presentation bank danamon

19
Analisa Cost-Benefit

Upload: andi-fachri

Post on 04-Jul-2015

616 views

Category:

Real Estate


0 download

DESCRIPTION

Saving on Danamon Bank on AC electricity with our technology

TRANSCRIPT

Page 1: Presentation bank danamon

Analisa Cost-Benefit

Page 2: Presentation bank danamon

Customer• Bandara Sepinggan, Balikpapan

• PT. Caltex, Riau

• Panasonic Batrey, Batam

• VICO Indonesia, Balikpapan

• Oberoy Hotel, Lombok

• Universitas Negeri Padang

• Balai Besar Bahan Dan Barang Teknik ( B4 T ),

Bandung

• Badan Sertifikasi dan Standarisasi (

BARISTAN ), Surabaya

• Universitas Pembangunan Nasional, Jakarta

• Universitas Indonesia, Jakarta

Page 3: Presentation bank danamon

Custome

r

• Politeknik Bandung• Gedung Sucofindo Pusat, Jakarta• Cilegon Mall, Banten• PT. Sumiden ( Steel Factory ), Cimanggis Depok• PT. SKF ( Bering Factory ), Jakarta• RS. Siloam, Jakarta• Ice Factory, Balikpapan • Airport Selaparang, Mataram• Bandara Juanda, Surabaya• YPI Pesantren Al Zaytun, Indramayu• LIPI, Bandung• PT. Vastek Prima, Bandung• PT. Grand Textile Industry, Bandung• PT. Himalaya Tunas Texindo, Bandung• PT. Kelian Equatorial Mining ( KEM ), Kalimatan Timur• PT. Al Ma’Soem, Bandung dll.

Page 4: Presentation bank danamon

Trainning

• PT. KEM Kalimantan Timur• PT. Vico Kalimantan Timur• PT. Pertamina Persero Balikpapan

dan Balongan• PT. Puteraco Inti Buana, Surabaya• PT. Caltex Pacific Indonesia, Riau• PT. Pupuk Sriwijaya, Palembang• Balai Latihan kerja, Bandung• BLK Singosari, Malang• BLK Condet, Jakarta• BLK Balikpapan• Politeknik Bandung• LEMBANGTEK, Bandung• Universitas Indonesia, Jakarta

Page 5: Presentation bank danamon

Penanganan

MasalahPT. Greenstar Artek Indonesia sampai saat ini tidak pernah

mendapat komplain dari para pelanggan atas penggunaan refrigeran hidrokarbon “ARTEK”.

Atau dengan kata lain refrigeran hidrokarbon “ARTEK”tidak ada masalah pada sistem pendingin yang sudah terpasang

Page 6: Presentation bank danamon

Garansi / Jaminan yang dapat

diberikan oleh PT. Greenstar Artek

Indonesia atas pengaplikasian refrigeran hidorkarbon “ARTEK”adalah

Saving Energy Minimal 15 %

Maintenance Aplikasi refrigeran hidrokarbon “ARTEK” selama 3

bulan setelah retrofit dilakukan.

Garansi / Jaminan

Page 7: Presentation bank danamon

Power consumption/ month ( kWh)

Saving Bill / month

Retrofitting cost

3.834 3.137 697

5.290.230 4.328.957 961.274

6.150.000

ROI ( month ) 6,40

R22 AR22 Saving

Cab. Permata hijau

Page 8: Presentation bank danamon

Pemakaian

AC ListrikKWH Harga/KWH Total

Pemakaian Blok I 1.097 900 987.525

Pemakaian Blok II 1.670 1.380 2.304.255

3.291.780

KWH Harga/KWH Total

Pemakaian Blok I 1.097 900 987.525

Pemakaian Blok II 1.330 1.380 1.835.055

2.822.580

Tanpa Hydrocarbon

Dengan Hydrocarbon

Permata Hijau I

Page 9: Presentation bank danamon

KWH Harga/KWH Total

Pemakaian Blok I 1.530 900 1.376.550

Pemakaian Blok II 911 1.380 1.256.490

2.633.040

KWH Harga/KWH Total

Pemakaian Blok I 1.530 900 1.376.550

Pemakaian Blok II 554 1.380 1.256.490

2.140.380

Tanpa Hydrocarbon

Dengan Hydrocarbon

Permata Hijau II Pemakaian

AC Listrik

Page 10: Presentation bank danamon

Total

Penghematan

Permata

Hijau

Permata Hijau I Permata Hijau II Total Penghematan

483.276 507.440 990.716

Biaya Retrofit 6.150.000

BEP ( Month ) 6,2

Page 11: Presentation bank danamon

Power consumption/ month ( kWh)

Saving Bill / month

Retrofitting cost

14.960 12.038 2.922

20.644.800 16.612.613 4.032.188

25.950.000

ROI ( month ) 6,44

R22 AR22 Saving

Cab. Kelapa gading

Page 12: Presentation bank danamon

Pemakaian

AC ListrikKWH Harga/KWH Total

Pemakaian Blok I 8.712 900 7.840.350

Pemakaian Blok II 10.569 1.380 14.584.530

22.424.880

KWH Harga/KWH Total

Pemakaian Blok I 8.712 900 987.525

Pemakaian Blok II 7.647 1.380 10.552.343

18.392.693

Tanpa Hydrocarbon

Dengan Hydrocarbon

Kelapa Gading

Page 13: Presentation bank danamon

Total

Penghematan

kelapa

gading

Kelapa GadingTotal Penghematan

4.153.153 4.153.153

Biaya Retrofit 25.950.000

BEP ( Month ) 6,2

Page 14: Presentation bank danamon

Power consumption/ month ( kWh)

Saving Bill / month

Retrofitting cost

3.880 3.151 729

5.354.745 4.348.311 1.006.434

6.300.000

ROI ( month ) 6,26

R22 AR22 Saving

Cab. kalibata

Page 15: Presentation bank danamon

Pemakaian

AC ListrikKWH Harga/KWH Total

Pemakaian Blok I 2.766 900 2.489.702

Pemakaian Blok II 4.124 1.380 5.690.658

8.180.359

KWH Harga/KWH Total

Pemakaian Blok I 2.766 900 987.525

Pemakaian Blok II 3.394 1.380 4.684.224

7.173.925

Tanpa Hydrocarbon

Dengan Hydrocarbon

Kalibata

Page 16: Presentation bank danamon

Total

Penghematan

KalibataKalibataTotal Penghematan

1.036.627 1.036.627

Biaya Retrofit 6.300.000

BEP ( Month ) 6,1

Page 17: Presentation bank danamon

Power consumption/ month ( kWh)

Saving Bill / month

Retrofitting cost

2.010 1.632 379

2.774.145 2.251.574 522.572

3.300.000

ROI ( month ) 6,31

R22 AR22 Saving

Cab. cinere

Page 18: Presentation bank danamon

Pemakaian

AC ListrikKWH Harga/KWH Total

Pemakaian Blok I 2.195 900 1.975.050

Pemakaian Blok II 2.275 1.380 3.138.810

5.113.860

KWH Harga/KWH Total

Pemakaian Blok I 2.195 900 987.525

Pemakaian Blok II 1.896 1.380 2.615.790

4.590.840

Tanpa Hydrocarbon

Dengan Hydrocarbon

Cinere

Page 19: Presentation bank danamon

Total

Penghematan

cinereCinere Total Penghematan

538.711 538.711

Biaya Retrofit 3.300.000

BEP ( Month ) 6,1