GENERAL INFORMATION AND INSTRUCTIONS FOR USE: Boxes for pre-installation of air conditioning. Flush mounted in walls, ceilings and floors noncombustible, and recommended for a maximum voltage of 1,000 V AC or 1,500 d.c. Are made of termoplastic material ABS, halogen free. These boxes come with caps and a siphon for evacuation and displacement of the water produced by condensation during the work of a cold or heat pump. The siphon is made of PP thermoplastic halogen-free. For installation have windows to left and right for the placement of the siphon with drainage outlet and stoppers to prevent odors in the period in which the machine is not installed. -Degree of protection against impacts IK: 0.7. -Isolation voltage: 750 V. Test method voltage: 3,500 V. -Glow wire test 650 º. -Maximum and minimum temperature during installation: -25 ° C to 60 º C. -Tightening torque on screws: 0.50 Nm. The boxes are intended for use in an indoor enclosure, for electrical installations or similar. 12 SEQUENCE OF ASSEMBLING FIXING INSTRUCTIONS: The flush mounted boxes are fixing to the wall in the holes provided for such purpose, using cement mortar, plaster or plaster, placed so that they protrude from 5 to 8 mm, in this way when you plaster the wall, the box will be flush with the wall. For removing the lid, you have to do toggle with a screwdriver, between the box and the wall. Boxes for pre-installation of air conditioning

Upload: seavi-slu

Post on 06-Mar-2016

220 views

Category:

Documents


4 download

DESCRIPTION

Boxes for pre-installation of air conditioning

TRANSCRIPT

Page 1: Seavi 03 Boxes for pre-installation of air conditioning

GENERAL INFORMATION AND INSTRUCTIONS FOR USE: Boxes for pre-installation of air conditioning. Flush mounted in walls, ceilings and floors noncombustible, and recommended for a maximum voltage of 1,000 V AC or 1,500 d.c. Are made of termoplastic material ABS, halogen free. These boxes come with caps and a siphon for evacuation and displacement of the water produced by condensation during the work of a cold or heat pump. The siphon is made of PP thermoplastic halogen-free. For installation have windows to left and right for the placement of the siphon with drainage outlet and stoppers to prevent odors in the period in which the machine is not installed. -Degree of protection against impacts IK: 0.7. -Isolation voltage: 750 V. Test method voltage: 3,500 V. -Glow wire test 650 º. -Maximum and minimum temperature during installation: -25 ° C to 60 º C. -Tightening torque on screws: 0.50 Nm. The boxes are intended for use in an indoor enclosure, for electrical installations or similar.

12

SEQUENCE OF ASSEMBLING

FIXING INSTRUCTIONS: The flush mounted boxes are fixing to the wall in the holes provided for such purpose, using cement mortar, plaster or plaster, placed so that they protrude from 5 to 8 mm, in this way when you plaster the wall, the box will be flush with the wall. For removing the lid, you have to do toggle with a screwdriver, between the box and the wall.

Boxes for pre-installation of air conditioning

Page 2: Seavi 03 Boxes for pre-installation of air conditioning

REF. 23039

REF. 23038

REF. 23034

Pieces/packing: 10 Unit Price: 5,4720 €

SIPHON FOR BOXES REF. 23034 Y 23039

13

Measures mm: 300 X 100 X 60 Pieces/packing: 2 Unit Price: 12,2100 €

BOX FOR PRE-INSTALLATION OF AIR CONDITIONING 300 X 100 X 60 mm

Measures mm: 480 X 130 X 60 Pieces/packing: 2 Unit Price: 15,0500 €

Boxes for pre-installation of air conditioning

BOX FOR PRE-INSTALLATION OF AIR CONDITIONING 480 X 130 X 60 mm