resume_p prakosa 201605

27
PANTJORO PRAKOSA Resume 2016

Upload: pantjoro-prakosa

Post on 17-Feb-2017

107 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Resume_P Prakosa 201605

PANTJORO PRAKOSA

Resume 2016

Page 2: Resume_P Prakosa 201605

Executive Summary

Over twenty (20) years experiences in Oil and Gas Industry as Project Manager in Project Management and Engineering Services for engineering (FEED, Basic Design Eng., & Detail Design Eng), procurement and construction (fabrication) with various projects environments which cover greenfield onshore and brownfield offshore projects such as Development Oseil Phase I field facilities – Bula; Indonesia for Kuwait Foreign Petroleum Exploration Company-KUFPEC; Wellhead Platform and interface facilities for TOTAL Indonesie; WHP A/B & C for Cendor Phase 2 Development; Malaysia for Petrofac (PML)/Kencana HL; and Floating Production Storage and Offloading (FPSO) Topside Facilities for GPC GALOC Field

Page 3: Resume_P Prakosa 201605

Responsibilities

Project Manager with role to provide project management through the use of applicable and relevant procedures to maintain client relationships and be accountable for the safe and effective delivery of the contract and services to the agreed scope and specification toward successfully project delivery by consideration on cost, time, resource and quality

Page 4: Resume_P Prakosa 201605

Area Expertise

Management Managing, lead and coordinating of project from the conceptual stages through commercial and technical aspect including planning, engineering, procurement, construction, hook-up, start-up, performance testing, initial operations and close-out the project Accountable in Business and Proposal Development to secure a potential project with strong analytical basis Project monitoring commercial outcomes which is consisting of controlling on project cash flow, and revenue

EngineeringConversant in engineering design stage such as FEED (Front End Engineering Design), Detailed Design for Green field and Brown fields

Page 5: Resume_P Prakosa 201605

Area Expertise

EngineeringAccountable in design safety aspect such as Major Accident Hazard (MAH), Safety Critical Element (SCE), Performance Standard (PS), Verification Scheme and Production Critical Element (PCE) Familiar with International Code requirements, e.g. ASME, ANSI, API and NACE Standard

FabricationExpert in fabrication management and processes especially pressure vessel, heat exchanger, steam and hot water boiler, skid package including piping system/package

Page 6: Resume_P Prakosa 201605

Area ExpertiseLecturer

Institute Technology of Indonesia in year of 2006 for undergraduate student. The programme is aimed to encourage the student that become specialise in mechanical & piping design implementation. The module consisting of theoretical and engineering practice for pressure vessel common design and line sizing that complying with Code requirement, such ASME Section I & VIII, Division I and ASME B31.1 & B31.3.

PT. Truba Jurong Engineering in year of 2005 for junior engineer to deliver knowledge in particular of engineering processes. The programme consisting of conceptual, front end engineering design, basic, and detail design that complying with Code and International Standard requirement such ASME Section I & VIII Division I, ASME B16.5, B31.1 & B31.3 and International standard, i.e. API Std, ANSI Std, NACE Std

Page 7: Resume_P Prakosa 201605

AchievementsManagement

Develop and monitoring the Project Risk Management to ensure and identify the potential of delay or bottlenecking Successful in securing and enhance the project’s cash-flow from negative to positive performance to ensure the project’s financial return to the positive and improve profits Managing project team to encourage project quality delivery to meet Client expectation and complying with international code requirements Successful in the updating of the project execution and quality plan as a benchmark to distinguish between common and specific projects to meet project requirements Provide training in project management system for local employees to understanding in project execution Restudy the existing scope of work to identify the scope that out of the responsibility and liability and then following up by variation order for the additional work has been completed

Page 8: Resume_P Prakosa 201605

AchievementsEngineering

Proactive along with engineering team to identify the most of potential areas of variation that may arise during the course of engineering for the project. Thus will be intensively communicated with respective Client / Costumer; and following to resolve with justification due to the changes of work scope Provide feedback to engineering discipline supervisors as and when required on the progress to ensure that engineering deliverables generated by the project engineering team meet the project requirements in terms of technical content and follow project specific procedures such as the engineering plan, quality plan, document numbering and levels of approval

FabricationAccomplishment of ASME “U & S” Stamp Certifications and “R” Certificate of Authorization from National Board of Inspection Code – NBIC in year of 2004

Page 9: Resume_P Prakosa 201605

QualificationsAcademic

2013 MBA in Strategic Management, International Business School of University Technology Malaysia

1991 Degree of Mechanical Engineering, Institute Technology Indonesia

ProfessionalRegistered Engineer #0905-09-020304 the Institution of Engineers Indonesian

Page 10: Resume_P Prakosa 201605

TrainingManagement

Lloyd Register Commercial Awareness Programme (CAP) Lite, January 2015, Kuala Lumpur – MALAYSIA Lloyds Register Project Management Framework course in October 2013, Kuala Lumpur – MALAYSIA AMEC Leadership Development Program course in December 2008, SINGAPOREAMEC Leadership Development Program course in November 2008, Kuala Lumpur – MALAYSIAAMEC Principles of Project Management course in August 2007, Shanghai – CHINA Leadership Battlefield course in 2007, Jakarta – INDONESIAThe Institute for Management Education and Development course in 1993, Jakarta – INDONESIA

Page 11: Resume_P Prakosa 201605

TrainingEngineering

Lloyd Register Development of Written Scheme Verification, February 2013, Perth – AUSTRALIA

SafetyLloyds Register Keep Your People Safe workshop in May 2014, Kuala Lumpur – MALAYSIA AMEC First Step Safety Leadership course in July 2008, Kuala Lumpur – MALAYSIA

Page 12: Resume_P Prakosa 201605

Upstream portfolio - offshore

Engineering (FEED, Basic Eng & Detail Eng), Procurement, Construction and Installation

Engineering (FEED, Basic Eng & Detail Eng), Procurement, Construction, Installation and Commissioning

Page 13: Resume_P Prakosa 201605

Downstream portfolio - onshore

Engineering (FEED, Basic Eng & Detail Eng), Procurement, Construction and Installation

Engineering (FEED, Basic Eng & Detail Eng), Procurement, Construction, Installation and Commissioning

Page 14: Resume_P Prakosa 201605

Engineering and Fabrication

Design, Procurement, Fabrication / Construction and FAT

Design, Procurement, Fabrication / Construction, Installation and FAT

Page 15: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

OIL AND GAS SECTOR

A OFFSHORE a. CENDOR Phase 2

WHP B & C, A PETROFAC 2011-

2015 Lloyd's Register Technical ServicesMALAYSIA

Design Verification and Validation

b. WEST DESARU WSS

PETROFAC 2011-2015

Lloyd's Register Technical ServicesMALAYSIA

Design Verification and Validation

c. CENDOR Phase 2 WHP B & C, A

PETROFAC 2011-2012

DPS Sdn Bhd/Leighton Engineering ConsultantMALAYSIA

Detail Engineering Design

Page 16: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks d. D35 PG-A PETRONAS

Carigali Sdn Bhd

2010-2011

DPS Sdn BhdMALAYSIA

Detail Engineering for•Upgrading Liquid and Gas Metering System from Operation to Custody•Upgrading HVAC System

e. BNP-B AND BNDP-B

PETRONAS Carigali Sdn Bhd

2010-2011

DPS Sdn BhdMALAYSIA

Detail Engineering for Baronia Firewater System for two additional fire monitors at BNP-B and BNDP-B

Page 17: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

f. Angsi D satellite drilling platform associated pipeline and AnDP-D Host Tie-in at Angsi-A complex

PETRONAS Carigali Sdn Bhd / Exxon-Mobil Exploration

2010-2011

MMC EngineeringMALAYSIA

Conceptual and Detail Design

g. Angsi-C (AnDP-C) PETRONAS Carigali Sdn Bhd / Exxon-Mobil Exploration

2010-2011

MMC EngineeringMALAYSIA

Detail Design

h. Angsi-B (AnDP-B) PETRONAS Carigali Sdn Bhd / Exxon-Mobil Exploration

2010-2011

MMC EngineeringMALAYSIA

Conceptual and Detail Design

Page 18: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

i. Central Luconia, F29 AND F14 Tie-in at F23R-A Module 3

SARAWAK SHELL BERHAD

2009-2010

MMC AMEC Sdn BhdMALAYSIA

Pre-Front End Engineering Design

j. BTMP – B Platform SARAWAK SHELL BERHAD

2009-2010

MMC AMEC Sdn BhdMALAYSIA

Feasibility study on upgrading lifting capacity

k. TOTAL TP13A N/S EPSC1 GTS Gx & Mx and additional of AWHP Bx, Fx, Nx

TOTAL INDONESIE

2007-2008

PT. AMEC Berca INDONESIA

Detail Design Brownfield Production Facilities offshore projects

l. TOTAL TP11N EPSC13 Offsite Facilities

TOTAL INDONESIE

2007-2008

PT. AMEC Berca INDONESIA

Detail Design Brownfield Production Facilities offshore projects

Page 19: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks m. Block B-17 Carigali-

PTTEPI Operating Co. Sdn Bhd (CPOC)

2007 PT SENERGY PANTJA TEKNIKINDONESIA

Detail Design Brownfield Production Facilities offshore projects(Bid stage)

n. SUPG-G and SUJT-C

PETRONAS Carigali Sdn Bhd

2007 PT SENERGY PANTJA TEKNIKINDONESIA

Detail Design Brownfield Production Facilities offshore projects(Bid stage)

Page 20: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks o. Gas Compression

Upgrading Conoco PhillipsINDONESIA

2005 PT ISTANA KARANG LAUTINDONESIA

EPC Brownfield Production Facilities offshore projects

Page 21: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

OIL AND GAS SECTOR

B ONSHORE a. Work Area 1:

Omar, Tanak, and Thayyem

Al Furat Petroleum Company

2010-2011

DPS Sdn BhdMALAYSIA

Detail Design Brownfield Production Facilities onshore projects

b. Work Area 2: El Ward

Al Furat Petroleum Company

2010-2011

DPS Sdn BhdMALAYSIA

Detail Design Brownfield Production Facilities onshore projects

Page 22: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks c. Work Area 3:

Adra, Tishrin, Mahardi

Al Furat Petroleum Company

2010-2011

DPS Sdn BhdMALAYSIA

Detail Design Brownfield Production Facilities onshore projects

d. Tiaka Gas Facility ENERGY MEGA PERSADA

2005-2006

PT. EXPRO INDONESIA

EPC Brownfield Production Facilities onshore projects

e. Sepanjang Development

ENERGY MEGA PERSADA

2005-2006

PT. EXPRO INDONESIA

EPC Brownfield Production Facilities onshore projects

Page 23: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

f. Power Generation, Jabung Gas Booster Station

TRANSGASINDONESIA

2007 PT SENERGY PANTJA TEKNIKINDONESIA

EPC Brownfield Production Facilities onshore projects (Bid stage)

g. MIRI Crude Oil Terminal (MCOT) Rejuvenation

PETRONAS Carigali Sdn Bhd

2007 PT SENERGY PANTJA TEKNIKINDONESIA

Detail Design Brownfield Production Facilities onshore projects(Bid stage)

Page 24: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks h. TEG Dehydration

Skid Packages PERTAMINA

2007 PT SENERGY PANTJA TEKNIKINDONESIA

Detail Design Brownfield Production Facilities onshore projects(Bid stage)

i. Sales Gas Metering System

Amerada Hess

2007 PT SENERGY PANTJA TEKNIKINDONESIA

EPC Brownfield Production Facilities onshore projects (Bid stage)

Page 25: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

j. Sour Water Stripper package

Trans Pacific Petrochemical Indonesia

2007 PT SENERGY PANTJA TEKNIKINDONESIA

EPC Brownfield Production Facilities onshore projects (Bid stage)

k. Sand Collection and Desander Tank Skid Packages

UNOCAL 2006 PT SENERGY PANTJA TEKNIKINDONESIA

EPC Brownfield Production Facilities onshore projects

l. Replacement Heat Exchanger 22-E-03

BUKHARA REFINERY PLANT

2005 PT ISTANA KARANG LAUTINDONESIA

EPC Brownfield Production Facilities onshore projects

Page 26: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks m. Reconstruction 2

(two) Acid Flare @ 110 m height and 4 (four) HP Flares @ 50 m height

TURKMENISTANREFINERY PLANT

2005 PT ISTANA KARANG LAUTINDONESIA

EPC Brownfield Production Facilities onshore projects

n. Development Oseil Phase I

Kuwait Foreign Petroleum Exploration Company (KUFPEC)

2004-2005

PT ISTANA KARANG LAUTINDONESIA

EPC Greenfield Production Facilities onshore projects

o. Operating Field Facilities packages

EXXON MOBILINDONESIA

1997-1998

PT TRIPATRA ENGINEERING & CONSTRUCTORINDONESIA

EPC Greenfield Production Facilities onshore projects

Page 27: Resume_P Prakosa 201605

ExperiencesNo. Project involved Client Years Company Remarks

OIL AND GAS SECTOR

C FLOATERSa. Semisubmersible

Floating Production System (FPS) Gumusut Kakap

Shell 2012-2015

Lloyd's Register Technical ServicesMALAYSIA

Class and Verification

b. NGUJIMA YIN WOODSIDEAUSTRALIA

2013 Lloyd's Register Technical ServicesMALAYSIA

Class and Verification

c. Floating Production Storage Offloading – FPSO Intrepid

Rubicon Offshore International Pte Ltd

2007 PT. EXPRO INDONESIA

EPC Topside Production Facilities