Romanian experience and lessons learnt implementing SEVESO Directive. Francisc Senzaconi Magdalena Duta Ghergut. Romanian experience implementing SEVESO Directive. Starting 1 st of January 2007 Romania is an European Union Member State - PowerPoint PPT PresentationTRANSCRIPT

Romanian experience and lessons learnt implementing SEVESO Directive
Francisc SenzaconiMagdalena Duta Ghergut

Romanian experience implementing SEVESO Directive
Starting 1st of January 2007 Romania is an European Union Member State
The first transposition of Directive 96/82/EC - Seveso II was done in 2003
The subsequent legislation for implementing the directive’s requirements was draw up mostly before 2007
13.06.2014 Brussels 2

MINISTRY OF ENVIRONMENT AND CLIMATIC CHANGES MINISTRY OF INTERNAL AFFAIRS
CCNEGLEPA
NEPA NEG GIES
CIES
Romanian Competent Authorities
13.06.2014 Brussels 3

Steps for transposition
Assessment of the existing legal requirements Development of a National policy Development of an Action plan, incl. transposition with
deadlines, targets and clearly delegated responsibilities Drafting of the new legislation Assessment of the compliance with the EU requirements Impact assessment of the proposed legislation Twining project on the implementation of the legislation Twinning
Project RO 2002/2002/IB/EN-02 between Romanian MEWM and the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety;
Final endorsement of the legislation
13.06.2014 Brussels 4

How the cooperation works
Updating of the Seveso II operators inventory; Analyzing the documentation (Notification, MAPP, SMS
and SR); Common inspections; Land use planning & Domino Effects; Testing of EEP’s; Investigation of major accidents; Technical assistance for operators; Common reports to national CA’s; Participating in environmental licensing procedures.
13.06.2014 Brussels 5

Analyzing the documentation
The interface with operators is LEPA (the only exception is for emergency planning)
Which part?Documentation is assessed by all authorities, each of them
coming with its own expertise
How?Each authority assess the whole SR regarding the
completeness and correctness; During the assessment, before the finalization of the written
answer to the operator, it is organized least one common inspection for verification of the SR.
13.06.2014 Brussels 6

Problems faced in implementation
Immediately after de transposition of the
directive in 2003: lack of experience,
lack of institutional capacity,
lack of training
lack of trust and cooperation between the authorities.
13.06.2014 Brussels 7

Lessons learnt – steps for a good cooperation
Agreements between CA’s
Regular meetings between CA’s;
Establishing of national CCA and TWG’s (with industry, with
other authorities and only with CA’s);
Building a common strategy for the implementation of
Seveso II Directive requirements at national and local level;
Review and update the legal framework together;
Common training activities;
13.06.2014 Brussels 8

Lessons learnt – steps for a good cooperation
Exchanging information in COMAH domain;
Participating together to the seminars, conferences, workshops in Seveso II field;
Common investigation in case of some complex incidents occurrence
at the request of local CA’s;
Technical assistance in the assessment of some complex SR’s at the
request of local CA’s;
Common audits of local subordinated structures;
Accessing EU funds through common project on implementation of
Seveso II Directive requirements.
13.06.2014 Brussels 9

Lessons learnt - threats and challenges
Threats:
Economical recession – shut down of factories
Reorganization of public institutions – loosing of administrative
capacity
Loosing of trained human resources – lowering of technical
capacity
Tendency to forget the disasters happened in the past – operators
concentrate more on business and less on industrial safety
Challenges:
The very young personnel in the Seveso domain
New industrial domains
13.06.2014 Brussels 10

Programme for the Prevention, Preparedness and Response to Man-made and Natural
Disasters in the ENPI East Region (PPRD East)
SEVESO Directives Capacity Development Regional Workshop – April 22-24, 2013, Moldova Sub-regional workshop (Armenia, Georgia and
Ukraine) – September 23-27, 2013, Ukraine Sub-regional workshop (Azerbaijan, Belarus and
Moldova) – December 2-6, 2013, Belarus Exchange of Experts – April 28 – May 1, 2014, Brasov,
Romania
13.06.2014 Brussels 11

Objectives
To introduce the specialists from the Eastern Partnership Countries in the COMAH field,
To achieve an understanding of the scope of Seveso Directive, To achieve an understanding of definitions/ terminology, To describe and outline the main requirements and future
challenges in this field; To introduce the participants in the field of implementation of
Seveso Directive requirements, To outline the importance of legislative, administrative and
operational capacities for the implementation of Seveso Directive requirements and the cooperation between them.
13.06.2014 Brussels 12

Objectives
If in the regional workshop there were presented and discussed all the requirements of Seveso Directives in the sub-regional workshops all the work was concentrated more on practical implementation issues.
The exchange of experts workshop on Seveso Directives held in Brasov, Romania was aimed to present the way in which the Romanian competent authorities implemented the requirements of the Seveso Directives, an important part of the time being dedicated to practical exercises (testing of an Internal Emergency Plan and an External Emergency Plan at two upper tier Seveso establishments). There were also simulated two inspections and the participants played an important role in performing them.
13.06.2014 Brussels 13

Results
Theoretical training in the main COMAH aspects; Almost all issues presented and discussed in the
theoretical part of the programme were putted into practice, offering an applied training;
A vivid discussions and exchanges of opinions as well as sharing of experience between participants and between countries;
Creating the premises for team work between different authorities of the same country;
13.06.2014 Brussels 14

Results
Creating the premises for a good transboundary cooperation through working in mixed teams of representatives from different countries;
Increasing the knowledge of the participants in organizing / planning inspections and emergency response exercises;
Increasing the knowledge of participants in assessing the documentation in the field of COMAH (Notification, PPAM, SR, IEP, EEP, LUP).
13.06.2014 Brussels 15

Possible issues to be considered for the phase II of PPRD-East
Help for transposition, implementation and adaptation of the national legislation to the Seveso Directive into participant countries;
Help for capacity building and raise the inter-institutional interest and cooperation for the Seveso Directive implementation;
Training on the connection of Seveso II Directives with other EU Directives for a broader view on industrial safety;
13.06.2014 Brussels 16

Possible issues to be considered for the phase II of PPRD-East
• Developing trainings programmes for:– Seveso inspections;– Emergency planning in case of major accidents involving
dangerous substances;– Industrial accidents investigation;– Support to elaborate a training programme for CA’s based on
accidents happened in industry;– Risk assessment, risk measurement and acceptable risk;– Land-use planning in the context of Seveso Directives;
• Risk mapping and data bases• Programmes for rising up the public implication and
involvement in the COMAH domain
13.06.2014 Brussels 17

13.06.2014 Brussels 18