Investment opportunities of Atyrau region

Akimat of Atyrau region

Page 2: Presentation atyrau

ATYRAU REGION

ATYRAU

Gross regional product (in 2013):

20 bn. USD

25% of industrial production volume

600 industrial enterprises

RUSSIAN FEDERATION

CHINAUZBEKISTANTURKMENISTAN

More than 35% of oil and gas extraction

in national volume

KYRGYZSTAN

KAZAKHSTAN

Page 3: Presentation atyrau

Potential of the regionTotal reserves:

4,5 bn. tons of oil

2,0 trillion m3 of gas

Tengiz Field

((

((

((((

Priority sectors of Atyrau region

Petrochemical complex Machine-building

complex

Gas and oil

Barite ore Sand and gravelSalt

Gypsum Chalk

Clay and brick raw materialsPotash

The construction industry

Key resourcesof Atyrau region

Agro-industrial complex

Alternative energy

Kashagan Field

Page 4: Presentation atyrau

Program ofFORCED

Industrial-innovativeDEVELOPMENT

44 investment projects

amounted 8 bn. USD

Polyethylene

Polypropylene

Chemical reagents

Hydrogen peroxide

Benzene

Paraxylene

Fuel “Euro-5”

Production of modular home construction

3 Industrial zones

Production of drill beats and drilling systems

Assembly of large and heavy equipment

Page 5: Presentation atyrau

Cooperate with

50 countries

900 foreign companies and joint

ventures

5 enterprises with

share of UAE capital

SEZ «National Industrial Petrochamical Technopark»

3476 ha

Members of SEZ are provided with the following benefits:

Corporate income tax

Value added tax

Building tax

Property tax

Land tax

Import duty on purchased equipment

0%

Registered - more than 30 participants

Page 6: Presentation atyrau

National company

Share in the authorized capital is up to 49%

Consolidate public-private partnership

Investment projects are initiated by private business

Atyrau Innovations

Established by the decree of Akimat of the Atyrau region

Service support

Informational-analytical support for investors (tax exemptions, investment

preferences and etc.)

Assistance in all stages of projects

The principle of “one window”

SEC“Atyrau”

Page 7: Presentation atyrau

Priority projects

Construction of the transport and logistic center

Polymers and fertilizers manufacturing plant

Construction of the plant on environmentally safe utilization of

municipal waste

Alternative sources of water

Potassium fertilizers production plant

Plant on processing of meat and milk products

Page 8: Presentation atyrau

Oil and Gas Industry

Name of the project: Polymers and fertilizers manufacturing plant

Cost of the project: 400 million USD

The project’s implementation period: 2 years

Type of product: Ethylene, propylene, butylene and butadiene

Payback period: 5 years

Number of workplaces: 150

Page 9: Presentation atyrau

Oil and gas industry

Name of the project: Basalt fiber manufacturing plant

Cost of the project: 13 million USD

The project’s implementation period: 2 years

Type of product: Basalt fiber, composite materials

Payback period: 6 years

Number of workplaces: 166

Page 10: Presentation atyrau

Logistics infrastructure

Name of the project: Construction of the transport and logistic center

Cost of the project: 9 million USD

The project’s implementation period: 1 year

Type of the service: Storage, sorting and processing of cargoes

Payback period: 5 years

Number of workplaces: 70

Page 11: Presentation atyrau

Construction sector

Name of the project: Expanded clay manufacturing plant

Cost of the project: 2 million USD

The project’s implementation period: 2 years

Type of the product: Expanded clay blocks, expanded clay pellets

Payback period: 10 years

Number of workplaces: 62

Page 12: Presentation atyrau

Agro-industrial complex

Name of the project: Animal feed manufacturing plant

Cost of the project: 9 million USD

The project’s implementation period: 1 year

Type of the product: Feed for cattle

Payback period: 1 year

Number of workplaces: 25

Page 13: Presentation atyrau

Alternative energy

Name of the project: Alternative sources of water

Cost of the project: 82,5 million USD

The project’s implementation period: 2 years

Type of the product: Ecologically friendly water

Payback period: 5 years

Number of workplaces: 100

Capacity of the project: 130 thousand cub. m. of water per day

Page 14: Presentation atyrau

Name of the project:

Cost of the project: 110 million USD

The project’s implementation period: 4 years

Type of the product: Alternative energy

Payback period: 6 years Number of workplaces: 100

Construction of the plant on environmentally safe utilization of municipal waste

Alternative energy

Capacity of the project: 100 thousand tons per year

Page 15: Presentation atyrau

Petrochemical indusrty

Name of the project: Basalt continuous fiber, composite and reinforcing materials manufacturing plant Cost of the project: 9 million USD

Capacity of the project: 1 stage: 2000-2500 tons of fiber per year 2 stage: 10 thousand tons of composite materials

Number of workplaces: 600

The project’s implementation period: 4 years

Page 16: Presentation atyrau

Construction indusrty

Name of the project: Construction of new airport terminals

Cost of the project: 60 million USD

Modernization of airport with construction of passenger and cargo terminals, which will be the multimodal hub and west gateway of Kazakhstan for air cargo transportation

Number of workplaces: 500 The project’s implementation period: 4 years

Page 17: Presentation atyrau

Agro-industrial complex

Name of the project: Potassium fertilizers production plant

Cost of the project: 177 million USD

Type of the service: production of potassium fertilizers

Number of workplaces: 824 000

The project’s implementation period: 5 years