resume sofie zahra_2016
TRANSCRIPT
SofieZahra,ST,PMPKompPPRITBB.21DagoAtasBandung-WestJava-Indonesia|+6281809250526|[email protected]
Executive Summary
Self-motivatedandgoal-orientedConstructionEngineerandcertifiedProjectManagementProfessional(PMP)with8+
years experience dedicated to construction engineering, execution, and supervision of various type of EPC Projects
(Petrochemical,Boiler,andOil&GasFacilities)inaccordancewiththecontractdocuments,plans,technicalspecifications
andstandardsofquality,safety,andperformance.
Education and Professional Certification
PROJECT MANAGEMENT PROFESSIONAL (PMP) | 2016-2019 | PMI (PROJECT MANAGEMENT INSTITUT)
BACHELOR DEGREE OF CIVIL ENGINEERING | 2003-2007 | INSTITUT TEKNOLOGI BANDUNG
SMUN 3 BANDUNG | 2000-2003 | SENIOR HIGH SCHOOL
Award
WINNER OF POTY (PROJECT OF THE YEAR) 2016 | BY PMI INDONESIA CHAPTER | JAN 2016
PAPER FOR PROJECT MANAGEMENT STRATEGY OF “EPCC GEOTHERMAL KAMOJANG 1X35MW (KMJ-5) PROJECT
Skills & Abilities
MANAGEMENT
• Project Management, Construction Management, HSE Management, HAZID (Hazard Identification) Study, Risk
Management,ProcurementandSubcontracting,ChangeOrderManagement,ContractManagement
• Planning,Executing,andMonitoring&Controlling
SOFTWARES
• AutoCAD, MS Office, MS Project
COMMUNICATION
• Presentation and negotiation skills
• English (IELTS 6,5 – 2015)
Experience
CONSTRUCTION ENGINEER (CIVIL) | PT REKAYASA INDUSTRI | JUNE 2012 - PRESENT
• INITIATING: Prepare proposal documents to meet clients requirements stipulated in ITB including Manpower
Planning, Equipment Plan, Budget, Construction execution strategy
• PLANNING: Develop Construction Execution Plan, Method of statement, Procedures and Specifications prior to start
Construction activity, HAZARD Identification study, Construction Sequence, Prepare Subcontractor Plan package
and the requisition
• EXECUTING : Select best Subcontractors (tender process), supervise site works to ensure the works meet the
requirement specifications, scopes, quality requirement, and as per schedule
Page 2
• MONITORING & CONTROLLING: Monitoring and Reporting (daily, weekly) Subcontractors performance
(achievement) then analyzing productivity of work based on the report. Develop recovery plan (forecast) if
necessary.
• CONTRACT MANAGEMENT: Together with Contract depart and Construction Manager, resolve dispute of scope of
work, variations, extension of time (EOT), contract issue by administer all issues arising in written document such
as letter, MOM, memo, etc.
·
SUBCONTRACTING ENGINEER | PT TRIPATRA ENGINEERING AND CONSTRUCTION | NOV 2011 – JUNE 2012
• Develop and analyze subcontract documentation (interpretation of contract scope and terms and conditions).
• Provide advice and seek counsel on contractual, commercial, taxation, insurance and legal issues.
• Provide Subcontract Agreement between Subcontractor and Contractor for any kind of activities related to the
project based on RFP (request for proposal).
• Coordinate subcontracts development, compilation, sourcing, pre-tenders, and invitation to tender, evaluations of
proposals received including requests for qualifications.
• Post award coordination of Subcontract Variations, including evaluation of Subcontractor s claims and defending
claims from Subcontractors.
GEOTECHNICAL ENGINEER | PR KPC | JAN 2008 – NOV 2011
• Giving review and assessment for pit design, spoil dump design, top soil design, embankment, and other design
related to stability and geotechnical concern.
• Field inspection; supervising field work which is performed by operation to be carried out in safety manner under
safety condition.
• Reviewing monitoring method and monitoring installation in area where is indicated as unstable area including
VWP, standpipe, drain hole, prism, extensometer, radar.
• Giving review and recommendation of soil/ rock failure condition
• Reporting of geotechnical investigation and infrastructure project (including soil stratigraphy condition and
recommendation for its foundations)
Project Highlight
SUMPAL COMPRESSION PROJECT | SUMPAL, SOUTH SUMATERA - INDONESIA | JAN 2015 - PRESENT
· Client : ConocoPhillips (Grissik) Ltd.
· Project Value :
· Project Duration : 21 months
· Project Description : Sumpal Compression Project is intended to install new gas compression facility to maintain gas
production capacity of 310 MMscfd and maximize the raw gas recovery. It consists of installation of compression station
with three (3) Gas Turbine Driven compression trains, also installation of power generation, 2 Units GTG (@950kW)
and 1 Unit EDG (500kW)
STG & BOILER BATU BARA PROJECT | PALEMBANG, SOUTH SUMATERA - INDONESIA | SEPT 2014 – JAN 2015
· Client : PT Pupuk Sriwidjaja Palembang
· Project Value : 127,829,316.70 USD
· Project Duration : 31 months (Effective Date 30th Aug 2013)
· Project Description : 1 Unit STG with capacity 23 MW Nett & 2 Units Boiler Cap @240T/H
SAMUR PROJECT | SIPITANG, SABAH -MALAYSIA | AUG 2012 – SEPT 2014
· Client : Petronas Chemicals Fertiliser Sabah, Malaysia
· Project Value : 41,071,702 USD (Lump Sum Fixed Price) and 107,379,217 USD (Target Cost)
· Project Duration : 47 Months
Page 3
· Project Description : The PLANT will consist of 2100 MTPD ammonia production unit, 3500 MTPD urea production
unit, 3850MTPD urea granulation unit, associated utilities and offsites including bulk urea storage and jetty facility to
load bulk urea to the ship
DC-1 CGPX PROJECT | GRISSIK, SOUTH SUMATERA - INDONESIA | AUG 2012 – SEPT 2014
· Client : ConocoPhillips (Grissik) Ltd.
· Project Value : USD 138.000.000
· Project Duration : 24 months
· Project Description : Dayung Compression & Central Gas Plant Debottleneck Project is an expansion of the existing CGP
facility to increase processing capacity of the high CO2 system from 310 MMSCFD to 460 MMSCFD.
Organization Experience
PMI VOLUNTEER | PMP PREPARATION MENTOR | 2016 - PRESENT
MENYAPA INDONESIA VOLUNTEER | LPDP | 2016 - PRESENT
Interest
• READING NEWS, PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONTRACT MANAGEMENT
• TRAVELING & PHOTOGRAPHY
• YOGA, ZUMBA, DANCE