portfolio 2016 daniel hartley
DESCRIPTION
Small portfolio of working covering student projects and work in practice.TRANSCRIPT
ACCESS INTO ATRIUM
IN PRACTICE // LOTS ROAD POWER STATION
VIEW OF ATRIUM ROOF
AN AREA WHICH WAS OF INTEREST TO THE PLANNERS WAS WHETHER THE ACCESS INTO THEBUILD WOULD BE ATTRACTIVE, THIS DUE TO THE ACCESS TO DAYLIGHTING INTO THE AREABEING PROBLEMATIC, THE IMAGE SHOWS THAT THE ENTRANCE TO THE COMMERCIAL PLOTS OF LOTS ROAD WOULD BE ACCESSIBLE TO DAYLIGHTING AND THAT VIEWS OF THE HISTORICAL ELEMENTS OF THE BUILDING WOULD BE RETAINED, SUCH AS THE INTERNAL CHIMNEY AND HISTORIC COLUMNS.
ALONGSIDE THE VIEW INTO THE ATRIUM FROM ACCESS ROUTE, IT WAS IMPORTANT TO SHOW THE INTERNAL MAKE-UP OF THE ATRIUM ROOF, THIS SHOWS THE LEVELS OF DAYLIGHTING INTO THE BUILD AND HOW THE ATRIUM ROOF WORKS ALONGSIDE THE EXISTING INTERNAL CHIMNEY TO CREATE AN INTERESTING SPACE WITHIN THE OLD TURBINEHALL.
VISUALS CREATED IN SKETCHUP, RENDERED IN PODIUM AND EDITED IN ADOBE PHOTOSHOP
THE VISUALS BELLOW WERE PART OF A PRE-PLANNING APPLICATION PACKAGE SENT TO HIGHLIGHT AREAS OF IMPORTANCE WITHIN THE REDEVELOPMENT OF LOTS ROAD POWER STATION, CHELSEA. THE HISTORIC BUILD IS CURRENTLY AWAITING CONSENT FROM PLANNERS.
OPENINGS
02 TERRACOTTA FEATURES CLEANED.03 ADDITIONAL APERTURES IN WALL. ALUMINIUM FRAMED WINDOWS WITH OPENING LIGHTS FOR VENTILATION.04 ALUMINIUM FRAME CURTAI WALLING SYSTEM WITH OPENING LIGHTS FOR NATURAL VENTILATION.05 ALUMINIUM FRAME CURTAI WALLING SYSTEM WITH SAFETY GLASS.06 STEEL GATES
08 CLEANED BRICKWORK.
KEY
NORTH ELEVATION
01
02
04
04
02
05
01
02
03
08
04
04
08
06
05
03
07 07
08 08 080202
IN PRACTICE // LOTS ROAD POWER STATION
SIDE ELEVATION SHOWING EXISTING CHIMNEY FRONT ELEVATION SHOWING DETAIL WORK
THE DRAWING SHOWS THE EXISTING CHIMNEY, A FOCAL POINT OF THE BUILD. WITHIN THIS I WORKED ON UPDATING THE ELEVATION TO SUPPORT THEINTERNAL SCHEME.
THE DETAILED VIEW OF THE FRONT FACADE SUPPORTED THE NOTION OF KEEPING THE BUILD WITHIN ITS CONTEXTUAL HERITAGE, ALIKE THE SIDE ELEVATION
GUTTER FIXING DETAILS
S.S.L.
Aluminum flashing, RAL 9017.
Powder coated metal balustrade, RAL 9017.
Balustrade support angle to engineers drawings.
Corner drainage outlet 75mm.
Hopper.
Rainwater pipe 100mm
Aluminum flashing, RAL 9017
Deck support.
Timber decking.
Waterproofing.
Structural slab to engineersdetails.
Cement board RAL 7047
IN PRACTICE // BLUE ANCHOR LANE
A MORE PRACTICAL PROJECT THAT I HAVE WORKED ON IS BLUE ANCHOR LANE, OF WHICH I HAVE MOSTLY COMPLETED DETAIL WORK WITHIN, THE IMAGES ON THIS PAGE SHOW A 1:50 SECTION OF THE GUTTERING SYSTEM THROUGH A COMPLICATED JUNCTION OF BALCONY STEPS SUPPORTED BY A 1:5 DETAIL AND LOCATION PLAN.
S.S.L.
S.S.L.
S.S.L.
Hopper.
Rainwater pipe 100mm.
Corner drainage outlet 75mm.
Hopper.
Rainwater pipe 100mm.
Corner drainage outlet 75mm.
Hopper.
Rainwater pipe 100mm.
Corner drainage outlet 75mm.
1ST FLOOR
2ND FLOOR
3RD FLOOR
4TH FLOOR
min 500
55
min
150
min 1200
55
min 500
min 1200min 1200
233
min 500
min 400
min 480
min 1200
Balustrade HeightFrom S.S.L.
S.S.L.
430
295
aluminium capping, RAL 9017
gravel edging barrier
aluminium capping, RAL 9017
powder coated metal balustrade,RAL 9017
Balustrade Extension HeightFrom S.S.L.
aluminium upstand flashingRAL 9017.
aluminium capping, RAL 9017.
cavity closer.
Opening Head
445
filter membrane: Bauder filterfleece
MF ceiling channel
vapour barrier: Bauder
timber decking
aluminium capping 9017
powder coated metalbalustrade, RAL 9017
structural slab to structural engineers details.
timber supports
fire stop
1100
min
cavity closer
Waterproof coveringunderlayer Bauder G4EInsulation: Bauder PIR taperedinsulation
Cap sheet -Bauder K5K
additional cap sheet layerunderneath support
high performance insulation TBCgutter
Insulation: Bauder PIRflatboard to upstands
insulation to soffit TBC
15mm plasterboardvapour barrier
MF ceiling channel
structural slab to structural engineers details.fire stop
insulation to soffit TBC
15mm plasterboardvapour barrier
MF ceiling channel
structural slab to structural engineers detailsfire stop
insulation to soffit TBC
15mm plasterboardvapour barrier
MF ceiling channel
structural slab to structural engineers detailsfire stop
insulation to soffit TBC
15mm plasterboardvapour barrier
6TH FLOOR ROOF 6TH FLOOR ROOF ROOF 4TH FLOOR ROOF
approved brick
Vapour barrier: BauderVB4-Expal
tapered insulation: Bauder PIRto achieve 0.2 U-value
brown roof
Waterproof covering underlayerBauder G4E
protection layer: Bauder Ecomatslip layer: Bauder PE foil
gravel edging barrier
filter membrane: Bauder filterfleece
vapour barrier: Bauder
tapered insulation: Bauder PIRto achieve 0.2 U-value
Bauder xero-flor XF300 sedumblanket
Waterproof covering underlayerBauder G4E
protection layer: Bauder Ecomatslip layer: Bauder PE foil
filter membrane: Bauderfilter fleece
vapour barrier: Bauder
Insulation: Bauder PIRtapered insulation
Waterproof coveringunderlayer Bauder G4E
protection layer: Bauder Ecomatslip layer: Bauder PE foil
gravel edging barrier
695
1108
360
360
IN PRACTICE // BLUE ANCHOR LANE
PARAPET DETAILS
THE ABOVE DETAILS WERE SENT AS PART OF A REQUEST FOR INFORMATION TO THE BUILDING CONTRACTORS TO CLARIFY PARAPET HEIGHTS THROUGHOUT THE BUILD. THIS WAS DUE TO COMPLICATIONS WITH THE ORIGINAL PLANNING SUBMISSION WHICH LED TO CONCRETE UP STANDS BEING EMPLOYED ON THE STREET FACING FACADE TO PREVENT THE BUILDING GIVING THE IMPRESSION OF BEING TALLER THAN ITS NEIGHBOURING STRUCTURES. AS CAN BE SEEN WITHIN THE DETAILS, THERE WERE RANGING PARAPET HEIGHTS THROUGHOUT THE BUILD, THIS BEING PARTIALLY DUE TO THE PLANNING ISSUE MENTIONED PREVIOUSLY BUT ALSO DUE TO DIFFERENT CONDITIONS, FOR EXAMPLE THE PARAPETS HOUSING GREEN ROOFING NEEDED TO BE AT A HIGHER LEVEL TO MEET REGULATIONS.
SITE CONSTRAINTS
UNIVERSITY // THE TOWER BREWERY PROJECT
SITE OPPORTUNITIES
CONSTRAINTS THAT COULD OBSTRUCT THE PROJECTS DEVELOPMENT WERE HIGHLIGHTED EARLY ON, THE IMAGE SHOWS A REFINEMENT OF THE INITIAL SITE ANALYSIS, USING AUTOCAD AND ADOBE PHOTOSHOP TO COMPILE THE FINDINGS, AREAS SUCH A NOISE POLLUTION AND VISUAL BARRIERS WERE LOOKED AT.
IN THE SAME FORMAT, SITE OPPORTUNITIES WERE OBSERVED, HERE WE LOOKED AT ACCESS ROUTES, VOCAL POINTS AND OTHER AREAS WHICH COULD HAVE A POSITIVE EFFECT ON THE PROJECTS DEVELOPMENT.
PROJECT BRIEFTHE FINAL PROJECT OF MY THIRD YEAR WAS SET IN THE POST-INDUSTRIAL SETTING OF LAMBRATE, MILAN. WITHIN THE AREA GROUNDWATER IS FORECAST TO RISE ALARMINGLY,BY MINING THIS WATER WE CAN REDUCE ITS INCREASE WHILE REVERSING THE INDUSTRIAL DECLINE OF ITALY.
THE BUILD USES THIS WATER TO BREW ALE ON A VERTICAL PROJECTION, A PRACTICE WHICH WAS ONCE COMMON BUT NOW EXTINCT. THE METHOD ALLOWS GRAVITY ITSELF TO FUEL THE BREWING ROUTE AND IN TURN CREATES A VISUAL DISPLAY OF THE PROCESS FROM TOP TO BOTTOM.
GROWING ITS OWN BARLEY AND HOPS, WHILST WELLING ITS OWN WATER, CREATES AN ENTIRELY SELF-SUSTAINABLE MODULE THAT REUSES THE SKIN OF A PERISHED INDUSTRIAL BUILD AND ALLOWS FOR THE THEORETICAL REVIVAL AND MODIFICATION OF OLD INDUSTRY WHILST CREATING A RE-CLAIMED ATMOSPHERE.
SPECIFIC STUDY - GROUND WATER LEVELS IN MILAN, ITALY GROUND WATER DIAGRAM - SPECIFIC TO SITE
AS THE PROJECT GATHERED MOMENTUM, RISING LEVELS OF GROUND WATER IN MILAN WAS AN AREA WHICH INTERESTED THE PROJECT. THE ABOVE DIAGRAM SHOWS THE AREA OF LAMBRATE, IN WHICH THE PROJECT WAS SET AND ITS RISK OF RISING GROUND WATER THE AREA HOLDS.
RELATING THE FINDINGS IN A VISUAL SETTING TO THE SITE AREA WAS CRUCIAL IN DEMONSTRATING HOW GROUND WATER COULD POTENTIALLY MINED TO CREATE A POSITIVEOUT OF THE NEGATIVE ISSUE.
UNIVERSITY // THE TOWER BREWERY PROJECT
SPATIAL RELATION AXONOMETIC DIAGRAM
UNIVERSITY // THE TOWER BREWERY PROJECT
AS THE PROJECT DEVELOPED FURTHER, THE IDEA OF THE BREWERY DEVELOPED WITH IT; A HISTORIC METHOD OFBREWING BEER, KNOWN AS ‘VERTICAL BREWING’ WHICH USES GRAVITY TO FUEL THE BREWING PROCESS WAS FOUND, THIS CONCEPT WAS MANIFESTED INTO THE ABOVE DIAGRAM. SHOWING HOW THE SPACES OF THE BREWERY WOULD WITH ONE ANOTHER.THE DIAGRAM WAS CREATED IN VECTORWORKS AND DEVELOPED IN ADOBE PHOTOSHOP.
INTERNAL STRUCTURE FOR HOUSING BREWING TUNS
THE IDEA OF THE BREWERY BECAME THE FOCAL POINT OF THE PROJECT, WITH THIS IT WAS IMAGINES THAT THE BREWING TUNS COULD BE EXPOSED FOR PUBLIC VIEWING, THIS WOULD RESULT IN AN INTERNAL STRUCTURE BEING CREATED TO HOUSE THE TUNS. AS CAN BE SEEN ABOVE A 1:100 MODEL OBSERVING HOW I IMAGINED THE BREWING TUNS WOULD SIT, THIS WAS FURTHER DEVELOPED WITH A TRIANGULAR INTERNAL STRUCTURE CREATED TO HOUSE THE TUNS TO THE LEFT.
UNIVERSITY // THE TOWER BREWERY PROJECT - TECHNICAL APPLICATION
UNIVERSITY // THE TOWER BREWERY PROJECT
STRUCTURE, SECURING THE BREWING TUNS
WHEN DEVELOPING THE STRUCTURE WHICH WOULD HOUSE THE BREWING TUNS, IT WAS DECIDED THAT THE TUNS SHOULD BE VISIBLE FROM INSIDE THE ‘BREWING TOWER’ ALLOWING PEOPLE TO GO ON BREWING TOURS AND LEARN ABOUT THE HISTORIC METHOD OF BREWING.THE DEVELOPMENT MODEL WAS CREATED IN SKETCHUP.
UNIVERSITY // THE TOWER BREWERY PROJECT
DEVELOPMENT THROUGH MODEL MAKING
THE ABOVE IMAGES SHOW DEVELOPMENT FROM MODEL MAKING THROUGHOUT THE DESIGN PROCESS, THESE MODELS WERE CREATED WHILST SKETCHING AND CREATING MODELS IN CAD TO FUEL THE DEVELOPMENT AND ENSURE THE SCHEME WAS SUCCESSFUL BOTH IN FORM AND FUNCTION.
UNIVERSITY // THE TOWER BREWERY PROJECT
FLOOR PLANS
THE FLOOR PLANS WERE DRAWN IN AUTOCAD THEN TRANSPORTED INTO ADOBE ILLUSTRATOR TO CREATE CLEAN LINE WORK, ONCE THIS WAS COMPLETED THE DRAWINGS WERE HAND RENDERED TO SHOW SHADING IN THE BUILD.
UNIVERSITY // THE TOWER BREWERY PROJECT
LONGITUDINAL SECTION
POSSIBLY THE MOST CRUCIAL DRAWING FROM THE PROJECT WAS THE SECTION, SHOWING THE DESIGN SCHEME FROM ITS MOST IMPORTANT VIEW, THE PROCESS OF THE DRAWING WAS CREATED USING THE SAME METHOD AS THE FLOOR PLANS. HAND RENDERING WAS CHOSEN AS IT WAS FELT THE DESIGN WAS ‘INDUSTRIAL’ AND THEREFORE IMPORTANT THAT THE PLANS WERE DRAWN TO THIS EFFECT.
UNIVERSITY // THE TOWER BREWERY PROJECT
FINAL MODEL
THE FINAL MODEL, MADE USING 3mm BRASS WHICH WAS HAND ETCHED TO CREATE WORN TEXTURE WAS CREATED AS A SECTION OF THE BUILD, IT WAS FELT THIS WAS THE MOST EFFECTIVE WAY IN WHICH TO PRESENT THE DESIGN.
UNIVERSITY // THE TOWER BREWERY PROJECT
INTERIOR VISUALS
THE VISUALS TAKEN FROM IMAGES OF MODELS AND MANIPULATED IN ADOBE PHOTOPSHOP, THESEWERE CREATED TO ACCOMPANY THE SECTION AND FLOOR PLANS. THE IMAGE TO THE LEFT SHOWS HOW THE BREWING TUNS COULD BE VIEWED FROM INSIDE THE BUILD AND THE VISUAL TO THE RIGHT SHOWS THE IMPORTANCE OF LIGHTING AND MATERIALITY IN THE PUBLIC BAR AREA.
UNIVERSITY // THE TOWER BREWERY PROJECT
1:5 DETAILS // EXISTING WALL CONNECTION // ROOF CONNECTION
THE PRIMARY STRUCTURE OF THE BUILD USES STEEL AS ITS CHOICE OF MATERIALITY, IN THE FIRST JUNCTION CAN BE SEEN THE CONNECTION BETWEEN THE EXISTING WALL AND THE INTERVENTION, USING STEEL FASTENING AND A LEAD FLASH, IT CAN ALSO BE SEEN THAT THE WALL STRUCTURE USED WAS DOUBLE SKIN, USING TOUGHENED GLASS AND PERFORATED BRASS PANELLING TO ALLOW INTERESTING PATTERNS ON LIGHTING INTO THE BUILD.BOTH DETAILS WERE DRAWN IN AUTOCAD AND LINE WEIGHTED IN ADOBE ILLUSTRATOR.