pipeline, pump & compressor stations · us$ 43 billion employs worldwide around 30,000 people;...
TRANSCRIPT
![Page 1: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/1.jpg)
2017
Engineering for a better future
PIPELINE, PUMP & COMPRESSOR STATIONS
![Page 2: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/2.jpg)
2 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
60 years of construction experienceworldwide Successfully completed more than 500 projects in
45 countries, with a historical contract value ofUS$ 43 billion
Employs worldwide around 30,000 people; 10%of which is technical and 6% of which isadministrative personnel
Named one of the world’s top contractors byEngineering News-Record (ENR), a leadingpublication for the engineering and constructionindustry since 1982
2016 Annual Revenue, comprising the revenues offollowing activities corresponding to USD 3.5 billion: Engineering & Construction Power Real Estate Trade
Traded publicly in Borsa Istanbul (BIST) with aMarket Cap of more than US$ 7 billion.
Holds ISO 9001, OHSAS 18001 & ISO 14001 and ASME certificates
Shares the vision & goals of its customers, adopts to their needs and to local conditions
More than 50 subsidiaries operating in 6 major geographical areas:
CIS, Asia, Middle East, Europe, Africa andTurkey
Int r oduc ing
![Page 3: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/3.jpg)
3 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Gl obal l y
More than 500 projects in 45 countries
![Page 4: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/4.jpg)
4 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Cur r ent pr o j ec t s
Oil & GasPower Plants InfrastructureCivil Works
GNr Nr Project Name Country
1 1 West Qurna-I IOT Project Iraq
2 2 Early Works and Facilities Construction for SCPX Project Georgia
3 3 Senimdi Kurylys Master Services Contracts (1131939) Kazakhstan
4 4 Senimdi Kurylys Master Services Contracts (1224036) Kazakhstan
5 5 Senimdi Kurylys CSC EPC Onshore Contracts (1134328) Kazakhstan
6 6 Senimdi Kurylys CSC EPC Onshore Contracts (1206904) Kazakhstan
7 7 Senimdi Kurylys FGP Multi Well Pads Civil Installation (Contract 1310153) Kazakhstan
8 8 Kashagan Oil Field Development Equipment Rental (Various Contracts) Kazakhstan
9 9 Kashagan Oil Field Development Marine Channel Works (CatRo EN-VO-001) Kazakhstan
10 10 Kashagan Oil Field Development Offshore Construction Works (Contract 1037071) Kazakhstan
11 11 Kashagan Oil Field Development Offshore Construction Works (Contract 1103298) Kazakhstan
12 12 Kashagan Oil Field Development Offshore Construction Works (NCOC N.V. /2016-0001) Kazakhstan
13 1 750 MW Samawa CCPP Iraq
14 2 750 MW Dhi-Qar CCPP Iraq
15 3 Baghdad 1500 MW CCPP - Besmaya Iraq
16 1 Prishtine – Hani I Elezit (Route No:6) Motorway Kosovo
17 1 SED New USA Embassy Compound in Nouakchott Mauritania
18 2 SED New USA Embassy Compound in the Hague, Wassenaar Netherlands
19 3 SED New USA Embassy Compound in Dhahran Saudi Arabia
20 4 SED New USA Embassy Compound in Colombo Sri Lanka
21 5 SED New USA Embassy Compound in Ashgabat Turkmenistan
22 6 SED New USA Embassy Compound in Kabul Afghanistan
23 7 SED New USA Embassy Compound in Hyderabad India
24 8 SED New USA Embassy Compound in Asuncion Paraguay
25 9 USA Embassy Moscow Annex Office Building Russia
26 10 Kashirskaya Shopping Center Russia
27 11 Multifunctional Medical Center in Gelendjik Russia
28 12 TAIF Business Center Kazan Russia
![Page 5: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/5.jpg)
5 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
enka Pıpel ıne, Pump & Compr essor St at ıons No Project Title Business Line Country Location Start Date Finish Date
1 Kashagan Oil Field Development Offshore Construction Works Oil Gas, Petrochemicals Asia Kazakhstan 2015-04-20 2016-10-01
2 Senimdi Kurylys Crude Shipment Capacity EPC Project Oil Gas, Petrochemicals Asia Kazakhstan 2014-07-29 2017-07-01
3 South Caucasus Pipeline Expansion (SCPX) Early Works and Facilities Project Oil Gas, Petrochemicals Asia Georgia 2014-02-07 2018-03-01
4 Senimdi Kurylys Master Contractor Services (Contract 1131939) Oil Gas, Petrochemicals Asia Kazakhstan 2013-12-01 2018-11-01
5 Senimdi Kurylys Master Contractor Services (1155538) Oil Gas, Petrochemicals Asia Kazakhstan 2013-12-01 2015-11-08
6 North Rumaila Crude Oil Turbo Pump Station (PS-1) Project Oil Gas, Petrochemicals Asia Iraq 2013-12-01 2016-04-23
7 TANAP - Trans Anatolian Natural Gas Pipeline Project - Engineering Services Oil Gas, Petrochemicals Eurasia Turkey 2013-05-01 2014-08-01
8 Senimdi Kurylys Construction Services (Contract 844780) Oil Gas, Petrochemicals Asia Kazakhstan 2011-06-01 2014-02-01
9 Senimdi Kurylys Construction Services (Contract 672887) Oil Gas, Petrochemicals Asia Kazakhstan 2009-05-21 2011-06-01
10 411 MW Yajva Combined Cycle Power Plant Power Plant Eurasia Russian Federation 2008-07-15 2011-08-01
11 Supply and Erection of Zawia Potable Water Pipeline Project Oil Gas, Petrochemicals Africa Libya 2007-06-23 2011-06-30
12 SGI-II Turnaround Mechanical Works Injection Booster Compr. (Contract 571501-4-1274) Oil Gas, Petrochemicals Asia Kazakhstan 2007-02-01 2007-10-01
13 Zawia Desalination Plant Project (Sea Water Thermal (MED-TVC) Plant) Oil Gas, Petrochemicals Africa Libya 2006-07-11 2012-02-29
14 Kashagan Oil Field Development Project - Onshore Plant Services Oil Gas, Petrochemicals Asia Kazakhstan 2006-06-01 2007-02-01
15 Kashagan Oil Field Development Project, Offshore Civil Construction Works Oil Gas, Petrochemicals Asia Kazakhstan 2005-04-01 2012-10-01
16 Senimdi Kurlyls TCO Asset Development Projects (SGI -SGP Frame Agreement 1671) Oil Gas, Petrochemicals Asia Kazakhstan 2004-02-01 2008-12-01
17 Sakhalin II Onshore Processing Facility (OPF) Project Oil Gas, Petrochemicals Eurasia Russian Federation 2003-06-01 2009-07-01
18 Oued Athmania Water Treatment Plant Infrastructure Africa Algeria 2002-08-01 2007-03-01
19 İZMİR BOO CCPP Fuel Gas Pipeline and Pressure Reducing, Metering Station Project Power Plant Eurasia Turkey 2001-05-15 2002-03-21
20 Kashagan Oil Field Exploration Project, Offshore Civil Works (Contract 2000-278) Oil Gas, Petrochemicals Asia Kazakhstan 2001-03-01 2004-05-01
21 Senimdi Kurlyls Infrastructure Works Engineering Construction (Contract OM 202) Oil Gas, Petrochemicals Asia Kazakhstan 2001-02-01 2009-06-01
22 GEBZE - ADAPAZARI BOO CCPP Fuel Gas Pipeline and Pressure Reducing, Metering Station Project Power Plant Eurasia Turkey 2001-01-13 2001-10-31
23 CS-1 Kırklareli Compressor Station, Unit K4 Supply and Construction Project Oil Gas, Petrochemicals Eurasia Turkey 2000-03-30 2002-11-07
24 Tengiz Crude Oil Export Project Oil Gas, Petrochemicals Asia Kazakhstan 2000-03-01 2000-10-01
25 CS-1 Kırklareli Compressor Station, Unit K3 Upgrade and Revamping Project Oil Gas, Petrochemicals Eurasia Turkey 1999-08-06 2002-03-19
26 CS-1 Kırklareli Compressor Station, K1 K2 Units Upgrade Project Oil Gas, Petrochemicals Eurasia Turkey 1997-05-22 1998-09-30
27 Supply and Construction of CS-3 Compressor Station Project Oil Gas, Petrochemicals Eurasia Turkey 1996-07-18 1998-07-31
28 Gas Pipeline Construction Oil Gas, Petrochemicals Africa Algeria 1995-01-01 1995-10-01
29 Tengiz Oil Fields Development Off Plot (Contract OM 133) Oil Gas, Petrochemicals Asia Kazakhstan 1993-07-16 2001-03-01
30 Derna Al-Bumba Water Project Infrastructure Africa Libya 1986-12-01 1996-03-01
![Page 6: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/6.jpg)
6 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
No Project Title Business Line Country Location Start Date Finish Date
31 600 MW Trakya Natural Gas Combined Cycle Power Plant Extension I Power Plant Eurasia Turkey 1986-11-01 1989-08-01
32 USSR - Turkey Natural Gas Pipeline Project Oil Gas, Petrochemicals Eurasia Turkey 1986-09-01 1988-09-01
33 Russian Natural Gas Pipeline, BOTAŞ Ankara River Pass Infrastructure Eurasia Turkey 1986-09-01 1988-08-31
34 Istanbul Sewerage Project (1st Stage) Civil Works for Yenikapı Pretreatment Plant Pumping Stations Infrastructure Eurasia Turkey 1985-06-01 1988-06-01
35 Water Lines in Fanateer, Defii and Mutrafiah, Contract No. 570-C11 Infrastructure Asia Saudi Arabia 1985-02-01 1986-09-01
36 Istanbul Sewerage Project (1st Stage) Mechanical and Electrical Works for Yenikapı Pre-treatment Plant Pumping Stations Infrastructure Eurasia Turkey 1984-09-01 1988-08-01
37 Nahrawan Industrial Estate Water Supply Scheme - EPC Civil Asia Iraq 1984-08-01 1986-03-01
38 New Battaliyah Water Stormwater Facilities Infrastructure Asia Saudi Arabia 1984-07-01 1985-05-01
39 Amman Service Reservoirs - Contract 2 Infrastructure Asia Jordan 1983-10-01 1986-04-01
40 Amman Service Reservoirs - Contract 3 Infrastructure Asia Jordan 1983-10-01 1986-04-01
41 Iraq-Turkey Crude Oil Pipeline Expansion Project (Turkish Part) Oil Gas, Petrochemicals Eurasia Turkey 1983-03-01 1984-10-01
42 Crude Oil Export Project Oil Gas, Petrochemicals Asia Iraq 1983-03-01 1984-10-01
43 Al Khafji Phase 2 Desalination Plant Infrastructure Asia Saudi Arabia 1982-10-01 1986-02-01
44 Diyarbakır Province Drinking Water Supply System Infrastructure Eurasia Turkey 1982-05-01 1986-05-01
45 Kerbela Water Pipeline and Pumping Station - EPCC Infrastructure Asia Iraq 1982-05-01 1983-11-01
46 Tasluja Water Pipeline and Pumping Station - EPCC Infrastructure Asia Iraq 1982-03-01 1983-12-01
47 Riyadh Water Transmission System, Pump Stations 5 and 6 Infrastructure Asia Saudi Arabia 1981-03-01 1983-07-01
48 Riyadh Additional Water Supply Contract No. 3 Treatment Works Infrastructure Asia Saudi Arabia 1979-10-01 1982-05-01
49 Middle Anatolian Refinery Housing Compound Part 2 Civil Eurasia Turkey 1977-08-01 1980-10-01
50 Makkah Water Pipeline Infrastructure Asia Saudi Arabia 1977-07-01 1977-11-01
51 Elazığ - Uluova Irrigation Project Infrastructure Eurasia Turkey 1977-05-01 1979-10-01
52 İskenderun Iron and Steel Factories, Raw Materials Preparation Facilities Civil Eurasia Turkey 1972-01-01 1975-05-01
enka Pıpel ıne, Pump St at ıon, Compr essor Pr o j ec t s
![Page 7: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/7.jpg)
7 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
KASHAGAN – Oil Fiel d Devel opmentCaspian Sea, Kazakhst an
Onshore Civil Works
Offshore Civil Works
1998 EPC construction of Bautino supply base
1998-1999 Supply of graded rock for appraisal berms
1999-2000 Expansion of OKIOC Bautino supply base
2001-2004 Infrastructure upgrade works in Bautino
2005 Construction of Cuttings Pits in Koshken
2006 Supply of High Density Rock (HDR), EPC loading & berthing facility in Saritash
2008 Supply of sheet pile materials
2001-2004 OKIOC Contract 2000-278: Offshore Civil Works
2005-2012 Contract 2004-1372 Offshore Civil Works
D Complex ConstructionA Island Construction2 ea. EPC Islands6 ea. Berms10 ea. IPS (Ice Protection Structures)4 ea. IRG (Ice Rubble Generators)3 ea. DC Islands for FFD
Project Value: US$ 1.88 Billion
Main Work Item Quantity Unit FEED Design,Engineering Procurement Transport &
Logistic Fabrication Construction
Earthworks 14,809,000 ton N/AHaulage* 12,513,000 ton N/AExcavation 1,944,302 m² N/A N/ASheetpile 90,337 ton N/AStructural Steel 7,850 tonIn-Situ Concrete 72,639 m³Precast Concrete Elements 362,420 tonGeomembrane/ Geotextile 618,800 m² N/AU/G Piping 32,170 m N/A
Not by ENKAPartially by ENKAFully by ENKA
![Page 8: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/8.jpg)
8 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
KASHAGAN – Oil Fiel d Devel opmentCaspian Sea, Kazakhst an
The Kashagan field is located in the Kazakhstan sector of the Caspian Sea and extendsover a surface area of approximately 75 kilometers by 45 kilometers. The reservoirlies some 4,200 meters below the shallow waters of the northern part of the CaspianSea. The use of conventional drilling and production technologies, such as concretestructures or jacket platforms that rest on the seabed - is not possible due to theshallow water and cold winter climate of the northern part of the Caspian Sea. Toensure their protection from harsh winter conditions and pack ice movement,offshore facilities are being installed on artificial islands. There are two main types ofisland – small unmanned ‘drilling islands’ and larger manned ‘hub islands’.Hydrocarbons will travel from the drilling islands to hub islands via pipeline. The hubislands will contain processing facilities to separate recovered liquid (oil and water)from the raw gas, as well as gas injection and power generation systems. DuringPhase I, around half of the gas produced will be re-injected back into the reservoir.Separated liquid and raw gas will be taken by pipeline to the Bolashak onshoreprocessing plant in Atyrau oblast, where export quality oil will be produced. Some ofthe processed gas will be sent back offshore for use in power generation while somewill be used to generate power at the process plant itself.
![Page 9: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/9.jpg)
9 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
KASHAGANOil Fiel d Devel opment
![Page 10: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/10.jpg)
10 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
SAKHALIN PROJECTS - Russian Feder at ion
![Page 11: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/11.jpg)
11 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Sakhal in II Onshor e O&G Pr oc essing Fac il it y (OPF)
July 2003 July 2004
July 2005 Nov 2006 (Phase 1 completed)
![Page 12: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/12.jpg)
12 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Sakhal in II (OPF) Tr anspor t at ion & Er ec t ion of Heavy Equipment
![Page 13: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/13.jpg)
13 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Capacity
51 Million m3 /day gas 10,000 ton /day condensate & c/o 120 MW Power Generation
Milestones
Construction
Contract Signed : May 2003 Phase 1 complete : Nov 2006 First Oil in : Nov 2008 First Gas in : Feb 2009 Phase 2 complete : July 2009
2,200 men at peak 31 mio man-hours total (10 mio w/o LTI) 10 mio man-hours w/o LTI - during construction 6 mio man-hours w/o LTI - in operating plant
Sakhal in II (OPF) Fir st c ombined O&G Pr oc essing in Russia - Lar gest of it s kind in t he wor l d
Project Value: US$ 1.1 Billion
Main Work Item Quantity Unit FEED Design,Engineering Procurement Transport &
Logistic Fabrication Construction
Earth Works 1,750,000 m3 N/AConcrete 95,000 m3
Structural Steel 9,000 tonA/G Piping 6,000 tonCabling 2,800,000 lm N/AMech. Equipment 7,000 tonInsulation & Paint 160,000 m2
Buildings 13,000 m2
Not by ENKAPartially by ENKAFully by ENKA
![Page 14: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/14.jpg)
14 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
ENKA was awarded by Fluor Daniel Eurasia Inc. and Exxon NeftegasLimited (ENL) in May 2005 with the contract for installation ofmechanical and piping systems, and the works were completed by theend of October 2006, two months ahead of schedule.
Construction scope undertaken and completed by ENKA included: Erection and installation of compressors, generators, heat
exchangers, boilers, pumps and sludge catchers Hook-up of 30,000 tons pre-fabricated modules (900-2,500 tons
each ) Erection of 2,200 tons structural steel, Field fabrication and erection of 32,000 lm of interconnecting
piping, pressure-testing Painting & insulation works Commissioning & Start-Up assistance
The execution of Sakhalin-I OPF Mechanical & Piping erection workswere performed with manpower of 1,000 people at the peak, and atotal of 2.8 million man-hours without any Lost Time Incident (LTI).
Sakhal in I (OPF) Onshor e Oil Pr oc essing Fac il it y
Project Value: US$ 110 Million
![Page 15: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/15.jpg)
15 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location : North Rumaila / Iraq Client : South Oil Company (SOC) of Ministry of Oil
Project Description: Part of Modernization Program of Pump Stations at North
Rumaila to pump Crude Oil to FAO Depot 2 x 13 MW Gas Turbine –Pump Sets each to deliver 6100 m3/h
Crude Oil to 685 m. Complete Turn-Key EPC including all equipment Construction, Erection Start-up & Commissioning within 20
Months from effective date of Contract
IRAQ Nor t h Rumail a PS- 1 Cr ude Oil Pump St at ion
Project Value: US$ 59 Million
Commencement : December 2013 Completion : April 2016
Main Work Item Quantity Unit
ReinforcedConcrete 6,393 m3
Structural Steel 440 ton
Piping 1,088 tonMain EquipmentErection 478 ton
Welding 11,245 Di
Cabling 75,563 m
![Page 16: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/16.jpg)
16 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location : Georgia Client : South Caucasus Pipeline Company Ltd. Project Description:
The existing South Caucasus Pipeline transports gas fromAzerbaijan to markets in Georgia and Turkey with a systemdesign capacity of 7.4 bcma. The South Caucasus PipelineExpansion (SCPX) will increase the capacity of the existing systemby approximately 16 bcma through a 48” diameter pipeline andwill connect to TANAP pipeline.
ENKA and Bechtel Joint Venture have been awarded the SCPXEarly Works and Facilities contract on 7 February 2014. Theclient, SCP, is an international consortium whose shareholdersare BP – United Kingdom (%28.8), TPAO – Turkey (%19), SOCAR –Azerbaijan (%16.7), Petronas – Malaysia (%15.5), Lukoil – Russia(%10) and, NICO – Iran (%10). The Bechtel ENKA Joint Venturescope under this contract comprise of all related early civil worksand construction of two compressor stations and a pressurereduction and metering station at three different locations.Construction of an 15 km Access Road between the existingMillennium highway and the Second Compressor Station is alsoin the early Works scope of the contract.
GEORGIA SCPX Early Works and Facilities Project
Commencement : February 2014 Completion : March 2018
![Page 17: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/17.jpg)
17 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
TANAP PROJECTTANAP Tr ans Anat ol ian Nat ur al Gas Pipel ine Pr oj ec t
Currently the world’s largest pipeline project Total investment over USD 10 billion for the works in
Turkish territory
FEED for the portion in Turkish territory. The work was executed in collaboration with Bechtel Inc.
Key figures: 1,800 km 56” pipeline 6 compressor stations 2 metering stations Dardanelles Strait crossing
Project Value : 54 Million USD Commencement : May 2013 Completion : August 2014
Client: TANAP (SOCAR 16.7% + BP 28.8% + PETRONAS 15.5% + LUKOIL 10% + TPAO 19% + NICO 10%)
![Page 18: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/18.jpg)
18 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
KAZAKHSTAN TENGIZ Pr o j ec t s
World’s largest single-train sourcrude processing facility
SGP – Second Generation Project
Contract Signed : 2003 First Oil : 2007 Final Turnover : 2008 Project Value : 588 Million USD
Newly introduced re-injectiontechnology (depth 7 km)
SGI – Sour Gas Injection Project
Additions to Tengiz Oil Processing Facilities
Train 5 Project
Contract Signed : 2003 Mechanical Completion : 2007 Project Value : 77 Million USD
Contract Signed : 1997 Mechanical Completion : 2000 Project Value : 562 Million USD
Additions to Tengiz Oil Processing Facilities
CSC New Tank Farm Project
Contract Signed : 2014 Mechanical Completion : 2017 Project Value : 339 Million USD
![Page 19: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/19.jpg)
19 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
TENGIZ Pr o j ec t sSGI & SGP Main Work Item Quantity Unit FEED Design,
Engineering Procurement Transport& Logistic Fabrication Construction
Earth Works 1,700,000 m3 N/A
Concrete 125,000 m3
Structural Steel 35,000 ton
A/G Piping 15,000 ton
Cabling 3,100,000 lm N/A
Mechanical Equipment 1,750 ea
Instrument 60,600 ea N/A
Not by ENKAPartially by ENKAFully by ENKA
![Page 20: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/20.jpg)
20 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Nat ur al Gas Fir ed CCPPsBuil t , Owned, Oper at ed (BOO) by ENKA
ENKA is the sole owner of the Gebze,Adapazarı and İzmir Natural Gas Fired CCPPssince December 2005
Collective annual generation capacity of 32billion kilowatt-hours are capable of meeting12% of Turkey's aggregate energyconsumption.
1,554 MW Gebze & 777 MW Adapazari
1,523 MW Izmir
In 2011, ENKA’s Adapazari Power Plant wasselected as the Power Plant of the Year withan availability of 99.8 % by the PowerMagazine.
![Page 21: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/21.jpg)
21 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
ADAPAZARI/ GEBZE/ IZMIR CCPPO&M HISTORY
![Page 22: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/22.jpg)
22 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
ENKA Adapazari and Gebze CC Power Plants, with a total installed capacity of2,310 MW achieved 99.8% availability in 2010 and set a new world record forpower plant availability with GE 9 FA gas turbines. This availability record wasnearly 7% higher than the industry average of 92% for all technology gas turbinesand is still a global record for F-class gas turbine technology.
Factory Mutual Global (FM) awarded all ENKA Power Plants the status of HighlyProtected Risk in recognition of ENKA’s commitment to the reduction of potentiallosses through a stringent program of risk mitigation and prevention.
ENKA Operations and Maintenance Team with its over 89 engineers and 176technicians is also playing an important role in the successful realization ofprojects. Its ultimate purpose is to provide pre-commissioning and commissioningservices to ENKA's local or international Gas-fired power plant or Oil & Gas facilityprojects.
set s a New Wor l d Rec or d as an Independent Power Pr oduc er
![Page 23: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/23.jpg)
23 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
411 mw Yaj v inskaj a Power Pl ant - Russia
Awarded the “Best Project in thePower/Industrial category” in 2013 GlobalBest Projects Competition of ENR(Engineering News-Record).
Location
Client
Project Description
Perm Region / Russian Federation
OGK-4 (EON)
Lump Sum Turnkey - A plant with single shaftconfiguration, 1 gas turbine, 1 steam turbine and1 heat recovery steam generator.
Construction Period
07/2008 - 08/2011
Project Value: 460 Million USD
![Page 24: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/24.jpg)
24 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Main Work Item Quantity Unit Design,Engineering Procurement Fabrication Construction Commissioning
& Start-UpEarth Works 50,000 m3 N/AConcrete 11,427 m3
Structural Steel 3,074 tonA/G Piping 959 tonCabling 385,337 lm N/AMech. Equipment 6,155 tonInsulation & Paint 6,000 m2
Buildings 8,328 m2
Not by ENKAPartially by ENKAFully by ENKA
411 mw Yaj v inskaj a Power Pl ant - Russia
![Page 25: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/25.jpg)
25 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Client: Ministry of Water Resources NationalAgency of Dams – ANBT
Location: Mila – Algeria Construction Period: August 2002 - March 2007 Contractor: Enka – Main Contractor Project Description: Construction of a zoned earthfill dam with
a reservoir capacity of 31,5 hm3 in the cityof Mila. The crest has a length of 600 mand height of 44 m.
Oued At mania Dam - Al ger ia
![Page 26: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/26.jpg)
26 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Project : Former U.S.S.R. - Turkey Natural Gas Pipeline Location : From Bulgarian Turkish border to Ankara (Turkey) Construction Period : 03/1986 – 09/1988 Job Owner : BOTAS Transportation by Pipelines Inc. Turkey Contractor : Consortium of Spie Capaq - ENKA - Brown and RootMajor Item : 842 km 36 - 24 inch gas pipeline
(118 km of the pipeline is offshore, in the Marmara Sea at a max depth of 90m)
For mer U.S.S.R. – Tur key Nat ur al Gas Pipel ine
![Page 27: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/27.jpg)
27 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Project : Iraq - Turkey Crude Oil Pipeline Expansion Location : Turkey and Iraq Construction Period : 03/1983 - 10/1984 Job Owner : BOTAS Transportation by Pipelines Inc., Turkey
State Organization for Oil Projects - SCOP, Iraq Contractor : Enka - Toyo Engineering Consortium Project Description:
Design and construction of expansion project to increase the capacity
of existing 40", 1000 km crude oil line from 35 million tons/year to 50
million tons/year.
Construction of 80 km of pipeline loop with 30” and 40” diameters.
Replacement of pumps and motors at existing stations
Modification of dispatching center
Extension of the metering stations and addition of the 4th metering
station
Construction of five new pump stations complete with high voltage
substation.
Tie-in of new stations to existing pipeline.
Ir aq - Tur key Cr ude Oil Pipel ine Expansion
![Page 28: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/28.jpg)
28 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Der na Desal inat ion Pl ant Pr oj ec t (Sea Wat er Ther mal (MED- TVC) Pl ant )PROJECT DESCRIPTIONDerna Desalination Plant Project, located in Derna city in eastern part of Libya, was in part of a development plan
implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan
Leader, to cover high demand of reliable water sources in eastern part of Libya.
The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2x20,000
m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with
all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation
whereas; light fuel oil (LFO) are used as back-up fuels. The project consists of a redundant sea water intake system
of which complete basic and detailed engineering was included in EPC scope of the Project.
Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as
consortium partner of the Project.
The project includes a water distribution network line with water storage tanks.
LOCATION: Derna - Libya
OWNER / CLIENT: General Electricity Company of Libya (GECOL)
PROJECT DURATION:Aug 2006 – Aug 2010
CONTRACT TYPE:Lump Sum Turn Key
CONTRACT VALUE:EUR 38 Million
![Page 29: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/29.jpg)
29 of 30Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Zawia Desal inat ion Pl ant Pr oj ec t (Sea Wat er Ther mal (MED- TVC) Pl ant )PROJECT DESCRIPTIONZawia Desalination Plant Project, located in Zawia city in western part of Libya in 60 km distance to capital city
Tripoli, was in part of a development plan implemented by General Electricity Company of Libya, in the period of
40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of
Libya.
The Project consisted of engineering, procurement, construction, commissioning and start-up of a 4x20,000
m3/day Water Production Plant with three type of fuel, Heavy Fuel Oil (HFO), NG and Light Fuel Oil (LFO),
complete with all Balance of Plant (BOP) systems. NG is planned to be used as main fuel for MED Desalination
Plant operation whereas; heavy fuel oil (HFO) are used as back-up fuels.
Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as
consortium partner of the Project.
The project includes a relatively large water distribution network line in 142 km with water storage tanks and
pumping stations.
LOCATION: Zawia - Libya
OWNER / CLIENT: General Electricity Company of Libya (GECOL)
PROJECT DURATION:July 2006 – Feb 2012
CONTRACT TYPE:Lump Sum Turn Key
CONTRACT VALUE:EUR 62 Million
![Page 30: PIPELINE, PUMP & COMPRESSOR STATIONS · US$ 43 billion Employs worldwide around 30,000 people; 10% of which is technical and 6% of which is administrative personnel Named one of the](https://reader034.vdocuments.net/reader034/viewer/2022052611/5f051fac7e708231d4116283/html5/thumbnails/30.jpg)
İNŞAAT VE SANAYİ A.Ş.Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349
Beşiktaş / İstanbul
Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69