Research Update

Briefing for 18 November HSRMC

David Howson, 17th November 2014

Page 2: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

2

Contents:

Helicopter Health Monitoring

Helicopter Ditching & Water Impact

Operations to Moving Helidecks

Helideck Lighting

Helicopter Flight Data Monitoring

GPS – Guided Offshore Approaches

Helideck Friction

Helideck Environmental Research

HUMS for Rotors

HTAWS

Lightning Strikes

Page 3: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

3

Helicopter Health Monitoring Research

Page 4: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

4

Helicopter Health Monitoring Research

All HSRMC research completed and reported.

Implementation of advanced anomaly detection (AAD) needs to

be ‘encouraged’.

Update on EASA funded work to follow.

Page 5: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

5

Helicopter Ditching & Water Impact Research

Page 6: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

6

Helicopter Ditching & Water Impact

Research – Side-Floating EFS

5th EASA RMT.0120 meeting took place at Helitech in Amsterdam

during October 2014:

− Progress slow.

− NPA delayed to July 2015.

− Two additional meetings scheduled.

− Tutorial on proposed new wave tank testing standard to be

held in January 2015.

− Meeting with OEMs to discuss side-floating EFS scheme to be

held prior to next meeting.

No progress in Canada.

Page 7: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

7

Helicopter Ditching & Water Impact

Research – EBS

Two systems (Survitec and Hansen Protection) approved.

Testing for a third (Viking) about to start.

Review of EBS training be performed as part of OPITO general

review of BOSIET and FOET – CAA is participating.

Page 8: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

8

Operations to Moving Helidecks

Page 9: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

9

Operations to Moving Helidecks

Contract for production standard HMS let to Fugro GEOS Ltd.

HMS will be to CAA/Atkins interim standard:

− Improved, standardised displays;

− Deck-mounted traffic lights;

− Relative wind monitoring;

− Significant heave rate (SHR) with anti-flicker;

− Generic advisory only MSI/WSI limit.

Trials on Captain FPSO (Chevron/Bristow) due to commence

January 2015.

CAA/Atkins/Fugro launch meeting on 26 Nov.

Page 10: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

10

Helideck Lighting

Page 11: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

11

Helideck Lighting – Circle and H

Update to CAP 437 appendix C finalised:

− Tolerances on location of circle & ‘H’ on helideck introduced;

− Tolerances on circle & ‘H’ introduced.

Some problems with Orga system on Centrica CPC-1 due to

installation method chosen.

2nd Orga trials system installed on BP Miller platform in

September 2014.

Implementation:

− Most orders are to ship yards for new decks;

− North Sea slow to start retrofit;

− Some platform operators understood to be considering not

fitting the system and ceasing night flights – issue of

emergency de-manning.

Page 12: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

12

Helideck Lighting - Other

Specification for heli hoist light being finalised.

Issues with resetting of wave-off lights on NUIs being discussed

with industry.

Page 13: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

13

Helicopter Flight Data Monitoring

HOMP

MANAGER

(PILOT):

Assessment

Flight data

HOMP

OPERATOR:

Data Replay,

Analysis and

Verification

FLIGHT SAFETY

OFFICER:

Review Meeting

Crew Feedback

Changes to

Procedures,

Manuals,

Training

etc.

Reporting of

Trend information

to Management

and Staff

Changes to

HOMP,

Investigations

Page 14: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

14

Helicopter Flight Data Monitoring

No progress on July helicopter FDM User Group since last

meeting in June 2014.

Agreed exercise to review event sets for EC225 to attempt to

consolidate understanding.

Insufficient resource within helicopter operators?

Need joint industry effort to raise standards?

Page 15: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

15

GPS- Guided Offshore Approaches

Page 16: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

16

GPS- Guided Offshore Approaches

New helideck lighting now on Miller platform and EC225

operating restriction lifted so Bond AS332L2 trials aircraft

availability should be ok. Night trial could now be progressed.

Introduction into service trials:

− Could progress in parallel with night trial;

− Could use existing OEM system – close enough to SOAP but

will need AIS to be added (EFIS software modification);

− Initial discussions held with JOR;

− Need to progress with JOR/HeliOffshore.

Page 17: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

17

Helideck Friction

Page 18: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

18

Helideck Friction

All research at NLR in The Netherlands completed and reported.

Proposed new scheme discussed and agreed in principle with

HCA Helideck Steering Committee (HSC).

CAA to produce scheme detail for discussion and agreement with

HCA HSC prior to wider industry consultation.

New scheme to be implemented in CAP 437, backed up by detail

published in separate report.

Page 19: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

19

Helideck Environmental Research

Page 20: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

20

Helideck Environmental Research

Turbine exhausts on Ninians have/are being re-routed following

issue of Sikorsky Safety Advisory.

Use of FDM to map and monitor helideck environments will be

promoted at the HFDM User Group.

Presentation from Norway on turbine plumes to follow.

Note five Safety Recommendations issued by NTSB regarding

release of ‘raw gas’.

Page 21: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

21

HUMS for Rotors

Page 22: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

22

HUMS for Rotors

Update from Alan Wilson, AgustaWestland.

Page 23: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

23

Helicopter TAWS

Page 24: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

24

Helicopter TAWS

Contract with Flightdatapeople.com extended to investigate

further envelopes to address G-WNSB accident scenario.

Last meeting held on 01 October 2014:

− Improved Mode 1 to 6 envelopes increased warning time from

5.7 sec to approx 8 sec, but too late to help;

− New collective pitch vs airspeed envelope showing good

promise giving approx 12.5 sec;

− Alternative energy-based warning envelope also being

investigated.

Work on warning forms/formats:

− Specification agreed;

− Some funding secured but will likely need more; plan to

approach HeliOffshore.

Page 25: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

25

© Crown copyright Met Office

Lightning Strikes

Page 26: Research Update - Civil Aviation Authority · 2016. 8. 5. · 11 Helideck Lighting – Circle and H Update to CAP 437 appendix C finalised: −Tolerances on location of circle & ‘H’

26

Lightning Strikes

Winter 2013/14 trial inconclusive due to very low incidence of

lightning risk.

Issue of display volatility reported believed to be due to volatility

of risk – has been addressed by adding advisory to F215.

Further trial during winter 2014/15 underway.

Precipitation radar coverage to be extended under EUMETNET

OPERA project – should improve accuracy of forecasts for

Norway and Scatsta.