s42021-a124-z34-4-7631

20
Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 1 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name Installation instructions for SIPAC-S cable connector IDC - 1/2SU, 1SU Contents Page 1 SIPAC-S cable connector dimensions 2 ½ SU, 1 SU height 55 and 1 SU height 77 2 2 Standard cable (balanced), special coax cable up to 2 Mbit/s for ½ SU 3 2.1 Balanced cable 3 2.1.1 Cable preparation 3 2.1.2 Securing cable 3 2.2 Special coax cable (7 single cables), installation in China 4 3 Standard-/special coax cable up to 34 Mbit/s for ½ SU 5 3.1 Standard coax cable (max. 4 single cables) 5 3.1.1 Cable preparation 5 3.1.2 Securing cable 5 3.2 Standard coax cable for ½ SU (7 single cables) 6 3.2.1 Cable preparation 6 3.2.2 Securing cable 6 3.3 Special coax cable (max. 4 single cables) 7 3.3.1 Cable preparation 7 3.3.2 Securing cable 7 3.4 Special coax cable (7 single cables) 8 3.4.1 Cable preparation 8 3.4.2 Securing cable 8 4 Standard/special coax cable up to 155 Mbit/s for ½ SU and 1 SU 9 4.1 Standard coax cable for ½ SU 9 4.1.1 Cable preparation 9 4.1.2 Securing cable 9 4.2. Special coax cable for ½ SU, installation in China 10 4.2.1 Cable preparation 10 4.2.2 Securing cable 10 4.3 Standard coax cable for 1 SU, height 77, (max. 4 single cables) 11 4.3.1 Cable preparation 11 4.3.2 Securing cable 11 4.3.3 Assembly sequence contact block 12 4.3.4 Assembly sequence with max. 4 single cables and PCB 13 5 Fitting contacts to balanced cable and coax cable, assembly, tools 14 5.1 Contact fitting tool for ½ SU and 1 SU cable connector 14 5.2 Cutting tool for coax cable 14 5.3 Formerly used contact fitting tools 15 5.4 Setting conductor/wire diameter 16 5.5 Preparation coax cable 16 5.6 IDC fitting contact pins 17 5.7 Assembly of contact lamellae container, screening housing 18 5.8 Disassembly of screening housing, removal tool for cable connector 19 5.9 Assembly of dummy/linking plug 20

Upload: hoang-hai

Post on 22-Feb-2015

104 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 1 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

Installation instructions for SIPAC-S cable connector IDC - 1/2SU, 1SU Contents Page 1 SIPAC-S cable connector dimensions 2 ½ SU, 1 SU height 55 and 1 SU height 77 2 2 Standard cable (balanced), special coax cable up to 2 Mbit/s for ½ SU 3 2.1 Balanced cable 3 2.1.1 Cable preparation 3 2.1.2 Securing cable 3 2.2 Special coax cable (7 single cables), installation in China 4 3 Standard-/special coax cable up to 34 Mbit/s for ½ SU 5 3.1 Standard coax cable (max. 4 single cables) 5 3.1.1 Cable preparation 5 3.1.2 Securing cable 5 3.2 Standard coax cable for ½ SU (7 single cables) 6 3.2.1 Cable preparation 6 3.2.2 Securing cable 6 3.3 Special coax cable (max. 4 single cables) 7 3.3.1 Cable preparation 7 3.3.2 Securing cable 7 3.4 Special coax cable (7 single cables) 8 3.4.1 Cable preparation 8 3.4.2 Securing cable 8 4 Standard/special coax cable up to 155 Mbit/s for ½ SU and 1 SU 9 4.1 Standard coax cable for ½ SU 9 4.1.1 Cable preparation 9 4.1.2 Securing cable 9 4.2. Special coax cable for ½ SU, installation in China 10 4.2.1 Cable preparation 10 4.2.2 Securing cable 10 4.3 Standard coax cable for 1 SU, height 77, (max. 4 single cables) 11 4.3.1 Cable preparation 11 4.3.2 Securing cable 11 4.3.3 Assembly sequence contact block 12 4.3.4 Assembly sequence with max. 4 single cables and PCB 13 5 Fitting contacts to balanced cable and coax cable, assembly, tools 14 5.1 Contact fitting tool for ½ SU and 1 SU cable connector 14 5.2 Cutting tool for coax cable 14 5.3 Formerly used contact fitting tools 15 5.4 Setting conductor/wire diameter 16 5.5 Preparation coax cable 16 5.6 IDC fitting contact pins 17 5.7 Assembly of contact lamellae container, screening housing 18 5.8 Disassembly of screening housing, removal tool for cable connector 19 5.9 Assembly of dummy/linking plug 20

Page 2: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 2 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

1 SIPAC-S Cable Connector Dimensions Screening approx. 60 dB

1) space for lettering

82,8

1)

77

0

65,4

11,518,5

5561,8

24 18,5

0

55

1) 1)

8 2

Contacts35 Press-in

Contacts

1

IDC45 Contacts

1e

aIDC20 Contacts

Coding gray

e

a

Coding gray

Coding gray

1/2 SU Height 55 1 SU

Height 77 1 SU

9e

a

4

Page 3: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 3 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

2 Standard cable (balanced); Standard-/ Special coax cable up to 2 Mbit/s for 1/2 SU 2.1 Standard cable (balanced) V42255-Z1001-A2 (S-09YS(St)CY 14x2x0.4/1.0) or V42255-Z1001-A4 (S-09YS(St)CY 4x2x0.6/1.2) or V42255-Z1001-A5 (S-09YS(St)CY 8x2x0.6/1.2) or Plug kit no. C50228-Z100-B102 for ½ SU 2.1.1 Preparing Cable • Strip back cable sheath. • Shorten shielding braid. • Remove filler and foil. • If shielding wire is not applied to contact, cut off. 2.1.2 Securing cable • Feed prepared cable through nut, sleeve and cable clamp. • Fold back shielding braid over sleeve. • Push cable clamp up to 0.5 +0.5 over Shielding braid and sleeve. • Using hand pliersV23599-M1015-C1, apply pressure to pressure zone of cable clamp. Pressure exerted manually approx. 30 Nm. For fitting contact blades see 5.6

Shielding braid

Cable Shielding braid

+13

Cable clamp

Collar

Pay attention to positionof cable clamp

Hand plirsV23599-M1015-C1

Page 4: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 4 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

2.2 Special coax cable for 2 Mbit/s, ½ SU, 7 single cables for installation in China Cable data as per sample shown: (Local ident. no. SYV-75-2-1, grey/beige) 75 Ohm; internal conductor diameter 0.34 mm; insulator diameter 1.9 mm; 1 braided screen; Outer cover diameter 3.2 +/- 0.2 mm; Color black Plug kit no. C50228-Z100-B402 for ½ SU 2.2.1 Preparing cable • Slide nut, collar and cable clamp on to each of the 7 cables in this order (approx. 200 mm). • Strip back 66 mm of sheath from each cable. Shorten screen braid to 12 mm, untwine it and fold it outwards by about 45 degrees. Shorten dielectric by 24 mm. • Slide 40 mm of Fa. Raychem heat-shrink tubing, ordering no. KYNAR 1/16-X, 5 mm over the dielectric and heat-shrink it over its entire length. • Fit all contacts as described in point 5.6, also fitting can be done with former tool point 5.3, sheet 15. • Push collar 57 mm forwards under the screening braid - note position! • Push all 7 untwined screening braids back over the collar. 2.2.2 Securing cable • Push cable clamp over the screening braid and align it so that it is at 90 degrees to the key face of the collar. Note position relative

to contact a when doing this! • Before crimping check dimension 57 mm. • Using hand pliers V23599-M1015-C1 press together the crimp zone of the cable clamp. Pressure exerted by hand approx. 30 Nm. • Cut of shielding braid at the edge of the collar. Install connector holder and screening housing as described in point. 5.7

66

12

Cable clampNut Collar

24

Coax cable

Screening braid

Dielectric

5

Heat-shrink tube

Conductor

57

1

4 ae

Cable clamp Contact lamellae a

Key face30 Nm

Cable clamp

Page 5: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 5 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

3 Standard-/special coax cable up to 34 Mbit/s for ½ SU 3.1 Standard coax cable up to 34 Mbit/s (max. 4 cables) • Cable ordering No. V42251-Z61-C5 02Y(St)CY 0.45/2,0 Plug kit no. C50228-Z100-B106 für ½ SU 3.1.1 Preparing cable • Strip back cable sheath • Fold back shielding braid over cable sheath. • Press down shielding braid (max. 4,2 mm) and cut to length, if necessary remove foil and filler. • Insert cable (max. 4) through nut and 4-section star. In the case of 2 cables arrange them to be

diagonally opposite. 3.1.2 Securing cable • Assemble cable clamp, cable and 4-section star. • Ensure that cable clamp is 1.5 mm from key surface • Use hand pliers V23599-M1015-C1 to apply pressure to crimping zone of cable clamp. Manual pressure needed approx. 30 Nm. ( ) Reference dimension For fitting contacts see 5.6

Coax cable

Max 4 cables

4-section starNut

min. 80

20

0...2

(O 4

,2)

Shown for 1 coaxial cableCable clamp

Note SW

Pay attention to positionof cable clamp

Hand plirsV23599-M1015-C1

Page 6: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 6 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

3.2 Standard coax cable up to 34 Mbit/s for ½ SU (7 individual cables) • Cable ordering No. V42251-Z61-C5 02Y(St)CY 0,45/2,0 Plug kit no. C50228-Z100-B102 for ½ SU 3.2.1 Preparing cable • Strip back cable sheath . • Feed 7 cables through nut and sleeve, untwine screening braid and fold back over sleeve. • If requested in manufacturing document, strip back stranded wire V45571-B110-H (AWG 24). Lay parallel to screening braid between sleeve and cable clamp. 3.2.2 Securing cable • Fit cable clamp over sleeve. Use hand pliers V23599-M1015-C1 to apply pressure to crimping zone of cable clamp. Pressure exerted by hand approx. 30 Nm. • Note position of cable clamp to key face. • Cut of shielding braid at edge of sleeve. For fitting contacts see 5.6

Nut Collar

Screening braid

Cable clamp

min. 70

Screening braid

1080

Wire

Pay attention to positionof cable clamp

Hand pliersV23599-M1015-C1

30 Nm

Page 7: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 7 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

3.3 Special coax cable up to 34 Mbit/s for ½ SU, max. 4 cables, for installation in China Cable data as per sample shown: 75 Ohm; internal conductor diameter 0,34 mm; insulator diameter 1,9 mm; 1 braided screen; Outer cover diameter 3.2 +/- 0.2 mm; colour: black Plug kit No.C50228-Z100-B406 for ½ SU 3.3.1 Preparing cable • Strip back cable sheath. • Fold back shielding braid over cable sheath. • Press down shielding braid and cut to length. • Insert cable (max. 4) through nut and 4-section star. For 2 cables, arrange cables to be diagonally

opposite. 3.3.2 Securing cable • Fix cables (max. 4) and 4-section star. • Use hand pliers V23599-M1015-C1 to apply pressure to crimping zone of cable clamp. Pressure exerted by hand approx.30 Nm. • Remove insulation up to 36 -1 mm. • Slide Raychem heat-shrink tubing, ordering no. KYNAR-1/16-X. 5 mm over the insulator and heat shrink over its entire length. For fitting contacts see 5.6

>-Coax cable

Max 4 cables

Nut 4-section star

20

80

(O 4

,2)

Cable clamp

1 Coax cable shown36 -1

405

Heat-shrinktubing

Note SW

Pay attention to positionof cable clamp

Hand pliersV23599-M1015-C1

Page 8: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 8 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

3.4 Special coax cable up to 34 Mbit/s for ½ SU, 7 single cables, for installation in China Cable data as per sample shown: 75 Ohm; internal conductor diameter 0.34 mm; insulator diameter 1.9 mm; 1braided screen; Outer cover diameter 3.2 +/- 0.2 mm; Colour: black Plug kit no. C50228-Z100-B402 for ½ SU 3.4.1 Preparing cable • Slide nut, collar and cable clamp on to each of the 7 cables in this order (approx. 200 mm). • Strip back 66 mm of sheath from each cable. Shorten screen braid to 12 mm, untwine it and fold it outwards by about 45 degrees. Shorten dielectric by 24 mm. • Slide 40 mm of Raychem heat-shrink tubing, ordering no. KYNAR 1/16-X, 5 mm over the dielectric and heat-shrink it over its entire length. • Fit all contacts as described in point 5.6, also fitting can be done with former tool point 5.3, sheet 15. • Push collar 57 mm forwards under the screening braid - note position ! • Push all 7 untwined screening braids back over the collar. 3.4.2 Securing cable • Push cable clamp over the screening braid and align it so that it is at 90 degrees to the key face of the collar. Note position relative

to contact a when doing this! • Before crimping check dimension 57 mm. • Using hand pliers V23599-M1015-C1 press together the crimp zone of the cable clamp. Pressure exerted by hand approx. 30 Nm. • Cut of shielding braid at the edge of the collar. Install connector holder and screening housing as described in point. 5.7

66

12

Cable clampNut Collar

24

Coax cable

Screening braid

Dielectric

5

Heat-shrink tube

Conductor

57

1

4 ae

Cable clamp Contact lamellae a

Key face30 Nm

Cable clamp

Page 9: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 9 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

4 Standard-/special coax cable up to 155 Mbit/s for 1/2 SU and 1 SU 4.1 Standard coax cable up to 155 Mbit/s for ½ SU Cable ordering no. V42251-Z61-C5 02Y(St)CY 0,45/2,0 Plug kit no. C50228-Z100-B106 for ½ SU 4.1.1 Preparing cable • Strip back cable sheath • Fold shielding braid back over cable cover and then fold it forwards again. Press down shielding braid. • Insert cable (max, 4) through nut and

4-section star. Where there are 2 cables, arrange them so

as to be diagonally opposite each other. 4.1.2 Securing cable • Using hand pliers V23599-M1015-C1, fix cable clamp, cable and 4-section star. Press together crimping zone of cable clamp. Pressure exerted by hand approx. 30 Nm. • Solder wire H50402-A509-A36, approx. 60 mm YV1x0.5/0.9 (ye/bl) to tinned shielding braid. If necessary remove foil and filler. Keep to soldering temperature and time

to a minimum.

Coax cable min. 80

Screening braid

max. 4 cables

20

0...2

4-section star

Nut

(O 4

,2)

28 -1

0,5 +0,5

Cable clamp

Pay attention to positionof cable clamp

30 Nm

Note SW 11,5

Hand pliers

Page 10: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 10 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

4.2 Special coax cable for 155 Mbit/s, 1/2 SU, for installation in China

75 Ohm; Inner conductor dia. 0.34 mm; insulation dia. 1.9 mm; 2 Screening braid; outer cover 4.2 +/- 0.2 mm

Use hand pliers V23599-M1015-C1 to fix cable clamp, cableand 4section star. Press together crimp zone of the cable clamp. Manual pressure exerted approx. 30 Nm.

If nessessery remove foil and filter Keep to minimum soldering temperature and time.

Remove dielectric to 32 -1 mm.

Slide 5 mm of Raychem heat-shrink tubing, ordering no. Nr. KYNAR-1/16-X, over the dielectric and heat shrink it over its entire length.

4.2.2 Securing cable

80

Coax cable 2 screening braids

4-section star>-

0.5 +0.5

Wire end collar

Cable clamp

"

4.2.1 Preparing cable

Strip back cable sheath

Insert cable (max. 4) through nut and 4-section star

Push back external screening braid

Push wire end collar DIN 46228-A4-9 between the two screens up to cable collar. Cut off external screening braid flush with rivet

Note SW11,5

Plug kit no. C50228-Z100-B406 für 1/2 SU

Cable data as shown in sample: (Local ident. no. SYV-75-2-2, black)

Nut

For fitting contacts see 5.3, 5.4 and 5.6

-

-

-

-

-

-

-

-

-

-

Solder wire H50402-A509-A36, YV 1x0,5/0,9(yellow/black) approx. 60 mm to sreening braid.

Pay attention to positionof cable clamp

Hand pliersV23599-M1015-C1

30 Nm

25 -132 -1

5

Solder point WireHeat-shrink tube

Page 11: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 11 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

4.3 Standard coax cable up to 155 Mbit/s for 1 SU, Height 77, (max. 4 cables in 4-section star) Cable ordering no. V42251-Z61-C5 02Y(St)CY 0,45/2,0 Plug kit no. C50228-Z101-B309 for 1 SU 4.3.1 Preparing cable

• Strip back cable sheath • Fold shielding braid back over cable cover and then fold it forwards again. Press down shielding braid. If necessary remove foil and filler. • Insert cable (max, 4) through nut and

4-section star. Where there are 2 cables, arrange them so

as to be diagonally opposite each other. 4.3.2 Securing cable • Using hand pliers V23599-M1015-C1, fix cable clamp, cable and 4-section star. Press together crimping zone of cable clamp. Pressure exerted by hand approx. 30 Nm. • Immersion-tin cable and shielding braid, cut to length and remove dielectric. If necessary remove foil and filler. *) Fit as per manufacturing document ( ) Reference dimension Pressing contact block see 4.3.3, soldering see 4.3.4 and manufacturing document.

>- 80

20

Cable clamp

3

0...2

Nut 4-section star

1,5

Screening braid

Max. 4 cables

Pay posituion to positionof cable clamp

HandzangeV23599-M1015-C1

Page 12: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 12 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

4.3.3 Assembly Sequence: Pressing contact block onto PCB Caution! only to be performed in the factory! Press contact block Onto PCB using the specified tool. If necessary equip PCB as per manufacturing document.

Page 13: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 13 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

4.3.4 Assembly of max. 4 single coax cables in 4-section star up to 155 Mbit/s Snap connectorized PCB into contact block holder. Insert assembled contact block holder into inner screening housing shell. Insert cable pre mounted in 4-section star into inner screening housing shell and tighten

manually with nut. Solder cable as per manufacturing document, screen and inner conductor onto PCB.

Loosen nut, push outer screening housing shell over preassembled inner shell; the two parts lock

together audibly. Tighten nut SW 17, with approx 5 Nm.

NutCable clamp

4-sction star

Inner sides butting

Solder lug

Contact block holder

Contakt blockPCB

Insert cable

Outer screening housing shell

Inner screening housing shell

Scrining braid solder

Coax cable

solder

Page 14: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 14 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

IDC-handpliers (without tool mounting) for 1/2 SU and 1 SU, for 75 Ohm coax cable(see point 5.2) and 120 Ohm balanced cable: ordering no. V23599-M1019-S101.

Ordering no. for table mounting incl. clamp: V23599-M1019-S103

5 Fitting contacts to standard/special cable, mounting, tools

5.1 Fitting tool for 1/2 SU und 1 SU cable connector

Cable holderfor 1/2 SU or 1 SU

Handgrip

On manufactoring a 75 Ohm standard coax cable V42251-Z61-C5, 02Y(ST)CY 0,45/2,0-75,is necessary. cutting tool with the Ordering no. V23599-M1019-S104

Tool is drawn opend, without tool mounting.

Cutting flap

Table mounting

Table

1 SU1/2 SUMark 1...8 Marking

1

Sliding wedge

Clamp

5.2 Cutting Tool for coax cable

Cutting edges

Page 15: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 15 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

5.3 Former fitting tools for ½ SU und 1 SU

1

Ordering no.V23599-M1019-S1 for 1 SU - bal. cable V23599-M1019-S 31 for 1 SU - coax cableV23599-M1019-S2 for 1/2 SU - bal. cable V23599-M1019-S 32 for 1/2 SU - coax cable

Sliding surfaceOrdering no. V23599-M1018-S10

Height 12 mmWidth 160 mmDepth 230 mm

Hand press

Travel safety device

Angle-shaped cableseperator

Cutter

Separatingcomb

Holding pockets

Cable holder

Mark 1...8

Sliding wedge Marking

Contact fitting tool

Lever with securing screws Ordering no. V23599-M1019-S5

Page 16: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 16 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

-

- Handgrip and cutting slap turn to theright side.

Lay the prepared cable in the cable holderand tighten by hand with the nut.

The cutting flap and tool handgrip turn tothe left side.

Release trigger at the Handgrip until stop.More handgrip and cutting flap to the rightand remove the cable.

-

-

-

For fitting contact blades see 5.6

The single cable core is to be put in thecompart slide.

Cutting toolpartiell viewcable holder

Nut

5.4 Set conductor/wire diameter

Dependent on the wire core used, the imprinting depth is to be by shiftingthe sliding wedge between marks 1...8.The sliding wedge can be losed by the both hexagonal-headed screws.The mark settings are given in the table.

5.5 Preparation of the coax cable 75 Ohm, dielectrica cut on both sides.Tool ordering no. V23599-M1019-S104

Table

Contact element ID Diameter Conductor/wire

Mark 1...8

Cableordering number

Remarks

Standard cable M 0.6/1.1 1 V42255-Z1001-A5

V42255-Z1001-A48x2x0.6/1.24x2x0.6/1.2

M offset (bare)/0.45 4 V42251-Z61-C5 Coax 0.45/2.0 S 0.4/1.0 3 V42255-Z1001-A2 14x2x0.4/1.0 S 0.4/1.0 3 V42255-Z1001-A7 8x2x0.4/1.0Special cable

S 0.34/1.9 7...8 For installation inChina

Single coax,1 screening wire

S 0.34/1.9 7...8 For installation inChina

Single coax,2 screening wires

S 0.28/1.6 7...8 For installation inChina

8 x coax 0.28/1.6

Page 17: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 17 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

5.6 IDC-Contact lamellae fitting with tool ordering no. V23599-M1019-S101 (Equal manufacturing steps as used with forma tools: V23599-M1019-S1, -S2, -S31, -S32) Handgrip, cutting slap and the angle-shaped cable separator turn to the right side. Lay the prepared cable in the cable holder with the crimping zone of the cable clamp

pointing upwards and tighten by hand with the nut. ------------------------------------------------------------------------------------------------------------------------------------------------------- Notes for special coax cable for installation in China: Note insertion dimension in separating comb of the tool. ------------------------------------------------------------------------------------------------------------------------------------------------------- Insert contact with opening towards the separating comb at 1. The angle-shaped cable separator turn to the left side. Start with contact a. Lay wires as per manufacturing documents in separating comb and

angle-shaped cable separator and press down into clamp slit.

When ready, the cutting slap und handgrip turn to the left side. Release trigger at the Handgrip until stop. More handgrip and cutting flap to the right and remove the cable.

1Trigger

Angle-shapedcable separator

Outer angle-shapedpiece with cutter

hand grip

Cable holderfor 1/2 SUor 1 SU

shown 1/2 SU

By using the 1 SU:turn stop to diownward position

IDC-Contact element Contact lamellae

0,5 +1Insert dimension

Separating comb

Cable holderAngle-shapedcable separator

Clamp slit

Fittig tool partiell viewshown 1 SU

Cable clamp

Page 18: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 18 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

5.7 Assembly of contact lamellae container Assemble five contacts, wired as per manufacturing documents, in the sequence shown a...e and insert into the contact lamellae container (black). Contacts must face open side. Place cover (gray) over contact lamellae container. Assembly of the screening housing Snap closed contact-part holder into inner screening housing shell. Push outer screening housing shell over preassembled inner shell until the two parts audibly lock. Screw tight nut SW 12 - with torque of 3.5 Nm in the case of ½ SU. Screw tight nut SW 17 - with torque of 5 Nm.

1/2 SU 1 SU

abcde

Con t a c t l a m e l l a e cont a i n e r ( b l a c k )

Co v e r ( g r a y )

Contact lamellae

I n n e r c o n t a c t

N u t

Locking catch

Contact lamellae

e

Screening h o u s i n g s h e l l

a bcd

Outerside Innerside O u t e r s i d e I n nerside

Page 19: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 19 + 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

5.8 Disassembly tools Cable connector opener for disassembling the screening housing for ½ SU and 1 SU - ordering no. V23599-M5025-E10

Unscrew the

nut from the cable connector. Use the tool for opening the screening housing to hook on the lamellae side in between the both screening housing parts. During untighten the locking catch you can remove the housing parts. Unplugging tool for the ½ SU und 1 SU cable connector For to loosen the plugged connector push the unplugging tool in between the cable connector and the adapter-bridge and untighten the locking catch. Now the cable connector is removable. Unplugging tool for ½ SU Cable connector Ordering no. V23599-M5029-U3 Handgrip for the above tool with the length 250 mm. Ordering no. V23599-M8001-U2 Unplugging tool for 1 SU Cable connector Ordering no. V23599-M5029-U1 Handgrip for the above tool with the length of 250 mm. Ordering no. V23599-M8001-U2

1/2 SU shown

Cable connector - OutsideCoding gray

Cable connector opener

Handgrip

Unpluggingtool

Handgrip

Unpluggingtool

25

Page 20: S42021-A124-Z34-4-7631

Copyright © Siemens AG 1995 All rights reserved Installation Instructions for SIPAC-S cable connector Datum 15.05.95 Name Berkmüller Installation Instructions 04 28.04.04 And Gepr. 03 J351K77174 17.12.97 Sei Norm 02 J071K77774 12.03.97 Sei ICN CP 01 H145K16274 24.05.96 Zo Sheet 52 13.03.96 Zo Siemens AG S42021-A124-Z34-*-7631 20 - 51 15.05.95 Lie 20Sh. Iss. Change Notice Date Name

5.9 Assembly of dummy/linking plug ½ SU, 1 SU height 55 Kit no. C50228-Z101-B208 for ½ SU If required prepare contacts as per factory document, e.g, with wire links. Assemble prepared contacts in sequence shown a.. e and insert into contact-part holder- Contacts face open side. Place cover on contact-part holder. Snap closed contact-part holder into inner screening housing shell. Push outer screening housing shell over preassembled inner shell until the two parts audibly lock. Plastic cover

Cover

Contacts

Plastik contact-partholder

ea

1 SU shown

1SU shown

Locking catch forcontact-part holder

Inner screening housing shell

Outer screening housing shell

Plastic cover