peir_vs chelsea embankment foreshore part 2

Upload: thamestunnel

Post on 07-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    1/27

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    2/27

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    Chelsea 5

    Chelsea 4

    Chelsea 3

    Chelsea 2

    Chelsea 1KC51

    KC50

    KC4 (KC56)Chelsea 6

    Nine Elms 7

    Nine Elms 6

    W3

    Vol 16 Figure 4.4.1for PEIR

    Chelsea Embankment ForeshoreAir Quality and Odour -

    Air Quality Monitoring Locations

    Title:

    Map Ref : ........................ .... 1PL03-AQ-10064Date : ............ .................. .... 2011/09/30Projection : ................ .......... British National Grid

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be

    Acquired or Used

    !(Existing Local Authority

    Continuous Monitors

    !(Existing Local AuthorityDiffusion Tubes

    !(New Diffusion Tubes(Project)

    0 70 140 210 28035

    Metres

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    3/27

    TCBs

    Monument

    9.5m

    Chelsea Reach

    MHW

    Shingle

    12.4m

    11.0m

    ShingleMHW

    Shingle

    CHELSE

    AEMBA

    NKMENT

    4.3m

    4.9m

    4.9m

    RiverTh

    ames

    5.4m

    (ArmyPensioners)

    Chelsea

    Reach

    7.5m4.3m

    rial

    MeanHigh

    Water

    Royal Hospital

    Pavilio

    nC

    ourt

    1to5

    15

    CR

    B

    oroCons t&LBBd

    y

    BoroConst

    ,GL AslyCo

    nst&LBBd

    y

    CCLW

    !

    !

    !

    !

    #*

    #*

    ")Q

    !(

    528480,177776

    528342,177743

    528505,177896

    Trawl1

    Trawl2

    AL2

    AL1

    SE1

    SE2

    SW1

    SW2

    CS14X

    528264,177840

    Vol 16 Figure 5.4.1for PEIR

    Chelsea Embankment ForeshoreAquatic Ecology

    Sampling Locations

    Title:

    Map Ref : ......................... ... 1PL03-AE-20002Date : .............................. .... 2011/10/03Projection : ................ .......... British National Grid

    0 20 40 6010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    Draft Limit of Land to beAquired or Used

    !( CSO (Directly Controlled)

    Airlift

    ")Q Quadrat

    Seine Netting

    #* Sweep/Kick Sample

    ! Coordinates of Sampling Area

    Boat Fish Trawl

    Sampling Area for Fish andBenthic Invertebrates

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    4/27

    TCBs

    Mu

    Monument

    9.5m

    11.9m

    Chelsea Reach

    MHW

    Shingle

    MH

    12.4m

    11.0m

    Shingle

    M

    Shingle

    CHELSE

    AEMB

    ANKMEN

    T

    4.3m

    4.9m

    4.9m

    RiverTh

    ames

    5.4m

    Pensioners)

    Chelsea

    Reach

    7.5m

    4.3m

    MeanHigh

    Water

    Hospital

    Lister Hospital

    4.3m

    7.2m

    GrosvP

    avilio

    nC

    ourt

    Water

    1to

    5

    15

    Hi

    CR

    BoroCons t&LBBd

    y

    BoroConst,

    GL AslyCon

    st&LBBdy

    CCLW

    A

    A

    A A

    KENSINGTON & CHELSEA

    WANDSWORTH

    CITY OF WESTMINSTER

    Vol 16 Figure 6.4.1for PEIR

    Chelsea EmbankmentTerrestrial Ecology -

    Phase 1 Habitat Survey

    Title:

    Map Ref : ........................ .... 1PL03-TE-40007Date : ............................. ..... 2011/10/03Projection : .................. ........ British National Grid

    0 10 20 30 405

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    Scattered Trees

    ACultivated/Disturbed Land

    - Amenity Grassland

    Hard Standing

    Intertidal - Mud/Sand

    Other - Tall Ruderal

    Running Water

    Scrub - Dense/Continuous

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    5/27

    76

    58

    4

    48

    47

    46

    45

    44 43

    4139

    38

    37

    36

    31

    3029

    28 27

    26

    25

    21

    20

    34-3532-33

    40 42

    49

    5

    3

    2

    1

    17

    10

    9

    18

    19

    19

    50

    16

    15

    14

    13

    12

    11

    Vol 16 Fig 7.4.1For PEIR

    Chelsea Embankment ForeshoreHistoric Environment Feature

    Title:

    Map Ref : ........................ .... 1PL03-HE-60021Date : ............. ................. .... 2011/10/06Projection : .................. ........ British National Grid

    0 25 50 75 10012.5

    Meters

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    !( HE Feature/Findspot

    ") Past Investigation

    " Statutorily Listed Building

    HE Feature

    Statutorily Listed Building

    Wreck/Obstruction

    Registered Park/Garden

    Draft Limit of Landto be acquired or used

    Study Area

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    6/27

    3

    6 2

    7

    5

    4

    9

    1

    8

    Vol 16 Figure 8.4.1for PEIR

    Chelsea Embankment ForeshoreLand Quality

    Contaminative Land Uses

    Title:

    0 20 40 60 8010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7thFloor,

    37NorthWharf Road,Paddington,LondonW21AF

    Thames Water Utilities

    Legend

    Draft Limit of Land to be Acquiredor Used

    Draft Limit of Land 250m Buffer

    Past & present potentialcontamination sources

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Re f I te m I nfe rre d Da te o f

    Operation

    None

    1 Timber Yard c1874-1896

    2 Timber Yard c1875-1896

    3 Dock c1896-1975

    4

    Battersea

    Wharf c1896-1975

    5

    Disinfection

    Station c1916-1973

    6

    Lister

    Hospital

    c1896 - present

    7

    Corporation

    Depot

    c1950-1967

    8 De po t c 19 73

    9

    Electrical

    Substation c1973

    Off-site

    On-site

    Map Ref : ....................... ..... 1PL03-LQ-30002Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    7/27

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    8/27

    &:&:

    &:&:

    &:

    &:&:&:

    &:

    &:

    """

    _

    _

    Vol 16 Figure 8.4.3for PEIR

    Chelsea Embankment ForeshoreLand Quality - Environmental

    Records and Waste Sites

    Title:

    Map Ref : ........................ .... 1PL03-LQ-30024Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid

    0 20 40 60 8010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7thFloor,

    37NorthWharf Road,Paddington,LondonW21AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Draft Limit of Land 250m Buffer

    Waste

    _ Past Potential Contaminated Industrial Uses" Registered Waste Transfer Sites

    Hazards

    &: Pollution Incidents to Controlled Waters_ Past Potentially Contaminated Industrial Uses

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    9/27

    Lodge

    (private)

    El SubSta

    EMBA

    NKMEN

    TGARDE

    NS

    10

    4.8m

    5

    Chapel

    Chap

    el

    (priv

    ate)

    6.8m

    College Court

    Great

    Hall

    se

    19

    18

    20

    TCB

    Dock

    MP

    GROS

    Viaduct

    Dolphin

    Mud

    SL

    MP

    TCBs

    MeanHighWater

    Mud

    SL

    5.4m

    SL

    8.5m

    123a

    Monument

    9.5m

    SL

    Bridge

    11.9m

    MHW

    ChelseaReach

    7.1m

    MHW

    SL

    Viaduct

    SL

    Pumping Station

    8.2m

    MP

    Shingle

    Hard

    GP

    Western

    RiverTha

    MHW

    FB

    MP

    Bridge

    MPs

    Chy

    Viaduct

    MHW

    Chelsea12.4m

    MP

    11.0m

    Grosvenor

    SGantry

    9.3m

    Shingle

    MHW

    Dolphin

    SL

    Shingle

    T u n n e l

    GrosvenorCanal

    MPs

    8.5m

    SL

    124

    Subway

    PC

    Shing le

    MHW

    Shingle

    CHELSE

    AEMB

    ANKME

    NT

    4.3m

    4.9m

    Shingle

    4.9m

    23

    17to2

    0

    4.8m

    Tennis Courts

    Festival PleasureGardens

    22

    6.6m

    RiverTh

    ames

    5.4m

    MeanHigh

    Water

    (Army Pensioners)

    ChelseaR

    each

    ChelseaCo

    urt

    11to12

    7.5m

    21

    Sluice

    4.3m

    Slopingm

    asonry

    War Memorial

    Hard

    MeanHigh

    Water

    CarPark

    RoyalHospital

    4.8m

    5.2m

    Shingle

    CARR

    IAGED

    RIVEN

    ORTH

    5.1m

    Lister Hospital

    Gatliff

    t16

    Close

    to

    British T

    1to20

    164

    R

    S

    Police Station

    152

    141

    3

    Transport1to120

    177

    Depot

    PEABODYAV

    153

    1to16

    1to20

    58to73

    GATLIFFROAD

    PumpingStation

    to

    to

    Chy

    1to20

    188

    1to20

    U

    78

    LB

    DFn

    CHELSE

    ABRIDG

    ERO

    AD

    FS

    Figure

    to

    5.1m

    38

    to

    Ranelagh

    5.4m

    117

    5.1m

    266

    Royal Hospital

    EBURYBRIDGE

    ROAD

    53

    1to

    42

    Chelsea Gate

    DFn

    Statue

    to

    WellingtonBuildings

    to

    260

    39

    Stone

    105

    4.3m

    5.8m

    (siteof)

    90

    to

    Stone

    43to57

    to

    Court

    Light Horse

    237

    52

    66

    79

    116

    249

    261to

    74

    House

    4.7m

    21291to1

    04

    27

    GATLIFF

    7.2m

    Ranelagh Gardens

    Stone

    Court

    to

    to

    248

    26

    67

    128

    to

    201

    15

    to

    6.5m

    ChelseaGardens to

    MLW

    MLW

    MH&M

    LW

    MH&M

    LW

    EASTROA

    D

    1

    to

    1 4 2

    WarwickBuildi n

    g

    Os wa ld

    Bu i ld

    in g

    Centurion Building

    HowardBuilding

    1

    to

    159

    1 to101

    1to242

    GrosvenorP

    avilio

    nC

    ourt

    Waterside

    1to

    5

    15

    Hirst Court

    30

    1t o48

    10

    Cubitt Building

    1t o151

    Grosvenor Waterside

    HepworthCourt

    1to97

    20

    Eus ta c e Bui l

    in

    1

    to

    1 7 0

    P

    Playground

    Sw

    ing

    Br

    idge

    Bram

    ah

    Woods

    House

    1to198

    WentworthCourt

    4

    House

    9

    BoroConst, GLAsly Con t

    CR

    Bor o

    Cons t&

    LB

    Bdy

    CCLW

    BoroConst,

    GLAslyCon

    st &LBBdy

    CCLW

    CR

    CR

    Chelsea Gardens

    Embankment Gardens

    Pavilion Court

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    Vol 16 Figure 9.4.1for PEIR

    Chelsea Embankment ForeshoreNoise and Vibration -Residential Receptors

    Title:

    Map Ref : ....................... ..... 1PL03-NV-40002Date : ............................. ..... 2011/09/30Projection : .................. ........ British National Grid

    0 25 50 75 10012.5

    Metres

    Mapping reproduced by permission of Ordnance Survey on

    behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    Residential Receptors

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    H

    u

    tim

    ..

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    10/27

    !(

    !(

    !(!(

    1

    Lodge

    (private)

    El SubSta

    EMBA

    NKMEN

    TGARDE

    NS

    TA

    10

    4.8m

    5

    r r

    Chapel

    nni urt

    Chap

    el

    (priv

    ate)

    6.8m

    College Court

    TA

    A

    Great

    Hall

    se

    1

    19

    18

    2

    TCB

    Dock

    MP

    GRO

    Viaduct

    Dolphin

    Mud

    SL

    MP

    TCBs

    Mean HighWater

    Mud

    SL

    5.4m

    SL

    8.5m

    123a

    Monument

    9.5m

    SL

    Bridge

    11.9m

    MHW

    ChelseaReach

    7.1m

    MHW

    SL

    Viaduct

    SL

    Pumping Station

    8.2m

    MP

    Shingle

    Hard

    GP

    Western

    RiverTha

    MHW

    FB

    MP

    Bridge

    MPs

    Chy

    Viaduct

    MHW

    Chelsea12.4m

    MP

    11.0m

    Grosvenor

    SGantry

    9.3m

    Shingle

    MHW

    Dolphin

    SL

    Shingle

    T u n n e l

    GrosvenorCa

    nal

    MPs

    8.5m

    SL

    124

    Subway

    PC

    Shingle

    MHW

    Shingle

    CHELS

    EAEMB

    ANKME

    NT

    4.3m

    4.9m

    Shingle

    4.9m

    23

    17to2

    0

    4.8m

    Tennis Courts

    Festival PleasureGardens

    22

    6.6m

    RiverTh

    ames

    5.4m

    MeanHigh

    Water

    (Army Pensioners)

    ChelseaRe

    ach

    ChelseaCo

    urt

    11to12

    7.5m

    21

    Sluice

    4.3m

    Slopingm

    asonry

    War Memorial

    Hard

    MeanHigh

    Water

    CarPark

    RoyalHospital

    4.8m

    .

    5.2m

    Shingle

    CARR

    IAGE

    DRIVE

    NORTH

    5.1m

    .

    e

    Lister Hospital

    Gatliff

    t1

    6

    Close

    to

    British T

    I

    1to20

    164

    t

    R

    t2

    l y r un

    S

    t

    Police Station

    t2

    152

    141

    t2

    3

    Transport1to120

    l

    u

    t

    mli

    t t e

    177

    E

    IE

    L

    E

    2

    Depot

    PE

    AB

    OD

    YA

    V

    153

    1to

    16

    33

    1to20

    58to73

    t

    GATLIFFROAD

    PumpingStation

    to

    to

    t

    r

    t

    Chy

    1to20

    t2

    188

    1to20

    U

    78

    LB

    DFn

    CHELSEABR

    IDGE

    ROAD

    FS

    Figure

    to

    5.1m

    38

    .

    to

    Ranelagh

    5.4m

    117

    5.1m

    266

    Royal Hospital

    EBURYBRIDGE

    ROAD

    53

    L

    1to

    42

    Chelsea Gate

    DFn

    Statue

    to

    WellingtonBuildings

    to

    260

    39

    Stone

    105

    4.3m

    5.8m

    (siteof)

    90

    to

    Stone

    43to57

    to

    Court

    Light Horse

    237

    52

    66

    79

    116

    249

    261to

    74

    House

    4.7m

    21291to104

    27

    GATLIFF

    7.2m

    Ranelagh Gardens

    Stone

    Court

    to

    to

    248

    26

    67

    128

    to

    201

    15

    to

    6.5m

    ChelseaGardens to

    MLW

    MLW

    MH&M

    LW

    MH&M

    LW

    EASTROAD

    1

    1

    to

    1 4 2

    WarwickBu

    ilding

    Os wa ld Bu ild in g

    Centurion Building

    HowardBuil d

    ing

    1

    to

    159

    1 t o 101

    1to242

    GrosvenorP

    avilio

    nC

    ourt

    Waterside

    1to

    5

    15

    Hirst Court

    30

    1t o48

    10

    Cubitt Building

    1t o151

    Grosvenor Waterside

    HepworthCourt

    1to97

    20

    Eus ta c e B

    uilin

    1

    to

    1 7 0

    1

    P

    Playground

    Swing

    Bridge

    Bram

    ah

    Woods

    House

    1to

    198

    WentworthCourt

    4

    House

    9

    BoroConst, GLAsly Con t L y

    CR

    Bor oCons t&

    LB

    Bdy

    CCLW

    BoroConst,G

    LAslyConst

    &LBBdy

    CCLW

    y

    CR

    CR

    CS13B

    CS13A

    CS15X

    8

    7

    6

    5

    4

    3

    2

    1

    1

    1

    CS14X

    Vol 16 Figure 10.4.1for PEIR

    Chelsea Embankment ForeshoreSocio-Economic - Context Plan

    Title:

    Map Ref : ......................... ... 1PL03-SE-20007Date : .............................. .... 2011/10/04Projection : ................ .......... British National Grid

    0 20 40 60 80 10010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    Draft Limit of Land to beAcquired or Used

    !( CSO (Directly Controlled)

    !( CSO (Indirectly Controlled)

    Site Context Features

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Site Context Features1. Thames Path and National Cycle Route2. Residential3. Ranelagh Gardens4. Royal Hospital South Grounds5. Royal Hospital Chelsea6. Lister Hospital7. Battersea Park8. Grosvenor Rail Bridge

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    11/27

    KENSINGTON & CHELSEA

    WANDSWORTH

    CITY OF WESTMINSTER

    Vol 16 Figure 11.4.1for PEIR

    Chelsea Embankment ForeshoreTownscape and VisualDevelopment Pattern

    and Scale

    Title:

    Map Ref : ........................ .... 1PL03-TS-40008Date : ............. ................. .... 2011/10/04Projection : ................. ......... British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Building Heights

    (mts)

    0 - 20m

    20 - 40m

    40 - 60m

    60 - 80m

    80 - 100m

    >100m

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    12/27

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(!(!(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(!(!(!(!(!(!(!(!(!(!(!(!(

    !(!(!(!(!(!(!(!(!(

    !(!(

    !(

    !(!(!(

    !(

    !(

    !(!(!(!(!(

    !(

    !(

    !(!(

    !(!(

    !(

    !(

    !(

    CHRI

    STCHUR

    CHSTR

    EET

    CAVE

    RSHA

    MSTRE

    ET

    ROYALH

    OSPIT

    ALRO

    AD

    CHRIST

    CHU

    RCH

    EMBA

    NKMENT

    GARD

    ENS

    WES

    TRO A

    D

    CLO

    VERM EWS

    PHYS

    ICPL

    ACE

    CHELSE

    AEMBA

    NKMENT

    NS

    TERRACE

    TITES

    TREET

    SWAN W

    ALK

    PARADISE

    WALK

    DILKE ST

    REET

    THEP AR

    AD E

    CARRIA

    GE

    DRIVE

    NORTH

    CARRIAGEDRIVEW

    EST

    TerraceWalk

    WOODFALL

    STRE

    ET

    TEDW

    ORTH

    DURH

    AMPLAC

    E

    SMITHS

    TREET

    SMITH

    FRANKLIN'SR

    OW

    SQUA

    RE

    TERR

    ACE

    ELYT A

    LACE

    TERR

    ACE

    AND

    ERSO

    NSTR

    EET

    T RYO

    N

    RAL

    STO

    NSTREE

    T

    CHR

    ISTC

    HUR

    CH

    STRE

    ET

    WELLIN

    GTO

    N

    STLEO

    NARD

    'STERRA

    CE

    WA L

    POLE

    STR EET

    SQU A R E

    CHELTENH

    AM

    B Y W A T E R S T R E E T

    OR MON D

    EGA TE

    ST REET

    ROYA

    LA VEN U

    E

    TEDW

    ORTH

    SQUA

    RE

    KIN

    G'S ROAD

    ROYA

    LHO

    SPITAL

    ROA

    D

    TEDW

    ORTH

    GARDENS

    OR M

    ON D EGA TE

    TITESTR

    EET

    GROSV ENOR ROAD

    PAXTON TERRACE

    CHELSE

    AEMB

    ANKME

    NT

    CARR

    IAGED

    RIVE

    NORTH

    PRI E F LERIE

    C A R R I A G E D R I V E E A S T

    SOPWITH

    WAY

    BATTER

    SEAP

    ARKRO

    AD

    PL

    ER

    CIRCUS

    BRA

    DMEAD

    Q U E E N S T O WN R O A D

    QUEEN'S

    CARRIA

    GED

    RIVEEA

    ST

    CLAREND

    ONSTREET

    SUTHERLANDSTREET

    WARWIC

    KWAY

    SUSSEX

    STREET

    SUTHE

    RL AND

    T U R P E N T I N E L A N

    E

    S U S S E X S T R E E T

    P E A B O D Y A V

    E N U E

    ALD

    ERNEYSTREET

    CUMBERLA

    NDSTREET

    GATLIFFROAD

    EBUR

    YB

    RID

    GE

    ROA

    D

    CAMB

    RIDGESTREE

    T

    LUPUS S

    TREET

    CHURCHILL GARDEN S ROAD

    ROW

    W E S T M O R E L A N D T E

    R R A C E

    WESTMO

    RELANDPLA

    CE

    WINCHESTE

    RSTREET

    STREET

    CHELSEABRIDG

    EROAD

    SLOA N E

    C OU R T

    EA S

    T

    LOWER

    P

    R E S T R E E T

    E B U R Y

    B R I D

    G E

    R O A D

    ROYALH

    OSPIT

    ALRO

    AD

    RANELA

    GHGRO

    VE

    SLOA N E

    C OU R T

    WES

    T

    STB A

    R N A

    B A S

    BLOOM

    FIELD TE

    RRACE

    HOL

    BEIN

    PLACE

    SLOANE STRE

    ET

    GATLIFF

    BUH

    EPL

    E

    TURK

    S RO

    W

    HOLBEIN

    MEWS

    PIMLICO

    ROA

    D

    GARDENS ROAD

    G VE

    CHURCHIL L

    WARWICKSQUARE

    LUPUSST

    REET

    GLOU

    CESTER

    STREET

    WINCH

    ESTER STREET

    CUMBERLA

    ND STREET

    WARWICKSQUARE

    WARW

    ICKSQUAR

    GLASGOWTERRACE

    GLOU

    CESTER

    STR

    EET

    CAMBR

    IDGESTREET

    ALDERNEYSTR

    EET

    DENBIG

    HPLA

    CE

    J H

    '

    L

    E

    STGEORGE' SDRI VE

    BATTE

    RSEA

    PARKR

    OAD

    CRINGLE STREET

    KIRT LI NG

    S TREET

    L

    REE

    STEWART' S

    ROAD

    SAVONA STRE

    ET

    THESSA

    LYROAD

    EA ST

    R OA D

    STBA RNABASM EWS

    KENSINGTON & CHELSEA

    WANDSWORTH

    CITY OF WESTMINSTER

    Vol 16 Figure 11.4.2for PEIR

    Chelsea Embankment ForeshoreTownscape and Visual

    Pattern and Extentof Vegetation

    Title:

    Map Ref : ........................ .... 1PL03-TS-40039Date : ............. ................. .... 2011/10/05Projection : ................. ......... British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    !(

    Known TreePreservation Orders

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    13/27

    Ci

    KENSINGTON & CHELSEA

    WANDSWORTH

    City of Westminster

    Battersea Park

    Ranelagh Gardens

    Burtons Court

    Chelsea Hospital Gardens

    Chelsea Physic Garden

    Vol 16 Figure 11.4.3for PEIR

    Chelsea Embankment ForeshoreTownscape and Visual

    Open SpaceDistribution and Type

    Title:

    Map Ref : ........................ .... 1PL03-TS-40132Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Metropolitan Open Land

    Historic Parksand Gardens

    Designated Open Space

    (RBKC UDP)

    Public Open Space

    Private Open Space

    ROYA

    LHOSP

    ITALROAD

    EBURYBR

    IDGE

    ROAD

    LUPUSSTREE

    T

    BATT

    ERSE

    APAR

    KROA

    D

    QUEENSTOWNROAD

    CHELSEAEMBA

    NKMENT

    CHELSEAEM

    B

    ANKMENT

    GROSVENORROAD

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    14/27

    KENSINGTON & CHELSEA

    WANDSWORTH

    CITY OF WESTMINSTER

    Vol 16 Figure 11.4.4for PEIR

    Chelsea Embankment ForeshoreTownscape and Visual

    Transport Network

    Title:

    Map Ref : ........................ .... 1PL03-TS-40075Date : ............................. ..... 2011/10/05Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    Rail

    Thames Path

    London Cycle Routes

    A Road

    ROYA

    LHOSP

    ITALROAD

    EBURYBR

    IDGE

    ROAD

    LUPUSSTREE

    T

    BATT

    ERSE

    APAR

    KROA

    D

    QUEENSTOW

    NROAD

    CHELSEAEMBA

    NKMENT

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    15/27

    WANDSWORTH

    KENSINGTON & CHELSEA CITY OF WESTMINSTER

    Battersea Park Conservation Area

    Pimlico Residential

    Battersea Industrial

    Royal Hospital Conservation Area Residential

    Royal Hospital Conservation Area - Grounds

    Chelsea Residential

    Belgravia Industrial

    Belgravia Residential

    Battersea Residential

    Belgravia Residential

    Grosvenor Bridge Rail

    Royal Hospital Conservation Area - Ran elagh Gardens

    Battersea Park ConservationArea Residential Area

    Vauxhall commercial

    River Thames - Royal Hospital & Battersea Park Reach

    River Thames - Nine Elms Reach

    Vol 16 Figure 11.4.5foe PEIR

    Chelsea Embankment ForeshoreTownscape and VisualTownscape Character

    Areas

    Title:

    Map Ref : ......................... ... 1PL03-TS-40158Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey on

    behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Townscape CharacterArea Boundary

    Conservation Areas

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    16/27

    .

    .

    .

    .

    .

    .

    .

    .

    Kennsington and Chelsea

    City of Westminster

    KENSINGTON & CHELSEA

    WANDSWORTH

    CITY OF WESTMINSTER

    9A.1

    1.2

    1.1

    2.4

    2.6

    2.3

    2.1

    2.8

    1.3

    Vol 16 Figure 11.4.6for PEIR

    Chelsea Embankment ForeshoreTownscape and VisualViewpoint Locations

    Title:

    Map Ref : ......................... ... 1PL03-TS-40105Date : .............................. .... 2011/10/06Projection : ................ .......... British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey on

    behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    . Viewpoints

    Zone of TheoreticalVisibility

    LVMF Linear Views

    Verifiablephotomontage locations

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    LVMF Linear Views:

    9A.1 - King Henry VIII's Mound,Richmond to St Paul's Cathedral

    Viewpoint Locations:

    1.X - Residential receptors2.X - Rereational receptors

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    17/27

    kk

    kk

    kk

    kk

    Chelsea Embankment Foreshore

    A3212

    A3212

    A3216

    Chelsea Embankment

    Chelsea Bridge Road

    WANDSWORTH

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEA

    Title:

    Map Ref : ........................ .... 1PL03-TT-50143Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid

    0 30 60 90 12015

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7thFloor,

    37NorthWharf Road,Paddington,LondonW21AF

    Thames Water Utilities

    Legendkk Site Access

    Construction Traffic Routes

    Primary Route

    Secondary Route

    Transport for London Road Network

    Strategic Road Network (SRN)

    London Cycle Routes

    Thames Path

    Draft Limit of Land to be Acquired or Used

    Local Authority Boundary

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Volume 16 Figure 12.2.1for PEIR

    Chelsea Embankment ForeshoreTransport - Construction

    Traffic Routes

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    18/27

    #*

    Chelsea Embankment Foreshore

    Western Pumping Station

    A3212

    A3212

    A3216

    44,137,360,452

    360

    44

    360

    44,137,452

    C10

    137,360,452

    Chelsea Embankment

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEA

    WANDSWORTH

    Title:

    Map Ref : ........................ .... 1PL03-TT-50121Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid

    0 30 60 90 12015

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7thFloor,

    37NorthWharf Road,Paddington,LondonW21AF

    Thames Water Utilities

    Legend#* Pumping Station

    Bus Stop

    Bus Route

    Transport for London Road Network

    Strategic Road Network (SRN)

    London Cycle Routes

    Thames Path

    Draft Limit of Land to be Acquired or Used

    Local Authority Boundary

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Volume 16 Figure 12.4.1for PEIR

    Chelsea Embankment ForeshoreTransport - Local Site Plan

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    19/27

    !

    !2.29

    2.28

    Vol 16 Figure 15.4.1for PEIR

    Chelsea Embankment ForeshoreFlood Risk

    EA Flood Zones

    Title:

    Map Ref : ........................ .... 1PL03-FL-20005Date : ............. ................. .... 2011/09/30Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tidal Defences

    ! Water Level Node

    EA Flood Zone 3

    EA Flood Zone 2

    Note: Water Level Node - Thames TidalJoint Probability Extreme Water Levels 2008

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    20/27

    Lodge

    (private)

    El SubSta

    EMBA

    NKMEN

    TGARDE

    NS

    10

    4.8m

    5

    Chapel

    Chap

    el

    (priv

    ate)

    6.8m

    College Court

    Great

    Hall

    se

    19

    18

    20

    TCB

    Dock

    MP

    GROS

    Viaduct

    Dolphin

    Mud

    SL

    MP

    TCBs

    MeanHighWater

    Mud

    SL

    5.4m

    SL

    8.5m

    123a

    Monument

    9.5m

    SL

    Bridge

    11.9m

    MHW

    ChelseaReach

    7.1m

    MHW

    SL

    Viaduct

    SL

    Pumping Station

    8.2m

    MP

    Shingle

    Hard

    GP

    Western

    RiverTha

    MHW

    FB

    MP

    Bridge

    MPs

    Chy

    Viaduct

    MHW

    Chelsea12.4m

    MP

    11.0m

    Grosvenor

    SGantry

    9.3m

    Shingle

    MHW

    Dolphin

    SL

    Shingle

    T u n n e l

    GrosvenorCanal

    MPs

    8.5m

    SL

    124

    Subway

    PC

    Shing le

    MHW

    Shingle

    CHELSE

    AEMB

    ANKME

    NT

    4.3m

    4.9m

    Shingle

    4.9m

    23

    17to2

    0

    4.8m

    Tennis Courts

    Festival PleasureGardens

    22

    6.6m

    RiverTh

    ames

    5.4m

    MeanHigh

    Water

    (Army Pensioners)

    ChelseaR

    each

    ChelseaCo

    urt

    11to12

    7.5m

    21

    Sluice

    4.3m

    Slopingm

    asonry

    War Memorial

    Hard

    MeanHigh

    Water

    CarPark

    RoyalHospital

    4.8m

    5.2m

    Shingle

    CARR

    IAGED

    RIVEN

    ORTH

    5.1m

    Lister Hospital

    Gatliff

    t16

    Close

    to

    British T

    1to20

    164

    R

    S

    Police Station

    152

    141

    3

    Transport1to120

    177

    Depot

    PEABODYAV

    153

    1to16

    1to20

    58to73

    GATLIFFROAD

    PumpingStation

    to

    to

    Chy

    1to20

    188

    1to20

    U

    78

    LB

    DFn

    CHELSE

    ABRIDG

    ERO

    AD

    FS

    Figure

    to

    5.1m

    38

    to

    Ranelagh

    5.4m

    117

    5.1m

    266

    Royal Hospital

    EBURYBRIDGE

    ROAD

    53

    1to

    42

    Chelsea Gate

    DFn

    Statue

    to

    WellingtonBuildings

    to

    260

    39

    Stone

    105

    4.3m

    5.8m

    (siteof)

    90

    to

    Stone

    43to57

    to

    Court

    Light Horse

    237

    52

    66

    79

    116

    249

    261to

    74

    House

    4.7m

    21291to1

    04

    27

    GATLIFF

    7.2m

    Ranelagh Gardens

    Stone

    Court

    to

    to

    248

    26

    67

    128

    to

    201

    15

    to

    6.5m

    C

    helseaGardens to

    MLW

    MLW

    MH&M

    LW

    MH&M

    LW

    EASTROA

    D

    1

    to

    1 4 2

    WarwickBuildi n

    g

    Os wa ld

    Bu i ld

    in g

    Centurion Building

    HowardBuilding

    1

    to

    159

    1 to101

    1to242

    GrosvenorP

    avilio

    nC

    ourt

    Waterside

    1to

    5

    15

    Hirst Court

    30

    1t o48

    10

    Cubitt Building

    1t o151

    Grosvenor Waterside

    HepworthCourt

    1to97

    20

    Eus ta c e Bui l

    in

    1

    to

    1 7 0

    P

    Playground

    Sw

    ing

    Br

    idge

    Bram

    ah

    Woods

    House

    1to198

    WentworthCourt

    4

    House

    9

    BoroConst, GLAsly Con t

    CR

    Bor o

    Cons t&

    LB

    Bdy

    CCLW

    BoroConst,

    GLAslyCon

    st &LBBdy

    CCLW

    CR

    CR

    "/

    "/"/

    "/Noise 3

    Noise 2Noise 1

    Noise 4

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    Vol 16 Figure C.1for PEIR

    Chelsea Embankment ForeshoreNoise and Vibration -

    Noise Measurement Locations

    Title:

    Map Ref : ....................... ..... 1PL03-NV-40019Date : ............................. ..... 2011/09/30Projection : .................. ........ British National Grid

    0 25 50 75 10012.5

    Metres

    Mapping reproduced by permission of Ordnance Survey on

    behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    LegendDraft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    "/ Noise Survey Locations

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    21/27

    !.!.

    !.

    !.

    !.

    !H

    !H

    !H!H

    !H

    !H

    !H!H!H

    !H

    !H

    !H!H

    !H!H

    !H!H!H

    !H

    !H!H

    !H

    !H

    !H

    !H

    !H

    !H!H

    !H

    !H

    !H

    Chelsea Embankment Foreshore

    SR1095

    SR1092SR1091

    SR1087

    SR1086

    SR1083

    SA1096SA1084

    SA1082

    PR1094

    PR1088

    PR1085

    PR1081

    SR1087A

    PR1088A

    SR2076

    SR2075

    SR2074

    SR2073 SR2072

    SR2071

    SR2070

    SR2069

    SR2068SR2067

    SR2066 SR2065

    SA2064

    SA2063

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    LAMBETHHAMMERSMITH & FULHAM

    Title:

    Map Ref : ......................... ... 1PL03-WR-20004Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or UsedThames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    LTT 2009 GI Drilled Boreholes

    !H Land

    !H Marine

    LTT 2011 GI Proposed Boreholes

    !. Land

    !. Water

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Vol 16 Figure E.1for PEIR

    Chelsea Embankment ForeshoreGroundwater

    Superficial GeologyThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    22/27

    !.!.

    !.

    !.

    !.

    !.

    !.

    !.!.

    !.

    !.

    !.!.!.

    !.

    !.

    !.!.

    !.!.

    !.!.!.

    !.

    !.!.

    !.

    !.

    !.

    !.

    !.

    !.!.

    !.

    !.

    !.

    Chelsea Embankment Foreshore

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    LAMBETHHAMMERSMITH & FULHAM

    60

    70

    SR1095

    SR1092

    SR1089

    SR1087

    SR1086SR1083SA1096

    SA1084

    SA1082

    PR1094

    PR1090

    PR1088

    PR1085

    PR1081

    SR1087APR1088A

    SR2075

    SR2074

    SR2073

    SR2071

    SR2070

    SR2069SR2068

    SR2067

    SR2066 SR2065

    SA2064

    SA2063

    Title:

    Map Ref : ......................... ... 1PL03-WR-20059Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    LTT 2009 GI Drilled Boreholes

    !. Land

    !. Marine

    LTT 2011 GI Proposed Boreholes

    !. Land

    !. Water

    EA Chalk Piezometric Level(mATD) - January 2008

    Solid Geology

    London Clay Formation

    Vol 16 Figure E.2for PEIR

    Chelsea Embankment ForeshoreGroundwater - Solid Geology

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    23/27

    AAA

    A

    A

    D

    D

    Chelsea Embankment Foreshore

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    LAMBETHHAMMERSMITH & FULHAM

    PGWU1414

    PGWU2139

    TQ27-284A

    TQ27-284BU

    60

    70

    TQ27-88

    TQ27-334

    Title:

    Map Ref : ......................... ... 1PL03-WR-20060Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or UsedThames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    D EA Water Quality Monitoring Locations

    EA Groundwater Level Monitoring Locations

    A Historical Data Available

    A Recent Data AvailableEA Chalk Piezometric Level(mATD) - January 2008

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Solid Geology

    London Clay Formation

    Vol 16 Figure E.3for PEIR

    Chelsea Embankment ForeshoreGroundwater

    EA Monitoring LocationsThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    24/27

    ")

    :

    :

    ::

    ::

    :

    :

    :

    :

    :

    Chelsea Embankment Foreshore

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    LAMBETHHAMMERSMITH & FULHAM

    W1

    60

    70

    90

    82 87

    72

    250

    210

    205

    162

    107

    193

    8

    130

    Title:

    Map Ref : ......................... ... 1PL03-WR-20061Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    GSHP Scheme: Chalk: Thanet Sands

    LA Groundwater Unlicensed Abstractions

    ") Chalk

    EA Chalk Piezometric Level

    (mATD) - January 2008

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Solid Geology

    London Clay Formation

    Vol 16 Figure E.6for PEIR

    Chelsea Embankment ForeshoreGroundwater - GSHP

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    25/27

    Chelsea Embankment Foreshore

    WANDSWORTH

    KENSINGTON & CHELSEA

    CITY OF WESTMINSTER

    LAMBETHHAMMERSMITH & FULHAM

    60

    70

    Title:

    Map Ref : ......................... ... 1PL03-WR-20005Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    EA Chalk Piezometric Level(mATD) - January 2008

    Source Protection Zones

    Zone I (Inner Protection Zone)

    Zone II (Outer Protection Zone)

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Vol 16 Figure E.7for PEIR

    Chelsea Embankment ForeshoreGroundwater - SPZThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    26/27

    110-RG-ENV-PKC4X-000110

  • 8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2

    27/27

    Phase two consultation (Autumn 2011)

    For further information see our website:www.thamestunnelconsultation.co.uk

    or call us on 0800 0721 086