(Results-Framework Document)for
R F D
Tourism
(2015-2016)
Government of Haryana
03/06/2015 3.09 PMGenerated on
Confirmation mail of RFD Submission has been sent to the user's email Id: [email protected] Organisation's Email Id: [email protected]
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Tourism-(2015-2016)
To position Haryana as an important tourist desination
Mission
To increase tourists footfalls in HaryanaUpgradation and improvement in tourism infrastructureTo promote private sector
investment in tourism sectorTo upgrade and enhance tourism services to international levelDevelopment of Rural/village
tourism
Objectives
1 Use of technology to improve quality of tourism services and increase tourist footfall
2 To create/maintain new/existing infrastructure for tourism in the State
3 Creation of tourism related infrastructure funded under circuits & destinations by MoT
4 To encourage private sector investment in the tourism in PPP mode
5 To create employment opportunities in the State
6 To revamp the Organization Structure of Haryana Tourism Corporation
7 To promote Tourism and aggressivly Publicize Haryana as a Major National and International Destination
8 To strengthen the Finalicial Health of Haryana Tourism
Functions
To develop tourism infrastructure in the Public sector and private sector1
To encourage/facilitate the private investors in setting up of tourism/hotel projects2
Formulation/implementation of tourism policy3
Tourist Services-Supply of information, reservation of accommodation and provision of other amentities4
Construction/maintenance of tourist infrastructure5
Establishment, budget and accounts matters6
Human resource development in tourism sector7
Vision
03/06/2015 3.09 PMGenerated on
Page : 2 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Use of technology to improve quality oftourism services and increase tourist footfall
6.00 Mobile Apps for onlineroom booking system
Design andDevelopment ofMobile Apps foronline room bookingsystem of HaryanaTourism
Date 30/11/2015 31/01/2016 31/03/201631/12/201531/10/20152.00[1] [1.1] [1.1.1]
Implementation ofIntegrated HotelManagement Software inTourist Complexes
Installation ofIntegrated HotelManagementSoftware in TouristResorts
No. 3 1 0242.00[1.2] [1.2.1]
selection of channel partner Appointment ofchannel partner formarketing of HTCthrough web agents.
Date 31/12/2015 31/03/2016 --31/01/201630/09/20152.00[1.3] [1.3.1]
To create/maintain new/existinginfrastructure for tourism in the State
43.00 Establishment/ Setting upof IHMs, ConventionCentres/ PortaCabins/Banquet Halls andConstruction/ Renovation ofRooms, Restaurant/ Bar/Fast Foods and Kitchens
Construction ofconvention center atFlamingo Touristcomplex, Hisar
Date 30/09/2015 31/12/2015 31/03/201631/10/201531/08/20152.00[2] [2.1] [2.1.1]
Construction ofSIHM at YamunaNagar
Date 30/09/2015 31/12/2015 31/03/201631/10/201531/08/20155.00[2.1.2]
Construction ofconvention hall intourist complexgauriyyabahadurgarh
Date 31/08/2015 31/12/2015 31/03/201631/10/201530/06/20152.00[2.1.3]
Construction ofMultipurpose Hallincluding
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/11/20152.00[2.1.4]
03/06/2015 3.09 PMGenerated on
Page : 3 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
infrastructure worksetc. Pipli
Upgradation &structural change inexisting building &re-modeling of arexpansion of room &fast Food centre atexisting touristcomplex.Construction of newbuilding barrestaurant publictoilet kitchen storepantry reception giftshop etc at Hodel
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/07/20152.00[2.1.5]
Construction ofshop,ATM room andother infrastructurework at JungleBabbler touristcomplex dharuhera
Date 30/09/2015 31/01/2016 31/03/201631/12/201531/07/20152.00[2.1.6]
Construction of shoproom and otherinfrastructure workat surkhab touristcomplex at Sirsa
Date 31/08/2015 31/12/2015 31/03/201631/10/201530/06/20152.00[2.1.7]
Construction ofhealth club in GolfCourse Faridabad
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20152.00[2.1.8]
03/06/2015 3.09 PMGenerated on
Page : 4 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Construction ofATM room at petrolpump and alliedworks at Aravali GolfCourse Faridabad
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/08/20152.00[2.1.9]
Construction ofmultipurpose hallkitchen 4 nos roomskitty party roomconference roompublic toilets sunstation rooms withelectric sub stationDG sets airconditioning ofmultipurpose hall firefighting securitysystem includingparking andlandscaping atadjoining HUDAGymkhana clubJagadhari yamunanagar
Date 30/11/2015 29/02/2016 31/03/201631/12/201531/10/20152.00[2.1.10]
Construction ofmultipurpose hallwith with toiletpantry and upgradation of existingparking kitchen attourist complex grey
Date 30/09/2015 31/01/2016 31/03/201631/12/201531/07/20152.00[2.1.11]
03/06/2015 3.09 PMGenerated on
Page : 5 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
pelican yamunanagar
Construction ofshop,ATM room andother infrastructurework at SandpiperTourist ComplexRewari
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/08/20151.00[2.1.12]
Construction of ATMroom and otherinfrastructure workat Neelkanthi Touristcomplex kurukshetra
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/08/20151.00[2.1.13]
Construction of staffquarter principalresidence etc at IHMRohtak
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20152.00[2.1.14]
Construction ofMotel,Bar Parkingroad at FlamingoHisar
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20152.00[2.1.15]
Construction of 4rooms additionalrooms and otherinfrastructure workat jungle babblerDharuhera
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20152.00[2.1.16]
03/06/2015 3.09 PMGenerated on
Page : 6 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Converstion ofcovered varandainto rooms at touristcompled ballbhgarh
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20151.00[2.1.17]
Renovation of roomsand fast food centreat tourist complexpanipat and otherworks
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20151.00[2.1.18]
Renovation of bar atkingfisher touristcomplex Ambala
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20151.00[2.1.19]
Infrastructure inSurajkund CraftsMela
Date 31/01/2016 15/03/2016 31/03/201629/02/201631/12/20152.00[2.1.20]
Upgradation of roadin SurajkundComplex
Date 31/12/2015 29/02/2016 31/03/201631/01/201630/09/20151.00[2.1.21]
Construction of newrooms in variousTourist Complex
Date 30/11/2015 29/02/2016 31/03/201631/12/201531/10/20152.00[2.1.22]
Renovation of roomsin various touristcomplexes
Date 30/11/2015 29/02/2016 31/03/201631/12/201531/10/20152.00[2.1.23]
Creation of tourism related infrastructurefunded under circuits & destinations by MoT
8.00 Development of TourismCircuits
Completion ofConstruction Workof Yamuna Nagar -Panchkula - PoantaSahib Circuit Phase-I
Date 31/07/2015 29/02/2016 31/03/201630/09/201530/06/20152.00[3] [3.1] [3.1.1]
03/06/2015 3.09 PMGenerated on
Page : 7 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Completion ofConstruction Workof Panipat -Kurukshetra -Pinjore CircuitPhase II
Date 31/07/2015 29/02/2016 31/03/201630/09/201530/06/20152.00[3.1.2]
Development of HeritageCircuit at Mahendergarh &Madhogarh
Preparation ofRFP/DCA &submission toHIDB/GOI
Date 30/11/2015 29/02/2016 31/03/201631/12/201531/08/20152.00[3.2] [3.2.1]
Development ofKurukshetra under KrishnaCircuit
Preparation of DPRand Submission toGovt of India forapproval.
Date 30/11/2015 29/02/2016 31/03/201631/12/201531/08/20152.00[3.3] [3.3.1]
To encourage private sector investment inthe tourism in PPP mode
4.00 Surajkund Nature Retreaton PPP basis
Submission of RFP /DCA to HIDB forapproval
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/08/20151.00[4] [4.1] [4.1.1]
Integrated Tourism Resortcum spa at Mallah
Issue of Tender fordevelopment ofintegrated TourismResort cum spa atMallah
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/08/20151.00[4.2] [4.2.1]
Development ofamusement park at Rohtak
Issue of Tender fordevelopment ofamusement park atRohtak Submissionof RFP/DCA
Date 31/08/2015 31/12/2015 31/03/201630/09/201530/06/20151.00[4.3] [4.3.1]
Camping Site at DamdamaSubmission of RFP/DCA
Issue of tender forCamping Site atDamdama
Date 31/10/2015 29/02/2016 31/03/201631/12/201531/08/20151.00[4.4] [4.4.1]
To create employment opportunities in theState
13.00 Implementation of "Hunar-Se-Rozgar Tak" Scheme
Candidates to beTrained by IHMs,Kurukshetra/
No. 1370 1066 914122015257.00[5] [5.1] [5.1.1]
03/06/2015 3.09 PMGenerated on
Page : 8 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Rohtak/Faridabad/Panipat
Canditates to betrained by HaryanaTourism TouristResorts
No. 1245 966 830110413806.00[5.1.2]
To revamp the Organization Structure ofHaryana Tourism Corporation
6.00 Restrucuring of Staff ofHaryana TourismCorporation
Proposal ofRestructuring ofHaryana TourismCorporation Is sentto HBPE forapproval
Date 30/09/2015 31/12/2015 31/03/201631/10/201530/06/20153.00[6] [6.1] [6.1.1]
Framing of Service Rules ofHaryana TourismCorporation
Proposal of ServiceRules of HaryanaTourism CorporationIs sent to HBPE forapproval
Date 30/09/2015 31/12/2015 31/03/201631/10/201530/06/20153.00[6.2] [6.2.1]
To promote Tourism and aggressivlyPublicize Haryana as a Major National andInternational Destination
8.00 Marketing and Publicity ofthe tourism products toattract Domestic andForeign Tourists
Participation indomestic /Internationalseminar/exhibition-ITM, TTF, PATA,CII,SATTE, WTM,London, ITB Berlin,etc.Organising FairsBaisakhi Festival,Mango Mela,Heritage Festivaland SurajkundInternational CraftsMela. Road ws itancities with the helpof tour operators orby
No. 4 2 1357.00[7] [7.1] [7.1.1]
03/06/2015 3.09 PMGenerated on
Page : 9 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
engaging eventmanagementcompany. Specialpackages forChandigarh-Pinjore-Chandigarh;Chandigarh-Morni-Chandigarh;Chandigarh-Kurukshetra-Chandigarh alongwith transportfacilities.
Marketing of HaryanaTourism through Electronic/Print Media
Engaging EventManagementCompany/TourismAmbassador forhighlighting placesof tourist interest inHaryana throughprint advertisementsand other publicitymaterial of HaryanaTourism A 20-second TVcommercial and aradio jingle to bemade with brandambassadorendorsing HaryanaTourism’s Tourist
Date 31/10/2015 31/12/2015 31/01/201630/11/201530/09/20151.00[7.2] [7.2.1]
03/06/2015 3.09 PMGenerated on
Page : 10 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Tourism -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient functioning of RFD. 4.00 Finalize a strategic plan. Finalize the strategic planfor the next year.
Date 25/02/2016 27/02/2016 28/02/201626/02/201624/02/20162.0*
Timely submission of draft forapproval.
On-time submisssion. Date 29/05/2015 25/06/2015 30/06/201515/06/201525/05/20152.0
Improving internalefficiency/responsiveness/services deliveryof department
6.00 Develop RFDs for allresponsibility centres.
percentage of RCc covered % 90 70 60801002.0*
Implementation of Harsamadhan Percentage of complaintsresolved within prescribedtimline.
% 90 70 60801002.0
Delivery of services as perCitizen Charter.
Percentage of targetedservices
% 90 70 60801002.0
* Mandatory Objective(s)
Complexes.
To strengthen the Finalicial Health ofHaryana Tourism
2.00 Increasing profitability ofTourist Complexes ofHaryana TourismCorporation
Profitability ofTourist Complexesof Haryana TourismCorporation will beincrease by 25%during the year2015-16
% 22 17 1520252.00[8] [8.1] [8.1.1]
03/06/2015 3.09 PMGenerated on
Page : 11 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 30/11/2015DateDesign andDevelopment ofMobile Apps for onlineroom booking systemof Haryana Tourism
Use of technology to improve qualityof tourism services and increasetourist footfall
Mobile Apps for onlineroom booking system
-- -- --[1] [1.1] [1.1.1]
-- 3No.Installation ofIntegrated HotelManagement Softwarein Tourist Resorts
Implementation ofIntegrated HotelManagement Software inTourist Complexes
-- -- --[1.2] [1.2.1]
-- 31/12/2015DateAppointment ofchannel partner formarketing of HTCthrough web agents.
selection of channelpartner
-- -- --[1.3] [1.3.1]
-- 30/09/2015DateConstruction ofconvention center atFlamingo Touristcomplex, Hisar
To create/maintain new/existinginfrastructure for tourism in the State
Establishment/ Setting upof IHMs, ConventionCentres/ PortaCabins/Banquet Hallsand Construction/Renovation of Rooms,Restaurant/ Bar/ FastFoods and Kitchens
-- -- --[2] [2.1] [2.1.1]
-- 30/09/2015DateConstruction of SIHMat Yamuna Nagar
-- -- --[2.1.2]
-- 31/08/2015DateConstruction ofconvention hall intourist complexgauriyya bahadurgarh
-- -- --[2.1.3]
03/06/2015 3.09 PMGenerated on
Page : 12 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 31/12/2015DateConstruction ofMultipurpose Hallincluding infrastructureworks etc. Pipli
-- -- --[2.1.4]
-- 31/10/2015DateUpgradation &structural change inexisting building & re-modeling of arexpansion of room &fast Food centre atexisting touristcomplex. Constructionof new building barrestaurant public toiletkitchen store pantryreception gift shop etcat Hodel
-- -- --[2.1.5]
-- 30/09/2015DateConstruction ofshop,ATM room andother infrastructurework at Jungle Babblertourist complexdharuhera
-- -- --[2.1.6]
-- 31/08/2015DateConstruction of shoproom and otherinfrastructure work atsurkhab touristcomplex at Sirsa
-- -- --[2.1.7]
-- 31/12/2015DateConstruction of healthclub in Golf CourseFaridabad
-- -- --[2.1.8]
03/06/2015 3.09 PMGenerated on
Page : 13 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 31/10/2015DateConstruction of ATMroom at petrol pumpand allied works atAravali Golf CourseFaridabad
-- -- --[2.1.9]
-- 30/11/2015DateConstruction ofmultipurpose hallkitchen 4 nos roomskitty party roomconference roompublic toilets sunstation rooms withelectric sub station DGsets air conditioning ofmultipurpose hall firefighting securitysystem includingparking andlandscaping atadjoining HUDAGymkhana clubJagadhari yamunanagar
-- -- --[2.1.10]
-- 30/09/2015DateConstruction ofmultipurpose hall withwith toilet pantry andup gradation of existingparking kitchen attourist complex greypelican yamuna nagar
-- -- --[2.1.11]
03/06/2015 3.09 PMGenerated on
Page : 14 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 31/10/2015DateConstruction ofshop,ATM room andother infrastructurework at SandpiperTourist ComplexRewari
-- -- --[2.1.12]
-- 31/10/2015DateConstruction of ATMroom and otherinfrastructure work atNeelkanthi Touristcomplex kurukshetra
-- -- --[2.1.13]
-- 31/12/2015DateConstruction of staffquarter principalresidence etc at IHMRohtak
-- -- --[2.1.14]
-- 31/12/2015DateConstruction ofMotel,Bar Parking roadat Flamingo Hisar
-- -- --[2.1.15]
-- 31/12/2015DateConstruction of 4rooms additionalrooms and otherinfrastructure work atjungle babblerDharuhera
-- -- --[2.1.16]
-- 31/12/2015DateConverstion of coveredvaranda into rooms attourist compledballbhgarh
-- -- --[2.1.17]
-- 31/12/2015DateRenovation of roomsand fast food centre attourist
-- -- --[2.1.18]
03/06/2015 3.09 PMGenerated on
Page : 15 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
complex panipat andother works
-- 31/12/2015DateRenovation of bar atkingfisher touristcomplex Ambala
-- -- --[2.1.19]
-- 31/01/2016DateInfrastructure inSurajkund Crafts Mela
-- -- --[2.1.20]
-- 31/12/2015DateUpgradation of road inSurajkund Complex
-- -- --[2.1.21]
-- 30/11/2015DateConstruction of newrooms in variousTourist Complex
-- -- --[2.1.22]
-- 30/11/2015DateRenovation of rooms invarious touristcomplexes
-- -- --[2.1.23]
-- 31/07/2015DateCompletion ofConstruction Work ofYamuna Nagar -Panchkula - PoantaSahib Circuit Phase- I
Creation of tourism relatedinfrastructure funded under circuits &destinations by MoT
Development of TourismCircuits
-- -- --[3] [3.1] [3.1.1]
-- 31/07/2015DateCompletion ofConstruction Work ofPanipat - Kurukshetra -Pinjore Circuit Phase II
-- -- --[3.1.2]
-- 30/11/2015DatePreparation ofRFP/DCA &submission to
Development of HeritageCircuit at Mahendergarh&
-- -- --[3.2] [3.2.1]
03/06/2015 3.09 PMGenerated on
Page : 16 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
HIDB/GOIMadhogarh
-- 30/11/2015DatePreparation of DPRand Submission toGovt of India forapproval.
Development ofKurukshetra underKrishna Circuit
-- -- --[3.3] [3.3.1]
-- 31/10/2015DateSubmission of RFP /DCA to HIDB forapproval
To encourage private sectorinvestment in the tourism in PPPmode
Surajkund Nature Retreaton PPP basis
-- -- --[4] [4.1] [4.1.1]
-- 31/10/2015DateIssue of Tender fordevelopment ofintegrated TourismResort cum spa atMallah
Integrated TourismResort cum spa at Mallah
-- -- --[4.2] [4.2.1]
-- 31/08/2015DateIssue of Tender fordevelopment ofamusement park atRohtak Submission ofRFP/DCA
Development ofamusement park atRohtak
-- -- --[4.3] [4.3.1]
-- 31/10/2015DateIssue of tender forCamping Site atDamdama
Camping Site atDamdama Submission ofRFP/DCA
-- -- --[4.4] [4.4.1]
-- 1370No.Candidates to beTrained by IHMs,Kurukshetra/ Rohtak/Faridabad/Panipat
To create employment opportunitiesin the State
Implementation of"Hunar-Se-Rozgar Tak"Scheme
-- -- --[5] [5.1] [5.1.1]
-- 1245No.Canditates to betrained by HaryanaTourism TouristResorts
-- -- --[5.1.2]
03/06/2015 3.09 PMGenerated on
Page : 17 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 30/09/2015DateProposal ofRestructuring ofHaryana TourismCorporation Is sent toHBPE for approval
To revamp the Organization Structureof Haryana Tourism Corporation
Restrucuring of Staff ofHaryana TourismCorporation
-- -- --[6] [6.1] [6.1.1]
-- 30/09/2015DateProposal of ServiceRules of HaryanaTourism Corporation Issent to HBPE forapproval
Framing of Service Rulesof Haryana TourismCorporation
-- -- --[6.2] [6.2.1]
-- 4No.Participation indomestic / Internationalseminar/exhibition-ITM, TTF, PATA,CII,SATTE, WTM, London,ITB Berlin,etc.Organising FairsBaisakhi Festival,Mango Mela, HeritageFestival and SurajkundInternational CraftsMela. Road ws itancities with the help oftour operators or byengaging eventmanagementcompany. Specialpackages forChandigarh-Pinjore-Chandigarh;Chandigarh-Morni-Chandigarh;Chandigarh-
To promote Tourism and aggressivlyPublicize Haryana as a MajorNational and International Destination
Marketing and Publicityof the tourism products toattract Domestic andForeign Tourists
-- -- --[7] [7.1] [7.1.1]
03/06/2015 3.09 PMGenerated on
Page : 18 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 30/04/2015DateFinalize the strategic plan forthe next year.
Efficient functioning of RFD. Finalize a strategic plan. -- -- --*
* Mandatory Objective(s)
Kurukshetra-Chandigarh along withtransport facilities.
-- 31/10/2015DateEngaging EventManagementCompany/TourismAmbassador forhighlighting places oftourist interest inHaryana through printadvertisements andother publicity materialof Haryana Tourism A20-second TVcommercial and aradio jingle to be madewith brandambassador endorsingHaryana Tourism’sTourist Complexes.
Marketing of HaryanaTourism throughElectronic /Print Media
-- -- --[7.2] [7.2.1]
-- 22%Profitability of TouristComplexes of HaryanaTourism Corporationwill be increase by25% during the year2015-16
To strengthen the Finalicial Health ofHaryana Tourism
Increasing profitability ofTourist Complexes ofHaryana TourismCorporation
-- -- --[8] [8.1] [8.1.1]
03/06/2015 3.09 PMGenerated on
Page : 19 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Tourism -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 25/02/2016DateOn-time submisssion.Timely submission of draft forapproval.
-- -- --
-- 90%percentage of RCc coveredImproving internalefficiency/responsiveness/servicesdelivery of department
Develop RFDs for allresponsibility centres.
-- -- --*
-- 90%Percentage of complaintsresolved within prescribedtimline.
Implementation ofHarsamadhan
-- -- --
-- 90%Percentage of targetedservices
Delivery of services as perCitizen Charter.
-- -- --
* Mandatory Objective(s)
03/06/2015 3.09 PMGenerated on
Page : 20 of 24
Section 4:Acronym
Results-Framework Document (RFD) for Tourism -(2015-2016)
AcronymSI.No Description
Haryana Infrastructure Development Board1 HIDB
State Institute of Hotel Management2 SIHM
Page : 21 of 24
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Tourism -(2015-2016)
Success indicator Description Definition MeasurementSI.No General Comments
Page : 22 of 24
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Tourism -(2015-2016)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Page : 23 of 24
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Tourism -(2015-2016)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 13/14 FY 15/16FY 14/15 FY 16/17 FY 17/18Unit