plug-in ready michigan //powerpoint// made possible through the generous support of the u.s....

11
//plug-in ready michigan // powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric vehicle preparedness plan: Introduction

Upload: preston-cummings

Post on 03-Jan-2016

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

made possible through the generous support of the U.S. Department of Energy

plug-in ready michiganan electric vehicle preparedness plan: Introduction

Page 2: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Agenda

Introduction

Status of EV Readiness

Utilities

Planning & Zoning

Codes & Permitting

What’s Ahead

Page 3: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Introductions

Page 4: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Stakeholders

Page 5: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Project ObjectiveTo be prepared…

The objective of this project is to create a community based electric vehicle

infrastructure readiness plan and implement activities in anticipation of larger electric vehicle deployment efforts in the future.

Page 6: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Why Plan for EV’s?

Reduce dependency on imported oil

Bolster economy

Reduce emissions that have a negative effect on our health and environment

Appropriately prepare for emerging market – be proactive

Establish the state as a leader

Page 7: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Planning Process

Phase 1: Assembling the Team

Phase 2: Data Gathering and Partner Input

Phase 3: Collaborative Writing Process

Phase 4: Outreach

Page 8: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Page 9: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Plan Design

Page 10: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Plan StructureUser Icons

Page 11: plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric

//plug-in ready michigan

//powerpoint//

Plan StructureTiers of Readiness

Accepting -There is a desire to ensure no barriers exist, but there is no interest in actively promoting the installment of charging stations.

Encouraging - There is both a desire to ensure no barriers exist and an interest in promoting the installation of charging stations.

Assertive -There is a desire to ensure that charging stations, or at a minimum charging infrastructure, be installed as part of parking requirements.