Page 1: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Presentation to19th Annual NPS Conference

Funding provided by Rhode Island DEM through a USEPA section 319 grant

Narrow River Stormwater Abatement Narrow River Stormwater Abatement Jim Riordan, AICPMay 20, 2008

Jim Riordan, AICPMay 20, 2008

Page 2: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Narrow River Study Goals & ObjectivesNarrow River Study Goals & Objectives

GOAL: Reduce pathogens and nutrients; and return baseflow to predevelopment levels.

Assess watershed conditions.

Conduct conceptual planning study.

Select 4 subwatersheds and appropriate BMPs with Stakeholder Input.

Design BMPs to 75%.

GOAL: Reduce pathogens and nutrients; and return baseflow to predevelopment levels.

Assess watershed conditions.

Conduct conceptual planning study.

Select 4 subwatersheds and appropriate BMPs with Stakeholder Input.

Design BMPs to 75%.

Page 3: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Project Study AreaProject Study Area

PETTA LAKE SHORES 2PETTA LAKE SHORES 2WOODSIA TRAIL –NORTH

PETTA LAKE SHORES 3WOODSIA ROAD –SOUTH

METTATUXET 4METTATUXET 4WOODBRIDGE ROAD

CIRCUIT DRIVE 1WAMPUM ROAD

EDGEWATER 2EDGEWATER 2SOUTH FERRY ROAD

METTATUXET 3METTATUXET 3SHAGBARK ROAD

PETTA LAKE SHORES 1SHADBUSH TRAIL

PETTASQUAMSCUTT COMBINATION

PETTASQUAMSCUTT TERRACE 1 & 2

PETTAQUAMSCUTT AVENUE

METTATUXET 1METTATUXET 1OLD PINE ROAD

METTATUXET ROAD

METTATUXET 2METTATUXET BEACH

EDGEWATER 1EDGEWATER 1LAKESIDE DRIVE

INDIAN HEADINDIAN HEADINDIAN TRAIL

CIRCUIT DRIVE 2CONANICUS ROAD

Technical Memorandum Subwatersheds

Narragansett Subwatershed Names

TMDL Subwatershed Names

Page 4: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Hydrologic Data by SubwatershedHydrologic Data by Subwatershed

27.73.21.180.300.6050.862.37.219.5Mettatuxet 4

35.93.70.980.320.6454.865.37.620.1Mettatuxet 3

51.35.61.640.420.8554.868.610.226.8Mettatuxet 1

119.022.83.120.971.9464.774.923.289.2PettasquamscuttTerrace Combo

22.23.50.340.170.3567.575.24.213.5Edgewater 2

70.213.21.120.761.5170.278.018.147.2Edgewater 1

225.727.73.251.282.5767.077.030.8100.4Petta Lake Shores 2

52.16.51.480.420.8458.972.910.127.2Indian Head

cfsacre-ftacre-ftacre-ftacre-ftacresacres

Q25V25VGWRV1flushWQV CNnCN

AimpATotalOutfall

Key Points

• WQV = 9.3 ac/ft

• VGWR = 13.11 ac/ft

Page 5: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Available BMPsAvailable BMPs

•Roof leader disconnection

Impervious surface disconnection

•Vegetated strips

Engineered vegetative strips and conveyances

•Permeable Pavement

•Dry wells

••Disconnected catch basins and proprietary infiltration units

••Infiltration trenches

•••Bioretention

•••Sand filters

Filtration and infiltration

Source Reduction

UplandEnd-of-PipePractices and Strategies

Key Points

• Considered all BMPs in Table 3 (page 8).

• Analyzed only BMPs that produced quantifiable result.

Page 6: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Sand FilterSand Filter

Elevation

Typical Section

OPTIONAL IMPERMEABLE LINER

Plan View

Section View

Page 7: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

BioretentionBioretention

Plan View

Elevation

Typical Section

Page 8: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Infiltration TrenchInfiltration Trench

Page 9: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Disconnected Catch BasinDisconnected Catch Basin

Page 10: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Dry WellsDry Wells

Page 11: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Permeable PavementPermeable Pavement

Page 12: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Vegetative StripVegetative Strip

Page 13: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Roof Leader DisconnectionRoof Leader Disconnection

Page 14: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

On-Lot BMPsAssuming 20% ParticipationOn-Lot BMPsAssuming 20% Participation

68Study Area (weighted average)1

811Mettatuxet 4

910Mettatuxet 3

611Mettatuxet 1

611Pettasquamscutt Terrace 2

67Pettasquamscutt Terrace 1

77Edgewater 2

56Edgewater 1

49Petta Lake Shores 2

36Indian Head

VGWRWQV

Percent Treated (%)

Subwatershed

• Based on a recent survey conducted by the Town, actual willingness to participate is 10 – 18%.

Page 15: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Upland BMPsUpland BMPs

32% - 47%62% - 96%TOTAL

62%100%Mettatuxet 3

100%100%Mettatuxet 1

100%100%Pettasquamscutt Terrace 2

0% – 30%48% - 100%Pettasquamscutt Terrace 1

0%0%Edgewater 2

0% – 56%42% - 100%Edgewater 1

0% -23%29% - 100%Petta Lake Shores 2

58%100%Indian Head

VGWRWQV

Best Available Volumetric CapacitySubwatershed

Page 16: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

End-of-Pipe BMPsEnd-of-Pipe BMPs

73%78% - 80%TOTAL

100%100%Mettatuxet 3

100%100%Mettatuxet 1

100%100%Pettasquamscutt Terrace 2

92%100%Pettasquamscutt Terrace 1

100%100%Edgewater 2

100%100%Edgewater 1

0% -9%11% - 29%Petta Lake Shores 2

97%100%Indian Head

VGWRWQV

Best Possible Level of Treatment Subwatershed

Page 17: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 18: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 19: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 20: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 21: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 22: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 23: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 24: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Conceptual DesignsConceptual Designs

Page 25: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Order-of-Magnitude Opinions of CostOrder-of-Magnitude Opinions of Cost

98139$3,000,000TOTAL

913$260,000Mettatuxet 4

711$220,000Mettatuxet 3

1318$370,000Mettatuxet 1

2433$690,000Pettaquamiscutt Terrace Combo

34$80,000Edgewater 2

1216$340,000Edgewater 1

2028$710,000Petta Lake Shores 2

1116$330,000Indian Head

% GWR% WQVCOSTSUBWATERSHED

Key Points

• Cost are ESTIMATES for planning purposes only.

• Cost do not include, land, design and permitting.

• Actual costs may be 2x or greater.

Page 26: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Rating MatrixRating Matrix

Key Points

• Allows comparison of BMPs across subwatersheds.

• Does not rate on-lot BMPs as the decision to implement is primarily in the hands of property owners.

Page 27: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Rating MatrixRating Matrix

Criteria Rankings as Determined by TACCriteria Rankings as Determined by TAC

Types of BMPs Analyzed

Types of BMPs Analyzed

Page 28: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Rating MatrixRating Matrix

Calculated from Reference MaterialsCalculated from Reference Materials

Calculated Based on Hydrologic Data

Calculated Based on Hydrologic Data

Subjective Values—Based on BPJ

Subjective Values—Based on BPJ

Page 29: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Scoring RubricScoring Rubric

NA

NA

1

3

1

2

2

2

2

3

3

Assigned Weight

Fraction town-owned x 1Fraction in roadway, managed open space or stabilized x 0.5Fraction unmerged vacant land x 0.25Fraction merged vacant land x 0.13

Multiplier B – Type of Area Available

=( 0.75(Vtreatable1/WQVtotal) + 0.25(Vtreatable /VGWR-total))4 x 10Multiplier A – Treated

Volume

Project has few impediments to being implemented (permitting, engineering, other approvals)=10

Project has significant impediments to being implemented (permitting, engineering, other approvals)=0

Ability to Implement

Finished project has limited impacts to neighborhood (perceived or otherwise) = 10

Finished project has significant impacts to neighborhood (perceived or otherwise) = 10

Public Acceptance

High reliability to function during range of storm events = 10Little reliability to function during range of storm events = 0

Reliability

O&M cost/ability low = 10O&M cost/ability moderate = 5O&M cost/ability high = 0

Operation & Maintenance (O&M)

= 10 – unit cost (Table 153)Construction Cost

= 10 – VPA (Table 153)Space Requirement/Land

=VGWR1 x GWR factor

VGWR-SW2

Groundwater Recharge

= WQV x nitrogen reduction benefit factorWQVSW

2Nitrogen Reduction

= WQV1 x bacteria reduction benefit factorWQVSW

2Bacteria Load Reduction

Scoring RubricCriteria

Page 30: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

BMP SelectionBMP Selection

Recommendations

• Scores provide a strong starting point for identifying locationsfor BMPs.

• Based on the scores (above) and additional information from the Town, we would recommend:

– Pettaquamscutt Terrace Combination (PTC).

– Edgewater 1 & 2 (E1 & 2).

Page 31: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

75% Plans75% Plans

Page 32: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

75% Plans—Pettaquamscutt Terrace75% Plans—Pettaquamscutt Terrace

Page 33: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

75% Plans—Edgewater 1&275% Plans—Edgewater 1&2

Page 34: Presentation to 19th Annual NPS Conferenceneiwpcc.org/npsconferenceold/08-presentations/Riordan.pdfPresentation to 19th Annual NPS Conference Funding provided by Rhode Island DEM through

Next StepsNext Steps

Grant of $1.1M from RIDEM

• Final design and permitting for Pettaquamscutt and Edgewater.

• Construction and monitoring of BMPs at Pettaquamscutt and Edgewater.

• Further design work for the other Narrow River Subbasins