rtc2012-confidence in the final geometry – detailed coordination, prefabrication, multi- trade...

74
RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi-Trade Preassembly John Mack Herrero Contractors, Inc

Upload: connor-elman

Post on 29-Mar-2015

215 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

RTC2012-Confidence in the Final Geometry – Detailed Coordination,

Prefabrication, Multi-Trade Preassembly

John Mack

Herrero Contractors, Inc

Page 2: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

John Mack

• VDC / BIM Department Manager at Herrero Contractors, Inc.

• 26 years in the construction industry• Last 3.5 as a general contractor• Previous 22.5 years in the mechanical and plumbing

industry• Doing BIM/VDC for 18 years

– Union trained plumber– Ran detailing department for two large mechanical

contractors– Helped design software for third party AutoCAD and

Project Management programs• Been involved with Lean Construction for 7+ years.• Participate with Lean Construction Institute (LCI),

Center for Integrated Facility Engineering (CIFE) and Project Production Systems Laboratory (P2SL).

• President of the San Francisco Navisworks User Group (SFNUG).

Page 3: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

• Established 1955

• Second Generation Family Owned Business

• Areas of Operation: Northern California and anywhere else our customers take us

• Construction Employers Association’s safety award for the past four years

• Primary focus is Integrated Lean Project Delivery

• Providing Preconstruction and Construction Services

• All Projects Done Using VDC

• Full Time VDC Employees

Higher Education

For Other Examples Visit Our Website at www.herrero.com

K-12 Schools

Healthcare

Hospitality

Historical Restoration and Renovation Affordable Housing

Residential

Retail

Tenant Improvement

Page 4: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Topics

• Qualifying the Background Models• Establishing the Team• Building Coordination

– Few RFI’s and Change Orders During Construction• Layout• Fabrication, Delivery and Installation

– Cost Savings in the Field• More Prefabrication• Just in Time Delivery to Field• Smaller Crews Sizes

o Better Safety• Better Field Productivity• Less Rework

Page 5: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Qualifying the Background Model

Page 6: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

• Does the model match the dimensions• Can the model be used for clash avoidance / building

coordination• Can we use the model for model based quantity takeoff• Can we use the model for model based estimating• Can we use the model for time based field simulations• Can we use the model for field layout• Is the architect willing to partner with us to make the

model usable for any of the above items that do not work

Qualifying the Background Models

Page 7: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Does the model match the details and dimensions

Page 8: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Can this model be used for Clash Avoidance

Page 9: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Can we use this model for model based quantity takeoff or model based estimating

Page 10: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Can we use this model for time based field simulation

Page 11: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Can we use this model for field layout

Download

Layout

Draw

Page 12: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Will the architect partner with us to build one model to meet all needs

Page 13: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Using the Models for Building Coordination

Page 14: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Bringing the Team Together

• The lingering question…”When do we bring the trade partners on board?”– Current methods suggest that TPs are brought on during CD phase– Sometime in during late SD to Early DD is best to start qualifying the models

and documents

• What trade partners are needed early?– Steel Fabricator, Metal Framer, HVAC (wet and dry), Plumber, Fire Protection,

Electrical, Dry Wall, Data and Security Wiring (cable tray)– Steel Fabricator is the most important to bring on to eliminate redraw based on

structural installation. This is a top reason for redraw

• Why are the TPs needed?– Work with design team to make model and drawings reflect the actual

construction– Start team building between trades, builders and designers to get in tune with

the project at an early phase to speed up the construction– Minimize RFI’s and Change Orders during construction

Page 15: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

The Collocate or Not

• The Collocation Benefit– Shared server allows for real time drawing updates.– Coordination is done all week long while modeling.– Ease of communication with other trades in room.– Shared resources such as plotter, printer, fax, etc.– Good to have a place for a projection screen.

• If no Collocation– Establish set coordination meetings once a week that everyone

can meet online. 1st & signoff meeting in person– Understand that more than one meeting a week is disruptive to

model production.– Look into setting up some kind of distance collaboration for

non-meeting days.

Page 16: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Creating the Model

• Define the purpose of the model.– Why are you building a model?– What do you want to gain from it?

• Electronic Data Exchange.– How are you going to exchange data? FTP, Buzzsaw, Projectwise, some web based

software, CDRom’s using sneaker net.– Get access setup for everyone as soon as possible.

• Eliminate Waste– Try to draw in series instead of in parallel.

• Establish a point that the drawing of the model changes hands from design team to construction team that works for your project.

• This will vary on every project based on team expertise and schedule.– Use products like Navisworks on a projector screen for clash detection instead of light

tables.• More precise and less time needed.

• Keep Trade Partners Working and Same Pace

Page 17: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Mindmap for Model Usage

Page 18: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Planning the Process• Model the Problems You Need to Solve• Defining Information Needed• Data Hand-Off vs. Collaboration• Reduce Redundant (or Un-needed) Information• Define Data Exchange Methods Early• Set achievable goals for team and assign to performers

Page 19: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Issues / Questions• Development of explicit handoffs between team members• Tracking of the latency of responses during the design

coordination process• Development of explicit process goals and value stream at

the beginning of the process (purpose of model, prefab etc.)

Page 20: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

• Level of detail drawn in model.– Dependant on what phase the of project.

• Hangers, supports and seismic.• Misc. metals• Small pipe and conduit.• Structural steel bracing and gussets.• Junction / Pull boxes.• Bus duct.

– Carry over lessons learned from past projects on what worked and did not work.

– What the team feels is valuable.• Caution!!

– Too much detail can cause CPU crashes.– Software seems to be ahead of the hardware.– All 3d project may result in floor plans to be broken down into small pieces

to be productive.• Avoid crashing and slow drawing regeneration.

– Vista 64 bit seems to help, but not a full solution.

Establishing Level of Detail

Page 21: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Tracking Level of Detail

Page 22: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Use Tolerances Between Trades to Build it Real-Must Have Accurate Models

Page 23: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Using the Model for Layout

Page 24: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Laser Guided Layout: Total Station

A total station is an optical instrument used in modern surveying. It is a combination of an electronic theodolite (transit), an electronic distance measuring device (EDM) and software running on an external computer

Page 25: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Background with survey points

Page 26: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Background with layout and survey points-3876 points to layout

Page 27: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Total Station Setup

Tripod and Beam Clamp Usage

Page 28: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Layout on metal deck

• Left Picture: Sheet Metal Strap• Right Picture: Pipe Hangers

Page 29: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Lesson Learned: Must Haves• Proper training from vendor is a must• Do not change crews if possible• Use composite crew to save multiple setups in same area• Teach the user how to add points to the layout in the field• General Contractor buy in

– Control lines from G.C.– Scheduled time for Total Station layout to minimize floor congestion

• A couple hard dimensions for manual verification• Mount unit as solid as possible – minimal vibration

• ACCURATE DRAWN MODELS to for Layout Dimensions

Page 30: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Lessons Learned: Pros (Pluses)• Saves time in field• Saves time detailing

– No need to dimension drawings.

• Layout is accurate– Do not have tape measure growth

• Trades can layout a floor simultaneously (using composite crews)

Page 31: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Lessons Learned: Cons (Deltas)

• Setting up the unit multiple times to cover an area can be time consuming.

• Information can be lost if system crashes.• Limitations due to “line of sight” usage.• Movement of floor can cause disruptions of

service.• Too many people in area can be frustrating• Unit limited to file size.• Shiny objects interfere with the beam.• Too many boxes to keep track of. We built a

custom gang box just for storage for the Total Stations.

Page 32: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Using the Model forFabrication, Delivery and Installation

Page 33: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc
Page 34: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Pre-fab from 3-D Model & Just InTime (JIT) Delivery

1. 3D Model of Plumbing System2. Bill of Materials from 3D Model 3. System assembled on site

• More confidence in pre-fab due to accurate 3D modeling• Right material at the right time• 50% more plumbing pre-fab than conventional

Page 35: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Piping Trade Partner Using the Models

Page 36: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Bench Fabrication

Page 37: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Cart Loading

Page 38: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Loading Process Rack Cart

Page 39: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Loaded Process Cart Rack

Page 40: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Labeling

Page 41: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Delivery Truck

Page 42: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Pick to Building Floor

Page 43: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Field Installation

Page 44: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Process Rack Installed

Page 45: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Plumbing Trade Partner Using the Models

Page 46: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Bundled Pipe for Fabrication (Left)Plumbing Fabrication (Right)

Page 47: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Fabricated Plumbing (Left)Capped for Shipping (Right)

Page 48: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Water Closet Wall Fabrication

Page 49: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

HVAC Trade Partner Using the Models

Page 50: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Model Plan View of Building Floor

Page 51: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Section Drawing for Fabrication

Page 52: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Sheet Metal Spool Sheet

Spool sheet are used for sectioning and field installation. Pieces not sectioned are labeled, placed into carts with floor and building area marked on cart. This drawing accompanies material to jobsite. Later generation of spool sheets include column lines for field installation.

Page 53: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Duct Tower

When large duct is “sectioned”, the duct tower is used. The tower allows assembly of 25’ sections by one person, without the possibility of injuries due to heavy lifting.

Page 54: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Sectioned Duct for Delivery to Field

Sectioned duct, labeled by floor, bldg. area and download number as defined on the spool sheet. All sectioned duct is sent to the site with wheels for ease of jobsite mobility.

Page 55: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Duct Wheel Assembly

Duct wheel assembly. Wheel attaches to duct at the TDC, TDF or Duct-Mate flange and is held in place with a “vice-grip” c-clamp welded to the wheel assembly.

Page 56: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Duct Wheel Assembly Sealed for Delivery

Page 57: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Duct Cart Sealed for Delivery

Page 58: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Duct Section Delivered to Field

Page 59: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Multi-Trade Partners Using the Model

Page 60: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Model Plan View of Area for Fabrication

Page 61: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Cut Sheet for Parts Comes Directly from 3D Model

Page 62: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Parts Cut on Plasma Cutter

Page 63: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Fabricated Part

Page 64: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Fabricated Part Attached to Purchased Coil

Page 65: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Label to Track Quality of Part

Page 66: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Assembly Line

Page 67: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Cut Copper Pieces for VAV Fabrication

Page 68: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Valve and Control Kits Ready to be Placed on VAV

Page 69: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Complete VAV Assembly: Trades are Piping, Sheet Metal and Controls

Page 70: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

VAV Cart Ready to Ship

Page 71: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

VAV Assembly Installed in Field

Page 72: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Less Rework = Savings for Owner

• Field Installation is an Exact Match to Model• Re-work only 43 hours out of 25,000 hours • HVAC Contractor had over $750K of labor savings on $9.04

Million GMP contract

Page 73: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Worth Repeating

• Partner Early• Plan Properly• Have the correct subs on board at start of project

– Minimum = Mechanical, Plumbing, Fire Protection, Electrical, Data, Steel Fabricator, Metal Framer

• Track commitments• All trades to provide a 3d model representing actual

installation• Keeping all subs drawing at the same pace• BIGGEST: General Contractor participation and enforcement

of coordination

Page 74: RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc

Questions?

John Mack Herrero Contractors, Inc.