ppt-open area test site
TRANSCRIPT
-
7/23/2019 Ppt-open Area Test Site
1/15
EMI MEASUREMENTSEMI MEASUREMENTS
OPEN AREA TEST SITE (OATS)
ROJI VARGHESE RAJAN
Reviewed ByK.J.JEGADISH KUMAR AP/ECE
-
7/23/2019 Ppt-open Area Test Site
2/15
INTRODUCTIONINTRODUCTION Measurement of Radiated Emissions (RE) from
equipment, apparatus or instrument and the Radiation
Susceptibility (RS) of such an equipment/ apparatus/instrument constitute the two basic EMI/EMC
measurements.
accepted standard approach for measuring RE/RS of an
equipment.
-
7/23/2019 Ppt-open Area Test Site
3/15
MEASUREMENT OF RADIATEDMEASUREMENT OF RADIATED
EMISSIONEMISSION
With the Equipment under test (EUT) switched on,
the receiver is scanned over the specified frequency
range to measure emissions from the EUT.
-
7/23/2019 Ppt-open Area Test Site
4/15
-
7/23/2019 Ppt-open Area Test Site
5/15
-
7/23/2019 Ppt-open Area Test Site
6/15
TEST SITETEST SITE With the help of a proper test site and a calibrated
receiving antenna, radiated emissions from equipment
under test over a specified frequency band can be
measured.
Using a calibrated transmitting antenna, susceptibility of
equipment under test can be checked under specified fieldconditions.
Measurements done in a room, or enclosed area result in
reflections or scattered signals from walls, floor, and
ceilings which corrupt the measurements.
Measurements done in a proper open-area test site (OATS)
avoids such scattered signals and reflections.
-
7/23/2019 Ppt-open Area Test Site
7/15
-
7/23/2019 Ppt-open Area Test Site
8/15
-
7/23/2019 Ppt-open Area Test Site
9/15
MEASUREMENT PRECAUTIONSMEASUREMENT PRECAUTIONS
Electromagnetic Environment: need to be relatively quietand free from the presence of strong signals from broadcastradio, TV transmitters, manmade electromagnetic
radiations like automobile ignition systems or arc-weldingequipments.
Electromagnetic Scatterers: OATS should be free from,
transmission lines, open telephone and telegraph lines,fences, trees.
Power and Cable Connections: For improving theaccuracy of measurements, it is necessary that the electricalpower connections to the EUT and the cables between thetransmit/receive antenna located in the test site and thetransmitter/receiver equipment located nearby are placed inunderground trenches.
-
7/23/2019 Ppt-open Area Test Site
10/15
The shape and size of the open area test site need to be
appropriate to ensure that no scattered signals are present,
which could affect the measurements. American National
Standards recommend that
Sc and Sd are the scattered signal from obstructionslocated at the boundary of the OATS and the direct
signal between the EUT and the transmit/receive
antenna, respectively.
-
7/23/2019 Ppt-open Area Test Site
11/15
OATS CONFIGURATIONSOATS CONFIGURATIONSStationary EUT
EUT remains stationary andthe transmit/receive antennais traversed on a circular pathso as to view the equipmentrom a rec ons n
the azimuth).
D 1.5D
The path length of thescattered signal is twice thatof the direct signal whichensures the scattered signalstrength is at least 6dB belowthe direct signal strength.
-
7/23/2019 Ppt-open Area Test Site
12/15
Stationary Antenna
The EUT is mounted on a
platform which can be
rotated 360 in the azimuth.
The transmit/receive antenna
can remain stationary and yet
directions.
The boundary of the test site
is an ellipse with a major axis
MD
of dimension 2D and
minor axis Md of dimension
3D, where D is the distancebetween the EUT and the
transmit/receive antenna.
-
7/23/2019 Ppt-open Area Test Site
13/15
EUT Antenna SeparationEUT Antenna Separation
In most measurements, the distance D between the
EUT and the transmit/receive antenna is arranged tobe 1, 3, or 10 m.
To have D different from these standard distances,
t e resu ts rom t e measurement are extrapo ate toone of these standard distances by using a suitable
transformation.
-
7/23/2019 Ppt-open Area Test Site
14/15
TERRAIN ROUGHNESSTERRAIN ROUGHNESS
Maximum allowable terrain roughness is determined using
Rayleigh roughness criteria and the applicable limit is
b is the height of the rough edge of the terrain and is the
wavelength corresponding to the frequency of
measurement.
-
7/23/2019 Ppt-open Area Test Site
15/15
REFERNCESREFERNCES V.P.Kodali, Engineering EMC Principles, Measurements
and Technologies, Chapter 5 page (79-86).
C.R.Paul, Introduction to Electromagnetic Compatibility,
,
http://www.emcdirectory.com/suppliers-28A-open-area-
test-sites-oats-for-fcc-emi-emc-testing.htm