review on deliverables and forward look
DESCRIPTION
Review on Deliverables and forward look. André van Es. Review of deliverables. Three levels of deliverables: Level 3: Deliverable at Tasks Level 2: Deliverable at Design Study Level 1: Deliverable at Project Level 0: Deliverable at Board Level - PowerPoint PPT PresentationTRANSCRIPT
André van Es2nd SKADS Workshop 10-11 October 2007
Review on DeliverablesReview on Deliverablesand forward lookand forward look
André van Es
André van Es2nd SKADS Workshop 10-11 October 2007
Review of deliverablesReview of deliverables
Three levels of deliverables:
Level 3: Deliverable at Tasks Level 2: Deliverable at Design Study Level 1: Deliverable at ProjectLevel 0: Deliverable at Board Level
We present progress in terms of the Level 0 deliverables
André van Es2nd SKADS Workshop 10-11 October 2007
DS-1DS-1ASTRONASTRON
University of University of ManchesterManchester
Observatoire Observatoire de Parisde Paris
DS-2DS-2Rijks Universiteit Rijks Universiteit
GroningenGroningenASTRONASTRONINAF-IRAINAF-IRA
MPIfRMPIfRUniversidad de ValenciaUniversidad de Valencia
CSIROCSIROSwinburneSwinburne
Leiden ObservatoryLeiden ObservatoryChalmersChalmers
OxfordOxfordUniversity of University of ManchesterManchester
Observatoire de ParisObservatoire de ParisCambridgeCambridge
University of MelbourneUniversity of MelbourneNatal UniversityNatal University
PRAO-LPIPRAO-LPIUniversity of LeedsUniversity of Leeds
University of GlasgowUniversity of GlasgowUniversity of AdelaideUniversity of Adelaide
DS-3DS-3University of University of CambridgeCambridge
ASTRONASTRON
University of University of ManchesterManchester
CSIROCSIRO
INAF-IRAINAF-IRA
University of University of OxfordOxford
Cambridge Cambridge UniversityUniversity
Observatoire Observatoire de Parisde Paris
National National Research Research
FoundationFoundation
DS-4DS-4University of University of ManchesterManchesterASTRON ASTRON
Observatoire Observatoire de Parisde ParisINAF-IRAINAF-IRAFG-IGNFG-IGN
University of University of OxfordOxfordCSIROCSIRO
National National Research Research CouncilCouncil
University of University of CambridgeCambridge
University of University of OrléansOrléansCNRSCNRS
OMMIROMMIR
DS-5DS-5ASTRONASTRON
University of University of ManchesterManchester
Observatoire Observatoire de Parisde Paris
JIVEJIVE
INAF-IRAINAF-IRA
MPIfRMPIfR
Oxford Oxford UniversityUniversity
CSIROCSIRO
National National Research Research
FoundationFoundation
UMKUMK
University of University of CambridgeCambridge
OMMICOMMIC
DS-6DS-6INAF-IRAINAF-IRA
ASTRONASTRON
JIVEJIVE
CSIROCSIRO
Univ. SydneyUniv. Sydney
DS-7: DS-7: University of Manchester, Observatoire de ParisUniversity of Manchester, Observatoire de Paris
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-1Review on deliverables: DS-1
Deliverable/ Milestone No
Planned (in months)
Achieved (in months)
Deliverable/Milestone Name
DS1 1. 1-oct-05 Nov-05 Organize kick-off DS1 2. 1-oct-05 1-jan-06 Implement adequate management tools DS1 - ongoing Continuous coordination and management DS1 - ongoing Continuous assessment and control DS1 3 1-Nov-05 30-June-
06 Document on outreach policy
DS1 4 1-Apr-05 1-Oct-05 Establish web-page DS1 5 1-Nov-05 1-Feb-06 Document on IPR Policy DS1 6 1-Apr-06 4-Sep-06 SKADS international workshop 2006 DS1 7 1-Apr-07 10-Oct-07 SKADS international workshop 2007 DS1 8 1-Apr-08 Sep 08 SKADS international workshop 2008 DS1 9 1-Apr-09 Sep 09 SKADS international workshop 2009
André van Es2nd SKADS Workshop 10-11 October 2007
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-2Review on deliverables: DS-2
Nominal
Completion Date
Actual/ Planned
completion Date
Milestone
DS2 1 1-jun-07 1-jun-07 Conclusion on Science Drivers
DS2 2 1-dec-08 1-dec-08 Conclusion on Year in the Life for different SKA realizations
DS2 3 1-jul-08 1-jul-08 Optimised Configuration for the SKA
DS2 4 1-mei-09 1-mei-09 Demonstration of new calibration and imaging Techniques
André van Es2nd SKADS Workshop 10-11 October 2007
A Report and Proceedings...A Report and Proceedings...
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-3Review on deliverables: DS-3
Nominal
Completion Date
Actual/ Planned
completion Date
Milestone
DS3 1 30-jun-08 31-dec-08 Delivery of prototype phase transfer link DS3 2 31-dec-08 31-dec-08 Development cost of model for the network DS3 3 30-mei-09 30-mei-09 Report on technology roadmapping and costing DS3 4 1-jul-07 1-jul-07 Delivery of framework for functional simulator DS3 5 30-mei-09 30-mei-09 Report on network achtitecture DS3 6 30-jun-08 30-jun-08 Overview reports on site selection DS3 7 31-dec-08 31-dec-08 Final reports on site selection DS3 8 30-jun-08 30-jun-08 Reports on SKA for the user
DS3 9 30-dec-05 30-dec-05 Model driven architecture specification of control and data processing
DS3 10 30-jun-08 30-jun-08 Report MDA constructs, interfaces and platforms DS3 11 30-dec-07 30-dec-07 report on scalable platform specific composition DS3 12 30-jun-08 30-jun-08 MDA assessment and scalability recommendations
André van Es2nd SKADS Workshop 10-11 October 2007
SKADS Design & Costing SKADS Design & Costing Paper (SKA Memo 93)Paper (SKA Memo 93)
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-4Review on deliverables: DS-4
Nominal
Completion Date
Planned Completion Milestone
DS4 1 30-dec-06 done SiGe band pass filter using PIC technology prototype DS4 2 30-dec-07 31-dec-08 ADC performance evaluation
DS4 3 1-jul-07 1-jul-08 Hybrid LNA first devices
DS4 4 1-jul-06 1-jul-08 Inventory of RFI mitigation techniques and applicability to SKA
DS4 5 1-jul-07 1-jul-08 Evaluation of impact of moving interference sources on SKA DS4 6 31-okt-07 1-mrt-08 Characterised antenna element DS4 7 1-mrt-08 1-jul-08 antenna element with integrated MMIC prototype
DS4 8 1-jul-07 1-mrt-08 Simulated Digital beamformer for 2-PAD
DS4 9 30-dec-06 done Prototype low cost SiGe analogue beamformer DS4 10 29-dec-08 2-feb-09 Prototype complete 2-PAD digital tile
DS4 11 30-jun-09 30-jun-09
Final reports on semiconductor technologies, RFI mitigation strategies, antenna element design, digital beamformer design 2-PAD performance (T1-T6)
André van Es2nd SKADS Workshop 10-11 October 2007
Prototype of Low Cost SiGe Prototype of Low Cost SiGe BeamformerBeamformer
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-5Review on deliverables: DS-5
Nominal
Completion Date
Planned Completion Milestone
DS5 1 30-dec-05 30-dec-05 Completion of System Requirements DS5 2 1-mrt-06 15 May-06 Design Review of First Tile
DS5 3 1-jul-06 1-jul-06 Delivery of first manufactured tile
DS5 4 1-mrt-07 1-okt-07 completion of 10 tile system DS5 5 31-mei-08 1-sept-2008 completion of first 100 tiles DS5 6 1-jan-09 1-jan-2009 completion of m anufacturing of all tiles
André van Es2nd SKADS Workshop 10-11 October 2007
EMBRACE 10 tile prototypeEMBRACE 10 tile prototype
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-5Review on deliverables: DS-5
Nominal
Completion Date
Planned Completion Milestone
DS5 1 30-dec-05 30-dec-05 Completion of System Requirements DS5 2 1-mrt-06 15 May-06 Design Review of First Tile
DS5 3 1-jul-06 1-jul-06 Delivery of first manufactured tile
DS5 4 1-mrt-07 1-okt-07 completion of 10 tile system DS5 5 31-mei-08 1-sept-2008 completion of first 100 tiles DS5 6 1-jan-09 1-jan-2009 completion of manufacturing of all tiles
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-6Review on deliverables: DS-6
Nominal
Completion Date
Planned Completion Milestone
DS6 1 1-jul-06 done Design Report on Analog Optical link DS6 2 30-apr-07 done Design Report on Analog and digital optical link
DS6 3 31-aug-08 31-aug-08 Report on data handling for large telescopes
DS6 4 30-sep-08 30-sep-08 Wide band high dynamic range A/D FX correlator, small
prototype DS6 5 30-sep-08 30-sep-08 Software beamforming and multibeaming on BEST-x DS6 6 30-sep-08 30-sep-08 Algorithms for RFI mitigation DS6 7 1-jul-08 1-jul-08 Calibration methods for large array DS6 8 30-sep-08 30-sep-08 report on High sensitivity astronomical tests
André van Es2nd SKADS Workshop 10-11 October 2007
BEST Report on optical linksBEST Report on optical links
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS-7Review on deliverables: DS-7Task number Deliverable
No Deliverable Name Planned
(in months)
Achieved (in months)
DS7-T1 1 SKADS Quarterly Report Q4/2006
19 19
DS7-T1 2 SKADS Quarterly Report Q1/2007
22 22
DS7-T1 3 SKADS Quarterly Report Q3/2007
25 25
DS7-T1 4 SKADS Quarterly Report Q4/2007
19 19
DS7-T1 5 SKADS Quarterly Report Q1/2008
22 22
DS7-T1 6 SKADS Quarterly Report Q3/2008
25 25
DS7-T1 7 SKADS Quarterly Report Q4/2008
19 19
DS7-T1 8 SKADS Quarterly Report Q1/2009
22 22
DS7-T1 9 2007 Annual Report to International SKA Project Office
24 25
DS7-T1 10 2008 Annual Report to International SKA Project Office
24 25
DS7-T1 11 2009 Annual Report to International SKA Project Office
24 25
André van Es2nd SKADS Workshop 10-11 October 2007
A Quarterly Report...A Quarterly Report...
André van Es2nd SKADS Workshop 10-11 October 2007
Updated PlanUpdated Plan
Prior to 2nd Annual Report project planning was updatedAll Design Studies submitted new milestone/deliverable
tableNew milestone dates were discussed and agreed with DS
leadersSKADS on track to finish on 30th June 2009
André van Es2nd SKADS Workshop 10-11 October 2007
Deliverables/Milestones planned Deliverables/Milestones planned (update 2(update 2ndnd annual report) annual report)
Level 0 Deliverables
0
10
20
30
40
50
60
0,5 1 1,5 2 2,5 3 3,5 4
Time
Tot. N
r. of
Deli
vera
bles
Planned (DoW)Current Plan
André van Es2nd SKADS Workshop 10-11 October 2007
Next 18 months Next 18 months (major milestone for each DS)(major milestone for each DS)
DS2: Final Report on SKA configurationsDS 3:
– Implementation of Cost and Functional simulator tool– Selection of networking and computing technologies
DS 4: Completion of 2-PAD designDS 5: Build and first testing of EMBRACE at Westerbork
and Nancay (100 tiles)DS 6: BEST demonstrating beamforming and Hl sensitivity
astronomical testsDS 8 : First iteration of Overall System Design and Project
plan
André van Es2nd SKADS Workshop 10-11 October 2007
Review on deliverables: DS 8Review on deliverables: DS 8
Design Study 8 produces the major deliverables of the project (the focal and cohering point of SKADS):
1. Overall System Design2. Preliminary SKA Plan3. White Paper for the ISSC
It is the collection of all activities and will show and establish the direction towards the SKA