Page 1: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

THOMAS ANDERSON, CCPEMILY CROSS, MASc, PEng, CEM

Burlington, Vermontcx‐associates.com

tom@cx‐associates.comemily@cx‐associates.com

Performance Monitoring for Efficiency

Page 2: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Efficiency Vermont is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

2

Page 3: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Learning Objectives

Understand why performance monitoring is necessary

Learn how to apply real time performance monitoring economically and

effectively

Know which basic performance metrics to include on every project

Understand the best approaches to long term performance data archiving

3

Page 4: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Course EvaluationsIn order to maintain high‐quality learning experiences, please access the 

evaluation for this course by logging into CES Discovery and clicking on the Course Evaluation link on the left side of the page.

4

Page 5: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Performance Monitoring

• Part of the ongoing commissioning process for buildings and building systems

5

Page 6: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

What is Commissioning?

• Comprehensive QA process for buildings and building systems

Soup to Nuts– Design Review– Equipment and Instrumentation Validation– Functional Performance Testing– Continuous Commissioning

6

Page 7: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

What is Commissioning?

• Comprehensive QA process for buildings and building systems

Soup to Nuts– Design Review– Equipment and Instrumentation Validation– Functional Performance Testing– Continuous Commissioning

7

Page 8: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

What is Commissioning?

• Comprehensive QA process for buildings and building systems

Soup to Nuts– Design Review– Equipment and Instrumentation Validation– Functional Performance Testing– Continuous Commissioning

8

Page 9: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

What is Commissioning?

• Comprehensive QA process for buildings and building systems

Soup to Nuts– Design Review– Equipment and Instrumentation Validation– Functional Performance Testing– Performance Monitoring

9

Page 10: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Case Study: BIA CxBurlington International Airport

Chiller Plant Upgrade AHU/Boiler Upgrade

10

Page 11: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Case Study: BIA Cx

Burlington International Airport

Chiller Plant Upgrade

Frictionless (Magnetic Bearing) Centrifugal ChillerTwo Fan Induced Draft Cross flow Cooling TowerBTU Meters with Insertion Turbine Flow Meters

11

Page 12: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Case Study: BIA Cx

Burlington International Airport

HVAC Upgrade

Rooftop/VAVs (2)Condensing Boilers (2)Existing Ductwork

12

Page 13: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Design ReviewChiller Plant

• The control diagram at this time lacks the capability for facility operators monitor how much power the pumps and the chiller consume…we suggest that pump and chiller KW values be imported into the DDC control system and displayed on the DDC graphics…display of chiller kW, tonnage, and a kW per Ton performance metrics.

13

Page 14: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Design ReviewChiller Plant

• The piping diagram calls for glass “stick” type piping thermometers.  These stick type piping thermometers are very difficult to read in the field.  We suggest the use of round dial type piping thermometers.  These are far easier to read in the field and will benefit facility operating staff.

14

Page 15: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Design ReviewHVAC Systems

• Cross connects Cold/Hot duct cross connection: The new VAV boxes are shown connected to either the existing hot or cold duct mains…To mitigate main duct pressure losses, could the separate hot and cold duct mains be cross connected to equalize air flow?

15

Page 16: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Leaks• Air Leaks:  loss of conditioned air

wasted fan energy– Existing ducts: seams, joints, corners, not sealed

16

Page 17: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Leaks• Air Leaks: loss of conditioned air

wasted fan energy– New equipment: damaged closure mechanisms and gaskets, as installed

17

Page 18: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Leaks

18

Page 19: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Pressure Drop • VAV box air inlet• 4 inch round duct runout installed• 6 inch round duct runout specified• 4 to 5 times inlet static pressure drop

19

specified installed

C0 = 19 C0 = 89

Page 20: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Pressure Drop 

• Piping strainer inaccessible

20

Top of duct

Roof

Strainer

Page 21: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Retrofit• Known Issue

21

Page 22: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Retrofit• Opportunities for Communication

22

Page 23: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Per Drawings?

• Cogged vs. Standard fan V‐belts

23

Page 24: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Per Drawings?

• Counterflow piping

24

Page 25: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Equipment Checkout: Air Quality• Standing water not permitted per ASHRAE 62.1• CHW pipe insulation remained to be installed, no drain

25

Page 26: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Instrumentation: Gauges and Sensors

26

Page 27: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Instrumentation: Gauges and Sensors• Pete’s plugs for validation of piping sensors and gauges• Round vs. Stick thermometers are easier to read

• Calibrate/compare against NIST certified test instruments• Location of thermostats and control system sensors

– Avoid interference from direct sun or equipment exhaust

27

specified installed

Page 28: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Instrumentation: DDC Program Validation

28

Page 29: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Instrumentation: DDC Program Validation

• Sensor scaling errors– 0 to 5 V or 0 to 10 V?– Chiller percent load displayed found to be one third of actual per BTU meters

• Physical checks– Outside air dampers found in a position other than commanded by the DDC system

– Too much outside air being brought in (expensive)

29

Page 30: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Functional Performance Testing: Chiller

• Chilled water pump rate of flow change found to be too rapid

• Minimum chiller flow was not maintained

30

Page 31: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Functional Performance Testing: HVAC

• Software programmed with an economizer mode lockout when the outdoor air temperature drops below 40F.

• Outside Air Control: configured for damper position rather than flow.

31

Page 32: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Functional Performance Testing: ControlsChiller MER exhaust fan stays on after alarm clears

MER temperature > 80FRefrigerant leak detection

32

Page 33: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Up Next: Performance Monitoring

33

Thomas Andersontom@cx‐associates.com

802.861.2715 x11

Page 34: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Why Performance Monitoring?

• How many miles per gallon is my building getting?

34

Page 35: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Building Energy Tracking

• How does my building compare to peer building?

• Am I using what is expected?• Has anything changed?• Am I improving over time?

35

Page 36: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

System Energy Tracking

• Are systems behaving as they should?• How efficient are my systems?• Today’s performance vs. 3 years ago?

36

Page 37: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

System Energy Tracking

• Building energy efficiency depreciates 2% to 3% a year

37

Page 38: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

System Energy Tracking

Expectations for building operators:• Manage systems efficiently• But we do not provide efficiency feedback in our designs

38

Page 39: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Energy Management

You cannot manage… 

…What you cannot measure

39

Page 40: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

What To Measure

•Building Service‐ Electrical‐ Fuel

•Central Plants‐ Heating‐ Cooling‐ Refrigeration

40

Page 41: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Other Sub Groups

•Key Lighting Circuits‐ Exterior Lighting‐ Key Lighting Zones

•Computer Rooms•Central Air Handlers•Central Pumps

41

Page 42: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Devices

BTU Meters• Liquids:

‐ Heating Hot Water‐ Chilled Water‐ Domestic Hot Water

42

Page 43: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Turbine Meters

•Closed Loop Fluids• Fairly Clean Water

43

Page 44: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Turbine Meters

44

Page 45: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Ultrasonic Meters

•Clamp‐on•Non‐Invasive•Good for Retrofits•Clean or Unclean Liquids

45

Page 46: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Ultrasonic

46

Page 47: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Electromagnetic Meter

• Critical water flow applications• Open loop• “Dirty Water”

‐ Gray Water‐ Sea Water‐ Process Liquids

47

Page 48: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Electromagnetic Meter 

48

Page 49: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Power Monitoring

• Key Electrical Sub‐circuits‐ Exterior Lighting / Interior Lighting

• Key large equipment‐ Chillers‐ Large Compressors, etc…

• Primary Electrical Service – Possibly 

49

Page 50: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Power Monitoring

•Measure True kW•Also:

‐ Voltage‐ Power Factor

50

Page 51: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Power Monitoring

51

Page 52: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

VFD Power Loss

52

Page 53: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

VFD Power Loss IO

53

Page 54: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

VFD Power Loss – Network Interface

54

Page 55: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Performance Metrics

Building Annual Energy:• kBTU/Square Foot/Year

• EUI: Energy Use Index• “Miles per Gallon” for Buildings

• For Electrical and Fuels• Also: kWH/Square Foot/Year

55

Page 56: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Unit Conversion

• Electrical:‐ kWH/YR x 3.41 kBTU/kWH

• Fossil Fuel:‐ Fuel Units/YR x BTU Per Unit/ 1,000

• Units Delivered to Building (not source  Energy)

56

Page 57: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Information Presentation

57

Page 58: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

58

Page 59: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Cooling Plant

59

Page 60: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Cooling Plant

60

Page 61: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Typical Pump

59

Page 62: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Cx of Performance Monitoring

Commissioning:• BTU Meters: Water• Upstream/Downstream straight piping• T&B Accuracy Verification

‐ vs. Balance Valve‐ vs. Pump Curve‐ vs. Equipment Pressure Drop

62

Page 63: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

BTU Meters: Water

• Temperature‐ +/‐ 0.1°F Accuracy Goal‐ Insertion Temperature Probe‐ ≈ with +/‐ 0.1°F Accuracy ‐ ≈ RTD Type: Not Thermister‐ Must Have Insertion Test Ports!

63

Page 64: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Power Meters

•Goal: +/‐ 0.1 kW (True kW)•3 Phase: Sum of 3 legs•Precision field meter required

‐ +/‐ $2,000 meter cost

• Stable operation required

64

Page 65: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

VFD Based Power

• +/‐ 0.1 kW Accuracy Goal• Compare VFD Display with building BMS• Check for 0.0 KW when off 

65

Page 66: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Data Acquisition

•Capture Related Data•Outside Air Temperature (All)•Cooling Plants

‐ OA Enthalpy‐ CHWS Temperature‐ Condenser Water Temperature

‐ To Chiller

66

Page 67: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Correlate Related Data

• Heating: BTUH vs. Average Hourly OA Temp• Fans: kW/kCFM/HR vs. Average Hourly OA Temp

• Cooling Plant‐ kW/Ton vs. Average Hourly Enthalpy‐ kW/Ton vs. Average Hourly Condenser Temp

67

Page 68: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Data Management

Central Plants• Data Frequency: Every Minute• Then 15 Minute Average• Then Hourly Average• Then Daily Average, etc...

68

Page 69: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Data Management

• Too Much Data to Store•Develop Average Data

‐ For Permanent Storage

•Dump detailed data after +/‐ 90 days or so

69

Page 70: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Further Resources

“The Building Performance Tracking Handbook,” California Commissioning Collaborative – cacx.org 

ASHRAE Guideline 22‐2008 –“Instrumentation for Monitoring Central Chilled‐Water Plant Efficiency”

70

Page 71: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Further Resources

CBECS – Commercial Building Energy Consumption Survey

Benchmarking Building Energy Performance Oak Ridge National Laboratory –

eber.ed.ornl 

69

Page 72: Performance Monitoring for Efficiency · “The Building Performance Tracking Handbook,” California Commissioning Collaborative –cacx.org ASHRAE Guideline 22‐2008 – “Instrumentation

Questions?

Thomas Andersontom@cx‐associates.com