    Rain Catchment and Adaptive Building Reuse:The Historic Seaholm Power Plant

    Kent S. Butler, Ph.D.1

    Adam C. Roy2

    John Rosato3

    1 Univ. of Texas at Austin2 Seaholm Power Ltd3 Seaholm Power Ltd

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    2/33

    Seaholm Power Plant

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    3/33

    DOWNTOWN AUSTIN, 2006

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    4/33THE FIRST AUSTIN POWER PLANT, 1893

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    5/33Seaholm Power Plant at Full-scale Production, late 1950s

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    6/33POWER PLANT SITE REMEDIATED, 2006

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    7/33

    ORIGINAL SITE PLAN DRAWING, LATE 1940s

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    8/33

    SEAHOLM DISTRICT

    MASTER PLAN, 2000

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    9/33

    TBG: Perspective

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    10/33

    TURBINE HALL SCHEME -- SECTION

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    11/33

    West Side Entry

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    12/33

    Town Lake

    Turbine Building

    Office Building(NEW)

    Highrise Hotel/Condominium

    (NEW)

    Water Intake& Pumphouse

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    13/33

    HotelHotel

    OfficesOffices

    ParkingParking

    Turbine BuildingTurbine Building

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    14/33

    FEASIBILITY STUDY: PAYBACK PERIODS

    Years to Achieve Return on Investment

    Water Price Inflation

    (%)

    Scenario 2 3 4 5

    A 29 23 20 19

    B 27 21 20 18

    C 34 29 26 22

    D 46 36 30 27

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    15/33

    CONDENSER COOLING SYSTEM PLAN

    Shoal Creek

    To

    wnLake

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    16/33

    CONDENSER DISCHARGE PIPES

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    17/33

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    18/33

    STORMWATER DISCHARGE PIPES

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    19/33

    COOLING WEIRS, PLAN VIEW

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    20/33

    EAST COOLING WEIR

    Plan

    Section

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    21/33

    Young men posing (for scale) in East Cooling Weir

    C

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    22/33

    Cooling Weir Dimensions:- East Weir

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    23/33

    Cooling Weir Discharge Pipes

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    24/33

    COOLING WEIR DISCHARGE PIPE, 60 DIA.

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    25/33

    Turbine Infrastructure Storage Capacities

    West cooling weir (16L x 15W x 28H) 55,000 gal.East cooling weir (same as west weir) 47,000 gal.West weir discharge pipe (60 dia.) 28,600 gal.East weir discharge pipe (60 dia.) 14,100 gal.Weir connector pipe (60 dia.) 12,600 gal.Condenser discharge pipe (54 dia.) . 15,600 gal.

    TOTAL STORAGE CAPACITY: 172,900 gal.

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    26/33

    ROOF ELEMENTS OF TURBINE BUILDING

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    27/33

    CATCHMENT AREA CALCULATIONS

    Turbine Hall 45,000 sq. ft. Office/parking (2 floors 28,000 sq. ft. Hotel/Condo

    .

    26,000 sq. ft.Total roof area 99,000 sq. ft.

    Plaza Hardscape . 45,000 sq. ft. Total Catchment Area 144,000 sq. ft.

    Plantings, streets, parking . 65,000 sq. ft.

    Total Developed Area 209,000 sq. ft.

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    28/33

    (assuming 160,000 gals. min. storage capacity)

    Total Annual Irrigation Demand: 1,322,000 gal.

    Turbine Roof rainfall collected (75% efficy): 694,000 gal.Office roof rainfall collected (75% efficy): 432,000 gal.Municipal water supplementation: 196,000 gal.

    Percentage of demand met by RWH: 69%

    Annual Rainwater Yield AnalysisTurbine building & Office building

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    29/33

    STORM OVERFLOW AND WATER QUALITY BMP

    Prince GeorgesCounty, MD, n.d.

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    30/33

    BIORETENTION SWALE FOR WATER QUALITY BMP

    y, ,

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    31/33

    -- (assuming capture 1.2 inches of first-flushrunoff for 75% impervious cover development)

    Hotel/Condo 26,000 sq. ft.Plaza Hardscape 45,000 sq. ft.

    Total Catchment Area 71,000 sq. ft.

    Total storm water detention volume: 7,100 cu. ft.or 53,000 gal.

    Runoff collected (70% efficiency): 37,000 gal.

    Storm Runoff Analysis forStorm Runoff Analysis for

    Turbine and Office BuildingsTurbine and Office Buildings

    andand HardscapeHardscape SurfacesSurfaces

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    32/33

    TBG: Perspective

  • 8/9/2019 Rain Catchment and Adaptive Building Reuse

    33/33