PITANJA SA VIŠESTRUKIM ODGOVORIMA BROJ 12 1.Parallel running is: the same as direct changeover. when the transition from an old IS to a new IS is immediate. when the transition from an old IS to a new IS is phased. when the old IS and new IS run simultaneously for a period. none of the above. 2. Software quality is determined by: the number of bugs only. how well the software meets the needs of the business. the sales level of the software. both the first and second answers. none of the above. 3. The build phase of systems development includes: documentation. data migration. testing. programming. all of the above. 4.The project closedown review is: part of the build phase. necessary to identify poor practice in the build phase of the project. necessary to identify poor practice in the implementation phase of the project necessary to identify poor practice in the entire project. all of the above.

Upload: jerinasd

Post on 10-Apr-2015

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: pitanja sa visestrukim odgovorima broj 12

PITANJA SA VIŠESTRUKIM ODGOVORIMA BROJ 12

1.Parallel running is:

the same as direct changeover. when the transition from an old IS to a new IS is immediate. when the transition from an old IS to a new IS is phased. when the old IS and new IS run simultaneously for a period. none of the above.

2. Software quality is determined by:

the number of bugs only. how well the software meets the needs of the business. the sales level of the software. both the first and second answers. none of the above.

3. The build phase of systems development includes:

documentation. data migration. testing. programming. all of the above.

4.The project closedown review is:

part of the build phase. necessary to identify poor practice in the build phase of the project. necessary to identify poor practice in the implementation phase of the project necessary to identify poor practice in the entire project. all of the above.

5. Unit testing:

involves users. involves volume testing. involves 'black-box' testing. involves system testing none of the above.

6. Direct changeover is:

Page 2: pitanja sa visestrukim odgovorima broj 12

when the transition from an old IS to a new IS is phased. when the transition from an old IS to a new IS is immediate. the same as phased implementation. when the old IS and new IS run simultaneously for a period. none of the above.

7. Staff training for a new IS should include:

education about the reasons for the system. education for all employees in an organisation. training in how to use the features of the software. both the first and third answers. none of the above.

8. Alpha test software is:

a companion to the software. nearly ready for general release. an early version of software tested by some users only. the same as beta test software. a general release of the software.

9.User acceptance testing typically occurs:

after systems testing. after project closedown review. before systems testing. at the same time as systems testing.

10.The project closedown review is used:

with the big-bang changeover method. to assess the efficiency and effectiveness of a project. in conjunction with the 'big-bang' method. in conjunction with the parallel running method.