rcap annual meeting washington, dc december 2010

14
RCAP Annual Meeting Washington, DC December 2010.

Upload: adelia-fox

Post on 05-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RCAP Annual Meeting Washington, DC December 2010

RCAP Annual MeetingWashington, DC December

2010.

Page 2: RCAP Annual Meeting Washington, DC December 2010

• Water and Waste Disposal (WWD) Direct Loans• WWD Guaranteed Loans• WWD Grants• Emergency Community Water Assistance Grants• Technical Assistance and Training Grants• Solid Waste Management Grants

Water and Environmental Programs

Page 3: RCAP Annual Meeting Washington, DC December 2010

ARRA – NEXT 5 YEARS

• 5 year money

• Challenge to get projects built in 5 yrs

• Training for operators

• Rate studies & sustainable management

Page 4: RCAP Annual Meeting Washington, DC December 2010

Challenges• Someone to trust

• Explain the federal application and environmental process

• Loan/Grant splits and fairness – Reality check

• Talk about Sustainable Systems

• Develop a realistic timeline

Page 5: RCAP Annual Meeting Washington, DC December 2010

Players• Specialists• Area Director• Program Director• Owner• Engineering Firm• Contractor• State Engineer• TAT Providers !!!

Page 6: RCAP Annual Meeting Washington, DC December 2010

Owner/RD Borrower

• What are the owner’s responsibilities?

– Basically, it’s their project and they drive the bus

– Need to be fully informed

– Ask Questions

– Expect accountability

Page 7: RCAP Annual Meeting Washington, DC December 2010

Consulting Engineer• Act as owner’s representative• Adhere to terms of their contract

– can be all, or parts of, three pieces• planning• design• construction management

– deliverables– on time– within budget

Page 8: RCAP Annual Meeting Washington, DC December 2010

Contractor

• Build it per plans and specs– On time– Within budget– Fix Warranty items

Page 9: RCAP Annual Meeting Washington, DC December 2010

Celebrate!!

• Ground breaking ceremony

• Let community see progress

• Discuss the project and timeline

• Lots of pictures

Page 10: RCAP Annual Meeting Washington, DC December 2010

Money is left, Now what?

• Any money left is usually grant funds

• Always go back to Scope of work

• Money left –now what?? – Big Red Truck?– Extra Paving

Page 11: RCAP Annual Meeting Washington, DC December 2010

Plan an open house!

• Let community see what they just invested in the improvement to the community

• Invite Congressional political delegation

• They need to see where money is going

Page 12: RCAP Annual Meeting Washington, DC December 2010

Management of System• Sustainability of system

• Discussion of what affects rates, plan on regular rate increases

Page 13: RCAP Annual Meeting Washington, DC December 2010

Financial Analysis Tool

• Financial Ratios– Average Monthly Cost– Average Rate as % of MHI– Current Ratio– Debt Coverage Ratio– Debt Service per User– O&M Ratio

Page 14: RCAP Annual Meeting Washington, DC December 2010

• Current Ratio - Current Assets divided by Current Liabilities - Percentage Form

• Debt Service Coverage Ratio - (Total Revenue + Depreciation - O&M)/Debt Service - Percentage Form