results of assembly shop renovation

6
1 Complex renovation of assembly shop Setting up of a new assembling lines As was As now

Upload: petr-shashin

Post on 04-Aug-2015

17 views

Category:

Engineering


0 download

TRANSCRIPT

1

Complex renovation of assembly shopSetting up of a new assembling lines

As was As now

2

As was

Complex renovation of assembly shopCreating of supermarket

As now

3

Complex renovation of assembly shopLED luminaries assembling shop

As was As now

4

Complex renovation of assembly shopLED luminaries assembling shop

Result

Improved capacity + 24 %

Optimized production area + 18 %

Increased productivity Up to 48 %

Storage area optimized Up to 5,5 times

«Supermarket» is created -

5

Complex renovation of assembly shopAutomatic gasketing machine

As was As now

6

Complex renovation of assembly shopAutomatic gasketing machine

As was As now + / -,%

Productivity per shift 390 820 +210 %

Number of gaskets types 21 1 100 %