Beach Replenishment in Seaford

Twice a year a firm of contractors arrive to redistribute the shingle in Seaford Bay.

The whole thing takes about three weeks and employs six earthmovers, two bulldozers and a digger.

Page 2: Seaford Beach Replenishment

Where is Seaford?Main direction of LSD

Newhaven Harbour Arm – prevents LSD –

Mouth of the River Ouse

At ebbing tides the river currents reverse LSD at the centre of the bay

note the beach west of the arm

Page 3: Seaford Beach Replenishment

Seaford Bay looking East.

The contractors move shingle from east of the bay (under Seaford Head) to the centre then from the west to the centre.

Page 4: Seaford Beach Replenishment

Bucket holds 18 m3

Note how the beach has been eroded here

Page 5: Seaford Beach Replenishment

View looking east

Note the severity of the erosion here

Page 6: Seaford Beach Replenishment

Trucks unloading shingle at centre of beach.

Page 7: Seaford Beach Replenishment

Bulldozer levels the beach.

Page 8: Seaford Beach Replenishment

View looking west – this beach has yet to be replenished.

Page 9: Seaford Beach Replenishment

View looking east –

beyond the bulldozer

where the beach has been replenished.

Page 10: Seaford Beach Replenishment

A Sunny Day in Seaford