37 NEW LOTS AVECOGENERATION SYSTEM
PLAZA RESIDENCES
□ MECHANICAL SYSTEMS BC 1704.16
□ HEATING SYSTEMS BC 1704.25
□ FIRE-RESISTANT PENETRATIONS AND JOINTS BC 1704.27
□ ENERGY CODE COMPLIANCE INSPECTION BC 110.3.5
□ HVAC & SERVICE WATER HEATING EQUIPMENT IIB3
□ HVAC & SERVICE WATER HEATING CONTROLS IIB4
□ DUCT PLENUM AND PIPING INSULATION & SEALING IIB5
□ MAINTENANCE INFORMATION IID1
SPECIAL INSPECTIONS/PROGRESS (TR-1) ENERGY CODE COMPLIANCE INSPECTIONS (TR-8)
![Page 2: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/2.jpg)
COGENERATION MECHANICAL FLOW DIAGRAM
![Page 3: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/3.jpg)
COGENERATION HOT AIR EXHAUST & FLUE LAYOUTCOGENERATION MECHANICAL PIPING LAYOUT
![Page 4: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/4.jpg)
COGENERATION DUCT WORK DETAILCOGENERATION FLUE DETAIL
COGENERATION WATER PIPING DETAIL
![Page 5: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/5.jpg)
COGENERATION CELLAR PLUMBING LAYOUT
![Page 6: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/6.jpg)
COGENERATION GAS RISER DIAGRAM
COGENERATION GAS CONNECTION DETAIL COGENERATION WATER PIPING DETAIL
![Page 7: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/7.jpg)
COGENERATION CELLAR ELECTRICAL LAYOUT
![Page 8: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27](https://reader034.vdocuments.net/reader034/viewer/2022050604/5fab6985f84f9c2c5b7d0373/html5/thumbnails/8.jpg)
COGENERATION ELECTRICAL ONE LINE DIAGRAM