Safety Management and Safety Management and Certification on Singapore Certification on Singapore Longest Road Tunnel Longest Road Tunnel - - Kallang Kallang and Paya Lebar Expressway and Paya Lebar Expressway (KPE) (KPE) Presenter Presenter - - Roger Lim Roger Lim Land Transport Authority (LTA) of Singapore Land Transport Authority (LTA) of Singapore

Upload: others

Post on 11-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Safety Management and Safety Management and Certification on Singapore Certification on Singapore

Longest Road Tunnel Longest Road Tunnel -- Kallang Kallang and Paya Lebar Expressway and Paya Lebar Expressway

(KPE)(KPE)

Presenter Presenter -- Roger LimRoger LimLand Transport Authority (LTA) of SingaporeLand Transport Authority (LTA) of Singapore

Page 2: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Presentation OutlinePresentation Outline

Project OverviewProject Overview

LTA Safety Certification Process for Road ProjectsLTA Safety Certification Process for Road Projects

KPE Safety Objectives & Management.KPE Safety Objectives & Management.

Challenges of Implementing Safety ManagementChallenges of Implementing Safety Management

Benefits Derived from KPE Safety ManagementBenefits Derived from KPE Safety Management

ConclusionConclusion

Page 3: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

KPE Project OverviewKPE Project Overview

KPE Route Map

E&M Systems

Environmental Measures

Operation Measures

Page 4: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

KPE Route Map

Kallang Section

Paya LebarSection

VB-A

VB-B

VB-CVB-D

VB-E

VB-F

Page 5: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

E&M Systems

Tunnel Ventilation & Environmental Control System (TV&ECS)

Fire Protection System (FPS)

High and Low Voltage Electrical Distribution Systems (ES)

Integrated Traffic and Plant Monitoring Systems (ITPMS)

Communications System (CS)

Lifts and Hoist Systems (L&HS)

Page 6: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Environmental Measures

Key areas of environmental concerns are:

Land use

Air & Water Quality

Noise & Vibration

Visual Impacts

Page 7: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Operation Measures

Regulations on Prohibitions

Restrictions in Tunnel

Public Education

Page 8: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Tunnel with Base Lighting Installed

Page 9: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Cross Section Showing Ventilation Ducting

Page 10: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Passenger Cross Passage Without Door

Page 11: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Passenger Cross Passage

Page 12: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Vehicle Cross Passage

Page 13: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

LTA Safety Certification Process LTA Safety Certification Process for Road Projectsfor Road Projects

Role of LTA and Its Safety Goal

Purpose of LTA Project Safety Review (PSR) Process

What is in the PSR Process for Roads?

Types of Safety Submission

Roles/Parties in PSR

Page 14: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Management agency for Ministry of Transport (MOT) on land transport infrastructure and systems.

Responsible for the design, construction, operation and maintenance of the public road structures.

Role of LTA

Page 15: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Strive for the highest standards of safety consistent with international best practices.

Believes that every accident is avoidable.

Aims to achieve zero accidents for all its projects.

LTA’s Safety Goals

Page 16: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Purpose of Project Safety Review (PSR) Process

To provide a staged, systematic and robust check and balance process on safety

management and assurance of new road projects throughout their project lifecycles

Page 17: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

What is in the PSR Process for Roads?

1. Four-stage safety certification process - concept/ preliminary, design, handover/ post-construction and operation readiness.

2. Emphasis on safety -roads design safety, Electrical & Mechanical (E&M) systems safety and operation safety.

3. Hazard Identification and Management.

4. A Project Safety Assurance Committee (PSAC).

5. Safety Submissions - Proof of Safety at Each Stage.

Page 18: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Types of Safety Submission

1. Roads Design Aspects

Preliminary Design Safety Submissions (PDSS)

Detailed Design Safety Submission (DDSS)

Temporary Traffic Control Safety Submission(TTCSS applicable for construction phase)

Post Construction Safety Submission (PCSS)

Page 19: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

2. E&M Aspects

Concept Safety Submission (CSS)

Design Safety Submission (DSS)

Handover Safety Submission (HSS)

3. Operation Readiness Aspects

Operation Safety Submissions (OSS)

Types of Safety Submission

Page 20: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Roles/ Parties in PSR

Four Main Roles:

Reviewer - LTA Project Team

Submitter - Roads - LTA Project Team- E&M - SAI Department- Operation - Operator

Auditor - Safety Department (SD)

Arbitrator/Endorser -PSR Committee (Roads) and Corporate Safety Committee (CSC)

Page 21: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

KPE Roads Operator

ROADS KPE Project Team

Systems Assurance & Integration

ENGINEERING

Safety

SAFETY & CONTRACTS

DEPUTY CE

CHIEF EXECUTIVE (CE)

CHAIRMAN

LTA Organisation Chart

Page 22: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Endorsement/Acceptance Process for Safety Submission

Safety submission made

Technical working groupAdvise

Safety submission re-submitted

Yes Yes

Yes

CorporateSafety Committee accepts the safety

submission?

No

No

No

Advise

Thesubmitter

accepts PSRCommittee (Roads)

decision?

Audit conducted

Audit report issued to the PSR Committee

(Roads)

PSRCommittee(Roads)

endorses/accepts the safety submission?

To implement commitments in the earliest possible time

Page 23: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

KPE Safety Objectives & KPE Safety Objectives & ManagementManagement

Project Safety Objectives

KPE Safety Management

Overview of Safety Activities

Page 24: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

KPE PROJECT SAFETY OBJECTIVES

Provide freedom from unacceptable risk for road users and that the levels of risk are acceptable in accordance with the KPE/LTA risk matrix.

Meet or surpass relevant standards such as NFPA 502 and/or BD 78/99.

Meet the requirements of Singapore statutory agencies. E.g. Fire Safety & Shelter Department (FSSD), Building & Construction Authority (BCA), Singapore Civil Defence Force (SCDF) and Traffic Police (TP).

Page 25: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

KPE SAFETY MANAGEMENT

ConceptConcept DesignDesign HandoverHandoverOperationOperation(Trial Run (Trial Run => Open)=> Open)

Road Road DesignDesign

E&M E&M SystemsSystems

OperatorOperator

PDSS(Preliminary)

DDSS(Detailed)

PCSS(Post Construction)

CSS(Concept)

PDSS(Preliminary)

Integrated

DSS(Design)

Integrated

DDSS(Detailed)

Integrated

HSS(Handover)

HSS(Handover)

POSS(Preliminary)

Pre-FinalOSS

OSS

Safety Submissions for the KPE Project

Page 26: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

LTA KPE Safety Committee (KSC)

Safety Team(Observer)

Project Director

Project Managers

(E&M/Civil)

Project Team

•KPE Operator•Traffic Management•Intelligent Transport Systems Centre

Engineering Team

E&M Systems•Systems Assurance & Integration •Signalling, Communications & Control•Mechanical & Electrical Services

Civil•Design Development (Roads Design)•Civil Design

Roads Team

Contractors

Civil

E&M & Systems Assurance Team

Page 27: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Overview of Safety Activities

Review of E&M contractors’ submissions on systems assurance (HAZOP, hazard analyses, Fault Tree Analysis (FTA), Failure Modes and Effects Criticality Analysis (FMECA), etc). Electromagnetic Compatibility (EMC), integrated test specification and plan,

Validate Specifications via Tests.

Contract Level Safety Activities

Page 28: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Deterministic AssessmentHAZOP (HAZard and Operability) Study and Hazard Analyses (on system and interface level)Hazard Management and Hazard Register/LogSoftware Safety AssessmentInspections and WalkthroughsIntegrated Testing and Commissioning (ITC)Operator’s Trial Running.

System Level Safety Activities

Page 29: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Challenges of Implementing Challenges of Implementing Safety ManagementSafety Management

Early Challenges with PSR Process

Safety Integrity Level (SIL) and Software Safety

Overall KPE System Risk Level

Operation Safety and Readiness

Page 30: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

Benefits Derived from KPE Benefits Derived from KPE Safety ManagementSafety Management

Greater Safety Awareness and Risk Management

Contract Specifications

Page 31: Safety Management and Certification on Singapore Longest ...€¦ · Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE) Presenter - Roger Lim

CONCLUSIONCONCLUSION

KPE - First Road Tunnels that Undergoes LTA Safety Management and Certification Process

Safety Provisions, Measures and Management are Commensurable with International Standards and Best Practices.

Experience Learnt enables LTA to Improve the PSR Process for Future Projects.