TRANSCRIPT
Report to the CSLF Technology Group on the Plant Barry 25MW CCS Integrated Demonstration
Christopher RomansSenior Manager for Government RelationsMitsubishi Heavy Industries America, Inc.
CSLF 2017 Ministerial Abu Dhabi, United Arab Emirates December 4, 2017
© 2017 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 2
KM CDR (Kansai Mitsubishi Carbon Dioxide Removal) ProcessTM
Developed in the early 1990s with Kansai Electric
Similar to other amine-based technologies
Proprietary features including KS-1™ solvent
First plant in 1999
KM CDR Process is a registered trademark of Mitsubishi Heavy Industries, Ltd., in Japan, the United States of America, European Union (CTM), Norway, Australia, and China.
© 2017 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 3
KM CDR ProcessTM Development History
From 1991 –2 TPD Nanko Pilot Plant on Natural
Gas Exhaust(Kansai Electric Power Co.)
From 2002 -1 TPD Hiroshima Pilot Plant
on Coal Exhaust(MHI R&D Center)
From 2006 –10 TPD Matsushima Pilot Plant on Coal
Exhaust(J-Power)
From 2008 -400MWeq Absorber Flow Tests
(MHI Mihara)
Engineering HQ(Yokohama)
© 2017 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 4
Commercial Experience (1) World leading large scale post combustion CO2 capture technology licensor, with 13 commercial plants in operation
from a variety of natural gas, heavy oil (*) and coal flue gas sources.(*) Currently heavy oil is not used as main fuel at any plant below (converted to natural gas).
World’s largest CO2 Capture Plant is in commercial operation in Texas.
2005330 Mt/d Japan
2009450 Mt/d India
2006450 Mt/d India
CO2 Recovery (CDR) Plant –IFFCO Phulpur Unit (India)
2006450 Mt/d India
CO2 Recovery (CDR) Plant –IFFCO AonlaUnit (India)
2010400 Mt/d UAE
2009450 Mt/d Bahrain
2010240 Mt/d Vietnam
2011340 Mt/d Pakistan
2012450 Mt/d India
2014500 Mt/d Qatar
1999210 Mt/d Malaysia
20164,776 Mt/d U.S.A.
2017283 Mt/d Japan
20211,200 Mt/d Russia
© 2017 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 5
2009 India (Kakinada)450 Mt/d5
2011 Pakistan340 Mt/d9
2012 India (Vijaipur)450 Mt/d
11
2016 U.S.A (WA Parish)4,776 Mt/d
MHI is a World leading LARGE-SCALE post combustion CO2 capture technology licensor, with 13 commercial PCC plants in operation
7
2014 Qatar500 Mt/d
2009 Bahrain450 Mt/d
2010 UAE400 Mt/d
3
4 2006 India (Phulpur)450 Mt/d
8
10
2 2005 Japan330 Mt/d
2010 Vietnam240 Mt/d
1 1999 Malaysia210 Mt/d
Plant under construction
Plant under operation
Commercial Experience (2)
12
136
14 2021 Russia1,200 Mt/d
2006 India (Aonla)450 Mt/d
2017 Japan283 Mt/d
© 2017 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 6
Plant Barry – Joint CCS demo by Southern Company and MHIPlant Barry CO2 Demo Plant – helped prove commercial viability of carbon capture on coal fired flue gas
Plant location Mobile County (Alabama, U.S.A.)
Plant owner Alabama Power
Plant scale 25 megawatts (MWeq)Flue gas amount
116,800 Nm3/h
CO2 conc. 10.1 mol%-wetCO2 capture capacity
500 metric ton/day (150,000 ton/year)
CO2 removal 90%
Operating data as of 8/31/14:Operating time 12,400 hrsCaptured CO2 230,100 metric tonInjected CO2 115,500 metric ton
Absorber
Regenerator
CO2 compression & Dehydration unit
Flue gas inlet
Flue Gas Quencher
300 feet
150 feet
7
8
CCS Joint Demonstration at Alabama Power’s Plant Barry Integrated CO2 capture, transportation and storage at a fossil-fueled power plant
• CO2 capture equivalent to 25-megawatts
• 12-mile pipeline linking captured CO2 with injection site in Citronelle Dome
• 211,000 metric tons CO2 captured with115,000 metric tons injected into ~9,400-foot deep saline formation
• Site characterization, UIC permitting, injection and monitoring of CO2 for geologic storage, and closure
9
Directional drilled 18 sections of the pipeline under roads,
utilities, railroad tracks, tortoise colonies, and
wetlands (some up to 3,000 ft long and 60 ft deep).
DOT 29 CFR 195 4-inch carbon steel, liquid
pipeline; buried 5 feet with
surface vegetation
maintenance.
© 2017 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 10
Petra Nova Project – based on Plant Barry demonstration experience
“NRG Energy, JX Nippon complete world’s largest post-combustion carbon capture facility on-budget and on-schedule1”
1NRG press release: http://investors.nrg.com/phoenix.zhtml?c=121544&p=irol-newsArticle&ID=2236424
August 2017 – Power Magazine “Plant of the Year”
In Commemoration of Plant Barry CCS Project Accomplishments - June 30, 2017