reliability, guarantees, quality, optimal solutions ...oil loading/unloading racks design,...
TRANSCRIPT
reliability, guarantees, quality, optimal solutions , flexibility,efficiency
+
+
reliability, guarantees, quality, optimal solutions , flexibility,efficiency
Olimps Ltd. was founded in 1991 by joining the efforts of specialists previously working for variousdesign and engineering institutions based in Riga, Latvia.
Certificates ISO 9001, ISO 14001, OHSAS 18001 issued by TÜV NORD CERT GmbH Certificates, licenses and permits issued by GAZPROMCERT, self-regulatory organizations in Russia, Belarus , EU
countries (Latvia, Lithuania) Company turnover in 2014 has exceeded 20 MEUR (220 MEUR in 10 years) Average number of employees is 196 persons (including 100 employees of design and engineering department)
Our focus:
Comprehensive design of oil/gas/petrochemicals storage and handling facilities Automatic process control systems (APCS) for oil, petrochemicals and LNG terminals, underground gas storage
facilities Implementation of ЕРС contracts, (transportation of oil and gas, terminals, infrastructure)
Our advantages:
Long term partnership with design and construction companies in Russia and EU countries Good knowledge and experience in applicable normatives and standards (EN,DIN,API,LBN, Russian standards
etc.) Knowledge of specificities of project stages in accordance with western and Russian standards EPC contract experience in projects implemented in EU and Russia; Staff competence
Olimps Ltd. was founded in 1991 by joining the efforts of specialists previously working for variousdesign and engineering institutions based in Riga, Latvia.
Certificates ISO 9001, ISO 14001, OHSAS 18001 issued by TÜV NORD CERT GmbH Certificates, licenses and permits issued by GAZPROMCERT, self-regulatory organizations in Russia, Belarus , EU
countries (Latvia, Lithuania) Company turnover in 2014 has exceeded 20 MEUR (220 MEUR in 10 years) Average number of employees is 196 persons (including 100 employees of design and engineering department)
Our focus:
Comprehensive design of oil/gas/petrochemicals storage and handling facilities Automatic process control systems (APCS) for oil, petrochemicals and LNG terminals, underground gas storage
facilities Implementation of ЕРС contracts, (transportation of oil and gas, terminals, infrastructure)
Our advantages:
Long term partnership with design and construction companies in Russia and EU countries Good knowledge and experience in applicable normatives and standards (EN,DIN,API,LBN, Russian standards
etc.) Knowledge of specificities of project stages in accordance with western and Russian standards EPC contract experience in projects implemented in EU and Russia; Staff competence
Company organization chart
FinancialDepartment
BOARD OF DIRECTORSDirectors of dept. BOARD CHAIRMAN Quality and HSE Managers
Director of DepartmentDirector of DepartmentCommercial Director
Director ofDepartment
Director ofDepartment
Project Director(Ventspils nafta…and other projects)
Project and site managers
Project Director(Latvijas Gaze… and other projects)
Project and site managers
Project Director(Тuapse…,Primorsk…,Ust-Luga port…
and other projects)
Project and site managers
Project Director( АТТ, Karelskij okatish, Unipark and other projects)
Deputy Director of department(Design & Engineering)
– 108 employees
Deputy Director ofdepartment (PLC, SCADA, ITengineering) – 22 employees
Project control chiefengineers (10)
Cost estimation (3)
Civil / Structuralengineering group
Nr.I (9)
Civil / Structural /Architectural
engineering groupNr.II (18)
Site layout / plan (4)
Projectinspection
group
Archive andLibrary
Qualityassurance
group
PLC & SCADA engineersgroup (11)
Commissioning engineers (5)
Economist
Lawyer
Prospectivedevelopment group
InformationService group
Accounts group
Economist
Branch in RussiaFederation-Director
-Accountant
CAD group
IT engineers group (6)
www.olimps.lv
Design and engineering department
Department ofeconomic planning,
development andproject
(Design works management,Procurement management,
Construction works management,EPC works management,
Subcontractors management)
Project department
Project Director( АТТ, Karelskij okatish, Unipark and other projects)
Project and site managers
Project Director(Klaipedos nafta and other projects)
Project and site managers
Equipment procurement group
Tender group
Olimps Ltd. Branch in St. Petersburg
Oil & Gas Process,Mechanical, Piping
engineering (12)
Electrical engineering(16)
Instrumentation andcontrol systemsengineering (13)
Site layout / plan (4)
Commissioningengineers
Commissioningengineers
HR resourcesgroup
Secretariat andoffice
management
Lawyer
Office maintenance group.Automobiles.
Security service
Utilities Process,Mechanical, Piping
engineering (12)
ЕРС - Engineering Procurement Construction
Comprehensive design solutions
•General planning•Architectural and civil solutions•Engineering utilities and systems•Process technology•Process automation•Fire-fighting automation•Power supply•Telecommunication systems•Information technologies•Construction organization planning•Expert examination and approval procedures
Equipment procurement
•Sourcing (technology and licenser are commonly selectedby the Customer)
• Drafting and control of delivery schedule• Drafting of delivery lots (packages)• Preparation of check lists for tenders• Organization of tenders• Vendor inspection• Stepwise acceptance of equipment• Participation in factory tests• Arrangement of delivery, logistics• Arrangement of storage facilities
Construction
•Project budget management• Construction management (of subcontractors’ works)• Drafting and control of construction schedule• Drafting of lots• Sourcing of subcontractors• Subcontractor inspection• Arrangement of temporary utilities and structures
Commissioning
• Commissioning scheduling• Development of testing procedures• Examination of mounting/installation quality•System inspection ,•Inspection of process equipment• Simulation testing•Operation startup
Service support
•Customer’s staff training•Warranty and post-warranty service
Comprehensive design solutions
•General planning•Architectural and civil solutions•Engineering utilities and systems•Process technology•Process automation•Fire-fighting automation•Power supply•Telecommunication systems•Information technologies•Construction organization planning•Expert examination and approval procedures
Equipment procurement
•Sourcing (technology and licenser are commonly selectedby the Customer)
• Drafting and control of delivery schedule• Drafting of delivery lots (packages)• Preparation of check lists for tenders• Organization of tenders• Vendor inspection• Stepwise acceptance of equipment• Participation in factory tests• Arrangement of delivery, logistics• Arrangement of storage facilities
Construction
•Project budget management• Construction management (of subcontractors’ works)• Drafting and control of construction schedule• Drafting of lots• Sourcing of subcontractors• Subcontractor inspection• Arrangement of temporary utilities and structures
Commissioning
• Commissioning scheduling• Development of testing procedures• Examination of mounting/installation quality•System inspection ,•Inspection of process equipment• Simulation testing•Operation startup
Service support
•Customer’s staff training•Warranty and post-warranty service
3D design and simulation is:
• providing quality enhancement ;
• current trend and actual standard
For automation of design works Olimps apply the following
Bentley analysis software :
•AutoPipe,
•PlantFLOW,
•STAAD Pro,
and the following design systems :
•Autodesk Revit,
•Intergraph CADWorx Plant,
•Bentley AutoPLANT,
•Autodesk Structural Detailing,
•AutoCAD Electrical,
•AutoCAD Civil 3D.
The experience of applying 3D technologies in various projects
proves its high effectiveness and quality enhancement.
3D design
3D design and simulation is:
• providing quality enhancement ;
• current trend and actual standard
For automation of design works Olimps apply the following
Bentley analysis software :
•AutoPipe,
•PlantFLOW,
•STAAD Pro,
and the following design systems :
•Autodesk Revit,
•Intergraph CADWorx Plant,
•Bentley AutoPLANT,
•Autodesk Structural Detailing,
•AutoCAD Electrical,
•AutoCAD Civil 3D.
The experience of applying 3D technologies in various projects
proves its high effectiveness and quality enhancement.
Process automationConsultations•survey•determination of automation requirements,•conceptualization
Design of the following systems:• automation• APCS• fire detection and alarm• automatic fire-fighting• emergency shutdown• operational and commercial accounting• gas content monitoring• process communication• control of utilities (BMS), CCTV, security and access control
ProductionCommissioningCustomer’s staff trainingSupport and maintenanceWaranty and post-warranty service
Turnkey APCS and dispatching systems are supplied to
Consultations•survey•determination of automation requirements,•conceptualization
Design of the following systems:• automation• APCS• fire detection and alarm• automatic fire-fighting• emergency shutdown• operational and commercial accounting• gas content monitoring• process communication• control of utilities (BMS), CCTV, security and access control
ProductionCommissioningCustomer’s staff trainingSupport and maintenanceWaranty and post-warranty service
Turnkey APCS and dispatching systems are supplied to
•Incukalns UGS (Latvijas Gāze)•Ventspils Nafta terminal•Ventbunkers•Rosneft Tuapsenefteprodukt•Naftaimpekss
•LatRosTrans•Ust-Luga oil seaport•Knevichi airport fueling unit•Klaipedas Nafta LNG terminal
Ust-Luga seaport•Ust-Luga seaport, Transneft•Ust-Luga Oil (oil transhipment)•EST (European Sulphur Terminal)
Riga oil seaport• Naftaimpekss• Kundzinsala• Riga Fertilizer terminal• Neste Latvia
Ventspils free port•Ventspils nafta terminals•Ventbunkers•Vars•Ventaonjaks
Klaipeda port (Klaipedas Nafta)
Rosneft Tuapsenefteprodukt
Rosneft Nakhodkanefteprodukt
Primorsk seaport
Batumi oil terminal (Georgia)
Export terminals
Ust-Luga seaport•Ust-Luga seaport, Transneft•Ust-Luga Oil (oil transhipment)•EST (European Sulphur Terminal)
Riga oil seaport• Naftaimpekss• Kundzinsala• Riga Fertilizer terminal• Neste Latvia
Ventspils free port•Ventspils nafta terminals•Ventbunkers•Vars•Ventaonjaks
Klaipeda port (Klaipedas Nafta)
Rosneft Tuapsenefteprodukt
Rosneft Nakhodkanefteprodukt
Primorsk seaport
Batumi oil terminal (Georgia)
Реализованные проекты
Oil loading/unloading racks
Design, construction and commissioning of 24 railway oilloading/unloading racks :
•More than 40 know-how
•Light, dark and viscous oil products
•Using of thermal oil as heating agent
•Shed / roofing
•Installation of pump units on rack and outside
•Top and bottom heating and unloading
•Heating and unloading of batches of viscous oil tankcars
•Patent LR №13425 – Viscous oil heating nozzleapplying flow transfer method.
Implemented railway rack projects:Ventspils nafta, LatviaVentbunkers, LatviaVentamonjaks, Ventall Termināls, LatviaViru Olitoostas, EstoniaRosneft-Nakhodkanefteprodukt ,Nakhodka, RussiaTransbunker, St.Petersburg , RussiaRN-Tuapsenefteprodukt, Tuapse, RussiaPetrotrans-Primorsk, Primorsk, RussiaUst-Luga Oil (Rosneftbunker), Ust-Luga, Russia
Реализованные проекты
Design, construction and commissioning of 24 railway oilloading/unloading racks :
•More than 40 know-how
•Light, dark and viscous oil products
•Using of thermal oil as heating agent
•Shed / roofing
•Installation of pump units on rack and outside
•Top and bottom heating and unloading
•Heating and unloading of batches of viscous oil tankcars
•Patent LR №13425 – Viscous oil heating nozzleapplying flow transfer method.
Implemented railway rack projects:Ventspils nafta, LatviaVentbunkers, LatviaVentamonjaks, Ventall Termināls, LatviaViru Olitoostas, EstoniaRosneft-Nakhodkanefteprodukt ,Nakhodka, RussiaTransbunker, St.Petersburg , RussiaRN-Tuapsenefteprodukt, Tuapse, RussiaPetrotrans-Primorsk, Primorsk, RussiaUst-Luga Oil (Rosneftbunker), Ust-Luga, Russia
Ventspils Nafta TerminalsCustomer: Ventspils Nafta Terminals JSC (Latvia)
Terms: 1996 – ongoing cooperation
Object description : oil and oil products loading , storage andtransshipment terminal. Terminal area exceeds 100 hectares. Annualoil handling capacity : up to 33 mio tonnes .
Total tank farm capacity 1 195 000 m3 (50 000 m3 – 4 tanks, 20000 m3 – 31 tanks, 10 000 m3 – 5 tanks, 5000 m3 – 65 tanks);
Pumping stations 11 pcs. (122 pumps, 2200 electrically actuatedvalves);
Railway loading /unloading facilities (7 000 000 tonnes – totalannual capacity of the terminal for receiving products by railway, 3railway racks where 176 rail tank cars can be dischargedsimultaneously);
2 jetties, which allows handling of 4 tankers simultaneously; Fire-fighting station with a fully automated control centre.
Complete technical reequipment and reconstruction of terminalfacilities: tank farms, pump stations, railway loading/unloading racks,treatment facilities, jetties, production units e.t.c.
Works implemented by Olimps: Consultations, elaboration of concept design; Elaboration of all stages of design project; Equipment procurement; Supervision; Monitoring of implementation of construction and installation
works; Development and procurement of process control systems Comprehensive testing and commissioning
www.olimps.lv
Customer: Ventspils Nafta Terminals JSC (Latvia)
Terms: 1996 – ongoing cooperation
Object description : oil and oil products loading , storage andtransshipment terminal. Terminal area exceeds 100 hectares. Annualoil handling capacity : up to 33 mio tonnes .
Total tank farm capacity 1 195 000 m3 (50 000 m3 – 4 tanks, 20000 m3 – 31 tanks, 10 000 m3 – 5 tanks, 5000 m3 – 65 tanks);
Pumping stations 11 pcs. (122 pumps, 2200 electrically actuatedvalves);
Railway loading /unloading facilities (7 000 000 tonnes – totalannual capacity of the terminal for receiving products by railway, 3railway racks where 176 rail tank cars can be dischargedsimultaneously);
2 jetties, which allows handling of 4 tankers simultaneously; Fire-fighting station with a fully automated control centre.
Complete technical reequipment and reconstruction of terminalfacilities: tank farms, pump stations, railway loading/unloading racks,treatment facilities, jetties, production units e.t.c.
Works implemented by Olimps: Consultations, elaboration of concept design; Elaboration of all stages of design project; Equipment procurement; Supervision; Monitoring of implementation of construction and installation
works; Development and procurement of process control systems Comprehensive testing and commissioning
Venbunkers
Customer: Ventbunkers JSC, Latvia
Terms: 1995 – ongoing
Object description: oil and oil products loading , storage andtransshipment terminal. Terminal area = 43 hectares. Annual oilhandling capacity : up to 7 mio tonnes . 25 tanks, total tank farm volume 355 000 m3 Diesel fuel tanks, 2х4х20 000 m3; Mazut tank farm No.4 (2х20 000 м3) Tank farm No.7 (9х5000 + 3х20 000 м3); Mazut tank farm 3x10 000 tonnes. Railway racks for unloading of light and dark oil products Special rack for unloading of damaged railway tank cars Production facilities
Works implemented by Olimps: Consultations, elaboration of concept design; Elaboration of all stages of design project; Equipment procurement; Supervision; Monitoring of implementation of construction and installation
works; Development and procurement of process control systems Comprehensive testing and commissioning
Customer: Ventbunkers JSC, Latvia
Terms: 1995 – ongoing
Object description: oil and oil products loading , storage andtransshipment terminal. Terminal area = 43 hectares. Annual oilhandling capacity : up to 7 mio tonnes . 25 tanks, total tank farm volume 355 000 m3 Diesel fuel tanks, 2х4х20 000 m3; Mazut tank farm No.4 (2х20 000 м3) Tank farm No.7 (9х5000 + 3х20 000 м3); Mazut tank farm 3x10 000 tonnes. Railway racks for unloading of light and dark oil products Special rack for unloading of damaged railway tank cars Production facilities
Works implemented by Olimps: Consultations, elaboration of concept design; Elaboration of all stages of design project; Equipment procurement; Supervision; Monitoring of implementation of construction and installation
works; Development and procurement of process control systems Comprehensive testing and commissioning
Oil and oil products transportation pipeline (LatRosTrans)
Customer : LatRosTrans Jsc
Terms: 1994 – ongoing
Project description:Complete reequipment and upgrading of oil and diesel fueltransportation facilities servicing grid pipeline from Belarusborder to Ventspils. Pipeline annual throughput capacity upto 8 mio tonnes .Total lenght of grid pipelines = 780 km (in Latvia only) ;Four pump stations : «Skrudaliena 1, 2», «Ilukszte»,«Dzukste»;Three oil and diesel fuel metering units ;Tank farm, total volume 160 000 m3Oil products unloading rack
Works implemented by Olimps: Consultations, elaboration of concept design; Elaboration of all stages of design project; Equipment procurement; Supervision; Monitoring of implementation of construction and
installation works; Development and procurement of process control systems Comprehensive testing and commissioning
Customer : LatRosTrans Jsc
Terms: 1994 – ongoing
Project description:Complete reequipment and upgrading of oil and diesel fueltransportation facilities servicing grid pipeline from Belarusborder to Ventspils. Pipeline annual throughput capacity upto 8 mio tonnes .Total lenght of grid pipelines = 780 km (in Latvia only) ;Four pump stations : «Skrudaliena 1, 2», «Ilukszte»,«Dzukste»;Three oil and diesel fuel metering units ;Tank farm, total volume 160 000 m3Oil products unloading rack
Works implemented by Olimps: Consultations, elaboration of concept design; Elaboration of all stages of design project; Equipment procurement; Supervision; Monitoring of implementation of construction and
installation works; Development and procurement of process control systems Comprehensive testing and commissioning
Customer: MN Druzhba (Transneft Jsc, Russia)
Contractor: Ust-Luga design and engineering company
Terms : December 2009 – January 2012
ЕРС contract
Project description: Construction of oil storage and transshipment terminalin Ust-Luga sea port – the destination of BTS-2 pipeline system handling 30mio tonnes annually (with potential expansion up to 38 mio tonnes)
Tank farm 420 000 m3 (50 000 m3 – 8 pcs., floating roof; 10 000 m3 - 2pcs., fixed roof);
Process pipelines DN500-DN1200, more than 5 km; Pump station (8 pumps 4000m3/h , 120m head); Oil metering station (4 units , 12 000 m3/h capacity); Boiler house (4 MWth); Utilities: water supply, sewerage, power supply, communications, alarm
system e.t.c..; Fire prevention system and fire-fighting pump station ( 2 water tanks x
3000 m3 ). Treatment facilities Office and auxiliary buildings
Works implemented by Olimps as a part of UPIK consortium:
Design of office an auxiliary buildings; Supervision; Project management; Equipment procurement ; Construction management (26 subcontractors , more than 1800
construction workers including 150 engineers, 350 units of constructionmachinery)
EPC for process control systems ; EPC power supply solutions; Commissioning; Service support.
Ust-Luga oil storage base, Baltic Pipeline System -2Customer: MN Druzhba (Transneft Jsc, Russia)
Contractor: Ust-Luga design and engineering company
Terms : December 2009 – January 2012
ЕРС contract
Project description: Construction of oil storage and transshipment terminalin Ust-Luga sea port – the destination of BTS-2 pipeline system handling 30mio tonnes annually (with potential expansion up to 38 mio tonnes)
Tank farm 420 000 m3 (50 000 m3 – 8 pcs., floating roof; 10 000 m3 - 2pcs., fixed roof);
Process pipelines DN500-DN1200, more than 5 km; Pump station (8 pumps 4000m3/h , 120m head); Oil metering station (4 units , 12 000 m3/h capacity); Boiler house (4 MWth); Utilities: water supply, sewerage, power supply, communications, alarm
system e.t.c..; Fire prevention system and fire-fighting pump station ( 2 water tanks x
3000 m3 ). Treatment facilities Office and auxiliary buildings
Works implemented by Olimps as a part of UPIK consortium:
Design of office an auxiliary buildings; Supervision; Project management; Equipment procurement ; Construction management (26 subcontractors , more than 1800
construction workers including 150 engineers, 350 units of constructionmachinery)
EPC for process control systems ; EPC power supply solutions; Commissioning; Service support.
Customer: : Ust-Liga Oil, JscPreviously – Rosneftbunker (Russia)
Contractors: Kombit Engineering, petroproekt
Terms: 2008 – ongoing
Description: railway loading, storage and transshipment of oilproducts , up to 30 mio tonnes per year
Railway tanks unloading facilities :
Rack No.1 , mazut heating and discharge 2х72 tank cars
Rack No.2, mazut heating and discharge 2х72 tank cars
Rack No. №3 , light oil discharge 2х72 tank cars, pumpstation No.4
Rack No.4 , viscous oil discharge , 2х36 tank cars
Completed works: Design, all stages Supervision EPC APCS:
Equipment procurement Software development Installation and commissioning
Comprehensive commissioning, operation startup.
Ust-Luga seaport, Ust-Liga Oil JSC
Customer: : Ust-Liga Oil, JscPreviously – Rosneftbunker (Russia)
Contractors: Kombit Engineering, petroproekt
Terms: 2008 – ongoing
Description: railway loading, storage and transshipment of oilproducts , up to 30 mio tonnes per year
Railway tanks unloading facilities :
Rack No.1 , mazut heating and discharge 2х72 tank cars
Rack No.2, mazut heating and discharge 2х72 tank cars
Rack No. №3 , light oil discharge 2х72 tank cars, pumpstation No.4
Rack No.4 , viscous oil discharge , 2х36 tank cars
Completed works: Design, all stages Supervision EPC APCS:
Equipment procurement Software development Installation and commissioning
Comprehensive commissioning, operation startup.
Rosneft export terminal, Tuapse, RussiaCustomer: Rosneft-Tuapsenefteprodukt
Contractor: Kombit Engineering
Terms: 2005 – ongoing
Project description:
Reconstruction and expansion of oil loading, storage andtransshipment terminal from 6 to 17 mio tonnes per yearTotal tank farm volume 400 000 m3; Pump stations;
3 oil discharge railway racks;
Jetties ,
New deep-water channel;
Thermal oil heating room ;
Treatment facilities;
Works completed by Olimps:
Consultations, concept design;
Design –all stages;
Equipment procurement;
Supervision;
Control of implementation of construction, installation and
commissioning;
Development and procurement of process automation systems
Comprehensive commissioning
Customer: Rosneft-Tuapsenefteprodukt
Contractor: Kombit Engineering
Terms: 2005 – ongoing
Project description:
Reconstruction and expansion of oil loading, storage andtransshipment terminal from 6 to 17 mio tonnes per yearTotal tank farm volume 400 000 m3; Pump stations;
3 oil discharge railway racks;
Jetties ,
New deep-water channel;
Thermal oil heating room ;
Treatment facilities;
Works completed by Olimps:
Consultations, concept design;
Design –all stages;
Equipment procurement;
Supervision;
Control of implementation of construction, installation and
commissioning;
Development and procurement of process automation systems
Comprehensive commissioning
Rosneft export terminal, Nakhodka, Russia
Customer: Rosneft- NakhodkanefteproduktContractor: Kombit Engineeringterms: 2004 – 2010
Object description:
Reconstruction of oil loading, storage and transshipmentterminal
Tank farm, volume 400 000 m3; Pump stations; Oil discharge railway racks;
Scope of works:
Consultations, concept design; Design works; Supervision; Control of implementation of construction, installation
and commissioning; APCS development and procurement Commissioning
Modernization of airports’ fueling facilities and central fueling stations
Contractor : Aviatehnologii Topliva, Jsc,Terms : 2007г. – ongoing
Involved airports : Sheremetyevo, Domodedovo (Москва), Pulkovo(St.Peterspurg), Кnevichiи (Vladivostok), Koltsovo (Ekaterinburg), Krimskairport, GelendzhikDesign of new and reconstruction of existing POL storage units and CAFS,incl.: Tank farms Railway racks Transformer substations, switchboards Office and production premises with checkpoints Fire-fighting pump stations with backup power sources Process units and pipelines Treatment facilities Utilities and communications POL laboratories
Completed works: Consultations, concept design; Design works; Supervision; Control of implementation of construction, installation and
commissioning; APCS development and procurement Commissioning
Contractor : Aviatehnologii Topliva, Jsc,Terms : 2007г. – ongoing
Involved airports : Sheremetyevo, Domodedovo (Москва), Pulkovo(St.Peterspurg), Кnevichiи (Vladivostok), Koltsovo (Ekaterinburg), Krimskairport, GelendzhikDesign of new and reconstruction of existing POL storage units and CAFS,incl.: Tank farms Railway racks Transformer substations, switchboards Office and production premises with checkpoints Fire-fighting pump stations with backup power sources Process units and pipelines Treatment facilities Utilities and communications POL laboratories
Completed works: Consultations, concept design; Design works; Supervision; Control of implementation of construction, installation and
commissioning; APCS development and procurement Commissioning
Neste Latvia light oil terminal design and reconstruction
Customer : Neste Latvia Jsc
Terms: 2009 – ongoing
Light oil storage and dispatch to end customer and owngasoline stations network .
Terminal facilities include : oil loading/unloading railway rackfor 12 tank cars, tank farm 30100 m3 , jetty with pipelineinfrastructure
Project description:
Neste Latvia terminal modernization
Completed works:
Complete substitution of automation system (APCS); Elaboration of commercial accounting of all product volume
with subsequent elaboration of joint logistics system withmain Neste Oil company;
Loading system modernization including blending ,installation of flow computers
Expansion of pump station and pipeline to jetty; Modernization of pump station , installation of frequency
transformers.
Customer : Neste Latvia Jsc
Terms: 2009 – ongoing
Light oil storage and dispatch to end customer and owngasoline stations network .
Terminal facilities include : oil loading/unloading railway rackfor 12 tank cars, tank farm 30100 m3 , jetty with pipelineinfrastructure
Project description:
Neste Latvia terminal modernization
Completed works:
Complete substitution of automation system (APCS); Elaboration of commercial accounting of all product volume
with subsequent elaboration of joint logistics system withmain Neste Oil company;
Loading system modernization including blending ,installation of flow computers
Expansion of pump station and pipeline to jetty; Modernization of pump station , installation of frequency
transformers.
Completed works: Consultations, concept design Design, all stages Supervision Programming and commissioning ПНР Management of electric installation works
Design of waste treatment facilities for Batumi oil terminal (Georgia)
Customer: Batumi oil terminal Ltd. (Georgia)
Contractor: „Conti Chemical Company” Ltd.
Terms: 2010
Project description:
Modernization of Batumi oil terminal in accordance with clientrequirements.
Work scope:
Detailed design development for oil vapor odor control unit forKapreshumi tank farm;
Detailed design development for vapor recovery unit for Maintank farm;
Detailed design development for industrial and rain wastewater treatment unit for Kapreshumi tank farm;
Detailed design development for industrial and rain wastewater treatment unit for Kholodnaya Sloboda tank farm;
Detailed design development for industrial and rain wastewater treatment unit for Common tank farm area
Detailed design development for oil vapor transferring from oiltankers and removing of mercaptan/H2S from oil vaporsduring tanker loading operations on berth No.1 and tandemloading/unloading operations.
Customer: Batumi oil terminal Ltd. (Georgia)
Contractor: „Conti Chemical Company” Ltd.
Terms: 2010
Project description:
Modernization of Batumi oil terminal in accordance with clientrequirements.
Work scope:
Detailed design development for oil vapor odor control unit forKapreshumi tank farm;
Detailed design development for vapor recovery unit for Maintank farm;
Detailed design development for industrial and rain wastewater treatment unit for Kapreshumi tank farm;
Detailed design development for industrial and rain wastewater treatment unit for Kholodnaya Sloboda tank farm;
Detailed design development for industrial and rain wastewater treatment unit for Common tank farm area
Detailed design development for oil vapor transferring from oiltankers and removing of mercaptan/H2S from oil vaporsduring tanker loading operations on berth No.1 and tandemloading/unloading operations.
Riga Fertilizer Terminal
Customer: RIGA FERTILIZER TERMINAL, LLCTerms : Q3 2010 – Q1 2013Project description :Terminal is designed for reception of mineral fertilizerstransported by railway transport, cargo storage and loadingto marine vessels. Terminal annual cargo turnover is 2 mio.tonnes.Terminal’s process line includes: Double-track wagon unloading station (WUS), allowing
simultaneous unloading of two rail cars on each track tostorage bunker under the tracks;
Mineral fertilizers storage domes - 2 domes x 15 000tones and 6 domes x 25 000 tones;
Underground and above-ground belt conveyors andjunction units for: cargo transportation from WUS to domes or
directly to vessel loading; cargo transportation from domes to vessel; cargo transportation between domes.
Vessel loading system (stationary ship loader on jetty (2loading lines), mobile shiploader);
Aspiration systems.
Works completed by Olimps: Design, Engineering , General design. Supervision
Customer: RIGA FERTILIZER TERMINAL, LLCTerms : Q3 2010 – Q1 2013Project description :Terminal is designed for reception of mineral fertilizerstransported by railway transport, cargo storage and loadingto marine vessels. Terminal annual cargo turnover is 2 mio.tonnes.Terminal’s process line includes: Double-track wagon unloading station (WUS), allowing
simultaneous unloading of two rail cars on each track tostorage bunker under the tracks;
Mineral fertilizers storage domes - 2 domes x 15 000tones and 6 domes x 25 000 tones;
Underground and above-ground belt conveyors andjunction units for: cargo transportation from WUS to domes or
directly to vessel loading; cargo transportation from domes to vessel; cargo transportation between domes.
Vessel loading system (stationary ship loader on jetty (2loading lines), mobile shiploader);
Aspiration systems.
Works completed by Olimps: Design, Engineering , General design. Supervision
LNG terminal in Klaipeda (Lithuania)
Customer: AB Klaipedas Nafta (Lithuania)
Contractor: ОА «BMGS»
Terms: 2013 – December 2014
ЕРС contract
Project description :Construction of LNG terminal allowing handling up to1 bln. m3 LNG with potential of expansion for up to 3 bln. m3 , includingdesign, engineering, procurement and construction of jetty with relatedinfrastructure for mooring of Floating storage and regasification unit(FSRU, 170 000 m3 capacity), intended for LNG regasification andsubsequent influx into Lithuanian gas grid network.
Jetty infrastructure; Constructions on high pressure gas platform and on service
platform; Fire-fighting system (acc.to NFPA); Power supply system; APCS; Auxiliary low-current systems; Berthing and mooring systems; Utilities, lifting equipment, gangways.
Works completed by Olimps: Engineering; Concept and detailed design projects; Procurement of equipment and materials; Construction and installation works management; EPC solution for APCS development; Commisioning and putting into operation
www.olimps.lv
Customer: AB Klaipedas Nafta (Lithuania)
Contractor: ОА «BMGS»
Terms: 2013 – December 2014
ЕРС contract
Project description :Construction of LNG terminal allowing handling up to1 bln. m3 LNG with potential of expansion for up to 3 bln. m3 , includingdesign, engineering, procurement and construction of jetty with relatedinfrastructure for mooring of Floating storage and regasification unit(FSRU, 170 000 m3 capacity), intended for LNG regasification andsubsequent influx into Lithuanian gas grid network.
Jetty infrastructure; Constructions on high pressure gas platform and on service
platform; Fire-fighting system (acc.to NFPA); Power supply system; APCS; Auxiliary low-current systems; Berthing and mooring systems; Utilities, lifting equipment, gangways.
Works completed by Olimps: Engineering; Concept and detailed design projects; Procurement of equipment and materials; Construction and installation works management; EPC solution for APCS development; Commisioning and putting into operation
Gas industry objects: Incukalns UGSCustomer: Latvijas Gaze Jsc.
Terms: 1997 – ongoing
Object description: Incukalns UGS is a subsidiary of latvijas Gaze Jscfocusing on gas purchase, transportation and distribution .
Incukalns UGS volume: total 4,46 bln. nm3; active gas 2,32 bln. nm3.
UGS modernization , including design, substitution of equipmentunits, construction and installation works , commissioning for thefollowing facilities : Compression stations No.1 , No.2, Gas gathering stations SP1, SP2 , SP3, Methanol storage units SP1, SP2 , SP3, Gas metering units KS1, KS2, Gas dehydration unit KS1, UGS process control systems, UGS power supply ,
Works completed by Olimps: Consultations, concept design; Elaboration of engineering design in cooperation with
Giprospecgaz Jsc; Equipment procurement ; Supervision; Control and implementation of construction and installation works; Development and procurement of process automation systems Comprehensive commissioning and testing
Customer: Latvijas Gaze Jsc.
Terms: 1997 – ongoing
Object description: Incukalns UGS is a subsidiary of latvijas Gaze Jscfocusing on gas purchase, transportation and distribution .
Incukalns UGS volume: total 4,46 bln. nm3; active gas 2,32 bln. nm3.
UGS modernization , including design, substitution of equipmentunits, construction and installation works , commissioning for thefollowing facilities : Compression stations No.1 , No.2, Gas gathering stations SP1, SP2 , SP3, Methanol storage units SP1, SP2 , SP3, Gas metering units KS1, KS2, Gas dehydration unit KS1, UGS process control systems, UGS power supply ,
Works completed by Olimps: Consultations, concept design; Elaboration of engineering design in cooperation with
Giprospecgaz Jsc; Equipment procurement ; Supervision; Control and implementation of construction and installation works; Development and procurement of process automation systems Comprehensive commissioning and testing
Customer : Latvijas Gaze JSC
Terms; 2006-2008
Project description :
Substitution of dismantled GGS with new one with daily capacity15 mio mn3. Operating pressure during injection stage - input 105bar, output 105 bar, during gathering stage - input 105 bar, output55 bar).
The station consists of: 17 slugcatchers for 1st phase of gas treatment, 16 operation and 1 testing line for adjustment and metering of
gas flow, 4 filter separators for 2nd phase of gas treatment, Methanol storage, distribution and injection unit with 34
injection points, New GGS building with security and other auxiliary systems; Internal and external utilities.
Scope of work:
Design development; Equipment procurement; Installation of process equipment and pipelines; Power supply system procurement and installation; Control system procurement, development and installation; Utilities systems procurement and installation; Facility adjustment, start-up and commissioning.
Gas gathering station SP1 , Incukalns UGS
Customer : Latvijas Gaze JSC
Terms; 2006-2008
Project description :
Substitution of dismantled GGS with new one with daily capacity15 mio mn3. Operating pressure during injection stage - input 105bar, output 105 bar, during gathering stage - input 105 bar, output55 bar).
The station consists of: 17 slugcatchers for 1st phase of gas treatment, 16 operation and 1 testing line for adjustment and metering of
gas flow, 4 filter separators for 2nd phase of gas treatment, Methanol storage, distribution and injection unit with 34
injection points, New GGS building with security and other auxiliary systems; Internal and external utilities.
Scope of work:
Design development; Equipment procurement; Installation of process equipment and pipelines; Power supply system procurement and installation; Control system procurement, development and installation; Utilities systems procurement and installation; Facility adjustment, start-up and commissioning.
Gas dehydration unit KS1, Incukalns UGS
Customer: Latvijas Gaze Jsc
Terms : 2008-2012
(design : Q2. 2008 – Q2. 2009,
construction: Q2. 2010 – Q1. 2012)
Project description:
Gas dehydration unit is an integral part of compressor stationNr.1 platform and is designed for natural gas treatment before itssupply to gas grid when natural gas is extracted fromunderground storage. Unit designed daily capacity is 14 mio mn3.The unit consists of: Column unit (2 columns with daily capacity = 7 mio mn3
each); Diethyleneglycol (DEG) recovery unit, Water separation unit and collection tank; Fresh DEG and DEG drain storage tanks; Control and monitoring unit; Internal and external utilities.
Scope of work:
Design development; Equipment procurement; Installation of process equipment and pipelines; Power supply system procurement and installation; Control system procurement, development and installation; Utilities systems procurement and installation; Facility adjustment, start-up and commissioning
Customer: Latvijas Gaze Jsc
Terms : 2008-2012
(design : Q2. 2008 – Q2. 2009,
construction: Q2. 2010 – Q1. 2012)
Project description:
Gas dehydration unit is an integral part of compressor stationNr.1 platform and is designed for natural gas treatment before itssupply to gas grid when natural gas is extracted fromunderground storage. Unit designed daily capacity is 14 mio mn3.The unit consists of: Column unit (2 columns with daily capacity = 7 mio mn3
each); Diethyleneglycol (DEG) recovery unit, Water separation unit and collection tank; Fresh DEG and DEG drain storage tanks; Control and monitoring unit; Internal and external utilities.
Scope of work:
Design development; Equipment procurement; Installation of process equipment and pipelines; Power supply system procurement and installation; Control system procurement, development and installation; Utilities systems procurement and installation; Facility adjustment, start-up and commissioning
Gas distribution station Riga-1
Customer : Latvijas Gaze Jsc
Terms : 2006 – 2007
Project description :
GDS Riga-1 is pre-fabricated skid mounted gas distributionstation with 2 outlets (6 bar and 12 bar), with total capacity 175000 m3/h. All equipment units are placed in container typebuilding 12,2х16,1х2,9m. The container includes 5 separatedand isolated rooms:- Process room;- Odorization unit;- Boiler room;- Power supply equipment room;- Diesel generator.Condensate collection takes place in 10 m3 underground tank.GDS operator’s building and odorizer storage (60 tanks, 200leach) is located separately from the process equipmentcontainer. For operator’s needs on site arranged artesian welland sanitary sewer system. The design provides for standalonediesel generator 60 kW. Station’s security is provided byperimeter alarm and CCTV systems as well as area lighting.
Scope of work:
- Design development (concept + detailed);- Field supervision.
www.olimps.lv
Customer : Latvijas Gaze Jsc
Terms : 2006 – 2007
Project description :
GDS Riga-1 is pre-fabricated skid mounted gas distributionstation with 2 outlets (6 bar and 12 bar), with total capacity 175000 m3/h. All equipment units are placed in container typebuilding 12,2х16,1х2,9m. The container includes 5 separatedand isolated rooms:- Process room;- Odorization unit;- Boiler room;- Power supply equipment room;- Diesel generator.Condensate collection takes place in 10 m3 underground tank.GDS operator’s building and odorizer storage (60 tanks, 200leach) is located separately from the process equipmentcontainer. For operator’s needs on site arranged artesian welland sanitary sewer system. The design provides for standalonediesel generator 60 kW. Station’s security is provided byperimeter alarm and CCTV systems as well as area lighting.
Scope of work:
- Design development (concept + detailed);- Field supervision.
Customer: Latvijas Gaze Jsc
Terms : Q1. 2006 – Q2 2007
Project description:
GDS Riga-3 is pre-fabricated skid gas distributionstation with 1 outlet (16 bar), with total capacity 300000 m3/h, located on territory of GDR Riga-1. Allequipment units are placed in metal container12,2х18,1х3,7 m. The container includes 5separated and isolated rooms: Process room; Odorization unit; Boiler room; Power supply equipment room; Diesel generator.Condensate collection takes place in 10 m3
underground tank. Station’s security is provided byperimeter alarm and CCTV systems as well as arealighting.
Scope of work:
Design development (basic + detailed); Field supervision.
Gas distribution station Riga-3
Customer: Latvijas Gaze Jsc
Terms : Q1. 2006 – Q2 2007
Project description:
GDS Riga-3 is pre-fabricated skid gas distributionstation with 1 outlet (16 bar), with total capacity 300000 m3/h, located on territory of GDR Riga-1. Allequipment units are placed in metal container12,2х18,1х3,7 m. The container includes 5separated and isolated rooms: Process room; Odorization unit; Boiler room; Power supply equipment room; Diesel generator.Condensate collection takes place in 10 m3
underground tank. Station’s security is provided byperimeter alarm and CCTV systems as well as arealighting.
Scope of work:
Design development (basic + detailed); Field supervision.
Customer: Latvijas Gaze JSC
Terms: Q4 2007 – Q3. 2008
Project description:
GDS Ziemeli is pre-fabricated skid gas distributionstation with 1 outlet (16 bar), with total capacity 150000 m3/h. All equipment units are placed in metalcontainer 12,2х16,1х3,7 m. The container includes 5separated and isolated rooms: Process room; Odorization unit; Boiler room; Power supply equipment room; Diesel generator.Condensate collection takes place in 10 m3
underground tank. GDS duty operator’s building islocated separately from process equipment container.For operator’s needs on site arranged artesian welland sanitary sewer system. The design provides forstandalone diesel generator 60 kW. Station’s securityis provided by perimeter alarm and CCTV systems aswell as area lighting.
Scope of work:
Design development (basic and detailed); Field supervision.
Gas distribution station Ziemeli
Customer: Latvijas Gaze JSC
Terms: Q4 2007 – Q3. 2008
Project description:
GDS Ziemeli is pre-fabricated skid gas distributionstation with 1 outlet (16 bar), with total capacity 150000 m3/h. All equipment units are placed in metalcontainer 12,2х16,1х3,7 m. The container includes 5separated and isolated rooms: Process room; Odorization unit; Boiler room; Power supply equipment room; Diesel generator.Condensate collection takes place in 10 m3
underground tank. GDS duty operator’s building islocated separately from process equipment container.For operator’s needs on site arranged artesian welland sanitary sewer system. The design provides forstandalone diesel generator 60 kW. Station’s securityis provided by perimeter alarm and CCTV systems aswell as area lighting.
Scope of work:
Design development (basic and detailed); Field supervision.
Substitution of Riga-Panevezys pipeline underwater pass throughDaugava river basin
Customer: Latvijas Gaze JSC
Terms: Q1 2010 – Q4. 2011
Project description:
The purpose of the project was to exclude from the existingDN700 gas grid Riga-Panevezys the bottlenecked pipeline partDN500 crossing the Daugava river. New underwater pipelineDN700 has been constructed by using horizontal directionaldrilling method (HDD). Total length of the pipe is aprx. 1,7 km,including HDD length 1,5 km, max. pressure – 55 bar.
Scope of work:
Design development (including geo investigation); Earth works for specific site preparing for drilling
operations; HDD drilling; New pipeline procurement and welding on one river side
and pulling into drilled hole; Pipeline construction on river sides and connection to the
existing valves stations; Pipeline testing and putting into operation; Existing pipeline disconnection and dismantling and site
recovery after works.
Customer: Latvijas Gaze JSC
Terms: Q1 2010 – Q4. 2011
Project description:
The purpose of the project was to exclude from the existingDN700 gas grid Riga-Panevezys the bottlenecked pipeline partDN500 crossing the Daugava river. New underwater pipelineDN700 has been constructed by using horizontal directionaldrilling method (HDD). Total length of the pipe is aprx. 1,7 km,including HDD length 1,5 km, max. pressure – 55 bar.
Scope of work:
Design development (including geo investigation); Earth works for specific site preparing for drilling
operations; HDD drilling; New pipeline procurement and welding on one river side
and pulling into drilled hole; Pipeline construction on river sides and connection to the
existing valves stations; Pipeline testing and putting into operation; Existing pipeline disconnection and dismantling and site
recovery after works.
Capital repairs of main pipelines Pskov-Riga andIzborsk – Incukalns UGS in sections passing through Gauja river
Customer : Latvijas Gaze Jsc
Terms: Design stage Q4 2011 – Q3 2012, Construction stage Q4 2013– ongoing.Project description:
The purpose of the project is to replace the existing pipelines laying onthe Gauja river bed by using HDD drilling for new ones. Installation of 2new pipelines DN700 and one pipeline DN700 for telecommunicationsystem, each apprx. 650m long, with max. pressure 55 bar. Both riversides are located in Gauja river national park area covered by Natura2000 program with the highest environmental protection requirementsduring the construction works.
Scope of work:
Design development (including geo investigation); Earth works for specific site preparing for drilling operations; HDD drilling; New pipelines procurement and welding on one river side and
pulling into drilled holes; Pipelines construction on river sides and connection to the existing
valves stations, which should be relocated from flood zones; Pipelines testing and putting into operation; Existing pipelines disconnection and dismantling and site recovery
after works.
Customer : Latvijas Gaze Jsc
Terms: Design stage Q4 2011 – Q3 2012, Construction stage Q4 2013– ongoing.Project description:
The purpose of the project is to replace the existing pipelines laying onthe Gauja river bed by using HDD drilling for new ones. Installation of 2new pipelines DN700 and one pipeline DN700 for telecommunicationsystem, each apprx. 650m long, with max. pressure 55 bar. Both riversides are located in Gauja river national park area covered by Natura2000 program with the highest environmental protection requirementsduring the construction works.
Scope of work:
Design development (including geo investigation); Earth works for specific site preparing for drilling operations; HDD drilling; New pipelines procurement and welding on one river side and
pulling into drilled holes; Pipelines construction on river sides and connection to the existing
valves stations, which should be relocated from flood zones; Pipelines testing and putting into operation; Existing pipelines disconnection and dismantling and site recovery
after works.
Karelsky Okatysh Jsc. Severstal Jsc.
Customer: Karalsky Okatysh Jsc (Russia)
Terms: 2010 - ongoing
Object description: Ore mining and processing enterprise
handling more than 10.3 mio tonnes of iron ore annually. Dark oil discharge railway rack (1х16 tank cars) Recirculating mazut discharge system (2 heating units) POL storage (3VST х 10 000 m3) Tank heating system applying thermaal oil as heating agent
(VST 4х10 000 m3, VST 3х2000m3) Diesel fuel pump of POL storage unit Tail thickening unit (waste left after ore enrichment) and
transportation to tailing dump (unthickened waste transportationcapacity 16000 m3/h).
Works completed By Olimps:
Consultations, concept design;
Design documentation for all design project stages
Supervision
APCS development
Procurement of APCS equipment
APCS setting and commissioning
Customer: Karalsky Okatysh Jsc (Russia)
Terms: 2010 - ongoing
Object description: Ore mining and processing enterprise
handling more than 10.3 mio tonnes of iron ore annually. Dark oil discharge railway rack (1х16 tank cars) Recirculating mazut discharge system (2 heating units) POL storage (3VST х 10 000 m3) Tank heating system applying thermaal oil as heating agent
(VST 4х10 000 m3, VST 3х2000m3) Diesel fuel pump of POL storage unit Tail thickening unit (waste left after ore enrichment) and
transportation to tailing dump (unthickened waste transportationcapacity 16000 m3/h).
Works completed By Olimps:
Consultations, concept design;
Design documentation for all design project stages
Supervision
APCS development
Procurement of APCS equipment
APCS setting and commissioning
Naftan JSC. Polimir production facility, Belarus
Customer : Naftan JscTerms: 2008 – 2009.Project description : reconstruction of vacuum evaporating systemunits intended for vaporization of sodium rhodanate water solution
Scope of project:
installation of PECON vaporization unit in designed annexbuilding
connection of vaporization unit to existing process lines andutilities
elaboration of architectural and construction solutions for theannex building
annex building utilities :- water supply and sewerage;- supply and exhaust ventilation;- electric lighting;- grounding of equipment , utilities and metal structures. Lightning
protection;- fire alarm and communication system;
Customer : Naftan JscTerms: 2008 – 2009.Project description : reconstruction of vacuum evaporating systemunits intended for vaporization of sodium rhodanate water solution
Scope of project:
installation of PECON vaporization unit in designed annexbuilding
connection of vaporization unit to existing process lines andutilities
elaboration of architectural and construction solutions for theannex building
annex building utilities :- water supply and sewerage;- supply and exhaust ventilation;- electric lighting;- grounding of equipment , utilities and metal structures. Lightning
protection;- fire alarm and communication system;
Work scope:
Concept design; Engineering design; Supervision
Power generation and distributionCustomer: “Latvenergo» Ltd. (Latvia) / Sadales tīkls, Ltd.
Terms: ongoing cooperation
Works completed:
110/10 kV power substation Nr.32 «Gajoks» (Daugavpils) –10 kV switchgears unit design development, 110 kVswitchgears design development;
110/6 kV power substation Nr.61 «Liepaja» - 6 kVswitchgears unit design development;
Power substation TP-901 reconstruction designdevelopment;
110 kV power substation «Marupe» relay protection andautomation system site adjustment and start-up;
Kegums hydroelectric power station (HPS) fire alarmsystem design development;
Daugavas HPS (Kegums HPS, Plavinas HPS, Rigas HPS)common control (SCADA system) center developmentconcept;
Customer: “Latvenergo» Ltd. (Latvia) / Sadales tīkls, Ltd.
Terms: ongoing cooperation
Works completed:
110/10 kV power substation Nr.32 «Gajoks» (Daugavpils) –10 kV switchgears unit design development, 110 kVswitchgears design development;
110/6 kV power substation Nr.61 «Liepaja» - 6 kVswitchgears unit design development;
Power substation TP-901 reconstruction designdevelopment;
110 kV power substation «Marupe» relay protection andautomation system site adjustment and start-up;
Kegums hydroelectric power station (HPS) fire alarmsystem design development;
Daugavas HPS (Kegums HPS, Plavinas HPS, Rigas HPS)common control (SCADA system) center developmentconcept;
Client: “Juglas Jauda» Ltd. (Latvia)
Terms: 2007-2008 years
Project description:
Cogeneration plant construction on Brivibas street 401, Riga,electrical output power 12 MW, thermal power aprx.50 MW.
Works completed:
Consultation services for power supply system part; Design development for plant power production facilities
connection to Latvenergo grid; Electrical equipment supply, installation and start-up; Field design supervision for plant power production facilities
connection to Latvenergo grid project realization; Design development for plant emergency lighting.
Customer: Jurmalas udens JSCContractor: JV “O.A.S. būve”Terms: Q2. 2006 – Q1. 2008Project description:Reconstruction of two existing water supply treatment (iron removaltechnology) plants (WTP), including: Reconstruction of WTP Dzintari with capacity 8000 m3/day,
including water tower with tank volume 800m3; Reconstruction of WTP Jaundubulti with capacity 8000 m3/day,
including construction of new boosting pumping station withcapacity 560m3/h and treated water reservoir V=2000 m3.
Reconstruction of 12 existing artesian wells;Reconstruction of existing water supply and sewage system, including: Reconstruction of existing sewage pumping stations 3 pcs., with
capacity 241 m3/h, 200m3/h, 60m3/h; New sewage pumping station construction 1 pc., capacity 130
m3/h; Water supply pipelines reconstruction and construction, diameter
up to 400mm, total length aprx.12 km; Sewage pipelines reconstruction and construction, diameter up to
400mm, total length aprx.5 km.
Scope of work: Project management; Equipment procurement; Construction and installation works; Start-up and commissioning.
Infrastructure objects
Customer: Jurmalas udens JSCContractor: JV “O.A.S. būve”Terms: Q2. 2006 – Q1. 2008Project description:Reconstruction of two existing water supply treatment (iron removaltechnology) plants (WTP), including: Reconstruction of WTP Dzintari with capacity 8000 m3/day,
including water tower with tank volume 800m3; Reconstruction of WTP Jaundubulti with capacity 8000 m3/day,
including construction of new boosting pumping station withcapacity 560m3/h and treated water reservoir V=2000 m3.
Reconstruction of 12 existing artesian wells;Reconstruction of existing water supply and sewage system, including: Reconstruction of existing sewage pumping stations 3 pcs., with
capacity 241 m3/h, 200m3/h, 60m3/h; New sewage pumping station construction 1 pc., capacity 130
m3/h; Water supply pipelines reconstruction and construction, diameter
up to 400mm, total length aprx.12 km; Sewage pipelines reconstruction and construction, diameter up to
400mm, total length aprx.5 km.
Scope of work: Project management; Equipment procurement; Construction and installation works; Start-up and commissioning.
Infrastructure objects
Customer: Latvijas Dzelzcels Jsc
(Latvian Railway)
Terms: 2014 – ongoing
Project description:
Reconstruction of existing passenger platforms and 16 station
buildings in Riga-Jurmala and Riga-Jelgava routes
Work scope:
Concept design;
Engineering design;
Preparation for documentation approval procedure;
Supervision
Customer: Latvijas Dzelzcels Jsc
(Latvian Railway)
Terms: 2014 – ongoing
Project description:
Reconstruction of existing passenger platforms and 16 station
buildings in Riga-Jurmala and Riga-Jelgava routes
Work scope:
Concept design;
Engineering design;
Preparation for documentation approval procedure;
Supervision
Partnership
ID No. Issuing authority, type of document Jurisdiction
СРО-П-012-109-06 Self-regulatory organization «Soyuzpetrostroy-Proekt»Competency certificate
Russia
1883.05-2013-9909175283-C-010
Self-regulatory organization «Baltic Construction Complex»Competency certificate
Russia
Г000.LV.У00009 Certification authority Gazpromcert.Competency certificate
Russia
М 22654 Rosneft JscVerification certificate
Russia
№ 44104050692 EN ISO 14001:2004 TUV NORD CERT .Competency certificate
International
CERTIFICATION
№44116050692 BS OHSAS 18001:2007 TUV NORD CERTCompetency certificate
International
44100050692 EN ISO 9001:2008 TUV NORD CERTCompetency certificate
International
№ 0141 – R LR Registry of Construction enterprises.Registration certificate
Latvia
1331 LR Chamber of Commerce.Registration certificate
Latvia
6809 RB Ministry of Foreigh Affairsregistration certificate of company subsidiary
Belarus
7741 LR Registry of Construction enterprises.Registration certificate
Lithuania
Turaidas 10B, Riga, LV 1039, LatviaPhone: (+371) 67 045 670Fax: (+371) 67 045 671E-mail: [email protected]
www.olimps.lv