rio 2016 transport strategy - stadium:...

26
DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION Ancona Italy Sep/2011 RIO 2016 Transport Strategy

Upload: haanh

Post on 12-Feb-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATIONDEPARTMENT OF TRANSPORTATION

Ancona – Italy – Sep/2011

RIO 2016 Transport Strategy

Page 2: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

RIO METROPOLITAN AREA

Source: IBGE/IMF

Location: southeast of Brazil (57% of the GNP);

Area: 43,910 km² (0.5% of the country’s area)

Population: 15.4 million (8.4% of the country’s total)

GNP: US$ 185 billion (11.2% of Brazil’s GNP and US$ 6,000 per capita GNP)

Page 3: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

RIO METROPOLITAN AREA

Source: PDTU

20 municipalites

11 million people

19 million trips/day

12 million motorized trips(9 million in public transportation)

75% ofthe State

Page 4: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

REFLECTIONS ON BRAZILIAN ECONOMIC GROWTH

Brazilian fleet in 2010 – 64.8 million vehicles;

10% yearly growth in the last 4 years;

Brazilian population in 2010 was 190.7 million;

Country has an average of one car per 2.94 inhabitants;

Fleet will reach 120 million by 2020.

Page 5: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

CURRENT CONGESTION COSTS

Rio de Janeiro: yearly loss of R$ 12 billion10% of local GNP (Source: Coppe/UFRJ)

São Paulo: R$ 33.1 billion in losses in 20083 times more than in 2000 (Source: FGV/SP)

A professional worker is expected to lose 3 years of his life with daily 90 minute trips (Source: ANTP)

A Brazilian loses 5% of his productivity due totraffic congestions (Source: Citigroup)

Serious problems for work access and job opportunities (Source: World Bank)

Page 6: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

PROJECT AGENDA

2012 – Rio + 20 United Nations Conference on Sustainable Development;

2013 – Confederations Cup;

World Youth Journey;

2014 – Football World Cup;

2016 – Olympic Games

Page 7: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

GOALS FOR TRANSPORTATION - 2016

Trains

1 million passengers/day

Metro Lines 1+2

1.1 million passengers/day

Ferries

150,000 passengers/day

BRTs

1 million passengers/day

Metro Line 4374,000 passengers/day

Metro Line 3Operational

Page 8: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

METRO – PASSENGERS

mil

lio

n p

assen

gers

year

Page 9: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

Expansion of Line 1 until General Osorio Station;

Acquisition of 114 new rail cars;

Construction of Line 1A – Direct connection Pavuna-Botafogo;

Constructed Cidade Nova Station and initiated Uruguai Station, with news

concepts of accessibility;

Reforming stations, improving access for handicapped passengers;

Renovation of Operational Control Center;

Construction and operation of Line 4 – South Zone - Barra da Tijuca.

INVESTMENTS - METRO SYSTEM

Page 10: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

TRAINS – PASSENGERS

Map Lines

mil

lio

n p

assen

gers

Page 11: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

RAILWAY SYSTEM – UNTIL 2016

Already acquired 30 trains with delivery predicted for 2011;

Acquisition of another 90 trains for the World Cup 2014 and Rio 2016;

Reforming 89 Stations – concept of accessibility and sustainability;

Reforming 2 Large Train Maintenance Workshops;

Modernization of 94 trains – all with air conditioning;

Reforming electrification, control and signaling systems

Metrolization of railway operation system.

Page 12: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

FERRIES – PASSENGERS

Acquisition of new vessels

Reforming waterway terminals

Investments of R$ 300 million until 2016

mil

lio

n p

assen

gers

year

Page 13: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

INCREASE IN PASSENGERS

MeansPeriod

2006 - 2010 %

Ferries 7,269,784 4,2

Trains 30,521,696 17,6

Intercity buses * 106,922,254 61,7

Metro 28,559,129 16,5

Total 173,272,863 100

*2007 – 2010 Sources: DETRO and AGETRANSP

Page 14: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

NEW TECHNOLOGIES

Cable Cars – mobility and integration

Gondolas: 152

Capacity for gondola: 10 passengers

Cycle time: 38 minutes

Capacity: 30,000 passengers/day

Investment: R$ 495 million

Beneficiary population: 400,000 people

Service to 13 communities

Stations:6

Extension: 3,5 km

ww

w.e

mop.r

j.gov.b

rw

ww

.jb.c

om

.br

Page 15: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

NEW TECHNOLOGIES

Cable Cars – mobility and integration

First cables for mass transit in Brazil

Integration with the railway

Operating: 10h/day

Stations with public services, banks, post offices, etc.

ww

w.a

mante

sdafe

rrovia

.com

.br

ww

w.e

nsaio

sfr

agm

enta

dos.b

logspot.

com

Page 16: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

NEW TECHNOLOGIESRing of high performance transport

ww

w.r

io2016.n

et.

br

Page 17: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

NEW TECHNOLOGIESBus Rapid Transit - BRT

Transolimpica

Transcarioca

Transoeste

Transbrasil

Airport

Deodoro

Olympic Complex

Olympic Park

Olympic Village

Page 18: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

NEW FUELS

Biodiesel

Biodiesel with ethanol

Biodiesel with GNV

Pure GNV

Electric/Diesel Hybrid engines

GAS/DIESEL

BIODIESEL ELECTRIC/DIESEL HYBRID

Page 19: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

HOW DID WE REACH THESE NUMBERS?

Intercity One-Ticket Fare subsidy R$ 218

million (2010)

Fighting illegal transportation

Economic growth

Increase in trips = 173 million/year = 536,000 trips/day

Page 20: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

More than R$ 30 billion in investments;

Construction of 4 BRTs and Line 4 of the metro;

Modernization of the entire metro-rail system;

Reforming 89 stations and purchase of 594 rail cars.

OLYMPIC PLAN - 2016

Page 21: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

METRO LINE 4 - IPANEMA-BARRA

Contract signed on 02/25/10; Tunnel works started: September, 2010 Stations: 7 Extension: 16 km Expected demand: 450.000 passengers/day (2016) Cost: R$ 5,5 billion Start of commercial operation: December, 2015

ww

w.s

etr

ans.r

j.gov.b

r

Page 22: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

METRO LINE 4 - IPANEMA-BARRAw

ww

.setr

ans.r

j.gov.b

r

Page 23: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

First one-ticket system for a metropolitan area in the country;

Includes 20 municipalities within the Metropolitan Area;

First system in the world that connects the subsidy to the user’s identity;

Reduction from 74 to 12 bus fares in the Metropolitan Area.

INTERCITY TICKET w

ww

.parq

uenanci.com

.br

ww

w.lig

adonorio.b

logspot.

com

Page 24: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

INTERCITY TICKET

FGV Research (Oct/10):

Average savings of R$ 2.62 per user;

Over 50% reduction in amount of trips;

Increase in formal jobs from 71.0% to 72.15% (2009 – 2010).

265 thousand benefitted users/day (average)

Total subsidy of R$ 431.8 million

Average subsidy per user/day = R$ 2.71

727 thousand trips/day (average)

1.9 million users

423.4 million trips made

February/2010 to Sep/2011 (data from 05/09/11)

Page 25: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

Encourage the use of bicycles as a means of transportation

Sub-Programs Educational (awareness) Operational (infrastructure) Promotional (races, campaigns etc.)

Main Actions Implementation of bike paths Integrated bike racks Public bike systems Agreements with the Ministry of

Cities, Municipalities, Universities, Other state agencies and BID

RIO STATE OF THE BICYCLE

STATE OF THE BICYCLE

ww

w.s

etr

ans.r

j.gov.b

r

Page 26: RIO 2016 Transport Strategy - Stadium: Homestadium-project.eu/...de_Janeiro_State_Rio_2016_Transport_Strategy.pdf · RIO 2016 Transport Strategy. DEPARTMENT OF ... Serious problems

DEPARTMENT OF TRANSPORTATION

Thank You!

Tatiana Carius – [email protected]