PROJECT MAAGEMET INFORATION AND CONTROL SYSTEM

Presented By:-Rohit GothwalNalin PriyaranjanRahul BhartiSumit KumarDeepak Kumar

Page 2: Project Maagemet Information and Control System

Four Basic Elements of a ProjectResource• People• Equipment• material

Time • Task• Dependency• Critical path

Money• Cost• Contingencies• profit

Scope• Project size• Goal• Requirements

Page 3: Project Maagemet Information and Control System

Project management information system (PMIS) : Introduction•Accurate and timely information is essential for the management of a project

•The project manager—or any other manager for that part—simply cannot make and execute meaningful decisions without relevant and timely information

•The importance of information in project management calls for special techniques, tools and procedures that can be called as Project Management Information System (PMIS)

•PMIS is intended to store information essential to the effective planning, organizing, directing, and controlling of the project, as well as provide a repository of information to be used to keep stakeholders informed about the project’s status.

Page 4: Project Maagemet Information and Control System

PMIS: Importance•Lot of information is required in project initiation

•Organizations of all sizes need information to design, produce, market, and provide after-sales support to the products and services that are offered to customers

•The best information loses its value if it is not available to people who need it to make decisions and direct actions

•Stakeholders have various information needs that can often be satisfied through the information stored in the PMIS

•Those individuals with real or perceived information needs about the project soon become disenchanted when inadequate or inaccurate information is provided.

•“Surprises on projects are not career-enhancing moves.”

Page 5: Project Maagemet Information and Control System

PMIS: A schematic view

Page 6: Project Maagemet Information and Control System

PMIS: A schematic view

Page 7: Project Maagemet Information and Control System

PMIS: Information value and characteristics

Project information is as much an essential resource as people, materials, and equipment

A common misconception is that data equals information

Information collected during project planning can indicate possible risk sources during project execution phase

During post-project assessments, the PMIS can provide a wealth of information on what was accomplished, what should have been accomplished, and how it was accomplished

One project may generate significant information that has value for future projects

Information should be: accurate, precise, reliable and its detail level

Page 8: Project Maagemet Information and Control System

PMIS: Examples (DMRC) In 1989, RITES undertook a feasibility study for developing an MRTS for Delhi and completed it in 1991 and submitted a Detailed Project Report for phase-1 of Delhi Metro Project in 1995

DMRC used Primavera Project Planner for project planning and monitoring

The software contained resource planning module, cost planning module and other features

It provided information of all critical and upcoming activities, making it possible to keep track of and reschedule activities appropriately

Recently, Delhi Metro is to procure and install a Centralised Data Management System, it will act as a tool for data acquisition, visualization, reporting and consequently, as a tool for risk minimization

Page 9: Project Maagemet Information and Control System

PMIS: Sharing information When the project management information system provides information to stakeholders, the conditions for getting the stakeholders working together are facilitated

The sharing of information can promote trust, empathy, and more mature relationships among project stakeholders

It is is one of the more important dimensions of keeping the team members working together cohesively and concurrently in the utilization of the project resources

Page 10: Project Maagemet Information and Control System

Information Failure•Using unreliable information systems can result to major failure of enterprises.•Example: Administrative law judges found that LILCO nuclear power plant's measurement and reporting systems continually and repeatedly failed to accurately depict cost and schedule status at Shoreham. Thus LILCO managers were unable to use these measurement systems to gain an accurate picture of what was happening on the site

Page 11: Project Maagemet Information and Control System

Information Failure•Ethen's Olympic games first estimated at a cost of 3 billon euro, finally ending costing 12 billion euros.•Canadian army registry, an information system first estimated at ‘no more than 2 million dollar in a year’ finally closed to 1 billion dollar 10 years later.•Connaught Place renovation: cost of project scaled from 67 crore to 671 crore and took 3 years more to complete.

Page 12: Project Maagemet Information and Control System

PMIS Software

Page 13: Project Maagemet Information and Control System

Advantages of PMIS • PMIS supports the successful completion of the project within time, scope, budget and quality standards.

• PMIS integrates technical, functional and business constraints, ensuring maximal control and visibility on the project.

• PMIS helps in software application life cycle management.

• PMIS is referred and used in expert judgment.

• Since every industries such as Software, Construction, automotive, insurance which provides a product or services prefers to use project management PMIS is inevitable.

• PMIS reduces project failures and ensure proper communication.

Page 14: Project Maagemet Information and Control System

PMIS: Difficulties and challenges A PMIS can fail to support the project through a lot of reasons

•Most important is design of the system for the required information

•Too complex an arrangement for either inputting information into the system or retrieving information will frustrate many users

•Users of the information will avoid the PMIS if the data are aged or inaccurate

•Overpopulating the system with irrelevant information or information that masks the vital few can lead to errors in decisions

•Some studies and observations of decision-making theory have concluded that one should have about 80 percent of the information to make the best decision

•Delays in decision making for lack of information may be worse than making a decision on inadequate information

Page 15: Project Maagemet Information and Control System

Project Control Control is the last element in the implementation cycle of planning-monitoring-controlling

Control is focused on three elements of a project◦ Performance◦ Cost◦ Time

Chapter 11-1

Page 16: Project Maagemet Information and Control System

Controlling Performance There are several things that can cause a project’s performance to require control:◦ Unexpected technical problems arise◦ Insufficient resources are available when needed◦ Insurmountable technical difficulties are present◦ Quality or reliability problems occur◦ Client requires changes in specifications◦ Interfunctional complications arise◦ Technological breakthroughs affect the project

Chapter 11-2

Page 17: Project Maagemet Information and Control System

Controlling Cost There are several things that can cause a project’s cost to require control:◦ Technical difficulties require more resources◦ The scope of the work increase◦ Initial bids were too low◦ Reporting was poor or untimely◦ Budgeting was inadequate◦ Corrective control was not exercised in time◦ Input price changes occurred

Chapter 11-3

Page 18: Project Maagemet Information and Control System

Controlling Time There are several things that can cause a project’s schedule to require control:◦ Technical difficulties took longer than planned to resolve◦ Initial time estimates were optimistic◦ Task sequencing was incorrect◦ Required inputs of material, personnel, or equipment were

unavailable when needed◦ Necessary preceding tasks were incomplete◦ Customer generated change orders required rework◦ Governmental regulations were altered

Chapter 11-4

Page 19: Project Maagemet Information and Control System

Purposes of Control There are two fundamental objectives of control:

◦ 1. The regulation of results through the alteration of activities

◦ 2. The stewardship of organizational assets

The project manager needs to be equally attentive to both regulation and conservation

The project manager must guard the physical assets of the organization, its human resources, and its financial resources

Chapter 11-5

Page 20: Project Maagemet Information and Control System

Three Types of Control Processes Decisions must be made concerning:

◦ At what points in the project will control be exerted ◦ What is to be controlled◦ How it will be measured ◦ How much deviation will be tolerated◦ How to spot and correct potential deviations before they occur

Chapter 11-10

Page 21: Project Maagemet Information and Control System

Three Types of Control Processes No matter what the purpose in controlling a project there are two basic types of control mechanisms that can be used:◦ Go/no-go control◦ Post control

Cybernetic control is a third, but less common control mechanism that is rarely directly applicable to projects.

Chapter 11-11

Page 22: Project Maagemet Information and Control System

Characteristics of a Control System

A good control system:◦ Should be flexible◦ Should be cost effective◦ Must be truly useful◦ Must satisfy the real needs of the project◦ Must operate in a timely manner◦ Sensors and monitors should be sufficiently accurate and precise to

control the project within the limits that are functional for the client and parent organization

Chapter 11-15

Page 23: Project Maagemet Information and Control System

Control Systems All control systems use feedback as a control process The control of performance, cost, and time usually require different input data:◦ Performance - engineering change notices, test results, quality checks,

rework tickets, scrap rates◦ Cost - budgets to actual cash flows, purchase orders, absenteeism,

income reports, labor hour charges, accounting variance reports◦ Schedule - benchmark reports, status reports, PERT/CPM networks,

earned value graphs, Gantt charts, WBS, and action plans