    The PMP application is a project in itself. Ultimately the application is completed onlin

    organize your information before you sit down to complete the application online. Thiexperience meets the requirements, and give you a preview of what the application

    There are 5 main worksheets in this workbook and 15 worksheets for you different p

    1. Instructions- This is where you are now. It tells you how to use this workbo

    2. Project Domains - This is simply a list of typical project tasks that are organiapplication requires you to break down the hours you have spent on your proje

    3. Screen Shots - These are actual screen shots of what the application looks lik

    have to input will come from the Project Worksheets (P1,P2, P3, etc...)

    4. Education- On this worksheet you will fill in your education attained which wi

    requirements needed based on your level of education.

    5. Experience Summary - This worksheet is a summary of all of your projects afrom the individual Project Worksheets (P1,P2, P3, etc...). The Qualificatio

    many you have listed, and how many you stil l need.

    P. Project Worksheets - These worksheets are where you will list each of your

    sheets you will enter the total hours that you spent on the project and then enthere will be carried over to the Experience Summary sheet.

  • 8/21/2019 PMP Application Assistant v6.2

    2/305

    PMP Application Assist

    Instr

    e but it is quite lengthy and requires a lot of information so it is extremely helpful to gather

    s spreadsheet is designed help you organize your information, make sure your projectrocess is like.

    rojects.

    k.

    zed by the 5 project management process groups . You need to be aware of these becausects into these 5 process groups.

    e on the pmi.org website so you can see what lies ahead. Most of the information that you

    ll automatically set up the formulas in the Experience Summary worksheet for the

    nd shows a running total of your project hours and months. The information here is pulledSummary at the top of this worksheet shows the amount of hours and months required, h

    rojects and all of the information that you will need for each of them. At the bottom of thes

    er the estimated percentage of that time spent in each of the five domains. The hours input

  • 8/21/2019 PMP Application Assistant v6.2

    3/305

    ant v6.2

    ctions

    and

    the

    ill

    verw

    e

  • 8/21/2019 PMP Application Assistant v6.2

    4/305

  • 8/21/2019 PMP Application Assistant v6.2

    5/305

  • 8/21/2019 PMP Application Assistant v6.2

    6/305

  • 8/21/2019 PMP Application Assistant v6.2

    7/305

  • 8/21/2019 PMP Application Assistant v6.2

    8/305

    Project Domains

    Initiating Planning

    Conduct project selection methods Gather and document requirements

    Develop the project charter Identify key project team members

    Identify key stakeholders Define roles and responsibilities

    Define the scope of the project Create the work breakdown structure

    Evaluate the feasibility of new products or

    services

    Develop a communication plan

    Review the charter with key stakeholders

    to confirm project scope, risks, issues,

    assumptions and constraints

    Develop the cost, schedule, resource,

    quality and procurement plans

    Identify and document high level risks,

    assumptions and constraints

    Obtain project plan approval from the

    customer

    Decompose tasks

    Divide and prioritize tasks

    Develop project schedules

    Estimate costs

    Allocate budget

    Identify and document project risks

    Evaluate project risks

    Define risk strategies

    Develop contingency plans

    Develop the risk management plan

    Meet vendors

    Product evaluations

    Prepare RFPs, RFQs

    Conduct a kick off meeting

    Develop the change management plan

    This is simply a list of typical project tasks and where they fall in the 5

  • 8/21/2019 PMP Application Assistant v6.2

    9/305

  • 8/21/2019 PMP Application Assistant v6.2

    10/305

    Executing Monitoring & Controlling

    Manage the resource allocation Report performance

    Execute tasks defined in the project plan Compile change requests

    Implement a quality management plan Perform quality control audits

    Implement approved changes Perform earned value analysis

    Gather, maintain, and approve timesheets Verify the scope of the project

    Provide coaching and training to team

    members

    Ensure the project deliverables conform to

    quality standards established in the

    project quality plan

    Implement approved actions and

    workarounds

    Track schedule, cost, quality, risk, etc.

    Obtain project resources Monitor the status of identified risks

    Conduct team building activities Identify any new risks

    Evaluate resumes Take corrective actions

    Interview candidates Update the risk response plan

    project management domains. You need to be aware of these because the ap

  • 8/21/2019 PMP Application Assistant v6.2

    11/305

  • 8/21/2019 PMP Application Assistant v6.2

    12/305

    Closing

    Obtain final acceptance for the project

    Identify and document lessons learned

    Update project records and documents

    Archive project records and documents

    Obtain financial, legal and administrative

    project closure

    Release project resources and provide

    performance feedback

    Create and distribute final project report

    Measure customer satisfaction

    lication requires you to break

  • 8/21/2019 PMP Application Assistant v6.2

    13/305

  • 8/21/2019 PMP Application Assistant v6.2

    14/305

  • 8/21/2019 PMP Application Assistant v6.2

    15/305

  • 8/21/2019 PMP Application Assistant v6.2

    16/305

  • 8/21/2019 PMP Application Assistant v6.2

    17/305

  • 8/21/2019 PMP Application Assistant v6.2

    18/305

  • 8/21/2019 PMP Application Assistant v6.2

    19/305

  • 8/21/2019 PMP Application Assistant v6.2

    20/305

  • 8/21/2019 PMP Application Assistant v6.2

    21/305

  • 8/21/2019 PMP Application Assistant v6.2

    22/305

  • 8/21/2019 PMP Application Assistant v6.2

    23/305

    Screen Shots

    These are actual screen shots of what the application looks like on the pmi.org websifrom the Project Worksheets (P1, P2, P3,etc...)

    1. Login Screen

    3. Contact Email

    5. Attained Education

  • 8/21/2019 PMP Application Assistant v6.2

    24/305

    7. Eligibility Worksheet

    9. Add/Edit Organization Details

  • 8/21/2019 PMP Application Assistant v6.2

    25/305

    11. Add/Edit Project Domain Hours

    13. Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    26/305

    15. Optional Information

    17. Application Agreement

  • 8/21/2019 PMP Application Assistant v6.2

    27/305

  • 8/21/2019 PMP Application Assistant v6.2

    28/305

    te so you can see what lies ahead. Most of the information that you will have to input will c

    2. Contact Address

    4. Contact Phone Number

    6. PMP Requirements Overview

  • 8/21/2019 PMP Application Assistant v6.2

    29/305

    8. Add/Edit Project Specific Information

    10. Add/Edit Organization Contact

  • 8/21/2019 PMP Application Assistant v6.2

    30/305

    12. Add/Edit Project Summary

    14. Add/Edit PM Education

  • 8/21/2019 PMP Application Assistant v6.2

    31/305

    16. Name on Certificate

    18. Review Progress and Submit

  • 8/21/2019 PMP Application Assistant v6.2

    32/305

  • 8/21/2019 PMP Application Assistant v6.2

    33/305

    me

  • 8/21/2019 PMP Application Assistant v6.2

    34/305

  • 8/21/2019 PMP Application Assistant v6.2

    35/305

  • 8/21/2019 PMP Application Assistant v6.2

    36/305

  • 8/21/2019 PMP Application Assistant v6.2

    37/305

  • 8/21/2019 PMP Application Assistant v6.2

    38/305

  • 8/21/2019 PMP Application Assistant v6.2

    39/305

  • 8/21/2019 PMP Application Assistant v6.2

    40/305

  • 8/21/2019 PMP Application Assistant v6.2

    41/305

  • 8/21/2019 PMP Application Assistant v6.2

    42/305

  • 8/21/2019 PMP Application Assistant v6.2

    43/305

  • 8/21/2019 PMP Application Assistant v6.2

    44/305

  • 8/21/2019 PMP Application Assistant v6.2

    45/305

  • 8/21/2019 PMP Application Assistant v6.2

    46/305

  • 8/21/2019 PMP Application Assistant v6.2

    47/305

  • 8/21/2019 PMP Application Assistant v6.2

    48/305

  • 8/21/2019 PMP Application Assistant v6.2

    49/305

  • 8/21/2019 PMP Application Assistant v6.2

    50/305

  • 8/21/2019 PMP Application Assistant v6.2

    51/305

  • 8/21/2019 PMP Application Assistant v6.2

    52/305

  • 8/21/2019 PMP Application Assistant v6.2

    53/305

  • 8/21/2019 PMP Application Assistant v6.2

    54/305

    Education

    Attained Education

    * Highest level of education attained: or global eq

    * Year degree awarded: 2005

    * School/University:

    * Address:

    * City

    State/Province

    Zip/Postal Code

    * Country:

    * Field of Study:

    Project Management Education

    * Course Title

    * Institution Name:

    * Course Start Date: (i.e. 12/11/20

    * Course End Date: (i.e. 12/11/20

    * Hours: 36

    530003

    INDIA

    Engineering

    Bachelor Degree

    ANDHRA UNIVERSITY

    Karachettu Road

    AU North Campus

    VISAKHAPATNAM

    ANDHRA PRADESH

  • 8/21/2019 PMP Application Assistant v6.2

    55/305

  • 8/21/2019 PMP Application Assistant v6.2

    56/305

    uivalency

    Bachelor Degree

    Project Months Required: 36

    Project Hours Required: 4,500

    4)

    4)

  • 8/21/2019 PMP Application Assistant v6.2

    57/305

  • 8/21/2019 PMP Application Assistant v6.2

    58/305

  • 8/21/2019 PMP Application Assistant v6.2

    59/305

  • 8/21/2019 PMP Application Assistant v6.2

    60/305

  • 8/21/2019 PMP Application Assistant v6.2

    61/305

  • 8/21/2019 PMP Application Assistant v6.2

    62/305

  • 8/21/2019 PMP Application Assistant v6.2

    63/305

  • 8/21/2019 PMP Application Assistant v6.2

    64/305

  • 8/21/2019 PMP Application Assistant v6.2

    65/305

  • 8/21/2019 PMP Application Assistant v6.2

    66/305

  • 8/21/2019 PMP Application Assistant v6.2

    67/305

  • 8/21/2019 PMP Application Assistant v6.2

    68/305

  • 8/21/2019 PMP Application Assistant v6.2

    69/305

  • 8/21/2019 PMP Application Assistant v6.2

    70/305

    Experience Summary

    Required Qualified Still Need

    PM Experience Months: 36 71 0

    PM Experience Hours: 4,500 8,795 0

    PM Education Hours: 35 36 0

    Tab Start Through Months

    Hyperlinks May, 2006 Oct, 2013 71

    Project 01 May, 2006 Feb, 2007 10

    Project 02 Mar, 2007 Nov, 2007 9

    Project 03 Dec, 2007 Jan, 2009 14

    Project 04 Feb, 2010 Aug, 2012 31

    Project 05 Sep, 2012 Oct, 2013 14Project 06 0

    Project 07 0

    Project 08 0

    Project 09 0

    Project 10 0

    Project 11 0

    Project 12 0

    Project 13 0

    Project 14 0

    Project 15 0

    If you have found this spreadsheet to be helpful, please stop by our Fr

    While you are there, feel free to LIKE, T

    Facilities Management System for Seagate In

    Integrated Hospital Energy Management Syst

    REPLACEMENT OF LOCAL CONTROL SYSTEM

    QUALIFICATION SUMMARY

    Project Title

    Totals:

    9MW Co-Gen Power Plant Automation

    Automation of MgCl2 Handling unit in Titaniu

    Act

    http://www.passionatepm.com/pmp-exam-prep-information-and-resourceshttp://www.passionatepm.com/pmp-exam-prep-information-and-resourceshttp://www.passionatepm.com/pmp-exam-prep-information-and-resourceshttp://www.passionatepm.com/pmp-exam-prep-information-and-resourceshttp://www.passionatepm.com/pmp-exam-prep-information-and-resources
  • 8/21/2019 PMP Application Assistant v6.2

    71/305

  • 8/21/2019 PMP Application Assistant v6.2

    72/305

    TotalHours

    Months

    Hours

    Initiating

    Planning

    Executing

    Monitor/

    Control

    Closing

    Dec/2006

    Jan/2007

    Feb/2007

    Mar/2007

    Apr/2007

    8,795 71 8,795 558 3,074 2,385 1,986 793

    1,068 3 1,068 75 374 267 246 107

    960 9 960 77 326 250 230 77

    1,539 14 1,539 92 523 431 369 123

    3,648 31 3,648 219 1,313 1,058 730 328

    1,580 14 1,580 95 537 379 411 1580 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0

    e Resources page on our website and leave us a nice comment.

    EET, or +1 the page. Thanks! :)

    Application Submission Date

    Expected Month of Application to PMI:

    Expected Year of Application to PMI:

    Earlie

    Enter the date that you intend to submit your application to PMI

    Domain Hoursual Qualified

    This date is

    All of you

    P

  • 8/21/2019 PMP Application Assistant v6.2

    73/305

  • 8/21/2019 PMP Application Assistant v6.2

    74/305

    May/2007

    Jun/2007

    Jul/2007

    Aug/2007

    Sep/2007

    Oct/2007

    Nov/2007

    Dec/2007

    Jan/2008

    Feb/2008

    Mar/2008

    Apr/2008

    May/2008

    Jun/2008

    Jul/2008

    Aug/2008

    Sep/2008

    Oct/2008

    Nov/2008

    Dec/2008

    Jan/2009

    Feb/2009

    Mar/2009

    Apr/2009

    May/2009

    Jun/2009

    Jul/2009

    Aug/2009

    Sep/2009

    Oct/2009

    Nov/2009

    Dec/2009

    Jan/2010

    Feb/2010

    Mar/2010

    Apr/2010

    May/2010

    st Year Allowed Six Years Ago Five Years Ago Four

    he only thing you need to fill out on this sheet.

    r project info is to be input on the individual

    roject Worksheets (P1, P2, P3, etc)

  • 8/21/2019 PMP Application Assistant v6.2

    75/305

  • 8/21/2019 PMP Application Assistant v6.2

    76/305

    Jun/2010

    Jul/2010

    Aug/2010

    Sep/2010

    Oct/2010

    Nov/2010

    Dec/2010

    Jan/2011

    Feb/2011

    Mar/2011

    Apr/2011

    May/2011

    Jun/2011

    Jul/2011

    Aug/2011

    Sep/2011

    Oct/2011

    Nov/2011

    Dec/2011

    Jan/2012

    Feb/2012

    Mar/2012

    Apr/2012

    May/2012

    Jun/2012

    Jul/2012

    Aug/2012

    Sep/2012

    Oct/2012

    Nov/2012

    Dec/2012

    Jan/2013

    Feb/2013

    Mar/2013

    Apr/2013

    May/2013

    Jun/2013

    Two Years Ago One YeYears Ago Three Years Ago

  • 8/21/2019 PMP Application Assistant v6.2

    77/305

  • 8/21/2019 PMP Application Assistant v6.2

    78/305

    Jul/2013

    Aug/2013

    Sep/2013

    Oct/2013

    Nov/2013

    Dec/2013

    Jan/2014

    Feb/2014

    Mar/2014

    Apr/2014

    May/2014

    Jun/2014

    Jul/2014

    Aug/2014

    Sep/2014

    Oct/2014

    Nov/2014

    Dec/2014

    Jan/2015

    Feb/2015

    Mar/2015

    Apr/2015

    May/2015

    Jun/2015

    Jul/2015

    Aug/2015

    Sep/2015

    Oct/2015

    Nov/2015

    Dec/2015

    ar Ago Next YearCurrent Year

  • 8/21/2019 PMP Application Assistant v6.2

    79/305

  • 8/21/2019 PMP Application Assistant v6.2

    80/305

  • 8/21/2019 PMP Application Assistant v6.2

    81/305

  • 8/21/2019 PMP Application Assistant v6.2

    82/305

  • 8/21/2019 PMP Application Assistant v6.2

    83/305

  • 8/21/2019 PMP Application Assistant v6.2

    84/305

  • 8/21/2019 PMP Application Assistant v6.2

    85/305

  • 8/21/2019 PMP Application Assistant v6.2

    86/305

  • 8/21/2019 PMP Application Assistant v6.2

    87/305

  • 8/21/2019 PMP Application Assistant v6.2

    88/305

  • 8/21/2019 PMP Application Assistant v6.2

    89/305

  • 8/21/2019 PMP Application Assistant v6.2

    90/305

    Project 1

    * Project Title:

    * Project Started: 5 (May) 2006 Earlier than 8 year

    * Through: 2 (Feb) 2007

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Organization Details

    Project Summary

    Project Engineer

    Schneider Electric India Pvt Ltd

    401, 4th Floor

    Ashoka Bhoopal Chambers

    INDIA

    Implementation of PLC based Control system for Automation of 9MW Co-Gen P

    key stakeholders, High level risks and assumptions.Create WBS,Define and reco

    with stakeholders.Execute tasks defined in project plan , Implement Quality Ma

    Plan.Monitor Risks,verify the scope of the project.Formalize final acceptance forand retain project records , measure customer statisfaction at end of project.Sy

    real time data from boilers and turbines to analyze the logics and downloads ap

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Sardar Patel Road

    Secunderabad

    Andhra Pradesh

    Engineering

    Project Specific Information

    9MW Co-Gen Power Plant Automation

    Project Contributor

  • 8/21/2019 PMP Application Assistant v6.2

    91/305

  • 8/21/2019 PMP Application Assistant v6.2

    92/305

  • 8/21/2019 PMP Application Assistant v6.2

    93/305

    s ago!

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating 7%

    Planning 35%

    Executing 25%

    Monitor & Control 23%

    Closing 10%

    100%

    592 Characters

    Back to EX

    Country Code:

    Area/State/City Code:

    Phone Number:

    Extension:500003

    Phone Number:

    Extension:

    91

    40

    39404000

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Contact Name:

    Organization Contact

    Srinivas Tata

    Country Code:

    Area/State/City Code:

    wer Plant.Identify

    rd project details

    agement

    project , Archivestem presents the

    p setpoints changes

    managed for this

    the project (e.g.

    ect management

    on each project.

    Organization's Phone Number

    Project Manager

    [email protected]

  • 8/21/2019 PMP Application Assistant v6.2

    94/305

  • 8/21/2019 PMP Application Assistant v6.2

    95/305

  • 8/21/2019 PMP Application Assistant v6.2

    96/305

    1068

    Hours

    74.76

    373.8

    267

    245.64

    106.8

    ERIENCE SUMMARY Sheet

    lectric.co.in

  • 8/21/2019 PMP Application Assistant v6.2

    97/305

  • 8/21/2019 PMP Application Assistant v6.2

    98/305

  • 8/21/2019 PMP Application Assistant v6.2

    99/305

  • 8/21/2019 PMP Application Assistant v6.2

    100/305

  • 8/21/2019 PMP Application Assistant v6.2

    101/305

  • 8/21/2019 PMP Application Assistant v6.2

    102/305

  • 8/21/2019 PMP Application Assistant v6.2

    103/305

  • 8/21/2019 PMP Application Assistant v6.2

    104/305

  • 8/21/2019 PMP Application Assistant v6.2

    105/305

  • 8/21/2019 PMP Application Assistant v6.2

    106/305

  • 8/21/2019 PMP Application Assistant v6.2

    107/305

  • 8/21/2019 PMP Application Assistant v6.2

    108/305

  • 8/21/2019 PMP Application Assistant v6.2

    109/305

  • 8/21/2019 PMP Application Assistant v6.2

    110/305

    Project 2

    * Project Title:

    * Project Started: 3 (Mar) 2007

    * Through: 11 (Nov) 2007

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    PLC & SCADA based automation for Mgcl2 handling unit in Titanium Plant.Devel

    charter,Identify and document high level risks.Create WBS,meet vendors.Execu

    project management plan,implement approved changes.Verify the scope of the

    corrective actions,Ensure project deliverables conforms to quality standards asmanagement plan.Identify and document lessons learnt,create and distribute fi

    report.This automation program will eliminate the drawbacks of the existing sys

    Project Specific Information

    Automation of MgCl2 Handling unit in Titaniu

    Project Contributor

    Manufacturing

    Organization Details

    Project Engineer

    Secunderabad

    Schneider Electric India Pvt Ltd

    401, 4th Floor

    Ashoka Bhoopal Chambers

    Sardar Patel Road

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    INDIA

    Project Summary

    Andhra Pradesh

  • 8/21/2019 PMP Application Assistant v6.2

    111/305

  • 8/21/2019 PMP Application Assistant v6.2

    112/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating 8%

    Planning 34%

    Executing 26%

    Monitor & Control 24%

    Closing 8%

    100%

    601 Characters

    op project

    te tasks defined in

    project,take

    er the qualityal project

    tem and also

    Area/State/City Code: 40

    Back to EX

    Organization's Phone Number

    Spong Plant Country Code: 91

    Phone Number: 39404000

    Extension:

    Organization Contact

    Contact Name: Srinivas Tata

    Area/State/City Code:

    Contact Relationship: Project Manager

    Contact E-mail: [email protected]

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    500003 Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    113/305

  • 8/21/2019 PMP Application Assistant v6.2

    114/305

    960

    Hours

    76.8

    326.4

    249.6

    230.4

    76.8

    ERIENCE SUMMARY Sheet

    lectric.co.in

  • 8/21/2019 PMP Application Assistant v6.2

    115/305

  • 8/21/2019 PMP Application Assistant v6.2

    116/305

  • 8/21/2019 PMP Application Assistant v6.2

    117/305

  • 8/21/2019 PMP Application Assistant v6.2

    118/305

  • 8/21/2019 PMP Application Assistant v6.2

    119/305

  • 8/21/2019 PMP Application Assistant v6.2

    120/305

  • 8/21/2019 PMP Application Assistant v6.2

    121/305

  • 8/21/2019 PMP Application Assistant v6.2

    122/305

  • 8/21/2019 PMP Application Assistant v6.2

    123/305

  • 8/21/2019 PMP Application Assistant v6.2

    124/305

    Project 3

    * Project Title:

    * Project Started: 12 (Dec) 2007

    * Through: 1 (Jan) 2009

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    The Facilities Management System (FMS) controls and monitors the Central Utili

    Water, Process Cooling Water, Hot Water, Clean Room, M+E services etc.Define

    and dcoument high level risks,assumptions,constraints.Gather and document re

    WBS ,Decompose , divide and prioritize tasks.Execute tasks defined in the projeplan,Implement approved changes.Verify the scope ,track schedule.Identify and

    learnt, create and distribute final project report.

    Project Specific Information

    Facilities Management System for Seagate In

    Project Leader

    Engineering

    Organization Details

    System Engineer

    Singapore

    C.N.A Group Ltd

    28 Kaki Bukit Crescent

    Kaki Bukit Techpark 1

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Singapore

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    125/305

  • 8/21/2019 PMP Application Assistant v6.2

    126/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating 6%

    Planning 34%

    Executing 28%

    Monitor & Control 24%

    Closing 8%

    100%

    525 Characters

    ties for Chilled

    the scope ,Identify

    quirements,create

    ct managementdocument lessons

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    ternational Substr Country Code: 65

    Phone Number: 6511 0082

    Extension:

    Organization Contact

    Contact Name: Rajendran

    Area/State/City Code:

    Contact Relationship: Project Manager

    Contact E-mail: [email protected]

    Contact's Phone Number

    Country Code: 65

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number: 6511 0082

    416259 Extension: 102

  • 8/21/2019 PMP Application Assistant v6.2

    127/305

  • 8/21/2019 PMP Application Assistant v6.2

    128/305

    1539

    Hours

    92.34

    523.26

    430.92

    369.36

    123.12

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    129/305

  • 8/21/2019 PMP Application Assistant v6.2

    130/305

  • 8/21/2019 PMP Application Assistant v6.2

    131/305

  • 8/21/2019 PMP Application Assistant v6.2

    132/305

  • 8/21/2019 PMP Application Assistant v6.2

    133/305

  • 8/21/2019 PMP Application Assistant v6.2

    134/305

  • 8/21/2019 PMP Application Assistant v6.2

    135/305

  • 8/21/2019 PMP Application Assistant v6.2

    136/305

  • 8/21/2019 PMP Application Assistant v6.2

    137/305

  • 8/21/2019 PMP Application Assistant v6.2

    138/305

    Project 4

    * Project Title:

    * Project Started: 2 (Feb) 2010

    * Through: 8 (Aug) 2012

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    The IHEMS Integrated Solution for KTP Hospital provides the infrastructure for

    to be integrated into a common platform for data exchange and collaboration. I

    stakeholders & analysis ,Define the scope, Identify high level risks, etc.Identify

    members, roles , Create WBS , Obtain stakeholder's project plan approval.Execproject plan,Execute tasks defined in project plan,Implement Quality Managem

    project performance,Monitor risks.Formalize final acceptance for project,Archive

    Project Specific Information

    Integrated Hospital Energy Management Sys

    Project Leader

    Healthcare

    Organization Details

    Senior System Engineer

    Singapore

    C.N.A Group Ltd

    28 Kaki Bukit Crescent

    Kaki Bukit Techpark 1

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Singpore

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    139/305

  • 8/21/2019 PMP Application Assistant v6.2

    140/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating 6%

    Planning 36%

    Executing 29%

    Monitor & Control 20%

    Closing 9%

    100%

    732 Characters

    ultiple applications

    entify key

    key project team

    te tasks defined innt plan.Measure

    & retain project

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    em(IHEMS) Country Code: 65

    Phone Number: 6511 0082

    Extension:

    Organization Contact

    Contact Name: Robinson

    Area/State/City Code: 65

    Contact Relationship: Project Manager

    Contact E-mail: [email protected]

    Contact's Phone Number

    Country Code: 65

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number: 96825484

    416259 Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    141/305

  • 8/21/2019 PMP Application Assistant v6.2

    142/305

    3648

    Hours

    218.88

    1313.28

    1057.92

    729.6

    328.32

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    143/305

  • 8/21/2019 PMP Application Assistant v6.2

    144/305

  • 8/21/2019 PMP Application Assistant v6.2

    145/305

  • 8/21/2019 PMP Application Assistant v6.2

    146/305

  • 8/21/2019 PMP Application Assistant v6.2

    147/305

  • 8/21/2019 PMP Application Assistant v6.2

    148/305

  • 8/21/2019 PMP Application Assistant v6.2

    149/305

  • 8/21/2019 PMP Application Assistant v6.2

    150/305

  • 8/21/2019 PMP Application Assistant v6.2

    151/305

  • 8/21/2019 PMP Application Assistant v6.2

    152/305

    Project 5

    * Project Title:

    * Project Started: 9 (Sep) 2012

    * Through: 10 (Oct) 2013

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Design, supply, install, testing and Commissioning of Environmental Control Sy

    Building Management System (BMS) for 7 stations.Identify key stakeholders &

    ,Develop Change Management Plan.Manage resouce allocation,Execute tasks de

    plan,Communicate with stakeholders & team,Mitigate project risks.Measure projperformance,Ensure deliverable conform to quality standards.Formalize final ac

    project,Idenitfy, document, communicate lessons learned.

    Project Specific Information

    REPLACEMENT OF LOCAL CONTROL SYSTEMS

    Project Leader

    Engineering

    Organization Details

    Senior System Engineer

    Bangalore

    C.N.A Engineering Pvt Ltd

    Unit 7, GINSERV, JSS Campus, CA Site no. 1

    H.A.L. 3rd Stage,

    Kodihalli

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    India

    Project Summary

    Karnataka

  • 8/21/2019 PMP Application Assistant v6.2

    153/305

  • 8/21/2019 PMP Application Assistant v6.2

    154/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating 6%

    Planning 34%

    Executing 24%

    Monitor & Control 26%

    Closing 10%

    100%

    508 Characters

    tem (ECS) and

    nalysis.Create WBS

    fined in project

    ecteptance for

    Area/State/City Code: 80

    Back to EX

    Organization's Phone Number

    FOR ECS AT 48 MR Country Code: 91

    Phone Number: 25214096

    Extension:

    Organization Contact

    Contact Name: Ramesh

    Area/State/City Code: 80

    Contact Relationship: Technical Manager

    Contact E-mail: [email protected]

    Contact's Phone Number

    Country Code: 91

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number: 9972124821

    560008 Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    155/305

  • 8/21/2019 PMP Application Assistant v6.2

    156/305

    1580

    Hours

    94.8

    537.2

    379.2

    410.8

    158

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    157/305

  • 8/21/2019 PMP Application Assistant v6.2

    158/305

  • 8/21/2019 PMP Application Assistant v6.2

    159/305

  • 8/21/2019 PMP Application Assistant v6.2

    160/305

  • 8/21/2019 PMP Application Assistant v6.2

    161/305

  • 8/21/2019 PMP Application Assistant v6.2

    162/305

  • 8/21/2019 PMP Application Assistant v6.2

    163/305

  • 8/21/2019 PMP Application Assistant v6.2

    164/305

  • 8/21/2019 PMP Application Assistant v6.2

    165/305

  • 8/21/2019 PMP Application Assistant v6.2

    166/305

    Project 6

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    167/305

  • 8/21/2019 PMP Application Assistant v6.2

    168/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    169/305

  • 8/21/2019 PMP Application Assistant v6.2

    170/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    171/305

  • 8/21/2019 PMP Application Assistant v6.2

    172/305

  • 8/21/2019 PMP Application Assistant v6.2

    173/305

  • 8/21/2019 PMP Application Assistant v6.2

    174/305

  • 8/21/2019 PMP Application Assistant v6.2

    175/305

  • 8/21/2019 PMP Application Assistant v6.2

    176/305

  • 8/21/2019 PMP Application Assistant v6.2

    177/305

  • 8/21/2019 PMP Application Assistant v6.2

    178/305

  • 8/21/2019 PMP Application Assistant v6.2

    179/305

  • 8/21/2019 PMP Application Assistant v6.2

    180/305

    Project 7

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    181/305

  • 8/21/2019 PMP Application Assistant v6.2

    182/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    183/305

  • 8/21/2019 PMP Application Assistant v6.2

    184/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    185/305

  • 8/21/2019 PMP Application Assistant v6.2

    186/305

  • 8/21/2019 PMP Application Assistant v6.2

    187/305

  • 8/21/2019 PMP Application Assistant v6.2

    188/305

  • 8/21/2019 PMP Application Assistant v6.2

    189/305

  • 8/21/2019 PMP Application Assistant v6.2

    190/305

  • 8/21/2019 PMP Application Assistant v6.2

    191/305

  • 8/21/2019 PMP Application Assistant v6.2

    192/305

  • 8/21/2019 PMP Application Assistant v6.2

    193/305

  • 8/21/2019 PMP Application Assistant v6.2

    194/305

    Project 8

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    195/305

  • 8/21/2019 PMP Application Assistant v6.2

    196/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    197/305

  • 8/21/2019 PMP Application Assistant v6.2

    198/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    199/305

  • 8/21/2019 PMP Application Assistant v6.2

    200/305

  • 8/21/2019 PMP Application Assistant v6.2

    201/305

  • 8/21/2019 PMP Application Assistant v6.2

    202/305

  • 8/21/2019 PMP Application Assistant v6.2

    203/305

  • 8/21/2019 PMP Application Assistant v6.2

    204/305

  • 8/21/2019 PMP Application Assistant v6.2

    205/305

  • 8/21/2019 PMP Application Assistant v6.2

    206/305

  • 8/21/2019 PMP Application Assistant v6.2

    207/305

  • 8/21/2019 PMP Application Assistant v6.2

    208/305

    Project 9

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    209/305

  • 8/21/2019 PMP Application Assistant v6.2

    210/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    211/305

  • 8/21/2019 PMP Application Assistant v6.2

    212/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    213/305

  • 8/21/2019 PMP Application Assistant v6.2

    214/305

  • 8/21/2019 PMP Application Assistant v6.2

    215/305

  • 8/21/2019 PMP Application Assistant v6.2

    216/305

  • 8/21/2019 PMP Application Assistant v6.2

    217/305

  • 8/21/2019 PMP Application Assistant v6.2

    218/305

  • 8/21/2019 PMP Application Assistant v6.2

    219/305

  • 8/21/2019 PMP Application Assistant v6.2

    220/305

  • 8/21/2019 PMP Application Assistant v6.2

    221/305

  • 8/21/2019 PMP Application Assistant v6.2

    222/305

    Project 10

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    223/305

  • 8/21/2019 PMP Application Assistant v6.2

    224/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    225/305

  • 8/21/2019 PMP Application Assistant v6.2

    226/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    227/305

  • 8/21/2019 PMP Application Assistant v6.2

    228/305

  • 8/21/2019 PMP Application Assistant v6.2

    229/305

  • 8/21/2019 PMP Application Assistant v6.2

    230/305

  • 8/21/2019 PMP Application Assistant v6.2

    231/305

  • 8/21/2019 PMP Application Assistant v6.2

    232/305

  • 8/21/2019 PMP Application Assistant v6.2

    233/305

  • 8/21/2019 PMP Application Assistant v6.2

    234/305

  • 8/21/2019 PMP Application Assistant v6.2

    235/305

  • 8/21/2019 PMP Application Assistant v6.2

    236/305

    Project 11

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    237/305

  • 8/21/2019 PMP Application Assistant v6.2

    238/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    239/305

  • 8/21/2019 PMP Application Assistant v6.2

    240/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    241/305

  • 8/21/2019 PMP Application Assistant v6.2

    242/305

  • 8/21/2019 PMP Application Assistant v6.2

    243/305

  • 8/21/2019 PMP Application Assistant v6.2

    244/305

  • 8/21/2019 PMP Application Assistant v6.2

    245/305

  • 8/21/2019 PMP Application Assistant v6.2

    246/305

  • 8/21/2019 PMP Application Assistant v6.2

    247/305

  • 8/21/2019 PMP Application Assistant v6.2

    248/305

  • 8/21/2019 PMP Application Assistant v6.2

    249/305

  • 8/21/2019 PMP Application Assistant v6.2

    250/305

    Project 12

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    251/305

  • 8/21/2019 PMP Application Assistant v6.2

    252/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    253/305

  • 8/21/2019 PMP Application Assistant v6.2

    254/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    255/305

  • 8/21/2019 PMP Application Assistant v6.2

    256/305

  • 8/21/2019 PMP Application Assistant v6.2

    257/305

  • 8/21/2019 PMP Application Assistant v6.2

    258/305

  • 8/21/2019 PMP Application Assistant v6.2

    259/305

  • 8/21/2019 PMP Application Assistant v6.2

    260/305

  • 8/21/2019 PMP Application Assistant v6.2

    261/305

  • 8/21/2019 PMP Application Assistant v6.2

    262/305

  • 8/21/2019 PMP Application Assistant v6.2

    263/305

  • 8/21/2019 PMP Application Assistant v6.2

    264/305

    Project 13

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    265/305

  • 8/21/2019 PMP Application Assistant v6.2

    266/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    267/305

  • 8/21/2019 PMP Application Assistant v6.2

    268/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    269/305

  • 8/21/2019 PMP Application Assistant v6.2

    270/305

  • 8/21/2019 PMP Application Assistant v6.2

    271/305

  • 8/21/2019 PMP Application Assistant v6.2

    272/305

  • 8/21/2019 PMP Application Assistant v6.2

    273/305

  • 8/21/2019 PMP Application Assistant v6.2

    274/305

  • 8/21/2019 PMP Application Assistant v6.2

    275/305

  • 8/21/2019 PMP Application Assistant v6.2

    276/305

  • 8/21/2019 PMP Application Assistant v6.2

    277/305

  • 8/21/2019 PMP Application Assistant v6.2

    278/305

    Project 14

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    279/305

  • 8/21/2019 PMP Application Assistant v6.2

    280/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    281/305

  • 8/21/2019 PMP Application Assistant v6.2

    282/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    283/305

  • 8/21/2019 PMP Application Assistant v6.2

    284/305

  • 8/21/2019 PMP Application Assistant v6.2

    285/305

  • 8/21/2019 PMP Application Assistant v6.2

    286/305

  • 8/21/2019 PMP Application Assistant v6.2

    287/305

  • 8/21/2019 PMP Application Assistant v6.2

    288/305

  • 8/21/2019 PMP Application Assistant v6.2

    289/305

  • 8/21/2019 PMP Application Assistant v6.2

    290/305

  • 8/21/2019 PMP Application Assistant v6.2

    291/305

  • 8/21/2019 PMP Application Assistant v6.2

    292/305

    Project 15

    * Project Title:

    * Project Started:

    * Through:

    * Project Role:

    * Primary Industry:

    * Job Title:

    * Organization Name:

    * Organization Address:

    * City:

    State/Province/Territory:

    Zip/Postal Code:

    * Country:

    *

    Total characters will be shown when you press "Enter".

    Project Specific Information

    -- select --

    -- select --

    Organization Details

    In the space provided below, please summarize the project management tasks that you

    project. Please ensure that your description is between 350 and 550 characters.

    Project descriptions should consist of the following: A brief, one-sentence project objective

    Project deliverables summarized by domain (initiating, planning, executing, etc)

    A brief, one-sentence project outcome

    Project descriptions should be a high level summary of the tasks you led and directed on

    Initiating: develop project charter etc.; Planning: Scope definition etc.; and so on). Proj

    experience is required in each of the process areas when all projects are totaled, but not

    Project Summary

  • 8/21/2019 PMP Application Assistant v6.2

    293/305

  • 8/21/2019 PMP Application Assistant v6.2

    294/305

    *

    *

    *

    *

    *

    Enter your total qualifiedhours for this project

    Enter % of hours for each domain

    Domain Percentage

    Initiating

    Planning

    Executing

    Monitor & Control

    Closing

    0%

    0 Characters

    Area/State/City Code:

    Back to EX

    Organization's Phone Number

    Country Code:

    Phone Number:

    Extension:

    Organization Contact

    Contact Name:

    Area/State/City Code:

    Contact Relationship:

    Contact E-mail:

    Contact's Phone Number

    Country Code:

    managed for this

    the project (e.g.

    ect management

    on each project.

    Phone Number:

    Extension:

  • 8/21/2019 PMP Application Assistant v6.2

    295/305

  • 8/21/2019 PMP Application Assistant v6.2

    296/305

    Hours

    0

    0

    0

    0

    0

    ERIENCE SUMMARY Sheet

  • 8/21/2019 PMP Application Assistant v6.2

    297/305

  • 8/21/2019 PMP Application Assistant v6.2

    298/305

  • 8/21/2019 PMP Application Assistant v6.2

    299/305

  • 8/21/2019 PMP Application Assistant v6.2

    300/305

  • 8/21/2019 PMP Application Assistant v6.2

    301/305

  • 8/21/2019 PMP Application Assistant v6.2

    302/305

  • 8/21/2019 PMP Application Assistant v6.2

    303/305

  • 8/21/2019 PMP Application Assistant v6.2

    304/305

  • 8/21/2019 PMP Application Assistant v6.2

    305/305