We give below necessary modifications/clarifications/additions/deletions pertaining to various clauses contained in the RFP. Please note that this corrigendum forms integral part of the RFP.
Sr.
No.
RFP Clause Clarification / Change in Clause / New
Clause
1 Page -2 , Point-1 (Brief details of the scope)
The Bank intends to procure services/ solutions for Installation, Commissioning, Maintenance, Monitoring and Facility Management for IT Service Management (ITSM) and IT asset management Solution (ITAM) for our all Branches/Offices for a period of 7 years. The detailed scope with technical details is illustrated in related clauses of RFP.
Page -2 , Point-1 (Brief details of the scope)
The Bank intends to procure services/ solutions for Installation, Commissioning, Maintenance, Monitoring and Facility Management for IT Service Management (ITSM) and IT asset management Solution (ITAM) for our all our Domestic and Foreign Branches/ Offices for a period of 7 years. The detailed scope with technical details is illustrated in related clauses of RFP.
2 3.2.2. General Scope of Work, Point 68
The bidder shall provide all the software/hardware/accessories/related appliances supplied that shall be compatible with IPv6 and comply with all latest security protocols/industry standards. The proposed solution shall be TLS 1.3 or higher ready.
3.2.2. General Scope of Work, Point 68
The bidder shall provide all the software, hardware, accessories, related appliances, Operating System, Database & Tape library as per specification and scope mentioned in the RFP including any other components required to make solution running as per SLA and required uptime. The supplied infrastructure shall be compatible with IPv6 and comply with all latest security protocols/ industry standards. The proposed solution shall be TLS 1.3 or higher ready.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
2 | P a g e
3 3.2.2. General Scope of Work, Point 104
The Bidder shall migrate both Active directory application and Antivirus application from existing hardware to new infrastructure/ hardware (provided by Bank) post End of support/ End of life of existing hardware. The Operating System, software and license components required for AD migration shall be provided by the Bank.
3.2.2. General Scope of Work, Point 104
The Bidder shall migrate both Active directory application and Antivirus application from existing hardware to new infrastructure/ hardware (provided by Bank). The Operating System, Software and licenses components required for AD migration and AV Migration shall be provided by the Bank. The bidder shall perform version upgrade of Active Directory and Antivirus as and when released by the OEM or as advised by the bank as part of facility management support without any extra cost to the Bank.
4 3.2.2. General Scope of Work
Additional Points -
3.2.2. General Scope of Work
Additional Points -
108. The bidder shall ensure that data
stored in all proposed solution database
should be encrypted while data at rest
and during data in transit. The bidder has
to do required arrangement for same.
109. The bidder shall test the patches (critical / non-critical) as and when released by OEM and new development/changes for the proposed solution/ servers/OS, first in test environment and thereafter deploy / install / implement the same in the production environment as per Bank's requirement .The bidder shall perform patching and upgrade of solution/ system during entire contract period as part of maintenance and technical support, without any additional cost to Bank. 110. The infrastructure for UAT and development environment will be created in Bank’s VM by the bidder. The
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
3 | P a g e
licenses required (if any) for UAT and development environment for creating in the Bank’s virtualized environment shall be factored by the bidder.
5 Clause 3.2.3 Sizing for ITSM, ITAM and Secure File Transfer Solution: Point 2. Bidder shall quote necessary infrastructure/ appliances to match the solution as per bank’s RFP requirements. The Solution should be able to keep one-year data online while backup of older data more than one year till seven years shall be backed up using Banks proposed backup solution with solution’s application, and restorable whenever required by solution’s application.
Clause 3.2.3 Sizing for ITSM, ITAM and Secure File Transfer Solution: Point 2. Bidder shall quote necessary infrastructure/ appliances to match the solution as per bank’s RFP requirements. The Backup of solutions shall be carried out as per Bank’s Backup policy.
The Bank will provide required storage through NetApp SAN storage and Commvault Backup Software for taking Backup of Solution. The bidder shall do end to end integration of all components (hardware and software) & Tape library with existing Cisco MDS9148S 16G FC SAN switch for Storage.
The Bidder shall provide licenses and SFPs(Qty: 144 Nos) for activation of SAN switch ports of 16G capacity spanned across Four SAN switches (36 ports per SAN switch) i.e. Two SAN Switch at DC and Two SAN Switch at DR Site. If any extra component is required for complete integration then bidder shall factor the same and provide the same without any additional cost to bank.
The bidder shall coordinate with existing Backup Vendor for complete integration of proposed infrastructure with existing Backup Solution and shall ensure solution data and logs backed-up as per defined Backup Schedules.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
4 | P a g e
The bidder shall arrange all required support with regard to management and maintenance of proposed hardware including tape library.
6 Clause 3.2.3 Sizing for ITSM, ITAM and Secure File Transfer Solution: Point 7
The proposed solution must have
redundancy at all levels e.g. RAID
redundancy (for hard drives), network
redundancy (for management network
interfaces) and power-supply redundancy
at hardware/ software level. Required to
achieve the defined SLA/uptime. It is
applicable if the bidder is supplying the
hardware also.
Clause 3.2.3 Sizing for ITSM, ITAM and Secure File Transfer Solution: Point 7
The proposed solution must have
redundancy at all levels e.g. network
redundancy (for management network
interfaces) and power-supply
redundancy at hardware/ software level
required to achieve the high availability/
redundancy as per defined SLA/uptime.
7 Clause 3.2.3 Sizing for ITSM, ITAM and Secure File Transfer Solution: Point 12 The bidder shall migrate existing Active Directory setup to
Clause 3.2.3 Sizing for ITSM, ITAM and Secure File Transfer Solution: Point 12 The bidder shall migrate and implement
the existing Active Directory setup to new
infrastructure as provided by Bank.
The bidder shall perform integration of
AD servers with monitoring tool deployed
by bidder to monitor the hardware
resources and AD critical services and
sharing the report of same to Bank
officials.
8 3.3.1 Common Scope for all Facility
Management Service (FMS) Teams
59. Integration of AD servers with HP monitoring tool to monitor the hardware resources and AD critical services and sharing the report of same to Bank officials.
i. Back up, import, copy, and restore GPOs.
3.3.1 Common Scope for all Facility
Management Service (FMS) Teams
59. Integration of AD servers with
monitoring tool deployed by bidder to
monitor the hardware resources and AD
critical services and sharing the report of
same to Bank officials.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
5 | P a g e
ii. Migrate GPOs between domains and forests
iii. Delegate GPO management. iv. Determine policy processing
order and precedence. v. Configure policy enforcement
and blocking. vi. Perform Group Policy security
filtering vii. Configure WMI filtering. viii. Enable loopback processing ix. Configure slow-link processing. x. Group Policy Caching.
i. Back up, import, copy, and restore GPOs.
ii. Migrate GPOs between domains and forests
iii. Delegate GPO management. iv. Determine policy processing
order and precedence. v. Configure policy enforcement
and blocking. vi. Perform Group Policy security
filtering vii. Configure WMI filtering. viii. Enable loopback processing ix. Configure slow-link processing. x. Group Policy Caching.
9 3.3.2 Facility Management Services
for Desktop Management/Active
directory/Antivirus Management
Additional Points -
3.3.2 Facility Management Services for Desktop Management/Active directory/Antivirus Management/ MMS-Exchange/DNS
Additional Points –
74. The bidder shall perform new user creation, modification (password reset and unlocking of accounts) in Active Directory.
75. Monitoring of Microsoft Exchange through Exchange Admin Center.
76. Server administration of MMS/ Exchange servers.
a. Monitoring of services and resolution of issue (if any)
b. Compliance and closure of all VAPT points) of all MMS /Exchanges Servers.
10 3.3.5 ITSM, NNMI, Server,
Storage, DB Monitoring FMS
Team-
FMS Requirement for Service
Manager, Capacity Manager,
Configuration Manager Inventory
3.3.5 ITSM,ITAM, NNMI, Server,
Storage, DB Monitoring FMS Team-
FMS Requirement for Service Manager,
Capacity Manager, Configuration
Manager Inventory Manager,
Network/Server/Database Monitoring &
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
6 | P a g e
Manager, Network/ Server/
Database Monitoring & Automation
Automation, Storage Monitoring,
Workflow Management
All other details as mentioned under 3.3.5 remains unchanged.
11 3.3.7 Desktop/Antivirus/Active Directory/Email/DNS/MMS Management Team –
Revised
3.3.7 Desktop/Antivirus/Active Directory/Email/DNS/MMS Management Team –
Revised composition of the team is appended below.
12 3.4 Eligibility Criteria iv. The bidder should have implemented the similar solution in any Public / Private Sector Bank / BFSI Sector in India in the last five years. The bidder should submit proof of implementation along with Purchase Orders and a letter from user organization mentioning successful implementation / migration along with staff strength. POCs done will not be treated as experience of the bidder.
3.4 Eligibility Criteria iv. The bidder should have implemented the similar solution in any Public / Private Sector Bank / BFSI Sector/ CPSE in India in the last five years. The bidder should submit proof of implementation along with Purchase Orders and a letter from user organization mentioning successful implementation / migration along with staff strength. POCs done will not be treated as experience of the bidder.
13 3.4.2.2 CERTIFICATE OF LOCAL
CONTENT
Certificate from the statutory auditor or
cost auditor of the company (in case of
companies) or from a practicing cost
accountant or practicing chartered
accountant (in respect of suppliers other
than companies) giving the percentage of
local content, on their letterhead with
Registration Number with seal.(format
6.34)
3.4.2.2 CERTIFICATE OF LOCAL
CONTENT
Certificate from the statutory auditor or cost auditor of the company (in case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of local content, on their letterhead with Registration Number with seal.(Format 6.33)
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
7 | P a g e
14 3.27.6.b Delivery Schedule Point - 1
The products and/or systems and/or services covered under this bid are to be supplied, installed and commissioned by OEM within the 8 weeks’ time which includes delivery and roll out of all related hardware/software solutions and implementation of solution/agent at all endpoints. No credit will be given to early deliveries. For delayed deliveries, liquidated damages will be applicable as mentioned in the related clause of the RFP.
3.27.6.b Delivery Schedule Point - 1
The products and/or systems and/or services covered under this bid are to be supplied, installed and commissioned by OEM within the 14 weeks’ time which includes delivery and roll out of all related hardware/software solutions and implementation of solution/agent at all endpoints. No credit will be given to early deliveries. For delayed deliveries, liquidated damages will be applicable as mentioned in the related clause of the RFP.
15 4.18 SLA, Uptime & Liquidation Damages Uptime, SLA and Penalty
Additional Clause
4.18 SLA, Uptime & Liquidation Damages Uptime, SLA and Penalty
(xvii) Replacement/ Repair of faulty
part of provided hardware and all
other components
All defective parts/ faulty shall be
replaced as part of maintenance at no
additional cost by the bidder.
Replacement parts shall be new part
from the same manufacturer(s) (OEM).
Whether a defective item or component
is to be replaced or repaired shall be at
the sole discretion of the bank.
In the case of a part, the defective part
removed from the system will become
the property of the selected bidder.
Response Time: Maximum Response
Time for Remedial Maintenance under
the CONTRACT is measured in elapsed
coverage hours from the time a service
request is received to the time THE
VENDOR’s customer engineer arrives at
Bank Site. This CONTRACT provides
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
8 | P a g e
maximum of 4 coverage hour’s response
time.
Table-1 (SLA, Uptime & Liquidation Damages) Appended below.
166 4.18 (SLA, Uptime & Liquidation Damages) Service Delivery Management
4.18 (SLA, Uptime & Liquidation Damages) Service Delivery Management
Table-1 (SLA, Uptime & Liquidation Damages) Appended below.
17 4.18 SLA, Uptime & Liquidation Damages
xvi. For all issues related to installed
infrastructure, RCA (Root Cause
Analysis) to be provided by the
respective OEM within 3 working
days. The delay in submission will
lead to penalty.
4.18 SLA, Uptime & Liquidation Damages
xvi. For all issues related to installed
infrastructure, RCA (Root Cause
Analysis) to be provided by the
respective OEM within 3 working
days. The delay in submission will
lead to penalty @ Rs. 200/day.
18 4.19 Payment Schedule
Payment shall be made in Indian Rupees,
as given below for delivering, installing,
commissioning and monitoring the
Solution / deliverables as mentioned in
the price schedule.
A. Payment of Solution
i. Payment of Solution Cost-
a. On delivery- 40 % payment of solution
cost upon complete delivery of appliance
at BOI DC and DR Site as per Bill of
Materials. The payment for partial delivery
shall not be made.
4.19 Payment Schedule
Payment shall be made in Indian
Rupees, as given below for delivering,
installing, commissioning and monitoring
the Solution / deliverables as mentioned
in the price schedule.
A. Payment of Solution
i. Payment of Solution Cost-
a. On delivery- 50 % payment of solution
cost upon complete delivery of appliance
at BOI DC and DR Site as per Bill of
Materials. The payment for partial
delivery shall not be made.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
9 | P a g e
b. On commissioning /
Implementation/Integration of the solution
- 60% of Solution Cost/ Implementation
Cost on successful commissioning of the
solution at BOI DC and BOI DR site with
full high availability and redundancy at
both the sites and after deployment of
10% of ordered licenses or on minimum
1000 nodes/ endpoints whichever is
higher for each solution with all enabled
features at end points and its signoff from
Bank team.
ii. Payment of License Cost –
The payment can be made in minimum
multiple/ lot of 10% of ordered licenses
quantity post deployment at endpoints
and signoff from Bank team.
iii. The payment frequency shall be
quarterly in arrear for recurring payments
hence the bidder should submit invoices
quarterly for payment of delivered
services to the Bank.
iv. The payment shall be made after
deducting applicable liquidated
damages/penalty.
b. On commissioning /
Implementation/ Integration of the
solution - 40% of Solution Cost/
Implementation Cost on successful
commissioning of the solution at BOI DC
and BOI DR site with full high availability
and redundancy at both the sites and
after deployment of 10% of ordered
licenses or on minimum 1000 nodes/
endpoints whichever is higher for each
solution with all enabled features at end
points and its acceptance from Bank
team.
c. On sign off- 10% after successful
deployment of the solution (licenses) at
all end points and its acceptance &
signoff from the Bank.
ii. Payment of License Cost –
50% on delivery of licenses in name of
the Bank.
40% after successful deployment of the
solution (licenses) at 70% end points and
its acceptance by the Bank.
10% after successful deployment of the
solution (licenses) at remaining end
points and its acceptance & signoff from
the Bank.
For Sign-off, the minimum coverage is
90% of ordered end points.
The payment shall be made after
deducting applicable liquidated
damages/ penalty.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
10 | P a g e
The above payment terms shall be
applicable for each solution individually.
19 Part 5: Technical Specifications
Solution 8 – Patch Management Solution
Additional Specifications
Part 5: Technical Specifications
Solution 8 – Patch Management Solution Additional Specifications are appended below.
20 Part 5: Technical Specifications
Solution/Deliverables 12 – Tape Library Additional Specifications
Part 5: Technical Specifications
Solution/Deliverables 12 – Tape Library Additional Specifications are appended below.
21 5.2 Sizing of Solutions
Revised
5.2 Sizing of Solutions
Revised sizing is appended below.
22 Format 6.3 - Price Schedule
Revised
Format 6.3 - Price Schedule
Revised price schedule is appended
below.
23 FORMAT 6.32: COMPLIANCE
STATEMENT
Deleted (Format is already available
as Format 6.15)
3.3.7 Desktop/Antivirus/Active Directory/Email/DNS/MMS Management Team –
Revised composition of the team -
Facility Management Services for Desktop /Active directory /Antivirus / MMS-
Exchange Management / DNS Management for Servers and End points
Loc Location Number of Resources Solution Desired qualification & Experience
BOI
DC &
BOI
DR
Required resources for
Desktop/Antivirus/Active
directory/DNS :
I. Three L1 resources are required in each day shift and Two L1
Level 1(L1):Should be Graduate (IT /
Computer), preferably, BE/B. Tech/MCA with
minimum 1 year of in-scope solutions and
minimum 3 years’ total experience in the field
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
11 | P a g e
resources are required in Night Shift (8 L1 resources / day) at DC.
II. One L2 resource is required in each shift. (3 resources / day) at DC.
III. One L3 resource is required in general shifts on Bank working days. (1 resources / day) at DC.
Required Onsite resources for
MMS/ Exchange server
management and Exchange
support :
I. One L1 resource is required in morning shift at DC/BKC.
II. One L1 Resource in Afternoon Shift
III. One L2 resources is required in General shift.
Note- The support should be extended on 24*7*365 basis.
of IT implementation / support of related
solutions
Should be certified in any 1 following
certifications:
● Trend Micro or other Antivirus management Certification Professional
● MCSA/MCSE/MCSE: Messaging ● Microsoft Outlook Associate 2016/2019
Level 2(L2):Should be Graduate (IT/
Computer), preferably, BE/B. Tech/MCA with
minimum 3 years of in-scope solutions and
minimum 7 years’ total experience in the field
of IT implementation / support of related
solutions
Should be certified in following certifications:
● MCSA/MCSE/MCSE: Messaging ● Microsoft Outlook Professional 2016/2019
Level 3(L3): Should be BE/B. Tech/MCA with
minimum 7 years of in-scope solutions and
minimum 7 years of total experience in the
field of IT implementation / support of related
solutions.
Should be certified in following certifications:
● MCSA/MCSE/MCSE: Messaging ● Microsoft Outlook Professional 2016/2019
4.18 SLA, Uptime & Liquidation Damages
Table1: Service Level Agreement and Penalty for Operations
Service Area Service Level Penalty
Availability Management
Coverage of agents After completing the delivery
timelines of the deployment
of agents at end points
If the deployed agent coverage is
below 90% of Base Count on a
weekly basis, a penalty of 5 % of
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
12 | P a g e
(which will serve the base for
coverage).Weekly penalty on
coverage of deployed agents
on endpoints for agent based
solutions.
The deployed agent at the
end of each month will serve
as “Base Count” for
evaluating coverage for next
month.
monthly contract value per week
of the solution will be levied.
If the deployed agent coverage is
below 80% of Base Count on a
weekly basis, a penalty of 10% of
monthly contract value per week
of the solution will be levied.
If the deployed agent coverage is
below 70% of Base Count on a
weekly basis, a penalty of 20 % of
monthly contract value per week
of the solution will be levied.
Uptime of the
solution for High
availability setup
Uptime % of application
calculated on monthly basis
for each solution.
Penalty shall be applicable in % (as
mentioned below) of monthly
contract value. If the uptime is
below 98%, the Bank shall have full
right to terminate the contract with
the Bidder.
99.90% monthly uptime and
above
NA
Below to 99.89% 1 % deduction of monthly contract
value for the solution for every
reduction in uptime by 0.01 % in
uptime. Uptime shall be calculated
monthly
Manpower Management
Manpower Services The bidder has to provide
experienced and certified
manpower at Bank premises
as per RFP. Any gap will
attract penalties.
● Penalty of Rs. 300 per day & Rs. 400 for absence per day for each L1 and L2 resources respectively in addition to deduction of relevant day’s unit cost of the resource.
● Penalty of Rs. 500 per day for absence per day for L3.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
13 | P a g e
resource in addition to deduction of relevant day’s unit cost of the resource.
● Penalty of Rs. 700 per day for absence per day for Delivery Lead resource in addition to deduction of relevant day’s unit cost of the resource.
The bidder has to replace the
manpower if specially asked
by the Bank within a period of
one month. A delay beyond
next Month billing cycle will
attract the penalty.
● Penalty of Rs. 300 per day & Rs. 400 for delay in joining of new resource as replacement for L1 & L2 resource respectively in addition to deduction of relevant day’s unit cost of the resource.
● Penalty of Rs.500 per day for delay in joining of new resource as replacement for L3 resource in addition to deduction of relevant day’s unit cost of the resource.
● Penalty of Rs. 600 per day for absence per day for Delivery Lead resource in addition to deduction of relevant day’s unit cost of the resource.
Centralized Management and Monitoring System
No Deployment or
less than 60%
functionality
Shall be available with 99.90 %
functionalities
30% of Monthly Contract Value
deduction for the entire solution for
every month of its non-availability
Partial Deployment
(having between 60-
80% functionality)
Shall be available with 99.90 %
functionalities
20% of Monthly Contract Value
deduction for the entire solution for
every month of its non-availability
Partial Deployment
(having between
than 80-95%
functionality)
Shall be available with 99.90 %
functionalities
10% of Monthly Contract Value
deduction for the entire solution for
every month of its non-availability
Partial Deployment
(having between
Shall be available with 99.90 %
functionalities
5% of Monthly Contract Value
deduction for the entire solution for
every month of its non-availability
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
14 | P a g e
than 95-99.90%
functionality)
Downtime of
Centralized
Monitoring Tool
Shall be available with uptime of
99.90 % monthly uptime
1 % deduction of monthly total of
Monthly Contract Value for the
solution for every reduction in uptime
by 0.01 % in uptime. Uptime shall be
calculated monthly
For “Centralized Monitoring System”, ATS post warranty period (i.e. Year 2 of the
contract), will be considered during Warranty Period for calculation of penalty.
Security Vulnerability Management
Version Upgrade
Major/ Minor for all
Software /
Middleware
The Operations Team has to
have version upgrades of all
underlying software /
Middleware as per respective
OEM recommendations &
Publish the Quarterly version
upgrade calendar for the
same. Failure to comply with
the Version upgrade calendar
will attract penalties.
For breaches of Version upgrade
–
● Penalty of Rs.100 per day for delay in version upgrade of (OS, Server, Solution, protocol etc.) per day.
Patching of all
Hardware /
Software /
Middleware
All underlying hardware /
software / Middleware to be
patched as per respective
OEM recommendations.
Failure to comply with the
Patch calendar will attract
penalties.
For breaches for patches –
● Penalty of Rs.100 per day for delay in applying of each patch as per security/statuary/ OEM recommendations.
Closure of VA / PT ,
and SCD Points on
all Hardware /
Software /
Middleware
All identified vulnerabilities
over underlying hardware /
software / Middleware to be
patched as per respective
OEM recommendations.
Failure to close these calls
within timelines will attract
For breaches for timelines
under Critical & High Category
– Penalty of Rs.300 per day per
vulnerability for delay in mitigation/
fixing vulnerabilities.
For breaches for timelines
under Medium Category –
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
15 | P a g e
penalties based on criticality
of calls.
1.Critical Category– 7 Days
2.High Category – 15 Days
3.Medium - 30 Days
4.Low - 60 Days
Penalty of Rs.200 per day per
vulnerability for delay in mitigation/
fixing vulnerabilities.
For breaches for timelines
under Low Category –
● Penalty of Rs.100 per day per vulnerability for delay in mitigation/ fixing vulnerabilities.
Knowledge Management
OEM Training once
in a year
Training not conducted by
OEM to the bank personnel
and on-site bidder resources
as per requirements of RFP.
● Penalty of Rs. 2,000 per month for each such solution for each defaulted month will be imposed.
OEM Health Check Health check not conducted
by the OEM representative
once in a year
1. Penalty of Rs. 2,000 will be charged for each such solution for each defaulted month will be imposed.
Compliance of RBI/
CERT-IN
Advisories/ other
regulatory advisory
Compliance by end date , as
notified in the advisory
2. Compliance by end date – No Penalty
Penalty by delay by each day By Delay of each day, 0.5% of
Monthly Contract Value, per
day
Service Delivery Management
Service/Incident
Call Closure
Service Calls/Incident call
logged in ticketing tool and
assigned to team should be
resolved within defined
timelines.
Failure to do so will result in
penalties.
For non-compliance of service
calls/ incidents closure
● More than 5% of Service Tickets remain open for More than 3 working days, then a penalty of 3 % of the Monthly Contract Value solution will be deducted.
● More than 10% of Service Tickets remain open for More than 3 working days, then a penalty of 5 % of the Monthly
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
16 | P a g e
Contract Value will be deducted.
● Penalty of Rs. 1000 per day for per incident ticket remains open for more than 24 hrs-48 hrs. and subsequently Rs 2000 per day if it remains open for more than 48 hours.
Antivirus Installation
& Pattern Update
All bank servers and desktops
should have Trend micro
Antivirus agents installed on it
with the latest Antimalware
pattern.
For breaches of Antivirus Monthly
Compliance –
● AV not installed or updated with the latest antimalware pattern on more than 1 % but less than 3% of total Servers/ desktop, then 2% of monthly FMS cost (related to the team) will be deducted as penalty.
● AV not installed or updated with the latest antimalware pattern on more than 3% but less than 5%, of total Servers/ desktop then 5 % of monthly FMS cost (related to the team) will be deducted as penalty.
● AV not installed or updated with latest antimalware pattern on more than 5% of total Servers/desktop then 10 % of monthly FMS cost (related to the team) will be deducted as penalty
Active directory
Configuration on
end points
All bank servers and desktops
should be in the Bank domain.
Failure to do so will attract
penalties.
For breaches of Active directory
Monthly Compliance –
● Active directory Services not configured on More than 1 % but less than 3%, of total desktops then 3% of monthly FMS cost (related to the
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
17 | P a g e
team) will be deducted as penalty.
● Active directory Services not configured on More than 3 % but less than 5%, of total desktops then 5% of monthly FMS cost (related to the team) will be deducted as penalty.
● Active directory Services not configured on More than 5% of total desktops then 10% of monthly FMS cost (related to the team) will be deducted as penalty.
Coverage of agents On coverage of deployed
agents on endpoints for agent
based solutions on a weekly
basis.
If the deployed agent coverage is
below 90% of base count on a
weekly basis, a penalty of 5% of
monthly contract value of
respective solution will be levied
per week.
If the deployed agent coverage is
below 80% of base count, a
penalty of 10% of monthly
contract value of respective
solution will be levied.
If the deployed agent coverage is
below 70%, a penalty of 20% of
monthly contract value of
respective solution will be levied.
Delay in replacement/repairs of faulty part of provided hardware
Service Area Service Level Penalty
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
18 | P a g e
Replacement/
repair of faulty part
of
provided hardware
and all other
components.
All defective parts/faulty Part
shall be replaced at no extra
cost. Replacement parts
shall be new part from the
same manufacturer(s).
Whether a defective item or
component is to be replaced
or repaired shall be at the
sole discretion of the bank.
In the case of a part, the
defective part removed from
the system will become the
property of the selected firm.
Response Time Maximum:
Response Time for
Remedial Maintenance
under the CONTRACT is
measured in elapsed
coverage hours from the
time a service request is
received to the time THE
VENDOR’s customer
engineer arrives at Bank
Site. This CONTRACT
provides maximum of 4
coverage hour’s response
time.
All defective parts/faulty Part shall
be replaced at no extra cost.
Replacement parts shall be new
part from the same
manufacturer(s). Whether a
defective item or component is to
be replaced or repaired shall be at
the sole discretion of the bank. In
the case of a part, the defective part
removed from the system will
become the property of the selected
firm.
Response Time Maximum:
If Response time < =4 Hrs then no
penalty
If Response time > 4 Hrs but <=8
hrs then 2% of Monthly Contract
Value if it is under warranty else 2%
of monthly AMC cost.
If Response time > 8 Hrs but <=24
hrs then 5% of Monthly Contract
Value if it is under warranty else 5%
of monthly AMC cost.
If Response time > 24 Hrs then
10% of Monthly Contract Value if
it is under warranty else 10% of
monthly AMC cost.
(a) During Warranty period, “Monthly Contract Value” will be as under- Solution Cost /12 + License Cost/12 + FMS Cost/12 (divided by 12 for getting
monthly amount out of yearly amount)
(b) Post Warranty period, “Monthly Contract Value” will be as under- AMC of Solution Cost/12 + AMC/ATS of License Cost/12 + FMS Cost/12
(divided by 12 for getting monthly amount out of yearly amount)
Penalty Cap on SLA: - 100% * Monthly Contract Value (calculated on Monthly
basis).
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
19 | P a g e
Part 5.1: Technical Specifications
Additional Specifications: Solution 8 – Patch Management Solution
Sr. No.
Functional Requirements Compliance (Yes/No)
Datasheet/ Reference
Remarks
75 The Bank requires one tool which helps in verification of Banks SCD Compliance over Server & Endpoint OS and network devices. This Tool should also have Vulnerability Management Capability for Windows Endpoints.
76 The Solution should operate without requiring the devices to belong to a Domain or Active Directory. The Solution shall be capable of integrating with one or more Active Directory structures if present; but should not require the schema to be extended.
77 The Solution must support the following OS platforms with agent and functionality coverage:
Windows 2008, 2012 and above.
Windows 7, Windows 8, Windows 10 and above.
HP-UX
Solaris
IBM AIX
Linux
Red Hat (Desktop, Enterprise)
SUSE
Ubuntu LTS versions
CentOS
78 The Solution must include agent software that is deployed on all managed devices having OS.
79 The Solution must provide a remote agent deployment utility for installing agents remotely. The tool should be able to use Active Directory or Local Administrator Authentication for
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
20 | P a g e
deploying agents to remote computers.
80 The agent deployment strategy should also consider use of the following agent deployment methods: a. Active Directory Group Policies to deploy agents at domain login b. login scripts to deploy agents at domain login c. Use of existing 3rd party software distribution tools as available. d. Manually installing the agent where no other methods succeed.
81 The agent should be configurable for quiet periods in which no work is done and with throttling features at client and Server sides.
82 The Agent should be able to coexist with other end point clients like Trend Micro antivirus, DLP , Application whitelisting Solutions etc.
83 The Solution must be capable of proactively reporting changes to managed devices within few minutes of detecting change or upon executing any action deployed from the server.
84 The Solution should have ability to clone out-of-box policies or create custom policies into custom collections for unique security considerations (i.e. – clone specific controls that target specific agents).
85 The Solution should have ability to either change the parameters for the individual control or enable/disable controls based upon security requirements.
86 The Solution should have the ability to create exceptions within the policies.
87 The Solution should perform integrity check of all actions deployed on the managed devices by verifying the digital signatures and checksum digest.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
21 | P a g e
88 The solution should automatically assess covered Devices against required compliance configurations and share detailed reports of compliance levels against each SCD Point. The Reports should be available in multiple formates like OS Wise, Branch wise, Aggregate Summary report for each point etc.
89 The Remediation of non-compliant items must be automated within the solution such that the device is made compliant without user intervention.
End Point Vulnerability Management
90 The Solution should be able to identify and fix the SANS Top 50 Vulnerabilities and also Windows registry Vulnerabilities in case of EndPoints .
91 The Solution should be able to identify systems with non-patched vulnerability conditions and identify these conditions without performing a network scan.
92 The Solution should allow the console user to deploy actions to remediate against the vulnerabilities identified.
93 The solution should automatically assess Windows endpoints against required compliance configurations and Vulnerability databases and if the endpoint is found to be out of compliance, the solution should have capability to place the endpoint in network quarantine.
94 The Remediation of non-compliant items must be automated within the solution such that the endpoint is made compliant without user intervention.
95 The Solution should also be able to target the Vulnerabilities for identification & remediation based on any particular property retrieved .
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
22 | P a g e
96 The Solution should be able to enable or disable any port or device on targeted agents as a policy action. The Solution should also be able to start/stop any service, enable / disable any network share or USB on targeted endpoint.
97 The Solution should support the ability of the agent to perform ‘self-quarantine’ if agent is not at a certain compliance level based upon policies the agent is monitoring.
98 The Solution should also be able to detect and remedy IE Security Configurations
Dashboard & Reporting Requirements
99 The Solution should provide Dashboard that shows in near real-time (within minutes) the compliance status of all agents being targeted against out-of-box compliance policies or Bank's defined SCD policies without the need of installing, configuring any additional scanning engines.
100 Dashboard must have the ability to drill down to show details for both compliant and non-compliant systems including but not limited to non-compliant controls, component name, category, identifier and type.
101 The Information reported should not be more than 1 day old for devices that are active on the network.
102 The Solution should have ability to create multiple reports within the dashboard to map to Bank's security requirements and environment.
103 The Access to reporting function should be controlled based on rights assigned by the Master Administrator.
104 The reporting module should contain, but not limited to, the following reports:
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
23 | P a g e
(i) Progress of all patches applied (ii) Number of vulnerabilities detected by month; (iii) Total number of computers managed and the distribution of these computers; (iv) Top 10 most common vulnerabilities detected;
105 The Solution should allows console operators to create and save graphical reports (e.g. pie, bar, line charts)
106 The Solution should allow console operators to customize and save the reports without the use of third party reporting tools
107 The Solution should allow console operators to drill-down from the report to the specific computers.
108 The Solution should allow console operator to trigger alerts when user-defined conditions are met.
109 The Solution should show trending and analysis of security configuration changes through advanced reporting.
110 The Proposed solution should also help in verification of Banks SCD Compliance over Databases, IIS, Microsoft AD, Exchange, Citrix ZenApp, VM Ware etc.
111 The solution should receive and act on vulnerability and security risk alerts published by the SANS Institute.
112 The solution should be able to map all vulnerabilities to industry standards to provide CVE, CVSS references etc & have integrate with Nessus Security
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
24 | P a g e
center a leading vulnerability management tool for single dashboard.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
25 | P a g e
Part 5.1: Technical Specifications
Solution 12 – Tape Library -Functional/Technical Specifications
Sr.
No.
Functional Requirements Compliance
(Yes/No)
Datasheet/
Reference
Remarks
1 Capacity
1. Shall support Native data capacity of more than 3 PB (uncompressed) expandable to more than 10PB (2.5:1 compressed) when fully populated, using LTO-8 Technology. 2. Shall be offered with Minimum of 12 x LTO-8 FC tape drives. Tape Drive shall support encryption. 3. Shall be offered with 160 Cartridge slots.
2 Tape Drive Architecture 1. Offered LTO-8 drive in the Library shall conform to the Data rate matching technique for higher reliability. 2. Tape Drive Architecture in the Library shall conform to the INCITS/T10 SCSI-3 standard or newer standards.
3 Speed Offered LTO8 drive shall have native speed of at least 300 MB/sec and a compressed speed of at least 600 MB/sec for 2.5:1 compression
4 Scalability Tape Library shall be scalable to more than 500 slots and 40 number
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
26 | P a g e
of LTO-8 Drives within the same Library.
5 Connectivity Offered Tape Library shall provide 8Gbps native FC connectivity to SAN switches.
6 Partitioning 1. Offered Tape Library shall have partitioning support so that each drive can be configured in a separate partition. 2. Offered Tape Library shall have support for at-least 20 partition.
7 Management Tape Library shall provide web based remote management.
8 Encryption device Offered Library shall be provided with a hardware device like USB key/separate appliance to keep all the encrypted keys in a redundant fashion.
9 Barcode Reader and Mail slots 1. Out of 160 slots, Tape library shall support Barcode reader and at-least 10 mail slots and shall be scalable to 30 mail slots when fully populated. 2. Offered LTO-8 drive shall also support LTO-7 – Type M media so that native cartridge capacity of LTO-7 cartridge can be increased to 9TB.
10 Other Features 1. Tape Library shall have GUI Panel 2. Shall be rack mountable 3. Shall have Redundant Power
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
27 | P a g e
Supply 4. Tape Library shall be supplied with software which can predict and prevent failures through early warning and shall also suggest the required service action. 5. Offered Software shall also have the capability to determine when to retire the tape cartridges and what compression ratio is being achieved
11 Consumables The tape library shall be supplied with 150 x LTO8 tape cartridges with barcode labels and 12 cleaning cartridges.
5.2 Sizing of Solutions-Revised
Sr.
No. Security Solution
Initial
Licenses
Required
High Availability/
DR
Infrastructure
Infrastructure
Remark
1 Service
Management
1. Ticketing 2. Service Desk 3. Change & Request
Management 4. Incident & Problem
Management 5. Knowledge
Management 6. SLA Management
200 – concurrent technician users and 40,000 end users
Solution/all components in DC in High Availability & and DR in standalone with all the related required items/ accessories. DC and DR should be fully redundant and capable of entire load at any point of time.
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
2 Workflow
Management
(Event-Correlation,
200 Solution/all components in DC in High Availability & and DR in standalone
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
28 | P a g e
Availability &
Orchestration)
(Servers, Storage,
Network Device)
with all the related required items/ accessories. DC and DR should be fully redundant and capable of entire load at any point of time
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
3 Capacity
Management
Servers-1500
Network Device-
200
Storage-50
1750 Solution/all components in DC in High Availability & and DR in standalone with all the related required items/ accessories. DC and DR should be fully redundant and capable of entire load at any point of time
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
4 Server Monitoring 1500 Solution/all components in DC in High Availability & and DR in standalone with all the related required items/ accessories. DC and DR should be fully redundant and capable of entire load at any point of time.
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
5. DB Monitoring 100 Solution/all components in DC in High Availability & and DR in standalone with all the related required items/
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
29 | P a g e
accessories. DC and DR should be fully redundant and capable of entire load at any point of time.
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
6. Storage Monitoring 50 Solution/all
components in
DC in High
Availability &
and DR in
standalone with
all the related
required items/
accessories. DC
and DR should
be fully redundant
and capable of
entire load at any
point of time.
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
7. Configuration
Management
(end points –
45000,
Servers-1500,
Storage-50,
database-100,
network devices-
12500)
59150 Solution/all
components in
DC in High
Availability &
and DR in
standalone with
all the related
required items/
accessories. DC
and DR should
be fully redundant
and capable of
entire load at any
point of time.
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
8. Patch Management
45000(Endpoints)
1500(Servers)
46500 Solution/all
components in
DC in High
Availability &
and DR in
standalone with
all the related
required items/
accessories. DC
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
30 | P a g e
and DR should
be fully redundant
and capable of
entire load at any
point of time.
components
required to make
solution running as
per Scope and
SLA.
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
9 Inventory (Asset)
Management
(45000endpoints)
(1500-Servers)
(50-Storage)
(12500-network
devices)
59,050 Solution/all
components in
DC in High
Availability &
and DR in
standalone with
all the related
required items/
accessories. DC
and DR should
be fully redundant
and capable of
the entire load at
any point of time.
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and
SLA.
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
10 Network Monitoring
& Automation
12500 Solution/all
components in
DC in High
Availability &
and DR in
standalone with
all the related
required items/
accessories. DC
and DR should
be fully redundant
and capable of
the entire load at
any point of time.
The Bidder shall
supply Hardware,
Software ,
Operating System ,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
solution running as
per Scope and SLA
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
11 Secure File
Transfer solution
(Client hosts
license-100)
100 Users/
Client Host
Solution/all
components in
DC in High
Availability &
and DR in
standalone with
all the related
required items/
accessories.
Installation &
Configuration of
6 different
The Bidder shall
supply Hardware,
Software,
Operating System,
Database & Tape
library as per RFP
specification for
Backup purpose
including any
components
required to make
The Bank will Provide
required storage through
SAN. The bidder has to do
end to end integration of
proposed hardware boxes
and tape library with
existing MDS9148S SAN
switch for Storage. The
Bidder shall also supply
license and SFP for
activation of 144 Nos. 16G
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
31 | P a g e
Note-i. Quantity may vary as per actual count. The bank will place PO as per required quantity only.
SFTP Standalon
e Servers in Bank
environment ( 3
Nos. at DC
Site & 3 Nos.
at DR Site)
solution running as
per Scope and
SLA.
ports spanned across 4
SAN switch (2 at DC and 2
at DR).
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
32 | P a g e
FORMAT 6.3: PRICE SCHEDULE
Part I: Solution Cost (Appliance based)
(Include in Price Bid Only – Not to be included in Technical Bid)
Ref: Your RFP Ref: BOI:HO:IT:RFP:ITSM:200 Dated: 15.06.2020
Part I: Solution Cost (Appliance based) with 1 Year Comprehensive Onsite Warranty
The bidder must take care in filling price information in the commercial bid, to ensure that
there are no typographical or arithmetic errors. All fields must be filled up correctly.
Consolidated, all-inclusive fee for the total project as specified in the Request for Proposal
should be mentioned.
This Technical Bill of Material (BOM) must be attached in technical bid as well as commercial
bid. The format will be identical for both technical and commercial bids, except that the
technical bid will not contain any price information.
Part I: Solution and License Cost (Appliance based) with 1 Year Comprehensive onsite
Warranty
Sr.
No Solution/Service Items Quantity
Unit
Cost
(in
INR)
Total
(in
INR)
1. Service
Management
1. Ticketing 2. Service
Desk 3. Change &
Request Management
4. Incident & Problem Management
5. Knowledge Management
6. SLA Management
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A1)
1
Perpetual License cost for 200
concurrent technician users and
40,000 end users with
200 –
concurrent
technician
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
33 | P a g e
implementation and all related
required items/ accessories with
One year Complete AMC, ATS
and Support Back Lining with
OEM.
(B1)
users and
40,000 end
users
Total Cost Z1=A1+B1 Z1
2. Workflow
Management
(Event-Correlation,
Availability &
Orchestration)
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A2)
1
Perpetual Licenses for 200 assets
(Servers, Storage, Network
devices etc.) With implementation
and all related required items /
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B2)
200
Total Cost Z2= A2+B2 Z2
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
34 | P a g e
3. Capacity
Management
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A3)
1
Perpetual License for 1750 assets
(Servers, Network Devices,
Storage etc.) with implementation
and all related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM
(B3)
1750
Total Cost Z3=A3+B3 Z3
4. Server Monitoring Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A4)
1
Perpetual License for 1500
servers with implementation and
all related required items/
accessories with One year
1500
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
35 | P a g e
Complete AMC, ATS, Support
Back Lining with OEM.
(B4)
Total Cost Z4= A4+B4 Z4
5. DB Monitoring Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A5)
1
Perpetual License for 100 DB
Instances with implementation
and all related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B5)
100
Total Cost Z5=A5+B5 Z5
6. Storage Monitoring Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A6)
1
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
36 | P a g e
Perpetual License for 50 storage
controllers with implementation
and all related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B6)
50
Total Cost Z6=A6+B6 Z6
7. Configuration
Management
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A7)
1
Perpetual license cost of 45000
end points with implementation
and all related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B71)
45000
Perpetual license cost of 1500
servers with implementation and
all related required items/
accessories with One year
Complete AMC, ATS, and Support
Back Lining with OEM.
(B72)
1500
Perpetual license cost of 50
Storage devices with
implementation and all related
50
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
37 | P a g e
required items/ accessories with
One year Complete AMC, ATS,
Support Back Lining with OEM.
(B73)
Perpetual license cost of 100
database instances endpoints
with implementation and all
related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B74)
100
Perpetual license cost of 12500
network devices with
implementation and all related
required items/ accessories with
One year Complete AMC, ATS,
Support Back Lining with OEM.
(B75)
12500
Total Cost
Z7=A7+B71+B72+B73+B74+B75
Z7
8. Patch Management Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A8)
1 - -
Perpetual license cost of 46500
devices with implementation and
all related required items/
accessories with One year
45000
Endpoints
and
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
38 | P a g e
Complete AMC, ATS, Support
Back Lining with OEM.
(B8)
1500
Servers
Total Cost Z8=A8+B8 Z8
9. Inventory (Asset)
Management
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A9)
1
Perpetual license cost of 59050
devices with implementation and
all related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B9)
45000-
endpoints
1500-
Servers
50-Storage
12500-
network
devices
Total Cost Z9=A9+B9 Z9
10. Network Monitoring
& Automation
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A10)
1
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
39 | P a g e
Perpetual license cost of 12500
network devices with
implementation and all related
required items/ accessories with
One year Complete AMC, ATS,
Support Back Lining with OEM.
(B10)
12500
Total Cost Z10 =A10+B10 Z10
11 Secure File
Transfer solution
Solution Cost, Commissioning of
Appliance at BOI DC in High
Availability and BOI DR in Stand
Alone. DC and DR Setup in full
redundancy with all required items
including OS, database (in case of
non-Oracle, Other OS than
windows), software / solution/ third
party products etc. with one year
Comprehensive Support/ warranty
(A11)
1
Perpetual License for 100 users/
client host with implementation
and all related required items/
accessories with One year
Complete AMC, ATS, Support
Back Lining with OEM.
(B11)
100
Total Cost Z11=A11+B11 Z11
12 Tape Library for
Backup Of
Solutions
Supply, Installation and
configuration and integration
of Proposed tape library as per
technical specification mentioned in
Part-5
(A12)
1
Total Cost Z12=A12 Z12
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
40 | P a g e
13 SFPs (144 Nos.)
16G for SAN
Switches along
with licenses
SAN switch licenses (Model: Cisco
MDS9148S) & SFP (Qty:144) of 16
G capacity with Bank Existing SAN
Storage for taking Backup of
proposed solution in DC & DR with
one year Support/ warrantee
(A13)
144 SFPs
along with
SAN Switch
Licenses
Total Cost Z13=A13 Z13
Grand Total Z =
Z1+Z2+Z3+Z4+Z5+Z6+Z7+Z8+Z9+Z10+Z11+Z12+Z13
Z
Important Notes:
1. The Bank reserves the rights to Buy for the line items as mentioned above as full or any partial
hardware and software. The Bank also reserves the rights to increase the number of any line
items mentioned while doing the actual procurement.
2. Price quoted should be exclusive of Goods & Services tax but inclusive of all other applicable
taxes.
3. In case of discrepancy between figures and words, the amount in words shall prevail.
4. No increase in costs, duties, levies, taxes, charges, etc., irrespective of reasons (including exchange rate fluctuations, etc.) whatsoever, shall be admissible during the currency of the Contract.
5. Successful bidder has to submit the OEM support certificate for all Products, Hardware and Software for releasing the payment. Bank will not release the payment until the certificate from the OEM will not be provided.
6. Hardware and software quoted in this bid should not be END of support during contract period.
7. For any item, the price is not quoted or cost is indicated as zero, it will be assumed that the item is provided to the bank at no cost.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
41 | P a g e
FORMAT 6.3: PRICE SCHEDULE
Part II
(Include in Price Bid Only – Not to be included in Technical Bid)
Ref: Your RFP Ref: BOI:HO:IT:RFP:ITSM:200 Dated: 15.06.2020
Part II: Annual Maintenance Cost (AMC)/ Annual Technical Support (ATS) Cost of
Solution and Licenses (Comprehensive Onsite Management, Maintenance, Support and
Services) (Comprehensive AMC/ ATS for 6 year period, post comprehensive warranty of
1 year)
Sr.
No
Solution/Service Items AMC/ATS
Charges
per year
(in INR)
(Excluding
GST)
Total Amount
of 6 years (in
INR)
(Excluding
GST)
1. Service Management
1. Ticketing 2. Service Desk 3. Change &
Request Management
4. Incident, Event & Problem Management
5. Knowledge Management
6. SLA Management
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A1
ATS/AMC for Perpetual
License cost of 200 Nos. and
40,000 end users with all
related required items/
accessories with Support Back
Lining with OEM
B1
Total Cost Y1=A1+B1 Y1
2. Workflow Management
(Event-Correlation,
Availability &
Orchestration)
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
42 | P a g e
A2
ATS/AMC for Perpetual
License for 200 assets with all
related required items/
accessories with Support Back
Lining with OEM
B2
Total Cost Y2=A2+B2 Y2
3. Capacity Management Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A3
ATS/AMC for Perpetual
License for 1750 assets with all
related required items/
accessories with Support Back
Lining with OEM
B3
Total Cost Y3=A3+B3 Y3
4. Server Monitoring Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A4
ATS/AMC for Perpetual
License for 1500 servers with
all related required items/
accessories with Support Back
Lining with OEM
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
43 | P a g e
B4
Total Cost Y4=A4+B4 Y4
5. DB Monitoring Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A5
ATS/AMC for Perpetual
License for 100 DB Instances
with all related required items/
accessories with Support Back
Lining with OEM
B5
Total Cost Y5=A5+B5 Y5
6. Storage Monitoring Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A6
ATS/AMC for Perpetual
License for 50 storage
controllers with all related
required items/ accessories
with Support Back Lining with
OEM
B6
Total Cost Y6=A6+B6 Y6
7. Configuration
Management
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
44 | P a g e
accessories with Support Back
Lining with OEM
A7
ATS/AMC for Perpetual
License for 45000 endpoints
with all related required items/
accessories with Support Back
Lining with OEM
B71
ATS/AMC for Perpetual
licensee for 1500 servers with
all related required items/
accessories with Support Back
Lining with OEM.
B72
ATS/AMC for Perpetual
licenses for 50 Storage devices
with all related required items/
accessories with Support,
Back Lining with OEM.
B73
ATS/AMC for Perpetual
licenses for 100 database
instances with all related
required items/ accessories
with Support Back Lining with
OEM.
B74
ATS/AMC for Perpetual
licenses for 12500 network
devices with all related
required items/ accessories
with Support Back Lining with
OEM.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
45 | P a g e
B75
Total Cost Y7=
A7+B71+B72+B73+B74+B75
Y7
8. Patch Management
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A8
ATS/AMC for Perpetual
License for 45000 endpoints &
1500 servers with all related
required items/ accessories
with Support Back Lining with
OEM
B8
Total Cost Y8=A8+B8 Y8
9. Inventory (Asset)
Management
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A9
ATS/AMC for Perpetual
License for 45000 endpoints,
1500 servers, 50 storage &
12500 network devices with all
related required items/
accessories with Support Back
Lining with OEM
B9
Total Cost Y9=A9+B9 Y9
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
46 | P a g e
10. Network Monitoring &
Automation
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A10
ATS/AMC for Perpetual
License for 12500 network
devices with all related
required items/ accessories
with Support Back Lining with
OEM
B10
Total Cost Y10=A10+B10 Y10
11 Secure File Transfer
solution
Comprehensive AMC/ATS of
Solution / appliance with all
related required items/
accessories with Support Back
Lining with OEM
A11
Y11
ATS/AMC for Perpetual
License cost of 100
users/client host with all related
required items/ accessories
with Support Back Lining with
OEM
B11
Total Cost Y11=A11+B11 Y11
12 Tape Library for
Backup Of Solution
AMC/ATS for Proposed tape
library at DC & DR site
A12
Total Cost Y12=A12 Y12
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
47 | P a g e
13 SFPs (144 Nos.) 16G
for SAN Switches
along with licenses
AMC/ATS of procured SFPs
A13
Total Cost Y13=A13 Y13
Grand Total
Y=Y1+Y2+Y3+Y4+Y5+Y6+Y7+Y8+Y9+Y10+Y11+Y12+Y13
Y
Important Notes:
1) All Prices will be exclusive of Goods & Services tax but inclusive of all other applicable taxes.
2) The AMC/ATS has to be a minimum of 8 % of the cost of respective line item as per Format 6.3 Part I) (All 6 Years AMC/ATS to be same i.e. same percentage for every year)
3) AMC charges to be given in the prescribed format separately.
4) AMC contract can be extended at the discretion of the bank at the same rates after the expiry of the contract period.
5) The Bank, at its sole discretion, will enter into an AMC/ATS Contract for required duration.
6) AMC will include all applicable Software Modules / Components items as applicable, indicated in the Price Schedule.
7) AMC charges as above will be considered for Price evaluation.
8) Bank at its discretion can terminate the AMC contract in whole or as part thereof with the bidder and discontinue the same without citing any reason by giving 90 days’ notice and applicable amount, on a pro-rata basis, for the service rendered shall be payable.
9) For any item, the price is not quoted or cost is indicated as zero, it will be assumed
that the item is provided to the bank at no cost.
10) Any extra components/ item/service if required for fulfilling the scope, the bidder is required to factor the same in above mentioned line items only.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
48 | P a g e
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
49 | P a g e
FORMAT 6.3: PRICE SCHEDULE
Part III
(Include in Price Bid Only – Not to be included in Technical Bid)
Ref: Your RFP Ref: BOI:HO:IT:RFP:ITSM:200 Dated: 15.06.2020
Part III: Facility Management Support (Operations Cost)
Resource
type
No. of
resources
Unit rate per
resource per
month (in INR)
Cost for One year
(IN INR)
Total cost for 7
years
(in INR)
L1 25
L2 13
L3 (Team
Lead)
3
Total amount in numbers X
Total amount in words
● It will be the decision of the Bank to decide the actual number of resources, which
may increase, or decrease depending on the actual requirements and will be finalized
with the successful bidder during the contracting period at a later stage.
● FMS Charges as above shall be considered for price evaluation.
● The Unit rate for L1, L2, L3 and Delivery lead will remain fixed for contract period.
● Payment of support/services will be done as per calculation of the uptime and deducting applicable penalty for downtime, which is mentioned in the related clause of the RFP.
● The bidders strictly quote in the format and for periods as mentioned above.
● Providing software upgrades in time for the devices supplied by the bidder from the Original Equipment Manufacturer (OEM).
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
50 | P a g e
FORMAT 6.3: PRICE SCHEDULE
Part IV
(Include in Price Bid Only – Not to be included in Technical Bid)
Ref: Your RFP Ref: BOI:HO:IT:RFP:ITSM:200 Dated: 15.06.2020
Part IV: Total Project Cost
Sr. No Type Total Cost (in INR)
1 Solution Cost with 1 Year Warranty-Z
2 AMC/ATS of Solution for Six Years (Service,
Management & Maintenance)-Y
3 Facility Management Cost for Seven Years- X
Total Cost Of The Project (TCP) in figures X+Y+Z
Total Cost Of The Project (TCP) in words X+Y+Z
Note: Lowest bidder will be declared after the sum of total of format 6.3 Part I, Part II and Part III as
tabulated above.
Validity: The prices offered will remain valid for Contract Duration in case of Additional Licenses
& for Manpower resources during contract period from the date of issue of Purchase Order.
Place:
Date:
Seal & Signature of the Vendor
Important Notes:
1. All Prices will be exclusive of Goods & Services Tax (GST) but inclusive of all other applicable taxes.
2. The bidder shall mandatorily attach the detailed Specifications of all Hardware/ Software, Components as above separately in the Technical Bid (Bill of Material, Format 6.13), supported by Technical Literature/ Data sheet/ Product Catalogues/Brochures, etc. This is Mandatory for the bidder.
3. Price quoted should be inclusive of all costs, duties, levies, taxes and all other applicable charges excluding GST as applicable in respective State,
4. In case of discrepancy between figures and words, the amount in words shall prevail. 5. In case of discrepancy between unit price and total price, the unit price shall prevail.
Request for Proposal for Implementation, Monitoring and Management of IT Service Management & IT Asset Management
51 | P a g e
6. The Annual Maintenance / Technical Support i.e. AMC/ATS, offered by the bidder should have a back to back supporting arrangement with the original suppliers or their approved business partners of the hardware or software with necessary documentary evidence thereof produced to the bank.
7. The vendor will be responsible for obtaining necessary clearance/approval from the local sales tax authorities (at destination place).
8. No increase in costs, duties, levies, taxes, charges, etc., irrespective of reasons (including exchange rate fluctuations, etc.) whatsoever, shall be admissible during the currency of the Contract.
9. L1 will be declared after examining Total Project Cost (point 4). 10. The price quoted, shall be valid for contract period. Prices payable to the Supplier as stated in
the Contract shall be firm and not subject to adjustment during performance of the Contract, irrespective of reasons whatsoever, including exchange rate fluctuations, changes in taxes, duties, levies, charges etc. Price quoted will be inclusive of all taxes, duties, levies charges, etc. and no additional charges shall be payable by the bank. GST/ Service tax payable if any under this contract shall be payable as applicable.
The above change shall be construed as part of RFP document (Ref:
BOI:HO:IT:ITSM:200 Dated :15/06/2020) .
All other terms and conditions shall be same as per RFP Ref:
BOI:HO:IT:ITSM:200 Dated :15/06/2020.
For Bank of India