCRIPT
Overview and Guidelines for...
SOA/NPAC, Internal and Inter-carrier testing
SOA Testing
May 1, 2001 to September 30, 2001 Must be coordinated through Neustar Not a topic for discussion in this forum
Internal (intra-company) testing
Timeframe– Now to September 30, 2001– Guidelines on Section 1.0.1 of industry test
plan– Once the intra-company testing of affected nodes and network, and the
certification testing with the Number Portability Administration Center (NPAC) is successfully completed, the Test Coordinator will schedule inter-company testing. Prior to initiating the inter-company testing, all intra-company testing must be completed by the individual Service Providers.
Inter-carrier testing
Excerpt from Industy test document Section 1.0.3 “Each Service Provider will conduct a set of test scripts between itself
and another service provider. Specific combinations of participants will be determined by the participants themselves, using the recommended list defined in Section 3…. Participants may choose to run additional tests developed by individual Service Provider combinations that address any specific needs, architectures or business arrangements of the testing partners.
Service Providers participating in a particular location will negotiate for test partners and test selections. Their Test Coordinators will manage this process by developing a master test schedule and track the testing done in each location by each Service Provider”
Wireless/Wireline porting
Any porting between wireless and wireline will default to wireline “long” timers
Wireless/wireline porting
SHORT WPR form Hours of operation -
will be discussed later ICC time
– 30 minutes
NPAC T1/T2 timer-– 1 hr each
LONG LSR form Hours of operation- will be discussed later ICC time
– 24 hour
NPAC T1/T2 Timer– 9 hours each
Reseller porting
Facility based provider is responsible for NPAC communication for its reseller
FB provider’s SPID will be on the NPAC record
Responsibility for ICC process is determined by each carrier
Reseller/Facility based provider porting
step 1 WPR
step 2 WPRC
step 3 Notification step 3 Notification
step 4a SV Create
NLSP OLSP
OLSP NLSP
NNSP ONSP
NNSP NPAC
Reseller/Facility based provider porting
step 4b SV Match
step 5 activate download
step 6a completion
step 6b completion
ONSP NPAC
NNSP NPAC
NNSP NLSP
ONSP OLSP
WNP Industry Test Plan
CTIA Number Advisory Working Group Intercarrier test plan (Version 1.0)– Section 1 - Scope/Purpose, Assumptions
vertical services not included, only tested as agreed between providers
“black box” testing approach only concerned with LNP compliance after porting business as usual, no degradation to system no vendors mentioned in test plan
WNP Industry Test Plan
Impacts to system by LNP Porting Order Exchange Service Provisioning Exception Processing – Order Cancellation Disconnected TN Snapback Call Flows 911 Record Changes Operator Services Inter-service provider billing
WNP Industry test plan
Section 2 - Network configuration requirements/consideration
STP, SCP, SSP, SOA/LSMS requirements
Section 3 - Test Planning– Test coordinator, manager roles/resp– Documenting results– Test matrix (Appx. A)
WNP Industry test plan
Section 4 - Test cases– 4.0 Provisioning cases (9 tests)– 4.1 Wireless/Wireless test cases (36 tests)– 4.2 Wireless/Wireline test cases (16 tests)– 4.3 Wireline/Wireless test cases (16 tests)– 4.4 Enhanced services (4 tests)– TOTAL = 81 possible tests– Description, procedure, results for each case
WNP Industry test plan
Appendices:– Appendix A Test matrix– Appendix B Support drawings– Appendix C Entry checklist– Appendix D Exit checklist– Appendix E Sample forms – Appendix F Test successful criteria– Appendix G Related documents– Appendix H Glossary of terms
Test coordination
MSA # Test coordinators from each SP will schedule
inter-carrier testing dates from this info– Company Date ready for testing– Company A (11/15/01)– Company B (12/12/01)– Company C (10/01/01)
Future Meetings
1 year until testing should be complete– June 2001 to May 2002– propose 12 monthly face to face meetings the week before WNPO
(2 day meetings)– 12 monthly conference calls (1/2 day meetings)– other ad-hoc meetings can be scheduled as needed
Next Meeting Dates Face to Face (2001) Tues & Wed week before
WNPO– June 5,6 Arlington, VA (Telecorp)– July 5 (no face-to-face, conf call)– Aug 7,8 Denver, CO (Qwest
Wireless*)– Sep 4,5 Seattle, WA (Voicestream
or Triton PCS*)– Oct 2,3 Dallas,TX (Cingular)– Nov 6,7 Atlanta, GA (Cingular)– Dec 4,5 Sprint PCS or– Telcordia*
WNPO
– June 11-12 Kansas City, MO– July 9-10 Ottawa– Aug 13-14 Seattle, WA– Sept 10-11 Baltimore, MD– Oct 8-9 San Antonio, TX– Nov 12-13 New Orleans, LA– Dec 10-11 Phoenix, AZ
Next Meeting Dates
Conf Calls (2 weeks after face-to-face)– TIME: 12 PM - 4 PM (Eastern)– May 24, 2001– June 21, 2001– July 5, 2001 (due to holiday)– July 19, 2001– August 23, 2001– September 20, 2001– October 18, 2001– November 29, 2001– December - cancelled