Page 1: Portfolio 2016 daniel hartley
Page 2: Portfolio 2016 daniel hartley

ACCESS INTO ATRIUM

IN PRACTICE // LOTS ROAD POWER STATION

VIEW OF ATRIUM ROOF

AN AREA WHICH WAS OF INTEREST TO THE PLANNERS WAS WHETHER THE ACCESS INTO THEBUILD WOULD BE ATTRACTIVE, THIS DUE TO THE ACCESS TO DAYLIGHTING INTO THE AREABEING PROBLEMATIC, THE IMAGE SHOWS THAT THE ENTRANCE TO THE COMMERCIAL PLOTS OF LOTS ROAD WOULD BE ACCESSIBLE TO DAYLIGHTING AND THAT VIEWS OF THE HISTORICAL ELEMENTS OF THE BUILDING WOULD BE RETAINED, SUCH AS THE INTERNAL CHIMNEY AND HISTORIC COLUMNS.

ALONGSIDE THE VIEW INTO THE ATRIUM FROM ACCESS ROUTE, IT WAS IMPORTANT TO SHOW THE INTERNAL MAKE-UP OF THE ATRIUM ROOF, THIS SHOWS THE LEVELS OF DAYLIGHTING INTO THE BUILD AND HOW THE ATRIUM ROOF WORKS ALONGSIDE THE EXISTING INTERNAL CHIMNEY TO CREATE AN INTERESTING SPACE WITHIN THE OLD TURBINEHALL.

VISUALS CREATED IN SKETCHUP, RENDERED IN PODIUM AND EDITED IN ADOBE PHOTOSHOP

THE VISUALS BELLOW WERE PART OF A PRE-PLANNING APPLICATION PACKAGE SENT TO HIGHLIGHT AREAS OF IMPORTANCE WITHIN THE REDEVELOPMENT OF LOTS ROAD POWER STATION, CHELSEA. THE HISTORIC BUILD IS CURRENTLY AWAITING CONSENT FROM PLANNERS.

Page 3: Portfolio 2016 daniel hartley

OPENINGS

02 TERRACOTTA FEATURES CLEANED.03 ADDITIONAL APERTURES IN WALL. ALUMINIUM FRAMED WINDOWS WITH OPENING LIGHTS FOR VENTILATION.04 ALUMINIUM FRAME CURTAI WALLING SYSTEM WITH OPENING LIGHTS FOR NATURAL VENTILATION.05 ALUMINIUM FRAME CURTAI WALLING SYSTEM WITH SAFETY GLASS.06 STEEL GATES

08 CLEANED BRICKWORK.

KEY

NORTH ELEVATION

01

02

04

04

02

05

01

02

03

08

04

04

08

06

05

03

07 07

08 08 080202

IN PRACTICE // LOTS ROAD POWER STATION

SIDE ELEVATION SHOWING EXISTING CHIMNEY FRONT ELEVATION SHOWING DETAIL WORK

THE DRAWING SHOWS THE EXISTING CHIMNEY, A FOCAL POINT OF THE BUILD. WITHIN THIS I WORKED ON UPDATING THE ELEVATION TO SUPPORT THEINTERNAL SCHEME.

THE DETAILED VIEW OF THE FRONT FACADE SUPPORTED THE NOTION OF KEEPING THE BUILD WITHIN ITS CONTEXTUAL HERITAGE, ALIKE THE SIDE ELEVATION

Page 4: Portfolio 2016 daniel hartley

GUTTER FIXING DETAILS

S.S.L.

Aluminum flashing, RAL 9017.

Powder coated metal balustrade, RAL 9017.

Balustrade support angle to engineers drawings.

Corner drainage outlet 75mm.

Hopper.

Rainwater pipe 100mm

Aluminum flashing, RAL 9017

Deck support.

Timber decking.

Waterproofing.

Structural slab to engineersdetails.

Cement board RAL 7047

IN PRACTICE // BLUE ANCHOR LANE

A MORE PRACTICAL PROJECT THAT I HAVE WORKED ON IS BLUE ANCHOR LANE, OF WHICH I HAVE MOSTLY COMPLETED DETAIL WORK WITHIN, THE IMAGES ON THIS PAGE SHOW A 1:50 SECTION OF THE GUTTERING SYSTEM THROUGH A COMPLICATED JUNCTION OF BALCONY STEPS SUPPORTED BY A 1:5 DETAIL AND LOCATION PLAN.

S.S.L.

S.S.L.

S.S.L.

Hopper.

Rainwater pipe 100mm.

Corner drainage outlet 75mm.

Hopper.

Rainwater pipe 100mm.

Corner drainage outlet 75mm.

Hopper.

Rainwater pipe 100mm.

Corner drainage outlet 75mm.

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

Page 5: Portfolio 2016 daniel hartley

min 500

55

min

150

min 1200

55

min 500

min 1200min 1200

233

min 500

min 400

min 480

min 1200

Balustrade HeightFrom S.S.L.

S.S.L.

430

295

aluminium capping, RAL 9017

gravel edging barrier

aluminium capping, RAL 9017

powder coated metal balustrade,RAL 9017

Balustrade Extension HeightFrom S.S.L.

aluminium upstand flashingRAL 9017.

aluminium capping, RAL 9017.

cavity closer.

Opening Head

445

filter membrane: Bauder filterfleece

MF ceiling channel

vapour barrier: Bauder

timber decking

aluminium capping 9017

powder coated metalbalustrade, RAL 9017

structural slab to structural engineers details.

timber supports

fire stop

1100

min

cavity closer

Waterproof coveringunderlayer Bauder G4EInsulation: Bauder PIR taperedinsulation

Cap sheet -Bauder K5K

additional cap sheet layerunderneath support

high performance insulation TBCgutter

Insulation: Bauder PIRflatboard to upstands

insulation to soffit TBC

15mm plasterboardvapour barrier

MF ceiling channel

structural slab to structural engineers details.fire stop

insulation to soffit TBC

15mm plasterboardvapour barrier

MF ceiling channel

structural slab to structural engineers detailsfire stop

insulation to soffit TBC

15mm plasterboardvapour barrier

MF ceiling channel

structural slab to structural engineers detailsfire stop

insulation to soffit TBC

15mm plasterboardvapour barrier

6TH FLOOR ROOF 6TH FLOOR ROOF ROOF 4TH FLOOR ROOF

approved brick

Vapour barrier: BauderVB4-Expal

tapered insulation: Bauder PIRto achieve 0.2 U-value

brown roof

Waterproof covering underlayerBauder G4E

protection layer: Bauder Ecomatslip layer: Bauder PE foil

gravel edging barrier

filter membrane: Bauder filterfleece

vapour barrier: Bauder

tapered insulation: Bauder PIRto achieve 0.2 U-value

Bauder xero-flor XF300 sedumblanket

Waterproof covering underlayerBauder G4E

protection layer: Bauder Ecomatslip layer: Bauder PE foil

filter membrane: Bauderfilter fleece

vapour barrier: Bauder

Insulation: Bauder PIRtapered insulation

Waterproof coveringunderlayer Bauder G4E

protection layer: Bauder Ecomatslip layer: Bauder PE foil

gravel edging barrier

695

1108

360

360

IN PRACTICE // BLUE ANCHOR LANE

PARAPET DETAILS

THE ABOVE DETAILS WERE SENT AS PART OF A REQUEST FOR INFORMATION TO THE BUILDING CONTRACTORS TO CLARIFY PARAPET HEIGHTS THROUGHOUT THE BUILD. THIS WAS DUE TO COMPLICATIONS WITH THE ORIGINAL PLANNING SUBMISSION WHICH LED TO CONCRETE UP STANDS BEING EMPLOYED ON THE STREET FACING FACADE TO PREVENT THE BUILDING GIVING THE IMPRESSION OF BEING TALLER THAN ITS NEIGHBOURING STRUCTURES. AS CAN BE SEEN WITHIN THE DETAILS, THERE WERE RANGING PARAPET HEIGHTS THROUGHOUT THE BUILD, THIS BEING PARTIALLY DUE TO THE PLANNING ISSUE MENTIONED PREVIOUSLY BUT ALSO DUE TO DIFFERENT CONDITIONS, FOR EXAMPLE THE PARAPETS HOUSING GREEN ROOFING NEEDED TO BE AT A HIGHER LEVEL TO MEET REGULATIONS.

Page 6: Portfolio 2016 daniel hartley

SITE CONSTRAINTS

UNIVERSITY // THE TOWER BREWERY PROJECT

SITE OPPORTUNITIES

CONSTRAINTS THAT COULD OBSTRUCT THE PROJECTS DEVELOPMENT WERE HIGHLIGHTED EARLY ON, THE IMAGE SHOWS A REFINEMENT OF THE INITIAL SITE ANALYSIS, USING AUTOCAD AND ADOBE PHOTOSHOP TO COMPILE THE FINDINGS, AREAS SUCH A NOISE POLLUTION AND VISUAL BARRIERS WERE LOOKED AT.

IN THE SAME FORMAT, SITE OPPORTUNITIES WERE OBSERVED, HERE WE LOOKED AT ACCESS ROUTES, VOCAL POINTS AND OTHER AREAS WHICH COULD HAVE A POSITIVE EFFECT ON THE PROJECTS DEVELOPMENT.

PROJECT BRIEFTHE FINAL PROJECT OF MY THIRD YEAR WAS SET IN THE POST-INDUSTRIAL SETTING OF LAMBRATE, MILAN. WITHIN THE AREA GROUNDWATER IS FORECAST TO RISE ALARMINGLY,BY MINING THIS WATER WE CAN REDUCE ITS INCREASE WHILE REVERSING THE INDUSTRIAL DECLINE OF ITALY.

THE BUILD USES THIS WATER TO BREW ALE ON A VERTICAL PROJECTION, A PRACTICE WHICH WAS ONCE COMMON BUT NOW EXTINCT. THE METHOD ALLOWS GRAVITY ITSELF TO FUEL THE BREWING ROUTE AND IN TURN CREATES A VISUAL DISPLAY OF THE PROCESS FROM TOP TO BOTTOM.

GROWING ITS OWN BARLEY AND HOPS, WHILST WELLING ITS OWN WATER, CREATES AN ENTIRELY SELF-SUSTAINABLE MODULE THAT REUSES THE SKIN OF A PERISHED INDUSTRIAL BUILD AND ALLOWS FOR THE THEORETICAL REVIVAL AND MODIFICATION OF OLD INDUSTRY WHILST CREATING A RE-CLAIMED ATMOSPHERE.

Page 7: Portfolio 2016 daniel hartley

SPECIFIC STUDY - GROUND WATER LEVELS IN MILAN, ITALY GROUND WATER DIAGRAM - SPECIFIC TO SITE

AS THE PROJECT GATHERED MOMENTUM, RISING LEVELS OF GROUND WATER IN MILAN WAS AN AREA WHICH INTERESTED THE PROJECT. THE ABOVE DIAGRAM SHOWS THE AREA OF LAMBRATE, IN WHICH THE PROJECT WAS SET AND ITS RISK OF RISING GROUND WATER THE AREA HOLDS.

RELATING THE FINDINGS IN A VISUAL SETTING TO THE SITE AREA WAS CRUCIAL IN DEMONSTRATING HOW GROUND WATER COULD POTENTIALLY MINED TO CREATE A POSITIVEOUT OF THE NEGATIVE ISSUE.

UNIVERSITY // THE TOWER BREWERY PROJECT

Page 8: Portfolio 2016 daniel hartley

SPATIAL RELATION AXONOMETIC DIAGRAM

UNIVERSITY // THE TOWER BREWERY PROJECT

AS THE PROJECT DEVELOPED FURTHER, THE IDEA OF THE BREWERY DEVELOPED WITH IT; A HISTORIC METHOD OFBREWING BEER, KNOWN AS ‘VERTICAL BREWING’ WHICH USES GRAVITY TO FUEL THE BREWING PROCESS WAS FOUND, THIS CONCEPT WAS MANIFESTED INTO THE ABOVE DIAGRAM. SHOWING HOW THE SPACES OF THE BREWERY WOULD WITH ONE ANOTHER.THE DIAGRAM WAS CREATED IN VECTORWORKS AND DEVELOPED IN ADOBE PHOTOSHOP.

Page 9: Portfolio 2016 daniel hartley

INTERNAL STRUCTURE FOR HOUSING BREWING TUNS

THE IDEA OF THE BREWERY BECAME THE FOCAL POINT OF THE PROJECT, WITH THIS IT WAS IMAGINES THAT THE BREWING TUNS COULD BE EXPOSED FOR PUBLIC VIEWING, THIS WOULD RESULT IN AN INTERNAL STRUCTURE BEING CREATED TO HOUSE THE TUNS. AS CAN BE SEEN ABOVE A 1:100 MODEL OBSERVING HOW I IMAGINED THE BREWING TUNS WOULD SIT, THIS WAS FURTHER DEVELOPED WITH A TRIANGULAR INTERNAL STRUCTURE CREATED TO HOUSE THE TUNS TO THE LEFT.

UNIVERSITY // THE TOWER BREWERY PROJECT - TECHNICAL APPLICATION

Page 10: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

STRUCTURE, SECURING THE BREWING TUNS

WHEN DEVELOPING THE STRUCTURE WHICH WOULD HOUSE THE BREWING TUNS, IT WAS DECIDED THAT THE TUNS SHOULD BE VISIBLE FROM INSIDE THE ‘BREWING TOWER’ ALLOWING PEOPLE TO GO ON BREWING TOURS AND LEARN ABOUT THE HISTORIC METHOD OF BREWING.THE DEVELOPMENT MODEL WAS CREATED IN SKETCHUP.

Page 11: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

DEVELOPMENT THROUGH MODEL MAKING

THE ABOVE IMAGES SHOW DEVELOPMENT FROM MODEL MAKING THROUGHOUT THE DESIGN PROCESS, THESE MODELS WERE CREATED WHILST SKETCHING AND CREATING MODELS IN CAD TO FUEL THE DEVELOPMENT AND ENSURE THE SCHEME WAS SUCCESSFUL BOTH IN FORM AND FUNCTION.

Page 12: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

FLOOR PLANS

THE FLOOR PLANS WERE DRAWN IN AUTOCAD THEN TRANSPORTED INTO ADOBE ILLUSTRATOR TO CREATE CLEAN LINE WORK, ONCE THIS WAS COMPLETED THE DRAWINGS WERE HAND RENDERED TO SHOW SHADING IN THE BUILD.

Page 13: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

LONGITUDINAL SECTION

POSSIBLY THE MOST CRUCIAL DRAWING FROM THE PROJECT WAS THE SECTION, SHOWING THE DESIGN SCHEME FROM ITS MOST IMPORTANT VIEW, THE PROCESS OF THE DRAWING WAS CREATED USING THE SAME METHOD AS THE FLOOR PLANS. HAND RENDERING WAS CHOSEN AS IT WAS FELT THE DESIGN WAS ‘INDUSTRIAL’ AND THEREFORE IMPORTANT THAT THE PLANS WERE DRAWN TO THIS EFFECT.

Page 14: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

FINAL MODEL

THE FINAL MODEL, MADE USING 3mm BRASS WHICH WAS HAND ETCHED TO CREATE WORN TEXTURE WAS CREATED AS A SECTION OF THE BUILD, IT WAS FELT THIS WAS THE MOST EFFECTIVE WAY IN WHICH TO PRESENT THE DESIGN.

Page 15: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

INTERIOR VISUALS

THE VISUALS TAKEN FROM IMAGES OF MODELS AND MANIPULATED IN ADOBE PHOTOPSHOP, THESEWERE CREATED TO ACCOMPANY THE SECTION AND FLOOR PLANS. THE IMAGE TO THE LEFT SHOWS HOW THE BREWING TUNS COULD BE VIEWED FROM INSIDE THE BUILD AND THE VISUAL TO THE RIGHT SHOWS THE IMPORTANCE OF LIGHTING AND MATERIALITY IN THE PUBLIC BAR AREA.

Page 16: Portfolio 2016 daniel hartley

UNIVERSITY // THE TOWER BREWERY PROJECT

1:5 DETAILS // EXISTING WALL CONNECTION // ROOF CONNECTION

THE PRIMARY STRUCTURE OF THE BUILD USES STEEL AS ITS CHOICE OF MATERIALITY, IN THE FIRST JUNCTION CAN BE SEEN THE CONNECTION BETWEEN THE EXISTING WALL AND THE INTERVENTION, USING STEEL FASTENING AND A LEAD FLASH, IT CAN ALSO BE SEEN THAT THE WALL STRUCTURE USED WAS DOUBLE SKIN, USING TOUGHENED GLASS AND PERFORATED BRASS PANELLING TO ALLOW INTERESTING PATTERNS ON LIGHTING INTO THE BUILD.BOTH DETAILS WERE DRAWN IN AUTOCAD AND LINE WEIGHTED IN ADOBE ILLUSTRATOR.