TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
Airport: System description:
Liège Airport (LLG) ULD handling system
Project Place: Start date:
Liège 2007, October
Project Country: Commissioning date:
Belgium 2008, June
Included components:
• 20 Airside interfaces (dolly docks) with hydraulic side shift
• 28 Workstations for building/breaking of ULD's with integrated weighing system
• 87 Right angle decks (RAD)
• 2 Turntables with integrated RAD
• 2 Hinged roller decks (bridge) with hydraulic lift
• 4 Truck docks with pop-up ball transfer units winch
• Castor deck area for manual ULD manoeuvring
• Two-phase delivery, installation, commissioning, training
Control system:
• Overall PLC control system
-
TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
-
TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
-
TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium