scaling up ppt

15
Scaling-Up Request for Proposals 2010-2011 Missouri Department of Elementary and Secondary Education (DESE) Missouri Integrated Model (MIM)

Upload: jensonr

Post on 30-Apr-2015

1.644 views

Category:

Education


0 download

DESCRIPTION

 

TRANSCRIPT

  • 1. MissouriIntegratedModel(MIM)
    Scaling-Up
    Request for Proposals
    2010-2011
    Missouri Department of Elementary and Secondary Education (DESE)
  • 2. Part I: About Scaling-Up MIM
    MIM districts can expand implementation of MIM to additional buildings or grade levels.
    A MIM elementary building may add an additional elementary building or add next grade levels as in a middle school building.
    A MIM middle school may add an additional middle school, an elementary building or a high school building.
    • DESE welcomes MIM districts to submit scaling-up plans for either an Exploration or Initial Implementation Phase.