Park School Modernization Summer 2012. After. Before. Entry. New paint, new glass, new landscape, new flagpole, and new paving. After. Before. Sidewalk dead ends into tree. New retaining wall, fence, and walkway around tree made of pavers. After. Before. Southern entrance into school. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Park School Modernization Summer 2012

Park School ModernizationSummer 2012

Page 2: Park School Modernization Summer 2012

New paint, new glass, new landscape, new flagpole, and new paving

Before AfterEntry

Page 3: Park School Modernization Summer 2012

New retaining wall, fence, and walkway around tree made of pavers

Before AfterSidewalk dead ends into tree

Page 4: Park School Modernization Summer 2012

New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting

Before AfterSouthern entrance into school

Page 5: Park School Modernization Summer 2012

New window glazing, water fountain, paint, asphalt, lighting and playground striping

Before AfterBack of school

Page 6: Park School Modernization Summer 2012

New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways

Before AfterOld boys restroom

Page 7: Park School Modernization Summer 2012

New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway

Before AfterPlanter

Page 8: Park School Modernization Summer 2012

New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway

Before AfterCampus

Page 9: Park School Modernization Summer 2012

New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway

Before AfterCampus

Page 10: Park School Modernization Summer 2012

New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway

Before AfterCampus

Page 11: Park School Modernization Summer 2012

New Exit stairs, paint, and playground striping

Before AfterExit stairs

Page 12: Park School Modernization Summer 2012

New exit stairs and playground striping

Before AfterExit stairs

Page 13: Park School Modernization Summer 2012

New siding on Annex Building

Before AfterOld siding on Annex Building

Page 14: Park School Modernization Summer 2012

New ADA compliant ramp and retaining wall

Before AfterRamp

Page 15: Park School Modernization Summer 2012

New entry store front, paint and railing

Before AfterEntry

Page 16: Park School Modernization Summer 2012

New Paint

Before AfterCeiling at front entry

Page 17: Park School Modernization Summer 2012

New casework and paint

Before AfterResource room

Page 18: Park School Modernization Summer 2012

New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater

Before AfterLower level classroom

Page 19: Park School Modernization Summer 2012

New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards

Before AfterLower level classroom

Page 20: Park School Modernization Summer 2012

Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler

Before AfterHallway

Page 21: Park School Modernization Summer 2012

Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint

Before AfterHallway

Page 22: Park School Modernization Summer 2012

New carpet, paint, door, counter, pin-up panels

Before AfterAdministrative offices

Page 23: Park School Modernization Summer 2012

New wall creating nurse station, new paint, flooring, doors

Before AfterAdministrative Office

Page 24: Park School Modernization Summer 2012

Remove wall, new casework, new sink

Before AfterStaff work room

Page 25: Park School Modernization Summer 2012

New window glazing where windows failed

Before AfterTypical Classroom

Page 26: Park School Modernization Summer 2012

New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator

Before AfterTypical classroom

Page 27: Park School Modernization Summer 2012

New storefront exit system, larger landing with abrasive action carpet new railing

Before AfterExit stairs

Page 28: Park School Modernization Summer 2012

All new fixtures and finishes

Before AfterTypical upper restroom