    SITE DEVELOPMENT

    Basin Design

    Planning & Zoning

    Site Layout & Parking

    Design

    Utility Layout

    Sewer Pump Station

    Drainage Impact Study Water Quality Studies

    REAL ESTATE

    ROW Acquisition

    River Rd ROW Mapping

    STRUCTURES

    Elevated Roadway

    Casino loading dock

    Levee transition ramps

    Basin T-Wall

    TRAFFIC

    Impact Study

    Roundabout Design

    Signal Permitting

    HIGHWAY

    Geometrics

    Permanent Signing Striping

    Drainage Design

    Roundabout Design

    Construction

    Administration

    SURVEY

    Boundary

    Topographic

    ALTA

    River Rd ROW Mapping

    CIVIL WORKS

    DOTD Inspection

    PROJECT MANAGEMENT

    Client Interface

    Permitting

    Utility Coordination

    Railroad Coordination Pipelines

    Architectural Interface

    Sub-consultants

    Cultural Resources

    Geotech

    Hydraulics Lighting

    Stantec Baton Rouge

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    3/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    4/34

    SiteSelection

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    5/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    6/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    7/34

    Concept Evolution

    30,000 sf gaming floor

    1,500 slot machines

    50 gaming tables

    Poker Tables

    Multipurpose event center

    Restaurants

    206 guestrooms

    Rooftop pool

    Covered parking garage

    Unique venues overlooking River

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    8/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    9/34

    Project Timeline

    06.17.09: Council Approval of Original Concept10.28.09: Original Corps Submittal

    10.29.10: Modified Corps Submittal

    10.28.11: Notice from DOTD to CNIC RR11.22.11: River Road Final Acceptance

    10.22.10: Planning Approval of Revised Concept04.30.10: Original Corps Approval

    09.27.11: Corps Approval of Modifications12.09.10: DOTD Approval of River Rd Relocation

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    10/34

    Critical Approvals

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    11/34

    Planning ApprovalZoning Approval (PUD)

    Site Master Plan Traffic Impact Study

    Drainage Impact Study

    Planning Commission &

    Council Approval

    Final Development Plan

    Traffic Mitigation Plan(City & State approval req.)

    Parking Layout Approval

    Conceptual Plan forUtility Services

    Circulation Plan

    Landscaping

    Planning Commission

    Approval

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    12/34

    Permitting & Coordination:

    USACE

    Section 10:Working Riverside

    404:

    Working in the Wetlands

    Area (Batture)

    Cultural ResourcesInvestigation

    USACE Divisions Involved:

    Hydraulics, Geotech, Levee,

    Wetlands, Cultural Resources

    Section 10 (Working on

    Batture) 404 Permit Wetland Impact

    Mitigation

    Coast Guard Approval

    River Pilot Approval

    OCPR Approval Ponchartrain Levee District

    Approval

    Cultural Resources

    State Historic Preservation

    (SHPO) Approval

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    13/34

    2 Historic Plantations on Site

    Cultural Resources

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    14/34

    Over Bags of Relics were One of the largests 'digs' in the state of Louisiana

    Relics found will be displayed at LSU Rural Life Museum

    gathered and documented2,000

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    15/34

    Elevated Roadway

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    16/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    17/34

    Permitting & Coordination:

    LADOTD

    Traffic Impacts

    Intersection

    Improvements

    River Road Relocation

    Cooperative Endeavor

    Agreement

    Road Lighting DistrictVegetation

    Enhancement Permit

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    18/34

    Traffic Impacts

    Study of 15+ Mile Radius

    Gardere at River RoadGardere at NicholsonNicholson at BluebonnetBurbank at Bluebonnet

    Perkins at SeigenPerkins at Bluebonnet

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    19/34

    Other Coordination:

    Canadian National RailroadConstruction Plans &

    Modifications

    Memo of

    Understanding

    $500,000Deposit

    Permits for Signal

    Pre-emption

    ROW ValuationUpdate

    Project Notification

    Package

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    20/34

    Utilities Impacted

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    21/34

    River Road Relocation

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    22/34

    River Road Relocation

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    23/34

    Cooperative Endeavor Agreement

    Pinnacle to Provide Design Engineering

    Relocation of Utilities

    Construction ofImprovements

    Contract

    Administration

    Construction Inspection

    DOTD Review/Approval of

    Plans

    Issuance of ApplicablePermits

    Monitor Construction

    Final Inspection

    Right of Way Exchange

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    24/34

    Roundabouts

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    25/34

    Vegetation

    EnhancementPermit

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    26/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    27/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    28/34

    Throughout the project planning process,

    Stantec coordinated with the following agencies:

    Louisiana Department of Transportation & Development

    Planning Commission

    Department of Public WorksArmy Corps of Engineers

    Pontchartrain Levee District

    Coastal Protection & Restoration Authority

    US Coast Guard

    State Historic Preservation Office

    Illinois Central/Canadian National Railroad

    Pipeline Companies

    Gulf State Utilities

    Baton Rouge Water Company

    Cox Communications

    AT&T

    Agencies Involved

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    29/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    30/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    31/34

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    32/34

    Corps of Engineers restricts construction

    when Carrollton gage reaches elevation 11

    March 1st: 8 below 50-yr avg

    March 30th: 4 above 50-yr avg

    July 15, 2011: Contractor is allowed to proceed

    SPRING

    2011

    FLOODS

  • 7/29/2019 S63 LAuberge Casino Project LTC2013

    33/34

    Sept 2010March 2011April 2011June 2011Aug 2011Dec 2011

    May 2012

    September 2012

    CONSTRUCTIONCOMPLETE