pending new

61
Urgent by Fax JODHPUR VIDHYUT VITRAN NIGAM LIMITED OFFICE OF SUPERINTENDING ENGINEER (RA&C) No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt. The Superintending Engineer(CC/DC/O&M), Jodhpur Discom, Jodhpur/Pali/Barmer/Jalore/ Bikaner/Sriganganagar/Hanumangarh/Churu. Sub.: Regarding detail of pending new & load extention applications for HT category. On the subject cited above, I am directed to enquire the status of pending HT new connection & load extention applications. As such, while enclosing the format for the desired information you are requested to kindly intimate the same by 5 th (detail as on end of previous month) & 20 th (detail as on 15 th of each month) day of each month, so that same may be apprised to higher authorities. Kindly treat it as urgent. Encl.: Format G:pending new

Upload: arvind-jain

Post on 21-Apr-2015

125 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.

Sub.: Regarding detail of pending new & load extention applications for HT category.

On the subject cited above, I am directed to enquire the status of

pending HT new connection & load extention applications.

As such, while enclosing the format for the desired information

you are requested to kindly intimate the same by 5 th (detail as on end of

previous month) & 20th (detail as on 15th of each month) day of each month, so

that same may be apprised to higher authorities.

Kindly treat it as urgent.

Encl.: Format

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 2: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(O&M),Jodhpur Discom,Bikaner/Churu.

Sub.: Regarding pending new & load extension applications for HT category.

Ref: Letter No.1229 dtd 09.06.11 of Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner.

While observing the information regarding subject cited above as

send by Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner vide

letter under reference, it has been observed that estimate for some of the

connections are pending beyond the permissible time limit as prescribed by

RERC in TCOS-2004/Standard of Performance and DN has not been issued

even after lapse of more than 3 months.

As such, you are requested to kindly look into the matter personally

and arrange to get released the connections within the specified time period as

specified by Hon’ble Commission.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 3: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.901 dtd 08.06.11

In continuation to this office letter under reference, vide which you were requested to send the status of pending HT new connection & load extention applications. In this context, the detail of MIP consumers has also been desired by higher authorities.

As such, while enclosing the new format for the desired information you are requested to kindly intimate the same by 5th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month, so that same may be apprised to higher authorities. The position as on today be send today itself, by fax(0291-5106366), for appraisal.

Kindly treat it as urgent.

Encl.: Format

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

Urgent by Fax

G:pending new

Page 4: Pending New

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.

Sub.: Regarding pendency of new & load extension applications for MIP & HT category.

While observing the status of pending new & load extension cases,

a serious view has been taken by higher authorities regarding delay in releasing

of the same.

As such, you are requested to kindly monitor the status personally

and instruct the concerns to get release the connections within the specified time

period, as specified by Hon’ble Commission and circulated vide booklet

“Standard of Performance” and TCOS-2004. The copy of the relevant section is

enclosed herewith for your ready reference.

Encl: As above.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 5: Pending New

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.

Sub.: Regarding pendency of new & load extention applications for MIP & HT category.

While observing the information regarding subject cited above, it has been observed that many connections are pending due to non-submission of “L” form/any other document by consumer. In this context, it is clarified that as per the provisions mentioned at Clause-4(5) of TCOS-2004 the applicant has to submit “L” form at the time of application. However, in case of HT connection, “L” form may be furnished later but before release of connection. It has also been mentioned at Clause-4(10) of TCOS-2004(amendment issued vide Comml.JDP/420) that, “The Nigam will provide the receipt of the application/“L” form received from the applicant. In case deficiency or incomplete application, the Nigam, within seven days of the receipt of application, shall inform the applicant of the deficiency, including non-attachment of L-Form. If the deficiency is not removed by the applicant within 30 days from the date of receipt of such intimation by the applicant, the application will stand cancelled and the application fee forfeited.”

In this context, you are advised to ensure that such type of deficiency checked at the time of application, as any delay badly reflects the image of Nigam and also there is a great loss of revenue to the Nigam.

(D.C.BHURAT)CHIEF ENGINEER(HQ)

JODHPUR DISCOM, JODHPURCopy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

CHIEF ENGINEER(HQ)JODHPUR DISCOM, JODHPUR

G:pending new

Page 6: Pending New

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC),Jodhpur Discom,Jodhpur.

Sub.: Regarding pending new & load extension applications for HT & MIP category.

Ref: Your office letter No.1158 dtd 16.06.11.

While observing the information regarding subject cited above as received vide letter under reference, it has been observed that DN for some of the connections are pending beyond the permissible time limit as prescribed by RERC vide Standard of Performance.

S.No. Name of Consumer Dt. of Application1 M/s Hindustan Gum & Chemical, Basni 25.04.112 M/s Ganga Arts, Boranada 26.04.113 M/s Indigo Paints, Boranada 04.05.114 M/s Rawat Steel, Boranada 04.05.115 M/s Geeta Handicraft, Boranada 09.05.116 M/s Shree Nath Dye Chem, Basni 03.05.117 M/s Angeera Timber, Basni 11.05.118 M/s Angira Ind., Basni 11.05.119 M/s Balaji Art Craft, Sangaria 12.01.1110 M/s Nakoda Spat Mental, Sangaria 19.01.1111 M/s Christater Ind., Sangaria 23.03.1112 M/s Shree Om Agro Products, Boranada 31.03.1113 M/s Nutritions Agro Food Product, Boranada 21.04.1114 M/s Rajasthan Gum Pvt. Ltd., Boranada 10.02.11

As such, you are requested to kindly look into the matter personally and arrange to get released the connections within the specified time period as specified by Hon’ble Commission.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ), Jodhpur Discom, Jodhpur, for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 7: Pending New

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(DC/O&M),Jodhpur Discom,Jodhpur/Pali/Jalore/BarmerBikaner/Sriganganagar/Churu.

Sub.: Regarding pending new & load extension applications for HT & MIP category.

Ref: Your information as on dtd 15.06.11.

While observing the information regarding subject cited above as

received vide letter under reference, it has been observed that DN for some of

the connections are pending beyond the permissible time limit as prescribed by

RERC vide Standard of Performance.

As such, you are requested to kindly look into the matter personally

and arrange to get released the connections within the specified time period as

specified by Hon’ble Commission.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 8: Pending New

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Jalore/BarmerBikaner/Sriganganagar/Churu.

Sub.: Regarding pending new & load extension applications for HT & MIP category.

Ref: Your information as on dtd 15.06.11.

While observing the status of pending new & load extension cases,

a serious view has been taken by higher authorities regarding delay in releasing

of the connections. In this context, I am directed to enquire the name of

officers/official, on whom part the delay has occurred.

As such, you are requested to kindly intimate the name of such

officers/officials within a period of seven days, for further needful at this end.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 9: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.06.11

Jodhpur Zone, SE(CC), Jodhpur

S.No. Name of Consumer Applied Load Dt. of Application

Dt of DN

Dt of SCO

1 M/s Hindustan Gum & Chemical, Basni

300 to 450HP, CD 225 to 390KVA

25.04.11 - -

2 M/s Ganga Arts, Boranada 59 to 90HP 26.04.11 - -3 M/s Indigo Paints,

BoranadaCD 80 to 125 KVA 04.05.11 - -

4 M/s Rawat Steel, Boranada 15 to 100 HP 04.05.11 - -5 M/s Geeta Handicraft,

Boranada20 to 59 HP 09.05.11 - -

6 M/s Shree Nath Dye Chem, Basni

24 to 70 HP 03.05.11 -

7 M/s Angeera Timber, Basni

24 to 35 HP 11.05.11 -

8 M/s Angira Ind., Basni 24 to 40 HP 11.05.11 -9 M/s Balaji Art Craft,

Sangaria25 to 59 HP 12.01.11 -

10 M/s Nakoda Spat Mental, Sangaria

5 to 40 HP 19.01.11 -

11 M/s Christater Ind., Sangaria

25 to 150HP CD 125KVA

23.03.11 -

12 M/s Shree Om Agro Products, Boranada

1200HP CD 1000KVA

31.03.11 -

13 M/s Nutritions Agro Food Product, Boranada

400 HP 21.04.11 -

14 M/s Rajasthan Gum Pvt. Ltd., Boranada

4350 HP CD 2400KVA

10.02.11 -

15 M/s G.G.Udhyog, Basni 70 HP 16.12.10 12.01.11 Job16 M/s Vinay Udhyog 35 HP 31.03.11 04.04.11 Job17 M/s Pawan Putra Ind.

Basni25 to 40HP 17.01.11 15.02.11 Job

18 M/s M.Y. Textiles Basni 47 to 57 HP 25.01.11 25.01.11 Job19 M/s Dungar Ram Pal 14.7 to 35 HP 23.12.10 14.02.11 Job20 M/s India Art &

Emporium40 to 50 HP 22.10.10 08.11.10 Job

21 M/s Parag Products 59 to 125 HP 17.01.11 08.03.11 Job22 M/s Hanuman Industries 59 to 125 HP 07.03.11 11.03.11 Job

G:pending new

Page 10: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.06.11

Jodhpur Zone, SE(DC), Jodhpur

S.No.

Name of Consumer Applied Load

Dt. of Application

Dt of DN Dt of SCO

1 M/s Baba Ramdev Chem 550HP 19.11.10 03.05.11 25.05.112 M/s PHED 360KW 22.02.07 28.03.07 Job3 M/s PHED XEN DDI 1394KW 22.02.07 28.03.07 Job4 M/s PHED XEN DDI 484KW 22.02.07 28.03.07 Job5 M/s AEN PHED 310 KW 25.02.10 05.03.10 Job6 M/s AEN PHED 600 KW 31.12.10 Tech.San.7 M/s AEN PHED 160 KW 31.12.10 T.S.8 M/s AEN PHED 160 KW 05.01.11 T.S.9 M/s AEN PHED 160 KW 06.01.11 T.S.10 M/s AEN PHED 160 KW 31.12.10 T.S.

Jodhpur Zone, SE(O&M), Jalore

1 M/s Narpat Singh 59 HP 21.04.112 M/s Shree Ganesh Granite,

Jalore25 to 60HP 26.04.11

3 M/s Ratneshwar Ind. 60 to 120 HP 05.05.11

G:pending new

Page 11: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.06.11

Jodhpur Zone, SE(O&M), Pali

S.No. Name of Consumer Applied Load Dt. of Application

Dt of DN

Dt of SCO

1 M/s Shiv Agrico, Rani 250 HP 03.05.10 03.09.10 L form2 M/s Panchsil Globe, Abu

Road10 MW 14.09.10 PPM to

TCC3 M/s J.B.Licene Steel, Abu

Road25 MW 14.09.10

4 M/s Gulsan Polymers, Abu Road

2000 KVA 29.09.10

5 M/s Puran Prakash, Pali 59 to 85 HP 13.04.116 M/s Sharda Udhyog, Pali 1350 to 1485

HP06.09.10

7 M/s Ma Kripa Ind., Pali 55 to 80 HP 28.12.10 26.04.118 M/s Shree Nath Minerals,

Sojat City59 to 120 HP 23.12.10 14.01.11 Job

9 M/s Shiv Jyoti P Ltd. 22 HP to 400KVA

18.04.11

10 M/s Minerals Orientals, Reodar

125 to 200 HP 15.03.11

11 M/s Shiv Marbles, Reodar 59 to 150 HP 11.03.1112 M/s Shri Nath Stone Crusher,

Reodar59 to 175 HP 17.03.11

Jodhpur Zone, SE(O&M), Barmer

1 M/s Hukma Ram, Guda 45 HP 13.10.10 25.02.11 Job2 M/s Raj Minerals, Barmer 59 HP 04.02.11 17.03.11 Job3 M/s Ganpati Plaster, Baytoo 35 HP 15.03.10 21.05.10 04.01.114 M/s Valkoo Jaisalmer Road, Barmer 50 to 149

HP07.01.11

5 M/s Karni Marbel, Barmer 40 to 59 HP 15.02.116 M/s Rajwest Power 4MVA 16.11.10

G:pending new

Page 12: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.06.11

Bikaner Zone, SE(O&M), Bikaner

S.No. Name of Consumer Applied Load

Dt. of Application

Dt of DN Dt of SCO

1 M/s Welcome Oxizen Ind., Salasar

325 15.03.11

2 M/s Anupurna Ind. Godwala 400 12.07.103 M/s Sipani Woolen Pvt. Ltd.,

Palana200 28.03.11

4 M/s Balaji Woolen Textile, Bikaner

59 05.05.11

5 M/s Quartz India, Bikaner 59 02.05.116 M/s Balaji Mines & Minerals,

Bikaner59 04.05.11

7 M/s Agarwal Packaging, Bikaner

50 to 80 03.05.11

Bikaner Zone, SE(O&M), Sriganganagar

1 M/s Mani Ram, Keshrisinghpur 59 to 70 HP 20.01.112 M/s GE Army, 2440 to 4900KVA 18.09.09 23.03.11 Job3 M/s Gurmel Singh, Raisinghpur 20 to 80HP 27.12.10

Bikaner Zone, SE(O&M), Churu

1 M/sXEN(PHED), Ratangarh 2500 HP 27.02.112 M/s Balaji Stone Ind., Bidasar 55 HP 21.10.10 26.11.10 Job3 M/s Minral Plaster, Sardarsahar 59 HP 02.01.11 02.06.114 M/s Shri Ram Gril Udhyog,

Rajaldesar150HP 30.01.11 31.05.11

5 M/s Kanhaya Lal, Ladnun 24 to 59 HP 30.06.106 M/s Kishan Lal Ladnun 20 to 40 HP 03.03.117 M/s Ganesh Repairing, Ladnun 44 to 132HP 02.03.118 M/s Laxmi Crusher Udhyog,

Sujangarh120 to 250 HP

30.03.11

9 M/s Ganga Crusher, Ladnun 120 to 220 HP

15.12.10

Bikaner Zone, SE(O&M), Hanumangarh

Nil

G:pending new

Page 13: Pending New

As per Standard of performance Regulation, 2003 issued by RERC

DN to be issued for load up 60 HP 21 days

Loads 60HP to 300 KW(402 HP)

G:pending new

Page 14: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.1014 dtd 15.06.11

On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.

The desired information as on 30.06.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.

Kindly treat it as urgent.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 15: Pending New

Details of delay in new/load extension application of MIP & HT category Information as on 15.07.11

Jodhpur Zone, SE(CC), JodhpurS.No. Name of Consumer Applied Load Dt. of

ApplicationDt of DN

Dt of SCO

Remarks

1 M/s Hindustan Gum & Chemical, Basni

300 to 450HP, CD 225 to 390KVA

25.04.11 24.06.11 -

2 M/s Angeera Timber, Basni

24 to 35 HP 11.05.11 12.07.11

3 M/s Angira Ind., Basni

24 to 40 HP 11.05.11 12.07.11

4 M/s Balaji Art Craft, Sangaria

25 to 59 HP 12.01.11 27.06.11

5 M/s Nakoda Spat Mental, Sangaria

5 to 40 HP 19.01.11 13.06.11 12.07.11

Not released

6 M/s Dungar Ram Pal

14.7 to 35 HP 23.12.10 14.02.11 Job

7 M/s Indra Art & Emp

40 to 50 HP 22.10.10 08.11.10 Job

8 M/s Parag Product 59 to 125 HP 17.01.11 08.03.11 Job9 M/s Prakash Stone 59 HP 27.10.10 13.12.10 07.06.1

1Not released

10 M/s Bhawal Export 18 to 59 HP 03.03.11 08.03.11 25.05.11

11 M/s S.K.Stone 59 HP 21.12.10 15.02.11 Job12 M/s Sun Moon

Stone59 HP 28.01.11 15.02.11 Job

13 M/s Radiant Stone 59 HP 09.03.11 13.04.11 Job14 M/s Mahaveer Sand

stone59 HP 11.05.11

15 M/s Mukal Stone 59 HP 17.05.1116 M/s Champa Lal 59 HP 31.05.1117 M/s Shanti

Enterprises150 to 250HP 01.06.11

18 M/s Shree Ram Agro

50 to 85 HP 10.02.11 08.03.11 24.06.11

CTPT req.

19 M/s Quart N Craft 25 to 45 HP 08.04.11 03.05.11 22.06.11

MIP box

20 M/s Richa Textile 70 to 150 HP 17.03.11 02.05.11 15.06.11

CTPT req

21 M/s Tak Udhyog 20 to 45 HP 18.04.11 03.05.11 26.05.11

MIP box

22 M/s Hanuman Ind. 59 to 125 HP 07.03.11 11.03.11 Job23 M/s Veenith Oil Ind

Boranada10 to 630 HP CD 460KVA

14.03.11 28.04.11 26.05.11

Not rele.

G:pending new

Page 16: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.07.11Jodhpur Zone, SE(DC), JodhpurS.No. Name of Consumer Applied

LoadDt. of Application

Dt of DN Dt of SCO

Remarks

1 M/s PHED XEN DDI

1394KW 22.02.07 28.03.07 Job

2 M/s AEN PHED 310 KW 25.02.10 05.03.10 Job3 M/s AEN PHED 600 KW 31.12.10 Tech.San4 M/s AEN PHED 160 KW 31.12.10 T.S.5 M/s AEN PHED 150 KW 05.01.11 T.S.6 M/s AEN PHED 150 KW 06.01.11 T.S.7 M/s AEN PHED 160 KW 31.12.10 T.S.8 M/s Dinesh

Fregrance25 to 300 HP

15.12.10 Under sanction

9 M/s Contemparary Furnitures

15 to 200 HP

12.01.11 30.05.11 Job

10 M/s Manidhari Gums and Chem

10 to 500HP

08.03.11 Under sanction

11 M/s AEN PHED Osian

60KW 29.12.10 Under sanction

12 M/s AEN PHED Osian

80 KW 06.01.11 Under sanction

13 M/s AEN PHED Baori

100KW 31.12.10 Under sanction

14 M/s K.D. Stone 42 HP 09.12.1015 M/s Mahadev Stone 59 HP 21.12.1016 M/s Jakhar Stone 59 HP 24.11.10 08.03.11 Job17 M/s Santosh Stone 59 HP 28.12.1018 M/s Bheru Singh 59 HP 10.03.1119 M/s Inder Singh 30 HP 13.04.11 06.07.11 Job20 M/s Om Stone 59 HP 21.04.11 29.06.11 Job21 M/s Hawa Kanwar 59 HP 04.05.11 Under san22 M/s Sona Textile 30 to 49 HP 29.12.1023 M/s A.B.Block &

Brick48 to 132 HP

28.02.11

24 M/s Laxmi Stone Works

25 to 55 HP 15.11.10

G:pending new

Page 17: Pending New

Jodhpur Zone, SE(O&M), Jalore Information as on 15.07.11

S.No. Name of Consumer Applied Load

Dt. of Application

Dt of DN Dt of SCO

Remarks

1 M/s Narpat Singh 59 HP 21.04.11 -2 M/s Mamta Polymers 47.5 HP 07.10.10 09.11.10 18.01.11 (fitting not

complete)In the information of Jalore Circle for many applications it has been mentioned that “factory construction work not completed”. In many case the Job order not completed even than have requested that transformer, meter, meter box required.

Details of delay in new/load extension application of MIP & HT category

Information as on 15.07.11Jodhpur Zone, SE(O&M), PaliS.No.

Name of Consumer Applied Load

Dt. of Appl.

Dt of DN Dt of SCO

Remarks

1 M/s Shiv Agrico, Rani

250 HP 03.05.10 03.09.10 Job

2 M/s Panchsil Globe, Abu Road

10 MW 14.09.10 PPM to TCC

3 M/s J.B.Licene Steel, Abu Road

25 MW 14.09.10 PPM to TCC

4 M/s Varun Ind 16.825 MW 15.02.11 PPM to TCC5 M/s Gulsan

Polymers, Abu Road2000 KVA 29.09.10 20.06.11

6 M/s Puran Prakash, Pali

59 to 85 HP 13.04.11 06.07.11

7 M/s Sharda Udhyog, Pali

1350 to 1485 HP

06.09.10 PPMb

8 M/s Shiv Jyoti P Ltd. 22 HP to 400KVA

18.04.11 Under Sanction

9 M/s Minerals Orientals, Reodar

125 to 200 HP

15.03.11 16.06.11

10 M/s Shiv Marbles, Reodar

59 to 150 HP

11.03.11 16.06.11 Job

11 M/s R.K. International, Falna

95 HP 04.04.11 13.07.11

12 M/s Bhavika Ispat, Rani

124 to 149 HP

04.05.11 Under Estimate

12 M/s Khandelwal Minerals

400 HP 29.03.11 04.04.11 L form pending

13 M/s Parswanath Ent 56 to 95 HP 18.05.11

G:pending new

Page 18: Pending New

Details of delay in new/load extension application of MIP & HT category Information as on 15.07.11

Jodhpur Zone, SE(O&M), Barmer

S.No. Name of Consumer Applied Load

Dt. of Application

Dt of DN

Dt of SCO

Remarks

1 M/s Hukma Ram, Guda 45 HP 13.10.10 25.02.11 Job2 M/s Ramasar Stone

Crusher, Barmer(R)59 HP 24.05.10 14.08.10 07.02.1

13 M/s Ganpati Plaster,

Baytoo35 HP 15.03.10 21.05.10 04.01.1

14 M/s Valkoo Jaisalmer

Road, Barmer50 to 149 HP

07.01.11

5 M/s Karni Marbel, Barmer

40 to 59 HP

15.02.11 21.06.11

6 M/s Rajwest Power 4MVA 16.11.107 M/s Vimloxi Products 40 HP 20.05.118 M/s Mahadev Minerals,

Baytoo85 HP 18.04.11 02.02.11 24.02.1

19 M/s Pooniya Minerals,

Baytoo94 HP 27.04.11

10 M/s Khiljee Ice, Barmer 59 to 149 HP

05.07.10 18.11.10

11 M/s Nakoda Minerals 55 HP 11.10.10 30.12.10 06.01.11

12 M/s Mahadev Minerals, Bhadkha, Baytoo

75 HP 05.01.11 02.02.11 09.04.11

13 M/s Laxmi Granite, Jaisalmer

59 to 350 15.11.10 12.05.11

14 M/s R.K.Stone 59 HP 22.02.11 21.03.11 27.06.11

Not rele.

15 M/s Jaishree/Gopal Das 59 HP 08.02.11 27.05.11 Job16 M/s Balaji Granite 59 HP 12.10.10 31.12.10 26.06.1

1Not rele.

17 M/s Neelkanth Granite 59 HP 20.04.11 20.05.11 11.06.11

Not rele.

18 M/s Kohinoor Shilpgram 106 to 166 HP

04.06.10 30.12.10 Job

G:pending new

Page 19: Pending New

Details of delay in new/load extension application of MIP & HT categoryInformation as on 15.07.11

Bikaner Zone, SE(O&M), BikanerS.No. Name of Consumer Applied

LoadDt. of Application

Dt of DN Dt of SCO

Remarks

1 M/s Welcome Oxizen Ind., Salasar

325 15.03.11 Under sanction

2 M/s Anupurna Ind. Godwala

400 12.07.10 09.06.11

3 M/s Gajanand Sunder lal

59 03.03.11 24.05.11

4 M/s Balaji Woolen Textile, Bikaner

59 05.05.11 30.06.11 Under sanction

5 M/s Maheswari Ind., Napasar

37 to 59 HP

30.04.11 13.07.11

6 M/s Balaji Mines & Constr., Bikaner

59 04.05.11 Under Estimate

7 M/s Agarwal Packaging, Bikaner

50 to 80 03.05.11 Under sanction

8 M/s National Ind. 20 to 110 16.05.11 Under sanction

9 J.K. Industires KIA 35 to 59 HP

26.05.11

10 M/s Shyam Sweet KIA BKN

25 To 35 HP

24.02.11 Under Sanction

11 M/s Bansal Udhyog 35 HP 06.07.11 Under Estimate

Bikaner Zone, SE(O&M), Sriganganagar

S.No. Name of Consumer Applied Load

Dt. of Application

Dt of DN Dt of SCO

Remarks

1 M/s Mani Ram, Keshrisinghpur

59 to 70 HP

20.01.11 Notice for CD

2 M/s GE Army, 2440 to 4900KVA

18.09.09 23.03.11 Job

3 M/s Gurmet Singh, Raisinghpur

20 to 80HP

27.12.10 Under sanction

4 M/s Rajesh Kumar/ Harbans Lal

22 to 55 HP

01.03.11 14.06.10 L form due

5 M/s Mahipal Food 80 to 250 HP

01.02.11 07.03.11 L form 27.06.11

6 M/s M.D. Industries 301 HP 170 KVA

19.11.10 10.01.11 Job issued on21.06.11

G:pending new

Page 20: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.07.11Bikaner Zone, SE(O&M), Churu

S.No.

Name of Consumer Applied Load

Dt. of Appl.

Dt of DN Dt of SCO

Remarks

1 M/sXEN(PHED), Ratangarh

2500 HP 27.02.11 Under sanction

2 M/s Shri Ram Grit Udhyog, Rajaldesar

150HP 30.01.11 31.05.11 Job

3 M/s Farien Ind. Khanpur 59 HP 20.05.11 Estimate4 M/s Ganpati Marble,

Charwas150 HP 24.06.10 28.10.10 - Revised

estimate5 M/s Kanhaya Lal,

Ladnun24 to 59 HP

30.06.10 Blue print not provide

6 M/s Kishan Lal Ladnun 20 to 40 HP

03.03.11 21.07.11

7 M/s Ganesh Repairing, Ladnun

44 to 132HP

02.03.11 Blue print not provide

8 M/s Laxmi Crusher Udhyog, Sujangarh

120 to 250 HP

30.03.11 Under sanction

9 M/s Ganga Crusher, Ladnun

120 to 220 HP

15.12.10 Under Estimate

10 M/s Pawan Crusher, Sarothia

140 to 200 HP

11.05.11 06.07.11 Under Estimate

Bikaner Zone, SE(O&M), Hanumangarh

Nil

G:pending new

Page 21: Pending New

Details of delay in release of new/load extension application of MIP & HT category

Information as on 15.07.11SE(M&P), JodhpurS.No. Name of Consumer Applied

LoadDt. of Application

Dt of DN

Dt of SCO

Remarks

1 M/s Tak Udhyog, Basni 20 to 45 HP

18.04.11 03.05.11 26.05.11

2 M/s Prakash Stone, Basni

59 HP 27.10.10 13.12.10 07.06.11

3 M/s Veenith Oil, Basni 10 to 630 HP

14.03.11 28.04.11 26.05.11

4 M/s Bhawal Export, NPH

18 to 59 HP

03.03.11 08.03.11 25.05.11

5 M/s Shree Ram Agro Product, Boranada

59 to 85 HP

10.02.11 08.03.11 25.05.11

6 M/s Quart N Craft, Boranada

25 to 45 HP

08.04.11 03.05.11 22.06.11

MIP box req

7 M/s Richa Textile, Basni

70 to 150 HP

17.03.11 02.05.11 15.06.11

CTPT req

8 M/s R.K.Stone, Jaisalmer

59 HP 22.02.11 21.03.11 27.06.11

9 M/s Balaji Granite, Jaisalmer(R)

59 HP 12.10.10 31.12.10 26.06.11

10 M/s Neelkanth Granite, Pokran

59 HP 20.04.11 20.05.11 11.06.11

G:pending new

Page 22: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.1081 dtd.20-06-11, 1095 dtd.22-06-11, 1096 dtd.22-06-11.

On the subject captioned above and letters under reference, vide which you were requested to ensure for release of connections within specified time period and to send the names of officers/officials on whom part the delay has occurred.

While observing the information of pending MIP and HT categories, new and load extension applications, as on 15th July, 2011, it has been noticed that delay has occurred in release of connections in so many cases. As such, while enclosing the list of some such applications, where delay has occurred, you are, requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is again, requested to kindly intimate the names of officers/officials on whom part the delay has occurred.

Kindly treat it as urgent.

Encl.:As above

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPURCopy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

Urgent by Fax

G:pending new

Page 23: Pending New

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(M&P),Jodhpur Discom,Jodhpur

Sub.: Regarding detail of release of new & load extention applications for MIP & HT category.

On the subject captioned above, while observing the information of pending MIP and HT categories, new and load extension applications, as on 15 th

July, 2011, it has been noticed that delay has occurred in release of connections in so many cases.

As such, while enclosing the list of some such applications, where delay has occurred, you are, requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is requested to kindly intimate the names of officers/officials on whom part the delay has occurred.

Kindly treat it as urgent.

Encl.:As above

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

G:pending new

Page 24: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.1014 dtd 15.06.11

On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.

The desired information as on 15.07.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.

Kindly treat it as urgent.

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 25: Pending New

Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11

Jodhpur Zone, SE(CC), JodhpurS.No. Name of Consumer Applied

LoadDt. of Appl.

Dt of DN Dt of SCO

Remarks

1 M/s Mahaveer send Ston

59 HP 11.05.11 25.07.11Under Job work

2 M/s Mukal Stone Art S.S.

59 HP 17.05.11 25.07.11Under Job work

3M/s Champa Lal S.S. 59 HP 31.05.11 25.07.11

Under Job work

4M/s N.K. Stone S.S. 59 HP 06.07.11

Notice for open plot

5M/s R.S. Stone & Art 59 HP 07.07.11

Notice for open plot

6M/s Gashi Ram S.S. 59 HP 12.07.11 13.09.11

Under Garece period

7 M/s Chand Mandi Stone S.s.

59 HP 13.07.11Under Notice open your plot

8M/s Kirshan Stone Art 59 HP 19.07.11 13.09.11

Under Job work

9M/s Marwar Stone Art 59 HP 26.07.11

Under objection

10

M/s Rajasthan Gum Pvt. Ltd. Boranada

4350 HP CD 2400 KVA

10.02.11 29.06.11

L Form & consumer side job work not carried out

11M/s Sunita Hydro Colloides Boranada

8900 HP CD 3500

16.03.11Under Revised estimate

12 M/S Chopara Strcts Ltd. Borananda

1700 HP CD 800

29.06.11 Notice for open plot

13 M/s Radiant Packing Boranada

58 HP 18.05.11 04.08.11Under Job work

14 M/s Sardar Espises Boranada

59 HP 11.07.11Notice for ownership

15 M/s Relience Matal Sangariya

75 HP CD 50 K

28.07.11Under observation

16M/s Gopal Sand Stone

150 HP CD 90

05.07.11 25.07.11Under Job work

G:pending new

Page 26: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.09.11Jodhpur Zone, SE(DC), JodhpurS.No. Name of Consumer Applied

LoadDt. of Application

Dt of DN Dt of SCO

Remarks

1 M/s PHED XEN DDI 1394KW 22.02.07 28.03.07 Job2 M/s AEN PHED 310 KW 25.02.10 05.03.10 Job3 M/s AEN PHED 600 KW 31.12.10 Tech.San4 M/s AEN PHED 160 KW 31.12.10 T.S.5 M/s AEN PHED 150 KW 05.01.11 T.S.6 M/s AEN PHED 150 KW 06.01.11 T.S.7 M/s AEN PHED 160 KW 31.12.10 T.S.8 M/s Dinesh Fregrance 25 to 300 15.12.10 Under sanct9 M/s AEN PHED Osian 60KW 29.12.10 Under sanct10 M/s AEN PHED Osian 80 KW 06.01.11 Under sanct11 M/s AEN PHED Baori 100KW 31.12.10 Under sanct12 M/s Maa Kripa 59 HP 08.04.11 06.07.1113 M/s Jakhar Stone 59 HP 24.11.10 08.03.11 Job14 M/s Om Stone 59 HP 21.04.11 29.06.11 14.09.1115 M/s Sona Textile 30 to 49 H 29.12.1016 M/s A.B.Block & Bric 48 to 132 28.02.1117 M/s Laxmi Stone Work 25 to 55 H 15.11.1018 M/s Shivam Chemical,

Piparcity140 to 275 HP

11.11.10

19 M/s Laxmi Ice, Bilara 35 to 50H 11.04.1120 M/s Barfa Zinning,

Bilara40 to 59 HP

11.04.11

21 M/s Dudi Stone, Bilara 59 HP 15.03.1122 M/s Jai Shankar Stone 59 HP 10.06.1123 M/s Dev Dasrath Stone 150 HP 24.06.1124 M/S New

Jagdamba Send Sto 59 7.7.11

Under Estimate

25 M/S Kusum Send St 59 12.7.11

Estimate

26 M/S Puja Stone 59 12.7.11 Estimate27 M/S Veer Teja

Stone 59 18.7.11Estimate

28 M/S B.S. Stone 125 13.7.11 Estimate29 M/S Ashapurna

Send Stone Keru 55 8.07.11Under

Estimate30 M/S Lotus

Engitech 89 11.7.11Estimate

31 Contact Electricts35 TO 45H

13.7.10Estimate

32 Indian Go Direct35 To55H

15.7.10 Estimate

33 M/S Raj Chemicals Rinya(Re-Open)

59 To 80HP

27.7.11Under Estimate

34 M/S Prince Chemicals Jawasiy

30 To 59HP

13.7.11Under Estimate

G:pending new

Page 27: Pending New

G:pending new

Page 28: Pending New

Jodhpur Zone, SE(O&M), Jalore Information as on 15.09.11

S.No. Name of Consumer Applied Load

Dt. of Application

Dt of DN Dt of SCO

Remarks

1 M/s Veer Teja Granite 60 HP 25.05.10 09.08.11 Job2 M/s Suraj Stone, Bhagli 60 HP 11.04.11 02.09.11 Job3 M/s Jai Rana Stone 60 HP

25.04.1110.06.11

09.08.11 Job

4 M/s Dhanlaxmi Stone, Madalpura

60 HP 27.04.11 09.08.11 Job

5 M/s Maa Sundha Granite, Madalpura

60 HP 10.06.11 09.08.11 Job

6 M/S Om Granite, Bishnagarh

45 HP 23.06.11 - Job

7 M/S Rajesh Granite, Bishangarh

40 HP 8.07.11 - Job

8 M/s Harsh Bherav Granite Ind. Madalpura

150 HP 20.04.11 16.06.1118.08.11 T/F, Met &

M. Box req.

9 M/s Maruti Grani Marmo, Bhagli

150 HP 24.05.11 27.07.11 Job

10 M/s Natural Granite, Bhagali

150 HP 01.06.11 1.09.11 Job

11 M/s Ratan Deep Granite, Madalpura

135 HP 09.06.11 1.09.11 Job

12 M/s Hanuman Stoneo, Madalpura

60 HP 06.07.11 2.09.11 Job

13 M/s Nagneshi Granite59 HP 25.04.11 23.08.11 Job

14 M/s Vikas Grani Marmo 125 HP 13.06.11 9.09.11 Job15 M/s Shiv Granite 60 HP 17.06.11 2.09.11 Job16 M/s S.R.Granite 60 HP 20.06.11 2.09.11 Job17 M/s Mukul Granite 60 HP 11.07.11 2.09.11 Job18 M/s Vijay Shree Granite 149 HP 12.07.11 2.09.11 Job19 M/s Natraj Industries

25HP - 60HP

18.04.11 23.08.11 Job

20 M/s Om Shiv Granite60HP - 120 HP

31.03.11 30.06.11 Job

21 M/s Choudhary Brothers

60HP - 120 HP

19.04.11 13.07.11 Job

22 M/sJai Guru Dev Industries

60HP - 150 HP

30.05.11 8.09.11 Job

23 M/s Dig Vijay granite60HP - 120 HP

06.06.11 12.08.11 Job

24 M/s Gaja Nand granite60HP - 149 HP

06.07.11 - Job

25 M/s Shree Granite60HP - 125 HP

25.07.11 - Job

G:pending new

Page 29: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.09.11Jodhpur Zone, SE(O&M), Pali

S.No.

Name of Consumer Applied Load

Dt. of Appl.

Dt of DN Dt of SCO

Remarks

1 M/s Shiv Agrico, Rani

250 HP 03.05.10 03.09.10 Job

2 M/s Varun Ind 16.825 MW 15.02.11 PPM to TCC

3 M/s Sidhi Vinayak Cement, Jaitaran

1500 KVA 28.05.11 PPM

4 M/s Puran Prakash, Pali

59 to 85 HP 13.04.11 06.07.11

5 M/s Sharda Udhyog, Pali

1350 to 1485 HP

06.09.10 PPM

6 M/s Parswanath Ent 56 to 95 HP 18.05.117 M/s Vikas Heena 59 to 70 HP 03.01.11 05.03.11 03.08.11 Trf req

M/s. Anamika 22to100 HP 06.07.11

Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11

Jodhpur Zone, SE(O&M), Jaisalmer

S.No. Name of Consumer Applied Load

Dt. of Appl

Dt of DN

Dt of SCO Remarks

1 Mishri khan/Valia khan

149 06.06.11No construct of meter room

2M/s Resopower

40 10.06.11 30.08.11Under Grace period

3 M/s Rajasthan solar urja 100 14.06.11 30.08.11

Under Grace period

4 M/s Rajlaxmi Minrals 59 22.07.11

Under estimate

5Lakh Singh Bhati

59 02.08.11Under estimate

6Shivkumar/Ramanlal,

59 07.06.11Under estimate

7 Kohinoor 106 to 166 04.06.10 30.12.10

Work in Progress

8 Madhvi Stone59 to 150 15.07.11

Under Estimate

9 Raj West 4Nos Long pending

G:pending new

Page 30: Pending New

Details of delay in new/load extension application of MIP & HT category

Information as on 15.09.11Jodhpur Zone, SE(O&M), Sirohi

S.No.

Name of Consumer Applied Load

Dt. of Appl.

Dt of DN Dt of SCO

Remarks

1 M/s Panchsil Globe, Abu Road

10 MW 14.09.10 PPM to TCC

2 M/s J.B.Licene Steel, Abu Road

25 MW 14.09.10 PPM to TCC

3 M/s Shiv Jyoti P Ltd. 22 HP to 400KVA

18.04.11 Under Sanction

4 M/s Shiv Marbles, Reodar

59 to 150 HP

11.03.11 16.06.11 Job

5 M/s Jayanti lal Umedram

59HP22-03-11

16-06-2011

Work under progress

6 M/s Hema Dhanna Choudhary

59 HP15-12-10

03-03-2011

Pannel box req

G:pending new

Page 31: Pending New

Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11

Jodhpur Zone, SE(O&M), Barmer

S.No. Name of Consumer Applied Load

Dt. of Appl.

Dt of DN

Dt of SCO

Remarks

1 Sh. Satiyay Mata Mills, 4th Phase Balotra 260 01.06.11

constrction work not completed

2 M/s Malleshawar Industries LTD BLT 230 30.06.11 Under Estimate

3 M/s. Alka Stone , Village- Deora 150 HP 01.02.11 29.04.11

Job

4 M/s. Rishabbh Granite, Village - Deora 150 HP 01.02.11 29.04.11

Job

5 M/s. Fateh Granit, Village - Deora 150 HP 01.02.11 29.04.11

Job

6 Sh. Jagdish Prashad / Sultana Ram 150 HP 01.02.11 29.04.11

Job

7 Sh. Vickaram ji / Daya ram / Village- Deora 150 HP 01.02.11 29.04.11

Job

8 Sh. Kailash / Bhanwar Singh Village Deora 150 HP 01.02.11 29.04.11

Job

9 M/s. Fateh Granit, Village - Deora 150 HP 01.02.11 29.04.11

Job

10 Sh. Devendra / Bhagirath Village 150 HP 01.02.11 29.04.11

Job

11 Mahadev minerals 40 to 85 18.04.10 02.02.11 Transf. not provid12 Tapriya Khanij Udhyog 80 23.02.11 29.04.11 JIR Pending13 Tapriya Plaster Kawas 80 01.02.11 29.04.11 JIR Pending14 Mahadev Stone Cuttin 59 21.06.11 09.08.11 DN Awaited15 Valkoo Jaisalmer Road 59 to

14907.01.11 Under objection

16 Raj west Pwt ltd Shivkar Road

4 MVA16.11.10 08.08.11

G:pending new

Page 32: Pending New

Details of delay in new/load extension application of MIP & HT categoryInformation as on 15.09.11

Bikaner Zone, SE(O&M), BikanerS.No.

Name of Consumer Applied Load

Dt. of App Dt of DN Dt of SCO Remarks

1 Oaisis Indi. Beechwal 86-22025.1.11 1.8.11

Own Trs. Not installed

2 Agarwal Packaging, KIA 50-80 3.5.11 16.8.11D.N. Amount not deposited

3 National Ind.KIA 20-110 16.5.11 16.8.11Work under Progress

4 J.K. Industires KIA 35-59 26.5.11 16.8.11Work under Progress

5 Maheswari ind. Napasar 37-55 30.4.11 13.7.11 Completed

6Prem Bhujiya Bhandar 25-50 7.1.11 12.7.11

L form not received

7S.K. Ind. KIA 10-35 10.1.11 12.7.11

L form under Checking

8 Karani Food Product KIA BKN 25-55 15.2.11 3.8.11

L Form under Checking

9Syam Sweet KIA BKN 25-35 24.2.11 3.8.11

D.N. Amount not deposited

10 Sarad Repakers KIA BKN 15-40 30.6.11

Under sanction

11Keshav Ind KIA BKN 3-59 23.6.11

Under sanction

12 Mahavir Chemical & Mineral, Sobhasar 59-80 26.10.10

Under sanction

13 Godara Plaster Ind. Sobhasar 59-85 21.10.10

Under sanction

14 Anant Plaster, Sobhasar 60-80 11.2.11 Under sanction

15 Dewal Ind. Sobhasar 59-85 24.5.11 Under sanction

16 Balaji Agro Cold Ind. Sobhasar 75-95 20.8.10 15.12.10

Notice issued for Transformer

17 Prince Packegers Nal Badi 25-40 31.5.11

Under Sanction

18 Super Plaster, Sobhasar 25-75 6.6.11 Under Sanction

19 Gaytri Plaster, Sobhasar 25.85 15.7.11 Under Sanction

20Pawan Polytex 125-250 27.7.11 12.8.11

Own Trs. Not installed

21 Vishwakarma Ind. Nokha 59-150 22.7.11

Under Objection

22 Welcome Oxizen Ind. Salasar

325 15.3.11 21.7.11Work under progress

23 Anpurna Ind. Gadwala 400 12.7.10 9.6.11DN Amount not deposited

24 Balaji Mines & Const. Roda

59 4.5.11 Under Objection

25 Bhagirath/Moda Ram, Napasar

37.5 19.5.11 Land conversion notice

26 M/s Jai Jawala Plaster, Jaimalsar

7531.5.11 30.8.11

Work under progress

27 M/s Siyag Plaster, Sobhasar

85 14.6.11 Construction is not ready

G:pending new

Page 33: Pending New

Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11

Bikaner Zone, SE(O&M), SriganganagarS.No. Name of

ConsumerApplied Load

Dt. of Application

Dt of DN Dt of SCO

Remarks

1Dhingra Flour & Oil Mill

40 HP to 150 HP 125KVA

24.06.11 19.09.11

2Rajesh Kr / Harbans lal

22 HP to 55 HP

01.03.11 14.06.1109.08.11

Sent to M&P for Releasing

3 Gurmel Singh/Jagir singh

20 HP to 80 HP

27.12.10 25.07.11

4 Prem Kr / Prabhu Dayal

59 HP 08.07.11

5Pawan Industries

25 HP to 50 HP

16.06.11 15.09.11

6 Shivam Plaster Udyog

59 HP 05.07.11

Details of delay in new/load extension application of MIP & HT category

Information as on 15.09.11Bikaner Zone, SE(O&M), Churu

S.No.

Name of Consumer Applied Load

Dt. of Appl.

Dt of DN Dt of SCO

Remarks

1 M/sXEN(PHED), Ratangarh

2500 HP 27.02.11 Under sanction

2 M/s Ganesh Repairing, Ladnun

44 to 132HP

02.03.11 22.07.11 Job

3 M/s Laxmi Crusher Udhyog, Sujangarh

120 to 250 HP

30.03.11 31.07.11 Under sanction

4 M/s Ganga Crusher, Ladnun

120 to 220 HP

15.12.10 22.07.11 Under Estimate

5 M/s Pawan Crusher, Sarothia

140 to 200 HP

11.05.11 06.07.11 Under Estimate

6 M/s XEN(PHED), Sardarsahar

1900 to 4000KVA

29.02.11

Bikaner Zone, SE(O&M), Hanumangarh

Nil

G:pending new

Page 34: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.1014 dtd 15.06.11

On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.

The desired information as on 15.08.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.

Kindly treat it as urgent.

(A.D.VYAS)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 35: Pending New

Urgent by FaxJODHPUR VIDHYUT VITRAN NIGAM LIMITED

OFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M/M&P),Jodhpur Discom,…………………….

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.1081 dtd.20-06-11, 1095 dtd.22-06-11, 1096 dtd.22-06-11, 1253 dtd 08.07.11.

On the subject captioned above and letters under reference, vide which you were requested to ensure for release of connections within specified time period and to send the names of officers/officials on whom part the delay has occurred.

While observing the information of pending MIP and HT categories, new and load extension applications, as on 15 th August, 2011, it has been noticed that in some cases demand note has not been issued even after lapse of more than 3-4months of deposition of files. Delay has also occurred in release of connections in so many cases. It has been gathered that sufficient number of LT CT & LT TVM’s are available with M&P wing. As such, you are requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is again, requested to kindly intimate the names of officers/officials on whom part the delay has occurred. Any requirement related to metering equipment be send to the Superintending Engineer(M&P), Jodhpur under intimation to Superintending Engineer(MM&C), Jodhpur.

Kindly treat it as urgent.

(A.D.VYAS)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPURCopy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new

Page 36: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(M&P),Jodhpur Discom,Jodhpur

Sub.: Regarding detail of release of new & load extention applications for MIP & HT category.

On the subject captioned above, while observing the information of pending MIP and HT categories, new and load extension applications, as on 15 th

July, 2011, it has been noticed that delay has occurred in release of connections in so many cases.

As such, while enclosing the list of some such applications, where delay has occurred, you are, requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is requested to kindly intimate the names of officers/officials on whom part the delay has occurred.

Kindly treat it as urgent.

Encl.:As above

(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

G:pending new

Page 37: Pending New

Urgent by Fax

JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)

No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.

The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….

Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.

Ref: This office letter No.1014 dtd 15.06.11

On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.

The desired information as on 31.08.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.

Kindly treat it as urgent.

(A.D.VYAS)SUPERINTENDING ENGINEER(RA&C)

JODHPUR DISCOM, JODHPUR

Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.

SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR

G:pending new